Identifying needs of terminals

EXECUTIVE SUMMARY As part of the CLYMA project, to identify service needs and terminals for development of the Corridor, we have prepared a catalogue with the terminals and services associated to this axis. We have put together some detailed fact sheets containing the infrastructure features and services of each terminal. As a result of this work, we have performed a comparative analysis of the terminals and identified the main shortcomings to be corrected.

STUDY CONDUCTED BY: TEIRLOG Ingeniería with the collaboration of Robert Claraco (2015)

The full document is accessible to the project’s Stakeholders Interest Group on the CLYMA website: www.clyma.eu The Madrid – Axis SPANISH INTERMODAL TERMINALS The Madrid - Lyon Axis, passing through and , covers seven regions: Madrid, Castile - La Mancha, Aragon, . PLAZA Catalonia, Languedoc-Rousillon, Rhone Alpes and Provence . TMZ -Cote d'Azur, passing through some key industrial and . I.T. MONZON logistic nodes and metropolitan areas. . D.P. AZUQUECA

Some of these nodes have an intermodal terminal within . L.C. PORTBOU their facilities, allowing the transfer of UTIs and/or goods . L.C. MORROT between road and rail modes. There are also a series of key . L.C. TARRAGONA CARGO ports with rail access along the axis, allowing the transfer of . L.C. GRANOLLERS CARGO UTIs and/or goods between the road, rail and maritime . L.C. CONSTANTÍ transport modes. . BARCELONA PORT . I.T. BAYER – BERTSCHI The analysis will differentiate between two different types of . L.C. ABROÑIGAL intermodal terminals - those already in operation and those . D.P. COSLADA at various stages of development. FRENCH INTERMODAL TERMINALS The box to the right lists the terminals analysed. . LYON – VENISSIEUX We have prepared two types of information sheets for each . PORT EDOUARD HERRIOT of the terminals in the catalogue covered in this document: . PORT LES VALENCE . . one contains detailed information on the location of . SETE the terminal, its physical characteristics, railway . PORT – LA – NOUVELLE facilities, types and volumes of current and planned . PERPIGNAN activity and availability of operational resources. .

. LE CANET . the other sheet covers the various types of services currently provided in the terminal: train services . MARSEILLE MOUREPIANE (receipt & dispatch, railway compositions, etc.), goods . MIRAMAS CLE SUD services (loading/unloading, depots, etc.), logistics . FOS XXL services (warehousing, consolidation ...), . administrative services and employee/driver services, etc. DEVELOPING/PLANNED SPANISH INTERMODAL TERMINALS Information was provided by the staff at these terminals to . L.C. VALLES – LA LLAGOSTA verify and complete the primary information available (all the . I.T. FAR D’EMPORDA intermodal terminal fact sheets) to make this compilation. . I.T. PENEDES

This analysis helped to identify the main shortcomings and . I.T. BASF deficiencies of the intermodal terminals on the axis, both in . L.C. VICALVARO terms of infrastructures and services, as shown in the table . L.F. ARANJUEZ CARGO on the next page.

2 Identification of shortcomings and deficiencies in the intermodal terminals

INFRASTRUCTURE ISSUES There is no large terminal in Catalonia, as there is in Madrid or Zaragoza, but a whole series, some of which are very small n and fairly close together, which prevents the generation of economies of scale and concentration of cargo & flows n Usage of the terminals (per surface or per L/U tracks) is much higher in the smaller terminals than in the larger ones n UIC gauge tracks are not available in the Spanish terminals, except in Barcelona Morrot and Port of Barcelona. 750-metre long loading/unloading tracks are not available in the Spanish and French terminals, except in Barcelona n Morrot (mixed-gauge tracks only) in Spain, and Miramas, Perpignan and Fos XXL in France. Trains therefore have to be cut. In most of the Spanish terminals, and all of the French ones, the tracks are not continuous, but “dead end of line”, n entailing more manoeuvres. Rail accessibility to the terminals of Coslada and Bertschi is insufficient. To access the terminal, trains have to be cut if n longer than 420 m and 225 m respectively. Difficulties in rail accessibility to the Fos XXL terminal. Difficulties in both rail and road access to the Lyon, Marseille and Avignon terminals owing to their location in their n urban areas and the design of the network, and heavy traffic. n Most of the small, private terminals need to be supported by an ADIF technical installation located nearby. Several Spanish and French terminals (Azuqueca, Portbou, Granollers, Abroñigal and Coslada in Spain, and Lyon- Vénissieux, Avignon and Marseille Le Canet in France) cannot be enlarged because they are located in urban areas or for n other reasons. In some of these, the problem will be solved by moving them to new planned terminals (Far d’Empordá, La Llagosta, Vicálvaro). n Difficulties in rail access to the terminals of the ports of Barcelona and Tarragona.

