EXPERIENCE IN CONSULTING AND ENGINEERING SERVICES UNDER PUBLIC-PRIVATE PARTNERSHIP PROJECTS

EXPERIENCE IN CONSULTING AND ENGINEERING SERVICES UNDER PUBLIC-PRIVATE PARTNERSHIP PROJECTS

Developing regions for people _01

CORPORATE 4 INFORMATION

INTRODUCTION

ICEACSA GRUPO WORLDWIDE

ACTIVITY AND SERVICE AREAS _02 _03

EXPERIENCE IN 10 CLIENTS 24 INFRASTRUCTURE MANAGEMENT PPP PROJECT DEVELOPERS CONSULTING SERVICES FOR DEVELOPERS IN COMPREHENSIVE STRUCTURING OF PPP PROJECTS CONCESSIONAIRES SPECIALIZED IN PPP PROJECT FINANCING AND DEVELOPMENT DUE DILIGENCE AND PROJECT FEASIBILITY

CONSULTANCY FOR PRIVATE INITIATIVE IN PPP CONSTRUCTION OR EPC COMPANIES SPECIALIZED IN PROCUREMENT PROCESSES INFRASTRUCTURE CONSTRUCTION AND/OR CONSERVATION

CONSTRUCTION STUDIES AND DESIGNS OPERATORS SPECIALIZED IN MANAGEMENT OF FOR PPP PROJECTS INFRASTRUCTURES AT THE SERVICE OF USERS CONSULTANCY AND TECHNICAL ASSISTANCE DURING THE CONSTRUCTION PHASE OF PPP PROJECTS PRIVATE COMPANIES AND INVESTMENT FUNDS WHOSE CORPORATE PURPOSE IS TO INVEST IN PPP PROJECTS CONSULTANCY AND MONITORING IN THE OPERATIONAL AND MAINTENANCE PHASE OF PPP PROJECTS FINANCIAL INSTITUTIONS SPECIALIZED IN PROVISION OF FINANCIAL RESOURCES FOR PPP PROJECTS 01 CORPORATE INFORMATION INTRODUCTION

MAIN STRATEGIES

5

PROVISION OF COMPREHENSIVE SERVICES TO CLIENTS DURING THE ENTIRE LIFE CYCLE OF THEIR PROJECTS Since it was founded in 1985, ICEACSA has achieved are guaranteed by the talent of a large, multidisci- an outstanding market position as a pioneering plinary team. consultant and leader in turnkey projects in the COMBINING general engineering, transport infrastructures, Our track record is backed by a portfolio of more INTERNATIONAL EXPERIENCE WITH LOCAL mobility management, water and the environ- than 2,000 projects. Comprehensive regional plan- KNOWLEDGE ment, regional and urban development and ning in the highway, port, water engineering, regional construction sectors. ICEACSA Grupo has become and urban planning and project development fields an international engineering group by continuous for more than € 40,000 million ($45,000 million USD) TO PROVIDE INSTANT development of its experience and know-how and by firmly endorses our governance. Studies, designs, RESPONSE carefully planned international expansion. structuring, project management and works super- vision for more than € 10,000 million ($11,000 million Experience, quality and a result-oriented approach USD) certify this. R&D+I CONTINUOUS provide our clients with the peace of mind that IMPROVEMENT comes from knowing that they are dealing with a fully Welcome to ICEACSA Grupo. QUALITY PROCEDURES accredited and highly solvent company. The results A member of the ANTEA Group AND CONTROL UNITED KINGDOM THE NETHERLANDS POLAND BELGIUM USA ROMANIA / FRANCE PORTUGAL

MEXICO INDIA

REP.DOMINICANAN DOMINICANA REP. BURKINA FASO NICARAGUA PANAMA GUINEA BENIN CONAKRY LIBERIA 6 COLOMBIA

PERU BRAZIL BOLIVIA

URUGUAY

COUNTRIES WITH ICEACSA GRUPO OFFICES

OTHER COUNTRIES WITH ICEACSA GRUPO COMPANIES’S RECENT INTERNATIONAL PROJECTS

COUNTRIES WITH OTHER ANTEA GROUP OFFICES

HEAD OFFICES

Glorieta de América, 5-1º MEXICO 15004 A Coruña (Spain) PANAMA Tel.: +34 981 279 231 (switchboard) Avenida Insurgentes Sur 1425, 7A COLOMBIA PERU Fax: +34 981 279 406 Colonia Insurgentes Mixcoac Calle 60 Este, Obarrio URUGUAY [email protected] Carrera 21 Nº100-20, Of. 1.001 Alcaldía Benito Juárez Edificio Obarrio 60, piso 14, Of. A Av. Reducto Nº1370, Of. 201 International Service: 110111 Bogotá D.C. 03920 Ciudad de México Ciudad de Panamá Miraflores C/ 25 de Mayo Nº 477, Esc. 28 Tel.: +34 981 148 747 Tel.: + 57 1 300 3106 Tel.: +52 55 8790 7800 Tel.: +507 397 8607 Lima 18 11000 Montevideo [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] ICEACSA GRUPO WORLDWIDE

