THE CITY OF SAN DIEGO REPORT TO THE PLANNING COMMISSION

DATE ISSUED: April 5, 2012 REPORT NO. PC-12-039

ATTENTION: Planning Commission, Agenda ofApril 12, 2012

SUBJECT: MONUMENT FLAG POLE - PROJECT NO. 262168- PROCESS 5

APPLICANT: Hillcrest Business Association

SUMMARY

Issue: Should the Planning Commission recommend City Council approval ofthe construction of a flag pole within an existing median located at Normal Street and University Avenue within the Uptown Community Planning Area?

StaffRecommendation: Recommend Approval of Site Development Permit No. 923086.

Community Planning Group Recommendation: The Uptown Planners voted 8-6 on February 17, 2012 recommending approval with no additional conditions (Attachment 9).

Environmental Review: The project was determined to be exempt pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15303 (new construction conversion of smaller structures). This project is not pending an appeal of the environmental determination. The environmental exemption determination for this project was made on March 16, 2012 and the opportunity to appeal that determination ended March 30, 2012.

Fiscal Impact Statement: None with this action; the costs ofprocessing this project have been paid by the applicant through a deposit account.

Code Enforcement Impact: None with this action.

Housing Impact Statement: None with this action.

",II . •>!: A .>!: D¥ ,;j DIVERSITY = .... cr·..· BACKGROUND

The 421-square-foot project site is located within an existing median at the intersection of Normal Street and University Avenue (Attachment I). The site is also within the CN-2A Zone of the Mid-City Communities Planned District, the Federal Aviation Administration Part 77 Noticing Area, and the Residential Tandem Parking Overlay Zone, within the Uptown Community Plan (Attachment 2). The site is currently within a Maintenance Assessment District (MAD) managed by the City of San Diego Park and Recreation Department.

The surrounding area consists ofbuildings ranging from one to five stories with a mix ofuses including residential, retail and commercial. Normal Street is classified as a Four Lane Collector by the Uptown Community Plan. The entire width ofthe Normal Street right-of-way is ISO feet.

Prior to 2010, Normal Street between University Avenue and Blaine Avenue was a four-lane, IIO-foot wide street with angled parking zones on both sides ofthe street and contained a raised center median. In 2010, Normal Street between University Avenue and Blaine Avenue was reconfigured to be a two-lane IIO-foot wide street with angled parking on both sides and a reconfigured median and angle parking in the middle ofthe street. The reconfiguration demolished the previously existing asphalt concrete raised median and installed a new raised median with landscaping and irrigation, IS, 2-hour metered angled parking spaces at the east side ofmedian, installed three new pedestrian ramps, plus two new disabled parking spaces on the east curb ofNormal Street and upgraded two existing pedestrian ramps.

DISCUSSION

The project proposes to construct a 65'-high flag pole within the southern section ofthe median located at the intersection ofNormal Street and University Avenue to display an 18-foot by 12­ foot Pride . The project also proposes seating elements and an aluminum fabricated monument at the base ofthe flag pole. The location ofthe proposed encroachments will be within the existing median and will require the removal ofexisting landscape improvements to allow for the installation on the flag pole, walking area, and bollards.

The applicant will be responsible for all maintenance for the proposal. In addition, the applicant, the Hillcrest Business Association, has met with Park and Recreation staffto commit to being responsible for all aspects ofconstruction, irrigation, plant materials, keeping irrigation systems in operation during the construction, and maintaining the area around the flagpole in perpetuity, including the monument flagpole, flag, seating area and paving related to the project including raising and lowering the flag (Attachment II). There are no other flags proposed to be flown on this flag pole at this time and there will be no lighting ofthe flag. The applicant has requested the flag be flown at halfmast during different periods oftime.

The existing parking on this block primarily supports the businesses along University Avenue. While these businesses rely on a high percentage ofwalking customers, they are benefited by the presence and visibility ofparking along the median. The addition ofa flag pole will add to the visibility ofthe reconstructed median and parking area.

- 2 - The proposed project requires a Process 5, Site Development Pe=it and requires City Council approval in accordance with San Diego Municipal Code Section 129.0710 (c). An encroachment displaying a flag that is not a national flag or a political subdivision thereof (i.e., state, county or City flag) warrants City Council consideration ofthe encroachment request.

The proposed project received a dete=ination ofno hazard from the Federal Aviation Administration on March 8, 2012.

Community Plan Analysis:

The Uptown Community Plan designates the project site within the No=al Street Right-of-Way. Although the Uptown Community Plan does not provide any specific recommendations for the installation ofmonument flags, the Urban Design Element ofthe community plan recommends that the excess right-of-way ofNo=al Street be developed as a linear mini park. The proposal for a flag type monument which would be located within an existing landscaped median would be consistent with this recommendation as the proposed flagpole monument could be seen as a contributing element to a potential linear park setting and would not preclude the development of a future linear park across the remainder ofthe No=al Street right-of-way.

The Uptown Community Plan goals include improving the pedestrian and vehicular quality of the streetscape through the design ofnew development, public improvements, landscaping, and coordinated street plantings. The proposed project would meet this objective through the incorporation ofa 6-foot tall monument at the base ofthe flagpole that tapers in height; by providing seating bollards; and by incorporating an 18-foot by 12-foot flag consistent with U.S. Government recommendations for flag size. Initially during the proposed project's review, a flag measuring 30 feet by 20 feet was proposed. However, due to concerns over issues related to pedestrian scale and visual impacts, the flag was reduced to a size that is considered typical for its proposed pole height and acceptable in scale. As proposed, the project would not adversely impact the goals, objectives, or recommendations in the Uptown Community Plan.

CONCLUSION

Staffhas reviewed the application for the Site Development Pe=it and dete=ined that the proposed project complies with the applicable sections ofthe Municipal Code. Staffhas dete=ined the required findings would support the decision to approve the proposed project (Attachment 4). Therefore, staffrecommends that the Planning Commission recommend the City Council approve the Site Development Pennit as conditioned.

ALTERNATIVES:

1. Recommend approval of Site Development Permit No. 923086, with modifications.

2. Recommend denial of Site Development Pe=it No. 923086, ifthe findings required to approve the project cannot be affi=ed.

- 3 - Respectfully submitted,

Mike Westlake Program Manager Project Manager Development Services Department Development Services Department

Attachments:

1. Aerial Photograph 2. Community Plan Land Use Map 3. Project Location Map 4. Project Data Sheet 5. Draft Permit Resolution with Findings 6. Draft Permit with Conditions 7. Environmental Exemption 8. Project Site Plans 9. Community Planning Group Recommendation 10. Ownership Disclosure Statement 11. Memo dated 1/31/2012 from the Hillcrest Business Association 12. Photo simulations

- 4 - Project Site ~gf

" .-

I ~AA~· :Ii~ 8~. ; 1 I ~ ~ Aerial Photo (f) North ~ MONUMENT FLAG- NORMAL & UNIVERSITYAVENUE >-3 PROJECT NO. 262168 W -- ~ 5--10 Ju/lt· to-l~ dl.i " I 1~ 19 dl~·l .1'iI-44 dul"" 401·/J <1tYi~ • 7.).-110 11lIM: Mi.l.W U!oG I R%HJI'n(,,,1 (4) ~ lE'(2 U~e 11:- MldentJQI (')) ,.~ \ US., P9'Sj{jenl,DI (61 omm ,R~".1Irrtkll (3) CC'M'l IRfSldertlat (4 Project Site Corrvn Innujertl~ IIJI C('fT'\m I n'

Land Use Map North MONUMENT FLAG- NORMAL & UNIVERSITY AVE UE PROJECT NO. 262168 iJ '-' -'-'.~ ~ VI ~ '-.:::../ o "" .~ E ~J '\: EI Cajon 81' i!' s '? '">- ~ OJ ll-~ 0. Tyler Ave Ci~1 - Hayes Ave 'I"Iv., r ~ f I < '" < VI- ~ "1j1 VI­ lincoln Ave p g'" Scripps Mercy . S't ~1 Project Site 'E Hospital ~ ... w,as'(l.\(l.g.\O'l' I 0-,'" , .., 1 I Lincoln !' ~ I I '"­ .;r VI fon Sf I ­ ..<; "::J'" .... o co ;;::'--rL~ ~ N VI _ '" 'C I' .....ro V"II .-'Vi 'lAVe' -==---=University A ,.QJ I I 0 ~ ~ :> ~ I '" .. ii ~ ·R inson Ave-=:: =~ I ~ ~ I,' 'I c ~ I VI c: VI~ - '" _ L d' St <: E "- I :c V) an IS, SJ S :2: nia .c" ... -0 :;.-...... ~ r'll V' Avel ... .~ 0 .Q ~ """ ~ c a: 100q reet 250 thLJ IX: I -;., ,, ]1 ~ @ 2012 Micr~ofl 'lRorporatio~ @ 201 O;§lA\t-i:EQ Q. 1T " Cypress I've "1j t: cypress A·ie 'u; QJ c oS ~ J I': ,I ,.... A' I j ...... ~ ....- j • ~ ~ Project Location Map North (8 MONUMENT FLAG- NORMAL & UNIVERSITYAVENUE ~ PROJECT NO. 262168 ...., W w ATTACHMENT 4 PROJECT DATA SHEET

PROJECT NAME: Monument Flag Pole

PROJECT DESCRIPTION: construction ofa flag pole within an existing median located at Normal Street and University Avenue

COMMUNITY PLAN Uptown Community Planning Area AREA:

DISCRETIONARY Site Development Permit ACTIONS:

COMMUNITY PLAN LAND The Urban Design Element ofthe community plan USE DESIGNATION: recommends that the excess right-of-way ofNormal Street be developed as a linear mini park.

