1.0 GENERAL INFORMATION

1.1 Introduction

M/s. Radiance Realty Developers India Ltd. have proposed and constructed a residential building at Survey No. 87/1B1A, 86/1B in Okkiyam-Thoraipakkam village, SholinganallurTaluk, Kancheepuram District. Earlier we have submitted our application to SEIAA, dated 03.05.2013. Environmental Clearance has not been granted by SEIAA and the application has been delisted due to starting of construction at site without obtaining prior environmental clearance in violation of EIA Notification, 2006. As per the recent notification on the regularization of violation cases dated 14th March 2017, we would like to submit our proposal with the total built up area of 66279.13 Sqm for Environmental Clearance to the Ministry of Environment, Forests and climate change for the said project.

1.2 Contact details of the Project Proponent

Name & Contact Address: K. Kannadasan Assistant No. 480, , Khivraj Complex – II, 6th Floor, , .600035 E – Mail: [email protected] T: 044 - 43470970

1.3 Land Description

The area of the plot is 12302 sqm. It was a vacant land and has now been converted for Residential building. As per CMDA Master Plan, the site was classified under Industrial Use zone. Site is having flat terrain and soil has the capacity to absorb rainfall. The project site is located at 12°56'54.19"N latitude and 80°14'21.74"E longitude. The site is well connected by SH 49A (East) and SH 109 (North). The site is situated in Okkiyam-Thoraipakkam village, Taluk, Kancheepuram District. The environmental settings of the site are given below: Table 1: Details of Environmental Setting S. No. Particulars Details 1. Latitude 12°56'54.19"N 2. Longitude 80°14'21.74"E 3. Total Plot Area 12302sqm 5. Nearest Highway SH 49-A ()

7. Nearest Railway Station (3 Km, NW) 8. Nearest Airport Chennai International airport (8.5 km, NW) 9. Nearest (16 km, NE) 10. Nearest City Chennai(1 km, N)

1.4 Project Survey nos.

S. No. 87/1B1A, 86/1B Okkiyam-Thoraipakkam village, , Kancheepuram District

Land use map and Land ownership documents are enclosed in Annexure – I.

1.5 Local Regulation applicable for township and Area development

We are following the regulations of Chennai Metropolitan Development Authority (CMDA) as per Second Master Plan of Chennai Metropolitan Area 2026 -Volume II Development Regulations.

1.6 Litigation(s) pending against the proposed project and /or any directions or orders passed by any court of law/any statutory authority against the project is to be detailed out

No litigations are pending against the project.

2.0 PROJECT DESCRIPTION

M/s. Radiance Realty Developers India Ltd. has constructed a Residential building in Okkiyam-Thoraipakkam village, Sholinganallur Taluk, Kancheepuram District in the state of Tamil Nadu. Total Plot area is 12302 sqm. The total built-up area of the building is 66279.13 Sqm.

Salient Features of the project:

Particulars Details Project Name Mandarin Location Okkiyam-Thoraipakkam village, Sholinganallur Taluk, Kancheepuram District, Tamil Nadu. Type of project Construction for residential building Total Plot Area 12302 Sqm Total Built up area 66279.13 Sqm OSR 1384.17 Sqm Ground coverage 3351 Sqm Road & pavements 4114.17 Sqm Green Belt 1850 Sqm Surface parking area 1302.66 Sqm STP, Solid Waste Disposal and Other 300 Sqm Utilities Area Number of 3 blocks, tower 1 – Stilt+16 floors, tower 2 – Blocks/floors Stilt+13 floors with combined double basements and tower 3 – Stilt+9 floors Building Height 62.1 m Road Approach road – 200 ft- - Thoraipakkam Road in North and Rajiv Gandhi Road in the East. Nearest Railway Station Velachery(3 Km, NW) Nearest Airport Chennai International airport (8.5 km, NW) Nearest Harbor Chennai port (16 km, NE) Nearest Town (1.5 km, N) Parking facilities – 332 Two wheelers - 118 Power requirement 4102 kva Source of power TNEB Power backup 250KVA – 4Nos 125 kva – 1 no Water requirement Total water requirement: 273 Fresh water: 180 Recycled water: 93 Water Source CMWSSB Estimated 1980 persons population Project cost Rs. 121.98 Cr

2.2 Man power requirement:

Local labors from nearby areas were deployed for the project work. Nearly 100 – 200 skilled and unskilled laborers will be employed during peak construction period.

