<<

CORPORATE OVERVIEW 2019 CONTENTCONTENT

0.0 * Content - Energoprojekt INTRODUCTION 1. sustainable development, growth and profitability

A BRIEF HISTORY Energoprojekt WAS FOUNDED IN , IN 1951 2. AS A STATE OWNED COMPANY AIMED TO PROVIDE DESIGNING AND CONSULTING SERVICES WITHIN POWER GENERATION, WATER MANAGEMENT AND IRRIGATION SECTOR

ORGANISATION STRUCTURE SUBSIDIARIES IN SERBIA, FOREIGN COMPANIES, 3. REPRESENTATIVE AND BRANCH OFFICES

MAIN BUSINESS ACTIVITIES 4. WIDE RANGE OF ACTIVITIES ORGANIZED TROUGH SPECIALIZED SUBSIDIARIES WITHIN THE GROUP

MARKETS CURRENTLY ACTIVE IN MORE THAN 30 COUNTRIES 5. ACROSS FOUR CONTINENTS …

KEY REFERENCES HYDRO POWER PLANTS, THERMAL POWER PLANTS, INDUSTRIAL 6. PLANTS, ARCHITECTURE, INFRASTRUCTURE

KEY FINANCIAL DATA 7. Permanent GROWTH …

OWNERSHIP STRUCTURE 8. Energoprojekt IS A PUBLIC LIMITED COMPANY

* Content - Energoprojekt 0.1 INTRODUCTION1. INTRODUCTION

Since 1951 when founded Through a period of over 68 years it has developed a large spectrum of activities, as a consulting company, always offering the highest quality and Energoprojekt has grown standards, in the following fields: into a complex business energy generation, transmission and distribution, urban planning, architecture, system, integrating 11 building engineering and construction, companies (9 of which are infrastructure, water management and environmental protection, industry, internationally active) with information technologies. its headquarters in Serbia and 22 companies, repre- sentative and branch of- fices abroad.

* In the course of its successful development into one of the leading world-wide companies in the fields of consulting and contracting activities, Energoprojekt has been engaged in implementation of various projects and facilities in over 70 countries so far, all over the world.

1. INTRODUCTION

The name of Energoprojekt can be found on the lists of Top International Design Firms and International Con- tractors published every year by the renowned American magazine “Engineering News Record”.

Projects successfully completed by Energoprojekt are the best reference for acquiring new jobs. As a reliable, efficient and highly committed partner with wide international experience easily adapted to various market requirements, Energoprojekt successfully cooperates with both domestic and foreign clients in realization of important investment projects. ...foreword

1.0 * Introduction - Sixty-sixth anniversary INTRODUCTION 68 years of 1. SUSTAINABLE DEVELOPMENT, GROWTH AND PROFITABILITY excellence

Energoprojekt is committed to attaining success and benefit for our customers, employees, shareholders and the communities we serve.

‘Implementation through expertise’ is the Energoprojekt’s mantra and through this policy the firm achieves the highest levels of confidence and satisfaction of its clients, together with recommendations from them, both domestically and world-wide.

Aiming to contribute positively to the world’s business environment, Energoprojekt will:

Ensure sustainable development, growth and profitability Strengthen the company’s reputation on all markets, by anticipating and fulfilling the requirements of its clients Uphold its integrity in all business activities Conduct its business relations in the spirit of cooperation and partnership Assure the realization of business endeavors in accordance with the planned performances, and Develop human resources and upgrade the work environment.

This decidedly constructive business contribution will enable the fulfillment of our mission with a high degree of suc- cess - in accordance with Energoprojekt’s established tradition. The vision of Energoprojekt is to be one of the foremost international leaders in the fields of engineering, construction and project management, enabling investors, partners and clients to recognize us as an integral part of their own success, thus satisfying clients, employees and shareholders alike, and sharing in the responsibility towards society as a whole.

Since 2001, Energoprojekt stocks has been traded on . As of July 19, 2007, Energoprojekt was listed on the A List of Belgrade Stock Exchange.

* Introduction - Our core values 1.1 HISTORY2. A BRIEF HISTORY Energoprojekt was found- Its structured expansion has resulted in the formation, under ENERGOPROJEKT GROUP, ed in Belgrade, the capi- of nine diversified, internationally active tal of former SFRY, as state and sophisticated companies covering the full range of contracting and consulting owned company aimed engineering activities. to provide designing and ENERGOPROJEKT GROUP is presently consulting services within operating in more then 30 countries around hydro and thermal power the world, with an average annual turnover of around EUR 270 million and contracts generation and irrigation exceeding EUR 200 million. systems. With 68 years of operation, ENERGOPROJEKT GROUP has developed into an organization Over our long and suc- competent to undertake large and complex projects, ranging from studies cessful history, Energo- and investigations, through design and projekt extended its supervision to construction and full scale fields of activity to in- implementation. clude industrial plants, Today the ENERGOPROJEKT GROUP is the largest Serbian contractor for water management sys- complex projects including construction tems, public and residen- management, full engineering and turn-key tial complexes, telecom- projects. munication systems and data processing systems.

… a brief history

2.0 * … a brief history A BRIEF HISTORY 68 years of 2 . ENERGOPROJEKT BECAME A WORLD-RENOWN COMPANY excellence

The following is a brief summary of relevant projects designed or developed by the ENERGOPROJEKT GROUP of companies during the last 68 years in more than 70 countries all over the world:

• 50 hydro power plants of various types and capacities; • 34 thermal power plants (oil, gas or lignite fired) of various types and capacities (with a unit capacity up to 600 MW); • 15 industrial power plants; • 20 heating plants and 34 district heating systems; • Over 200 power transformation stations (voltage levels up to 400 kV); • Several thousand kilometers of overhead transmission and cable lines (voltage levels up to 400 kV); • Over 50 projects of rural electrification; • 50 water processing plants; • 40 complex land improvement systems; • Over 30 water management and river flood control projects; • About 50 municipal and industrial water supply and sewage systems; • Multiple infrastructure projects (underground facilities, tunnels, highways, regional roads, runways, railroads and metro stations); • Over 1,300 complex projects in different industrial fields (oil and coal processing, ferrous and non-ferrous metal- lurgy, metalwork’s, chemical and pharmaceutical industry, building materials, textile and leather, wood and paper, food etc.); • 100 public buildings; • 10 conference centers; • 1,000,000 m2 commercial premises, over 750,000 m2 residential buildings, great number of hospitals, health centres, schools, administrative buildings, tourist and sport facilities; Heating, cooling and air-conditioning installations for a/m projects; Interior design and furnishing for a/m projects; Information systems and technologies for a/m projects.

The ENERGOPROJEKT GROUP workforce of 2,100 represents its basic creative force. The renowned professional- ism of its 800 fully qualified, skilled and experienced engineers and other highly specialized experts, enable the ENERGOPROJEKT GROUP to retain its position as one of the most prominent and trusted groups around the world.