ZONING INFORMATION: ZONE: CN-2A Zone ofthe Mid-City Communities Planned District HEIGHT LIMIT: 30-Foot maximum height limit. LOT SIZE: 6,000 square-foot minimum lot size. FLOOR AREA RATIO: 0.75 maximum. FRONT SETBACK: 15 feet. SIDE SETBACK: 5 feet. STREETSIDE SETBACK: 10 feet. REAR SETBACK: 15 feet. PARKING: none required

LAND USE EXISTING LAND USE ADJACENT PROPERTIES: DESIGNATION & ZONE University Avenue NORTH: Existing right-of- way/Commercial; CN- 2A.

SOUTH: Existing right-of-way; Normal Street CN-2A.

EAST: Commercial; CN-2A. 7-11

WEST: Commercial; CN-2A. Commercial Retail

DEVIATIONS OR none VARIANCES REQUESTED:

COMMUNITY PLANNING The Uptown Planners voted 8-6 on February 17, 2012 GROUP recommending approval with no additional conditions. RECOMMENDATION: ATTACHMENT 5

PLANNING COMMISSION RESOLUTION NO. XXXX-PC

RECOMMENDING TO THE CITY COUNCIL APPROVAL OF SITE DEVELOPMENT PERMIT NO. 923086 MONUMENT FLAG - PROJECT NO. 262168 DRAFT

WHEREAS, on April 12, 2012, the Planning Commission ofthe City of San Diego held a public hearing for the purpose ofconsidering and recommending to the Council ofthe City of San Diego approval and adoption ofSite Development Permit No. 923086; and

WHEREAS, the Hillcrest Business Improvement Association, Permittee, requested Site Development Pennit No. 923086, for the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNormal Street and University Avenue to display an 18-foot by 12-foot Pride Rainbow flag; and

WHEREAS, the Planning Commission ofthe City of San Diego has considered all exhibits and written documents contained in the file for this project on record in the City of San Diego, and has considered the oral presentations given at the public hearing; NOW THEREFORE,

BE IT RESOLVED, by the Planning Commission ofthe City ofSan Diego that it hereby recommends to the Council ofthe City ofSan Diego approval and adoption ofthe Site Development Permit No. 923086.

Site Development Permit Findings - Section 126.0504 (a)

1. The proposed development will not adversely affect the applicable land use plan.

The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNormal Street and University Avenue to display an 18-foot by 12-foot Pride Rainbow flag. The site is in the CN-2A Zone ofthe Mid-City Communities Planned District, the Federal Aviation Administration Part 77 Noticing Area, and the Residential Tandem Parking Overlay Zone, within the Uptown Community Plan.

Although the Uptown Community Plan does not provide specific recommendations for the installation ofmonument flags, the Urban Design Element ofthe community plan recommends that the excess right-of-way ofNormal Street be developed as a linear mini park. The proposal for a flag type monument which would be located within an existing landscaped median would be consistent with this recommendation as the proposed flagpole monun1ent could be seen as a contributing element to a potential linear park setting and would not preclude the development ofa future linear park across the remainder ofthe Normal Street right-of-way.

Page 1 of5 ATTACHMENT 5

The Uptown Community Plan goals include improving the pedestrian and vehicular quality ofthe streetscape through the design ofnew development, public improvements, landscaping, and coordinated street plantings. The proposed project would meet this objective through the incorporation ofa 6-foot tall monument at the base ofthe flagpole that tapers in height; by providing seating bollards; and by incorporating an 18-foot by 12-foot flag consistent with u.s. Government recommendations for flag size. Initially during the proposed project's review, a flag measuring 30 feet by 20 feet was proposed. However, due to concerns over issues related to pedestrian scale and visual impacts, the flag was reduced to a size that is considered typical for its proposed pole height and acceptable in scale. As proposed, the project would not adversely impact the goals, objectives, or recommendations in the Uptown Community Plan.

2. The proposed development will not be detrimental to the public health, safety, and welfare.

The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNonnal Street and University Avenue to display an 18-foot by 12-foot Pride Rainbow flag. The site is in the CN-2A Zone ofthe Mid-City Communities Plauned District, the Federal Aviation Administration Part 77 Noticing Area, and the Residential Tandem Parking Overlay Zone, within the Uptown Community Plan.

The project was determined to be exempt pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15303 (new construction or conversion ofsmaller structures. All Uniform Building, Fire, Plumbing, Electrical, Mechanical Code and City regulations governing the construction and continued operation ofthe development apply to this project to prevent adverse affects to those persons or properties in the vicinity of the project. Therefore the proposed project will not be detrimental to the public health, safety and welfare.

3. The proposed development will comply with the applicable regulatious ofthe Laud Developmeut Code.

The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNonnal Street and University Avenue to display an 18-foot by 12-foot Pride Rainbow flag. The site is in the CN-2A Zone ofthe Mid-City Communities Plmmed District, the Federal Aviation Administration Part 77 Noticing Area, and the Residential Tandem Parking Overlay Zone, within the Uptown Community Plan.

The proposed project complies with all applicable development regulations ofthe CN-2A Zone and no deviations are proposed. The maximum height as established by the Interim Height Ordinance within this area ofthe Mid City Communities Plan District is 65 feet. The flag pole has been designed to not exceed the 65-foot height limit. Therefore the proposed project will comply with applicable regulations ofthe Land Development Code.

Page 2 of5 ATTACHMENT 5

Supplemental Findings Public Right-of-Way Encroachments -Section 126.0504 (0)

1. The proposed encroachment is reasonably related to public travel, or benefits a public purpose, or all record owners have given the applicant written permission to maintain the encroachment on their property. The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNormal Street and University Avenue to display an l8-foot by l2-foot Pride Rainbow flag. The median has been designed to provide a landscape separation between northbound and southbound traffic on Normal Street. The flag pole relates to public travel by further improving the landscape median. The project will benefit the public by providing a location for the display ofa flag. The Permittee has received written approval from the Southland Corporation owner ofthe 7­ 11 to the east and written approval from the managing partner ofthe Hillcrest Village Partnership owner ofthe lot to the west. Therefore the proposed project will reasonably relate to public travel, benefit a public purpose, and has written approval from the relevant property owners.

2. The proposed encroachment does not interfere with the free and unobstructed use of the public right-of-way for public travel. The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNormal Street and University Avenue to display an 18-foot by 12-foot Pride Rainbow flag. The median has been designed to provide a landscape separation between northbound and southbound traffic on Normal Street. The flag will be entirely located within the existing landscaped portion ofthe median. Existing walkways within the median will not be displaced. The traffic lanes of travel will not be altered by this project. Therefore the proposed project will not interfere with the free and unobstructed use ofthe public right-of-way for public travel.

3. The proposed encroachment will not adversely affect the aesthetic character of the community.

The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNonnal Street and University Avenue to display an 18-foot by 12-foot Pride Rainbow flag. The flag pole monument has been designed to include a fabricated base, seating elements, and additional landscape. The proposed size or dimensions ofthe flag is consistent with standards for flags flown on a 65-foot tall flag pole. Therefore the proposed project will no adversely affect the aesthetic character ofthe community.

Page 3 of5 ATTACHMENT 5

4. The proposed encroachment does not violate any other Municipal Code provisions or other local, state, or federal law.

The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNormal Street and University Avenue to display an l8-foot by l2-foot Pride Rainbow flag. The site is in the CN-2A Zone of the Mid-City Communities Planned District, the Federal Aviation Administration Part 77 Noticing Area, and the Residential Tandem Parking Overlay Zone, within the Uptown Community Plan.

The proposed project complies with all applicable development regulations ofthe CN-2A Zone and no deviations are proposed. The maximum height as established by the Interim Height Ordinance within this area ofthe Mid City Communities Plan District is 65 feet. The flag pole has been designed to not exceed the 65-foot height limit.

The project is subject to Part 77 review by the Federal Aviation Administration (FAA). The height ofthe structure has been approved by the FAA and is conditioned by this permit to notify the FAA after construction is complete.

The project has been conditioned to comply with all regulations ofany other applicable governmental agency. Therefore the proposed encroachment does not violate any other Municipal Code provision or other local, state, or federal law.

5. For coastal development in the coastal overlay zone, the encroachment is consistent with Section 132.0403 (Supplemental Use Regulations ofthe Coastal Overlay Zone).

The proposed project is the construction ofa 65'-high flag pole within the southern section ofthe median located at the intersection ofNonnal Street and University Avenue to display an 18-foot by 12-foot Pride Rainbow flag. This location is not located within the Coastal Overlay Zone. Therefore this finding is not applicable to this project.

BE IT FURTHER RESOLVED that, based on the findings hereinbefore adopted by the Development Services Department Site Development Permit No. 923086, are hereby GRANTED by the Development Services Department, to the referenced Owner/Pem1ittee, in the fonn, exhibits, terms and conditions as set forth in Pennit No. 923086, a copy ofwhich is attached hereto and made a part of.