2.3 Land Use Area Break up: Table 2: Land use Break up

Details Area in (Sqm) a) Total Land Area 12302 b) Total Ground Coverage Area of Buildings 3351 c) Roads and Pavements Area 4114.17 d) Surface or open Parking Area (if any) 1302.66 e) STP, Solid Waste Disposal and Other Utilities Area 300.00 f) Greenbelt development Area (Should be Minimum 15%) 1850 g) OSR Area 1384.17 Built-up Area Breakup: Table 3.1: Basement

Total Built Parking (FSI Area) Non FSI Area up area Floor name Area Sqm Sqm Sqm Sqm

Basement 2 0.00 141.22 5387.97 5529.19

5304.94 Basement 1 0.00 955.76 4349.18

TOTAL 0.00 1096.98 9737.15 10834.13

Table 3.2 Tower - 1

Dwelling Built-up Built-up Units Area Built-up Area Area

Parking (FSI Area) Non FSI Area Area Total Built ‘Floor Name Sqm Sqm Up Area Stilt Floor 3.87 504.76 1636.84 2145.47 st 1 Floor 0.00 78.70 2089.47 2168.17 2nd Floor 1420.33 1524.13 10 103.80 0.00 3rd Floor 1420.33 0.00 1524.13 10 103.80 4th Floor 1420.33 0.00 1524.13 10 103.80 5th Floor 1418.51 0.00 1522.29 10 103.78 6th Floor 1418.51 0.00 1522.29 10 103.78 7th Floor 1420.33 0.00 1524.13 10 103.80 8th Floor 1420.33 0.00 1524.13 10 103.80 9th Floor 1420.33 0.00 1524.13 10 103.80 10th Floor 1420.33 0.00 1524.13 10 103.80 11th Floor 1418.51 0.00 1522.29 10 103.78 12th Floor 1418.51 0.00 1522.29 10 103.78 13th Floor 1420.33 0.00 1524.13 10 103.80 14th Floor 1420.33 0.00 1524.13 10 103.80 15th Floor 1420.33 0.00 1524.13 10 103.80 16th Floor 1420.33 0.00 1524.13 10 103.80 Total 21301.54 2140.38 3726.31 27168.23 150 Table 3.3 Tower – 2

Built-up Built-up Built-up Area Area Area Total Built Dwelling Floor Name Parking (FSI Area) Non FSI Area Up Area Units Area

Sqm Sqm (100%) Stilt Floor 0.00 310.13 1902.04 2212.17 1st Floor 0.00 76.36 2157.90 2234.26 2nd Floor 1425.30 103.79 0.00 1529.09 10 3rd Floor 1425.30 103.79 0.00 1529.09 10 4th Floor 1425.30 103.79 0.00 1529.09 10 5th Floor 1424.06 103.78 0.00 1527.84 10 6th Floor 1424.06 103.78 0.00 1527.84 10 7th Floor 1425.30 103.79 0.00 1529.09 10 8th Floor 1425.30 103.79 0.00 1529.09 10 9th Floor 1425.30 103.79 0.00 1529.09 10 10th Floor 1425.30 103.79 0.00 1529.09 10 11th Floor 1425.30 103.79 0.00 1529.09 10 12th Floor 1425.30 103.79 0.00 1529.09 10 13th Floor 1425.30 103.79 0.00 1529.09 10 Total 17101.12 1631.95 4059.94 22793.01 120

