6/0-02-925/2015-5 Date: December 21, 2015 Belgrade

Total Page:16

File Type:pdf, Size:1020Kb

6/0-02-925/2015-5 Date: December 21, 2015 Belgrade Republic of Serbia COMMISSION FOR PROTECTION OF COMPETITION Number: 6/0-02-925/2015-5 Date: December 21, 2015 Belgrade Pursuant to Article 37(2) of the Law on Protection of Competition (“Official Gazette of the RS”, nos. 51/09 and 95/13), Article 192(1) of the Law on General Administrative Procedure (“Official Gazette of the FRY”, nos. 33/97, 31/01 and “Official Gazette of the RS”, no. 30/10), and Article 2(1/6) of the Tariff on the level of compensation for activities within the competence of the Commission for Protection of Competition (“Official Gazette of the RS”, no. 49/11), deciding under the Notification on concentration entered under number 6/0-02-925/2015-1, submitted on December 15, 2015, by company “AMAN” LLC Belgrade, with registered seat at the address 52a Vinogradska Street, Belgrade – Surčin, Republic of Serbia, registered in the Business Registers Agency of the Republic of Serbia under company registration number 06048064, via plenipotentiary attorney Beba Miletić, 28 Oblakovska Street, Belgrade, Republic of Serbia, on December 21, 2015, President of the Commission for Protection of Competition enacts the following D E C I S I O N I Concentration of undertakings in summary procedure IS APPROVED created by acquisition of direct control on the part of company “AMAN” LLC Belgrade, with registered seat at the address 52a Vinogradska Street, Belgrade – Surčin, Republic of Serbia, registered in the Business Registers Agency of the Republic of Serbia under company registration number 06048064, over business operations performed on the retail market in non-specialized stores predominately supplied with food, beverages and tobacco that represent functional business- technical entireties in the following trade objects: "IDEA Blok 28", 39 Umetnosti Boulevard, Belgrade- New Belgrade, "IDEA Sremska Mitrovica", bb Marko Peričin Settlement, Sremska Mitrovica, “IDEA Tamiš kapija“, 10k Dositeja Obradovića Street, Pančevo, „RODA SM Sava“, 155 Jurija Gagarina Street, Belgrade – New Belgrade, “RODA Megamarket Smederevo”, bb Despota Đurđa Street, Smederevo, “RODA Supermarket Sombor”, bb Sportska Street, Sombor, and “RODA Supermarket Niš”, 2 Kralja Milana Square, Niš. II IT IS ESTABLISHED that the applicant of Notification on concentration has executed payment in the amount of RSD 3,056,917.50 (in words: three million, fifty-six thousand, nine hundred seventeen and five tenths Dinars) to the account of the Commission for Protection of Competition no. 840-000000880668-16, maintained with the Treasury Administration, with reference number 6/0-02-925/2015-1, which represents determined amount of the fee as compensation for issuing decision on approval of concentration in summary procedure from Article 2(1/6) of the Tariff on the level of compensation for activities within the competence of the Commission for Protection of Competition. .
Recommended publications
  • Do Not Let Belgrade Drown (Ne Davimo Beograd)
    Č Š ć Do not let Belgrade drown (Ne davimo Beograd) Initiative Do not let Belgrade drown was form in 2014 to oppose the Belgrade Waterfront’s project, the consequences and the way the process of planning and the legalizing the project was carried out. It attracted a number of associations, independent organizations, experts, lawyers, academics, journalists, architects and urban planners. Our idea is to stress the importance of popular participation in the development of the city We believe that is possible to build a new kind of solidarity and civic mobilization Giant Duck Becomes Belgrade Resistance Symbol Small-scale actions were followed by mass protests in 2015 and at the beginning of 2016. The watershed moment followed the demolitions of 25 April 2016, when citizens showed up in great numbers to protest, demanding resignations and laying criminal responsibility at the door of officials. We led the biggest civic protests since those that toppled Slobodan Milošević in 2000. Movement transformed into political organization which participated in the local elections. Key achievement is positioning of the topics of urban development and citizen participation in decision making process as one of most important issues in public sphere in Belgrade. Local elections, march 2018. We independently took part in Belgrade elections on March 4, 2018 as a citizen list under the name "Initiative Do not let Belgrade drown - Yellow Duck - Our City, Our City - Ksenija Radovanovic", presenting a program of 20 points. Support was provided by other local movements from Serbia, as well as Janis Varufakis, DIEM25, Ada Colau, Ska Keller, “Zagreb je nas” movement.