Page 4 of5 ATTACHMENT 5

Renee Mezo Development Project Manager Development Services

Adopted on: April 12, 2012

Job No. 24002306 cc: Legislative Recorder, Planning Department

Page 5 of5 ATTACHMENT 6

RECORDING REQUESTED BY CITY OF SAN DIEGO DEVELOPMENT SERVICES PERMIT INTAKE, MAIL STATION 501

WHEN RECORDED MAIL TO CITY CLERK MAIL STATION 2A

SPACE ABOVE THIS FOR RECORDER'S USE INTERNAL ORDER NUMBER: 24002306

SITE DEVELOPMENT PERMIT NO. 923086 MONUMENT FLAG, PROJECT NO. 262168 CITY COUNCIL DRAFT

This Site Development Permit No, 923086 is granted by the City Council ofthe City of San Diego to the HILLCREST BUSINESS IMPROVEMENT ASSOCIATION, Permittee, pursuant to San Diego Municipal Code [SDMC] sections 126,0503 and 129,0710, The 421­ square-foot project site is located within an existing median at the intersection ofNormal Street and University Avenue, The site is within the CN-2A Zone ofthe Mid-City Communities Planned District, the Federal Aviation Administration Part 77 Noticing Area, and the Residential Tandem Parking Overlay Zone, within the Uptown Community Plan, The project site is legally described as: A portion ofthe public right-of-way located within a median and specifically within Normal Street north ofthe intersection ofNonnal Street and University Avenue and south ofBlaine Avenue as shown on Exhibit nAn dated , on file in the Development Services Department.

Subject to the terms and conditions set forth in this Permit, permission is granted to Permittee to erect and maintain a flag pole and flag: described and identified by size, dimension, quantity, type, and location on the approved exhibits [Exhibit nAn] dated , on file in the Development Services Department. The project shall include:

a, Construction of a 65'-high flag pole within the southern section ofthe median located at the intersection ofNormal Street and University Avenue to display an 18-foot by 12­ foot Pride Rainbow flag;

b, Seating elements;

Pagelof6 ATTACHMENT 6

c. An aluminum fabricated monument at the base ofthe flag pole;

d. Landscaping (planting, irrigation and landscape related improvements);

e. Public and private accessory improvements determined by the Development Services Department to be consistent with the land use and development standards for this site in accordance with the adopted community plan, the California Environmental Quality Act [CEQA] and the CEQA Guidelines, the City Engineer's requirements, zoning regulations, conditions ofthis Permit, and any other applicable regulations ofthe SDMC.

STANDARD REQUIREMENTS:

1. This permit must be utilized within thirty-six (36) months after the date on which all rights ofappeal have expired. Ifthis permit is not utilized in accordance with Chapter 12, Article 6, Division 1 ofthe SDMC within the 36 month period, this permit shall be void unless an Extension ofTime has been granted. Any such Extension ofTime must meet all SDMC requirements and applicable guidelines in effect at the time the extension is considered by the appropriate decision maker. This permit must be utilized by _

2. While this Permit is in effect, the subject property shall be used only for the purposes and under the terms and conditions set forth in this Permit unless otherwise authorized by the appropriate City decision maker.

3. This Permit is a covenant running with the subject property and all ofthe requirements and conditions ofthis Pennit and related documents shall be binding upon the Owner/Pennittee and any successor(s) in interest.

4. The continued use ofthis Permit shall be subject to the regulations ofthis and any other applicable governmental agency.

5. Issuance ofthis Permit by the City of San Diego does not authorize the Owner/Pennittee for this Permit to violate any Federal, State or City laws, ordinances, regulations or policies including, but not limited to, the Endangered Species Act of 1973 [ESA] and any amendments thereto (16 U.S.C. § 1531 et seq.).

6. The Owner/Pennittee shall secure all necessary building permits. The Owner/Pennittee is infonned that to secure these pennits, substantial building modifications and site improvements may be required to comply with applicable building, fire, mechanical, and plumbing codes, and State and Federal disability access laws.

7. Construction plans shall be in substantial conformity to Exhibit "A." Changes, modifications, or alterations to the construction plans are prohibited unless appropriate application(s) or amendment(s) to this Pennit have been granted.

Page 2 of6 ATTACHMENT 6

8. All ofthe conditions contained in this Pennit have been considered and were detennined- necessary to make the findings required for approval ofthis Pennit. The Pennit holder is required to comply with each and every condition in order to maintain the entitlements that are granted by this Pennit.

If any condition ofthis Pennit, on a legal challenge by the Owner/Pennittee ofthis Pennit, is found or held by a court ofcompetent jurisdiction to be invalid, unenforceable, or umeasonable, this Pennit shall be void. However, in such an event, the Owner/Pennittee shall have the right, by paying applicable processing fees, to bring a request for a new pennit without the "invalid" conditions(s) back to the discretionary body which approved the Pennit for a detennination by that body as to whether all ofthe findings necessary for the issuance ofthe proposed pennit can still be made in the absence ofthe "invalid" condition(s). Such hearing shall be a hearing de novo, and the discretionary body shall have the absolute right to approve, disapprove, or modify the proposed pennit and the condition(s) contained therein.

9. The Owner/Pennittee shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including attorney's fees, against the City or its agents, officers, or employees, relating to the issuance ofthis pennit including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval and any environmental document or decision. The City will promptly notify Owner/Pennittee ofany claim, action, or proceeding and, ifthe City should fail to cooperate fully in the defense, the OwneriPennittee shall not thereafter be responsible to defend, indemnifY, and hold harmless the City or its agents, officers, and employees. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense ofany claim related to this indemnification. In the event ofsuch election, Owner/Pennittee shall pay all ofthe costs related thereto, including without limitation reasonable attorney's fees and costs. In the event ofa disagreement between the City and Owner/Pennittee regarding litigation issues, the City shall have the authority to control the litigation and make litigation related decisions, including, but not limited to, settlement or other disposition ofthe matter. However, the Owner/Pennittee shall not be required to payor perfonn any settlement unless such settlement is approved by Owner/Pennittee.

AIRPORT REQUIREMENTS:

10. Within 5 days after construction reaches its greatest height FAA Fonn 7460-2, Notice of Actual Construction or Alteration shall be completed and returned to the FAA Southwest Regional Office.

11. There will be no lighting ofthe flag.

ENGINEERING REQUIREMENTS:

12. A public right-of-way pennit shall be obtained for the construction ofthe private improvements shown on the Exhibit 'A," satisfactory to the City Engineer.

Page 3 of6 ATTACHMENT 6

13. Prior to the issuance ofany construction pennits, the Owner/Pennittee shall submit a Water Pollution Control Plan (WPCP). The WPCP shall be prepared in accordance with the guidelines in Appendix E ofthe City's Stonn Water Standards, satisfactory to the City Engineer.

14. This project proposes to export material from the project site. All export material shall be discharged into a legal disposal site. The approval ofthis project does not allow the onsite processing and sale ofthe export material unless the underlying zone allows a construction and demolition debris recycling facility with an approved Neighborhood Use Pennit or Conditional Use Pennit per LDC Section 141.0620(i).

15. Flag(s) displayed on the flagpole shall be flown such that there is no less than eight (8) feet ofvertical clearance above the pedestrian walkway nor less than IS feet ofvertical clearance above the abutting travel way ofNonnal Street, satisfactory to the City Engineer.

PLANNINGillESIGN REQUIREMENTS:

16. A topographical survey confonning to the provisions ofthe SDMC may be required ifit is detennined, during construction, that there may be a conflict between the building(s) under construction and a condition ofthis Pennit or a regulation ofthe underlying zone. The cost of any such survey shall be borne by the OwnerlPennittee.

17. The size ofthe flag shall not exceed 18 feet by 12 feet.

18. The flag and flag pole shall be maintained in a clean and safe condition.

19. The Pennittee shall not allow the flag to fade, tear, or otherwise be in a condition of disrepair.

20. The height ofthe flag pole shall not exceed 65 feet above grade.

21. This pennit shall allow for the Pennittee to recognize donors by including their names on the base ofthe flag pole. The recognition ofthe donors shall be ofunifonn size and text. The use ofbusiness or corporate logos shall be prohibited.

22. The encroachment shall be installed and maintained in a safe and sanitary condition at the sole cost, risk and responsibility ofthe owner and successors in interest and shall not adversely affect the public's health, safety or general welfare.

23. The property owner shall agree to indemnify the City with an indemnification agreement satisfactory to the City Manager and City Attorney.

24. The Pennittee must agree to remove or relocate the encroachment within 30 days after notice by the City Engineer or the City Engineer may cause such work to be done.

25. The Permittee agrees to provide an alternate right-of-way or to relocate any existing or proposed City facility to a new alignment, all without cost or expense to the City, whenever it is

Page 4 of6 ATTACHMENT 6 determined by the City Engineer that any existing or proposed City facility cannot be economically placed, replaced, or maintained due to the presence ofthe encroaching structure.

26. Whatever rights and obligations were acquired by the City with respect to the rights-of-way shall remain and continue in full force and effect and shall in no way be affected by the City's grant ofpermission to construct and maintain the encroaching structure.

27. The Permittee owner shall maintain a policy of$1 million liability insurance, satisfactory to the City Engineer, to protect the City from any potential claims which may arise from the encroachment.

