Infrastructure Investments in Belgrade

Total Page:16

File Type:pdf, Size:1020Kb

Infrastructure Investments in Belgrade INFRASTRUCTURE INVESTMENTS IN BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY OCTOBER 2015. DEPARTMENT FOR DESIGNING AND PLANNING DOCUMENTATION www.beoland.com 5 1 2 4 3 BELGRADE RING ROAD In terms of motor traffic, Belgrade Ring Road is of the great significance for the future city traffic network and it reflects on all modes of transport, as well as on the overall development of Belgrade. Belgrade Ring Road is comprised of several roads, which, mutually connected, form the ring around the City, with two bridges across the Danube River and the Sava Bridge. This traffic route with all of its sections is included in the Beoland’s Program, and its parts are in diferent development phases. The Ring starts from Topcider, leaving the Inner City Semi Ring Road and goes through the Rakovica valley along the Patrijarha Pavla Street, and it further goes along Pere Velimirovica Street and Borska Street. It continues to the “Lasta” Interchange and then intersects with the Belgrade-Nis motorway. It not only intersects with the motorway, but also connects to the External Arterial Tangent Road (EATR) via Mokroluska Street. External Arterial Tangent Road (EATR) goes along the eastern edge of the city and further along the Mirijevski stream and towards the Danube River, at Ada Huja island, where it crosses the river by the bridge going to the left river bank of the Danube, and continues towards the Pancevacki Road, forming an interchange with it. From Pancevacki Road it continues as the North Tangent Road which is currently under construction. The importance of this city ring road in traffic terms is not only in connecting the city into one transportation network, but also in development of all other transport modes. Better connection between air (“Nikola Tesla” Airport) and road traffic will be achieved. In the area of the new industrial zone, at the left bank of the Danube River, downstream the Pancevo Bridge, the EATR will be intersecting with water traffic as well (Danube River waterway), and also will connect to the railway, via the railway gauge entering this zone. By planned construction of these facilities, the City of Belgrade will become the shipping and transportation center not only of Serbia, but also in the Balkan Peninsula, being the hub combining four types of transportation: road, rail, river and air transport. Besides indubitable transportation functions, construction of these roads vitalizes empty areas in the zone of “Lasta” Interchange and at the left bank of the Danube River, which may be the subject of new land acquisition, new construction and development of these parts of the City. 1 PATRIJARHA PAVLA STREET FROM ‘’HIPODROM’’ INTERCHANGE TO PERE VELIMIROVICA STREET The subject of the project is the road in the length of 3.5 km. The project includes roads with double tramway track and corresponding contact network, watersupply sewerage, public lighting, relocation and protecion of the existing electric power supply and telecomunication utilities, deviation of the Topcider River at two locations, underpass at the intersection with the Vojvode Misica Boulevard, underpass in the zone of the “Kosutnjak” intersection, two bridges over the Topcider River and retaining walls. The Investment Value – Overall investment value is EUR 22,000,000.00. Implementation Period – 5 years. 2 PERE VELIMIROVICA STREET FROM PATRIJARHA PAVLA STREET TO BORSKA STREET The subject of the project is Pere Velimirovica Street in the length of 1 km and with regulation line width of approx. 21m, as well as parts of the Velisava Vulovica Street in the length of 90m and Milana Blagojevica Spanca Street in the length of 250 m. The Project includes the roades, watersupply, sewerage, public lighting, relocation and protecion of the existing electric power supply and telecomunication utilities, relocation and protecion of the existing heating and gass pipelines, and relocation of the existing entrance to the shelter. The Investment Value - Overall investment value is EUR 2,100,000.00. Implementation Period – 3,5 years. 3 BORSKA STREET FROM PERE VELIMIROVICA STREET TO CRNOT- RAVSKA STREET The subject of the project is the 1,8 km long road with the width of the regulation line of 17-19m with the infrastructure including watersupply, sewerage, electric power supply network, telecommunication network, protection of the heating and gas pipeline. The Investment Value – The investment value is EUR 6.300.000,00. Implementation Period – 4 years. 