Connecting Europe Facility Studies for the proposed new railway line TRANSPORT between and Perpignan ) Member States involved: (LNMP

France 2014-FR-TM-0476-S Implementation schedule Start date: January 2014 End date: December 2019

Budget: Estimated total cost of the action: €23,300,000

Maximum EU contribution: €11,650,000

Percentage of EU support: 50%

Beneficiary: Ministère de l’écologie, du développement durable et de l’énergie (MEDDE) www.developpement-durable.gouv.fr

Implementing body: SCNF Réseau www.sncf-reseau.fr

Additional information:

Coordinator’s Report on the Corridor The new railway line between Montpellier and Perpignan will be instrumental http://ec.europa.eu/transport/themes/i in ensuring continuity of rail services between and for both nfrastructure/ten-t-guidelines/corridors passenger and freight traffic. The Action concerns preparatory studies for the construction of this new railway line. It relates to the Mediterranean European Commission Corridor. The Action is part of a Global Project that aims at the completion http://ec.europa.eu/transport of the new Montpellier-Perpignan railway line.

Innovation and Networks Executive The Action consists of a set of studies, including route alignment definition, Agency (INEA) socio-economic and financial studies, environmental assessment and http://ec.europa.eu/inea preparation of the public enquiry procedure.

In the long run, the Action will improve the connection between North-West Europe and the , providing a direct link between major cities such as , , , Montpellier and .

Please note that the present document is for information purposes only. The content and conditions of the grant agreement always prevail on any different information which may be included in this document or elsewhere.

Update: October 2015