7

In an increasingly globalized environment, with full capacity to tackle any kind of project our ICEACSA Grupo is committed to boosting its clients may require in the engineering in general, international presence while maintaining the transport infrastructures, mobility manage- same principles of sustainability, value creation, ment, water, environment and territorial devel- competitiveness, experience and instant response opment, urban and building fields. A team of that have made it what it is today. more than 3,100 qualified experts around the world distributed among more than 80 offices in Europe, ICEACSA Grupo operates internationally to America and Asia, enables us to provide our clients provide cross-border services in the areas in which with comprehensive services that contribute real it operates from its permanent offices inSpain, added value. Our mission is to assist our clients Colombia, Mexico, Panama, Peru and Uruguay. to meet all the requirements encountered in the Thus, the teams based in these places also work development of their business projects until execu- in neighboring countries to provide solutions that tion and commissioning of the works and start-up exactly meet the client’s needs and ensure transfer of the commercial activity. of know-how to the client with the frank, open and at the same time comprehensive approach that In addition, ICEACSA Grupo has set up stable characterizes the group as a whole. strategic alliances with important local partners in the countries where we operate. These connec- In 2017 all the ICEACSA Grupo companies joined tions ensure comprehensive knowledge of the the ANTEA Group, further reinforcing their inter- various markets and a high response capacity to national positioning and complementarity in the any project the client may propose. services we provide. As a result, we are endowed ACTIVITY AREAS AND SERVICES

ICEACSA Grupo provides services in the following areas:

8

TRANSPORT INFRASTRUCTURE WATER AND THE ENVIRONMENT INFRASTRUCTURES MANAGEMENT

COASTAL, MARINE, AND FLUVIAL REGIONAL/URBAN DEVELOP- INDUSTRY AND ENERGY INFRASTRUCTURES MENT AND ARCHITECTURE PROJECT LIFE CYCLE 05 OPERATIONAL CONSULYANCY PHASE SERVICES 9

ENGINEERING 01 SERVICES PLANNING

PROJECT 02 MANAGEMENT 04 FEASIBILITY CONSTRUCTION PHASE SERVICES

03 DISEIGN EXPERIENCE IN CONSULTANCY AND 02 ENGINEERING SERVICES UNDER PUBLIC-PRIVATE PARTNERSHIPS FEASIBILITY

PROJECT MONITORING CONSTRUCTION DESIGNS

I NF RA +3,300 KM +2,300 KM INDEPENDENT S G T CONSULTANCY AND ENGINEER IN R PPP ROAD INFRASTRUCTURE PROJECT STUDIES AND DESIGNS OF C U CONSTRUCTION T.A. N C INVOLVING INVESTMENT OF PPP ROAD INFRASTRUCTURE A T U N I R +8,000 MM USD F E COMPREHENSIVE PUBLIC-PRIVATE S PARTNERSHIP CONSULTING AND MONITORING PPP PROJECT OF CONSERVATION AND STRUCTURING PROJECTS MAINTENANCE

DUE DILIGENCE PLANNING AND MOBILITY M ANAGEMENT ASSET MANAGEMENT ITS EQUIPMENT

ICEACSA Grupo has extensive experience in Public-Pri- USER FLOW OPERATION AND vate Partnership projects. As we provide our services to MONITORING all the participating agents, we understand all their points of view and therefore have a comprehensive overall vision of how PPP projects work and of the needs and goals of all the parties involved. 11

PUBLIC GRANTING BODY FINANCING BODY CONCESSIONAIRE-DEVELOPER The ICEACSA Grupo teams provide support throughout the entire life cycle of the resulting infrastructure, from BUSINESS IDEA PRIVATE INITIATIVE structuring through procurement, design and construc- CONSULTANCY tion, to operation of the asset. We also conduct due dili- PRE-FEASIBILITY TECHNICAL PRE- TECHNICAL FEASIBILITY gence studies for financing, procurement, and acquisi- FEASIBILITY STUDIES STUDIES tion or sale of the asset. Finally, we can also perform

FEASIBILITY project monitoring and independent engineering STRUCTURE STUDY services during the design, construction and operating phases. APPROVALS DEVELOPMENT TECHNICAL TENDER ANALYSIS CONSULTANCY ICEACSA Grupo has the capacity to comprehensively PROCUREMENT DURING DUE DILIGENCE analyze the project as a whole from all points of view: PROCUREMENT technical, financial, legal, environmental, social and CONTRACT AWARD PROCESS commercial, or supply and demand. This means that the risk assessment is more efficient, which in turn enables FINANCIAL CLOSE SUPERVISION / CONSTRUCTION better assessment of mitigating mechanisms and more AUDITING PROJECT OR OPERATION accurate feasibility management. PRE-CONSTRUCTION CONSTRUCTION INDEPENDENT MANAGEMENT ENGINEER ICEACSA Grupo’s experience in Public Private Partner- CONSTRUCTION ship projects covers transport infrastructure projects TECHNICAL (roads, railways, ports, airports), water infrastructures ASSISTANCE OPERATION (drinking water and wastewater) and public service buildings (education, healthcare, correctional centers or public offices) and we carry out bothbrownfield and REVERSION greenfield projects. CONSULTING SERVICES FOR DEVELOPERS UNDER 01. Structuring studies for implementation of COMPREHENSIVE PPP PROJECTS the PPP project for refurbishment and upkeep of a 05* toll-free highway network in Tejupilco, Ixtapan and Toluca (Mexico). 1,637 km / 82 roadways / investment: 13,629 million MXN - 722 million USD - 2019.

02. Study of alternatives and operational and road safety enhancement project for the Cuernavaca- Acapulco highway, km 95+000 to km 110+000 section (Mexico). 15 km / investment: 52.4 million STUDIES AND DESIGNS FOR TECHNICAL FEASIBILITY MXN.

DEMAND STUDIES, SCENARIO MODELING, COST STUDIES 03. Pre-feasibility studies for connection of the east-west system under the Olaya Herrera airport in the Medellín municipal district (Colombia). 3 km / 2 ENVIRONMENTAL, SOCIAL AND LAND ASSESSMENT km tunnel / investment: 759,061 million COP - 253 million USD - 2017. RISK STUDIES 04. Technical, economic and financial feasibility 12 study of the transport and logistics infrastructure COST-BENEFIT AND VALUE-FOR-MONEY STUDIES for road access to the port area of Montevideo (Uruguay). 37 km urban roads / 5.8 km viaducts / FINANCIAL MODELING 1.6 km tunnels / investment: 634 MM USD - 2015.