28. In the event the City is required to place, replace, or maintain a public improvement over which the Permittee has constructed an encroaching structure, the Permittee shall pay the City that portion ofthe cost ofplacement, replacement, or maintenance caused by the construction, or existence ofthe Permittee's permanent encroaching structure.

29. The Permittee shall pay the City for all the cost ofplacing, replacing, or maintaining a public improvement within the public right-of-way when the City's facility has failed as a result ofthe construction or existence ofthe Permittee's encroaching structure.

30. The costs ofplacing, replacing, or maintaining the public improvement shall include the cost of obtaining a necessary alternate easement.

31. The Permittee shall pay the City or public utility for all cost ofrelocating, replacing, or protecting a facility within the public right-of-way when such relocation, replacement, or protection results from the construction ofthe encroachment.

32. No alterations to the design, location and materials, shall be permitted unless approved by the City Manager.

PARK AND RECREATION REQUIREMENTS:

33. The Park and Recreation Department Prior shall review and approve the construction plans prior to building permit issuance, the Owner/Permittee shall insure that reviews and approves

INFORMATION ONLY:

• The issuance ofthis discretionm'y use pemlit alone does not allow the immediate commencement or continued operation ofthe proposed use on site. The operation allowed by this discretionary use permit may only begin or recommence after all conditions listed on this permit are fully completed and all required ministerial permits have been issued and received final inspection.

• Any party on whom fees, dedications, reservations, or other exactions have been imposed as conditions ofapproval ofthis Permit, may protest the imposition within ninety days of

Page 5 of6 ATTACHMENT 6

the approval ofthis development permit by filing a written protest with the City Clerk pursuant to California Government Code-section 66020.

• This development may be subject to impact fees at the time ofconstruction permit issuance.

APPROVED by the City Council ofthe City of San Diego on~__by Resolution No. XXXX.

Page 6 of6 ATTACHMENT 7

NOTICE OF EXEMPTION

(Check one or both) TO: X RECORDER/COUNTY CLERK FROM: CITY OF SAN DIEGO P.O. BOx 1750, MS A-33 DEVELOPMENT SERVICES DEPARTMENT 1600 PACIFIC HWY, ROOM 260 1222 FIRST AVENUE, MS 501 SAN DIEGO, CA 92101-2422 SAN DIEGO, CA 9210 I

___OFFICE OF PLANNING AND RESEARCH 1400 TENTH STREET, ROOM 121 SACRAMENTO, CA 95814

PROJECT No.: PTS# 262168 PROJECT TITLE: MONUMENT FLAG POLE

PROJECT LOCATION-SPECIFIC: Nonnal St. and University Ave., San Diego, CA 92103

PROJECT LOCATION-CITy/COUNTY: San Diego/San Diego

DESCRIPTION OF NATURE AND PURPOSE OF THE PROJECT: A Site Development Permit (Process 5) to construct a 65-ft. high nag pole in the existing median at Nonnal Street and University Avenue in the Uptown Community Plan.

NAME OF PUBLIC AGENCY ApPROVING PROJECT: City of San Diego

NAME OF PERSON OR AGENCY CARRYING OUT PROJECT: Benjamin Nicholls, Hillcrest Business Association 3737 Fifth Ave. San Diego, CA 92103 (619) 299-3330 EXEMPT STATUS: (CHECK ONE) () MINISTERIAL (SEC. 2\080(b)(I); 15268); () DECLARED EMERGENCY (SEC. 21 080(b)(3); 15269(a)); () EMERGENCY PROJECT (SEC. 21080(b)( 4); 15269 (b)(c)) (X) CATEGORICAL EXEMPTION; SECTION 15303 OF THE STATE CEQA GUIDELINES: NEW CONSTRUCTION OR CONVERSION OF SMALL STRUCTURES () STATUTORY EXEMPTIONS:

REASONS WHY PROJECT IS EXEMPT: The City of San Diego conducted an initial study which determined that the proposed nag pole and flag is located in an urbanized area and the proposed project does not involve any physical changes which would affect sensitive environmental resources. Section 15303 ofthe State CEQA Guidlelines exempts small structures and facilities which have no sensitive species, endangered habitat, or other environmental effects. The pole and flag are not incompatible with existing development in the vicinity since the proposed project will not exceed the U.S. Government General Services Department recommendations for proportional sizes ofthe nag to the pole. Therefore, none ofthe exceptions listed in CEQA Section 15300.2 apply.

LEAD AGENCY CONTACT PERSON: Jean Cameron TELEPHONE: (619) 446-5379

IF FILED BY APPLICANT: I. ATTACH CERTIFIED DOCUMENT OF EXEMPTION FINDING. 2. HAs A NOTICE OF EXEMPTION BEEN FILED BY THE PUBLIC AGENCY APPROVING THE PROJECT? () YES () NO

IT IS HEREBY CERTIFIED THAT THE CITY OF SAN DIEGO HAS DETERMINED THE ABOVE ACTIVITY TO BE EXEMPT FROM CEQA ~L"'%A-NN-E-R------~)f..p( 2..C/~ DATE

CHECK ONE: (X) SIGNED By LEAD AGENCY DATE RECEIVED FOR FILING WITH COUNTY CLERK OR OPR: () SIGNED BY ApPLICANT

Revised 01041 Omjh ATTACHMENTS

landscape architectural plans for: pole & monument city of san diego GENERAL CONDITfDNS SHORT FORM

1. PROTECT/ON OF LIFEAND PROPERTY Contractor shaff protect all construction and landscaping from damage and, when requIred, provide guards or covering. Any damage shall be repaired or replaced at PLANS PREPARED FOR: the Contractor's expense. Contractors on the job shalf eany the following Insurance: (a) Worker's Compensation, (b) Public Comprehensive General Liability, and HILLCREST BUSINESS ASSOCIATiON Polk Ave 3737 FIFTH AVENUE SUITE 202 (e) property Damage. In an emergency threatening the safety oflife, work or adjoining SAN DIEGO CA 92103 properly, the Contractor is hereby instructed to act at his discretion to prevent such 619-299-3330 foss or injury and shall maintain the following minimum liability insurance coverage during the contract period. PLANS PREPARED BY:

COVERAGE URBAN Bodily fnjury $250,000 per Individual, per Occurrence 111 W PENNSYLVANIA NO. 2A Properly Damage $100,000 per Occurrence, aggregate SAN DIEGO, CA 92103 (619) 995·1306 MICHAEL BRENNAN, LLA I LEED AP 2. The Contractor shall cause to be named as additional insured in such Contractor's [email protected] Public Liability, Contractor's Protective Liability andAutomobile Liability Insurance ( policies the following: (a) Hillcrest Business Association, 3737 Fifth Ave Ste 202, San Diego, • Project Site CA 92103 (b) Urban Green, 111 WPennsylvaniaAve. Unit 2A, San Diego, CA 92103

3. Contractor shall not cause this policy to be canceled or permit it to lapse, and the SCOPE OF WORK insurance policy shalf include a clause to the effect that the policy shall not, at any A SITE DEVELOPMENT PERMIT FOR THE INSTALLATION OF : time during the construction period, be canceled or reduced, restricted or limited until 65' FLAG POLE WITHIN EXISTING IMPROVED MEDIAN fifteen (15) days afterall additional insureds have received written notice as '" • SMALL PATIO AT FLAG POLE BASE SEATING I BOLLARD ELEMENTS evidenced by returned receipts ofregistered or certified letters. I SHEET ALUMINUM FABRICATED MONUMENT AT BASE 4. The Contractor agrees to hold the Owner and Landscape Architect harmless from OF FLAG POLE any claims arising out ofhis operations ofany ofhis subcontractors, material VICINITY MAP REQUIRES REMOVAL OF SMALL PLANTINGS WITHIN supplies, oragenffi. N.T.S. THE FLAG POLE FOUNDATION & PATIO FOOTPRINT REQUIRES MODIFICATiON OF EXISTING IRRIGATION REVJSIONs 5. All local, municipal and state laws, rules and regulations governing or relating to any SYSTEM ORIGOATE SECONOSU.MITTAL