* … a brief history 2.1 ORGANIZATION STRUCTURE 3 . ENERGOPROJEKT GROUP - ORGANIZATION STRUCTURE

ENERGOPROJEKT GROUP

ENERGOPROJEKT HOLDING

Subsidiaries in which Companies in which COMPANIES, REPRESENTATIVE & Companies from BRANCH OFFICES IN THE WORLD has majority ownership Energoprojekt Group have significant • ENCOM GmbH Consulting, Engineering & ownership Trading Germany • I.N.E.C. ENGINEERING COMPANY LIMITED Energoprojekt United Kingdom Hidroinženjering ENERGO-PET • ENERGOPROJEKT MONTENEGRO D.O.O. HERCEG NOVI Montenegro • ENERGOPROJEKT ENERGODATA Energoprojekt MONTENEGRO D.O.O. PODGORICA Urbanizam i arhitektura ENERGOPLAST Montenegro • D.O.O. ENERGOPROJEKT OPREMA CRNA PODGORICA Energoprojekt Montenegro Entel • OOO EPO BELGRADE ENJUB Belarus • ENERGO KAZ D.O.O. Energoprojekt Kazakhstan • ENERGOPROJEKT RUS D.O.O. Industrija Fima SEE Russia Activist Plc. – in • ENHISA S.A. liquidation Peru Energoprojekt • ENLISA S.A. Visokogradnja Peru • Energoprojekt ENTEL LLC Oman Energoprojekt • Energoprojekt Entel LTD (Office) Niskogradnja Qatar • Energo Consult LLC Abu Dhabi Energoprojekt • ENERGOPROJEKT ENTEL Oprema Bahrein • ENERGO (NIGERIA) LIMITED Nigeria • ZAMBIA ENGINEERING AND CONTRACTING Energoprojekt COMPANY LIMITED Energodata Zambia • ENERGOPROJEKT ZAMBIJA LTD Zambia Energoprojekt • ENERGO (UGANDA) COMPANY LIMITED Sunnyville Uganda • ENERGOPROJEKT HOLDING GUINEE S.A. Guinea Energoprojekt • ENERGO (PRIVATE) LIMITED Park 11 Zimbabwe • ENERGOPROJEKT GHANA LIMITED Ghana • DOM 12 S.A.L. Lebanon

3.0 * Charts - Organization structure ORGANIZATION STRUCTURE 68 years of 3 . ENERGOPROJEKT HOLDING - ORGANIZATION STRUCTURE excellence

SHAREHOLDERS ASSEMBLY

SUPERVISORY BOARD AUDITING COMMISSION SECRETARY Energoprojekt Holding plc. INNER SUPERVISION

ADVISORS TO CEO CEO IMS COORDINATION BODY Executive Board of EP HOLDING

DIRECTORS’ EXECUTIVE BOARD OF EP GROUP COLEGIUM CEO, ED of EP Holding plc. CEO and Directors and Directors of Subsidiaries of Subsidiaries

CHIEF CHIEF CHIEF REGIONS FINANCIAL LEGAL OPERATING Subsidiaries OFFICER OFFICER OFFICER and Affiliates Abroad

Line of management Line of communication

* Charts - Organization structure 3.1 ACTIVITIES4. Main business activities

Energoprojekt developed it’s As a reliable, efficient and creative partner, Energoprojekt combines an business activities simultane- extensive understanding of specific ously with the development of technologies and local conditions with international operational basic activities which include: experience. This gives a solid base for a studies, analyses, research comprehensive set of consultancy and and development, consulting engineering services to be provided to our clients. and engineering, designing various projects, executing all types of works, equipping and erecting facilities, start- ing up facilities and complete systems, including complete “turn-key” services.

**

…business activities

4.0 * Main business activities MAIN BUSINESS ACTIVITIES 68 years of 4. Energoprojekt Group main business activities are as follow: excellence

Name Services Field of Activity

Subsidiaries: 4 design companies (Hidroinzenjering, Corporate legal, finance, develop- Energoprojekt Urbanizam i arhitektura, Entel and Industrija) 3 construction ment, marketing and internal auditing Holding companies (Visokogradnja, Niskogradnja and Oprema), services. Energodata, Sunnyville and Park 11

Energy: hydropower generation systems, facilities and plants. Field investigation works, design, Energoprojekt Water management and environmental protection: wa- consulting, engineering, development Hidroinženjering ter management and irrigation systems, water production and project management and processing plants, water supply systems and sewage systems

Energoprojekt Design, consulting, engineering, Buildings design: public, administrative and commercial Urbanizam i project development and project buildings, conference centers, hospitals and health centers, arhitektura management tourist and sport centers and facilities, residential buildings

Power: Thermal power generation, power generation from Design, consulting, strategic planning, renewable energy sources, power transmission and distri- Energoprojekt engineering, project development bution, telecommunication facilities and systems Entel and project management Water: Water production and processing, water transmis- sion and distribution

Industry: industrial plants and facilities (chemical, petro- Design, consulting and engineering, Energoprojekt chemical, pharmaceutical, tobacco, wood, food etc.), indus- project development and project Industrija trial power plants, industrial and thermal technologies, gas management transport and handling

Building engineering and construction: buildings (ad- Engineering, construction, procure- ministrative, commercial and residential buildings, business Energoprojekt ment, delivery, erection of equipment and conference centers, hospitals and health centers, tourist Visokogradnja and installations, commissioning and sports centers, industrial, thermal-energy and special purpose facilities)

Energy: hydropower structures and plants Infrastructure and water management: dams, aqueducts, Civil engineering construction works, water tunnels, irrigation systems, water supply and sewage Energoprojekt engineering, procurement and erec- systems, highways and roads, railroads, bridges, tunnels, un- Niskogradnja tion of equipment, commissioning dergorund works, railroad and subway stations, communal infrastructure, industrial and hydro-mechanical equipment and plants Power: thermal power facilities and plants, transmission and distribution of electricity, hydropower plants Engineering, construction, equipment Water - environmental protection: potable and waste Energoprojekt and plant procurement and installa- water processing, water and sewage systems, Oprema tion, commissioning, project manage- Industry: industrial facilities and plants, ment MEP instalations and control systems for various types of facilities

Development, design, engineering, Information technologies: multidisciplinary information Energoprojekt implementation, commissioning and systems, software and hardware solutions Energodata maintenance Graphic engineering, video production

* Main business activities 4.1 MARKETS5. MARKETS Currently, Energoprojekt is present and active in more than 30 countries across four continents. By generated revenues, apart from the local market, the most important markets are African countries (Nigeria, Uganda, Algeria, Ghana, Ethiopia, Zambia, Rwanda), Kazakhstan, Russia and Belarus, followed closely by Middle East countries (Qatar, UAE, Oman, Jordan) and South America (Peru).

RUSSIA UZBEKISTAN KAZAKHSTAN

BELARUS

ICELAND

ENGLAND IRELAND

GERMANY

MONTENEGRO

CYPRUS

ALGERIA

LIBYA BAHRAIN GUINEA OMAN GHANA DUBAI NIGERIA ABU DHABI IRAQ QATAR IRAN JORDAN ETHIOPIA PERU UGANDA * RWANDA ZAMBIA ZIMBABWE BOTSWANA

LEGEND ARGENTINA - COMPANIES ABROAD - PROJECTS - REPRESENTATIVE OFFICES - BRANCH OFFICES

Markets: Current and Passed ...human resources

5.0 * Markets MARKETS 68 years of 5 . OUR CLIENTS TRADITIONALLY INCLUDE MINISTRIES, LOCAL GOVERNMENT AGENCIES... excellence

*

…markets

Market position

Kazakhstan, as a rapidly developing country thanks to its oil reserves, represents the most important market for Energoprojekt. In the projects performed by Niskogradnja, which are most commonly financed by the European or the World Bank, competitors are generally from the Western European and Islamic countries. Visokogradnja is delegated most of the projects on the merit of its reputation in Kazakhstan.

On the Russian market, the main competitors are Russian companies and some well known companies from around the world.

