<<

LEGEND

Site boundary

National Park boundary

National Cycle Route 43 A4067 Proposals:

Rail River Tawe alignment YNYSWEN Platform

Buildings

Proposed Buildings ABERCRAF

Roads and hardscape

Access road

Car park CAEHOPKIN

Hardstanding / yard

Fenceline A4221

Perimeter security fence NCN43

Double internal stock fence 4.5km High Tonnage Drainage Testing Track

Storm ditch / swale COELBREN

Proposed pond

Existing pond Existing Onllwyn sidings to be

Green infrastructure (new / enhanced) 246.895 used for cold stock storage decommissioning - Boundary tree planting with apron Warm storage sidings with spatial capacity for up to 280 vehicles Wetland Infrastructure testings research & 6.9km Rolling development facility Peatland Stock Test Track Multi-storey staff block with 2no. platforms (230m length) mess and overnight stay facilities YSTRADGYNLAIS and associated Multi-storey Broadleaf woodland centre building A4067 Car park Coniferous woodland

Hedgerow

Acid grassland/lichen heath Research & Innoculated Heath Development centre / Acid grassland Maintenance Shed Sidings with capacity Wet Heath for up to 130 units Carriagewash building ONLLWYN Acid grassland Shunter’s cabins

Enclosed Pasture

Marshy grassland

Landscape mitigation

Acid grassland (existing)

Heath grassland (existing) N

N.T.S Heath (existing) A4109

SEVEN SISTERS Existing Onllwyn sidings to be

246.895 used for cold rolling stock storage Rolling stock decommissioning - siding with concrete apron Warm storage sidings with spatial capacity for up to 280 vehicles Infrastructure testings research & development facility Multi-storey staff block with mess and overnight stay facilities Multi-storey signalling control

N centre building N.T.S

Note: This key reflects content illustrated Car park in the wider masterplan proposals.

Research & Development centre

Maintenance Shed Headshunt Sidings with capacity for up to 130 units Carriagewash building ONLLWYN Shunter’s cabins