05. Comprehensive technical, administrative, PERFORMANCE-BASED CONTRACTING (PBC) social, land procurement, environmental, financial, accounting and legal structuring for the public PREPARATION OF TENDER DOCUMENTS, DATA ROOM initiative PPP project for the new road network in Valle del Cauca (Colombia). 760 km / investment: 10 SUPPORT IN THE CONTRACT AWARD PHASE, SALES AND 3,200,000 million COP - 960 million USD - 2020. MARKETING 06. Preliminary project for new water intake, water treatment plant and aqueduct for Panama City (Panama). 23 km pipeline / 43 km impulse line / investment: 300 million USD - 2015.

07. Strategic plan for the right-of-way of the Michoacán Package and execution plans of the Comprehensive structuring of projects enables assessment of the highway service stations (Mexico). 361 km / 19,414 feasibility of an initiative from the financial, supply and demand, year-30 AADT vehicles / investment: 150 million MXN - 7 million USD - 2016. technical, legal, environmental and social points of view. 08. Technical-financial feasibility study for extension of the Balaídos industrial estate in ICEACSA Grupo provides consultancy to its clients on the following (Spain). 240,755 m2 / 105,750 m2 for-profit area. key aspects: 09. Proposal for the Magdalena Medio Puerto Salgar Hacienda “Casa ” multimodal logistic • Puesta en común del conjunto de intereses de un importante center (Colombia). 4.9 km water layer, 390,000 m2 número de agentes de interés. land area / investment: 170 million USD - 2015. • Adecuada asignación de los riesgos a cada uno de los actores. • Definición y calibración de los indicadores de servicio que permiten su seguimiento posterior. • Asesoramiento en la comercialización y proceso de licitación. 10. Preliminary design of the wastewater 16 15 treatment plant and collectors in Baiona, (Spain). 4.5 km pipeline / 7,313 m3/h/ 35,000 inhabitants / investment: € 6.8 million - 9 million USD - 2006.

11. Specialized consultancy to execute the comprehensive technical, legal and financial structuring of the project known as Grupo 2 Centro Occidente, 4G road corridors: Ibagué-La Paila dual carriageway and Buga-Buenaventura and Santander de Quilichao-Chachagüí-Pasto- Rumichaca dual carriageway (Colombia). 791 km / investment: 15,800,000 million COP - 5,214 million USD - 2016.

12. Feasibility study for execution of the Chetumal-Costa Maya Short Route in the city of Chetumal, State of Quintana Roo (Mexico) 13 13. Preliminary draft of the Carballo-Finisterre high-capacity highway (Spain). 57.56 km / 12 viaducts / 20 junctions / investment: € 110 million - 120 million USD - 2005.

14. Planning, structuring, development and implementation of the “Bronx creative district ” project in Bogotá (Colombia). 20,705 m2 / 32,776 04 13 m2 built area / investment: 133,000 million COP - 40 million USD - 2019.

15. Technical, financial and legal structuring for the construction of the building known as ET-CAN in the city of Bogotá D.C. under a Public Private Partnership agreement (Colombia). 3 x 14-floor towers, each with 3 basements / 104,000 m2 / Silver LEED energy certification / investment: 434,000 million COP - 130 million USD - 2019.

16. Drafting of the concession project for a transport logistics center (Spain). 602,497 m2 / 180,000 m2 industrial and logistics area

17. Technical consultancy in the international public competition for the Tultepec highway concession – Felipe Ángeles International Airport – Pirámides, State of Mexico (Mexico). 27 km / 6,673 AADT vehicles estimated.

[*] Source: National Infrastructure Agency (ANI). DUE DILIGENCE AND PROJECT FEASIBILITY 01. Technical consultancy for review of the contract, monitoring of the construction and 05 maintenance of the PPP project for upkeep of the Pirámides - Tulancingo - Pachuca highway section (Mexico). 91.5 km / 90 overpasses / investment: 3,930 million MXN - 209 million USD - 2018.

02. Definition of the functional and spatial quality TECHNICAL AUDITS and strength and structural stability of two buildings to determine their suitability for use as instant PROJECT REVIEW. ANALYSIS OF TECHNICAL SOLUTIONS. ANALYSIS reaction units for the Canapote and Magangué Prosecutor’s Office (Colombia). 823 m2 / investment: OF REGULATORY COMPLIANCE AND PERMITS. PLANNING STUDIES. 2,500 million COP - 830,000 USD - 2017. REVIEW OF THE OPERATING MODEL 03. Technical-financial feasibility study for the ASSESSMENT OF ENVIRONMENTAL, SOCIAL AND LAND 10-year multi-year contract to provide services PROCUREMENT RISKS for upkeep of the Saltillo – Monterrey – La Gloria highway section under the provisions of the Public- Private Partnerships Act (Mexico). 201.2 km / 18,915 FINANCIAL AUDIT AADT vehicles / investment: 5,214 million MXN - 265 14 million USD - 2018. COST REVIEW AND ASSESSMENT, BUDGET 04. Technical-financial feasibility study for paving STUDY, CAPEX AND OPEX ANALYSIS AND PROJECTIONS roads in the municipalities of Guadalajara, Zapopan, San Pedro Tlaquepaque, Tonalá, El Salto, Tlajomulco ANALYSIS OF THE CONTRACTUAL SITUATION de Zúñiga, Ixtrahuacán de los Membrillos, Juanacatlán and Acatlán de Juárez, state of Jalisco (Mexico). 64.4 km / 65,900 vehicles/day / investment: STUDY OF PERFORMANCE INDICATORS (KPI) 1,515 million MXN - 80 million USD - 2019. 01 ANALYSIS OF AVAILABILITY AND PAYMENT MECHANISMS 05. Technical-financial feasibility study of the Periférico - Airport - Zapata PPP contract – Double- deck highway to Playas de Tijuana (Mexico). 4.2 km / 2.1 km of viaduct / 15,000 AADT vehicles / investment: 7,693 million MXN - 404 million USD - 2017.