In Africa, depending on the country in which it does business, Energoprojekt faces different levels of competition. In Ethiopia, Energoprojekt receives projects carried out mostly in cooperation with reputable companies from , England and USA. Algeria, which is a fast growing market, has a great concentration of highly reputable companies from France, UK, Germany, Canada, and USA in recent years. Somewhat lower level of competition is present in Ugan- da, Nigeria, and Ghana.

The Middle East became very interesting market for the majority of internationally renowned companies, predomi- nantly due to the significant capital investments in energy and infrastructure projects. In spite of this fact, Energopro- jekt has continual expansion of the services in Qatar, United Arab Emirates and Oman, as the most promising markets.

The market of South America (Peru), where Energoprojekt has been present for many years establishing a good reputation and solid references in the areas of civil engineering and hydro-engineering, is well defined despite the domination of companies from Western Europe (Spain, Italy) and from .

In South East Europe, Energoprojekt is providing services mainly in the civil engineering and power generation sec- tor for neighboring countries (Montenegro, Macedonia and Bosnia and Herzegovina)

Within Serbia, Energoprojekt has become one of the key drivers of the Serbian economy and a growth generator in all core business areas, from architecture and civil engineering, building and infrastructure industry to power generation and transmission, water management and environmental protection.

* Markets 5.1 6. ABSTRACT FROM REFERENCEREFERENCES

Since its foundation Energoprojekt has developed strong references in the fields of:

* Energy generation, transmission and distribution * Infrastructure * Water management - environmental protection * Building engineering and construction * Industry * Information technologies As a reliable, efficient and creative partner, Energoprojekt combines an extensive understanding of specific technologies and local conditions with international operational experience. This gives a solid base for a comprehensive set of consultancy and engineering services to be provided to our clients.

6.0 * Abstract from references ABSTRACT FROM REFERENCES 68 years of 6 . Since its foundation Energoprojekt has developed strong references… excellence *

...references

* Abstract from references 6.1 ENERGY 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2018 AND ON GOING)

Project status / Project name Technical details Country Client Services Year of comple- tion 1 Qatar-Power Transmission System Consultancy Services for Qatar Power Qatar KAHRAMAA Consultancy; On going Expansion, Phases XI, XII and XIII Transmission System Expansion – (Qatar General Electricity and Phases XI, XII and XIII projects covering Water Corporation) installation of new: • Substations • Cables • Telecommunication system • Substation Control System 2 Three 400/220KV Grid Stations Three grid stations: 400/220KV Oman OETC (Oman Electricity and Consultancy services for the On going at Sohar IPP-3, Sohar FREE ZONE 400 kV OHL/cables Transmission Company) construction; and She Almakarm and associated 400OHL/cable 3 New Shakhbout City 132/11kV, Substations: Shakhbout City 132/11kV, United TRANSCO (Abu Dhabi Transmis- Consultancy; On going Ruwdat 132/11kV, Al Faya 132/33kV Ruwdat 132/11kV, Al Faya 132/33kV Arab sion & Despatch Company) substations and 132kV Cable/OHL and 132kV Cable/OHL Works Emirates Works 4 CS for Engineering and Site Supervi- Two SS 400/132kV & associated TL United Dubai Electricity and Water Consultancy; On going sion of Canal Gardens (CANLGRDN) 400kV Arab Authority (DEWA) & DUBAI JANOUB (DXBJANUB) Emirates 400/132kV Substations and Associ- ated 400kV Overhead Line (OHL) Works PO 5 Dubai Shamal (DXBSHMAL) & Two 400/132kV substations, United Dubai Electricity and Water Consultancy; On going Shams (SHAMS) Substations, Dubai 400kV series reactor station Arab Authority (DEWA) and associated 400kV OHL Emirates 6 Double Circuit Transmission Line DC TL: 300kV Nigeria Power Holding Corporation of Design; Construction; Procuremant; On going 330kV, Erukan - Omotosho, lot 1 Length: 132km Nigeria (PHCN) Commissioning; on turn key basis; 7 Modernization and revitalization Hydro Power Plant Piva installed Montene- Elektroprivreda Crne Gore AD, Consultancy; On going of the hydropower plant Piva and capacity 3 x 120 MW and gro Nikšić hydropower plant Perućica - Phase II concrete arch dam 220 m height; Hydro Power Plant Perućica installed capacity 307 MW 8 Revitalisation of hydro aggregates Installed capacity of hydro aggregates: Serbia JP EPS - Ogranak "HE Đerdap", Preparation of Detailed design; On going and transformers No.1 on "Djerdap 6 x 194 MW Supervision 1" HPP 9 Coal mine Kolubara - A New Coal Energy Eficiency by Ecological Coal Serbia PU Electric Power Industry of Equipment and material delivery On going Depot, packadge C2, Infrastructure Quality Management; Infrastructural Serbia (EPS) for the management of coal qulaity, buildings and plants for the new coal execution of civil, mechanical and depot in RB Kolubara, at surface min- electrical works, takeover and start; ing Tamnava - Zapadno polje Package C2: Infrastructure; 10 Reactivation of TPP Kolubara B (350 350 MW Serbia PU Electric Power Industry of Consultancy services for the On going MW) construction Serbia (EPS) reactivation of TPP Kolubara B construction - equipment analysis, techno-economic analysis, Basic Design preparation, Bidding docu- ment preparation, Bid evaluation, Contracting; 11 Provision of design consultancy Energy-from-Waste Plant, with waste Serbia CNIM, France Design; On going services in connection with a waste treatment capacity of 340.000 t/a, to energy plant in Belgrade power production capacity of 30 MWel and heat production capacity of 56,5 MWth 12 Construction of new Unit B3 of TPP TPP350MW Serbia PU Electric Power Industry of Consultancy services (under FIDIC) - On going B (350 MW) including TS TS 110/6kV & TL 110kV Serbia (EPS) FIDIC Engineer Role; Rudnik 5 110/6 kV and TL 110 kV Technical control of design; Expert supervision of construction works; 13 CHP Pancevo: consulting services CHP Plant 160 MW Serbia Shanghai Electric Group Europa Preparation of technical docu- On going for the construction of the new mentation & permiting consulting CHP plant within the Oil Rafinery services; Pančevo 14 HPP Komarnica HP installed capacity of 168 MW Montene- Electric Power Industry of Preparation of preliminary design On going gro Montemegro, Niksic with feasibility study and environ- mental impact assessment study 15 Construction of electrical substation SS 110/33 kV Rwanda Energy Development Corporation Construction; 2018 110/33 kV, Gabiro Limited (EDCL) 16 Two double circuit transmission DC TL: 132kV Nigeria Talaveras Group of Companies Design; Project Management; 2018 lines 132kV, Afam-Trans Amadi; Length: 24+18km Construction; Procuremant; Com- Elenwo-Rukpokwu, Port Harcourt missioning; on turn key basis;

6.2 * Abstract from references - ENERGY ENERGY 68 years of 6. Hydro Power Plants excellence

Energoprojekt has participated in the design, consulting, engineering, construction, equipping and putting into operation all major hydro power projects in almost all countries of the former and in all con- tinents except for Australia.

The total installed capacity of hydro power plants is over 10,000 MW.