4 TRAFFIC CONNECTION BETWEEN BORSKA STREET AND “LASTA” INTERCHANGE The subject of the project is 4,5 km road with the width of the regulation line of 18-21m with the infrastructure including watersupply, sewerage, electric power supply network, telecommunication network, protection of the heating and gas pipeline. This section is divided into 7 Lots: • Lots 1 and 2 in the length of 1km with the width of the regulation line of 18 – 20m; • Lot 3, 1km long with the width of the regulation line of 20-21 m; • Lots 4 and 5 in overall length of 1.6km, and constructed in full cross-section; • Lot 6, 0.6 km long with the width of the regulation line of 21m; • Lot ‘’interchange’’ is completed section which provides for the connection of this section from Borska Street to “Lasta” Interchange with the motorway Е75. The Investment Value – Overall investment value for Lots 1, 2, 3, 6 and Lot “Interchange” is EUR 16,100,000.00. Implementation Period – 5 years. 5 EXTERNAL ARTERIAL TANGENT ROAD (FROM PANCEVO ROAD TO Е-75 MOTORWAY) The subject of the project is 10 km long road with the width of the regulation line of approx. 30m, with 7 interchanges, the bridge over the Danube River (750m long with the width of the regulation line of approx. 30m) in the zone of Ada Huja island, as well as significant number of bridges, overpasses and retaining structures. The subject of the project is also watersupply, sewerage, electric power supply network with different voltage levels, telecommunication network and landscaping design. Due to complexity of the route and numerous of facilities along the route, the design preparation should be phased. The Investment Value - according to the preliminary design prepared, the investment value is approx. EUR 174 million, out of which the bridge over the Danube River is EUR 90,5 million. Implementation Period – 8 years. INNER SEMI - RING ROAD The Topcider Tunnel starts at the Hipodrom interchange; the exit will be under the south stands of the „Partizan“ stadium where it will enter Dr Milutina Ivkovica St. and continue to Autokomanda Square. The tunnel is divided into two directions that will enter two separate tunnel tubes 2.172 meters long. Each tunnel tube will have 2 lanes, each 3.5 meters wide, and one auxiliary lane of 0.3 meters. Pursuant to the European Standards, the design provides for one car bridge between tubes on every 750 meters, the pedestrian crossover path on every 250 meters as well as the phone booths and firefighting equipment on every 125 meters. The Preliminary Design for the Topcider Tunnel has been prepared. • Estimated investment value of construction EUR 50million; • Implementation Period Planned: 4 years. The section 3 begins in front of Autokomanda hub and continues through the bridge structure, crossing the roundabout and further to the highway E75. Then it desends to the ground level and along the highway corridor continues up to the Sumice interchange. The total length of UMP section 3 road is approximately 2km long, 1km of which is on structure and the other is on the surface. Each direction is provided with 3 traffic lanes 3,5m width. The preparation for the planning and technical documents are under way. • The Investment Value – Overall investment value is EUR 30 million • Implementation Period – 6 years 4 5 1 2 3 RADIAL DIRECTIONS The roads going from the city centre to the suburban areas form the network of radial roads. They are spreading in all directions and connecting the rings around the city or the parts of these rings, or make the connection with the roads connecting the City of Belgrade with other towns. Radial roads that shall be improved within the network are as follows: 1. Nova Kumodraska Street; 2. Trgovacka Street – the connection to the bypass road; 3. Juzni Boulevard; as well as the whole range of roads within the network which need to be permanently improved and developed due to increased level of motorization, and transport technology. Taking into account the criteria, transportation needs, the degree of implementation of the project, the possibility of resolving the property issues, the construction of the following roads has been estimated as the priority: Trgovacka Street – connection to the bypass road. This road connects central city areas with the Ibarska Arterial Road and Belgrade Bypass (extension from Trgovacka Street to the bypass). According to the planning documents, this road shall have three lanes per each direction, intersections at the city core, and three interchanges in the bypass zone. Nova Kumodraska Street - This road connects major part of the Municipality of Vozdovac to the motorway and is especially important because its route intersects with two traffic rings: ICSRR and wider traffic ring. Making a breach of the Nova Kumodraska Street up to the motorway along the Kumodraski stream and up to the intersection with Darvinova Street forms the connection to the existing route of Kumodraska Street which is already constructed up to the village of Kumodraz. 1 NOVA KUMODRASKA STREET FROM USTANICKA STREET TO DARVINOVA ST. The subject of the project is the road 1,65 km long with the width of the regulation line of approx. 25,5m with new bridge over the motorway and all accompanying surface intersections with the existing roads, as well as the service road along the Е75 motorway including approach ramps.