Table 3.4 Tower – 3

Built-up Built-up Built-up Area Area Area Total Built Dwelling Floor Name Parking (FSI Area) Non FSI Area Up Area units Area

Sqm Sqm (100%) Stilt Floor 0.00 286.32 296.58 582.90 1st Floor 506.07 38.47 0.00 544.54 10 2nd Floor 506.07 38.47 0.00 544.54 10 3rd Floor 506.07 38.47 0.00 544.54 10 4th Floor 506.07 38.47 0.00 544.54 10 5th Floor 506.07 38.47 0.00 544.54 10 6th Floor 506.07 38.47 0.00 544.54 10 7th Floor 506.07 38.47 0.00 544.54 10 8th Floor 506.07 38.47 0.00 544.54 10 9th Floor 506.07 38.47 0.00 544.54 10 Total 4554.63 632.55 296.58 5483.76 90

Table 3.5 Summary

Total Built Up Area

Floor (FSI Total Built Up Dwelling Non FSI Area Area) Parking Area Name Sqm Area units Sqm Basement 1 0.00 141.22 4349.18 4490.40 Basement 2 0.00 955.76 5387.97 6343.73 Tower 1 21301.54 2140.38 3726.31 27168.23 150 Tower 2 22793.01 17101.12 1631.95 4059.94 120 Tower 3 4554.63 632.55 296.58 5483.76 90

TOTAL 42957.29 5501.86 17819.98 66279.13 360

Total No of Dwelling Units 360

2.4 Occupancy Details The expected population of the residential building is 1980 persons and the details are given below. Table 4 Occupancy S.No Description Rate of Occupancy load 1 Residential Population 360 1800 Visitors & Maintenance 10% of total 2 180 staff population Total 1980

2.5 Source of Water and Consumption

During Construction Phase: Total water requirement consumed during the construction phase was about 25- 30 KLD, which were sourced through tanker supply.

During Operation Phase: Total water requirement estimated during the operation phase will be 273 KLD of which daily fresh water requirement for domestic use will be 180 KLD. Source of fresh water supply is CMWSSB.

Flushing water requirement = 86 KLD (STP treated water) Gardening water requirement = 7 KLD (STP treated water)

Water Requirement

The total water requirement during operation is 273 KLD. The wastewater generation from the project is estimated to be about 218 KLD. During operational phase the sewage generated will be treated in the proposed STP of 220 KLD. The treated water will be recycled for flushing & gardening. The estimation of water requirement and the water balance chart is shown in table below:

Table 5: Water Requirement and Water Balance - Occupancy Load Calculation

Occupancy S.No Description Rate of Occupancy load 1 Residential Population 360 1800 Visitors & Maintenance 10% of total 2 180 staff population Total 1980

Table 6: Water Requirement Calculation

Total Water Fresh water Treated water Project Occupancy Requirement Requirement Requirement Components load (lpcd) (lpcd) (lpcd)

Residential 243000 162000 81000 1800 Population ( 135 lpcd) (90 lpcd) (45 lpcd) Visitors & 8100 2700 5400 180 Maintenance staff (45 lpcd) (15 lpcd) (30 lpcd) Total 251100 164700 86400 Water requirement for Gardening purposes based on the Gardening 6475litres 6475litres area (1850Sqm (@ 3.5 litres/Sqm) Swimming pool top up 15000 15000 Total 272575 179700 92875

Summary of water Requirement: Total water requirement = 273 KLD Fresh water requirement for domestic purposes = 165 KLD Treated water requirement for Flushing purposes = 86 KLD Treated water requirement for Gardening purposes = 7KLD Swimming pool top up = 15 KLD WATER BALANCE Daily Fresh Water Requirement (180 KLD)

Domestic Non 132 218 KLD STP Flushing (80%)KLD 220 KLD 165 KLD Swimming pool 15 KLD 207 KLD

Domestic Flushing 86 KLD (86 KLD)

Gardening 7 KLD 7 KLD

To CMWSSB 114 KLD 114KLD

2.6 Power Requirement

The estimated power requirement during operation phase is about 4102 KVa and it will be sourced from the nearby TNEB grid which will be distributed through the transformers within project premises. For emergency purposes, it is proposed to use DG sets of following capacities:

. 250 KVa x 4 Nos. . 125 KVa x 1 Nos.

