Fichetechnique REM Mesures D'attenuation ANGLAIS 2

Total Page:16

File Type:pdf, Size:1020Kb

Fichetechnique REM Mesures D'attenuation ANGLAIS 2 REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNYG Y MASCOUCHEUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNESNES TERMINAL S H U T T 15 L E MONTRÉALMMOONTRRÉAL- ESST 25 LAVAL 30 30 640 440 BUS SHUTTLE E 140 IN L E BOUCHERBOUCHB CHERVILLEVIV E H C 40 SAUVÉ U 20 Bus terminal O STATION C MONMOONNTRÉALNTTRÉA S A RADISSON Train station M STATION Metro station AHUNTSIC LOLONGUEUILN U STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) → or line 140 from Lachenaie to the Radisson station (±60 min) → or bus shuttle from the Terrebonne station to the Radisson station (±35 min) → or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) 2 Walk to the Sauvé1 metro station ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 → or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne areas LAVAAVAVAAL 15 19 40 25 440 2020 SAUVÉ STATION OUCHE MONMOMLINEOONNTRÉALN RRÉÉÉAAALL SC MONTMORENCY MA STATION AHUNTSIC 13 STATION LONGUEUILONNGGGUU UIL CENTRALE CÔTE-VERTU STATION STATION 520 134 Train station 10 15 20 Metro station 132 20 Mount Royal bypass (reverse side) REM MITIGATION MEASURES Repentigny/L’Assomption areas L,ASSOMPTIONT ON 40 2020 25 400 30 300 100 REPENTIGNYN MAM SCCOUCHEO HEE REPENTIGNY STATION TERREBONNEE 640 40 VARENNESNEES 15 0 25 40 LAVAL 300 30 MASCOUCHE LINE Train station 440 BUS SHUTTLE 100 Metro station RADISSON BOUCHERBOUCCH VILLEV L 20 19 MONTRÉALMONTRÉANT STATION PREFERRED ROUTES RUSH HOURS (WEEKDAYS) 1 Line 100 from L’Assomption (Saint-Gérard-Majella) to the Radisson station (±1 h 10 min) → or line 300 from Repentigny to the Radisson station (±30 min) → or line 400 from L’Assomption station to the Radisson station (±30 min) → or bus shuttle from Repentigny to the Radisson station (±35 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Repentigny station to the Sauvé station (±35 min) 2 Walk to the Sauvé1 metro station ±55 min* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 → or train line exo 5 Mascouche from the Repentigny station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 10 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Repentigny/L’Assomption areas LAVAAVAVAAL 15 19 40 25 440 2020 SAUVÉ STATION OUCHE MONMOMLINEOONNTRÉALN RRÉÉÉAAALL SC MONTMORENCY MA STATION AHUNTSIC 13 STATION LONGUEUILONNGGGUU UIL CENTRALE CÔTE-VERTU STATION STATION 520 134 Train station 10 15 20 Metro station 132 20 Mount Royal bypass (reverse side) REM MITIGATION MEASURES Montreal's east end RIVIÈRE- DES-PRAIRIES SHERBROOKE/GOUIN 2020 STATION TERMINAL 25 VAVARENNESRENNN ANJOU 640 STATION 9 44 POINTE- 30 LAVAL 0 AUX-TREMBLES 486 43 STATION 440 OUCHE LINE 432 SC 40 SAINT-LÉONARD/ 0 MA 41 MONTRÉAL-NORD STATION 15 43 9 HONORÉ-BEAUGRAND 19 25 STATION 44 9 RADISSON BOUCHERE VILLEVI SAINT-MICHEL/ 43 STATION 2 Bus terminal MONTRÉAL-NORD 13 STATION 9 43 20 Train station 9 CADILLAC STATION MONTRÉAMOMO ÉÉAALAL Metro station 30 AHUNTSIC towardVerseerrs lele PIE-IX Reserved lane STATION STATION CENTRE-CCEENENTRTRREE 430 0 VILLVILLLLE 41 LOLONGUEUILNGUE L TRAVEL OPTIONS RUSH