ICEACSA Grupo provides technical, financial, legal, environmental and social due diligence services for financial entities (to determine bankability of the same), investment entities (to determine financial profitability within an acceptable risk management framework) and concessionaires (to assess EPC proposals for drafting of contracts).

Our teams apply the knowledge obtained from participation in all stages of the infrastructure life cycle. This enables them to approach each project with a comprehensive vision and ensure that the audit is realistic, accurate and appropriate to the future reality. 06. Drafting of the technical-financial 06 09 feasibility study of the PPP contract for extension, rehabilitation, upgrading, operation and maintenance of the Nopalera drinking water treatment plant, Tecate (Mexico). Capacity: 350 l/s / tank: 5,000 m3 / investment: 131 million MXN - 7 million USD - 2017.

07. Technical-financial viability study for the Barranca Larga - Ventanilla highway, Oaxaca (Mexico). 24 km / investment: 893 million MXN - 47 million USD - 2020.

08. Technical-financial feasibility study for refurbishment of the Tehuantepec Isthmus railway, Medias Aguas - Ubero section (Mexico). 41.63 km / 65 km/h / investment: 786 million MXN - 42 million USD - 2020.

09. Technical-financial feasibility study of the 15 10-year multi-year contract to provide services for upkeep of the Pirámides - Tulancingo - Pachuca highway section under the provisions of the Public- Private Partnerships Act (Mexico). 91.5 km / 90 bridges / 19,734 AADT vehicles / investment: 3,930 million MXN - 200 million USD - 2017.

10. Consultancy to define and calibrate 08 09 performance standards in the Bicentenario Viaduct concession, State of Mexico (Mexico). 22 km / 20 km of viaduct / 33,000 AADT vehicles. CONSULTANCY FOR PRIVATE INITIATIVE IN PROJECT AWARD PROCESSES 01. International contract award process for the Auto-Estradas do Centro concession (Portugal). 378 02* km / investment: € 1,000 million - 1,400 million USD - 2008.

02. Support to a private bidder for review and CHARACTERIZATION OF EXISTING ASSETS analysis of the technical and financial information provided by the National Infrastructure Agency (ANI) to enhance the designs to optimize the scope, costs, DEMAND STUDIES timeframes and execution quality and subsequent operation and maintenance of the Autopista al Mar GAUGING STATIONS SURVEYS MANAGEMENT OF EXISTING DATA 1 project (Colombia). 172 km / 9.6 km of tunnels / investment: 1,469,415 million COP - 455 million USD SCENARIO MODELING FEE STUDIES -2015.

TECHNICAL AUDIT (REVIEW OF PLANS) 03. Engineering and technical assistance services for the procurement process of the study, design, construction, operation and maintenance of works VALUE ENGINEERING for extension and refurbishment of the Pan-American 16 Highway, Puente de las Americas - Arraiján section SOLUTION OPTIMIZATION COST (Panama). 11 km / investment: 300 million USD - 2019. ESTIMATION (CAPEX, OPEX) 04. Provision of support services to a private bidder in the contract award process for the Pacífico DRAFTING OF TECHNICAL PROJECTS 3 4G highway concessions (Colombia). 142 km / 1,869,690 million COP - 785 million USD - 2014. OPERATION AND MAINTENANCE PLANS 05. Engineering technical assistance for the 04* international public award process for concession of DRAFTING OF TENDERS highway sections and associated series of the Norte Litoral by the SCUT do Norte Litoral concession (Portugal). 112 km / 21 viaducts / 1 tunnel.

06. International tender project for concession of Government agencies have boosted their participation in PPP proj- highway sections and associated roadway packages in Greater Oporto designated by the “SCUT Greater ects through tenders of interest to concessionaires and EPC compa- Oporto concession” (Portugal). nies. These award processes allow short tender drafting and submis- 07. Basic project and collaboration to draw sion periods during which it is necessary to analyze the project on up the documentation for the tender process for the basis of the limited information provided by the public developer. granting a concession to operate the marine- sports facilities of the Dársena de la Marina in ICEACSA Grupo provides support to private enterprises to assess A Coruña (Spain). 25,752 m2 of water layer the feasibility of these opportunities and to draw up the tenders to be submitted by our clients. 08. Technical preliminary drafts and documentation – including identification of suitable sites – to meet the qualifying requirements to Risk management is conducted on the basis of a characterization apply for various wind power concessions (Spain). 4,628,932 m2. of the condition of the asset, commercial demand forecasts, and a review of regulatory criteria (technical, environmental and social). This work serves as the base for developing optimization scenarios of engineering solutions from the project investment, operation and maintenance points of view.

Note: In addition to those noted herein, ICEACSA Grupo’s portfolio includes a number of projects which, for reasons of confidentiality, cannot be published. 09. Technical assistance to support the tender 03 17 for Maintenance Refurbishment Operator (MRO) on the highways and bridges that comprise the Southeast Package (Mexico). 523 km / 133 viaducts / 21 junctions / investment: 14,000 million MXN - 670 million USD – 2020.

10. Technical support in the international public tender process for drafting of the execution plans, supply of materials and construction of the platform and track of the Tren Maya 1, 2 and 3 sections (Mexico). 614 km / maximum speed 160 km/h / 33 viaducts / 146 vehicle crossings.

11. Contract award process to convert the VRG 4.1 expressway to two lanes each way (Spain) Section C-531- Sanxenxo-Santiago- motorway, Santiago-Brión section (Spain). 15.8 km / 6 junctions / 18 viaducts totaling 1,966 m. 17 12. Contract award process to convert the VRG-1.1 expressway into a dual-carriageway motorway (Spain). 40 km / 11 junctions / 11 viaducts totaling 1,779 m / investment: € 59.4 million - 70 million USD - 2005.