2.7 Solid Waste Generation

Solid waste would be generated both during the construction as well as during the operation phase. The solid waste expected to be generated during the construction phase will comprise of excavated materials, used bags, bricks, concrete, MS rods, tiles, wood etc. The following steps are proposed to be followed for the management of solid waste:

 Construction yards are proposed for storage of construction materials.  The excavated material such as topsoil and stones will be stacked for reuse during later stages of construction  Excavated top soil will be stored in temporary constructed soil bank and will be reused for landscaping of the proposed Residential plotted colony project.  Remaining soil shall be utilized for refilling / road work / rising of site level at locations.

Construction Waste

Construction Empty cement Waste, Broken bags, containers Excavated Soil bricks, waste etc., plaster

Topsoil conserved Used in re- filing, Sold to agency for for landscaping, raising site level recycling balance used in re- filling

Table 7: Typical Solid Waste Sources and Quantity of Generation during Construction

S. No. Sources of waste Type of waste Quantity Sand, concrete, gravel, stone, Generation at the rate 1 Non-Biodegradable bricks, plastic, metal and glass 40-50 kg/Sqm of 2 Paper and wood Biodegradable construction area

Operation Phase:

Municipal Solid waste:

As the proposed project is a residential building, the solid waste envisaged during its operation phase includes waste papers, paper cups & plates, kitchen waste and plastic wastes. As per the manual on municipal solid waste prescribed by Central Public Health and Environmental Organization (CPHEEO), the quantity of solid waste generated varies between 0.2 to 0.6 kg/ capita/day. Quantity of solid waste generated from the proposed residential building is given below:

Table 8.1: Solid waste calculation Total solid Project Occupancy Per Capita Waste S.No Components load generation generation Kg/day 1 Residents 1800 0.5 900 Visitors& 2 Maintenance 180 0.2 36 staff Total Waste Generation in Kg/day 936

3 STP dry Sludge - - 20

Source: Central Public Health and Environmental Engineering Organization (CPHEEO)

Table 8.2: Composition of waste

Quantity S.No Description Mode of treatment / disposal (Tons/day) Will be treated in organic waste convertor Biodegradable Waste within the project site. Manure generated will 1 (@60% of waste 0.562 be used for landscaping purpose within generated) project site. Non-Biodegradable 2 waste (@40% of waste 0.374 Waste will be sold to recyclers generated Will be used as a Manure for greenbelt 3 STP Sludge 20 kg/day development

2.8 Parking requirement

Table 9 No of two No. of Area allotted for Details wheeler parks parking in (SQM) parks 1) Total number of Car Parks in Basement-1 54 6 693.06

2) Total number of Car Parks in Basement-2 79 6 1005.56

3) Total number of car parks in Stilt 79 31 1080.80 4)Total number of car parks in Ground level 73 69 1302.66 (Surface parking) 5) Total number of car parks in First floor 47 6 605.56

Total number of Car Parks required as 327 99 CMDA norms Total number of Car Parks provided 332 118 4687.64 Traffic Management Plan at the Entry & Exit to the Project Site:

The project will have access through Pallavaram-Thoraipakkam road in the Northern boundary and Rajiv Gandhi road in the Eastern boundary. Internal roads of 8.0 m wide are provided within the site for smooth movement of vehicles. The parking plan & traffic circulation plan showing the entry and exit and the internal circulation is given in Site plan.

