<<

Revision S May 2002 MISSIONS SUMMARY Page 113 - STS-88/2A LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (6) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-88 OV-105 CDR: KSC 39, PAD A KSC 15 (KSC 46) 104.5/104.5/ BI-095 51.60 DIRECT OI-26B CARGO: KSC W / D : OPF 187, VAB 5, PAD 37 = 229 days (Flight 13) Robert D. Cabana 338:08:35:34Z 350:03:53:30Z 109% (1) INSERTION (4) 37731 LBS ISS-2A Endeavour (Flt 4 - STS-41, STS-53, & 3:35:34 AM EST (P) 10:53:30 PM EST RSRM LAUNCH POSTPONEMENTS : First Shuttle STS-65) 3:35:34 AM EST (A) PREDICTED 67 POST OMS -2 PAYLOAD - Baselined launch date of 12/4/97 on 6/21/96. Flight to ISS P546/R113/V84/M101 Friday 18 Tuesday 14 100/104.5/ 175 X 97 NM CHARGABLE: - Postponed launch date to 7/9/98 on 5/27/97. 12/4/98 (5) 12/15/98 (10) 104.5/72/ ET-97 30986 LBS - Postponed launch date to 12/3/98 on 6/4/98. SEQ FLT #93 OMS PODS PLT: 104.5 DEPLOY: LPO4-20 Frederick W. Sturckow LAUNCH WINDOW DEORBIT BURN : SLWT-3 DEPLOYED: LAUNCH SCRUBS : KSC-93 RPO1-27 P547/R247/M215 4M59S Based on 350:02:48:04 ACTUAL 26791 LBS - Scrubbed 12/3/98 launch attempt after LO2 drainback hold time of 3M42S expired based on preferred launch FRC5-13 Preferred Launch 340 FPS 100/104.5/ SLWT SEP BURN : NON - DEPLOYED : PAD M / S 1/ EV 1 : Time and FGB 104.5/72/ RPT 347:21:49Z time (PLT) 5-minute window (LO2 drainback hold time Jerry L. Ross Planar/Phase. XRANGE: 134 NM 104.5 283K 213.1 X 209 3073 LBS 39A-54MLP-3 was 5M19S based on T-0 at PLW opening and 3M42S (Flt 6 - STS-61-B, STS-27, 1 = 2050 (1) NM MIDDECK: nominal T-0 at PLT). The Planar Launch Window was STS-37, STS-55, &STS-74) EOM PLS : KSC ORBIT DIR : AL 22 2 = 2044 (2) SLWT 1122 LBS 7M48S (opened at 337:08:55:31 and closed at P548/R89/V38/M80 TAL: ZZA 3 = 2041 (5) BR / UP RCS -2 337:09:03:19). Opted for use of the Preferred Launch TAL WX : MRN, BEN AIM PT : NOMINAL 207K SHUTTLE Time of 377:08:58:19 which provided a window of M / S 2 : ACCUMULATED 5M00S. An unexpected master alarm (MA), associated Nancy J. Currie SELECTED: MLGTD: 3163 FT ALL BLOCK SLWT COLLISION WEIGHTS: with hydraulic system 1 momentary pressure spike, (Flt 3 - STS-57, STS-70) RTLS : KSC 33/N/N 350:03:53:30Z IIA SSME'S IMPACT: AVOIDANCE DEPLOYED: P549/R165/V120/F21 TAL : MRN 20/N/N VEL: 197 KGS caused an automatic hold at T-4 minutes. After holding 1:27:30 877846 LBS at T-4 minutes for 3 minutes, the count was resumed. AOA: KSC 33 197 KEAS NON - DEPLOYED : M / S 3/ EV 2 : PLS: KSC 33/N/N HDOT: -2.3 FPS MET at T-31 seconds, another hold was called while 1378355 LBS troubleshooting the MA. Resolution of the MA occurred James H. Newman LAT: CARGO TOTAL : (Flt 3 - STS-51, STS-69) TDEL: TD NORM 195: 1.72°N 2824652 LBS slightly after the expiration of the 3M42S LO2 drainback P550/R168/V122/M146 -0.15 -0.008/-0.03 3293 FT LONG : hold time. The count was resumed; however, the 127.2°W PERFORMANCE launch window had expired. Post-flight, it was M / S 4 : MAX Q NAV : DRAG CHUTE MARGINS ( LBS ) : concluded that the most probable cause of the pressure 707 715 DEPLOY: FPR: 3783 spike was a “Switch Tease” which momentarily () CHUTE WAS FUEL BIAS: 720 reenergized the systems 1 hydraulic pump pressure (Flt 2 - STS-60) SRB STG : DISABLED. FINAL TDDP: 2365 solenoid valve. P551/R176/V154/M154 2:05.3 2:05 RECON: 1043 NLGTD: 6009 FT SHUTTLE NIGHT LAUNCH #20 SS EVA #42 : PERF: NOMINAL 350:03:53:38Z PAYLOADS: EMU/Tethered VEL: 164 KGS PLB: LAUNCH DELAYS : None. Launched on-time at EVA #35 2 ENG TAL ( ZZA ) : 158 KEAS ISS - 2A 338:08:35:34Z, 3:35:34 AM EST, on Friday, Scheduled EVA #36 on 2:25 2:25 HDOT: -6.2 FPS December 4, 1998. 