The East Line Project E Gardiner 010710

MAIN WORKS TO BE COMPATIBLE WITH PHASE 2 EXTENSION

FUTURE CONNECTION (BY JUNCTION History OTHERS) INTO AT 2 KINGSBURY ROAD N Contracts: NORTHENORTHERNRN EXTENSION

HOXTON PROJECT OFFICE, 15 ENABLING WORKS CONTRACT BONHILL STREET Refurbish and replacing HIGH STREET bridges Tower DISTRICT AND MAIN WORKS CONTRACT (BB-C JV) & CITY LINES CROSSRAIL 1 NORTH SECTION, YARD Design, construct, install, test and commission CENTRAL SECTION City of infrastructure for the railway between Dalston LIGHT RAIL and /New Cross Gate

R iv er Th am es WORKS CONTRACT Renew line and Stations South from New Cross

SURREY Gate to Crystal Palace/West QUAYS

MAIN WORKS TO BE COMPATIBLE WITH CENTRE & SOUTH PHASE 2 EXTENSION SECTIONS, SILWOOD TRIANGLE ROLLING STOCK CONTRACT (BT)

Southwark Supply and commission Class 378 trains SOUTHERN EXTENSION NEW CROSS FUTURE CONNECTION (BY OTHERS) INTO SOUTH GATE LONDON AT OLD ROAD JUNCTION CSD NEW CROSS

L I U N B W L O T O E U R R N N NEW CROSS GATE K FA D R S Maintenance: A C R E Y

EAST LONDON LINE PROJECT LOI, Carillion, BT, LOROL TO WEST CROYDON, MAIN WORKS CRYSTAL PALACE AND INTERMEDIATE STATIONS – CARILLION JOINT VENTURE HOLYWELL VIADUCT

SHOREDITCH HIGH STREET BRIDGE

BISHOPSGATE VIADUCT AND STATION

BISHOPSGATE YARD

BRIDGE GE19 The Line Project

80000 m3 Reinforced Concrete 5000T Structural Steel 5500m Ballasted Track, 6000m Slab Track 3rd Rail, 750V DC 5 SSI sections Network Rail and LUL Standards The Project Timeline

Oct 2006: Contract award and access to the northern section Dec 2007: Old ELL shuts Feb 2008: access to Old ELL Oct 2009: Test running started Jan 2010: Trial Operations started 27 April 2010: first passenger trains 23 May 2010: Full service DALSTON JUNCTION STATION

DALSTON JUNCTION STATION

HOXTON STATION

SHOREDITCH HIGH STREET BRIDGE

SHOREDITCH HIGH STREET STATION

CENTRE SECTION

NORTH PORTAL OF ROTHERHITHE NEW ROAD BRIDGE New Cross Gate Area NEW CROSS DEPOT SITE

NEW CROSS STATION Track

Any Questions?