Recommended publications
  • Zemunska Naselja
    ZEMUNSKA NASELJA 149 "Altina" naselje lepog imena i bez elementarnih uslova za normalan `ivot VA@NO JE BILO PRODATI PLACEVE (Br. 22/ 13. januar 2001) 152 Stvarno ili mogu}e, ali je najavljeno ZATRPA]E "BUSIJE" SME]EM! (Br. 24/ 10. februar 2001.) 154 [ta }e biti sa zemunskim naseljima "spomenicima" radikalske vlasti MALO NADE NA HORIZONTU (Br. 30/ 5. maj 2001.) 156 Naselje „13 maj” ni u Zemun polju, ni u Batajnici OVDE JE I VREME STALO (Br. 32/ 2. jun 2001) 158 TRANSFUZIJA U TRI FAZE (SVE@A KRV) (Br. 37/ 1. septembar 2001.) 160 KROJA^I NA[IH SUDBINA (Br. 49/ 23. februar 2002.) 162 Da li }e Op{tina Zemun biti svedena gotovo na polovinu sada{nje teritorije I BATANJI^ANI TRA@E OP[TINU (Br. 58/ 20. jul 2002.) 164 Divlja gradnja u naselju "Zmaj - kolonija" kao posledica "lo{e istorije" "OTPISANI" NE @ELE DA BUDU I "ZABORAVLJENI" (Br. 59/ 24. avgust 2002) 167 Bolji dani u naselju "Plavi horizonti" po~eli tek kad su se samoorganizovali STIGLA STRUJA, ^EKA SE AUTOBUS (Br. 63/ 19. oktobar 2002.) 147 DOSIJE ZEMUN 1999 - 2003. 170 Grmovac jo{ jedna [e{eljeva "nedo|ija" nadomak Zemuna, naselje prevarenih MILIONI MARAKA ZA "KAMEN OKO VRATA" (Br. 66/ 30. novembar 2002) 175 ZEMUN POLJE 148 ZEMUNSKA NASELJA "Hronika" broj 22/ 13. januar 2001 ALTINA naselje lepog imena i bez elementarnih uslova za normalan `ivot VA@NO JE BILO PRODATI PLACEVE Socijalisti nisu ni{ta uradili, a radikali su plan ure|enja naselja totalno ignorisali. Prodali su ~ak i placeve na kojima su trebali da budu podignuti pija- ca, obdani{te i crkva Do 1991.
    [Show full text]
  • Information Current As of November 18, 2020
    Information Current as of November 18, 2020 Table of Contents SOURCEREE PERSPECTIVE ............................................................................................3 OVERVIEW .........................................................................................................................6 WEBSITES ...........................................................................................................................6 OWNERSHIP .......................................................................................................................6 OBJECTIVES ......................................................................................................................6 FINANCIAL INTENTIONS .................................................................................................7 THE EFFECT ON AMERICA .............................................................................................8 ECONOMIC CORRIDORS .................................................................................................9 FUNDING .......................................................................................................................... 11 APPENDIX A: PROGRAM LEADERSHIP ....................................................................... 16 APPENDIX B: ASSOCIATED ENTITIES ......................................................................... 18 APPENDIX C: PARTICIPATING NATIONS.................................................................... 21 APPENDIX D: PROJECTS ...............................................................................................