HPP Tekeze HPP Djerdap I HPP Djerdap II Name Ethiopia Serbia Serbia 16 units of 27 MW 4 x 75 MW 12 x 175 MW Description Concrete dam on the river, Dam on the Tekeze river, 185 m high Dam on the Danube river, 55 m high 32-35 m high

Client Ethiopian Electric Power Corporation Electric Power Industry of Serbia Electric Power Industry of Serbia

HPP Bajina Bašta HPP Perućica, HPP Mratinje Name Serbia Montenegro Montenegro 348 MW 364 MW 360 MW Description Concrete hollow gravity dam on Drina Earth-fill dams on the Zeta river, Concrete arch dam on river, 90 m high h=11, 15, 16, 22 m Piva river, 220 m high

Client Electric Power Industry of Serbia Electric Power Industry of Montenegro Electric Power Industry of Montenegro

HPP Kafue Gorge HPP Bayano HPP Bekhme Name Zambia Panama Iraq 900 MW 300 MW 1,590 MW Description Earth-fill dam on the Concrete gravity dam, Earth-fill dam on the Kafue river, height 50 m height 44 m Greater Zab, height 230 m Institute for Water Resources and State Commission for Water Manage- Client Ministry of Electricity of Zambia Electricity ment Projects of Iraq

* Abstract from references - ENERGY – Hydro Power Plants 6.3 ENERGY 6. Thermal Power Plants and Facilities; Energy Transmission and Distribution Systems

Since its establishment to date, Energoprojekt has participated in rendering consulting services, design, construction, equipping, putting in operation and personnel training of majority of thermal power plants and electric power facilities in Serbia, Montenegro and many other countries in Middle East and Africa. The total installed capacity of thermal power plants is over 20,000 MW, while the total length of long distance transmission lines is more than 10,000 km.

TPP Nikola Tesla A, TPP Kostolac B2, TPP Nikola Tesla B, Name , Serbia Kostolac, Serbia Obrenovac, Serbia 1,650.5 MW 2 x 348.5 MW Description Thermal Power Plant, 1,290 MW Thermal Power Plant Thermal Power Plant

Client Electric Power Industry of Serbia Electric Power Industry of Serbia Electric Power Industry of Serbia

Jebel Ali Power and Desalination Name Ras Abu Fontas (RAF) C, Qatar Musandam, Oman Plant, UAE Station M – 400 kV s/s and CC with desalination Plant Gas Fired Power Station associated 400 kV OHL Description (GT-4x125 MW, ST-2x210 MW, MFE 3 6x30 MW 400 kV GIS 505 MVA 400/132 kV 4x30,000 m per day) Transformers

Ministry of Electricity and Water of Rural Areas Electricity Company Dubai Electricity and Water Authority Client Qatar (RAECO) (DEWA)

TPP “Kostolac B”, TPP Nikola Tesla A1 and A4, TPP Kolubara A, , Name Kostolac, Serbia Obrenovac, Serbia Serbia

Rehabilitation of Unit B2 with the re- 220 MW and 308.5 MW Ash Removal System Description construction of electrostatic precipita- Electrostatic Precipitator at - 45 t/h of ash tors (348,5MW) Units 1 and 4 - 3 km distance

Client Electric Power Industry of Serbia Electric Power Industry of Serbia Electric Power Industry of Serbia

6.4 * Abstract from references - ENERGY – Thermal Power Plants and Facilities; Energy Transmission and Distribution Systems ENERGY 68 years of 6. Thermal Power Plants and Facilities; Energy Transmission and Distribution Systems excellence

Qatar System for Electrical Energy Two transformer substations Central Name Transmission and Distribution TL (400 kV), Serbia Phases IV, VI - VII, VIII & IX, Qatar Area & Katampe, Abuja, Nigeria

Consultancy services for the Turn-key project for the construction of transmission & distrtribution system Construction of TL between SS 2 TS: II and FYR Macedonia border Description Over 120 SS of various voltage levels 2x60MVA, 132/33kV; 2x150MVA, 330/132kV (33 kV - 400 kV), and several hundreds 400 kV; 100 km long & 2x60MVA, 132/33kV kilometers of O/H and cable lines

Kahramaa (Qatar General Electricity & Electric Power Industry of Serbia & NEPA (National Electric Power Authority) Client Water Corporation) Instalaciones Inabensa S.A.

Clinical Centre of Serbia, Niš TS Oke-Aro (Erukan), District Heating Plant New Belgrade, Name Clinical Centre of Serbia, Belgrade, Lagos, Nigeria Belgrade, Serbia Serbia

Combined heat and power plant total TS Oke-Aro (Erukan), SG 2x300MVA; capacity 32 MW, central monitoring system CMS (Niš); Description 330/132 kV; 2x60MVA; 132/33kV, Reconstruction combined heat and power plant Lagos 1,8MWe & 1,8MWt, central monitoring system CMS (Belgrade).

Ministry of health of Serbia and Client Niger Delta PHCN Public Utility Co “Beogradske elektrane” Clinical Center of Serbia

The total installed power of thermal power plants is over 20,000 MW

* Abstract from references - ENERGY – Thermal Power Plants and Facilities; Energy Transmission and Distribution Systems 6.5 INFRASTRUCTURE 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING)