SERVICES ISSUES

n French terminals provide only the few indispensable services needed for changing modes. n Controlled temperature ITUs service for perishable goods is not provided in any of the Spanish terminals (except in the Port of Barcelona). There are no facilities able to provide this service in any of the Spanish terminals. n None of the Spanish terminals in this study have specialised facilities for dangerous goods, ITU storage (except the Bayer/Bertschi Terminal), and many of them are unable to provide services to these (R/D, L/U and storage of the ITUs), except PLAZA, Azuqueca Dry Port, Barcelona-Morrot, Granollers, TCB, Best, Tarragona Port and Bayer Terminals. n Very few terminals have services for cleaning ITUs (PLAZA, tmZ, Monzon and Azuqueca Dry Port) and maintenance (PLAZA and Azuqueca Dry Port). n In general, the Spanish terminals provide no services to goods: storage, consolidation/deconsolidation, etc., except tmZ, Azuqueca Dry Port and Abroñigal (Granollers, Bertschi, Coslada and Tarragona Port provide cargo storage and handling services). No French terminal provides services to goods. n Few terminals offer Custom and inspection services (PLAZA, Portbou, Bertschi, Abroñigal, TCB, Coslada, Tarragona Port). Others provide only Customs services (tmZ, Azuqueca and BEST). n Most of the Spanish terminals provide no services to haulage trucks (only tmZ, Monzón, Granollers, Abroñigal and Azuqueca). n Most of the French terminals lack additional services to ITUs. Several terminals do not even provide an ITU storage service. n Many of the Spanish terminals are associated or very close to a Logistics Platform, with the consequent advantages, but this is not the case for the French ones, except those associated with a port and the Miramas terminal.

Type of shortcoming: Critical n Significantly restrictive n Restrictive n 3 Summary tables and maps

Summary tables and maps have been prepared to evaluate and compare the current state of the intermodal terminals studied. These summary tables and maps include the main characteristics that define the functionality of intermodal terminals, and a system of colours to indicate the current state of the terminal in each aspect.

The features selected to evaluate and compare The colour system developed to assess the the intermodal terminals are: current state of the intermodal terminals in each feature is: . Total area Very good condition or high value . Road accessibility Medium condition or value (improbable) . Rail accessibility Deficient condition or low value . Technical characteristics: If no information is available for a feature, it will be Receipt/Dispatch tracks, white, since it cannot be assessed. Loading/Unloading tracks and Loading/Unloading & Storage yards . Current Activity: 2012 or 2013

4 INTERMODAL TERMINALS ON THE SPANISH SIDE

INTERMODALINTERMODAL TERMINALS TERMINALS ON THEIN FRENCH FRENCH SIDESIDE

5 ARAGON CATALONIA

ZARAGOZA ZARAGOZA MONZON BARCELONA TARRAGONA GRANOLLERS LOGISTICS PORTBOU CARGO FEATURES MARITIME INTERMODAL MORROT LOGISTICS CARGO LOGISTICS CARGO LOGISTICS PLATFORM LOGISTICS CENTRE TERMINAL (tmZ) TERMINAL CENTRE CENTRE CENTRE (PLAZA) 75.56 Ha 3.2 ha (6 ha 13.3 ha (7.5 ha are (entire railway entire area). Total area 11 ha 16.9 ha managed by UTE 16.3 ha 2.5 ha area 100 ha Final planned Sefemed – Setemar) approx.) stage: 15 ha

Direct access to Direct access to Direct access to the Not close to any the A-2 highway Close access to High-capacity roads the A-2 Ronda Litoral (B-10 high-capacity road (through the N-240, which Access to the N-260, AP-7 and C-17 can highway, and ring road), which because located in Road Mercazaragoza) has close connecting with the AP-7 be accessed by the close access to connects to most of the city, only AP-7 accessibility and close access accessibility to motorway and N-II in C-352 , connected other high- the highways and and A-7 can be to other high- the A-2 and A-22 directly with the capacity roads motorways that pass accessed a few km capacity roads (A- highways terminal (A-23 and A-68) through Barcelona away 23 and N-330)