13. Technical assistance for traffic flow study of 10 16 the SCUT Norte Litoral highway (Portugal).​ 14. Contract award process for the Lugoj - Deva Highway, lots 2 and 3 (Romania).

15. Contract award process for construction and operation of the Morrazo motorway and the regional road network on the Morrazo Peninsula (Spain). 14.5 km / 7 junctions/ 4 viaducts totaling 1,030 m / investment: € 41 million - 53 million USD - 2011.

16. Preliminary draft of the procurement RFQ for the design, construction, operation and financing of the Circuit 6 road infrastructure on Route 6, Cuchilla Grande-Route 12 section (Uruguay). 78 km / 5 bridges totaling 740 m / investment: 64 million USD - 2018.

17. Contract award process for final development of the Route 14 highway infrastructure, Sarand del Yi - Lascano - Velázquez section, Road Circuit 5 (Uruguay). 182 km (112 km of new route - 70 km of upgrading) / 6 junctions / investment: 110 million USD - 2020.

[*] Source: National Infrastructure Agency (ANI). CONSTRUCTION STUDIES AND DESIGNS FOR PPP PROJECTS 01. Construction plans for the high-specification Cardel - Poza Rica highway, section I: Laguna 11 Verde - Nautla, State of Veracruz (Mexico). 74 km / investment: 3,470 million MXN - 168 million USD - 2016.

CHARACTERIZATION OF EXISTING ASSETS 02. Execution plans for the Siglo XXI highway concession, Jantetelco - Xicatlacotla and Jantetelco - El Higuerón section, State of Morelos (Mexico). GEOMETRIC INVENTORY. TOPOGRAPHY 62 km / investment: 2,677 million MXN - 136 MM ASSESSMENT OF GEOTECHNICAL CONDITIONS USD -2017 03. Execution plans for final development STUDIES AND DESIGNS works on the Route 14 infrastructure, Sarandi del Yí - Lascano - Velázquez section. Road Circuit 5 (Uruguay). 182 km (112 km of new route - 70 km of FRONT-END ENGINEERING DESIGN (FEED) upgrading) / 6 junctions / investment: 110 million CONSTRUCTION PLANS (DETAILED DESIGN) USD - 2020. 18 04. Construction plans for functional units 1, 2 and OPERATION AND MAINTENANCE PLANS AND PROGRAMS 3 within the upgrading scope of the Puerta de Hierro - Palmar de Varela concession (Colombia). 170 km / DESIGN SUPERVISION 2 x 4-lane toll plazas / investment: 1,746 million COP - 520,000 USD - 2020.

INTEGRATED DESIGN MANAGEMENT 05. Execution plans for the final development works of the road infrastructure of Ruta 14 Center - West, Sarandi del Yi Bypass and R14-R3 link road, Road Circuit 3 (Uruguay). 291 km / 10 new bridges 02 totaling 1.75 km / 10 bridges totaling 1.3 km to be refurbished / 9 junctions / investment: 171 million USD – 2020.

06. Construction engineering plans to increase the capacity of the AP-9 highway, kp 55 junction with the southern branch in A Coruña (Spain). 2.8 km / investment € 7.3 million - 9.6 million USD - 2010.

The pre-construction phase requires studies and designs to iden- 07. Engineering of toll plazas, rest area and tify the technical requirements and initial investment for both final control center building for the Siglo XXI Highway, Jantetelco - El Higuerón section, Morelos state development or upgrading of existing infrastructures (brownfield (Mexico). 62 km / investment: 2,677 million MXN - projects) and new execution works (greenfield projects). This can be 136 million USD - 2017. done by FEED or by passing directly to detailed engineering stage. 08. Execution plans for the civil works of the Aguascalientes Sur, Tepezalá, Zacatecas, Tuli -Helios and The nature of the PPP contracts, the scope of which generally Viborillas solar plants (Mexico). 4,710,000 m2. includes both the construction and the operating (operation and 09. Construction plans for the AP -53 Santiago de maintenance) stages of the infrastructures must be taken into Compostela - motorway, section: Alto de Santo Domingo - A-52, sub-section: Cea interchange account to comply with the contractual terms and conditions. - A-52 (Spain). 18 km / 2 viaducts totaling 1.3 km / investment: € 140 million - 157 million USD - 2009. ICEACSA Grupo can also support the SPV with integrated design management to defend its interests against the company that holds the EPC contract. 10. Construction plans for civil works and 13* 09 facilities of the Container Terminal (FCT) in the outer port of Ferrol (Spain). 300,000 m2 / 20 m draft / 800 m berth /1,000,000 TEUs.

11. Routing and construction plans for the Santiago-Ourense Highway, Santiago - Alto de Santo Domingo section (Spain). 56 km / investment: € 297 million - 260 million USD - 1998.

12. Design, construction, operation and main- tenance of the East Arraiján wastewater treatment plant (WWTP), the trunk system and its connec- tions and operation and maintenance of the sewer networks of Burunga and Arraiján Cabezera, (Panama). WWTP capacity: 1.00 m3/s in horizon year 2050. 190.000 inhabitants / 5.000 m2 of new build- ings / investment: 60.5 million USD - 2019.

13. Detailed studies and designs of the Pacifico 19 1 link highway (Colombia). 50 km / 52 viaducts totaling 6 km / 2 double tunnels totaling 5.5 km / investment: 1,779,775 million COP - 587 million USD - 2016.

14. Construction plans and technical assistance for the construction and amendment to plans of the AG-56 Santiago - Brión highway including the As 15 14 Galanas N-550 - Pardiñas bypass (Spain). 15.8 km / investment: € 112 million - 135 million USD - 2007.