Project status / Project name Technical details Country Client Services Year of comple- tion 1 EPC Contract for design and execution of The new landfill has been designed accord- Serbia Beo čista energija doo Design and execution of part of the On going part of the construction works for the PPP ing to the scheduling of waste disposal: construction works; project for construction, exploitation and Old landfill: 11.840.000 m3; New landfill: management od the Vinča waste dump 6.202.000 m3 (interim landfill: 722.000 m3; including production of energy from waste in unprocessed: 4.010.000 m3; landfill for the waste processing plant residues after treatment: 1.470.000 m3) 2 Construction works within the project of Construction of road (from km Serbia Serbian Ministry of Construction / Construction; Construction of 4 traffic On going highway E-763, Section V: - 53+139.91 to km 77+118.23) Length: China Shandong International lanes and 3 stopping lanes, 9 bridges, 24 km Economic & Technical Cooperation 6 overbridges, intersection "Ljig", tunnel "Brančići" comprised of 2 tunnel tubes, each 940 m long, and river flow regulation.; 3 Construction of the tram-railway over the Construction of the 2,7 km new tram- Serbia Belgrade City Government Works execution; On going in Belgrade railway and reconstruction of a 1 km existing tram-railway 4 Railway section "Straževica tunel (enter) - Reconstruction of 58 km of railway Serbia Infrastrukture železnice Srbije, Execution of construction and electric On going Jajinci - Mala Krsna", on (Belgrade) Rakovica (from km 9+896 to km 67+800) and Beograd works; - Railway Hub K1 - Jajinci - Mala Krsna reconstruction of the railway station - railway and railway station "Mala Krsna" "Mala Krsna" 5 Highway E 763, Section IV, Ub - Lajkovac Road recontruction on 13 location, (from Serbia China Shandong International Works execution; On going km 40+645.28 do km 53+139), total Economic & Technical length 12,49 km 6 Regulation of river Peštan, Phase I, and Works execution on the river Peštan Serbia Public Enterprise Electric Power Works execution; On going construction of the road Baroševac- regulation and construction of the road Industry of Serbia (EPS), MB Medoševac-Vreoci Baroševac-Medoševac-Vreoci Kolubara, Lazarevac 7 Reconstruction of Karađorđeve street and Execution of works on the reconstruction Serbia City of Belgrade, Secretariat of Works execution; On going Savski keja (promenade) near Karađorđeva of Karađorđeve street and Savski keja Utilities and Housing Services street (promenade) near Karađorđeva street 8 Buy-pass of motorway around city of Construction of a part of buy-pass of Serbia Public Enterprise "Roads of Serbia" Works execution; On going motorway aroung city of Zrenjanin, 4 km in length (from 4+915.11 to km 8 +600.84) including two circle crossroads and bridge over Begej channel 9 Denivelized crossing of railroad Belgrade- Preparation of technical documentation Serbia City of Belgrade & Belgrade Land Preparation of technical documentation On going Batajnica-Šid and Bulevar umetnosti in New and work execution on the denivelized Development Public Agency and work execution; Belgrade crossing of railroad Belgrade-Batajnica- Šid and Bulevar umetnosti in New Belgrade 10 Rehabilitation of concrete channels Via Peru Municipalidad Provincial de Works execution; On going Cieneguilla and Cola de Alacran Sullana, Peru 11 Rehabilitation and reconstruction of a road Lenght: 58 km,rehabilitation of the Peru Provias Nacional del Ministerio de Upgrading, expansion and asphalt On going section Puerto Bermudes existing and construction of 3 new Transporte y Comunicaciones paving of a 58km long road section - Ciudad Constitucion bridges and rehabilitation of the existing and construction of three new bridges; 12 Preventive cleaning of the river-bed of Cleaning of the river-bed, 17 km in Peru MINAGRI Ministerio de Agricultura Works execution; preventive cleaning On going Chira river lenght, protection of the river bank by y Riego of the Chira riverbed and formation of stone 20.000 m3 "Pilot" channels along riverbed 100 - 150 in width on 2 sections ( from km25 to km 40 and from km 52+900 to km 53+670); 13 Railway reconstruction of South Corridor Sec- Total section length: 17.7 km Serbia Serbian Railways JSC/ Works execution including the ground 2017 tion 10, from to Ristovac RŽD International formation level, drainage objects constrution, platform and connecting roads construction and relocation and protection of cables and other objects; 14 Kolubara riverbed relocation and Riverbed relocation (2,6 km + 1,8 km), Serbia Business Entity Mining Basin Relocation and regulation of the Kolubara 2017 regulation, phase II, including the Peštan construction of a bridge, water intake, "Kolubara" ltd & Peštan riverbeds, construction of a tributary and accompanying infrastructural pumping station, 2,9 km technical water bridge across two rivers, construction of a facilities supply pipeline and 3,4 km access road water intake, pumping station and techni- cal water supply pipeline, construction of access road and work monitoring; 15 Upgrading Mpigi-Kanoni road Lenght: 64 km Uganda Uganda National Roads Authority Works execution; Road upgrading; 2017 (UNRA) 16 Execution of works on the reconstruction of Ten city roads in length of 15,5 km Uganda Kampala Capital City Authority Works execution; on the city roads 2017 ten city roads within districts of Kawempe reconstruction; and Lubanga 17 Construction of Approach Road to Radar Uganda Uganda National Roads Authority Construction; Works execution; 2017 Center near City of Nakasangola (UNRA) *

...infrastructure

6.6 * Abstract from references - INFRASTRUCTURE INFRASTRUCTURE 68 years of 6. excellence

Construction of infrastructural projects with the implementation of the most modern technology and equip- ment ranks among the most significant achievements of Energoprojekt’s engineers: Underground facilities Highways and regional roads Tunnels Airports Railway and metro stations Waste management and pollution control

One track railway bridge Belgrade bypass, section 5, Name Construction of Boulevard with Appurtenant Infrastructure Belgrade, Serbia Belgrade, Serbia

Construction; commissioning; construction of Construction of one track railway the city street, with appurtenant infrastructure: bridge (188m), reconstruction of the Construction of tunnel Straževica Description reinforced-concrete revetment and sewerage (cross-sections: 300x210 cm and 400x18cm), railway underbridge and Jurija Gaga- length 745m and flyovers gas & water supply pipeline, sanitary sewerage, storm water drainage & 110 rina street, New Belgrade

Belgrade Land Development Public Belgrade Land Development Public Public Enterprise “Roads of Serbia” and Client Agency, Serbia Agency, Serbia “Corridor 10”, Serbia

Pionirski Park Underground Road Mityana - Fort Portal, sec- Road Almaty-Akmola Name Garage, Belgrade, Serbia tion Mityana - Mubende, Uganda Section Almaty-Guishad

Underground garage with 460 Road length 225 km Asphalted road length 166 km, Description parking places Mityana - Mubende section 8 m width, with 2 m shoulders, Total area: 13,818 m² Total length 86 km totalling 12 m

Ministry of Transport and Communica- Belgrade City Hall Ministry of Transport and Communica- Client tions of the Republic of Kazakhstan Serbia tions, Uganda Kazahstan

Two Underground Metro “Vukov Spomenik” MULTIPLE UNDER- Name Stations, Almaly and Abay, Alma Ata, Kazakhstan Belgrade, Serbia GROUND FACILITIES, One „Column“ type and Underground railway station TUNNELS, HIGHWAYS, one „Pylon“ type metro station Platform area: 2,500 m2 at the depth of REGIONAL ROADS, Description Depth between 30 – 70 m; 40 m, oblique tunnels with 3 escalators, Construction of 3 tunnel tubes each diameter: 7.5 m and length of 65 m RUNWAYS, RAILWAY AND (diameter 90 - 100 m²) angle: 30 degree METRO STATIONS Belgrade Railway Traffic Co. Client AO Almatimetrokurilis Kazahstan Serbia

* Abstract from references - INFRASTRUCTURE 6.7 WATER – ENVIRONMENTAL PROTECTION 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2018 AND ON GOING)

Project sta- Project name Technical details Country Client Services tus / Year of completion 1 Irrigation System in San Peru Ministerio de Agricultura y Riego Works execution; On going Antonio, Huarango, Haen (MINAGRI), Peru 2 Water security mega reser- Project 1st phase includes: construction Qatar KAHRAMAA Consultancy; Project Management; On going voirs project (1st phase) of 24 concrete reservoirs with total ca- (Qatar General Electricity and pacity of approx. 10 million m3 of water, Water Corporation) 280 km (DN 1200-1600) corridor mains and 200 km (DN 900-1600) transmission pipeline 3 Pambukovica dam and irriga- Embankments dam with clay core 30 m Serbia Public Water Management Com- Preparation of basic design and preliminary On going tion system height and 245 m dam crest length pany “Srbijavode” Belgrade design with feasibility study; 4 Kamenica dam and irrigation Embankments dam with clay core 20 m Serbia Public Water Management Com- Preparation of basic design and preliminary On going system height and 424 m dam crest length pany “Srbijavode” Belgrade design with feasibility study; 5 Reconstruction of Flood Protection embankments, total length Serbia Delegation of the European Union Construction supervision; On going Protection System – Mačva of 16 km to the Republic of Serbia 6 Water Distribution Networks Oman PAEW (Public Authority for Consultancy Services for Construction On going for Wilayat Bidbid in Al Electricity & Water) Supervision; Dhakliya Governorate 7 Wadi El Fedan Dam Embankments dam with central clay Jordan Ministry of Water and Irrigation - Construction supervision; On going core, 25 m height and 302 m dam crest Jordan Valley Authority length 8 Kufranja Dam Concrete face rockfill dam (CFRD), Jordan Ministry of Water and Irrigation - Supervision; Construction supervision; On going 80 m height Jordan Valley Authority 9 Beni Slimane Dam Embankments dam with central clay Algeria "ANBT Preparation of the detailed design, technical On going core, 66 m height (National Agency for Dams and assistance and supervision over construc- Transfers)" tion;; 10 Djedra Dam Concrete face rockfill dam (CFRD), Algeria ANBT Design; Supervision; Preparation of the On going 60 m height (National Agency for Dams and detailed design, technical assistance and Transfers) supervision over construction; 11 Tarzout Dam Earth-fill dam, 60 m height Algeria ANBT (National Agency for Dams Preliminary design and tender documenta- On going and Transfers) tion for the construction ; 12 Seklafa Dam Seklafa concrete dam (h=47m) Algeria ANBT (National Agency for Dams Detalied design, technical assistance and On going and Transfers) construction supervision ; 13 Sidi Naceur Dam Rockfill Dam, 33,5 m height Algeria ANBT (National Agency for Dams Preparation of final design and tender On going and Transfers) documents; 14 Study of furnishing/securing The project area covers surface of Algeria ANBT Preparation of study On going water resources for West, 300 000 km2 (National Agency for Dams and Center and East regions Transfers) 15 Soubella Dam Embankments dam with central clay Algeria ANBT Preparation of the detailed design, technical 2018 core, 67 m height (National Agency for Dams and assistance and supervision over construction; Transfers) 16 "Tabeggart" Dam Earth-fill dam, 28 m height Algeria ANBT Preparation of the basic design and tender 2018 (National Agency for Dams and documentation; Transfers) 17 Sanation of the Gazivode Embankments dam with clay core 107.5 m Serbia Public Enterprise for water supply, Detailed Design and Works execution on 2018 Dam height and 520 m dam crest length electical energy generation and "Turn Key" basis; distribution "Ibar"