Direct access to Direct access to all Adif 200 Line, Direct access to Direct access to Adif Direct access to Adif Adif lines passing included in 2 Adif 070 Line and 238 Line, which 270 Line and Adif through Tarragona TEN-T rail to Adif 200 Line, Access to Adif connects to other 246 Line, and a few Rail Direct access to Adif 050 (600, 210, 230 and corridors and close access 200 Line through rail lines (Adif 200 Km away from the accessibility Line and Adif 270 Line 234), and few km (Cantabric – to Adif 210 Line, Selgua T.I. Line or mixed HSL terminal, there is a away of the city, Mediterranean Adif 700 Line and Barcelona – connection to Adif Adif 050 Line could and Central Adif 214 Line Figueres) 222 Line be accessed Corridors)

• R/D tracks • 15 electrified • R/D tracks: 3 • R/D of trains is • R/D tracks: 15 tracks on (managed by Adif): tracks of lengths • R/D tracks: 16 • R/D tracks: 2 Iberian gauge performed Iberian (max. 500 m) or 2 tracks on mixed between 100 m tracks of 750 tracks of lengths tracks (1 of 680 from the UIC gauge (max. 590 m) gauge with useful and 485 m m on Iberian up to 630 m m and 2 of 750 Selgua T.I. • 14 classification tracks lengths of 825 m • 13 non- gauge • L/U tracks: 3 stub- Technical m) • L/U tracks: 2 (10 on Iberian gauge and and 890 m electrified tracks • L/U tracks: 6 tracks of lengths characteristics • L/U tracks: 2 tracks of 520 m 4 on UIC gauge) • L/U tracks: 8 of lengths tracks (5 of of 340 m to 360 m (R/D tracks, tracks of 585 m (increasable to • L/U tracks: 4 tracks on tracks on Iberian between 330 m 850 m and 1 4 tracks of 750 • R/D & L/U tracks: L/U tracks, • 2 full containers Iberian gauge and 4 gauge (380 m – and 538 m of 690 m) 2 passing tracks of storage yards of m) tracks on UIC gauge 480 m) and 2 • 1 head electrified L/U & storage • 1 concrete 460 m and 490 m 2.1 ha and 1.35 • 2 L/U and ITUs (lengths 288 m - 340 m) tracks on mixed track of 230 m yards) yard for • 2 yards for L/U of ha, and 1 storage yards • 2 open-air platform of gauge (440 m) length container L/U 0.775 ha and 0.76 empty (increasable to 0.52 ha and 0.61 ha • 3 container L/U • 1 container L/U and storage of 4 yards) ha containers • 5 vehicles transshipment and storage yards and storage yard (all the tracks are on 3.7 ha (all the tracks on depot of 0.7 ha ramps of 1.8 ha, 1.38 ha of 1.8 ha Iberian gauge) Iberian gauge) (all the tracks on Iberian and 0.36 ha gauge)

2,754,189 t 816,464 t 330,385 t 774,153 t 123,511 t 311,911 t Current 1,816,847 t (intermodal: (intermodal: (intermodal: (intermodal: (intermodal: (intermodal: Activity (2012) (intermodal: 1,016,546 t) 65,625 TEUs) 98,000 TEUs) 317,670 t) 714,791 t) 24,814 t) 311,911 t)

6 CATALONIA COMMUNITY OF MADRID & SURROUNDINGS

BAYER – CONSTANTI SUD WHARF PRAT WHARF INTERMODAL AZUQUECA DE MADRID – BERTSCHI COSLADA DRY LOGISTICS RAIL TERMINAL RAIL TERMINAL TERMINAL OF HENARES DRY ABROÑIGAL FEATURES INTERMODAL PORT CENTRE (TCB) (BEST) TARRAGONA PORT PORT LOGISTICS CENTRE TERMINAL

5 ha (maritime ≈12 ha (maritime 5 ha (maritime 5.1 ha 1.8 ha container container container terminal, 6 ha 30 ha 12 ha Total area terminal 81 ha) terminal, 100 ha) 20 ha )