    [Show full text]
  • Airac Aip Amdt
    SRBIJA / CRNA GORA AIRAC AIP SERBIA / MONTENEGRO KONTROLA LETENJA SRBIJE I CRNE GORE SMATSA doo BEOGRAD / AMDT SERBIA AND MONTENEGRO AIR TRAFFIC SERVICES SMATSA llc 6/21 SLUŽBA ZA VAZDUHOPLOVNO INFORMISANJE / AERONAUTICAL INFORMATION SERVICE Trg Nikole Pašića 10, P.B. 640, 11000 Beograd, Serbia, AFS: LYBBYOYX 6 MAY TEL: + 381 11 321 8056, 321 8051 FAX: + 381 11 324 0456 e-mail: [email protected] Stupa na snagu / Effective Date 17 JUN 21 1. Sadržaj 1. Contents 1.1 Lokacijski indikator: LYEV – Uvođenje 1.1 Location indicator: LYEV – Introduction 1.2 AD BEOGRAD/Nikola Tesla: Parking pozicije – Izmene 1.2 BEOGRAD/Nikola Tesla AD: ACFT stands – Changes (prethodno objavljeno NOTAM-ima) (previously published by NOTAM) 1.3 AD BEOGRAD/Nikola Tesla: Navigacioni postupci – 1.3 BEOGRAD/Nikola Tesla AD: Navigation procedures – Izmene Changes 1.4 Uređivačke izmene 1.4 Editorial changes 2. Uklonite sledeće stranice 17 JUN 21 / 3. Uložite sledeće stranice 17 JUN 21 / On 17 JUN 21 remove the following pages: On 17 JUN 21 insert the following pages: GEN 0.2–1/2 20 MAY 21 GEN 0.2–1/2 17 JUN 21 GEN 0.4–1/6 20 MAY 21 GEN 0.4–1/6 17 JUN 21 GEN 0.5–1/2 20 MAY 21 GEN 0.5–1/2 17 JUN 21 GEN 2.4–1/2 28 JAN 21 GEN 2.4–1/2 17 JUN 21 GEN 3.2–11/14 20 MAY 21 GEN 3.2–11/14 17 JUN 21 GEN 3.2–15/16 22 APR 21 GEN 3.2–15/16 17 JUN 21 AD 2 LYBE 2.1–1/2 25 MAR 21 AD 2 LYBE 2.1–1/2 17 JUN 21 AD 2 LYBE 2.2–1/2 25 MAR 21 AD 2 LYBE 2.2–1/2 17 JUN 21 AD 2 LYBE 6.2–1/2 3 DEC 20 AD 2 LYBE 6.2–1/2 17 JUN 21 AD 2 LYBE 6.2–5/6 3 DEC 20 AD 2 LYBE 6.2–5/6 17 JUN 21 AD 2 LYBE 6.4–1/2 3 DEC 20 AD 2 LYBE 6.4–1/2 17 JUN 21 AD 2 LYBE 6.4–5/6 3 DEC 20 AD 2 LYBE 6.4–5/6 17 JUN 21 AD 2 LYBE 6.5–1/2 3 DEC 20 AD 2 LYBE 6.5–1/2 17 JUN 21 AD 2 LYBE 6.5–5/6 3 DEC 20 AD 2 LYBE 6.5–5/6 17 JUN 21 AD 2 LYBE 8.1–1/2 28 JAN 21 AD 2 LYBE 8.1–1/2 17 JUN 21 AD 2 LYBE 8.1–5/6 28 JAN 21 AD 2 LYBE 8.1–5/6 17 JUN 21 AD 2 LYBE 8.2–1/2 28 JAN 21 AD 2 LYBE 8.2–1/2 17 JUN 21 AD 2 LYBE 8.2–5/6 28 JAN 21 AD 2 LYBE 8.2–5/6 17 JUN 21 AD 2 LYBE 9.1–1/2 3 DEC 20 AD 2 LYBE 9.1–1/2 17 JUN 21 4.