    [Show full text]
  • Serbia Prime Site One AG 2 Gonten
    SERBIA PRIME SITE ONE WIRTSCHAFTLICHER BERICHT DES EDA Zusammenfassung Das globale Wachstum dürfte sich in diesem Jahr Der vom damaligen Regierungschef und aktuellem abschwächen, aber schon 2021 allmählich erholen, je- Präsidenten Aleksandar Vucic vor sechs Jahren be - doch sind die Wachstumsaussichten noch immer sehr gonnene Prozess der Restrukturierung der Wirt- ungewiss. Das Hauptrisiko für die Projektion auf kurze schaft und Konsolidierung der Finanzen wird weiter- Sicht ergibt sich aus dem noch zu wenig bekannten hin von der Regierung fortgesetzt. Erklärtes Ziel von Virus und möglichen Störungen bei globalen Ketten. Ministerpräsidentin Ana Brnabic ist, die nötigen Refor- Nach Prognosen des Internationalen Währungsfonds men im Hinblick auf einen EU-Beitritt voranzutreiben. (IWF) wird auch die serbische Wirtschaft in diesem Schwerpunkt der Regierungspolitik bleiben EU-Inte- Jahr vorrausichtlich um drei Prozent des BIP fallen, gration als wichtigstes strategisches Ziel, Digitalisie- könnte aber schon im nächsten Jahr um 7,5 Prozent rung, E-Government, Stabilhaltung der öffentlichen wachsen. Serbien verzeichnete vor der COVID-19 Finanzen, aber auch Fortsetzung der Wirtschafts- Krise ein Wirtschaftswachstum von 5 Prozent in den reformen und der Rechtsstaatlichkeit, insbesondere ersten vier Monaten 2020. Das serbische BIP belief der Unabhängigkeit der Gerichtsbehörden. Die bis- sich 2019 auf 45,9 Milliarden Euro, was einem Anstieg her durchgeführten strukturellen Reformen und Ein- von 4,2 Prozent entspricht. sparungen im Staatshaushalt brachten Serbien auf Wachstumskurs. Serbien verzeichnete zwei Jahre hin- Die makroökonomische Leistung Serbiens blieb 2019 tereinander eine hohe Wachstumsrate - einen Anstieg robust. Das Wachstum wird auf 4,2 Prozent geschätzt, von 4,4% in 2018 und 4,2 % im Jahr 2019. Serbien hat unterstützt durch starke ausländische Direktinvestitio- sich in sechs Jahren zu einer niedrigen Inflations- und nen und boomende Bautätigkeiten.
    [Show full text]
  • Residential Market Outlook – 2018
    Residential Market Outlook Belgrade | Jan 2018 Regulated by RICS Regulated by RICS Residential Market Outlook | Jan 2018 | LeRoy Realty Consultants | 1 Serbia’s overall economy health has been reinforced further in 2017, which lifted up the GDP & Construction Industry Growth country’s credit rating from BB- to BB¹, with a 5% stable outlook in December 2017. The outlook 4.0% for this year shows growth accelerating 4% 2.8% 3% 2.8% 2.2% The GDP growth of 1.8% in 2017 was lower than projected, 2% 1.8%* but its structure points toward underlying changes that will 1% shape the economic expansion in the coming years. The 0.8% growth is primarily driven by the increased investment, 0% -0.7% private consumption, exports and FDI. On the other hand, 2014 2015 2016 2017 the growth of the construction industry outperforms that of -1% the local economy in the last 3 years, with positive future -1.8% -2% prospects. Construction industry growth GDP *estimate FDI inflow in 2017 stood at EUR 2.3 billion, which is up by Source: Statistical Office of the Republic of Serbia 37.5% y-o-y thus exceeding the projection for 2017. The Central Bank has decided to cautiously loosen monetary Unemployment & Salaries policy, to support a boost in domestic economic activity, and 20% 6% decreased its key policy rate at a historic low of 3.5% on 18% Salary growth rate October 2017, which contributed to the decline in the EUR- 16% 4% indexed lending. 14% 3.7% 3.9% 12% 10% 1.4% 2% 8% Elevated levels of business and 6% 0% 4% -0.2% consumer sentiment Unemployment rate 2% 0% -2% Labor market conditions have continued to improve in 2017, 2014 2015 2016 2017 even faster than previously expected, with the Unemployment Salary growth unemployment rate falling to 12.9% in the third quarter of Source: Statistical Office of the Republic of Serbia 2017, coupled with two consecutive years of wage growth.
