PROJECT DELIVERY METHOD ANALYSIS Getting the best value for your dollar

DESIGN BID BUILD BUILD CONSTRUCTION CONSTRUCTION INTEGRATED PROJECT DELIVERY AGENCY MANAGEMENT AT RISK

OWNER OWNER OWNER OWNER OWNER

A/E GENERAL CONTRACTOR A/E CM AGENT A/E CONSTRUCTION MANAGER A/E CONSTRUCTION MANAGER A/E SUBCONTRACTORS SUBCONTRACTORS MULTIPLE PRIME CONTRACTORS SUBCONTRACTORS

CHARACTERISTICS CHARACTERISTICS CHARACTERISTICS CHARACTERISTICS CHARACTERISTICS • hired first by the owner • Owner hires a GC or Design Build team • Owner contracts directly with Architect firm • Owner selects the Architect based upon • Owner selects CM and A/E based upon • Owner/Architect develop program and • The Design Build team is fully responsible to the • Owner contracts directly with each qualifications and fee qualifications prior to design being started complete documents owner for the delivery of a project sub-contractor • Owner selects CM based upon qualification and fee • Owner/Architect/Construction Manager sign a • Architect is fully responsible for estimates, • Typically at some point (as early as possible) in the • Similar to CM at risk, but no guaranteed price prior to design being completed or possibly started joint contract constructability and design process a GMP is established • CM and Architect can be selected based upon • Architect and CM work together to deliver the • Entire team establish the project goals and • After the project documents are completely • Communication for the project flows through the qualifications and expertise project the owner requires objectives designed, they are put out for bid GC or D/B team to the owner • A GMP is established early in documentation • Characteristics similar to those of CM at risk • Traditionally the low bidder is selected to ADVANTAGES • Competitive bid for subcontracts complete project ADVANTAGES • CM and Architect selection based upon ADVANTAGES • Communication is directed through the • Owner has a single contract for design and qualifications ADVANTAGES • CM and Architect selection based upon Architect to the Owner construction • Projects can be delivered at accelerated/ • CM and Architect selection based upon qualifications • GMP is established early and owner risk is “fast-tracked” schedule qualifications • High efficiency delivery method ADVANTAGES controlled • CM involved in budget development • Owner can be involved in selection of CM team • “Fast-track” process • Familiar delivery method • Except for Owner changes, no change orders • Owner can select sub-contractor members • Ultimate “team” project approach • Defined roles/responsibilities for team • Project schedule can be accelerated/ • CM responsible to deliver the project on budget • Early CM involvement to budget and • Early involvement of not only CM & A/E but • Allows more firms to bid “fast-tracked” if necessary and on schedule schedule subcontractors for major trades • Initially presents the lowest potential cost for the • Owner involvement in the process is limited • Owner may be involved in sub-contractor selection • Owner risk is limited by team approach to risk/ project • Construction budget control DISADVANTAGES • All work except CM and A/E is competitively bid reward incentives • Owner is not issue resolution agent • CM has no contractual responsibility/control with • GMP is established early • Success of team members is measured against DISADVANTAGES sub-contractors • Projects can be delivered at accelerated/ success of project • Opportunity for cost sharing • No “fast-tracking” process available • Final price not established until bids are received “fast-tracked” schedule • Opportunity for cost sharing • Budgets may or may not be met... are • Owner must manage multiple contracts DISADVANTAGES • Opportunity for cost sharing • Increased ability to deliver project within budget not always current on pricing market(s) • High level of Owner involvement • Ensures high quality at lowest cost and schedule • Owner has limited involvement • Low bidder may not understand project goals, • Higher Owner risk since the Owner holds contracts • Difficult to establish criteria for selection of D/B objectives and criteria DISADVANTAGES DISADVANTAGES team • Owner has no control or input on sub- • Design team may not take input from CM during • Newer delivery method • Design is complete at GMP contractors design • Requires very involved owner • Process may not bring best and best • Process puts Owner as issue resolution agent if • Perception that price competition is limited • Some contractual issues to be addressed builder together for owner architectural documents and construction conflict • Quality control is responsibility of D/B team, no • High potential for change orders and conflict checks and balances • Owner control over GC’s staff is limited • No cost savings sharing OPTION - Select architect and general contractor • Relationships can be adversarial separately, then form D/B team

KEY: A/E-Architect/ | CM-Construction Manager | D/B-Design Build | GC-General Contractor | GMP-Guarantee Maximum Price