**

…water

6.8 * Abstract from references - WATER – ENVIRONMENTAL PROTECTION WATER – ENVIRONMENTAL PROTECTION 68 years of 6. excellence

In 67 years of business operations, Energoprojekt designed, contstructed and commissioned numerous proj- ects including dams, irrigation and hydro melioration systems, water processing plants, water supply and sew- age systems.

Chira - Piura Irrigation System, Jebel Ali Desalination and Power Mokroluški Main Drain, Name Phases I/II/III, Peru Plant, UAE Belgrade, Serbia

Reinforced concrete main drain for rainwater services Regulation of irrigation, clay-filled dam Station M – 400 kV s/s and Drainage: length - 800 m; 4 overflow h= 48 m, associated 400 kV OHL Description structures; crest length 9.5 km 400 kV GIS 505 MVA 400/132 kV 6 3 concrete diaphragm on both sides Accumulation capacity 1,000x10 m Transformers along the whole length of the 10.5 m deep canal

Dubai Electricity and Water Authority Belgrade Land Development Agency, Client Ministry of Agriculture, Peru (DEWA), UAE Serbia

Pećina Potable Water Treatment Potable Water Treatment Plant, Dam Rovni, Name Plant, , Serbia Limassol Cyprus Serbia

Potable water treatment plant Water Treatment Plant Earth-fill dam, h=75 m, 2 Description Q= 600 l/s Q= 3,500 m3/h Accumulation area: 2.4 km

Water Supply System Kolubara, Rovni, Directorate for Water Supply and Client City Council of Limassol, Cyprus Serbia Sewage, Serbia

40 COMPLEX LAND IMPROVEMENT SYSTEMS 50 WATER TREATMENT PLANTS OVER 30 WATER MANAGEMENT AND RIVER FLOOD CONTROL PROJECTS 50 MUNICIPAL AND INDUSTRIAL WATER SUPPLY AND SEWAGE SYSTEMS

* Abstract from references - WATER – ENVIRONMENTAL PROTECTION 6.9 BUILDING ENGINEERING AND CONSTRUCTION 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING)

Project sta- Project name Technical details Country Client Services tus / Year of completion 1 Chinese Cultural Center, Belgrade Area: 35.000 m², Serbia EMPIRET d.o.o. Beograd Urban project; Design; Consultancy; Works On going Floors: 2B+GF+7+1 execution; 2 Belgrade Waterfront; plot 19.1, "Belgrade Hotel and residential tower, height 168; Serbia Beograd na vodi d.o.o. Design & construction supervision consul- On going Tower", Belgrade Area: 65.815 m², tancy services; Floors: 2B+GF+40 3 Shopping Center "Ada Mall", Belgrade Area: 94.000 m², Serbia GTC Commercial Urban Project; Design & construction On going Floors: 3B+GF+4 Developments d.o.o. Beograd supervision consultancy services; Parts of the Design for Construction; Leasing documentation; Execution of MEP works; 4 Administrative building "Navigator Business Area: 50.000 m2 Serbia GP SEVEN d.o.o. Beograd Works execution; On going Center 2" Floors: 3 underground levels+GF+7+setback 5 Park 11, design and construction of residential Area: 29.282 m2 Serbia Energoprojekt Park 11 doo Beograd Urban Project; Design; Construction; On going and commercial building, Block 11a, New Floors: 2B+GF+8+setbackr Belgrade no. of flats: 134 6 Nikola Tesla Airport, Belgrade, Refurbishment Terminal building: Serbia VINCI AIRPORTS SERBIA Design - the entire design documentation on going and extension of the terminal building with Refurbishment and extension by (all stages) ancillary facilities within the modernization 2020:41.200m² planned by 2025. Planned extension by 2025: 28.000m² Heating plant 44 MW with three-generation plant Waste waters treatment plant: 855m3/day Solid waste treatment plant 7 Aneks of the SMATSA building with the Anex of the building B+GF+3 Serbia SMATSA Air Traffic Design; Preparation of design documenta- On going Control Tower New tower B+GF+16 Services LLC tion and fisibility study; Area: 7.400 m2 8 University Complex Narxoz, Almati Reconstruction and upgrade of the Kazakhstan AO Univerzitet Narxoz / Verni Capital Design; On going University Complex Narxoz Buildings area: 33.000m2 External area: 19.000m2 9 Internacional conference center and hotel "Hyatt Total area: 64.000m2 Russia (Rus- OOO MKC-RosEvroDevelopment I Agrokom Design - Modification of project documenta- On going Regency Rostov Don-Plaza" , Rostov on Don Floors: B+GF+ 5 to16 sian Fed.) Holding tion 10 Internacional conference center and hotel Total area: 64.000m2 Russia (Rus- OOO MKC-RosEvroDevelopment I Agrokom General contractor - structural, MEP & On going "Hyatt Regency Rostov Don-Plaza", Phase II, Floors: B+GF+ 5 to16 sian Fed.) Holding finishing works Rostov on Don 11 Hospital in the city of Siktivkar Reconstruction of the fospital building - Russia (Rus- State budget institution of the Komi General contractor - structural, MEP & On going Department of radiology sian Fed.) Republic / Inegrated Client Service of finishing works Area: 5.000 m2 Komi Republic Floors: GF+6 12 ANR National Assembley residences, Abuja Nigeria Julius Berger PLC MEP Systems: desigm, project management, On going works execution, procuremenet, commis- sioning; 13 ANI - Abuja National Institute for Legislative Nigeria Julius Berger PLC MEP Systems: design, project management, On going studies, Abuja works execution, procurement, commis- sioning; 14 Belgrade Waterfront, plot 21, two residential Total area: 76,785 m² Serbia Belgrade Waterfront Ltd. Urban Project; Design (to the Building 2018 towers, Belgrade Floors: 2B+GF+23+Tech Belgrade Permit for the piles) 15 Construction of multi-modal facility, Free Nigeria Julius Berger FZE Turn-key; 2018 trade Zone Calabar 16 Belgrade Waterfront, plot 14, admistrative 20 floors Serbia Belgrade Waterfront Ltd General contractor; 2018 and residential building, two towers A & B, Belgrade 17 Design and construction of the residentrial Total gross area 24.593 m2, landscaping Serbia Energoprojekt Holding PLC Beograd Design; Supervision;Construction; Works 2017 and business complex Sunnyville, Belgrade area 8.560 m2 Floors: 2B+GF+3+Attic execution; 18 Adaptation and reconstruction of business prem- Total area: 13,538 m² Serbia Banc Intesa PLC Belgrade, Serbia Design; adaptation & reconstruction 2017 isses in Banc Intesa Belgrade office buildings Floors: GF+8 19 Residential appartments and Spa Center in Appartments area: 10.500 m2 Kazakhstan TOO Astana Property Management General Contractor for Fitout Works; 2017 „Talan Towers” (Ritz Carlton Hotel), Astana Spa center area: 1.500 m2 20 Office building Gazprom Transgas, Ukhta Total area: 27.000m2 Russia (Rus- OOO Gazprom Transgaz Uhta Subcontractor Execution of structural, 2017 sian Fed.) finishing and MEP works; 21 Ecobank administrative building, Accra Total area: 30.300 m2 Ghana Ecobank Ghana Ltd Design; Supervision; General contractor - 2017 Floors: B1+B2+GF+13 construction; 22 Administrative Complex (Greenwich Centre), Area: 13.500 m², Ghana OCTOGLOW GHANA Ltd. Design; 2017 Tema Floors: B+ GF+ 4+1 **

