County Council - Planned Road Works This edition of the bulletin as automatically generated on the 19 Mar 2020 AND District

For more information about roadworks call our Customer Service Centre: 0116 3050001

Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

COVERT CLOSE Plant safe only Asset Creation 11/03/2020 21/05/2020 No Carriageway Incursion Distribution West

OADBY

DEVONIA ROAD Replace 1 jointbox frame and BT 19/03/2020 23/03/2020 No Carriageway Incursion cover(s) (915mm x 445mm) in Footway OADBY

GLEN ROAD Disconnecting existing mains and Construction Delivery and 01/04/2019 31/07/2020 Some Carriageway connecting new 355mm PE. Lay new Commercial (Asset Creati Incursion 355mm PE adjacent to existing main. OADBY

LAUNDE ROAD Water main renewals via Open cut/ Asset Creation 16/03/2020 14/04/2020 Road Closure DD methods approx 450m Transfer Distribution West of services and installation of OADBY valves/hydrants MANOR ROAD EXTENSION Boundary box Install,Clear to STW Water East 19/03/2020 23/03/2020 Traffic Control (Give and Boundary Job in Footway (6mm Take) Bitmac (Tarmac) ) OADBY

RAWLINGS COURT Boundary box Install,Clear to STW Water East 18/03/2020 20/03/2020 Some Carriageway Boundary Carriageway type 4 (up to Incursion 0.5 MSA) Job in Footway (6mm OADBY Bitmac (Tarmac) ) ROSEMEAD DRIVE Install external meter in boundary Integra Utility Services 23/03/2020 23/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent OADBY Reinstatement STOUGHTON DRIVE SOUTH Section 50, to excavate the highway LCC (Section 50/278/184) 18/03/2020 20/03/2020 No Carriageway Incursion at the property boundary to locate the water supply OADBY

STOUGHTON ROAD FIT NEW TEE IN FOOTWAY FOR Virgin Media - Kelly 23/03/2020 24/03/2020 No Carriageway Incursion CUSTOMER CONNECTION Communication

OADBY Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

THE FAIRWAY LAY NEW DOMESTIC SERVICE East of Network 23/03/2020 27/03/2020 Traffic Control (Give and 14M FROM MAIN IN FARSIDE EMLDZ S81 Take) FOOTWAY OADBY

THE PARADE Clear footway blockage Virgin Media - Comex 20/03/2020 24/03/2020 No Carriageway Incursion 2000 (UK) Ltd

OADBY

UPLANDS ROAD Water main renewals via Open cut/ Asset Creation 12/02/2020 24/03/2020 Traffic Control (Multi-Way DD methods approx 100m Transfer Distribution West Signals) of services and installation of OADBY valves/hydrants WOODFIELD ROAD Water main renewals via Open cut/ Asset Creation 28/02/2020 30/03/2020 Traffic Control (Multi-Way DD methods approx 350m Transfer Distribution West Signals) of services and installation of OADBY valves/hydrants WRIGHT LANE Replace 1 jointbox frame and BT 19/03/2020 23/03/2020 No Carriageway Incursion cover(s) (915mm x 445mm) in Footway OADBY

BARN CLOSE Replace 1 jointbox frame and BT 23/03/2020 25/03/2020 No Carriageway Incursion cover(s) (915mm x 445mm) in Footway WIGSTON

CANAL STREET Install 15m of 1 way poly duct in BT 17/03/2020 19/03/2020 No Carriageway Incursion Footway,Provide 1 core drill(s) into jointbox or building WIGSTON

CHERRY STREET Replace gully pot. LCC (Works Promoter) 19/03/2020 20/03/2020 Traffic Control (Give and 08:13:33 Take)

WIGSTON

CLEVELAND ROAD Replace 1 jointbox frame and BT 23/03/2020 25/03/2020 No Carriageway Incursion cover(s) (1310mm x 610mm) in Footway WIGSTON

COOKS LANE S278 works to construct new footway, LCC (Section 50/278/184) 16/03/2020 25/05/2020 Road Closure drainage ditches and resurfacing of the carriageway. Closure final WIGSTON weekend of works only 23/24 May. DORSET AVENUE Install 5m of 1 way poly duct in BT 18/03/2020 20/03/2020 Traffic Control (Give and Footway,Install 5m of 1 way poly duct Take) in Verge,Install 9m of 1 way poly duct WIGSTON in Carriageway Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

GLOUCESTER CRESCENT Replace 3 existing pole 0.5m x 0.5m BT 19/03/2020 19/03/2020 Traffic Control (Give and Take)

WIGSTON

GLOUCESTER CRESCENT Install 22m of 1 way poly duct in BT 18/03/2020 20/03/2020 No Carriageway Incursion Footway,Install 35m of 1 way poly duct in Verge WIGSTON

INGRAMS WAY Replace 1 jointbox frame and BT 23/03/2020 25/03/2020 No Carriageway Incursion cover(s) (915mm x 445mm) in Footway WIGSTON

LEICESTER ROAD NMA Int to Perm-Rein-Band 1 - 1/2 STW Water East 26/03/2020 26/03/2020 Lane Closure C.Way Job in Carriageway (Hot Rolled Asphalt-55/10 ) WIGSTON

LEICESTER ROAD Current permit expired 2/3/20. Email LCC (Permit Authority) 04/03/2020 20/04/2020 Some Carriageway recd 4/3/20 however, email worked 16:12:02 Incursion on 6/3/20 permit required asap WIGSTON

MAPLETON ROAD Boundary box Install,Clear to STW Water East 18/03/2020 20/03/2020 Traffic Control (Give and Boundary l Job in Footway (6mm Take) Bitmac (Tarmac) ) WIGSTON

MERE ROAD 1 joint hole in tarmac footway for Western Power, 6144 20/03/2020 24/03/2020 No Carriageway Incursion supply alteration Leicestershire South

WIGSTON

NEWTON LANE Please install new gully onto the LCC (Works Promoter) 16/03/2020 20/03/2020 Traffic Control (Two-Way culvert and 4 number of grips with 09:08:09 Signals) concrete swells and drop kerb as WIGSTON directed on site. PADDOCK STREET Skip - Licence- 788918 LCC (Permit Authority) 24/03/2020 30/03/2020 Some Carriageway 13:03:48 Incursion

WIGSTON

PARK ROAD water main renewal using trencless Asset Creation 10/02/2020 31/03/2020 Traffic Control (Priority methods long and short service Distribution West Working) connections with FJ and SV WIGSTON connections INCLUDING PLANT STATION ROAD NMA Defect CLO - Remedial Rein STW Water East 20/03/2020 20/03/2020 Traffic Control (Two-Way by CLO Topping only as sunken also Signals) sections need cutting to lower fire WIGSTON hydrant lid Job in Carriageway (Hot Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

WELFORD ROAD S278 works to construct new footway, LCC (Section 50/278/184) 16/03/2020 24/05/2020 Road Closure drainage ditches and resurfacing of the carriageway. Closure final WIGSTON weekend of works only 23/24 May. WEST AVENUE Excavate to on existing patche to Asset Creation 23/03/2020 25/03/2020 Traffic Control (Give and lacate logger and trbuils chamber Distribution West Take)

WIGSTON