An Innovative Model, an Integrated Network
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Fichetechnique REM Mesures D'attenuation ANGLAIS
REM MITIGATION MEASURES Deux-Montagnes area 9 TowaVersrss rd SAINTAAIN - JÉRÔMJÉJÉÉRRÔMEME 15 2020 440 59 40 BLAINVILLEBLA E SAINT-EUSTACHE LAVAAVAVVAAL 25 TERMINAL 15 9 MONTMORENCY Weekends 640 59 STATION MONTRMONTRÉALTTRRRÉARÉÉÉAAL 4 40 8 20 8 440 40 DEUX-MONTAGNES STATION Weekends BOIS-FRANC 640 STATION LONGUEUONGNGUEUILU L 964 CÔTE-VERTU STATION Bus terminal GRAND-MOULIN BONAVENTURE STATION RAIL SHUTTLE 404 STATION Train station 13 Metro station Reserved lane 40 404 20 PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Rail shuttle from Deux-Montagnes to the Bois-Franc station (±25 min) 2 Shuttle 964 – Trainbus Bois-Franc/Côte-Vertu (±15 min) ±1 h 05* (See reverse side for more details) 3 Metro from the Côte-Vertu station to the Bonaventure station (±25 min) TRAVEL OPTIONS IMPROVED SERVICE – Line 8 from Saint-Eustache to the Montmorency station1 (±20 min) +30 min – Line 9 from Saint-Jérôme to the Montmorency station1 (±1 h 30 min) between the Montmorency1 and Bonaventure stations – Line 59 from Blainville to the Montmorency station1 (±50 min) } EXPRESS BUS SHUTTLE OPTIONS OFFPEAK AND WEEKENDS – Shuttle 404 from Deux-Montagnes to the Mansfield terminal (±1 h 05 min from 5 to 6 a.m.) (±50 min from 9 a.m. to 3 p.m. and from 7 p.m. to 1 a.m.) * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Deux-Montagnes area 2020 SHUTTLE 964 – Trainbus Bois-Franc/Côte-Vertu – Service on weekdays from 5:30 a.m. -
A Living History of Montreal's Early Jewish Community
A NEW LIFE FOR CANADIANA VILLAGE? $5 Quebec HeritageVOL 3, NO. 12 NOV-DEC. 2006 News The Bagg Shul A living history of Montreal’s early Jewish community The Street that Roared Why the fight to save Montreal milestone matters to Mile Enders Christbaum comes to Canada Decorated tree topped pudding at Sorel party Quebec CONTENT HeritageNews EDITOR President’s Message 3 CHARLES BURY School Spirit Rod MacLeod DESIGN DAN PINESE Letters 5 Opinion 6 PUBLISHER Wisdom of the rubber stamps Jim Wilson THE QUEBEC ANGLOPHONE HERITAGE NETWORK TimeLines 7 400-257 QUEEN STREET SHERBROOKE (LENNOXVILLE) One stop culture shop QUEBEC Taste of the world J1M 1K7 The unknown settlers PHONE A philanthropist’s legacy 1-877-964-0409 New owner, same purpose for Saguenay church (819) 564-9595 Canadiana Village changes hands FAX Tombstone rising 564-6872 C ORRESPONDENCE The Street that Roared 14 [email protected] Why the fight for Montreal milestone matters Carolyn Shaffer WEBSITE The Bagg Shul 17 WWW.QAHN.ORG Montreal’s early Jewish community Carolyn Shaffer Christbaum Comes to Canada 19 PRESIDENT Decorated tree topped pudding at Sorel party RODERICK MACLEOD Bridge to Suburbia 21 EXECUTIVE DIRECTOR Vanished English towns and the South Shore’s past Kevin Erskine-Henry DWANE WILKIN What’s in a Name? 22 HERITAGE PORTAL COORDINATOR Land of shrugs and strangers Joseph Graham MATHEW FARFAN OFFICE MANAGER Book Reviews 24 KATHY TEASDALE Adventism in Quebec The Eastern Townships Quebec Heritage Magazine is Cyclone Days produced on a bi-monthly basis by the Quebec Anglophone Heritage Network (QAHN) with the support of The HindSight 26 Department of Canadian Heritage and Quebec’s Ministere de la Culture et des Luck of the potted frog Joseph Graham Communications. -
AECOM Top Projects 2017
AECOM Top Projects 2017 #13 Turcot Interchange #6 Romaine Complex #59 Region of Waterloo ION LRT #53 Giant Mine Remediation #65 Lions Gate Secondary Wastewater Treatment Plant #82 Wilson Facility Enhancement and Yard Expansion AECOM Top Projects 2017 With $186.4 billion invested in Canada’s Top100 Projects of 2017, the country is experiencing record investment in creating AECOM Top Projects 2017 and improving public sector infrastructure from coast-to-coast. Those investments are creating tens of thousands of jobs and providing a foundation for the country’s growing economy. EDITOR In 2017, AECOM again showed why it is a leader in Canada’s Andrew Macklin infrastructure industry. In this year’s edition of the ReNew Canada Top100 