CP243 Project State Project No. 0301-0181 WALK BRIDGE PROGRAM | 2017

The CP243 Interlocking Project will construct a new four- interlocking, a Anticipated Start Date powered switch and signal system that allows to move from one track July 2017 to another. The new interlocking is approximately 2,200 feet long, located Construction Duration on the New Haven Line (NHL) between East Norwalk and Westport and 3 Years approximately 1.5 miles east of the Walk Bridge. The project includes: Estimated Construction Cost $210 Million • Installation of six new switches and crossover tracks • Track realignment and replacement • Overhead catenary modifications including new crossover wiring What Does CP243 Mean? throughout the interlocking ‘CP’ is the control point • Installation of signal houses ‘2’ refers to the New Haven Commuter Line • New power balancing station ‘43’ is the nearest mile post on • Drainage improvements the rail line, marked from • Positive Control (PTC) capabilities Grand Central Station

A is a set of tracks that create a , that when moved allows for trains to change from one track to another. Map Legend Track Realignments Catenary and Signal Huts New Tracks, Track Base and Catenary Submarine cables and tie-ins

Contact Us The CP243 Interlocking project includes: fiber optic signal system upgrades from Monroe , west of the Norwalk River, to a new signal hut just east For more information on the of the River. This includes mounting the signal cable on the Walk Bridge and a Walk Bridge Program, Please submarine crossing of the Norwalk River at the movable span. Additionally, a visit: www.walkbridgect.com signal and submarine crossing for the Saugatuck River in Westport will occur as part of this work. Submit a comment through the website at: The new signal system upgrades will www.walkbridgect.com/contact accommodate (PTC) capabilities. PTC allows trains to Email: [email protected] be stopped automatically, improving op- erational safety. This is controlled by an on-board computer system that receives Follow us on Social Media information from base-stations, alerting the train in advance of speed limits, facebook.com/WalkBridgeCT track conditions and potential hazards.

@WalkBridgeCT This project is independent of the Walk Bridge Replacement Project, but will improve the operations on the mainline during the construction of the new bridge.