2020 REM MITIGATION MEASURES Canora – Mont-Royal Area

Total Page:16

File Type:pdf, Size:1020Kb

2020 REM MITIGATION MEASURES Canora – Mont-Royal Area 2020 REM MITIGATION MEASURES Canora – Mont-Royal area Boul. Jules-Poitras oouu Boul.Boul de l'Acadie 15 ded l'Ac Boul.Bo Saint-Laurent Ch. Rockland Accadiec 92 as R Sai r ock ie land t-La iririeri ure Poi Av.Av du enent e P Boul.Bo Lair u ASTCADIEATION ddu Rue Poirie ul. Par STACADIEATION c ph LaL sep os d 40 t-Jo int Boul. Montpellier 919 Sa m l on ul. CÔTE-STATIONVERTU GGraaah MONTRÉALMMOONNTRRÉRÉALALL Boul.BoBoul Saint-Joseph SCÔTE-TATIONVERTU Boul.Bou Graham e MONTMOMONO T-RO-RROOYAYAL CANORAGARE CANORA/ / Av.A Sainte-Croix L v -L MONT-ROYAL Boul.B Laird ded am n O ham ou Boul. Marcel-Laurin -d ra oon O. STATION alo ulul. TTal ens ôtôte CCôt Boul.Bo Graham nn-T ai a C rce ean 92 d l-L Rue Hodge e la -LLLau e Je uul aur ue ne oul uurin Boul. Thimens rtu RueRu Jean-Talon 9 e 91 VeVVer Ch. de la Côte-de-Liess e-V at Ca C a C Ch.Ch. Lucerne Luce de la rn Sa t l.l de eti te- p Boul.Boul de la Côte-Vertu 165 t /4 Côt 65 Ch.C de la Côte- oont de Mon e des-Neigese ud s Pin es la C o -N CCô -H 9 eieeig u n tet Ch.C de la Côte-Sainte-Catherine e v. de 91 es li il Av.Av des Pins O. 92 GareGTrainare ddestatione train m 40 ul. a C Boul. Édouard-Montpeti ie o V GareClosed de train train station ferméefermée 165//465 StationSMetrotatio nstation dede métrométro VVoieReservedoie rréservéeéserv laneée STNAMURATION SCÔTE-DES-NEIGESTATION SNAMURTATION 15 STCÔTE-DES-NEIGESATION PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Shuttle 919 – Trainbus Acadie/Mont-Royal/Namur (±15 min) ±35 min* 2 Metro from the Namur station to the Bonaventure station (±20 min) SHUTTLE 919 – Trainbus Bois-Franc/Côte-Vertu – Service on weekdays during rush hours in both directions – Departure every 15 minutes – Use of the reserved lane on rue Jean-Talon, from avenue Victoria to avenue Mountain Sights westbound and from avenue Victoria to rue de Nancy eastbound TRAVEL OPTIONS – Line 92 Jean-Talon – Departure every 20 minutes – Use of the reserved lane on rue Jean-Talon – Additional departures during rush hours: 4 westbound and 3 eastbound – Line 165 Côte-des-Neiges – Additional departures: 14 southbound and 6 northbound – Use of reserved lanes on chemin de la Côte-des-Neiges and boulevard René-Lévesque – Line 465 Express Côte-des-Neiges For more details, visit: quebec.ca/mobilitemontreal * The travel time does not include transfers between different transportation modes. 2020 REM MITIGATION MEASURES Canora – Mont-Royal area FARE MITIGATION MEASURE* To take advantage of the measure and receive up to 4 free months starting in January 2020, you must subscribe to OPUS+ or OPUS+ entreprise program as of November 11, 2019.** If you’re already an OPUS+ If you’re NOT registered or OPUS+ entreprise subscriber The measure will NOT be applied automatically to You must subscribe to OPUS+ or OPUS+ your membership—you must modify your fare in your entreprise to take advantage of this measure. online account to obtain this measure.*** If you do not make this modification, your current fare will be available at the regular price. exo.quebec/en/customer-service/rem/mitigation-measure *The fare mitigation measure is available to users of the exo6 Deux-Montagnes line who reside in the determined geographic area. Eligible users are those who have enrolled in the current REM fare mitigation measure by September 8, 2019. Certain conditions apply. **This date was determined to coincide with the subscription billing period. ***Please note that you may cancel your membership if you no longer wish to use public transit. Download the Chrono application to consult schedules and plan your trips. Enter Chrono ARTM in the App Store or Google Play Store search tool. Contact us: exo : 514 287-TRAM (8726) | STM : 514 STM-INFO | REM : www.rem.info.