15. Basic engineering and construction plans for the equipment and maintenance building of the Central Highway of Galicia in the Ribadulla toll plaza, , A Coruña (Spain). 869 m2 built area / investment: € 568,626 - 713,000 USD - 2003.

16. Construction plans for the marina in Baiona, Pontevedra (Spain). 295 moorings.

[*] Source: Consorcio Constructor Pacífico 1. CONSULTANCY AND TECHNICAL ASSISTANCE DURING THE 01. Supervision of the construction works of 424 CONSTRUCTION PHASE OF PPP km of Federal Network motorways and roads in 06 Mexico (Mexico). 424 km / investment: 12,442 million PROJECTS MXN - 719 million USD - 2015. 02. Administrative Supervising Agent (ASA) for comprehensive consulting, management, monitoring, supervision and administration of operations, maintenance and refurbishment of the TECHNICAL SUPERVISION OF WORKS Villahermosa bypass, State of Tabasco (Mexico). 24 km / investment: 845 million MXN - 44 million USD - 2020. TECHNICAL CONSULTANCY ON WORKS 03. Technical, financial, legal, administrative, ENVIRONMENTAL, SOCIAL AND LAND STUDIES operational, environmental, social and land procurement inspection of the concession contract under a public-private partnership scheme for the INTEGRATED CONSTRUCTION MANAGEMENT “Loboguerrero Buga” Corridor (Colombia). 55 km / investment: 60,000 million COP - 20 million USD - 20 PROJECT MONITORING 2017. 04. Administrative Supervising Agent (SAA) LENDERS’ TECHNICAL ADVISOR - INDEPENDENT ENGINEER services to provide comprehensive consultancy, management, monitoring, supervision and administration of operation, maintenance and refurbishment of the Atlacomulco – Maravatío highway, States of México and Michoacán (Mexico). 64 km / 8 dual-carriageway bridges / 22 overpasses and 31 underpasses / 2 toll plazas. 03

05. Supervision of operation, maintenance and monitoring of operation of the AP-9 in A Coruña (Spain). 23.7 km / investment: € 130 million - USD 155 million - 2005. ICEACSA Grupo contributes to the objectives of the stakeholders in 06. Technical assistance to road infrastructure the construction stage of the works conducted under PPP contract: development works on the Route 14 Center - West Sarandi de Yi bypass and the R14-R3 link road. Road Circuit 3 (Uruguay). 291 km / 10 new bridges totaling • Supervision of the works taking the perspective of the public 1.75 km / 10 bridges to be refurbished totaling 1.3 body, concessionaire / SPV or financing/investing institution km / 9 junctions / investment: 171 million USD - 2019. into account, as required. • Technical works office to support the EPC to optimize construc- tion solutions and value engineering proposals or, given that this type of contract is a long-term project, incorporation of technological innovations as they appear on the market.

Monitoring of the construction process, or project monitoring, enables effective monitoring of the progress of the works to ensure proper management of the contract risks from the point of view of each stakeholder. This enables monitoring and regular reporting on the key budgetary, quality and timeframe-related aspects. 07. Award of monitoring tasks of the elevated 02 08 bypass of Puebla (Mexico). 15.3 km on the second deck of the viaduct / investment: 960,000.00 MXN - 48,000 USD - 2018.

08. Works management and project monitoring of the works for the Container terminal of the Outer Port of Ferrol (Spain). 300,000 m2 / 20 m draft / 800 m of berths / 1,000,000 TEUs.

09. Control and surveillance of the works of the AP-9 Atlantic Highway, Rande - Puxeiros and Fene - Guisamo section, Galicia (Spain). 32.8 km / 8 junctions / 14 viaducts totaling 5,971 m / 4 tunnels totaling 2,651m / investment: € 200.8 million - 177 million USD - 2009.

10. Control and surveillance of the construction works of the AP-53 - Ourense highway, Alto de Santo Domingo - A-52 21 section, O Carballiño branch and Maside junction (Spain). 5.25 km km / investment: € 26 million - 23 million USD - 2009.

11. As-built documentation with amendments, Atlantic Highway AP-9, section: Fene - Ferrol (Spain). 9.1 km / investment: € 117 million - 142 09 11 million USD - 2014. 12. Monitoring, surveillance, and coordination of health and safety on the Santiago-Ourense AP-53 highway, Santo Domingo - A-52 upper section, sub-section: Cea-A-52 subsection (Spain). 12.70 km / investment: € 73.9 million - 106 million USD - 2009. CONSULTANCY AND MONITORING IN THE OPERATIONAL AND MAINTENANCE 01. Financial-technical feasibility study and PHASE OF PPP PROJECTS independent engineer to monitor the 10-year multi- 02 year contract for the purpose of providing services for upkeep of the Pirámides - Tulancingo - Pachuca highway section in terms of the Public Private Partnership Act (Mexico). 91.5 km / 90 bridges / 19,734 AADT vehicles / investment: 3,930 million MXN - 209 million USD - 2020.

TECHNICAL SUPERVISION OF OPERATION AND CONSERVATION. 02. Technical audits and supervision of the operation and maintenance of the Durango Mazatlán-Highway during the 2014-2016 period TECHNICAL CONSULTANCY ON OPERATION AND CONSERVATION. (Mexico). 120 km / 61 tunnels.

PROJECT MONITORING. 03. Administrative Supervising Agent (ASA) for comprehensive consulting, management, monitoring, supervision and administration of LENDERS’ TECHNICAL ADVISOR - INDEPENDENT ENGINEER operations, maintenance and refurbishment of the Villahermosa bypass, State of Tabasco (Mexico). 24 km / investment: 845 million MXN - 44 million 22 USD - 2020.