Located next to Close access to Located close to Located few km Located a few Connected to the Close to the the ring-road M- the Ronda several high- away from the km away from Mediterranean Northeast 30 (urban & Litoral (B-10), capacity roads C-14 highway . both A-7 and highway (A-7) highway (A-2), congested), which which connects Close access to (M-40, M-50 and Can be used to AP-7, both through the and a short connects with the Road to most of the the high-capacity A-2), and no far access accessible national road N- distance from 6 radial highways. accessibility motorways and roads A-2, B-10 from M-30, which highways T-11 through N- 241, and is also Radial Also close to the highways that connects with all and motorway 340a main close to highways motorway 2 high-capacity pass through the radial AP-7 road A-2 and C-25 (R-2) roads M-40, A-42 Barcelona highways or R-5 Connected to Connected, Can Tunis L.C., through the port, Direct access to Direct access connecting with the Can Adif 234 Line, to Adif 600 Has direct or through it to Tunis L.C., and and nearby, Line, which Has access to Adif Has direct almost direct Has direct access Adif 238 Line, connects through through this connects with 600 Line and Adif access to Adif access to Adif 200 to Adif 200 Line Rail accessibility and other rail it to Adif 238, and line, link to Adif Adif 210 Line 210 Line 200 Line Line, Adif, 310 Line and Adif 300 Line lines (Adif 200 to other rail lines 230 Line & to and Adif 200 and Adif 300 Line or mixed HSL (Adif 200, mixed Adif 210 Line Line Barcelona – HSL Barcelona – Figueres) Figueres)

• R/D tracks: 2 • R/D tracks: 1 • R/D tracks: 4 tracks of 850 m • R/D tracks: 15 • R/D tracks: 2 • L/U tracks: 1 • R/D & L/U track for 750 tracks of length on Iberian tracks of lengths tracks of 1.775 track on tracks: 8 tracks m trains lengths • R/D of trains gauge (a 800 m up to 700 m m and 450 m mixed gauge of 750 m length • L/U tracks: 2 between 460 is made in the long track on • L/U tracks: 19 length of 511 m on mixed gauge tracks of 500 m to 541 m Adif terminal mixed gauge is tracks for • L/U tracks: 1 useful length • 1 transfer m useful • L/U tracks: 5 of Can Tunis under study) handling trains bundle of 4 L/U Technical • 1 shunting modal yard of length tracks (2 of • 6 tracks of • L/U tracks: 4 of up to 500 m tracks of lengths characteristics neck of 220- 9.5 ha, 25.5 ha • Total storage 400 m & 3 of 750 m length tracks of 800 m length (L/U) and between 433 m (R/D tracks, 225 m for of storage area surface: 2.45 380 m) on mixed length on mixed for handling to 533 m L/U tracks, operations shared with ha (full & • 1 container gauge gauge conventional (extendable to 6 of R/D of maritime empty L/U & storage storage and • Container (increasable to 4 cargo trains of tracks) trains • 2 ha of empty containers yards) depot area of freight station more tracks) up to 400 m • 1 full containers • 1 container containers depot, ADR 1.1 ha of 1.38 ha • L/U yard of 1.5 • 4 L/U yards of depot of 2.2 ha L/U and depot , 2.7 ha of depot, and a • 1 container ha (increasable 1.78 ha, 1.22 ha, • Empty storage yard storage area for storage yard L/U yard of to 2.7 ha) 5.9 ha and 1.16 containers of 1.5 ha dangerous ITUs for other 1.1 ha • Storage area of ha depot of 1.9 ha cargo) 2.3 ha

1-2 container 713,087 t Start of 192,027 t trains per 98,000 TEUs (all 863,663 t Current Activity (intermodal: operations in - (intermodal: 102,000 TEUs week the terminal) (100% intermodal) (2012) 671,214 t) 2012 120,590 t) (average)

7 RHÔNE – ALPES INTERMODAL STATIONS BETWEEN PERPIGNAN AND AVIGNON

LYON PORT EDOUARD FEATURES LYON VÉNISSIEUX NAVILAND VÉNISSIEUX AVIGNON SETE PORT LA NOUVELLE HERRIOT OF LYON NOVATRANS

Total area 7 ha - - - -

Situated where the Heavy goods vehicles A-7 motorway traffics are mixed with This terminal is connects to the the urban traffics, and integrated in the itineraries with south there are 5 km of A9 motorway It is connected by the Located near the A46 motorway and not far from direction. The distance to the corridor. motorway between the A43 motorway, but its location in the urban terminal is also Road motorways (A9 and The access to A9 is Northern Perpignan and agglomeration of Vénissieux and Saint-Priest, and connected to the accessibility A7) provided by D600 Western (A9). the high traffic of this area, hinder accessibility to D838 road, the main The road access to the road (5 km). There The road access is those motorways connection between terminal is not as good are other road provided by road D6139 A7 and the urban as it could be, there connections with ring (there are are problems of traffic the Port of Sète important traffic saturation problems)