Recommended publications
  • Fichetechnique REM Mesures D'attenuation ANGLAIS
    REM MITIGATION MEASURES Deux-Montagnes area 9 TowaVersrss rd SAINTAAIN - JÉRÔMJÉJÉÉRRÔMEME 15 2020 440 59 40 BLAINVILLEBLA E SAINT-EUSTACHE LAVAAVAVVAAL 25 TERMINAL 15 9 MONTMORENCY Weekends 640 59 STATION MONTRMONTRÉALTTRRRÉARÉÉÉAAL 4 40 8 20 8 440 40 DEUX-MONTAGNES STATION Weekends BOIS-FRANC 640 STATION LONGUEUONGNGUEUILU L 964 CÔTE-VERTU STATION Bus terminal GRAND-MOULIN BONAVENTURE STATION RAIL SHUTTLE 404 STATION Train station 13 Metro station Reserved lane 40 404 20 PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Rail shuttle from Deux-Montagnes to the Bois-Franc station (±25 min) 2 Shuttle 964 – Trainbus Bois-Franc/Côte-Vertu (±15 min) ±1 h 05* (See reverse side for more details) 3 Metro from the Côte-Vertu station to the Bonaventure station (±25 min) TRAVEL OPTIONS IMPROVED SERVICE – Line 8 from Saint-Eustache to the Montmorency station1 (±20 min) +30 min – Line 9 from Saint-Jérôme to the Montmorency station1 (±1 h 30 min) between the Montmorency1 and Bonaventure stations – Line 59 from Blainville to the Montmorency station1 (±50 min) } EXPRESS BUS SHUTTLE OPTIONS OFFPEAK AND WEEKENDS – Shuttle 404 from Deux-Montagnes to the Mansfield terminal (±1 h 05 min from 5 to 6 a.m.) (±50 min from 9 a.m. to 3 p.m. and from 7 p.m. to 1 a.m.) * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Deux-Montagnes area 2020 SHUTTLE 964 – Trainbus Bois-Franc/Côte-Vertu – Service on weekdays from 5:30 a.m.
    [Show full text]
  • Griffintown Golroo Mofarrahi
    Griffintown Golroo Mofarrahi Post-professional graduate program in Cultural Landscapes School of Architecture McGill University August 2009 Report Submitted in Partial Fulfillment of the Requirements of the Degree of Master ofArchitecture Golroo Mofarrahi, 2009 Abstract: This study originates from observation that urban neigh bourhoods are in continuous transition as the economy ebbs and flows. Residential neighbour- hoods will either collapse or redlined for new development as their residents start to move out (The Lure of the Local, 202). At the same time, coun- try towns are being abandoned, working class neighbourhoods are further ghettoized and steel towns are rusting in decay as “deserted downtowns con- trast with exurban building booms” (The Lure of the Local, 202). An example of this type of neighbourhood is Griffintown, which was once a working class neighbourhood squeezed between Saint Gabriel farm and the suburbs of Recollets and Victoria town in Montreal. Griffintown was an industrial and residential district. It was urbanised in the 19th century and gradually decayed through the 20th century. As an industrial district it saw the birth of very first large factories of Canada and was known as the industrial heartland of Canada. The area was of great interest to most developers, and various projects have been proposed for this area. This report addresses the follow­ ing question: How does the extent artefact system in Griffintown represent tangible evidence of the way of life before forced resettlement, and are there any artefacts worth preserving in Griffintown, an area slated for imminent development? I Résumé: Cette étude trouve son origine dans la notion selon laquelle les quartiers ur- bains sont engagés dans un cycle de croissance et de déclin soumis aux aléas de la conjoncture économique.