    [Show full text]
  • Do Not Let Belgrade Drown (Ne Davimo Beograd)
    Č Š ć Do not let Belgrade drown (Ne davimo Beograd) Initiative Do not let Belgrade drown was form in 2014 to oppose the Belgrade Waterfront’s project, the consequences and the way the process of planning and the legalizing the project was carried out. It attracted a number of associations, independent organizations, experts, lawyers, academics, journalists, architects and urban planners. Our idea is to stress the importance of popular participation in the development of the city We believe that is possible to build a new kind of solidarity and civic mobilization Giant Duck Becomes Belgrade Resistance Symbol Small-scale actions were followed by mass protests in 2015 and at the beginning of 2016. The watershed moment followed the demolitions of 25 April 2016, when citizens showed up in great numbers to protest, demanding resignations and laying criminal responsibility at the door of officials. We led the biggest civic protests since those that toppled Slobodan Milošević in 2000. Movement transformed into political organization which participated in the local elections. Key achievement is positioning of the topics of urban development and citizen participation in decision making process as one of most important issues in public sphere in Belgrade. Local elections, march 2018. We independently took part in Belgrade elections on March 4, 2018 as a citizen list under the name "Initiative Do not let Belgrade drown - Yellow Duck - Our City, Our City - Ksenija Radovanovic", presenting a program of 20 points. Support was provided by other local movements from Serbia, as well as Janis Varufakis, DIEM25, Ada Colau, Ska Keller, “Zagreb je nas” movement.
    [Show full text]
  • Divergence of Myrobalan (Prunus Cerasifera Ehrh.) Types on the Territory of Serbia
    UDC 575: 634.22 Original scientific paper DIVERGENCE OF MYROBALAN (Prunus cerasifera Ehrh. ) TYPES ON THE TERRITORY OF SERBIA Dragan NIKOLI Ć and Vera RAKONJAC Faculty of Agriculture, Belgrade-Zemun, Serbia Nikoli ć D. and V. Rakonjac (2007): Divergence of myrobalan (Prunus cerasifera ehrh.) types on the territory of Serbia.. – Genetika, Vol. 39, No. 3, 333 - 342. Variability of some more prominent pomological characteristics was examined in three regions of Serbia (central, western, southern). In all the regions, significant variability of all studied characteristics was established. However, no specifics were manifested between regions, therefore, identical types emerge in all the regions. This is indicated by similar intervals of variation as well as similar mean values of characteristics per region. The obtained results lead to the conclusion that the entire territory of Serbia should be observed as a unique myrobalan population with highly expressed polymorphism of characteristics. To preserve genetic variability of myrobalan, collection is recommended for those types that were arranged into various groups and subgroups according to the results of cluster analysis. Key word: myrobalan, natural population, pomological characteristics, phenotypic variability ______________________________ Corresponding author: Dragan Nikoli ć, Faculty of Agriculture, Nemanjina 6, 11080 Belgrade-Zemun, Serbia, e-mail: [email protected] 334 GENETIKA, Vol. 39, No. 3, 333 -342, 2007. INTRODUCTION The myrobalan or cherry plum ( Prunus cerasifera Ehrh.) is native to southeastern Europe or southwestern Asia. Its seedlings are used for the most part as a rootstock for plum (W EINBERGER , 1975; E RBIL and S OYLU , 2002), but lesser for apricot (D IMITROVA and M ARINOV , 2002) and almond and peach (D UVAL et al ., 2004).
    [Show full text]
  • Dragan Kovačević, Maize Research Institute “Zemun Polje”, S. Bajića 1
    UDC 575:630 DOI: 10.2298/GENSR1302493K Original scientific paper GENETIC RELATIONSHIPS AMONG SOME Pinus, Picea AND Abies SPECIES REVEALED BY RAPD MARKERS Dragan KOVA ČEVI Ć 1* , Biljana NIKOLI Ć 2, Snežana MLADENOVI Ć DRINI Ć1, Sr đan BOJOVI Ć 3, Tanja DODOŠ 4, Nemanja RAJ ČEVI Ć 4, and Petar D. MARIN 4 1* Maize Research Institute “Zemun Polje”, Belgrade, Serbia 2Institute of Forestry, Belgrade, Serbia 3University of Belgrade, Institute for Biological Research “Siniša Stankovi ć”, Belgrade, Serbia 4University of Belgrade, Faculty of Biology, Institute of Botany and Botanical Garden “Jevremovac“,Belgrade, Serbia Kovacevic D, B. Nikolic, S. Mladenovic Drinic, S. Bojovic, T. Dodoš, N. Raj čevi ć and P. Marin (2013): Genetic relationships among some Pinus, Picea and Abies species revealed by RAPD markers. Genetika, Vol 45, No. 2, 493-502. Studies were undertaken to identify genetic relationships among ten different species of the family Pinaceae through randomly amplified polymorphic DNA (RAPD) markers. Eighteen arbitrary RAPD primers produced 123 fragments of which 107 were polymorphic (87%). The similarity coefficient values varied from 0.34 to 0.67. The highest similarity coefficient was detected between Pinus wallichiana and P. strobus as well as between Picea abies and P. orientalis , and the lowest was detected between three Pinus species ( P. heldreichii , P. peuce and P. wallichiana ) and Picea omorika . The analysis of RAPD markers confirmed the genetic relationships among species. Genus Picea is clearly separated from genus Pinus and is closer to genus Abies (A. concolor ) than to genus Pinus , what confirms up-to-date numerous comparative- morphological, anatomical, chemotaxonomic and molecular results of these closely related genera.