portion of this work are hereby incorporated into and made a part ofthese THIRD SUBMITTAL specifications and their provisions shaN be carried out by the contractor. HOLD HARMLESS AND INDEMNIFICATION CLAUSE 6. The contractor shall verify the locations ofail existing utilities, structures, and CONTRACTOR AGREES THA T HE SHALL ASSUME SOLE RESPONSIBILITY FOR JOB SITE services before commencing work. The locations ofutilities, structures and services CONDJTlONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING PROPERTY OWNER shown in these plans are approximate only. Any discrepancies between these SAFETY OFALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY THIS PROJECT IS LOCATED WITHIN CITY OF SAN plans and actual conditions shall be reported to the owner, general contractor CONTINUOUSLYAND NOTBE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER, THE CITY/COUNTY OF DIEGO RIGHT OF WAY (ifany) or landscape architect. LOCAL JURISDICTION, AND THE LANDSCAPEARCHITECT HARMLESS FROM ANYAND ALL 7. The contractor shallprotect all existing utilities and features to remain on, and LIABILITY REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON SITEAREA adjacent to, the project site during construction. Contractor shall repair, at his own THIS PROJECT, EXCEPTING FOR LIABILITYARISING FROM THE SOLE NEGLIGENCE OF THE THE SCOPE OF THIS PROJECT INCLUDES expense, all damage resulting from his operations or negligence. OWNER, THE CITY/COUNTY OF LOCAL JURISDiCTION, OR THE LANDSCAPEARCHfTECT. APPROXIMATELY 421 S.F. OF AREA WITHIN THE LIMIT OF WORK 8. The contractor shall obtain the pertinent engineering and/or architectural plans THE EXISTING MEDIAN HARDSCAPE AND PLANTING before beginning work. WAS CONSTRUCTED IN 2010 9. Permits for any construction depicted in these plans shaff be obtained by the contractor. 10. Contractor shall have a valid contractors license required for the particular work 111 WPENNSYLVANlAAVE#2A being done. Contractor shall not allow the license(s) to lapse during the contract SHEET SHEET INDEX DWG.NUM SAN DIEGO CA92103 period. 619,995,1300 [email protected] 11. Contractor shall notify Underground Service Alert (800) 442·4133 before start of TITLE SHEET 1 EXISTING CONDITIONS SITE PLAN construction (2 working days or48 hours). 2 CONSTRUCTION PLANS & ELEVA TlON 3 NOTE; BEFORE ANY EXCAVATION BEGINS 12. Contractor shaN verify existing location ofutilities as necessary to identify location. CONSTRUCTION DETAILS & NOTES 4 GALL DIG ALERT@ 1-800-227-2600 13. Contractor shaN protect in place aN existing trees, hedges and shrubs unless PRiVATE WNrRACT otherwise noted on the plans. MEDIAN IMPROlIEMEIff HARDSCAPE PUtNS FOR; 14. Contractor shall verify all elevations noted on the construction plans in the field. any PRIDE FLAG POLE & MONUMENT discrepancies shalf be reported to the owner, general contractor (ifany) and landscape TITLE SHEET architect. 15. Constractor is to assure proper drainage away from strucures and to drain inlets shown on the plans. Contractor is responsible for locating drain lines and daylight locations to the street or existing/proposed drain lines. Locate drain lines away from footings offlag pole or other appurtenances shown on the plans or shown on other consultants' plans. 1

SHEET 4 EXISTING UTILITIES SYMBOL ROS 2398 FIRE HYDRANT 0

-" SEWER MANHOLE (~) 0. TRAFFIC CONTROL PULL BOX !ITl CR 3264 0, SIGN q

WATER METER 0

\~ '~L ~'L ~e!r ~. GATE VALVE @ < \ \ .,. .___ r RO:._ ,_ _ ~\\ /l-~';;;;~':, ~ ~ TRAFFIC SIGNAL (X]E \'V\.~ r~"_ (75-o-"oi/,h. ", I "'_~0 =OJ)~"0 0_.~,O@ _ "~'" .0- TELEPHONE M,H. VAULT rn ~. / ~------;ROJECT--><:.1 A~A: . .. . , . ~ \ "~,'Il --k-l _\J.. _,.,_ -- -- .. " '- / '- ELECTRICAL PULL BOX []] ..------SEE PLAN Vll~V\r ENLARGEMENT SHEET 3 \;:.-?/\ '.. ". OJ '. .-- ~ -:::~:~: ~;~:~r ~ ~~ E1~:T7N;t:;K [TYPi..'~--"O~M:AL ST~fE~r:"."~NDI ~: ~- ~_~~ ELECTRIC POLE WUG WI STREET LIGHT -I'Ji- / ==:\ --:::------= =- --.4:' /J -.®' - 312';Fs-- _;/:.. _ .@-. __ WATER MAIN EXISTINGIMPROVEDMEDI~~_~ ..-·.- - I i EXrST1NGTREE~(TYP) ~ 'b I SEWER MAIN

EXISTI:'.' _vc&.'_0"PI_PE SEWr ~.. i~~;:'.I/ ~ ELECTRICAL LINE 12 --1--- -"1':""''''I-'~30~''''''~''''''iF''''~!\,<~~''~~~~J&®j;t'';=j~~~~~~'lj1=:7~~:::=~~~~~~1~63F:\'ct----~-_t__=_,-

I \1 30 1~Q.7TC _ ~ REVISIONS OR'G DATE EXISTINGP~ANTINGAREA +-.._::::- -, ""- ~\- EXISTING PUBLlCP/\ (,.~ ... _~ ~12.13FS ~?'~_. sscaND SUBMITTAL 1·0""2 TI-l'F"" I '" ¢' I I 1 ~,...... ___ ~-n-~~~--cr- APPROVEQ MB 11 / /..J 'I .J~~~ PLOT !>ATE ~ nil --- 309.56If....J ! • tjr 309·99FLj S""CE ASSHOWN ..-r ) .--' :.>- " ~~ , \''- - .,----_.-.------._-- ~ .~ \\\~\ (l; \ \I'I f'Ol ~ '\ urbang.~gD , ,;V,\ ' \ T NOTEi SURVEY INFORMA\I?N COMPILED FROM NORMAL STREET MEDIAN MPRdvEMENT PROJECT,::1S-BurLTS DATED 11-1-10 & ELECTRONIC FILES PROVI'\ED BY CITY OF SAN ~IEGO ENGINEERING DEPARTMENT ON 10..Q5-11 111 WPENNSYLVANIAAVE#2A SAN DIEGO CA 92103 CR 10275 619.995.1306 CONTRACTOR TO FIELD VERI\ALL EXISTING GAS & UTILITY LINES PRIOR MICHllEl@GOURBANGREEN,COM TO CONSTRUCTION \

NOTE: BEFORE ANY EXCAVATION BEGINS CR 10318 CALL DIG AlERT@ 1-800_227_2600 PRIVATE COI/TRACT \ MEDlA/IIlMPROVEMEllfHARDSCAPE PlANS FOR: PRIDE FLAG POLE & MONUMENT EXISTING CONDITIONS SITE PLAN 2 " i SHEET 2 oc SCALE;: "~20'.{)" 4 NORMAL STREE1(SOtlfHEicluND) NOTES: 1) THE OWNER/PERMITTEE WILL BE RESPONSIBLE FOR EXISTING CURB TO BE PROTECTED IN PLACE" ANY CURB DAMAGED DURING MAINTENANCE OF ALL THE PROPOSED IMPROVEMENTS, INCLUDING CONSTRUCTION ACTIVJTlES SHALL BE REPLACED IN..KIND AT CONTRACTOR'S THE MONUMENT, FLAGPOLE, FLAG, SOLLARDS AND PAVING EXPENSE AROUND THE BASE OF THE MONUMENT; THE RAISING, LOWERING AND STORING OF TI-lE FLAG.