2.9 Type of building material to be used

Following building material were used at site:

S. No. Building Material 1. Coarse sand 2. Fine sand 3. Stone aggregate 4. Stone for masonry work 5. Cement 6. Reinforcement steel 7. Pipe scaffolding (cup lock system) 8. AAC fly ash blocks 9. PPR (ISI marked) 10. P.V.C. conduit 12. MDS, MCBs 13. PVC rain water down take 14. Joinery hardware- ISI marked 15. PVC waste water lines 16. S.W. sewer line up to main sewer

2.10 Environmental Liability of the site

Project site was initially a vacant land. Hence the land was not polluted and suitable for residential development.

2.11 Existing Structure/Type of Material Demolition Debris etc

There were no existing structures in the project site, as it was a vacant land. Hence there was no demolition/debris management involved.

2.12 Essential Topo sheets/Maps to be provided with ToR application

Google maps covering 1 km, 5 km and 10 km radius are enclosed in Annexure – III

2.13 Digital Elevation Model/ Contour Map

Contour Map is enclosed in Annexure - IV. Details of environmentally sensitive places, wind pattern will be included in the EIA Report. Detailed layout plan of proposed project development, approach roads, landscape, sewage disposal facilities and waste disposal etc., will be given. Lay out plan of built up areas with covered construction such as DG set rooms, transformer will be provided in EIA report. Requirement of natural resources such as water, sand, and wood will be used during construction stage. The required natural resources are planned to procure from the nearby local market. Master Plan enclosed as Annexure – II.

2.14 Site Selection and Planning

The project site is owned by M/s. Greaves Cotton Limited and they have nominated M/s. Radiance Realty Developers India Ltd. as the attorneys. The project site was a vacant land which is categorized as Industrial use Zone. Site selection was done based on proximity to local communities, ecologically sensitive areas Geo technical report will be covered in the EIA study.

3.0 DESCRIPTION OF THE ENVIRONMENT

Baseline studies are carried out to provide the detailed description of the existing ecosystem, landscape, infrastructure, cultural heritage and urban environment. A baseline study describes the initial state of the environment within the selected boundaries of the study area. Water quality, soil quality, vegetation pattern, ecology, socio-economic profile, land use, places of archaeological importance etc. will be included in the EIA report.

Study Area

The details about the existing environmental values are projected at each section in the form of the maximum and minimum values at each location and the measurement duration will be provided in the Map. The area of the study covers 10 km radius around the proposed site. To make the process easier, the entire zone is divided into two, namely the core zone comprising of the proposed construction project area and the buffer zone covering the remaining areas covered under the 10 km radius. Monitoring will be done within the study area and as per CPCB guidelines. Primary data collection will be in one season.

3.1 Land Environment

a) Topography

From the topographical point of view, contour levels, slope of the site, landform and terrain characteristics etc, is vital for the planning and implementation of environmental protection measures. Investigation Report on the topography will be enclosed in the EIA Report.

Methodology

The methodology and the study will envisage different Land Use and Land Cover (LULC) around the proposed project area. b) Soil From the environmental point of view of soil type and characteristics, permeability, Sub-soil permeability and the soil fertility etc, is vital for the planning and implementation of green belt development, as part of maintaining the ecological balance of the region. The physical, strength and type of the soil characteristics Geotechnical investigation Report will be enclosed in the EIA Report. To identify soil quality Ph, Electrical conductivity, Moisture content, Total Kjeldahl nitrogen as N, Phosphorous as P will be analyzed as per Indian Standards test Method.

3.2 Air Environment

For the Climatology data the nearest authoritative meteorological recording station is maintained by the Regional Meteorological Center at , Chennai. The basic meteorological parameters such as wind speed, wind direction, Temperature, Humidity and Rain fall are pertinent to the air pollution studies are those governing the transport and diffusion of the pollutants in the atmosphere and it will be covered in EIA report. Base line data of air pollutant parameters extending an area of 10 km from the project site will be

monitored at 7 locations. Ambient air quality parameters namely PM2.5, PM10, Nitrogen dioxide, Sulphur dioxide and Carbon monoxide, Ozone, Pb, NH3, Benzene, Benzo alpha pyrene, Arsenic, Nickel will be analyzed as per Indian Standards 5182 method.