    [Show full text]
  • Serbia Prime Site One AG 2 Gonten
    SERBIA PRIME SITE ONE WIRTSCHAFTLICHER BERICHT DES EDA Zusammenfassung Das globale Wachstum dürfte sich in diesem Jahr Der vom damaligen Regierungschef und aktuellem abschwächen, aber schon 2021 allmählich erholen, je- Präsidenten Aleksandar Vucic vor sechs Jahren be - doch sind die Wachstumsaussichten noch immer sehr gonnene Prozess der Restrukturierung der Wirt- ungewiss. Das Hauptrisiko für die Projektion auf kurze schaft und Konsolidierung der Finanzen wird weiter- Sicht ergibt sich aus dem noch zu wenig bekannten hin von der Regierung fortgesetzt. Erklärtes Ziel von Virus und möglichen Störungen bei globalen Ketten. Ministerpräsidentin Ana Brnabic ist, die nötigen Refor- Nach Prognosen des Internationalen Währungsfonds men im Hinblick auf einen EU-Beitritt voranzutreiben. (IWF) wird auch die serbische Wirtschaft in diesem Schwerpunkt der Regierungspolitik bleiben EU-Inte- Jahr vorrausichtlich um drei Prozent des BIP fallen, gration als wichtigstes strategisches Ziel, Digitalisie- könnte aber schon im nächsten Jahr um 7,5 Prozent rung, E-Government, Stabilhaltung der öffentlichen wachsen. Serbien verzeichnete vor der COVID-19 Finanzen, aber auch Fortsetzung der Wirtschafts- Krise ein Wirtschaftswachstum von 5 Prozent in den reformen und der Rechtsstaatlichkeit, insbesondere ersten vier Monaten 2020. Das serbische BIP belief der Unabhängigkeit der Gerichtsbehörden. Die bis- sich 2019 auf 45,9 Milliarden Euro, was einem Anstieg her durchgeführten strukturellen Reformen und Ein- von 4,2 Prozent entspricht. sparungen im Staatshaushalt brachten Serbien auf Wachstumskurs. Serbien verzeichnete zwei Jahre hin- Die makroökonomische Leistung Serbiens blieb 2019 tereinander eine hohe Wachstumsrate - einen Anstieg robust. Das Wachstum wird auf 4,2 Prozent geschätzt, von 4,4% in 2018 und 4,2 % im Jahr 2019. Serbien hat unterstützt durch starke ausländische Direktinvestitio- sich in sechs Jahren zu einer niedrigen Inflations- und nen und boomende Bautätigkeiten.