04. Road Safety Audits and serious accident investigation tasks within the framework of the Supervisory Administration Agent (SAA) services to provide comprehensive consultancy, management, monitoring, supervision and administration of operation, maintenance and refurbishment of the Atlacomulco – Maravatío highway, States of México 03 Supervision of the asset is focused on meeting the service indicators and Michoacán. 64 km / 8 dual-carriageway bridges / established in the PPP contract. Those related to operating activities 22 overpasses and 31 underpasses / 2 toll plazas. represent continuous monitoring. For those related to upkeep and 05. Technical, financial, legal, administrative, maintenance, on the other hand, the tasks involving scheduled main- operational, environmental, social and land procurement inspection of the concession contract tenance must be differentiated from those concerned with extraor- under a public-private partnership scheme for the dinary situations (major maintenance). “Loboguerrero Buga” Corridor (Colombia). 55 km / investment: 60,000 million COP - 20 million USD - 2017. ICEACSA Grupo can contribute to implementation of these contracts:

• Structuring upkeep and maintenance plans and schedules. • Management of operations and support for obtaining and processing information from user control centers.

Monitoring of the construction process, or project monitoring, enables effective monitoring of the progress of the operating and maintenance activities to ensure proper management of the contract risks from the point of view of each stakeholder. In this way, periodic control and reporting on essential aspects of budget, quality and deadlines is enabled. 06. Extraordinary refurbishment project of the 01 10 surface course of the AG-56 Santiago - Brión freeway (Spain). 15.9 km / 23,700 vehicles/day / investment: € 3.5 million - 3.9 million USD - 2019.

07. Supervision of operation, maintenance and monitoring of operation of the AP-9 Highway in A Coruña (Spain). 23.7 km / investment: € 130 million - 155 million USD - 2005.

08. Technical monitoring of planning and execution of the conservation and maintenance of judicial complexes in the state of Veracruz de Ignacio de Lave (Mexico).

09. Project for operational improvements and road safety of the Cuernavaca - Acapulco Highway, section km 95+000 to km 110+000 (Mexico). 16 km / investment: 52.4 million MXN - 2.6 million USD - 2018. 23 10. Technical consultancy for coordination of reports and studies on mobility, technology and vehicle flow of the Traffic Management Center in Madrid for the General Directorate of Traffic (Spain). 6,000 km of roadway / 13,000 ITS units / 41 million data managed per day. 05 04 11. Drafting of studies and technical reports related to data transmission and management from the Northwest Traffic Management Center for the General Directorate of Traffic (Spain). 1,700 km of roadway / 3,200 ITS units / 3.7 million data managed per day. ​ 03 CLIENTS