EXISTING ADA ACCESSIBLE SIDEWALK TO BE PROTECTED IN PLACE AND REMAIN 2) THE OWNER/PERMITEE SHAlL BE RESPONSIBLE FORANY ACCESSIBLE THROUGHOUT CONSTRUCTION -ANY SIDEWALK DAMAGED DURING REQUIRED REDESIGN AND RETROFITTING CONSTRUCTION OFTHE CONSTRUCTION ACTIVJTlES SHALL BE REPLACED IN..KIND AT CONTRACTOR'S EXISTING HARDSCAPE AND LANDSCAPE, INCLUDING UTILITIES, EXPENSE IRRIGATION SYSTEM AND PLANT MATERlAl, REQUIRED FOR THE IMPLEMENTATION OF THE PROJECT, LIMIT OF WORK CONSTRUCTION FENCING 3)THE OWNERIPERMITTEE SHALL BE RESPONSIBLE FOR THE EXISTING ASPHALT STREET PAVING. ANY ASPHALT DAMAGED DURING REPAIRANDIOR REPLACEMENT OF ANY EXISTING HARDSCAPE OR LANDSCAPE THAT IS DAMAGED BY CONSTRUCTION OFTHIS CONSTRUCTION ACTlVJTlES SHALL BE REPLACED IN_KIND AT CONTRACTOR'S PROJECT, EXPENSE 4) THE DWNERIPERMITTEE SHAlL ENTER INTO AN ENCROACHMENT PUBLIC PAY PARKING SPACES SHALL REMAIN OPEN AND ACCESSIBLE DURING MAINTENANCE REMOVAL AGREEMENT (EMRA) WlTH THE CiTY TO CONSTRUCTION ACTIVJTlES IDENTIFY THAT THE OWNER/PERMITTEE WILL BE RESPONSIBLE FOR PROJECT MAINTENANCE. EXISTING TREE TO BE PROTECTED IN PLACE THROUGHOUT CONSTRUCTION 5) PRIOR TO CONSTRUCTION, THE OWNERIPERMrTTEE SHALL ACTIVITIES -ANY DAMAGES TO THE TREE WILL BE THE RESPONSIBILITY OF THE SCHEDULE AN ON_SITE MEETING WITH THE HILLCREST_UNIVERSiTY CONTRACTOR· REGULAR WATERING OF EXISTING TREES AND PLANT MATERIAL AVENUE MAINTENANCE ASSESSMENT DiSTRICT (MAD) SHALL CONTINUE THROUGH THE CONSTRUCTION PROCESS REPRESENTATIVE TO REVIEW EXISTING SITE CONDITIONS, INCLUDING THE IRRIGATION SYSTEM AND PLANT MATERIALS. EXISTING PLANTING AREA TO REMAIN PROTECTED IN PLACE -ANY DAMAGED OWNER/PERMITTEE SHALL SUBMIT WRITTEN DOCUMENTATION FOR PLANTS OUTSIDE THE FOOTPRINT OF THE MONUMENT AREA SHALL BE REPLACED REVIEW AND APPROVAL TO THE MAD REPRESENTATIVE OF THE IN LIKE AND KIND AT CONTRACTORS EXPENSE - REGULAR WATERING OF PlANTS EXISTING SITE CONDITIONS, NOnNG ANY HARDSCAPE OR EQUIPMENT THAT IS DAMAGED OR NOT WORKING PROPERLY, AND WITHIN THE MEDIAN SHALL CONTINUE THROUGH THE CONSTRUCTION PROCESS ANY UNHEALTHY OR DAMAGED PLANT MATERIAL A SIGNED COPY SHALL 810 PROVIDED TO THE MAD REPRESENTATIVE. APPROX, LOCATION OF EXISTING 1" METER,1.5' BACKFLOW PREVENTER ASSEMBLYIENCLOSURE & VALVES 6) THE MAD REPRESENTATIVE SHALL BE INVITED TO THE PRE-CDNSTRUCTION MEETING EXISTING 1" SERVICE LINE 7)ALL IRRIGATION SYSTEMS SHAlL REMAIN OPERATIONAL DURING EXISTING SIGN - CONTRACTOR SHALL PROTECT IN PLACE CONSTRUCTION, WHERE FEASiBLE 8) CONTRACTOR SHALL COORDINATE IRRIGATION REQUIREMENTS APPROX, LOCATION OF LEIT 4006 (6 STATION) IRRIGATION CONTROLLER­ WITH THE MAO REPRESENTATIVE PROTECT IN PLACE _ADJUSTMENTS TO TIMER SHALL BE COORDINATED THROUGH CITY LANDSCAPE MAINTENANCE SUPERVISOR 9) CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROVISION, ~~------~------~------SCHEDULING AND FULL COST OF WATER TRUCKSERVIDE IF THiS 65' FLAG POLE BASE - REFER TO SHOP DRAWINGS PROVIDED BY FLAG POLE SERVIDIO IS DETERMINED TO BE NEEDED BYTHE MAD INSTALLATION CONTRACTOR FOR FOOTING INFORMATION AND FULL REPRESENTAT1VE , CONSTRUCTION SPECIFICATIONS 10) TRAFFIC SHALL REMAIN OPEN WHILE CONSTRUCTION IS I UNDERWAY I ...... NORMAL STREET (NORTHBOUND) 6' HT. FABRICATED INFORMATIONAL MONUMENT - CIRCULAR DESIGN SHALL WRAP AROUND BASE OF FLAG POLE WITH SOLID SHEET ALUMINUM SEGMENTS ETCHED 11)EXISnNG IMPROVEMENTS SHALL BE PROTECTED IN PLACE 'f~,,~jlj) WITH CULTURALLY/ HISTORICALLY SIGNIFICANT LGBT COMMUNITY INFORMATION UNLESS NOTED OTHERWISE AND DONOR RECOGNITION - SEE DETAIL Cf4 \"" 12)JlJ.LSOIL EXPORT MATERIAL SHALL BE DISCHARGED INTO A LEGAL DISPOSAL SITE. ONSITE PROCESSiNG AND SALE OF EXPORT 22" orA. SPHERICAL BOlLARDS FOR SEATING AND TO PROTECT FLAG POLE / MATERrAL PROHIBITED MONUMENT BASE FROM VEHICULAR DAMAGE - BOLLARDS TO BE MODEL QR-22SP COLOR C1-T7 SEALER MT AVAILABLE THROUGH QUICKCRETE 951.737.6240 13) CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH OF EXISTING GAS AND UTILITY LINES PRIOR TO CONSTRUCTION CONCRETE PAVING TO MATCH EXISTING SIDEWALK _ADA ACCESSIBLE PATH F<~VISIONS SHALL BE MAINTAINED THROUGHOUT THE PAVING AREA FROM THE EXISTING WALKWAY AROUND THE FLAG POLE f MONUMENT _SURFACE TO SLOPE TOWARD 18' FLAG WIDTH S5CON" SUSMITTAl. 1-<>fl..12 PLANTING AREAS _INTEGRAL COLOR SCOFIELD 'CHARCOAL' _FINISH TO BE FLAGPOLE WASH/EXPOSE AGGREGATE #100, SUBMIT 2')(2' SAMPLE TEST PANEL PRIOR TO Tf-t'RO SUSMITTAL START OF PAVING _ SEE DETAIL A,B/4

MONUMENT PATIO MONUMENT DONOR RECOGNITION TILES _PROPOSED TO BE CUSTOM ETCHED BLACK GRANITE TILES SET FLUSH WITH SURROUNDING FINISH PAVING - GROUT EXlSTINGGRADE -12"MAX TO BE OBP BLACK 250 AVAILABLE THROUGH THOMPSON BUILDING MATERIALS619,287.9410 APPROVED

18' DIAMETER. FULLY EXTENDED FLAG FOOTPRINT JO~NO.

® DAT~ PLaT • .()fl..12 PLANTING & IRRIGATION WITHIN LIMITS OF PAVING TO BE REMOVED UNDER ASSHDWN ® DIRECTION OF THE CiTY LANDSCAPE MAINTENANCE SUPERVISOR, CONTRACTOR SHALL CAP & RECONNECT IRRIGATION LINES AS NECESSARY TO ENSURE PROPER FUNCTION OF EXISTING IRRIGATION SYSTEM, PLANTING AND IRRIGATION WITHIN PROPOSED LIMIT OF WORK MAY BECOME DISTURBED DURING CONSTRUCTION ACTIVrTlES - ANY SUCH DISTURBED MATERIALS SHALL BE REPLACED IN LIKE AND KIND

EXISTING 8" VC & 10" PIPE SEWER- CONTRACTOR SHALL VERIFY ACTUAL SEWER LOCATiON AND DEPTH IN FIELD. CONTRACTOR SHALL ALSO ENSURE THAT NO SITE WORK WILL IMPACT SEWER IN ANY WAY

EXISTING PAY TO PARK KIOSK AND PARKING SIGN _CONTRACTOR SHALL PROTECT IN PLACE AND MAINTAIN UNOBSTRUCTED ACCESS TO KIOSK THROUGHOUT 111 WPENNSYLVANIAAVE#2A CONSTRUCTION SAN DIEGO CA921m 61~,995,1306 MICHAEL@GOUR8A~GREEN,COM

NOTE: BEFORE ANY EXCAVATION BEGINS CALL DIG AlERT@ 1-800-227-2600 EXISTING TREE TO REMAIN PRlVATfCONTRAGT 6' HT. META'_ FABRICATEO MEDIM' IMPROVEMeiT HARDSGAPE PLANS FOR· MONUMENT FOOTING DETAIL

r2'l: DlI.. SEATING BOllARDS "" PRIDE FLAG POLE & MONUMENT

/ rEXlSmGPlANTUATERlAL FOOTING NOTE: FINAl FOOTING & FLAG pOLE DESIGN TO BE PREPARED CONSTRUCTION PLAN & ELEVATION / TO REMAIN (TYP,) BY SUNWARD FLAG 858.689.8444. UR9AN GREEN IS NOT RESPONSIBLE FOR THE DESIGN OR CONSTRUCTION SPECIFICATIONS OF THE FLAG POLE, FLAG POLE FOOTING, SOiLS TESTING ORSUBGRADE ~"I"'''''''. ~ CONDITIONS/PREPARATION. THE ABOVE DEPICTION OF THE FLAG POLE JiIt1. FOUNDATION IS FOR PLANNING AND APPROVAL PURPOSESAND I- REPRESENTS DESIGN PARAMETERS PROVIDED BY SUNWARD FLAG. 15' PAVED MONUMENT J A!lEA ~ 3 EAST ELEVATION 'A' SCALE AS SHOWN ! 4' , 1, • ~-- i SHEET 3 4 CONSTRUCTION NOTES: CONCRETE IRRIGATION NOTES PLANTING NOTES

