FasT racks- At a Glance (details subject to change) Information Source: http://www.rtd-fastracks.com/main_1 West Rail Line Projected Completion: 2013 Vehicle Type: Length (miles): 12.1 Stations: 12 Travel Time: 34 minutes ( to Jeffco Government Center)

US 36 BRT Line Projected Completion: 2015 (first segment from Pecos to Interlocken) Vehicle Type: Bus Rapid Transit (BRT) Length (miles): 18 Stations: 6 Travel Time: 26 minutes (Denver Union Station to Table Mesa)

Central Rail Extension Projected Completion: 2016 Vehicle Type: Light Rail Length (miles): 0.8 new Stations: 2 Travel Time: 18 minutes (end-to-end trip between downtown loop and 38th/Blake station)

East Rail Line Projected Completion: 2016 Vehicle Type: - Electric Multiple Unit (EMU) Length (miles): 22.8 Stations: 6 Travel Time: 35 minutes (Denver Union Station to Denver International Airport)

Gold Line Projected Completion: 2016 Vehicle Type: Commuter Rail - Electric Multiple Unit (EMU) Length (miles): 11.2 Stations: 7 Travel Time: 26 minutes (Denver Union Station to Ward Road)

I-225 Rail Line Projected Completion: 2020 (Completion date based on a successful 0.4% sales and use tax increase in 2012) Vehicle Type: Light Rail Length (miles): 10.5 Stations: 8 36 minutes (Iliff to 16th/California)

North Metro Rail Line Projected Completion: 2020 (Completion date based on a successful 0.4% sales and use tax increase in 2012) Vehicle Type: Commuter Rail - Electric Multiple Unit (EMU) Length (miles): 18.4 Stations: 8 Travel Time: 32 minutes (Denver Union Station to 162nd Ave)

Northwest Rail Line Projected Completion: 2020 (Completion date based on a successful 0.4% sales and use tax increase in 2012) Vehicle Type: Commuter Rail - Diesel Multiple Unit (DMU) Length (miles): 41 Stations: 7 Travel Time: 61 minutes (Denver Union Station to Longmont)

Southeast Rail Extension Projected Completion: 2020 (Completion date based on a successful 0.4% sales and use tax increase in 2012) Vehicle Type: Light Rail Length (miles): 2.3 Stations: 3 Travel Time: 45 minutes (Downtown to RidgeGate)

Southwest Rail Extension Projected Completion: 2020 (Completion date based on a successful 0.4% sales and use tax increase in 2012) Vehicle Type: Light Rail Length (miles): 2.5 Stations: 1 Travel Time: 32 minutes (Downtown to Lucent)