12/7/98 Node 1/PMA 1&2 Duration 7H21M (Deployed to ISS) TAL WX : EVA start at 3D13H34M MET NEG RETURN : BRK INIT : 135 KGS ICBC 3:55 3:55 8153 FT Mighty Sat - Zaragoza (prime) forecast and observed NO GO (ceiling and crosswind), Moron (selected) forecast and SS EVA #43 : (Deployed) PTA ( U / S 500) : DRAG CHUTE SAC-A (Deployed) observed GO. Ben Guerir forecast NO GO (ceiling & EMU/Tethered rain) but observed GO. EVA #36 4:48 4:45 JETTISON: GAS (1), SEM CHUTE WAS RMS, ODS Scheduled EVA #37 on DOLILU - II I - LOADS : 12/9/98 DROOP: DISABLED. M 3 EOM N/A 5:24 MIDDECK: - Uplink #24, I-Load uplink #43. Duration 7H02M BRK DECEL FPS 2: EVA start at 5D11H57M30S WEIGHT: SIMPLEX PERFORMANCE ENHANCEMENTS : MET PTM ( U / S 273) : AVE 7.7 PK 9.3 201538 LBS 5:57 5:56 5 CYRO TK SETS - Standard set plus PE High Q WIN/DEC, OMS assist 6 GN2 TANKS 4000 lbs, 52 NM MECO, and Del Psi. SS EVA #44 : WHEELS STOP : X CG: DEORBIT MECO CMD : 350:03:54:16Z 1084.33 213.6 X 208.8 EMU/Tethered 8:22.8 8:22.6 11506 FT NM RMS 52 FLIGHT DURATION CHANGES : None EVA #37 NM RMS used to Scheduled EVA #38 on LANDING grapple Node 1 and FIRSTS / LASTS : VI: ROLLOUT: - First Shuttle flight to International 12/12/98 25931 25929 8343 FT VELOCITY position on ODS. Duration 6H59M WEIGHT: Grapple FGB and (FGB), docked node to PMA/FGB. 44 SEC 201492 LBS 25898 FPS EVA start at 8D11H57M50S OMS -2 TIG : dock with Node 1. - First ISS assembly flight. MET 43:38 43:41 ENTRY X CG: Continued… 103 FPS 103 FPS Continued… 1086.18 RANGE Continued… 4343 NM Revision S May 2002 SPACE SHUTTLE MISSIONS SUMMARY Page 114 - STS-88/2A LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (6) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-88 Continued… Continued… Continued… MCC WHITE FCR (23) WINDS: SHUTTLE NIGHT LANDING #10 Continued 5T, 1R KTS - Landed on orbit 186 on KSC 15. FLIGHT DIRECTORS : OFFICIAL: A/E/O 4 - J. P. Shannon 3105P09 EVENTS : LD/O 1 - R. E. Castle R2, T5 KTS - STS-88/2A first International Space Station (ISS) O 2 - P. L. Engelauf assembly flight carried NODE, Unity. Plng/O 3 - A. F. Algate DENS ALT : -854 FT MOD - J. W. Bantle - First ISS element, the FGB , was launched from ISS LD/O 2 - M. A. Kirasich Baikonar Cosmodrome by a at 324:06:40:006Z FLT DURATION : into an orbit of 191.4 X 100 NM at inclination of 51.62 ISS/O 1 - S. P. Davis 11:19:17:56 ISS/Plng/O 3 - J. M. Hanley degrees. - STS-88/2A was the first rendezvous and docking of the S / T : 801:22:26:12 ISS Program. - RMS grapple of PMA-1/Node 1/PMA-2 at OV -105 : 339:21:54:19Z, unberth at 339:22:08:10Z, installed on 133:04:07:58 ODS at 339:23:52:40Z, ungrapple at 340:00:09:30Z. - RMS grapple of FGB at 340:23:47:02Z, FGB DISTANCE: ungrapple at 341:02:43:52Z. 4,650,000 sm - EVA 1 start at 341:22:09:51Z, end at 342:05:30:42Z, duration 7H21M51S. - ISS reboost burn start at 342:20:35:34Z, duration___. - EVA 2 start at 343:20:33:04Z, end at 344:03:34:34Z, duration 7H01M30S. - Node 1 (Unity) ingress at 344:19:54Z, FGB ingress at 344:21:11Z. - EVA 3 start at 346:20:33:24Z, end at 347:03:32:01, duration 6H58M37S. - SAC-A deployed at 9:20:15 MET. - Mighty SAT deployed at 10:17:13 MET. - Drag Chute was disarmed pending resolution of STS-95 Drag Chute door anomaly. (Mortar was removed.) - Undock at 347:20:24:34Z. - ISS Visitor time 6D17H34M20S

SIGNIFICANT ANOMALIES : - Galley iodine removal assembly hose QD incompatibility. - Five PLB floodlights failed. - Anomalous SAFER S/N 1007 GN2 and tank pressure reading. - GPS anomalies. - APU 2 fuel pump drain line pressure decay. - RCS jet R2D fail leak. - Right Pad A heater circuit failure. - Right RCS 1/2 tank isolation valves fail open. - Right inboard tire pressure indication failed low. - Failed portable foot restraint attachment device hatch pin came out, then broke.

RENDEZVOUS #44 - Rendezvous and dock with ISS PMA 2 Node 1 forward port.