I. OONCRSTE SHALLHAVS ~ ~I~I~UM COMPRESSIl'ESTRENGW IN 'iDAYSCFl.oo~ PSI. I. THIS BEl:Tlo""""Uos TOEXISTI,"G IRRIG~'OO" SVSTE~ IfflDIAI:ATION oR REP/JRIREPLACE WM~'JM~I'LIESTO PlAIffiIlO_T~SI\SAREslA.TOFREI'I.AC~GEXlSTINGPlAINO!ND FllEEOF EXCESS EQIllPMEIfT,IA 1 NO PI"BoR DUOTS SHAL, aEP",""p I~ CO~CRETEtOLU~~S,I'IAW OR BlAaB l~LESS I'.UBSISH INCID~T/IL TO WDRJND OOrlNEWOl4S SliAlUE 4. EACH Pl1INT SHIIlLI\ECEII'E"NlRl'ORI.I'(OI!EOlJAI.j"lANTTIIIlLETOASFOLI.O\'/& HEllllN POSI110~ PIIKlR TO F1JICI~GCOJIORETE. M.\£lE Willi PEN-liTE CONN,CTORS OR fOUAl, EAC" VII.'IT': O~ ACONTRDllER 6H11lL HAE A ~ REI~FORCNGWm1,~ SPLICE CONTINUOUB P>lMillRS MINII,IUM",P SEPAAATE WIRE COLOR, AlL \\I"ES S~All SSINSTALl.EOWlrH TWOI'lFm ~F IOXCEsSMlE 1. ALL EXPANSIO~ JOINTSSHALlRECEI\IE II<-INCH PRU,IOLDED FELT ~ATERIIl.AND RODTEDCl/TTIffiIl'PoT {II'GRAAI a. IXlNIROI. ~RE SHILLBS aUNOLEDANDPlACED B~EA1H r"'IHLI~E. IrrsTAllEIl W~,R, IN,ICATOO,/>ND AT ALLBUllDINO" W/lLLBAr4:l FL'N~ LAIERIII. UNES SHILL BE SLEEI'Ell WITH P.V.c, SCHEDULE~OlWlCEWe IlI>IMETER '. FHSIEPGIlADSS SHALlSE SMOOT'liEDTo E~1NA11 I'IJDt:l.INtl ORSTAr«W4GWATEI'.. 1 CO~TM[;TQR SljI>l.LSUal~T AsMlPLE (lFEAOHTYP"OP1ILE1FAVER AND OROLJT OOLOR OFSL,EViEDLINEI'iHEREIT PASSES U"IlERPAVEDAROO II«T~TED O~ PLAI'lS TO ",~IlSCAPEIIROIliTECTFQRAPPRO\IALB5I'CflE.STIJUING\\OFT SHIIlt BE ONE III PART PoRT",No CEr~,NT MI~OHSI11 PARTGRADEnSAND CONTROL \'!REs SHILL ~E SlEEVED IN ELECJRICM. OOIDUIT TO MAI~ lJNE, wrr~COlC!lA~, WATERPROOFI1GMlDmllES BlTEI~Ar:t5AN llE~OVIIfGAL,IAruSED 11.1I'\T FROFERPITCH FO.~ A, ALI. rMINlJNES I.~ THEsYslEll SHALL IE CAPPfDANDPROSSUAeTEBTEll AT lZ5 P.s,l FORA 12. lANDSCAPI' COONTRACTOOSHALUWNTAI~ /IlLPlANllrfGB FORAPEJlIOOOF~(soIDAYSIIFTERCOMI'LETION. OBTAI~ED, FOU~~TO CR,\JNADECAN BE IF IoNVflilAlNS LlRflXl\JRE6 AR.E IETIXlHIOH OR PORIOPOFFQU,HOURS. ANYlEI/(B fOOND sHIl.L~E CORRECTED IYI\E~O'IINa THE ,EAIND 'OLID, REMOVE COl.IPL5"OOI~OF WORKOUT~ElII~1HSSE:PlAI<~ CONTAACTORSHIIlLc~TAcTCWNER PIFE OR FITTINGS ANn l~sT AllI~" ~EW ~ViTE'!IAlIN ITS PLACE. 'l. AT ALL lHELANOilClo."S />NV MORTA'l NEllRI~O 1'11l1li. S.T BeFORE TILE IS PlACE". ANOAARANGE FOO.AWAuc lHROUaHTOllETSRlI~E THIIT i'lLASPECTSOF IOO.'.KAAECOJ.!PLElED. WORKMUSTBe ", ALLLATEI<.SSH>\Ll.SEPRSilSUReTESTF.UATDESlG.PRESS,","RJRONEHOUI'.. ~. SETTINllAND GROUTING TIU;S: AFTER sml~s BED HASScTSUFilClEmy, SPPJNKLE IXlY FlIllYCOl.FlETEDiIOCORL!lrlllTOALI. FlANS_SPEc:l~CATloNS Artl ~USTSE OOllPlETSll ~A aoop COrrnlACTORs~ALI. ~DT PORWI~D C""SNTO~SURFAce ANil COIIMENDE ",YI~" TILE, SET STMISHT EDGSSTO t. THo ALl.OW NOR CAUSEANY OI'HIS WORKTO BE COVEREIl uNT"lrH>\S \\'ilI\KW,NSljIi' IMN~ERAND MLISTBEACCEI'TED BVWECWNSR~ WIllTlIlG PRIORTo M SEGIN~11fG OI'M ll~EBESTA~USHEO TO KEEP JOINTS PAMLl.ELIoND UNIFO~M D\'ER ENTIREAREA. TIII,l'lI.E 6EEN II4SFSClED, T;srSDANOAi'l'ROVro 6YllIE BC1LO"",OWNER'SAumolUZEO MAlNTElWlOEl'ERlDlI. aou[l.Y INTO iED uslN" WOCO aLOCKS 0'SIZI.10 I~BURI~G setlo aEDPM FREE FROM REl'RESENTATllJE. 'DJAC~~T PA\'l~O. OEPR::,0T0N5 ANJ HISH ,POTS, FINISH FLUSHVmH WHEN READY. ALL T)l; MAlNTEM~CE_OD SHIIlLINl:LUIEWEfDlLOWlrfG SCOPE OF WORII: JOiNTS rull.AND '(uSH1'ITT~SPS(jFISD (!'lOUT, WIPE EXCEsS OROllT'ROM FACE OFlU, 11, IRJU'3A1l0N CO~TIlACTOR SIlALl.IIIJJUST /ilL 1''''' TL.6I~a TO PRO'IlDE AN EVoN GOVERAGE AND />ND~",/lLLJOINTS~ISHED~TUNIfCllMDSPTH TO "RQDleE lfO RU~OFF ONTO ~~RllilCAPE SURFACES 1o.000LVWATEI'I'fG~FALLP",NTIA\L1. SEASCII.LEp OUTO~IXl'ST.,"[;flO~f'!A~ W~,~THE lPiUN~LER5VSTEIIIS I~ 1l, CDMPLmD, 1HECONTIlACTOR, THE PRESENc. aFllig 8, I'IEHWl. OF ALI. WEEIJS FROMGROUNDCOI'ERAREAS. ORIJET/JL5, S~llDER«]W~"R'SALJT~ORIZEDR5I'RESENTATIVE SHALL PERFOOM AoaylflRSl N!lllOEll A'FOROED THE PlANTI~G AREAs TO E~SURE rr IS COMFLET, IMJ A'EQUArE. 1HE COOTRAamR lI. FILl.INllAND REI'l.ANTI~GOf _LOW AREASWHlCli AV CAlJ!l"ST~IlGWATER a'ill.LruR~ISH A1,U,lATmAL.sNJD FEIt'Ct.'U.LOU WORKREOOIRED TO CORRECT ANYlrt/IJ.1lQUIICEll E. nlJLlSllNll OflRRlGATI~ S"fSTE~AS NEOESSARY, OFCOVSRAGoATHI50WNCOBT. p, FLLKlAllD RECOMI'ACTIO~ OFEROOEOAREM, ruR~IS~T01HE t.lETALFABRICATION 1;, 1HE CCINTIlACTDRSHAU- CITY ACOMPLEE G, ViEEKLY REMOVALCF All. IIV\Sli,UTTER. CLFPI~G~ A"'lI.l FtlIlEIG~ DEMR 'AS aUal' DMWI'roNJDTMl "RI,rs sHQWI~" EXIlC' lOCA'OONS 01' ALL ITEMS ~5TALLeO. Ii AT lD IlAYSAFlERPlANlING.AAlMIl~IUMSULFATE SIj/llLBEAPPlJED To ~ A!lEASATWoRATS Of! LB!. I, Mo~UM"T "HAL,SE C~ST~UCTED FROM SEAMLESS llIO' SHEEI /lLU~II~U~ WITI1 WIIMAJ. T~ESE ARE TO aE DELIVERS] 011 DR BSFORE FI","- INSPECTION. PER1,

ORI'" DATE SECmm SUSM'TTAL THIRD SUeMm'AL

0)~ETEPAVING PSR CONSTRUCTION 0FLAGPOLEBASt: 0SURROl.l\JOING CONCRErE PAVj~G PER CONCRETE PA'fflG COLORAND FlNISH PlANS-CONTRACTOR 8HIILL INSTAll O PER CONSTRUCTION PlAN EXPANSION JOINTS WHERE PAVING ABUTS FlAG PO,E BASE f' RAllIUl.l NOSE ALL EOGESITYP,) APf>ROveD ~4 WOLYSTRYRENE FOAIIIWIPOlYSU,FIDE o 8A~ I.IPREGNATEO CAUlJLOT DATE NO.4 OOWELAT 24" O.C" 24' LONG, SLIP O ONE END AS SHOW" COMPACTED SUBGRAIlS PER SOLS O R8'ORT 0" 01;rpgij~~~~1N[=TU~T~W 0~~iiiJ~~"E\:~f~~W" PRE-DRlLIHl TOACCEPTII{JCTS tJ mE COIISTRUCTION IElENO 3'0lA. FlELO. PANELS SHALL BE smrED INTO 3'DA. CONCRETE Tl1ROUGH l'RUoRED H01£S ANO 3' BOLTS SET INTO QUICI\CRETE" CONTRACTOR SHAll CORE DRILL BO,T HOiES AFTER PANELS HAVEARRIIJED ON "" SJlEAND MEASURED fOR BOLT LOCATIONS ", ., " 111 VI PENNSYLVANIAAVEi/2A SAN DIEGO CA92103 619.995.1306 MICHAEL@GOURBANGREEN,COl.'