It is served by the A single track branch Accessible directly from railways which provide Includes a railway connect this terminal international tunnel TP Rail Direct access to general rail network through Lyon access to Avignon access with Lyon rail node Ferro and the rail Lyon - accessibility Vénissieux terminal station (high traffic (connection to (there are important Perpignan at the station station, very ) traffic problems) from Port la Nouvelle. saturated)

• 4 handling yards including two external yards with rails under • Port la Nouvelle has gantries and handling by tracks of 750 metres and stacker • 2 tracks of 300 will be equipped with a • 2 yards each served by two • 3 lines of 380 • 2 tracks of 400 metres under triangle with access tracks under gantry with metres under metres under 2 Technical gantry which will make it respective working lengths of gantry gantries characteristics • 2 tracks of 200 possible to return direct 250 metres for the first which • 2 lines of 325 •2 times 5 tracks • 2 tracks of 320 (R/D tracks, metres for with the engine in both has a gantry and 320 metres metres under •2 times 3 yards metres under 2 L/U tracks, handling with directions. for the second which has 2 gantry gantries the stacker • Tracks of 1000 metres in L/U & storage gantries • 2 handling • 8 tracks of 300 • 1 storage yard the course of restoration yards) • 2 tracks of 280 metres under yards metres for handling (500 TEUs of • This Port will be two gantries and a track of 320 by the stacker capacity) developed by building metres for handling with complementary stacker passenger terminals. • A 3,500 TEUs of capacity storage yard

Current - 30,630 TEUs - - - - Activity (2012)

8 PORTES LES VALENCE MOYENNE VALLÉS DU INTERMODAL STATIONS AT PERPIGNAN – LE BOULOU RHONE

LE BOULOU PERPIGNAN PORTES LES VALENCE RIVESALTES FEATURES TERMINAL AMBROGIO TRANSALLIANCE VIIA

- 10,2 ha 9 ha - 3ha - Total area

Near to the motorway exit for The A7 motorway is close “Perpignan Sud” Direct access to the Direct access to the A9 Direct access to the Close connection to Road to it (2 km) (connection A9 motorway motorway A9 motorway the A9 motorway accessibility between A9 and N116)

Direct rail connection Accessible from the Connects to the general to Perpignan – international railway through the Direct access to the Direct access to the Direct access to the Narbonne Line (a Rail tunnel TP Ferro and terminal of Port les general railway line general railway line general railway line branch that does not accessibility from the route Valence allow freight trains Lyon – Perpignan towards Spain)

•2 handling yards • 1 track of 350 of 750 metres metres for 20 Technical • 3 tracks of 400 metres • 4 tracks of 750 loading quays for characteristics • 8 tracks of 370 • 4 tracks of 200 • 2 tracks of 550 • 250 metres handling zone metres the rail motorway (R/D tracks, • 1 handling yard metres (container metres metres (car traffic • 1 container storage (no container L/U tracks, storage) (no container storage) only) (2,000 TEUs of capacity) of 370 metres storage) •2 tracks of 370 L/U & storage (saturated, as it is yards) metres very small) • 4.000 m2 for container storage

39,000 TEU (2014 Current Activity - 19,000 ITUs (2013) 6,500 ITUs 45,000 semi-trailers - data) (2012)

9 MARSEILLE SECTOR

MARSEILLE LE CANET MARSEILLE FEATURES FOS XXL MIRAMAS CLÉ SUD MOUREPIANE NOVOTRANS LE CANET NAVILAND LE CANET

Total area - - - - 55 ha

Direct access to Close access to the A7 metropolitan Close connection to some Close access to the A7 motorway, but motorway A55, and roads (N1569. D5, D10), but motorway, but location Road location inside also it has easy Connected to N180 (E80) motorway by the nearest high-capacity inside Marseille city accessibility Marseille city make connection to A7 N568 with access and close to terminal road is located 10 km from make access and traffic access and traffic motorway. the terminal (A54/E80 difficult difficult (traffic congestion motorway) problems)

It is connected by rail with Mourepiane Direct access to Direct access to general Station, integrated in general railway line, Rail railway line, but difficult the Marseille node It is connected to the railway network by It has very good rail but difficult because accessibility because of location (problems of traffic the rail branch to Miramas accessibility of location within within Marseille city but difficult because of Marseille city location in Marseille city)