    [Show full text]
  • Réseau Électrique Métropolitain (REM) | REM Forecasting Report
    Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Prepared by: Prepared for: Steer Davies Gleave CDPQ Infra Inc. Suite 970 - 355 Burrard Street 1000 Place Jean-Paul-Riopelle Vancouver, BC V6C 2G8 Montréal, QC H2Z 2B3 Canada Canada +1 (604) 629 2610 na.steerdaviesgleave.com Steer Davies Gleave has prepared this material for CDPQ Infra Inc.. This material may only be used within the context and scope for which Steer Davies Gleave has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer Davies Gleave shall be deemed to confirm their agreement to indemnify Steer Davies Gleave for all loss or damage resulting therefrom. Steer Davies Gleave has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. Réseau Électrique Métropolitain (REM) | REM Forecasting Report Contents 1 Introduction ............................................................................................................................
    [Show full text]
  • BONAVENTURE Quartier Bonaventure Transportation Objectives: Environment
    QUARTIER BONAVENTURE THE NEW MONTREAL Transformation of the Bonaventure Expressway, Phase 1 Summary of the Detailed Pre-project Design Studies, March 2009 QUARTIER BONAVENTURE THE NEW MONTREAL Transformation of the Bonaventure Expressway, Phase 1 Summary of the Detailed Pre-project Design Studies, March 2009 A city gateway to be redefi ned. Quartier Bonaventure A neighbourhood steeped in history, focused on the future The logo and signature represent drive and ambition by a moving line pointing towards the sky. The inter- secting lines demonstrate a determination to mend the east and west axes in order to create a true living environment in the heart of a historic site that will live once again. The colours represent the overriding presence of the St. Lawrence River and the need for the project to refl ect sustainable development. Finally, the contrast between dark blue and electric blue shows the balance between the strength of a structuring project for Montreal and the will to redefi ne this area in an imaginative and inspiring way, from both architec- tural and urban planning perspectives. Quartier Bonaventure CONTENTS PREFACE ° The Quartier Bonaventure: redefi ne Montreal of the future in an imaginative and inspiring way 1 ° The mission of the Société du Havre de Montréal : Bring the City to the St. Lawrence River 2 ° A project that has developed over time 3 SECTION 1 BACKGROUND ° A district at the centre of Montreal history 6 ° An urban reconstruction project inspired by the magic of its historic site 7 ° Creating Quartier Bonaventure
    [Show full text]
  • An Innovative Model, an Integrated Network
    RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN An innovative model, an integrated network / Presentation of the #ProjetREM cdpqinfra.com THE REM: A PROJECT WITH IMPACT The REM is a fully automated, electric light rail transit (LRT) system, made up of 67 km of dedicated rail lines, with 50% of the tracks occupying existing rail corridors and 30% following existing highways. The REM will include four branches connecting downtown Montréal, the South Shore, the West Island, the North Shore and the airport, resulting in two new high-frequency public transit service lines to key employment hubs. A team of close to 400 experts is contributing to this project, ensuring well-planned, efficient and effective integration with the other transit networks. All sorts of elements are being considered, including the REM’s integration into the urban fabric and landscape, access to stations and impacts on the environment. Based on the current planning stage, the REM would become the fourth largest automated transit network in the world, with 27 stations, 13 parking facilities and 9 bus terminals, in addition to offering: • frequent service (every 3 to 12 minutes at peak times, depending on the stations), 20 hours a day (from 5:00 a.m. to 1:00 a.m.), 7 days a week; • reliable and punctual service, through the use of entirely dedicated tracks; • reduced travel time through high carrying capacity and rapid service; • attention to user safety and security through cutting-edge monitoring; • highly accessible stations (by foot, bike, public transit or car) and equipped with elevators and escalators to improve ease of travel for everyone; • flexibility to espondr to increases in ridership, with the possibility of having trains pass through stations every 90 seconds.