3.3 Noise Environment

Noise Level Study

The main objective of noise monitoring in the study area is to establish the baseline noise levels and assess the impact of the total noise generated by the operation of the activities around it. The environmental impact of noise can have several effects varying from Noise Induced Hearing Loss (NIHL) to annoyance depending on loudness of noise. The environmental impact assessment of noise from construction activity, vehicular traffic can be undertaken by taking into consideration various factors like potential damage to hearing, physiological responses, and annoyance and general community responses. Noise survey should be conducted in the study area while covering 10 km distance from the project site. Noise monitoring will be undertaken for 24 hours at each location. Using hand held instruments sound Pressure Level (SPL) measurements and the levels were measured at all locations, recording for 5 minutes at each hour was taken for 24 hours continuously. The day noise levels have been monitored during 6 am to 10 pm and night levels during 10 pm to 6 am at all the sampling locations covered in the study area. The results will be produced as per the Noise Pollution (Regulation and Control) Rules 2000 – Ambient Air Quality Standards in respect of Noise.

3.4 Water Environment

Water quality

Water is a vital commodity for the survival of human beings, animals, and vegetation and also for the proper balance of the eco-system. As such any adverse impact on water quality due to the proposed construction will have serious consequences on the environment. Hence it is essential to study the water quality, water table, Rain water harvesting of the regime likely to b influenced by the project and allied activities as per TOR and MoEF, EIA Manual. The water quality of the study will be covered in EIA report.

Sampling and Analysis

Water sampling is to determine the existing quality of ground water around the project area and also to assess the impact from the proposed project. Sampling will be done by following standard guidelines for physical, chemical and bacteriological parameters. Analysis will be carried out by following methods prescribed in “Standard Methods for the Examination of Water and Wastewater (21st Edition)”. Samples will be collected from surface water body and bore wells in the study area. The site selection was done taking into account the drainage pattern and locations prone to water contamination. seven water sampling locations will be selected around 10 km distance from the project site.

3.5 Rain Water Harvesting

Keeping in mind the importance of water and it scarcity it is proposed to conserve water by rainwater harvesting by which the subsoil water condition / moisture content is maintained / improved to a great extent. Also it is proposed to harvest rainwater from the terrace area by collecting the same in a rainwater collection sump of suitable capacity and re-used for domestic purposes with the provision of a filtration unit. And the rainwater collected from open paved and landscape area will be collected in the storm water drain which is connected to Rainwater recharging pit; will be included in EIA report in detail.

Details of Recharge Trenches: Trench maintained all along the boundary, the depth of the trenches will be around 1.00 m. It is planned to remove the entire impervious layer to facilitate rain water recharge. The width of the proposed trenches is 1.5 m. Pebbles of different size will be provided in an ascending order in the tank and a layer of sand will be provided on top of the filter media. The rain water flowing through the open land, paved area and green belt area will be used for recharging to ground water through the above said trenches.

3.6 Biological Environment

Ecological survey will be done with the following objectives. 1. To carry out a systematic baseline survey of Flora and Fauna around 10 km radius of the study area. 2. To list the plants and animals present in the study area as per the classifications of MOEF, 3. To identify the impacts of the proposed expansion activities on the plants and animals, 4. To evaluate the impacts of the proposed action, and to propose Environmental Management Plan. Scope of the work involved 1. The study is required to be carried out as part of EIA study as per the guidelines of the Ministry of Environment and Forests (MOEF) and State Pollution Control Board (SPCB). 2. The study should be based on the systematic field survey and secondary data (One season). 3. The study will cover the following: Flora a) Area will be divided as core zone and buffer zone b) Listing of all species (scientific and local names) found in the study area - 10 km. Radius. c) Listing of species as per the following classifications: . Agricultural crops . Commercial crops . Plantation . Natural vegetation . Grass lands . Endangered species . Endemic species . Others d) Based on the above findings Impacts of the proposed expansion. e) Environmental Management plans to improve existing status of flora in the area.