It has lines of 1,480 metres divided into • A section of marshalling • 4 tracks grouped by three distinct sections and all tracks are yard with electrified 2 under gantries accessible to handling. • 6 tracks grouped by 3 tracks of 750 metres, (useful length 300 • 4 tracks of 350 • The first section of marshalling yard under gantries used for the receipt of metres) metres comprises 3 tracks of 600 metres working Technical • 3 tracks of which one trains; • 2 handling yards to • 1 track of 200 length characteristics group makes 220 • a crane yard of 730 allow for metres with • The second section of marshalling yard is (R/D tracks, working metres and metres in length, transhipments possibility of divided into two successive yards, L/U tracks, the second group 190 equipped with 3 tracks, under gantries handling including 6 tracks also with working metres where trucks can L/U & storage • 3 tracks of 300 • 1 handling and lengths of 600 metres. • 2 handling yards manoeuvre, and where yards) metres serve 2 storage yard of • The third part extends over 280 metres allowing there is handling by yards for handling 15.000 TEUs capacity working length by integrating points transshipments mobile cranes and a • 1 track of 135 leading to extension tracks container storage yard metres • Storage capacity is close to 1 million TEUs • 2 lines of 720 metres at Fos

Current - - - - 12,500 ITUs (2013) Activity (2012)

10 Main findings from the infrastructure and services analysis of certain key The performance of the reference terminals analysed is greater, both in terms of area productivity and track European terminals: Busto, DELTA 3, productivity, than most Spanish terminals. But there are TRICON & KTL Kombi Terminal notable exceptions like TCB in terms of area performance, Ludwidgshafen and tmZ and Coslada Dry Port in terms of tracks. Constantí, Granollers, Monzón or Lyon-Vénissieux High traffic levels, in no case corresponding terminals also show good performance levels. to the size of the terminal . The Kombi Terminal Ludwidgshafen is the smallest The conclusion is that some of the terminals in the Lyon- (13 ha), handling 350,000 TEUs, but TriCon (17 ha) Madrid section are among the best in Europe in terms of handles 530,000 TEUs. Busto (24 ha) handles performance, but most of them have low productivity 420,000 TEUs, and the largest, DELTA 3, handles ratios. 250,000 TEUs

Obtaining synergies by concentrating with inland waterway mode . The search for synergies by joining the location of Delta 3 and Tricon shows clear results.

Key provision of track infrastructure . All terminals show a significant provision of rail infrastructure: 10 tracks in TriCon, 11 in Busto, and 13 in Kombi Terminal Ludwidgshafen, also in DELTA 3. In almost every case the length of the tracks allows trains of at least 700 m.

Key provision of gantry cranes . All terminals have large handling capacity, mainly obtained with a significant provision of gantry cranes: 12 in Busto, 8 in Kombi Terminal Ludwidgshafen, 5 in DELTA 3, and 4 in TriCon.

Relevant combined transport operators involved in the terminal management . In the case of Busto, the terminal is owned and managed by HUPAC, the Swiss Rail-Road Combined operator; in Kombi Terminal Ludwidgshafen, HUPAC and Kombiverkehr, the German Rail-Road Combined operator, both are shareholders of the terminal management company. In TriCon, Kombiverkehr is also a shareholder, and in DELTA 3 Naviland and Novatrans, both combined transport operators, are also shareholders of the terminal operator. That is one way of ensuring traffic volumes.

11 CLYMA project consists of the implementation of theCLYMA corridor approachproject consists to a section of the ofimplementation the of Mediterraneanthe corridor approach corridor to a ,section concretely of the to the WesternMediterranean part of the corridor corridor and, specificallyconcretely toto thethe LyonWestern-Madrid part Axis. of the corridor and specifically to the Lyon-Madrid Axis. The project comprises of studies and actions on the organizationThe project and comprises optimal implementationof studies and actions of the on the TENorganization-T network and, takingoptimal into implementation account long ofterm the perspectives,TEN-T network environmental, taking aspectsinto account and associatedlong term needs,perspectives, as well as environmental studies that promote aspects environmental and associated sustainability,needs, as well resource as studies efficiency that promote and low -environmentalcarbon transportsustainability, within an resource integrated efficiency transport and concept. low-carbon This shouldtransport stimulate within the an deployment integrated transportof the Green concept. This Corridorshould stimulate concept. the The deployment project also of the intends Green to developCorridor a managerial concept. structureThe project alsofor the intends to intermodaldevelop corridor.a managerial structure for the intermodal corridor.