…building

6.10 * Abstract from references - BUILDING ENGINEERING AND CONSTRUCTION BUILDING ENGINEERING AND CONSTRUCTION 68 years of 6. excellence

Energoprojekt has designed many architectural projects in Serbia and world wide. Our projects have always demonstrated the concept that architecture is a refined blend of science and art, respecting both form and function of design solutions.

Energoprojekt has designed, constructed and equipped many facilities, such as:

Commercial / office-space buildings, public buildings Hotels, tourist complexes, sports complexes Parliaments, residential buildings and villas Airports, railroad stations and bus terminals Hospitals and health centers Housing projects Banks

White House, Presidential Palace, Conference Centre, Name Ministry Complex, Kuwait Tashkent, Uzbekistan Accra, Ghana

President palace Office space Government offices Description Total area: 5,746 m2 Total area: 15,000 m2 Total area: 270,000 m2

Client Government of Uzbekistan Government of the Republic of Ghana Government of Kuwait

Hotel Caspian Riviere Grand Palace, Hotel Hyatt Regency, Sheraton Hotel and Conference Name Aktau, Kazakhstan Belgrade, Serbia Centre, Harare, Zimbabwe Five star hotel Five star hotel Five star hotel Description Conference Centre: 30,145 m2 Total area: 25,000 m2 Total area: 37,500 m2 Hotel: 30,648 m2 Client TOO “Oil Real Estate” BMP Consortium Government of Zimbabwe

Belgrade Arena, Shah Alam Sports Complex, Sports Complex Igalo, Name Belgrade, Serbia Kuala Lumpur, Malaysia Montenegro

Universal sports hall Sports complex Sports complex Description Total area: 48,000 m2 Total area: 270,000 m2 Total area: 6,000 m2 Capacity: 20,000 spectators Capacity: 80,000 spectators Capacity: 3,000 spectators The of Herceg Novi, Client City of Belgrade Government of Selangor State SC Igalo

* Abstract from references - BUILDING ENGINEERING AND CONSTRUCTION 6.11 6. BUILDING ENGINEERING AND CONSTRUCTION

Administration Building, Bank Association of Uzbekistan, & Entertainment Name Belgrade, Serbia Tashkent, Uzbekistan Complex, Aktau, Kazakhstan

A class Administration Building in Office space Commercial Complex Description block 26, New Belgrade, Serbia Total area: 15,000 m2 Total area: 49,000 m2 Total area: 50,700 m2

Client Bluehouse Accession Property Holding Bank Association of Uzbekistan TOO “Oil Real Estate”

International Trade YU Business Centre - Building G, AL KHULAFA Office and Apart- Name Fair, Lagos, Nigeria Belgrade, Serbia ment Complex, Baghdad, Iraq

Exibition Space Residential / Office Space Residential and office space Description Total area: 80,000 m2 Total area: 27,500 m2 Total area: 86,000 m2 Complex area: 300 ha

Client Government of Nigeria Energoprojekt Baghdad City Council

Today, Energoprojekt’s teams of architects, engineers and town planners are achieving considerable results in various fields of urban and regional planning, architecture, interior design and construction of projects such as complete engineering contracts on the turn-key basis.

6.12 * Abstract from references - BUILDING ENGINEERING AND CONSTRUCTION INDUSTRY 68 years of 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING) excellence

Project status / Year Project name Technical details Country Client Services of completion 1 Modernisation of the oil processing The Delayed Coker Unit (S-5300, DCU); Serbia CB&I (Client NIS) Validation of all design; static On going complex in NIS Oil Refinery in Coke Transport System (S-5600, CHS) and calculations of concrete and steel Pančevo - Construction of a new appurtenant plants/facilities are envisaged structures, development of all deep oil processing plant and for the DCU designs of auxiliary structures; delayed Coker Unit 2000 t / day of mixed feed consulting services; checking 600 t /day petrol coke and certification of designs of pipelines under pressure; 2 Project for Technical Renovation 200.000 m³ Blast Furnace Gas Holder Serbia HBIS GROUP Serbia Iron&Steel / Nostrification of design documen- On going of Serbia Steel Mill of HBIS Group 250 t /h - Heating Furnace TSIC – China tation and preparation of static Serbia Iron&Steel Ltd 1.782 million t/g - Sintering machine calculation; supervision of works execution; 3 Increase of alternative fuels Increase of consumption of the alternative Serbia LAFARGE BFC Design, all stages On going consumption fuels 5 t/h, chlorine extraction and storage and its dosing to the cement mills by introduction of the following systems: 1. Alternative fuels dosing system to the satellite burner 2. Chlorine bypass system with the silo of capacity 2.000 m³ 3. Chlorine dust dosing system into the cement mills 4 Factory for the production of 1.000.000.000 tablets per year (solid Ghana Ernest Chemist Ltd, Ghana Design; Consulting services for ac- On going farmaceutical products forms); quiring GMP certificate; Execution 1.000.000 l of syrups per year of GMP critical works; General 5.000.000 l solutions for infusion per year contractor - construction; total net area of 11.000 m2 5 Construction of the Pharmaceutical Solid forms 12,8 mil. pack./year Sudan Liliam Pharmaceutical Industries Development of the detailed On going factory Liliam Pharmaceutical (I a Semisolid forms 0,76 mil. pack. / year Co.Ltd. design, works execution and equip- phase Cephalosporine), Khartoum Cephalosporine 5,4 mil. pack. / year ment installation, GMP qualification Sterile liquids 3,15 mil. pack / year of critical systems and commission- 14.950 m² ing of the pharmaceutical factory with all the appurtenant technical systems on a “turn-key” basis; 6 FEED for new crude oil storage Qatar Qatar Petroleum Preparation of preliminary design 2017 tanks at KM and Jaleha in Dukhan and tender documentation; 7 New fermenter facility within Fermenter capacity of 6 x 4000 hl Serbia Heineken Srbija d.o.o Development of design documen- 2016 Heineken brewery complex in tation and execution of works Zaječar. under “turnkey” contract 8 Construction of the New Sulfhuric PS convectors, conveyors, flash furnace gas Serbia CMSC Bor, Project Management; construction 2015 Acid Plant at CMSC Bor and pierce smith converters handling, WESP, SNC Lavalin works, partial delivery of equipment contact section, convertor, absorbing towers, and materilas, complete erection blower 4MW, preheater, heat exchangers, of the mechanical and electrical strong acid building, blower and MCC building equipment and installations; 9 Flash smelter at CMSC Bor - Control Building, dryer, flash smelting Serbia CMSC Bor, Design; Project Management; 2015 construction furnace, WHB and ESP, cold water reservoir, Outotec Commissioning; procurement of pipe bridge and filter. MEP equipment and systems and execution of civil, electrical and mechanical works; 10 Medical products and chemicals Area 1600 m2 Serbia Zorka Pharma Hemija Detailed design and works 2015 production plant , Zorka Pharma, execution at the revamping and Sabac extension of the plant; 11 Ferrochrome slag crushing and Capacity: 800.000 t/year Kazakhstan AO TNK KAZHROM Detalied design, supervision of 2015 sorting complex works execution and process equipment installation, equipment proqurement, testing, commis- sioning and personnel training; 12 Four Compressor Stations on the 4 compressor stations: designed capacity Kazakhstan AGP/ Engineering and Procure- Design; Detail design; 2015 route C of the Asian gas pipeline HPA–(3+1)x30 MW ment Services LLP, (Kazakhstan – China) Compressor stations are on the route C of the Asian gas pipeline Kazakhstan – China - expected max.production: 18,7 + 6,3 billion m3 /year 13 Two water recycling blocks Water Recycling Block №1: 2x4500 m3 /h of Kazakhstan Oil Rafinery Atiray/ Engineering Design; Detalied design; 2015 at the Atyrau Oil Refinery recirculated water and Procurement Services LLP, Water Recycling Block №2: 1x 1000 m3 /h Almaty of recirculated water **

