DEVELOPMENT OF ESRANGE
Philip Påhlsson 2020-03-10 ESRANGE THE MOST VERSATILE SPACE CENTER IN THE WORLD
Twice the size of Luxembourg Norway or Rhode Island Finland 5200 km2 ground space Sweden
5 6 SSC WORLDWIDE CUSTOMER PROXIMITY
550 Employees 30 Nationalities 20 Locations 10 Countries BUSINESS AREAS
Science & Satellite Ground Spacecraft Operations Launch Services Network Services & Engineering Services Spacecraft Operations UAS Satellite& EngineeringGround Services ScienceNetwork & Services ESRANGE SPACE Launch Services UAV Validation CENTER
Sounding Rockets Stratospheric Balloons
Aurora and Atmospheric Microgravity and Rideshare Missions Circumpolar Balloon Student Missions Mobile Ballooning Student Missions Drop Tests Science Atmospheric Reentry Suborbital Express Flights
Testbed Esrange SmallSat Express
Vertical Engine Vertical Stage Satellite Launch Horizontal Teststand Reusability Planetary Landers Spaceport Services Teststands Teststands Service Provider Spacecraft Operations UAS Satellite& EngineeringGround Services ScienceNetwork & Services ESRANGE SPACE Launch Services UAV Validation CENTER
Sounding Rockets Stratospheric Balloons
Aurora and Atmospheric Microgravity and Rideshare Missions Cirumpolar Balloon Student Missions Mobile Ballooning Student Missions Drop Tests Science Atmospheric Reentry Suborbital Express Flights
Testbed Esrange SmallSat Express
Vertical Engine Vertical Stage Satellite Launch Horizontal Teststand Reusability Planetary Landers Spaceport Services Teststands Teststands Service Provider LAUNCH SITES EXISTING AND PLANNED
Existing Planned launching launching states states French Guyana Australia
India Andøya Esrange Norway
Israel Pacific Spaceport Portugal Plesetsk Japan UK Dombarovsky Spain Vostochny China UK SpaceX Wallops Spain Baikonur Taiyuan New Zeeland Vandenberg South Jiuquan Sweden Texas Portugal Russia Palmachim Tanegashima Cape Canaveral Xichang USA Guiana Satish Dhawan
Equator
Queensland
Mahia
Exisiting Launch Sites Planned Launch Sites
11 LAUNCH SITES EXISTING AND PLANNED
Existing Planned launching launching states states French Guyana Australia
India Andøya Esrange Norway
Israel Pacific Spaceport Portugal Plesetsk Japan UK Dombarovsky Spain Vostochny China UK SpaceX Wallops Spain Baikonur Taiyuan New Zeeland Vandenberg South Jiuquan Sweden Texas Portugal Russia Palmachim Tanegashima Cape Canaveral Xichang USA Guiana Satish Dhawan
Equator
Queensland
Mahia
Exisiting Launch Sites Planned Launch Sites
12 LAUNCHER DEVELOPMENT SSC STRATEGY TO BOOST INNOVATION TRL 6 – TRL 8 Today TRL 5 – TRL 6
TRL 4 – TRL 5 TRL 3 – TRL 4
2021 2022 2019 2020
Horizontal test stand Vertical test First orbital launch <500 kN stand >100 kN
Suborbital test pad Reusability test pad Oxidizer storage facility
Mobile propellant facilities HORIZONTAL ENGINE TEST STAND VERTICAL ENGINE TEST STAND
Image: SpaceX VERTICAL STAGE TEST STAND 2:ND STAGE
Image: SpaceX SMALLSAT EXPRESS SMALLSAT EXPRESS GOAL
SSC shall launch satellites into orbit from Esrange before the end of 2021, making Esrange the first spaceport in Europe launching small satellites. MINDSET SMALLSAT EXPRESS STEP-BY-STEP REALIZATION
Capability Level Year
5 Esrange 2.0 2022+
4 Spaceport – Launch Service Provider 2022+
3 Spaceport – Flight Ticket Provider 2021
2 Testbed – Reusability and fly-back 2020
1 Testbed – Rocket motor and stage 2020
0 Modernization and upgrade (>100 MSEK)
Esrange Space Center – A Strategic National Asset
Internal 20 SMALLSAT EXPRESS STEP-BY-STEP REALIZATION – LEVEL 0 Upgrades of basic infrastructure at Esrange Upgrades to launchers Upgrade of power system at Esrange • Skylark building • 2x 2500 KVA Diesel generators • Upgrade of mobile tower • 2x 0,4/22 KVA transformers • New balloon operations • New short-break high power net New systems for balloons and rockets Refurbishment Upgrades to the ESRAD system • ESS • Launch Area • Main building • Hotel • MCC Construction of visitor center Upgrade of communication network at Esrange • Upgrade to fibre • Security upgrades
Internal Finished 2018 21 SMALLSAT EXPRESS STEP-BY-STEP REALIZATION – LEVEL 1
New Site LC-3 for reusability and orbital launching Two vertical test stands under construction • Road 3.8 km • Will allow for engine and stage testing at • Power Esrange from April 2020 • Fiber • Launch site 100m x 470m • Basic Infrastructure
Image credit: Firefly
Internal Finished Q4 2019 Finished before April 2020 22 C2-Protected 23 C2-Protected 24 25 26 27 28 SMALLSAT EXPRESS STEP-BY-STEP REALIZATION – LEVEL 2 First adaptation of LC-3 for Flyback booster and planetary lander tests (+orbital launch) • Tent hall integration hall • Construction of LC-3A pad • Liquids and gases infrastructure • Relocation of staff to Kiruna or Salmijärvi to free upminimum 20 Office seats • Adaptation of existing offices at Esrange
SpaceX Testsite Texas Image: Astra
Finished before end of 2020
Internal Image: SpaceX 29 SMALLSAT EXPRESS STEP-BY-STEP REALIZATION – LEVEL 3
First adaptation of LC-3 for Spaceport operations • LC-3B launch pad • LC-3B Flame duct • Process water storage • Process water pump • Process water piping • Concrete pads (fuel/oxidizers) • Ground works • Power, communication, lights and lightning protection • Mobile gantry • Payload integration building (Basic) • Sewage system • Potable water system
Internal Finished before end of 2021 30 SMALLSAT EXPRESS STEP-BY-STEP REALIZATION – LEVEL 4 Expansion of Esrange to support Launch Service provider role • New launch operation centre • Radar upgrade • Down-range permanent establishment • Payload integration building (High standard) • Relocation of staff to Kiruna C to free minimum 20 office • Relocation of NMC to Kiruna C to replace with launch operations center
Internal 31 SMALLSAT EXPRESS STEP-BY-STEP REALIZATION – LEVEL 5 Esrange 2.0 Expansion of Esrange support infrastructure • Expansion of hotel • Expansion of offices • Redesign of Esrange entrance • Refurbishment of main building • Orbit building • Upgrade of Sounding rocket launch area
Internal 32 SSC – A LAUNCH SERVICEPROVIDER
SmallSat Express
SmallSat Express Lite All-inclusive*
Spaceport Services In-between
Lease a pad
C2-Protected *Almost 33