    [Show full text]
  • Residential Market Outlook – 2018
    Residential Market Outlook Belgrade | Jan 2018 Regulated by RICS Regulated by RICS Residential Market Outlook | Jan 2018 | LeRoy Realty Consultants | 1 Serbia’s overall economy health has been reinforced further in 2017, which lifted up the GDP & Construction Industry Growth country’s credit rating from BB- to BB¹, with a 5% stable outlook in December 2017. The outlook 4.0% for this year shows growth accelerating 4% 2.8% 3% 2.8% 2.2% The GDP growth of 1.8% in 2017 was lower than projected, 2% 1.8%* but its structure points toward underlying changes that will 1% shape the economic expansion in the coming years. The 0.8% growth is primarily driven by the increased investment, 0% -0.7% private consumption, exports and FDI. On the other hand, 2014 2015 2016 2017 the growth of the construction industry outperforms that of -1% the local economy in the last 3 years, with positive future -1.8% -2% prospects. Construction industry growth GDP *estimate FDI inflow in 2017 stood at EUR 2.3 billion, which is up by Source: Statistical Office of the Republic of Serbia 37.5% y-o-y thus exceeding the projection for 2017. The Central Bank has decided to cautiously loosen monetary Unemployment & Salaries policy, to support a boost in domestic economic activity, and 20% 6% decreased its key policy rate at a historic low of 3.5% on 18% Salary growth rate October 2017, which contributed to the decline in the EUR- 16% 4% indexed lending. 14% 3.7% 3.9% 12% 10% 1.4% 2% 8% Elevated levels of business and 6% 0% 4% -0.2% consumer sentiment Unemployment rate 2% 0% -2% Labor market conditions have continued to improve in 2017, 2014 2015 2016 2017 even faster than previously expected, with the Unemployment Salary growth unemployment rate falling to 12.9% in the third quarter of Source: Statistical Office of the Republic of Serbia 2017, coupled with two consecutive years of wage growth.
    [Show full text]
  • New to Serbia the Best Entertainment Delta Planet Will Have the Biggest and the Most Prestigious Cinema in the Balkans
    The Ultimate Shopping Experience Each day we look for new experiences. To do that, we are building a brand new world – a world made of the best things in this one. Meet the biggest and best-located shopping mall in Delta Planet is designed to be the leading super- Serbia, providing a unique shopping experience for all regional shopping mall, and because of its size, offering, age groups, by offering the largest number of tenants and convenient location, it will attract visitors from the and a wide variety of international and local fashion city, the whole country, and also from across the region. brands. Delta Planet will change the face of Belgrade and Around 5,000 workers from many local companies become a symbol for a new quality of life. will be engaged in the construction of the mall. Its completion will create over 5,000 new jobs. The 182,000 m² shopping mall will be located at Autokomanda, Belgrade, near the E-75 highway, in the According to the plan, Delta Planet will offer 250 stores direction of Nis, with construction scheduled to start in with various contents to visitors in autumn 2014. the autumn of 2013. Its excellent position, close to the center of Belgrade and only 20 minutes from the airport, will facilitate access to visitors from the whole region. This EUR 200 million project will not only be the largest investment by the Delta Real Estate Group in the coming period, but will also be the second largest real estate investment in Serbia since 2000. City Landmark Spectacular Architecture The architecture of the mall is highlighted by its Looking to the future and the need to create a innovative design and use of the latest technology, sustainable “blue” planet, we are creating the first completely adapted to its surroundings.
    [Show full text]
  • "Službeni List Grada Beograda", Br. 34/2004 Br
    "Službeni list grada Beograda", br. 34/2004 br. 17/72, 31/83, 2/85, 28/87, 14/97, 2/99 i 13/00), prema kome je teritorija obuhvaćena ovim planom namenjena za industriju, proizvodno zanatstvo, Skupština grada Beograda na sednici održanoj 26. građevinarstvo i skladišta, kao i za saobraćajne decembra 2003. godine, na osnovu Zakona o površine. planiranju i izgradnji ("Službeni glasnik Republike Srbije", broj 47/03) i čl. 11. i 27. Statuta grada Prema Generalnom planu Beograda 2021. ("Službeni Beograda ("Službeni list grada Beograda", br. 18/95, list grada Beograda", broj 47/03) predmetni prostor 20/95, 21/99, 2/00 i 30/03) donela je se nalazi u površinama namenjenim za: - privredne delatnosti i privredne zone, P L A N D E T A L J N E R E G U L A C I J E - saobraćaj i saobraćajne površine i PRIVREDNE ZONE GORNJI ZEMUN - ZONE 1 I 2 - zelene površine. A. UVOD Sastavni deo Plana su i grafički prilozi - "Izvod iz Generalnog urbanističkog plana Beograda sa prikazom šire prostorne celine" i "Izvod iz A.1. Pravni i planski osnov Generalnog plana Beograda 2021." ("Službeni list grada Beograda", broj 47/03). Pravni i planski osnov za donošenje Plana detaljne regulacije privredne zone Gornji Zemun - zona 1 i 2 Karakter područja nalazi se u: Teritorija obuhvaćena ovim planom predstavlja deo - Zakonu o planiranju i izgradnji ("Službeni glasnik privredne zone Gornji Zemun, jedne od Republike Srbije", broj 47/03); najznačajnijih privrednih zo na Beograda na uvodnom pravcu sa severa, izuzetno dobro je saobraćajno - Odluci o izmeni i dopuni Odluke o generalnom povezana, sa neposrednom vezom na planirani urbanističkom planu Beograda ("Službeni list obilazni autoput.