…industry

* Abstract from references - INDUSTRY 6.13 6. INDUSTRY

During 67 years, Energoprojekt has been successful in implementing a variety of large-scale, highlycompli- cated and technologically complex industrial projects. We offer consulting services related to building con- struction, installation and start up, providing transfer of knowledge and state of the art technologies.

Energoprojekt has designed and/or constructed over 1,300 complex projects in different industrial fields such as:

Food processing industry Pharmaceutical industry Basic and processing chemical industries Transportation and storage of oil and gas Wood processing, cellulose and paper production industries Metal-processing industry Ore and metal processing industries and transportation systems Non-metal and construction materials industries Tobacco processing and cigarette production industries Industrial power plants, heating plants and boiler plants Gas distribution

INDUSTRIAL PLANTS AND FACILITIES

Schlumberger Oilfield Services Oilfield Services Base with Tanks, Name Paper factory, Siktivkar, Russia Facility, Aktau, Kazakhstan Pavlodar, Kazakhstan

Construction Construction, tanks capacity Description Construction 10,000 m2 50,000 tons

Client Schlumberger Logelco Inc. TOO Helios Mondi SLPK

BAT Tobacco Factory, Pharmaceutical Factory Pharmaceutical Plant Name Ibadan, Nigeria Tyumen, Russia Hemofarm, Serbia

Tobacco manufacturing and Description Pharmaceutical factory Pharmaceutical plant for sterile drugs cigarette production factory in ampoules and in lyophilized form

British American Hemofarm, Vršac Client Administration of Tyumen city Tobacco (BAT) Serbia

6.14 * Abstract from references - INDUSTRY INDUSTRY 68 years of 6. excellence

Wine producing plant and villas Diary Laktaši, , Dairy industry, Belgrade Name JUKO, Saryagash, Kazakhstan Republika Srpska “Imlek” Dairy, Serbia

Capacity 50,000 lit / day, Description Design and construction Dairy with capacity of Design and construction 500,000 l/daily

Client TOO Caspian Food Salford Group Imlek

Mineral Water Bottling Plant Detergent Factory Lab-Labs, Agricultural-Industrial Complex Name Vrujici, Serbia Russian Federation Kuban, Russian Federation

5 factories: dairy products factory, Detergent active components factory factory of conditor products, ice cream Water bottling plant Description Capacity: 50,000 t and 60,000 t/year production factory, fruit & vegetable freezing factory, pack factory

Si & Si Company, Kirishinjeftorgsintez AIK Kuban, Client , Serbia Russian Federation Russian Federation

OVER 1,300 DESIGNED AND/OR CONSTRUCTED COMPLEX PROJECTS IN DIFFERENT INUDSTRIAL FIELDS

* Abstract from references - INDUSTRY 6.15 6. INFORMATION TECHNOLOGIES

Energodata is one of the pioneers in the field of information technologies in the region. For more than five decades Energodata has been involved in design, engineering and implementation of customized software and hardware solutions.

A long-term partnership with world leading software (CA Technologies, Oracle, , SAP Business Ob- jects, Novell, Imperva etc) and hardware manufacturers (Dell, Lenovo…), enables Energoprojekt to design, develop and implement IT solutions such as:

Business Intelligence and Data Warehousing Project Management Security Management Service Management Infrastructure Management Backup and Recovery Management Software solutions for the large systems Software development for clients (IT outsourcing) Self-service banking solutions

Name Postal solutions Financial analysis Business Process Management

Development, maintenance and Business Process Management using Software solution OCRisc for the Description modernization of postal information Document Management system and analysis of financial documents solutions Business Intelligence tools

Post of Montenegro, Partner Microcredit Foundation, Client Sberbank and Erste bank, Serbia Post of the Republic of Srpska Tuzla, BiH

Business Intelligence Software solutions by customer’s Name needs ATM devices Tabular and graphical representation of Design, development and implemen- business data through „revived” reports tation of system and business software Sales, installation, maintenance and Description through which the data is analyzed in tailored to the specific needs of large service of ATMs depth and medium-sized business systems Post of Montenegro, Partner Microcredit Komercijalna banka, Credit Agricole, Client Telenor, , EPS, DDOR Foundation Tuzla BiH, Energoprojekt Holding NLB Bank and Direktna banka, Serbia

6.16 * Abstract from references - INFORMATION TECHNOLOGIES 68 years of excellence PERFORMANCE7. KEY FINANCIAL DATA

TOTAL AND OPERATING REVENUES, ANNUAL CONTRACTED VALUE, 2013 - 2018 2013 - 2018 (CONSOLIDATED) 317 311 288 292 600 300 294 286 272 262 500 250 213 214 198 196 400 200 338 346

300 276 150 152 141 224 185 186 in EUR million 200 in EUR million 100 161 221 120 61 60

50 100 186 149 205 104 124 126 55 12 0 0 2013 2014 2015 2016 2017 2018 2013 2014 2015 2016 2017 2018 BACKLOG 31.03.2019

OPERATING REVENUE TOTAL REVENUE SERBIA FOREIGN

8.OWNERSHIP OWNERSHIP STRUCTURE

OWNERSHIP STRUCTURE Energoprojekt Holding is a public limited company. Capital ownership is as follows:

14.16% OTHERS

52.26% Napred Razvoj AD Novi Beograd Montinvest Properties DOO Jopag AG 33.58% Bojović Dobroslav RepubliC OF Napred AD Beograd SErbia

Source: www.crhov.rs, May, 2019

* KEY FINANCIAL DATA * OWNERSHIP STRUCTURE 7.0 8.0 www.energoprojekt.rs