24 AGENCIA NACIONAL INMOBILIARIA VIRGILIO BARCO VARGAS | ACEOUSA | AGENCIA NACIONAL DE INFRAESTRUCTURA - ANI | AGENCIA PARA LA GESTIÓN DEL PAISAJE, EL PATRIMONIO Y LAS ALIANZAS PÚBLICO PRIVADAS - APP | ALEÁTICA | AUTOPISTAS DEL ATLÁNTICO, S.A. (AUDASA) | AYUNTAMIENTO DE CULLEREDO | BANCO DEL BAJÍO | BANCO INVEX, SA. INSTITUCION DE BANCA MULTIPLE | BANCO NACIONAL DE OBRAS Y SERVICIOS PÚBLICOS (BANOBRAS) | BANCO SANTANDER | BANORTE | CALTIA | COINTER - AZVI - VISE | CONCESIONARIA SANTIAGO-BRION | CONSELLERIA DE INFRAESTRUTURAS E MOBILIDADE - XUNTA DE GALICIA | CONSORCIO CONSTRUCTOR PACIFICO 1 - CONPACIFICO | CONSORCIO ZONA FRANCA DE VIGO | CONSTRUCTORA DE AUTOPISTAS DE MICHOACAN S.A.P.I DE C.V. | COPASA | DIRECCIÓN GENERAL DE TRÁFICO | DRAGADOS | EDOMEX | EMPRESA DE RENOVACION Y DESARROLLO URBANO DE BOGOTÁ | FCC CONSTRUCCIÓN, S.A. | FCT-FERROL CONTAINER TERMINAL, S.A. | FERROVIAL/AGROMAN U.T.E. | FONDO CAPITAL INFRAESTRUCTURA | FONDO FINANCIERO DE PROYECTOS DE DESARROLLO - FONADE | GRUPO ALDESA | GRUPO MOTA-ENGIL | INVECTURE GROUP | IRIDIUM | JOINT VENTURE MILLER GILBERTO E ICONO URBANO S.A. | JUNTA DE CAMINOS DEL ESTADO DE MÉXICO | LIBRAMIENTO ELEVADO DE PUEBLA, S.A. DE C.V. | MINISTERIO DE TRANSPORTE Y OBRAS PÚBLICAS DE URUGAUAY | MINISTERIO DE TRANSPORTES - GOBIERNO DE ESPAÑA | PROINDESA | PROMOTORA Y OPERADORA DE INFRAESTRUCTURA, S.A.B. DE C.V. | RAMÓN C. ÁLVAREZ CONSTRUCCIONES, S.A. | RECSA | SAASCAEM | SACYR CONCESIONES | SECRETARÍA DE INFRAESTRUCTURA Y TRANSPORTE DEL ESTADO DE QUINTANA ROO | AGENCIA NACIONAL INMOBILIARIA VIRGILIO BARCO VARGAS | ACEOUSA | AGENCIA NACIONAL DE INFRAESTRUCTURA - ANI | AGENCIA PARA LA GESTIÓN DEL PAISAJE, EL PATRIMONIO Y LAS ALIANZAS PÚBLICO PRIVADAS - APP | ALEÁTICA | AUTOPISTAS DEL ATLÁNTICO, S.A. (AUDASA) | AYUNTAMIENTO DE CULLEREDO | BANCO DEL BAJÍO | BANCO INVEX, SA. INSTITUCION DE BANCA MULTIPLE | BANCO NACIONAL DE OBRAS Y SERVICIOS PÚBLICOS (BANOBRAS) | BANCO SANTANDER | BANORTE | CALTIA | COINTER - AZVI - VISE | CONCESIONARIA SANTIAGO- BRION | CONSELLERIA DE INFRAESTRUTURAS E MOBILIDADE - XUNTA DE GALICIA | CONSORCIO CONSTRUCTOR PACIFICO 1 - CONPACIFICO | CONSORCIO ZONA FRANCA DE VIGO | CONSTRUCTORA DE AUTOPISTAS DE MICHOACAN S.A.P.I DE C.V. | COPASA | DIRECCIÓN GENERAL DE TRÁFICO | DRAGADOS | EDOMEX | EMPRESA DE RENOVACION Y The quality of the projects carried out by ICEACSA DESARROLLO URBANO DE BOGOTÁ | FCC CONSTRUCCIÓN, S.A. | Grupo is reflected in the prestige of the public and FCT-FERROL CONTAINER TERMINAL, S.A. | FERROVIAL/AGROMAN private organizations in our client portfolio: U.T.E. | FONDO CAPITAL INFRAESTRUCTURA | FONDO FINANCIERO DE PROYECTOS DE DESARROLLO - FONADE | GRUPO ALDESA 25 | GRUPO MOTA-ENGIL | INVECTURE GROUP PPP PROJECT DEVELOPERS: | IRIDIUM | JOINT VENTURE MILLER GILBERTO PUBLIC BODIES (GOVERNMENTS), E ICONO URBANO S.A. | JUNTA DE PRIVATE COMPANIES (CONCESSIONAIRES AND CAMINOS DEL ESTADO DE MÉXICO | INVESTORS) AND MULTILATERAL INSTITUTIONS. LIBRAMIENTO ELEVADO DE PUEBLA, S.A. DE C.V. | MINISTERIO DE TRANSPORTE Y OBRAS PÚBLICAS DE URUGAUAY CONCESSIONAIRES SPECIALIZED IN PPP PROJECT | MINISTERIO DE TRANSPORTES FINANCING AND DEVELOPMENT - GOBIERNO DE ESPAÑA | PROINDESA | PROMOTORA Y OPERADORA CONSTRUCTION OR EPC COMPANIES SPECIALIZED IN DE INFRAESTRUCTURA, S.A.B. DE INFRASTRUCTURE CONSTRUCTION AND/OR UPKEEP C.V. | RAMÓN C. ÁLVAREZ CONSTRUCCIONES, S.A. | RECSA | SAASCAEM | SACYR CONCESIONES | SECRETARÍA DE INFRAESTRUCTURA OPERATORS SPECIALIZED IN MANAGEMENT OF Y TRANSPORTE DEL ESTADO DE QUINTANA INFRASTRUCTURES AT THE SERVICE OF USERS ROO | AGENCIA NACIONAL INMOBILIARIA VIRGILIO BARCO VARGAS | ACEOUSA | AGENCIA NACIONAL DE INFRAESTRUCTURA - ANI | AGENCIA PARA LA GESTIÓN DEL PAISAJE, PRIVATE COMPANIES AND INVESTMENT FUNDS EL PATRIMONIO Y LAS ALIANZAS PÚBLICO PRIVADAS - APP | ALEÁTICA | WHOSE CORPORATE PURPOSE IS TO INVEST IN AUTOPISTAS DEL ATLÁNTICO, S.A. (AUDASA) | AYUNTAMIENTO DE CULLEREDO | PPP PROJECTS BANCO DEL BAJÍO | BANCO INVEX, SA. INSTITUCION DE BANCA MULTIPLE | BANCO NACIONAL DE OBRAS Y SERVICIOS PÚBLICOS (BANOBRAS) | BANCO SANTANDER | BANORTE | CALTIA | COINTER - AZVI - VISE | CONCESIONARIA FINANCIAL INSTITUTIONS SPECIALIZED IN SANTIAGO-BRION | CONSELLERIA DE INFRAESTRUTURAS E MOBILIDADE - XUNTA DE GALICIA | CONSORCIO CONSTRUCTOR PACIFICO PROVISION OF FINANCIAL RESOURCES FOR PPP 1 - CONPACIFICO | CONSORCIO ZONA FRANCA DE VIGO | CONSTRUCTORA DE AUTOPISTAS DE MICHOACAN S.A.P.I DE C.V. | COPASA PROJECTS | DIRECCIÓN GENERAL DE TRÁFICO | DRAGADOS | EDOMEX | EMPRESA DE RENOVACION Y DESARROLLO URBANO DE BOGOTÁ | FCC CONSTRUCCIÓN, S.A. | FCT-FERROL CONTAINER TERMINAL, S.A. | FERROVIAL/AGROMAN U.T.E. | FONDO CAPITAL INFRAESTRUCTURA | FONDO FINANCIERO DE PROYECTOS DE DESARROLLO - FONADE | GRUPO ALDESA | GRUPO MOTA-ENGIL | INVECTURE GROUP | IRIDIUM | JOINT VENTURE MILLER GILBERTO E ICONO URBANO S.A. | JUNTA DE CAMINOS DEL ESTADO DE MÉXICO | LIBRAMIENTO ELEVADO DE Edition: December 2020

HEAD OFFICES Glorieta de América, 5-1º | 15004 A Coruña (Spain) Tel.: +34 981 279 231 (switchboard) | Fax: +34 981 279 406 [email protected] International Service Tel.: +34 981 148 747 [email protected] iceacsa.com SPAIN COLOMBÍA MEXICO PANAMA PERU URUGUAY