projects report, AECOM was involved in PUBLISHER 29 of the 100 largest public sector infrastructure projects, Todd Latham one of just a handful of businesses to reach our Platinum Elite status. Those 29 projects represented just under $61.5 billion, close to one-third of the $186.4 billion list. ART DIRECTOR & DESIGN Donna Endacott AECOM’s involvement on the Top100 stretches across multiple sectors, working on big infrastructure projects in the transit, ASSOCIATE EDITOR energy, transportation, health care and water/wastewater Katherine Balpatasky sectors. That speaks to the strength of the team that the company has built in Canada to deliver transformational assets across a multitude of industries. Through these projects, AECOM has also shown its leadership in both putting together teams, and working as a member of a team, to help produce the best project possible for the client. As a company that prides itself on its ability “to develop and implement innovative solutions to the world’s most complex challenges,” they have shown they are willing to work with AECOM is built to deliver a better all involved stakeholders to create the greatest possible world. -
Griffintown Golroo Mofarrahi
Griffintown Golroo Mofarrahi Post-professional graduate program in Cultural Landscapes School of Architecture McGill University August 2009 Report Submitted in Partial Fulfillment of the Requirements of the Degree of Master ofArchitecture Golroo Mofarrahi, 2009 Abstract: This study originates from observation that urban neigh bourhoods are in continuous transition as the economy ebbs and flows. Residential neighbour- hoods will either collapse or redlined for new development as their residents start to move out (The Lure of the Local, 202). At the same time, coun- try towns are being abandoned, working class neighbourhoods are further ghettoized and steel towns are rusting in decay as “deserted downtowns con- trast with exurban building booms” (The Lure of the Local, 202). An example of this type of neighbourhood is Griffintown, which was once a working class neighbourhood squeezed between Saint Gabriel farm and the suburbs of Recollets and Victoria town in Montreal. Griffintown was an industrial and residential district. It was urbanised in the 19th century and gradually decayed through the 20th century. As an industrial district it saw the birth of very first large factories of Canada and was known as the industrial heartland of Canada. The area was of great interest to most developers, and various projects have been proposed for this area. This report addresses the follow ing question: How does the extent artefact system in Griffintown represent tangible evidence of the way of life before forced resettlement, and are there any artefacts worth preserving in Griffintown, an area slated for imminent development? I Résumé: Cette étude trouve son origine dans la notion selon laquelle les quartiers ur- bains sont engagés dans un cycle de croissance et de déclin soumis aux aléas de la conjoncture économique. -
2020 REM MITIGATION MEASURES Canora – Mont-Royal Area
2020 REM MITIGATION MEASURES Canora – Mont-Royal area Boul. Jules-Poitras oouu Boul.Boul de l'Acadie 15 ded l'Ac Boul.Bo Saint-Laurent Ch. Rockland Accadiec 92 as R Sai r ock ie land t-La iririeri ure Poi Av.Av du enent e P Boul.Bo Lair u ASTCADIEATION ddu Rue Poirie ul. Par STACADIEATION c ph LaL sep os d 40 t-Jo int Boul. Montpellier 919 Sa m l on ul. CÔTE-STATIONVERTU GGraaah MONTRÉALMMOONNTRRÉRÉALALL Boul.BoBoul Saint-Joseph SCÔTE-TATIONVERTU Boul.Bou Graham e MONTMOMONO T-RO-RROOYAYAL CANORAGARE CANORA/ / Av.A Sainte-Croix L v -L MONT-ROYAL Boul.B Laird ded am n O ham ou Boul. Marcel-Laurin -d ra oon O. STATION alo ulul. TTal ens ôtôte CCôt Boul.Bo Graham nn-T ai a C rce ean 92 d l-L Rue Hodge e la -LLLau e Je uul aur ue ne oul uurin Boul. Thimens rtu RueRu Jean-Talon 9 e 91 VeVVer Ch. de la Côte-de-Liess e-V at Ca C a C Ch.Ch. Lucerne Luce de la rn Sa t l.l de eti te- p Boul.Boul de la Côte-Vertu 165 t /4 Côt 65 Ch.C de la Côte- oont de Mon e des-Neigese ud s Pin es la C o -N CCô -H 9 eieeig u n tet Ch.C de la Côte-Sainte-Catherine e v. de 91 es li il Av.Av des Pins O. 92 GareGTrainare ddestatione train m 40 ul. a C Boul. Édouard-Montpeti ie o V GareClosed de train train station ferméefermée 165//465 StationSMetrotatio nstation dede métrométro VVoieReservedoie rréservéeéserv laneée STNAMURATION SCÔTE-DES-NEIGESTATION SNAMURTATION 15 STCÔTE-DES-NEIGESATION PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Shuttle 919 – Trainbus Acadie/Mont-Royal/Namur (±15 min) ±35 min* 2 Metro from the Namur station to the Bonaventure station (±20 min) SHUTTLE -