Fauna a) Core and Buffer zone divisions b) Listing of all species in the study area of 10 km radius around the study area c) Schedule for each species as per the Wild Life (Protection) Act, 1972 and as amended subsequently should also be furnished. d) Zoological and local name of the species should be furnished e) Listing of species should be classified as: . Endangered species . Endemic species . Migratory species . Details of aquatic fauna a) Presence of endangered and endemic species should be supplemented by density.

3.7 Socio Economic

The methodology adopted for the present study is the review of secondary data (2011 Census and District Statistical Handbook) with respect to population, occupational structure and infrastructure facilities available in the region in 10 km radius area. The information on socio-economic aspects of the study area will be compiled from various other secondary sources, which include public offices, semi-government and government agencies and focused in the EIA report. 3.8 Solid Waste

Construction Phase: Solid wastes generated are characterized and quantified according to different activities due to proposed project during construction and operation phase. Major components construction waste includes Cement Concrete, Bricks, Cement Plaster Steel (from RCC, door/window frames, roofing support, railing of Staircase) Rubble, Stone (marble, granite, sand stone) ,Timber / wood and the Minor components are Conduits (iron, plastic), Pipes (GI, iron plastic), Electrical Fixtures (copper / aluminum wiring, wooden baton, bakelite / plastic switches, wire insulations), Panels (wooden , laminated), Others (glazed tiles, glass panes). Construction wastes generated is estimated to be about 40-60 kg/m2.

Usage of Excavated soil, prevention of soil contamination, raw material handling and storage and disposal will be covered in the EIA report.

4.0 SPECIFIC STUDIES

The energy consumption analysis and data sheets are as per the Energy conservation Building codes 2007/Bureau of Energy Efficiency. The total power requirement for the project and the number of required DG sets will be provided in EIA report in detail.

4.1 Transport

Please refer site plan which will include the connectivity existing and proposed road. Traffic survey data will be discussed in the EIA report.

4.2 Energy Conservation

Energy conservation will be one of the main focuses during the complex planning and operation stages. The conservation efforts would consist of the following:

Architectural design

 Maximum utilization of solar light will be done.  Maximize the use of natural lighting through design.  The orientation of the buildings will be done in such a way that maximum daylight is available.  The green areas will be spaced, so that a significant reduction in the temperature can take place.

Energy Saving Practices

 Energy efficient lamps will be provided within the complex.  Constant monitoring of energy consumption and defining targets for energy conservation.  Adjusting the settings and illumination levels to ensure minimum energy used for desired comfort levels. Behavioral Change on Consumption

 Promoting resident awareness on energy conservation  Training staff on methods of energy conservation and to be vigilant to such opportunities

Green Belt Development

It is proposed to have tree plantation along the periphery of the site and also to develop lawn and greenery inside the project area. The vegetation for the green belt will be selected from the native species adapted to the local environment. About 1850 Sqm of green area has been provided.

Landscaping has been taken care of in view of the environment and aesthetics of the surrounding areas. Stress has been laid on providing ample green areas in close conjugation to the hard areas in a manner, that the overall harmony and ambience is maintained. Landscaping takes into account the various aspects of the architectural design. Trees are proposed to be planted to form an integral part of the landscape plantation and their selection is based on their ability to provide shade, flowers and fragrance apart from their high-yielding growth pattern. The addition of shrubs, hedges and ground cover will add to the aesthetics and softness to the hard building surfaces.

5.0 ENVIRONMENTAL MONITORING PROGRAM

Table 10: During Operation Stage

Sl. No Item Parameters Frequency Location

1 Ambient Air SPM,RSPM,SO2,NOX Quarterly At major construction area Quality (total 5 stations) around periphery of the site 2 Noise Level Equivalent Noise Quarterly Near DG sets, Near STP, Level Db (A) Near Parking Area.