HOURS (WEEKDAYS) POINTEAUXTREMBLES STATION - Line 410 – Express Notre-Dame to downtown - Line 430 – Express Pointe-aux-Trembles to downtown - Line 486 – Express Sherbrooke to the Honoré-Beaugrand station RIVIÈREDESPRAIRIES STATION - Line 449 – Express Rivière-des-Prairies to the Radisson station SAINTLÉONARD/MONTRÉALNORD STATION - Line 432 – Express Lacordaire to the Cadillac station SAINTMICHEL/MONTRÉALNORD STATION - Line 139 – Pie-IX and Line 439 Express Pie-IX to the Pie-IX station* AHUNTSIC STATION - Line 31 – Saint-Denis southbound to the Rosemont station (option for mobility-impaired users) - Line 121 – Sauvé to the Côte-Vertu station – Addition of 9 departures during the morning rush hours and 7 during the evening rush hours * Please note that major detours are planned northbound on lines 139 and 439 due to work related with the Pie-IX BRT (except from January to March as work will be suspended during winter) 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. FARE MEASURES Deux-Montagnes, Terrebonne and Mascouche areas 2020 MASCOUCHE 9 LINE MIRABELMIRMIRABM RRAAABBBEL Up to 30% discount 59 LAVALLLAAVVAAL DEUX-MONTAGNES9 5959 0 400440 LINE8 MONTRÉALMMOONNTTTRRÉAL FreeFree sshuttlehuttle 8 DEUX-MONTAGNES 400 STATION BOIS-FRANC STATION LONGUEUILLLOONGUEEUUIILL 964 CÔTE-VERTU STATION Free shuttle 964 DEUXMONTAGNES LINE MASCOUCHE LINE Free Up to 30% discount → Rail shuttle Deux-Montagnes/Bois-Franc → on the monthly pass fare → Shuttle 964 Bois-Franc/Côte-Vertu Minimum fare: $86.50 Current users 4 months free - as of January 2020 → With the annual subscription to the public transit service of the island of Montreal Monthly pass fare: $86.50 .
Recommended publications
  • Fichetechnique REM Mesures D'attenuation ANGLAIS
    REM MITIGATION MEASURES Deux-Montagnes area 9 TowaVersrss rd SAINTAAIN - JÉRÔMJÉJÉÉRRÔMEME 15 2020 440 59 40 BLAINVILLEBLA E SAINT-EUSTACHE LAVAAVAVVAAL 25 TERMINAL 15 9 MONTMORENCY Weekends 640 59 STATION MONTRMONTRÉALTTRRRÉARÉÉÉAAL 4 40 8 20 8 440 40 DEUX-MONTAGNES STATION Weekends BOIS-FRANC 640 STATION LONGUEUONGNGUEUILU L 964 CÔTE-VERTU STATION Bus terminal GRAND-MOULIN BONAVENTURE STATION RAIL SHUTTLE 404 STATION Train station 13 Metro station Reserved lane 40 404 20 PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Rail shuttle from Deux-Montagnes to the Bois-Franc station (±25 min) 2 Shuttle 964 – Trainbus Bois-Franc/Côte-Vertu (±15 min) ±1 h 05* (See reverse side for more details) 3 Metro from the Côte-Vertu station to the Bonaventure station (±25 min) TRAVEL OPTIONS IMPROVED SERVICE – Line 8 from Saint-Eustache to the Montmorency station1 (±20 min) +30 min – Line 9 from Saint-Jérôme to the Montmorency station1 (±1 h 30 min) between the Montmorency1 and Bonaventure stations – Line 59 from Blainville to the Montmorency station1 (±50 min) } EXPRESS BUS SHUTTLE OPTIONS OFFPEAK AND WEEKENDS – Shuttle 404 from Deux-Montagnes to the Mansfield terminal (±1 h 05 min from 5 to 6 a.m.) (±50 min from 9 a.m. to 3 p.m. and from 7 p.m. to 1 a.m.) * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Deux-Montagnes area 2020 SHUTTLE 964 – Trainbus Bois-Franc/Côte-Vertu – Service on weekdays from 5:30 a.m.