    [Show full text]
  • Banat Educational Households
    Banat Educational Households Banat Educational Households Page 2 of 20 CONTENTS Concept ..................................................................................................................................................................... 4 Italian example ......................................................................................................................................................... 5 Educational household Ferdy .......................................................................................................................... 5 Educational households in Italy ....................................................................................................................... 6 Map............................................................................................................................................................................. 7 Educational Household Banatski biser ............................................................................................................... 8 Educational household „Janošičanka“ .............................................................................................................. 10 Educational household Stefanović .................................................................................................................... 12 Educational household Bradvarević ................................................................................................................. 14 Educational household Filipović .......................................................................................................................
    [Show full text]
  • Hope Rises for Parents of Missing Babies
    abroad. adoption illegal for hospital out gled smug were -and alive still are children newborn their that suspect Serbia who since. ever happened what out “I Ivana Ivana of Serbia’s first notaries notaries first Serbia’s of election mire Disputes on Continued children. lost their to happened what discover to hope parents of thousands babies, missing on report awaited long- its publishing to readies group working agovernment As babies missing of parents risesfor Hope C Gordana law. the broke process selection the that candidates disappointed by claims back courts ifthe dearly pay Serbia could election process was unfair and illegal. and unfair was process election are ready to take this case to the the to thiscase take to ready are we and law the with in accordance Filipović is one of 6,000 parents in parents 6,000 of isone Filipović “The process was unfair, was not not was unfair, was “The process NIKOLIĆ ANDRIĆ has been struggling to find find to has beenstruggling who Filipović, Goran said birth,” after shortly died she me told doctors the in1998; girl baby my lost trative Court, claiming the the claiming Court, trative Adminis the with charges filed have notaries first asSerbia’s election secure to failed who andidates page 3 Belgrade Belgrade +381 11 4030 306 114030 +381 high-rise high-rise Page 5 - - eyes a eyes future future Thousands of parents in Serbia believe that their children were stolen atbirth. stolen were thattheirchildren inSerbiabelieve Thousands ofparents of forming the Chamber of Notaries. Chamberof the forming of process inthe influence political of cions suspi to notaries, the choose used to commission the that criteria the to dates BIRN.
    [Show full text]
  • Planned Contract Will See Alstom Supply Metro Trains, Infrastructure and Digital Train Control Solutions
    PRESS RELEASE Alstom signs Memorandum of Understanding for the design and building of Belgrade’s first metro system Planned contract will see Alstom supply metro trains, infrastructure and digital train control solutions 22 January 2021 – Alstom has signed a Memorandum of Understanding (MoU) KEY TAKEAWAYS with the Government of Serbia for the construction of phase 1 of the first line of the future Belgrade metro. In this project, Alstom will be responsible for a wide ⚫ Memorandum of scope of works including the metro trains themselves, digital train control Understanding signed today systems, platform screen doors, the infrastructure (the track laying and the power ⚫ First line of the Belgrade supply solutions) and the transport system integration. The construction of the metro new metro network is expected to start at the end of this year, pending signature ⚫ Alstom will supply the full of the contract with the relevant Serbian authorities. transport system: metro trains, power supply, “We are immensely proud that Alstom’s solutions will be part of the construction signalling and track-works, of the Belgrade metro, which is a very important infrastructure project in the including the system Balkan region. This project will greatly improve the transport offering available to integration Belgrade’s residents and will showcase Alstom’s leadership in metro solutions and providing a superior passenger experience,” says Antonio Moreno, Central and Eastern Europe Managing Director at Alstom. The new transport system will provide the foundations for truly sustainable mobility in the densely populated capital city of Serbia, rapidly contributing to the reduction of road congestion. The first two lines will cover a total of around 42 kilometres – the first 22 kilometres, the second nearly 20.