Mcgill Master Plan
DRA MASTERPLAN 2019 1 CREDITS + ACKNOWLEDGEMENTS McGill contributors: The Campus Planning and Development Office wishes to thank: Executive Director, McGill Teaching and Learning Services Campus Planning and Development Office (CPDO): Cameron Charlebois Facilities Management and Ancillary Services Manager, Master and Campus Planning (CPDO): Anna Bendix The McGill Office of Sustainability Senior Campus Planners The Office of the Dean of Libraries (Master and Campus Planning team, CPDO): Adam Dudeck (project coordinator) The Office of the Dean, Macdonald Campus Maxime Gagnon Kakwiranoron Cook, Special Advisor, Indigenous Initiatives Janelle Kasperski, Indigenous Education Advisor Project support (CPDO): Allan Vicaire, Associate Director, Student Services Director Stakeholder Relations: Dicki Chhoyang Space Data Administrator: Ian Tattersfield McGill Graphics, Communications and External Relations Manager, Special Projects and Planning: Geneviève Côté Senior Campus Planner (Development): Paul Guenther Joan Busquets, urban planner, BAU Barcelona, whose urban design study created for McGill in 2017 greatly informed this plan. Approved by the Board of Governors on May 23, 2019 MESSAGE FROM THE PRINCIPAL AND VICE-CHANCELLOR Dear Members of the McGill Community, At McGill University, we pride ourselves on having As we approach our third century, McGill is com- beautiful and vibrant campuses, both at Macdonald mitted to providing opportunities that open doors, and nestled in the heart of downtown Montreal. Our leading research that will change lives, fostering campuses are more than just a space for our class- innovation, and ensuring that our students are fu- rooms, libraries, labs, arts and sports facilities, and ture-ready. Our surroundings must therefore create student residences; they bring together all of these an environment that breeds collaboration, bold elements to create an ecosystem for growth and ideas, and critical thinking. -
Réseau Électrique Métropolitain (REM) | REM Forecasting Report
Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Prepared by: Prepared for: Steer Davies Gleave CDPQ Infra Inc. Suite 970 - 355 Burrard Street 1000 Place Jean-Paul-Riopelle Vancouver, BC V6C 2G8 Montréal, QC H2Z 2B3 Canada Canada +1 (604) 629 2610 na.steerdaviesgleave.com Steer Davies Gleave has prepared this material for CDPQ Infra Inc.. This material may only be used within the context and scope for which Steer Davies Gleave has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer Davies Gleave shall be deemed to confirm their agreement to indemnify Steer Davies Gleave for all loss or damage resulting therefrom. Steer Davies Gleave has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. Réseau Électrique Métropolitain (REM) | REM Forecasting Report Contents 1 Introduction ............................................................................................................................ -
M a C a S 2 0
M A C A S 2 0 1 9 Mathematics and its connections to the arts and sciences Program Faculty of Education McGill University Montreal, Quebec, Canada June 18 – 21, 2019 Table of Content Welcome to the 2019 MACAS Symposium .................................................................................... 3 International Program Committee (IPC) .................................................................................... 3 Local Organizing Committee (LOC) ............................................................................................ 4 Message from the International Program Committee (IPC) ...................................................... 