    [Show full text]
  • E-Mail: [email protected] Page: 1 Date: 08.08.2021 Https
    E-mail: [email protected] Object name Subotička 24 Mirosavljeva 6 Humska 6 Dimitrija Tucovića 48 AVALA INVEST doo i HOME FOR Investor IVGOLD doo SUPERIOR GRADNJA doo SIGMA STAN doo YOU doo Readiness 05.2020 District ZVEZDARA ČUKARICA SAVSKI VENAC ZVEZDARA Micro district Cvetkova pijaca Banovo brdo Stadion Partizan Vukov spomenik Street Subotička 24 Mirosavljeva 6 Humska 6 Dimitrija Tucovića 48 Trolleybus № 19, 21, 22, 29 Trolleybus № Trolleybus № 40, 41 Trolleybus № Lines of public transport Tram № 5, 6, 7, 14 Tram № 12, 13 Tram № 9, 10, 14 Tram № Parking space Underground Underground Underground Underground and on-site Floors - - - - Heating Electrical - Heat pump Central, counter Conditioning - - Heat pump Conditioner installed Price from, €/sqm from 2 100 €/sqm from 2 000 €/sqm from 2 100 €/sqm On request Page: 1 Date: 28.08.2021 https://novazgrada.rs/en/mycomparison E-mail: [email protected] Object name TAURUNUM TANDEM Bulevar oslobođenja 159 Strumička 11 Stepa Nova Investor STORMS doo Privatni investitori BANAT GRADNJA doo TIM GRADNJA EXCLUSIVE doo Readiness 08.2019 10.2019 District ZEMUN VOŽDOVAC VOŽDOVAC VOŽDOVAC Micro district Gornji grad Voždovac Lekino brdo FON Street Cara Dušana 122 Bulevar oslobođenja 159 Strumička 11 Vojvode Stepe 250 Trolleybus № Trolleybus № Trolleybus № 22 Trolleybus № Lines of public transport Tram № Tram № 9, 10, 14 Tram № Tram № 9, 10, 14 Parking space Underground - Underground Underground Floors - - - - Heating Central, counter - Central, counter Heat pump Conditioning - - - Conditioner Price from,
    [Show full text]
  • Serbia 2029 Prospectus
    REPUBLIC OF SERBIA (represented by the Government of the Republic of Serbia, acting by and through the Ministry of Finance) €1,000,000,000 1.500 per cent. Notes due 2029 Issue price: 98.909 per cent. The €1,000,000,000 1.500 per cent. Notes due 2029 (the “Notes”) to be issued by the Republic of Serbia, represented by the Government of the Republic of Serbia acting by and through the Ministry of Finance (the “Issuer”) will mature on 26 June 2029 and, unless previously purchased and cancelled, will be redeemed at their principal amount on that date. The Notes will bear interest at a rate of 1.500 per cent. per annum. Interest will accrue on the outstanding principal amount of the Notes from and including 26 June 2019 and will be payable annually in arrear on 26 June in each year, commencing on 26 June 2020. All payments of principal and interest in respect of the Notes shall be made free and clear of, and without withholding or deduction for, any taxes, duties, assessments or governmental charges of whatever nature imposed, levied, collected, withheld or assessed by or within the Republic of Serbia (the “Republic of Serbia” or “Serbia”) or any political subdivision or any authority thereof or therein having power to tax, unless such withholding or deduction is required by law. In that event, the Issuer shall pay such additional amounts as will result in the receipt by the Noteholders of such amounts as would have been received by them if no such withholding or deduction had been required, subject to certain exceptions set out in the Conditions (as defined below).
    [Show full text]