3 Exhaust from SPM, SO2 Quarterly Stacks of DG sets DG Set 4 Water Physical, chemical Quarterly  Ground water Analysis and Biological  Harvested water stored parameters in Tank (after treatment) 5 Waste water PH, BOD, COD,TSS, Quarterly  Before and after Analysis TDS, Oil and gas treatment from STP All parameters shall be monitored; compilation and reporting will be done by NABL Accredited Laboratory. 6.0 ADDITIONAL STUDIES

6.1 Risk Assessment and Disaster Management Plan

Risks in the complex will be due to natural calamities like earthquake, flooding and others such as fire and accidental hazards. All precautions will be taken to control these risks and a well-planned Disaster Management Plan will be covered in the EIA report.

6.2 Natural Resource conservation

Realizing the need for an eco-friendly environment has proposed to do the following natural resource conservation techniques. To minimize water demand the project has Water balance chart, sewage treatment plant, plan for treated water usage, dual pipe line rain water harvesting, regular air; water quality monitoring will be explained in EIA report of the project.

6.3 Assessment of Ecological damage and remediation plan

A separate assessment of the ecological damage will be done based on the specific terms of reference issued by the Expert Appraisal Certificate. Further, the remediation plan and natural and community resource augmentation plan will be prepared.

7.0 PROJECT BENEFITS

During construction phase local people were benefited by the construction type of employment. The project is located in the development zone. It will act as a pioneer for other development.

8.0 ENVIRONMENT MANAGEMENT PLAN

Environmental Management plan is a vital process of any management plan of the development project. This helps in signaling the potential problems that resulting from the proposed project and will allow for prompt implementation of effective corrective measures. The environmental monitoring will be carried out for the construction and operational phases.

Table 11: Environmental Monitoring Plan Frequency of Sl. No Description Sampling & Analysis Construction Phase 1 Ambient Air Quality Once in three month 2 Stack Emission from DG set Once in three month 3 Ambient Noise Level Once in three month 4 Soil Quality Once in three month 5 Ground Water Once in three month Operation Phase 1 Ambient Air Quality Once in three months 2 Stack Emission from DG set Once in three months 3 Ambient Noise Level Once in three months 4 Treated Sewage Once in a week 5 Ground Water Once in three months

Budget Allocation for Environmental Monitoring Plan

Table 12.1: Construction Phase Total Cost (Rs. In Lakhs) S. No Parameter Operational expenses Capital cost (per Annum) Drinking water & sanitation 1 3.5 8 (Temporary toilets facilities) 2 Storm Water management 2.0 5.0 3 Solid waste /debris management 0.7 4.0 4 Environmental Monitoring 0 4.0 5 Dust suppression Measure 3 5 Total Cost 19.00 5

Table 12.2: Operation Phase Cost In Lakhs Operational / S. No Item Setup Maintenance Cost per annum 1 STP Cost 40 5 Rain water Harvesting 2 10 1.1 (Recharge pits & collection sump) Environmental Monitoring 3 5 2.0 (NABL approved agency) 4 Energy conservation 28 1.5 5 Gardening 20 3 6 Solid Waste Management 12 2.0 Total Cost 115 14.6

11.0 CSR ACTIVITIES Detailed CSR initiatives mentioning specific financial commitment with time bound programme will be included in the EIA Report.

12.0 SUMMARY & CONCLUSION

The proposed project is a development of Residential building.

 There will be minimum negative impact on Air, Noise and Water Environment.  Treated Waste Water will be reused for gardening, flushing.  Rain Water harvesting system has been provided.  Organic waste converter for solid waste management is proposed.  There will be positive Impact on Social conditions in and around the site.  The Project will not result in any adverse impact to the Environment.  The marginal impact of setting up the Development in the proposed location will be fully mitigated by the Environment Management Plans. (EMP)  The proposed project will improve the quality of living being offered through better environmental aspects like large landscaped areas & better amenities.

All the above mentioned details of practices as provided in this ToR will be studied in detail during the EIA report.