5 Message from the Local Organizing committee (LOC) ............................................................... 6 Getting to the Venue ...................................................................................................................... 7 Getting to the Venue from the Airport ...................................................................................... 7 Getting to the Venue by Car ....................................................................................................... 8 Parking at the Venue .................................................................................................................. 9 Transit in Montreal: Metro ........................................................................................................ 9 Regarding the MACAS Symposium .............................................................................................. -
Cologix Montreal: Metro Connect Services Convenient, Simple Solution to Increase Access Across Data Centres Within a Metro Market
Cologix Montreal: Metro Connect Services Convenient, simple solution to increase access across data centres within a metro market Cologix’s Metro Connect is a low-cost product offering that extends Cologix’s dense network availability to customers regardless of data centre location within a market. Metro Connect is a fibre-based service that offers bandwidth of 100Mb (FastE), 1000Mb (GigE), or 10G and higher (Passive Wave). FastE and GigE services are delivered through a Cologix switch to the customer via a copper cross-connect. The Passive Wave offering provides a dedicated lambda over Cologix fibre that customers must light with their own network equipment. Customers are able to request one of two diverse routes for all three services. Cologix Montreal Metro Connect enables: Connections between Extended carrier and network A low-cost alternative to local Cologix’s 7 Montreal data choice loops centres Cologix’s Montreal Metro Connect product provides connections between the MTL1, Quick Facts: MTL2, MTL3, MTL4, MTL5, MTL6 and MTL7 data centres over shared dark fibre and Cologix-operated network equipment. The product comes in several different • Cologix operates confgurations to solve various customer requirements. All Metro Connect services include approx. 100,000 SQF across 7 a cross-connect within each facility to provide a complete end-to-end service. Montreal data centres • 2 pairs of 40-channel Cologix Montreal Metro Connect Map DWDM Mux-Demuxes (working and protect) enable 40x100 Gbps between each facility = 4Tbps Metro Optical -
Fichetechnique REM Mesures D'attenuation ANGLAIS
2020 REM MITIGATION MEASURES Montréal's east end area RIVIÈRE- DES-PRAIRIES SHERBROOKE/GOUIN STATION TERMINAL 25 VAVARENNESRENNN ANJOU 646400 SSTTAATION 9 44 POINTE- 30 LAVAL 0 AUX-TREMBLES 486 43 SSTTAATIOTIONN 440 OUCHE LINE 432 SC 40 0 SAINT-LÉONARD/ MA 41 MONTRÉAL-NORD STSTAATION 15 43 9 HONORÉ-BEAUGRAND 19 25 SSTTAATIOTIONN 44 9 RADISSON BOUCHERE VILLVI E SAINT-MICHEL/ 43 SSTTAATIOTIONN 2 BusBus terminalterminal MONTRÉAL-NORD 13 STATIOTIONN 9 43 20 TTrainrain station 9 CADILLAC SSTTAATIOTIONN MONTRÉAMOMO ÉÉAALAL MetroMetro stationstation 30 PIE-IX RReservedeserved lanelane AHUNTSIC towaVerseerrs rdlele STATIOTIONN CENTRE-CCEENENTRTRREE 430 0 SSTTAATIOTIONN VILLVILLLLE 41 LOLONGUEUILNGUE L TRAVEL OPTIONS RUSH HOURS (WEEKDAYS) POINTE-AUX-TREMBLES STATION - Line 410 – Express Notre-Dame to downtown - Line 430 – Express Pointe-aux-Trembles to downtown - Line 486 – Express Sherbrooke to the Honoré-Beaugrand station RIVIÈRE-DES-PRAIRIES STATION - Line 449 – Express Rivière-des-Prairies to the Radisson station SAINT-LÉONARD/MONTRÉAL-NORD STATION - Line 432 – Express Lacordaire to the Cadillac station SAINT-MICHEL/MONTRÉAL-NORD STATION - Line 139 – Pie-IX and Line 439 Express Pie-IX to the Pie-IX station* * Please note that major detours are planned northbound on lines 139 and 439 due to work related with the Pie-IX BRT (except from January to March as work will be suspended during winter) 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. 2020 REM MITIGATION MEASURES Montréal's east end area LAVAAVAVAAL 15 19 40 25 440 SAUVÉ SSTTAATIONTION MONMOMOONNTRÉALN RRÉÉÉAAALL MONTMORENCY MASCOUCHE LINE SSTTAATIONTION AHUNTSIC 13 SSTTAATIONTION LONGUEUILONNGGGUU UIL CENTRALE CÔTE-VERTU SSTTAATIONTION SSTTAATIONTION 520 134 TrainTrain stationstation 10 15 20 Metro stationstation 132 20 Mount Royal bypassbypass MASCOUCHE LINE EXTENSION MOUNT ROYAL BYPASS • 3 departures during the morning peak hours and 3 departures during the evening peak hours. -
