ENERGY MEETS REALITY

MAIN REFERENCES – TECHNICAL SERVICES A GLOBAL PRESENCE

ASHTAR REVAMPING – SEREPT GOLIAT FPSO – NORGE Onshore/ personnel: 300 Onshore/offshore personnel: > 150 Worked man-hours: > 1.800.000 Worked man-hours: > 225.000 N. of Checksheets: > 12.500 N. of Checksheets: > 250.000 Completion system used: WIN PCS Completion system used: Procosys (Statoil) HSE PERFORMANCES: LTIR 1,66 TRIR 3,33 HSE PERFORMANCES: LTIR 0 TRIR 0

PERLA PRODUCTION PROJECT – CARDON WEST FRANKLIN & ELGIN B OFFSHORE IV S.A. CAMPAIGN – TOTAL UK Onshore/offshore personnel: 8 Offshore personnel: > 75 Worked man-hours: > 15.000 Worked man-hours: > 250.000 N. of Checksheets: > 2.500 N. of Checksheets: > 32.000 Completion system used: WEB PCS Completion system used: ICAPS (OPERCOM) HSE PERFORMANCES: LTIR 0 TRIR 0 HSE PERFORMANCES: LTIR 0 TRIR 0

ZOHR GAS TREATMENT PLANT – PETROBEL Onshore personnel: 60 Worked man-hours: > 150.000 N. of Checksheets: > ongoing HSE PERFORMANCES: LTIR 0 TRIR 0

MARLIN DEVELOPMENT – FOXTROT INTL. KASHAGHAN ISLAND D – KCO JANGKRIK FPU – ENI INDONESIA Onshore/offshore personnel: 125 Offshore personnel: > 900 Offshore personnel: 8 Worked man-hours: > 35.000 Worked man-hours: > 3.600.000 Worked man-hours: > 20.000 N. of Checksheets: > 11.000 N. of Checksheets: > 460.000 N. of Checksheets: > 100.000 Completion system used: WIN PCS Completion system used: ACS (QEDI) Completion system used: PIMS (Omega) HSE PERFORMANCES: LTIR 0 TRIR 0 HSE PERFORMANCES: LTIR 0 TRIR 4.41 HSE PERFORMANCES: LTIR 0 TRIR 0 ZOHR PROJECT ZOHR gas treatment onshore plant phase 1

Completed

Client activities on Zohr Gas Treatment PETROJET Onshore Plant. Assistance includes Electrical, Control Owner &Instrumentation, Mechanical PETROBEL and Process/utility activities.

Location Rosetti Staff includes: PORT SAID - EGYPT Coordinator Specialist Engineers, Technical Leader Engineers, Main contractor Supervisors. SPA Technical Data Award Gas Processing Plant. September 2017 Phase 1 consists of treatment up Scope of work to 1bcf/day. Provision of Technical Services for commissioning assistance for the ZOHR PROJECT ZOHR gas treatment onshore plant phase 1

Completed

Client Control &Instrumentation, LOGELCO INC Mechanical and Process/utility activities. Owner Rosetti Staff includes: Lead PETROBEL Discipline Coordinators, Engineers, Supervisors and Location Technicians. PORT SAID - EGYPT

Main contractor Technical Data Rosetti Marino SPA Gas Processing Plant. Award Phase 1 consists of treatment up August 2017 to 1bcf/day.

Scope of work Provision of Technical Services during Commissioning and Start Up on Early Production Facilities. Support includes Electrical, GOLIAT PROJECT GOLIAT FPSO

Completed

Client Hook up KOSSCO LTD (Owner: ENI Norge) In progress

Location Scope of work Ulsan, South Korea (1° phase) Provision of Services for , (2° phase mechanical completion activities Hook up) on Goliat FPSO (Precommissioning & commissioning Main contractor – all disciplines). Rosetti Marino SPA Technical Data Contract Weight approx. 60.000 Tons, MS diameter 120m, height 76m, Daily rates FPSO with oil storage, sea ballasting system, Gas Turbine Award Generation and Living quarter January 2014 Manhours 1° phase: 82.795 Manhours 2° phase: 26.977 Ready for sail away (as of 30 Nov. 2015) 1st Quarter 2016 JANGKRIK FSU PROJECT – PMT COMMISSIONING SERVICES