    [Show full text]
  • Serbia August 2018
    FACT SHEET Serbia August 2018 . Support the Government of . Ensure that the UNHCR Serbia in strengthening its humanitarian and protection SERBIA asylum system in line with needs of refugees, especially applicable international of Persons with Specific Needs PRIORITIES: standards (PSN), are promptly identified and addressed POPULATION OF CONCERN FUNDING (AS OF AUGUST 2018) Serbia 2017 programme: Expended support at value of USD 12.5 M 2018 programme: Comprehensive budget: USD 18 M of which prioritized: USD 8.5 M Total: 232,130 Source: Ministry of Interior and Serbian Commissariat for Refugees and Migration UNHCR PRESENCE: Staff: as of August 2018 28 National Staff UNHCR and partners are 5 International Staff present in Preševo, Bujanovac and Vranje in Southern Serbia, 26 Affiliate Staff Dimitrovgrad, Pirot, Bela Total: 59 Palanka, Bosilegrad and Niš in Eastern Serbia, Adaševci, Šid, Principovac and Loznica in Offices: Western Serbia and Horgoš, UNHCR Representation in Kelebija, Kikinda, Sombor and Serbia Subotica in Northern Serbia, in Belgrade as well as in five 64 Bulevar Zorana Đinđića asylum centres situated around 11070 New Belgrade the country. www.unhcr.org 1 FACT SHEET > Serbia / August 2018 Working with Partners ■ UNHCR Serbia collaborates with the Ministries of Foreign Affairs, of Labour, Employment Veteran and Social Affairs, of Internal Affairs, of Public Administration and Local Self-Government, of Health, as well as the Serbian Commissariat for Refugees and Migration (SCRM) and local authorities. ■ Project Partnership agreements are in place with A11, Amity, Belgrade Center for Human Rights (BCHR), Crisis Response and Policy Center (CRPC), Danish Refugee Council (DRC), Humanitarian Center for Integration and Tolerance (HCIT), IDEAS, Indigo – Group for Children and Youth, International Aid Network (IAN), Praxis, Psychosocial Innovation Network (PIN), Sigma Plus, Vizija, UNDP, UNOPS and UNV.
    [Show full text]
  • Mass Heritage of New Belgrade: Housing Laboratory and So Much
    PP Periodica Polytechnica Mass Heritage of New Belgrade: Architecture Housing Laboratory and So Much More 48(2), pp. 106-112, 2017 https://doi.org/10.3311/PPar.11621 Creative Commons Attribution b Jelica Jovanović1* research article Received 17 November 2017; accepted 06 December 2017 Abstract 1 Introduction The central zone of New Belgrade has been under tentative It might be difficult for us today to grasp the joy and enthu- protection by the law of the Republic of Serbia; it is slowly siasm of the post-war generation of planners and builders, once gaining the long-awaited canonical status of cultural prop- New Belgrade had started to emerge from the swampy sand erty. However, this good news has often been overshadowed of the left bank of the Sava river. The symbolic burden of the by the desperation among the professionals, the fear among vast marshland, which served as a no-mans-land between the flat owners and the fury among politicians: the first because Ottoman and Habsburg Empire, could not be automatically they grasp the scale of the job-to-be-done, the last because it annulled after the formation of the first Yugoslavia in 1918. interferes with their hopes and wishes, and the second because It took another twenty-something years, a world war and a they are stuck between the first and the third group. This whirl- revolution to get there. However, as well as the political and pool of interests shows many properties of New Belgrade, that economic issues, there was a set of organisational and techno- stretch far beyond the oversimplified narratives of ‘the unbuilt logical obstacles to creating this city.
    [Show full text]
  • Geographical Index of Concentration As an Indicator of the Spatial Distribution of Tourist Attractions in Belgrade
    TURIZAM Volume 25, Issue 1 45–54 (2021) ORIGINAL SCIENTIFIC PAPER Geographical Index of Concentration as an Indicator of the Spatial Distribution of Tourist Attractions in Belgrade Sanja PavlovićA, Radmila JovanovićB Received: July 2020 | Accepted: March 2021 DOI: 10.5937/turizam25-27553 Abstract The spatial structure of tourist attractions can be presented both qualitatively and quanti- tatively. One of the indicators of the spatial structure of tourism is the index of geographi- cal concentration of tourist attractions. The geographical concentration of tourist attractions represents the ratio of the number of tourist attractions in the observed area and its struc- tural parts and the total number of structural units of the analyzed area. This paper aims to determine the spatial distribution of attractions in the administrative territories of Belgrade municipalities and to establish correlations with tourist attendance. The number and spatial distribution of accommodation capacities are the largest in the central city municipalities so that the number of visitors is the largest in them. At the same time, the central city municipal- ities have the highest concentration of tourist attractions. For data collection, the authors used field research, OSM (Open Street Maps), Google maps, with software processing ArcGIS 10.2. The research results enabled the definition of the model of distribution of tourist attractions and indicated its application. This model of distribution of tourist attractions shows that they are mostly concentrated in the city center. This also means a small spatial connection of tour- ist attractions in the city center and peripheral parts. Keywords: tourist attractions, spatial distribution, geographical index, Belgrade Introduction The competition of tourist values in an area, among other things, relies on the structure of the tourist resource.