    [Show full text]
  • Top 10 Real INSIGHTS 2020 Montréal Real Estate Market
    Top 10 Real INSIGHTS 2020 Montréal Real Estate Market Powered by ISSUE 45 AltusGroup ISSUE 2020 Montreal Real Estate Market TOP 10 REAL INSIGHTS 45 1 2 3 INSIGHTS FROM MAJOR INFRASTRUCTURE DEMAND FOR OFFICE WAAS IN THETTIME OF INDUSTRY LEADERS INVESTMENT UNDERWAY SPACE SOARED IN 2019 COVID-19 DURING THE CONTENT IN THE GMA FORMATION OF MONTREAL Montréal has been the Absorption of over 3 M sq. Pandemic will likely thin out recipient of billions of dollars ft. of office space the highest a crowded field of flexible REAL ESTATE MARKET in investment to improve rate in almost 20 years. office suppliers. transportation infrastructure. 7 6 5 4 COVID-19 CHANGING MONTRÉAL IS A HUB OF CAPITAL HAS BEEN MONTRÉAL INDUSTRIAL CONSUMER BEHAVIOR DEVELOPMENT FLOODING INTO VACANCY RATE AT RECORD MONTRÉAL LOW LEVELS Disruption to the retail sector Vigorous demand for space Investment volumes were Montréal has become the third continues as the pandemic across sectors has resulted up significantly in 2019 as tightest major industrial market sweeps across the globe. in increased development institutional investors and after Toronto and Vancouver. across the city. REITs chased yield and solid market fundaments. 8 9 10 HOUSING RENTAL 2019 REPRESENTED FIFTH WEST ISLAND for further details VACANCY AT A 15 YEAR CONSECUTIVE RECORD- ATTRACTING MAJOR on these top trends LOW IN THE GMA BREAKING YEAR IN THE GMA NEW DEVELOPMENTS please visit the real HOUSING MARKET estate forums portal at realestateforums.com The apartment sector expected Momentum Continued into New REM stations are resulting to continue to perform well in 2020 – March represented in millions of dollars worth of the face of COVID-19.
    [Show full text]
  • Analyzing the Parallelism Between the Rise and Fall of Baseball in Quebec and the Quebec Secession Movement Daniel S
    Union College Union | Digital Works Honors Theses Student Work 6-2011 Analyzing the Parallelism between the Rise and Fall of Baseball in Quebec and the Quebec Secession Movement Daniel S. Greene Union College - Schenectady, NY Follow this and additional works at: https://digitalworks.union.edu/theses Part of the Canadian History Commons, and the Sports Studies Commons Recommended Citation Greene, Daniel S., "Analyzing the Parallelism between the Rise and Fall of Baseball in Quebec and the Quebec Secession Movement" (2011). Honors Theses. 988. https://digitalworks.union.edu/theses/988 This Open Access is brought to you for free and open access by the Student Work at Union | Digital Works. It has been accepted for inclusion in Honors Theses by an authorized administrator of Union | Digital Works. For more information, please contact [email protected]. Analyzing the Parallelism between the Rise and Fall of Baseball in Quebec and the Quebec Secession Movement By Daniel Greene Senior Project Submitted in Partial Fulfillment of the Requirements for Graduation Department of History Union College June, 2011 i Greene, Daniel Analyzing the Parallelism between the Rise and Fall of Baseball in Quebec and the Quebec Secession Movement My Senior Project examines the parallelism between the movement to bring baseball to Quebec and the Quebec secession movement in Canada. Through my research I have found that both entities follow a very similar timeline with highs and lows coming around the same time in the same province; although, I have not found any direct linkage between the two. My analysis begins around 1837 and continues through present day, and by analyzing the histories of each movement demonstrates clearly that both movements followed a unique and similar timeline.