NOTE; BEFORE ANY EXCAVATION BEGINS CALL DIG ALERT@ 1-800-227-2600

A CONCRETE PAVING B paving joints C LGBT MONUMENT PRIVATS C1JNmACT MEDIAN IMPROVEMENT HltRDSC/iPE PLANS Fo.~: PRIDE FLAG POLE & MONUMENT CONSTRUCTION DETAILS & NOTES 4

SHSEr 4 4 ATTACHMENT 9

COMMUNITY PLANNING GROUP RECOMMENDATION

MONUMENT FLAG - PROJECT NO. 262168 SITE DEVELOPMENT PERMIT NO. 923086

The Uptown Planners voted 8-6 on February 17, 2012 recommending approval with no additional conditions. At the time ofthis report, the minutes ofthe meeting were not yet available. ATTACHMENT 10

City of San Diego Development Services 1222 First Ave., MS·302 Ownership Disclosure San Diego, CA 92101 ~ _~ Statement T - - (619)446-5000

Approval Type: Check appropriate box for type of approval (s) requested; r Netghborhood Use Pe""it r Coastal Development Permit r Neighborhood Development Permit rx Site Development Permit r Planned Development Permit r Conditional Use Permit ,Variance ,Tentative Map r Vesting Tentative Map r Map Waiver r Land Use Plan Amendment· r Other Project Title Project No. For City Use Only Hillcrest Monument Flag (#262168) Project Address:

Public right ofway in median on Normal Srrccl at University Ave.

Part I• To be completed when property Is held by Individual(s) I By signing the Ownership Disclosure Statement the owner(s) acknowledge that an application for a perroit map Qr other matter as identified above will be filed with the City of San Diego on the subject property with the intent to record an encumbrance against the property. Please list below the owner(s) and te08nt(s) (if applicable) of the above referenced property. The list must include the names and addresses of all persons who have an interest in the property, recorded or otherwise. and state the type of property interest (e.g.. tenants who will benefit from the permit, all individuals who own the property). A signature is required of at least one of the property owners. Attach additional pages if needed. A signature from the Assistant Executive Director of the San Diego Redevelopment Agency shan be reqUired for all project parcels for which a Disposition and Development Agreement (DDA) has been approved' executed by the City Council. Note: The applicant is responsible for notifying the Project Manager of any changes in ownership during the time the applicaUon is being processed or considered. Changes in ownership are to be given to the Project Manager at least thirty days prior to any public hearing on the subfeet property. Failure to provide accurate and current ownership information could result in a delay in the hearing process.

Additional pages attached IX Yes I No

Name of IndIVIdual

I Owner I TenanVLessee I Redevelopment Agency I Owner r TenanVlessee I Redevelopment Agency

Street Address: Street Address:

City/State/Zip: City/StateJZip:

Phone No: Fax No: Phone No: Fax No:

Stg08fure: Date: Signature : Date:

Name of IndiVIdual (type or print): Name of Individual (type or print):

I Owner ITenantILessee I Redevelopment Agency I Owner ITenant/lessee r Redevelopment Agency Street Address: Street Address:

CitylStatelZip: CitylStatelZip:

Phone No: Fax No: Phone No: Fax No:

Signature: Date: Signature : Date:

PnOled on recycled paper. Visit our web site at wwwsandtegogoy!development·SQMces Upon request. this information is available in alternative formats for persons with disabilities. D5-318 (5-05) Project Title: I Project No. (For City Usa Only) Hillcrest Monument Flag (#262168) IPart II- To be completed when property Is held by a corporation or partnership I Legal Status (please check): ~ IX Corporation r- Limited Liability -{)I"- I General) What State? Corporate Identification No. 330062422 I Partnership

By signing the Ownership Disclosure Statement the Qwner's) acknowledge that an application fQr a permit. map Qr other matter. as identified above will be filed with the City of San Dieqo Qn the SUbject property with the intent to record an encumbrance against the property.. Please list below the names, titles and addresses of all persons who have an interest in the property, recorded or otherwise, and state the type of property interest (e.g., tenants who will benefit from the permit, all corporate officers, and all partners in a partnership who own the property). A signature is required of at least one of the corporate Qfficers or partners who own the property. Attach additional pages if needed. Note: The applicant is responsible for notifying the Project Manager of any changes in ownership during the time the application is being processed or considered. Changes in ownership are to be given to the Project Manager at least thirty days prior to any public hearing on the subject property. Failure to provide accurate and current ownership information could resutt in a delay in the hearing process. Additional pages attached ryes r No Corporate/Partnership Name (type Qf print): CQrporateJpartnershlp Name (type or pont): Hillcrest Business Improvement Assn. Hillcrest Business Improvement Assn. I Owner IX TenanllLessee I Owner IX TenanllLessee Street Address: Street Address: 1051 University Avenue 535 University Ave. City/SlateJZip: City/StateJZip: San Diego San Diego PhOriEi No: Fax No: Phone No: Fax No: (619) 988-2626 (619)299-4230 (619) 295-2747 (619)295-2129 Name of Corporate OfflcerlPartner (type or print): Name of Corporate OfficerlPartner (type Of print): Nicholas Moede Mike Wright TiUe (type or prinl): Title (type or prin.): President Vice President Sig~oate: ~ :};-2-I-tZ ]r1if)L4J/~ 0'3'- t:;,-r'V Corporate/Partnership Name (type or print): Corporate/Partnership \ieitYPe or print): Hillcrest Business Improvement Assn. Hillcrest Business Improvement Assn. I Owner IX Ten.nllLessee I Owner IX TenanllLessee Street Address: Street Address: 1271 University Avenue 939 University Ave. City/SlaleJZip: City/StatelZip: San Diego San DiegQ Phone No: Fax No: Pf'lOile NO: Fax No: (315)778-) 076 (619)234-4829 (619)234-5937 Name of Corporate Officer/Partner (type or print): Name of COrporate Officer/Partner (type or print): Sean Cute Glenn Younger Title (type or print): Title (type or prinl): Secretary Treasurer Signatur~..:.-. Date: - '3-Jf-l?- Ii. l;orporale,...annersmp Name ltype or pnnt): CJrporate/P~nership fame (type or print):

I Owner r TenanVLessee I Owner I TenanllLessee Slreet Address: Street Address:

C~ylSl'telZip: City/StalelZip:

Phone No: Fax No: Phone No: Fax No:

Name of corporate OnlcerJPartrier (tYpe or pnnt): Name of Corporate Officerl?artner (type or print):

Title (type or print): TiUe (type or print):

Signature: Date: Signature : bate: ATTACHMENT 11

BUSINESS ASSOCIATION MEMORANDUM MESSAGE To: Andrew Field From: Benjamin Nicholls Date: January 3 l, 20 J 2 Fax: Phone: Subject: Hillcrest Pride Flag Monument Number ofpages (inc!. cover): 2

For Review -!-!!Ui=fTr:rg""oOlRHtc!-!---¥P't1lo*a15sceo-±D7i;ssceoa:al!'<"di---CORfidential

Introductio'l~ This memo establishes the responsibilities ofthe Hillcrest Business Association (HBA) conceming the proposed Monument Flag Project in Hillcrest San Diego (DSD# 262268) in relation to the San Diego Park and Recreation Department and the related Hillcrest-University Avenue Maintenance Assessment District (MAD). The HBA, a not for profit corporation, is undertaking a project to construct a 65' flag pole in the public right ofway in the median at the intersection ofNol1nal Street and University Avenue in San Diego. The proposed construction site is in the public rigbt ofway on land currently within the Hillcrest-University Avenue Maintenance Assessment District managed by San Diego Park and Recreation Department.

Statement ofresponsibility: The HBA and representatives ofthe City Park and Recreation Department (MAD staff) met on site on 1/9/2012. At this meeting HBA committed to:

• being responsible for all aspects offlagpole construction, which will include the redesign and retrofitting ofexisting hardscape and landscaping, including utilities, irrigation, and plant materials; • returning landscaped areas or hardscapes impacted by the constnrction to an acceptable standard in consultation with Park and Recreation staft; • meeting with Park and Recreation staff at a preconstruction meeting where existing site conditions shall be documented and construction particulars shall be discussed; • keeping, where feasible, irrigation systems in operation during construction, and providing for a water truck ifneeded for plant health in consultation with Park and Recreation staff; and • maintaining the area around the flagpole project in perpetuity, including the momm1ent, flagpole, flag, bollards, and paving relating to the project including raising cHId lowering the flag.

At this meeting, the City committed to:

3737 Fifth Ave. #202 San Diego, CA 92103 p:(619) 299-3330 f: (619) 299-4230 Attachment # 6 MOD with Dept. Park and Rec. BUSINESS ASSOCIATION • transplanting existing plants out ofthe project footprint in preparation for construction; • ensuring continued landscape maintenance ofsurrounding area during construction; and • working with HBA to minimize cont1icts with inigation systems, infrastructure, plants, /,-;1d maintenance practices dming the construction phase.

, gree,.£ent: I fl ag*e to the above provisions on behalf ofthe Hillcrest Business Association. . \) (\ )171/7 /\ \ IIJ/lf /,._'_ 31 e'd: njamin Nicholls Executive Director Hillcrest Business Association

[ acknowledge the above commitments and accept them as adequate to proceed with the project.

Signed: Andrew Field Assistant Deputy Director Park and Recreation Department·, Maintenance Assessment Districts Program

cc: Cory Peterson, District Manager

3737 Fifth Ave. #202 San Diego, CA 92103 p:(619) 299-3330 t' (619) 299-4230 ATTACHMENT 12