    [Show full text]
  • Serbia 2020 OSAC Crime & Safety Report
    Serbia 2020 OSAC Crime & Safety Report This is an annual report produced in conjunction with the Regional Security Office at the U.S. Embassy in Belgrade. OSAC encourages travelers to use this report to gain baseline knowledge of security conditions in Serbia. For more in-depth information, review OSAC’s Serbia country page for original OSAC reporting, consular messages, and contact information, some of which may be available only to private-sector representatives with an OSAC password. Travel Advisory The current U.S. Department of State Travel Advisory at the date of this report’s publication assesses Serbia at Level 2, indicating travelers should exercise increased caution due to crime. Review OSAC’s report, Understanding the Consular Travel Advisory System. Overall Crime and Safety Situation Crime Threats The U.S. Department of State has assessed Belgrade as being a HIGH-threat location for crime directed at or affecting official U.S. government interests. The considerable risk from crime is due to the activities of Organized Crime (OC) groups, as Serbia is a main trafficking route from the east to Europe. Rival OC groups target each other in a competitive market, as an ongoing turf war between OC groups over drug distribution rights, resulting in violence to include assassination by firearms and explosives. In 2019, there was one OC-related attempted murder and six OC-related murders in Serbia, a significant decrease from the previous year. None of these murders resulted in a criminal conviction, and most lack even a single suspect. All seven involved firearms. Local media reporting notes that in 2018, 35-40 OC attacks occurred in Belgrade, most involving firearms or car bombs.
    [Show full text]
  • Project Fact Sheet Subotica– Waste Water Treatment Plant
    Project fact ShEet Subotica Waste Water Treatment Plant upgrade and Extension PROJECT OBJECTIVES The capacity increase from 27.000 m3/per day to 36.000 m3/per day and in the rainy period to 72.000 m3/per day. The project comprises two separate contracts on different financial sources: 1. The funds for the Waste Water Treatment Plant were allocated within the municipal budget and the loan released by the European Bank for Reconstruction and Development (EBRD); 2. Apart from the EU contrubution, the municipality of Subotica allocated its own funds for the sludge line. OBJECTIVES • The waste water treatment plant capacity increase. TOTaL BUDGET: € 18.120.169 • Nitrogen and phosphorus reduction in line with the EU Directives. EU Contribution (CARDS 2004): € 5.070.169 • Safe and modern bioactive sludge surplus treatment. (Works € 4.720.169 and TA € 350.000) • Quality protection and improvement of Palić Lake. Italian government grant: € 600.000 PROJECT DESCRIPTION EBRD Loan: € 9.000.000 The upgrade and extension of the Waste Water Treatment Plant, i.e. waste water treatment facility, will solve the issue of the waste water treatment The Subotica Municipality Allocated Funds: € 3.000.000 in the Subotica municipality in the long run. The services of waste waters drainage and treatment in large scope would contribute to protection of Public Water Management Company Vode Vojvodine: € 450.000 water resources decresing on the annual level, whereas the new technolo- gy implementation for the waste water treatment will ensure higher environmental protection degree, especially of the Palić and Ludaš lakes ecosystems. The construction works on the waste water treatment facility were commenced on the 20th September, 2007.
    [Show full text]
  • Transition of Collective Land in Modernistic Residential Settings in New Belgrade, Serbia
    land Article Transition of Collective Land in Modernistic Residential Settings in New Belgrade, Serbia Milica P. Milojevi´c*, Marija Maruna and Aleksandra Djordjevi´c Faculty of Architecture, University of Belgrade, 11000 Belgrade, Serbia; [email protected] (M.M.); [email protected] (A.D.) * Correspondence: [email protected] Received: 30 September 2019; Accepted: 15 November 2019; Published: 16 November 2019 Abstract: Turbulent periods of transition from socialism to neoliberal capitalism, which have affected the relationships between holders of power and governing structures in Serbia, have left a lasting impact on the urban spaces of Belgrade’s cityscape. The typical assumption is that the transformation of the urban form in the post-socialist transition is induced by planning interventions which serve to legitimize these neoliberal aspirations. The methodological approach of this paper is broadly structured as a chronological case analysis at three levels: the identification of three basic periods of institutional change, historical analysis of the urban policies that permitted transformation of the subject area, and morphogenesis of the selected site alongside the Sava River in New Belgrade. Neoliberal aspirations are traced through the moments of destruction and moments of creation as locally specific manifestations of neoliberal mechanisms observable through the urban form. Comparison of all three levels of the study traces how planning and political decisions have affected strategic directions of development and, consequently, the dynamics and spatial logic of how new structures have invaded the street frontage. The paper demonstrates that planning interventions in the post-socialist transition period, guided by the neoliberal mechanisms, has had a profound impact on the super-block morphology.
    [Show full text]