BONAVENTURE Quartier Bonaventure Transportation Objectives: Environment
QUARTIER BONAVENTURE THE NEW MONTREAL Transformation of the Bonaventure Expressway, Phase 1 Summary of the Detailed Pre-project Design Studies, March 2009 QUARTIER BONAVENTURE THE NEW MONTREAL Transformation of the Bonaventure Expressway, Phase 1 Summary of the Detailed Pre-project Design Studies, March 2009 A city gateway to be redefi ned. Quartier Bonaventure A neighbourhood steeped in history, focused on the future The logo and signature represent drive and ambition by a moving line pointing towards the sky. The inter- secting lines demonstrate a determination to mend the east and west axes in order to create a true living environment in the heart of a historic site that will live once again. The colours represent the overriding presence of the St. Lawrence River and the need for the project to refl ect sustainable development. Finally, the contrast between dark blue and electric blue shows the balance between the strength of a structuring project for Montreal and the will to redefi ne this area in an imaginative and inspiring way, from both architec- tural and urban planning perspectives. Quartier Bonaventure CONTENTS PREFACE ° The Quartier Bonaventure: redefi ne Montreal of the future in an imaginative and inspiring way 1 ° The mission of the Société du Havre de Montréal : Bring the City to the St. Lawrence River 2 ° A project that has developed over time 3 SECTION 1 BACKGROUND ° A district at the centre of Montreal history 6 ° An urban reconstruction project inspired by the magic of its historic site 7 ° Creating Quartier Bonaventure -
Titre De La Présentation
RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN Fact sheets (Alignment optimization) Environmental Impact Study 0 Nom de la présentation Process and approach RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN (REM) • The Environmental Impact Study for the REM comprises thousands of pages, including three addenda. With a transparency objective in mind, CDPQ Infra has prepared several information documents summarizing the study to make the contents of the study more accessible: – A summary report on the study which shows the project’s evolution over the past few months; – A shorter summary setting out the main elements; and – Fact sheets showing the most recent changes in the project’s route. • The following fact sheets provide an overview of the most recent optimizations of the route, made since June. • Various fact sheets will be issued from time to time to track progress on the project and maintain ongoing dialogue. Environmental Impact Study – July 28, 2016 FACT SHEET 1 – Cultural heritage RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN (REM) Objective: prevent and minimize impacts on buildings with heritage potential caused by the connection between REM and Central Station in the Griffintown neighbourhood. The access to Central Station, using CN elevated tracks, allows the various branches to be connected in a single integrated network. • At present, the scenario analyzed for the construction of civil-engineering structures between Notre-Dame Street West and St. Paul Street West might require partial demolition of the rear section of the Rodier Building. • Other options that would avoid affecting this heritage building are however still being analyzed. • Optimization of the route in this sector has made it possible to avoid affecting the New City Gas Building, as well as various buildings in the block formed by Wellington-Ann-Brennan streets, eliminating the need for demolition of the Drummond-McCall Building*.