03.2016

SAIPEM S.P.A. Via Martiri di Cefalonia, 67 20097 San Donato Milanese, - SOLUTIONS FOR LNG SAIPEM.COM

­B SAIPEM SOLUTIONS FOR LNG SAIPEM CAPABILITIES

SAIPEM IS ACTIVE IN THE WHOLE LNG CHAIN

7

UPSTREAM 3 6 2

1 4 7 12 5 8 9 5 5 2 11 1 4 3 6 GAS PIPELINE 10 LIQUEFACTION PLANT 3 4 2 5 8 9 3 2 4 1 12 1 13 10 6 11

REGASIFICATION STORAGE & LOADING TERMINAL

IMPORT TERMINAL EXPORT TERMINAL EXPORT TERMINAL FLOATING (REGASIFICATION) EPC (LIQUEFACTION) FEED (LIQUEFACTION) EPC LNG FEED 1 Freeport 1 LNG Canada 1 Peru LNG (Marine Works) 1 FLNG 2 Canaport 2 BG OKLNG 2 GNL 3Z 2 Coral FLNG LNG 3 Fluxys Zeebrugge 3 NLNG - Bonny Seven Plus 3 Ras Gas Trains 3 Abadi FLNG TRANSPORTATION 4 BBG Bilbao 4 Arzew 4 NLNG Bonny LNG 4 Scarborough FLNG 5 OLT FSRU Toscana 5 Pars LNG 5 Angola LNG (Tank) 5 Panigaglia 5 Iran LNG 6 Gorgon LNG (Marine Works) EPC PROJECTS 6 Polskie LNG 6 Iris LNG 7 GDF Fos Cavaou 7 Yamal LNG > Executed #10 Base load LNG Trains ranging from 2 to 5 MTPA capacity 8 Revithoussa 8 PLNG 9 9 Marmara 9 Tangguh Expansion Project > Design and of #13 Regasification Terminals and more than 40 Tanks 10 Shell Hazira LNG 10 Browse LNG 11 Peyong Taek 11 Arrow LNG 12 CNOOC-Guangdong 12 Mozambique LNG 13 East Africa Onshore LNG CONTENTS 40 45 SAIPEM CAPABILITIES TECHNOLOGICAL SKILLS ONSHORE LIQUEFACTION MTPA MTPA

LNG REGASIFICATION FLOATING LIQUEFACTION TOTAL INSTALLED TOTAL INSTALLED LIQUEFACTION CAPACITY REGASIFICATION CAPACITY

2 3­ TECHNOLOGICAL SKILLS

LIQUEFACTION TECHNOLOGIES REGASIFICATION TECHNOLOGIES ACCESS TO PATENTED PROCESS VAPORIZER TYPES > APCI > ORV - Open Rack > Linde > SCV - Submerged Combustion > Axens > IFV - Intermediate Fluid > Shell > S&T - Shell and Tube > Black and Veatch > SMART - Air Vaporization > Moss Maritime (SAIPEM Group) Experience in managing different heating configurations which may be selected: open vs closed loop, direct vs indirect heating, sea water vs direct heating Skills to evaluate performances provided by Licensors and capability to select and integrate the proper machinery configuration and heat exchanger in the overall process scheme LNG STORAGE TANKS Capability to determine the combination of operating parameters minimizing the consumed > Full Containment 9% Ni refrigerant compressor power > Membrane Stainless Steel

Experience in compact arrangement of cold section exchangers and plant layout optimization In house capabilities to design and construct cryogenic tanks complying with specific site environmental conditions 31 Delivered within Regas Terminal, 17 Delivered within LNG plant/Stand Alone

4 5­ ONSHORE LIQUEFACTION GNL-3Z LNG COMPLEX ARZEW - ALGERIA

FROM GRASS TO ROOTS OPERATION INTEGRATED LNG FACILITY ON EPC DELIVERED TO SONATRACH ITS LARGEST LSTK BASIS LNG PRODUCTION TRAIN > LNG train 4.7 MTPA, APCI C3-SPLIT MR > An extensive set of Performance Tests successfully > Provisions for 2nd LNG Train completed by an integrated Client-Contractor team > Infrastructures, Storages, Utilities > 4,000,000 m3 of LNG exported up to Plant Provisional Acceptance May 5th 2015 > Lessons Learnt collected and capitalized

THROUGH WITH SAFE EFFECTIVE EXECUTION DESIGN

MAXIMIZE LNG PRODUCTION ENSURING SAFETY LNG production increased above the original 4.0 MTPA > Total mhrs no lti 20,500,000 up to a peak nominal capacity of 5.7 MTPA using > Manpower peak 12,000 pre-committed equipment (MCHE, Turbines)

6 7­ LNG REGASIFICATION

POLSKIE LNG FSRU TOSCANA SWINOUJSCIE LNG IMPORT TERMINAL – POLAND FLOATING STORAGE REGASIFICATION UNIT LIVORNO – ITALY

> High local content > Conversion of Mono-hull carrier (Golar Frost) with four Moss® type LNG tanks > Flexibility for future expansion > Towing operation from Dubai to Livorno (via Malta) > Easy operability and maintainability > FSRU installation and commissioning/start-up > Sinergies with onshore infrastructures and facilities > World’s first side by side mooring in open sea

285,000 Nm3/h 75,000 to 216,000 m3 2 x 160,000 m3 1.65 km 4.0 MTPA Side by Side 137,000 m3 2,500 tons CAPACITY LNG CARRIERS LNG TANKS JETTY CAPACITY LNG TRANSFER LNG STORAGE RE-GAS MODULE

COMMISSIONING AND START UP COMPLETED IN OPERATION Tanks, Terminal Cooldown and Q- Flex Unloading on December 2015 Start-up completed in 2015. Final acceptance in February 2016

8 9­ FLOATING LIQUEFACTION

SAIPEM CAPABILITIES FROM SUBSEA TO TOPSIDE DEVELOPMENT LNG TRANSFER FLOATING HOSE FOR TANDEM OFFLOADING > LNG production: from 2.5 to 5.0+ MTPA > Adapted to FLNG & FSRU applications > Lifetime: Over 25-year > LNG transfer up to 12,000 m3/hr. > Water depth down to 2000 m > Safe LNG transfer with waves up to 4m.

FLNG HYBRID RISER CRYOLINE LNG CRYOLINE Design of process modules and turret Suitable for cryogenic conditions Cooperation with Trelleborg Naval expertise Designed for high LNG transfer flow Integration of plant facilities into the hull Low pressure drop and heat ingress Motion effects and sloshing evaluation No ice formation during LNG transfer INNER CRYOGENIC HOSE Side-by-side or tandem offloading Integrated leak monitoring system

SURF TANDEM OFFLOADING Subsea field development Integrated storage and maintenance platform Risers, Umbilical and Flowlines Operability in severe environment Material Technologies for Subsea systems Reeling test performed Fully modular systems Innovative reel for hose storage COMPACT CONNECTION INNOVATIVE INSULATION MATERIAL Flexible design for different applications Qualified to EN 1474-3 and BV NR542

­­10 ­11