Master Plan for Chennai Port
Total Page:16
File Type:pdf, Size:1020Kb
Master Plan Report - Final March 2017 MASTER PLAN FOR CHENNAI PORT Master Plan for Chennai Port Prepared for Ministry of Shipping / Indian Ports Association Transport Bhawan, 1st Floor, South Tower, NBCC Place Sansad Marg, B. P Marg, Lodi Road New Delhi,110001 New Delhi - 110 003 www.shipping.nic.in www.ipa.nic.in Prepared by AECOM India Private Limited 9th Floor, Infinity Tower C, DLF Cyber City, DLF Phase II, Gurgaon, Haryana, India, Pin 122002, India Telephone: +91 124 4830100, Fax: +91 124 4830108 www.aecom.com March 2017 © AECOM India Private Limited 2017 The information contained in this document produced by AECOM India Private Limited is solely for the use of the Client identified on the cover sheet for the purpose for which it has been prepared and AECOM India Private Limited undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of AECOM India Private Limited. Quality Information Client: Ministry of Shipping / Indian Ports Association Contract No. (if any): Project Title: SAGARMALA: Master Plan for Chennai Port Project No.: DELD15005 Document No: DELD15005-REP-0000-CP-1005 Controlled Copy No: SharePoint Ref: Document Title: Master Plan for Chennai Port Covering Letter/ Transmittal Ref. No: Date of Issue: 31 March 2017 Revision, Review and Approval Records Master Plan for Chennai Port - ASM SG SG F. Final 31.03.2017 31.03.2017 31.03.2017 Master Plan for Chennai Port - ASM SJ SG E. Final 19.09.2016 19.09.2016 19.09.2016 Master Plan for Chennai Port - ASM SJ SG D. Final 25.08.2016 25.08.2016 26.08.2016 Master Plan for Chennai Port - ASM SJ SG C. Final 20.07.2016 21.07.2016 21.07.2016 Master Plan for Chennai Port - SJ ASM SG B. Final 10.06.2016 12.06.2016 15.06.2016 SJ ASM SG A. Master Plan for Chennai Port - Draft 04.02.2016 04.02.2016 04.02.2016 Prepared by/ Reviewed by/ Approved by/ Revision Description date date date Document Revision Register Issue Date of Revision By Name & Revision Details no. issue Position Incorporating comments on draft Master Plan 1. 15.06.2016 Hemanth Jayaraman report Manager Incorporating comments on Final Master Plan Hemanth Jayaraman 2. 21.07.2016 report Manager Incorporating comments on Final Master Plan Hemanth Jayaraman 3. 26.08.2016 report Manager Incorporating comments on Final Master Plan Amit Magadum 4. 19.09.2016 report Associate Amit Magadum 5. 31.03.2017 Revised as per Berthing Policy Details Associate Final Report Table of Contents EXECUTIVE SUMMARY ................................................................................................................................... VII PORT CAPACITY – CURRENT STATUS AND FUTURE AUGMENTATION ...................................................................................... IX PORT CONNECTIVITY ................................................................................................................................................. XII 1.0 INTRODUCTION .................................................................................................................................. 1-1 BACKGROUND ........................................................................................................................................... 1-1 SCOPE OF WORK ....................................................................................................................................... 1-2 OUTLINE OF THE REPORT ............................................................................................................................. 1-3 PRESENT SUBMISSION ................................................................................................................................ 1-3 2.0 THE PORT AND SITE CONDITIONS ....................................................................................................... 2-1 CHENNAI PORT AS AT PRESENT ..................................................................................................................... 2-1 RAIL AND ROAD CONNECTIVITY .................................................................................................................... 2-2 2.2.1 Road Connectivity ......................................................................................................................... 2-2 2.2.2 Rail Connectivity ........................................................................................................................... 2-2 SITE CONDITIONS ....................................................................................................................................... 2-3 2.3.1 Meteorology ................................................................................................................................. 2-3 Winds ............................................................................................................................................ 2-3 Rainfall .......................................................................................................................................... 2-4 Air Temperature ............................................................................................................................ 2-4 2.3.2 Oceanography ............................................................................................................................... 2-4 Tides .............................................................................................................................................. 2-4 Currents ........................................................................................................................................ 2-4 Waves ........................................................................................................................................... 2-4 3.0 DETAILS OF EXISTING FACILITIES......................................................................................................... 3-1 EXISTING FACILITIES ................................................................................................................................... 3-1 BHARATHI DOCK (BD) ................................................................................................................................ 3-2 3.2.1 POL Berths - BD I and BD III ........................................................................................................... 3-2 3.2.2 Berth BD II ..................................................................................................................................... 3-3 3.2.3 Chennai Container Terminal Pvt Ltd. (CCTPL) ............................................................................... 3-3 DR. AMBEDKAR DOCK (AD) ........................................................................................................................ 3-4 3.3.1 North Quay and West Quay Berths ............................................................................................... 3-5 3.3.2 South Quay Berths ........................................................................................................................ 3-6 3.3.3 Chennai International Container Terminal Pvt. Ltd. (CITPL) ......................................................... 3-6 JAWAHAR DOCK (JD) ................................................................................................................................. 3-7 3.4.1 JD East Berths (JD II, JD IV & JD VI) ............................................................................................... 3-8 3.4.2 JD West Berths (JD I, JD III & JD V) ................................................................................................ 3-8 OTHER FACILITIES AT THE PORT .................................................................................................................... 3-9 BULK LIQUID STORAGE & LINKAGES .............................................................................................................. 3-9 3.6.1 Tankage & Linkage on the Northern Side ..................................................................................... 3-9 3.6.2 Tankage & Linkage on the Southern Side ................................................................................... 3-11 SAGARMALA: Master Plan for Chennai Port i Final Report 4.0 PERFORMANCE, OPTIONS FOR DEBOTTLENECKING & CAPACITY ASSESSMENT .................................. 4-1 GENERAL.................................................................................................................................................. 4-1 PERFORMANCE OF THE BERTHS .................................................................................................................... 4-1 BCG BENCHMARKING STUDY ....................................................................................................................... 4-5 4.3.1 Observations on CCTPL ................................................................................................................. 4-5 4.3.2 Observations on Edible Oil Traffic ................................................................................................. 4-6 4.3.3 Observations on Fertiliser Traffic .................................................................................................. 4-7 MEASURES FOR CAPACITY ENHANCEMENT .....................................................................................................