    [Show full text]
  • Canadian Rail No212 1969
    a )~mnn ~Ormn Dcr 1V"o. 212 J~L"Y - .A.~G~S'T' 19&9 SE).KlfJ K·~PH ~l D .. 0004-88 . '12'101, ; AUGUST :6 '1 2 3 _' ---':~ ___~ _--I 4 5 6 ~ 8 ~ , 10' o )0. 20 . .In 00 •• of, a .d)'P4te IMt_on p.uenger·and· t;'a.J.n",a,n ••' g,.rdlng · t.an.f~r.th. p._ger ,Is ~.q~.te,d to "oy faro . and In'ihg ' t·'.,nsl.,'. t9 th"olfico Of th~ T;:a na ~ portatlon. AS,slotant, , 200 'E'lect,lc R·a .flw'ay Cliambors, ~"\ ilP.H..." ·'-bJov.' . pORTAGE ZO~E . -,' '. ' . '-' . "U'IO'jo". OIr(I..M'g~ 11 ' 007'56 0 '" 1./, .1\. 'll/ AUGUST ,6 ., El I , , \ I '. ' CARS OF THE WINNIPEG ELECTRIC RAILWAY 1881 ~ 1903 GeorC]8 IIClrris T he first record of rublic street trans­ portation in Winnipeg,ManitobCl,Canada , W88 made on the 19th. of July,1f177,I~hen an omnibus route was nroj,ected from Hig­ qins to McDermot Avenue8,on Main Street. The settlement of some 2,000 peonle was very stragnling and some means of get­ ting from the village on Point Douglas to the settlement around the Hudson Hay Comnany's post,near the Forks of the Rivers,wCls very necessary. This first nlRn,holdever,l~a8 an Abortive atternpt and lasted only one dayl It was not until Anril in 1H01 that an enterprisinq young man from the neighbouring province of Dntario,hy the nama of W.A.Austin, actually qot a frcmchisa,laid tracks and started R horsa-drRI~n transit system.
    [Show full text]
  • Fichetechnique REM Mesures D'attenuation ANGLAIS
    REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNYG Y MASCOUCHEUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNESNES TERMINAL S H U T T 15 L E MONTRÉALMMOONTRRÉAL- ESST 25 LAVAL 30 30 640 440 BUS SHUTTLE E 140 IN L E BOUCHERBOUCHB CHERVILLEVIV E H C 40 SAUVÉ U 20 Bus terminal O STATION C MONMOONNTRÉALNTTRÉA S A RADISSON Train station M STATION Metro station AHUNTSIC LOLONGUEUILN U STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) → or line 140 from Lachenaie to the Radisson station (±60 min) → or bus shuttle from the Terrebonne station to the Radisson station (±35 min) → or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) 2 Walk to the Sauvé1 metro station ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 → or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne
    [Show full text]
  • Fichetechnique REM Mesures D'attenuation ANGLAIS 2
    REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNYG Y MASCOUCHEUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNESNES TERMINAL S H U T T 15 L E MONTRÉALMMOONTRRÉAL- ESST 25 LAVAL 30 30 640 440 BUS SHUTTLE E 140 IN L E BOUCHERBOUCHB CHERVILLEVIV E H C 40 SAUVÉ U 20 Bus terminal O STATION C MONMOONNTRÉALNTTRÉA S A RADISSON Train station M STATION Metro station AHUNTSIC LOLONGUEUILN U STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) → or line 140 from Lachenaie to the Radisson station (±60 min) → or bus shuttle from the Terrebonne station to the Radisson station (±35 min) → or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) 2 Walk to the Sauvé1 metro station ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 → or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne
    [Show full text]
  • The Oxford Democrat : Vol. 73. No.19