Completed

Client The topsides fabrication activities ENI Indonesia were carried out in ’s Karimun Yard while the hull was Location fabricated at HHI’s yard in Ulsan, Ulsan, South Korea South Korea

Main contractor Technical Data Rosetti Marino SPA Treating capacity of 450MMSCFD of gas Scope of work Provision of Services and 4.400 barrel/d of condensate inspection assistance for mechanical completion, test and Technical Services preservation activities. Services started on October 2015 MARLIN DEVELOPMENT PROJECT Completed

Client equipment, prefabrication, FOXTROT INTERNATIONAL LDC fabrication and assembly, precommissioning, Location commissioning load out, site Offshore Ivory Coast hook‐up, site commissioning and assistance for start‐up of: Main contractor One (1) 4‐legged jacket, four (4) Rosetti Marino SPA skirt piles, A Four (4) deck level Topside and a 20 POB Living Contract Quarter EPC Technical Data Award Topside: LxWxH 54x31x20 December 2012 Weight: 4.500 tons Jacket: H 118 m Ready for sail away Weight: 3.500 tons Jacket & piles: August 2014 (+ 1.300 tons for piles) Deck: March 2015 Living Quarter: 20 POB

Scope of work , Procurement and supply of all material and WEST FRANKLIN PROJECT

Completed

Client Scope of work ELF EXPLORATION UK LTD / TOTAL Engineering, Procurement, Group , Installation, Hook‐up and Commissioning of Location Topsides for the West Franklin , UKCS (240 Km East of platform Aberdeen) Description Main contractor West Franklin topside will be Rosetti Marino SPA used in the extraction of gas and condensed crude oil, with 9 high Contract pressure and high‐temperature EPCI wellheads, the estimated production design rate of West Award Franklin platform is 40,000 July 2011 barrels of oil equivalent per day.

Ready for sail away Technical Data 2013 Topside: LxWxH: 40x40x20 mt Weight: 3.300 tons ELGIN B PROJECT

Completed

Client Scope of work ELF EXPLORATION UK LTD / TOTAL Engineering, Procurement, Group Construction, Installation, Hook‐up and Commissioning of Topsides Location for the Elgin B Platform North Sea, UKCS (240 Km East of Aberdeen) Description Elgin B topside will be used in the Main contractor extraction of gas and condensed Rosetti Marino SPA crude oil, with 12 high‐pressure and high‐temperature wellheads, Contract the estimated production design EPCI rate of Elgin B platform is of 65,000 barrels of oil equivalent Award per day. July 2011 Technical Data Ready for sail away Topside: LxWxH: 35x35x15mt June 2013 Weight: 2.300 tons DP3/DP4 MODIFICATION & REVAMPING PROJECT

Completed

Client Commissioning & assistance to MELLITAH OIL & GAS B.V. the Company during Start‐up

Location Description – Offshore Decommissioning and dismantling of Gas Sweetening Unit, Main contractor Procurement of bulk material Rosetti Marino SPA (structures, piping, E&I), construction of 3 chemical transfer Contract pump skids & 4 chemical injection EPIC contract on Turn Key Lump skids. Sum basis Offshore revamping works onboard two platforms, Update of Award the DCS/ESD/PSD system October 2012 Technical Data Provisional Acceptance Dismantling of Unit 22 for a total November 2013 weight of 240 tons (Columns, Piping and Structures) Scope of work Cables: 3000m Piping: 60t Engineering, Procurement, Scaffolding more than: 3500 m3 Fabrication, Transportation & Offshore works: 70.000 mhrs Delivery, Off‐shore installation, (SIMOPS) Testing, Precommissioning,