    The Oxford Democrat. VOLUME 73. SOUTH PARIS, MAINE, TUESDAY, MAY 8, 1906. NUMBER 19. ho s tin tnat m tue wan shimmer of tht Crallcy, so flint I could help to irnke i c. JONES, The Hired Man Question. East Oxford Local Union. AMONG THE FARMERS. £0* faded afterglow one might have pawed surer that he'd come beck to yuu. Bu An Aoirpal Story For ^ The annual meeting of the East Oxfon and Machinist, close bj her and not hare teen her I've only annoyed you. And you wen • Smith Local Union of T. P. S. C. £. will b \ Utile Polks MAINE. " SPKKU Τ HI PLOW." FARMERS1 CAPACITY FOR MANAGIN< The dark folds of her show- here— fro;n the SOUTH PARIS, held with the a long, gown awny house—avoldlnj e Congregational Society Manufacturer of general machinery, steam HELP.—ONE MAN WORKS AT DISAD Mechanic and Wednes ed faintly against the gray stone, and me and fearing that I"— mill work, «pool and tool *. Falls, Tuesday machinery on e VANTAGE. her bare from the rows, tape, lies act drille made ai ,J Correepou'U'nce pracllc&J agricultural topic 8-9. as follows: arms, elbow, la; "Vanrevel!" shouted William. (Mrs •., set u «oUclfaxl Aililreee all communications li day, May Programme mowing and threshing m across the face of the dial unr» iiâlre'l· sewla©·. tended for this TUESDAY MORNING. with Tanberry lud not told Lii?utenani all kinds, presses, guns department to Hkmby I The Tale of a Kicker chine*· pi pump·of and r e_ H&vmonu, Agricultural Editor Oxford Den la Devotional lazed fingers clinching the cornice; hei where to find Mies 4 knives, traps, etc., neatly promptly The question of hired help agaii 111.00.
    [Show full text]
  • Horaires Et Trajet De La Ligne ORANGE De Métro Sur Une Carte
    Horaires et plan de la ligne ORANGE de métro Station Côte-Vertu Voir En Format Web La ligne ORANGE de métro (Station Côte-Vertu) a 4 itinéraires. Pour les jours de la semaine, les heures de service sont: (1) Station Côte-Vertu: 00:02 - 23:55 (2) Station Henri-Bourassa: 08:34 (3) Station Montmorency: 00:00 - 23:53 Utilisez l'application Moovit pour trouver la station de la ligne ORANGE de métro la plus proche et savoir quand la prochaine ligne ORANGE de métro arrive. Direction: Station Côte-Vertu Horaires de la ligne ORANGE de métro 31 arrêts Horaires de l'Itinéraire Station Côte-Vertu: VOIR LES HORAIRES DE LA LIGNE lundi 00:08 - 23:55 mardi 00:02 - 23:55 Station Montmorency Rue Lucien Paiement, Laval mercredi 00:02 - 23:55 Station De La Concorde jeudi 00:02 - 23:55 1200 Boulevard De La Concorde Ouest, Laval vendredi 00:02 - 23:55 Station Cartier samedi 00:02 - 23:59 Station Henri-Bourassa dimanche 00:09 - 23:58 575 Boulevard Henri-Bourassa Est, Montreal Station Sauvé 9961 Rue Berri, Montreal Informations de la ligne ORANGE de métro Station Crémazie Direction: Station Côte-Vertu #545 Boulevard Crémazie, Montreal Arrêts: 31 Durée du Trajet: 47 min Station Jarry Récapitulatif de la ligne: Station Montmorency, 8086 Rue Berri, Montreal Station De La Concorde, Station Cartier, Station Henri-Bourassa, Station Sauvé, Station Crémazie, Station Jean-Talon Station Jarry, Station Jean-Talon, Station Beaubien, 505 Rue Jean-Talon Est, Montreal Station Rosemont, Station Laurier, Station Mont- Royal, Station Sherbrooke, Station Berri-Uqam, Station Beaubien
    [Show full text]