    [Show full text]
  • Griffintown Golroo Mofarrahi
    Griffintown Golroo Mofarrahi Post-professional graduate program in Cultural Landscapes School of Architecture McGill University August 2009 Report Submitted in Partial Fulfillment of the Requirements of the Degree of Master ofArchitecture Golroo Mofarrahi, 2009 Abstract: This study originates from observation that urban neigh bourhoods are in continuous transition as the economy ebbs and flows. Residential neighbour- hoods will either collapse or redlined for new development as their residents start to move out (The Lure of the Local, 202). At the same time, coun- try towns are being abandoned, working class neighbourhoods are further ghettoized and steel towns are rusting in decay as “deserted downtowns con- trast with exurban building booms” (The Lure of the Local, 202). An example of this type of neighbourhood is Griffintown, which was once a working class neighbourhood squeezed between Saint Gabriel farm and the suburbs of Recollets and Victoria town in Montreal. Griffintown was an industrial and residential district. It was urbanised in the 19th century and gradually decayed through the 20th century. As an industrial district it saw the birth of very first large factories of Canada and was known as the industrial heartland of Canada. The area was of great interest to most developers, and various projects have been proposed for this area. This report addresses the follow­ ing question: How does the extent artefact system in Griffintown represent tangible evidence of the way of life before forced resettlement, and are there any artefacts worth preserving in Griffintown, an area slated for imminent development? I Résumé: Cette étude trouve son origine dans la notion selon laquelle les quartiers ur- bains sont engagés dans un cycle de croissance et de déclin soumis aux aléas de la conjoncture économique.
    [Show full text]
  • 2020 REM MITIGATION MEASURES Canora – Mont-Royal Area
    2020 REM MITIGATION MEASURES Canora – Mont-Royal area Boul. Jules-Poitras oouu Boul.Boul de l'Acadie 15 ded l'Ac Boul.Bo Saint-Laurent Ch. Rockland Accadiec 92 as R Sai r ock ie land t-La iririeri ure Poi Av.Av du enent e P Boul.Bo Lair u ASTCADIEATION ddu Rue Poirie ul. Par STACADIEATION c ph LaL sep os d 40 t-Jo int Boul. Montpellier 919 Sa m l on ul. CÔTE-STATIONVERTU GGraaah MONTRÉALMMOONNTRRÉRÉALALL Boul.BoBoul Saint-Joseph SCÔTE-TATIONVERTU Boul.Bou Graham e MONTMOMONO T-RO-RROOYAYAL CANORAGARE CANORA/ / Av.A Sainte-Croix L v -L MONT-ROYAL Boul.B Laird ded am n O ham ou Boul. Marcel-Laurin -d ra oon O. STATION alo ulul. TTal ens ôtôte CCôt Boul.Bo Graham nn-T ai a C rce ean 92 d l-L Rue Hodge e la -LLLau e Je uul aur ue ne oul uurin Boul. Thimens rtu RueRu Jean-Talon 9 e 91 VeVVer Ch. de la Côte-de-Liess e-V at Ca C a C Ch.Ch. Lucerne Luce de la rn Sa t l.l de eti te- p Boul.Boul de la Côte-Vertu 165 t /4 Côt 65 Ch.C de la Côte- oont de Mon e des-Neigese ud s Pin es la C o -N CCô -H 9 eieeig u n tet Ch.C de la Côte-Sainte-Catherine e v. de 91 es li il Av.Av des Pins O. 92 GareGTrainare ddestatione train m 40 ul. a C Boul. Édouard-Montpeti ie o V GareClosed de train train station ferméefermée 165//465 StationSMetrotatio nstation dede métrométro VVoieReservedoie rréservéeéserv laneée STNAMURATION SCÔTE-DES-NEIGESTATION SNAMURTATION 15 STCÔTE-DES-NEIGESATION PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Shuttle 919 – Trainbus Acadie/Mont-Royal/Namur (±15 min) ±35 min* 2 Metro from the Namur station to the Bonaventure station (±20 min) SHUTTLE
    [Show full text]
  • CP's North American Rail
    2020_CP_NetworkMap_Large_Front_1.6_Final_LowRes.pdf 1 6/5/2020 8:24:47 AM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Lake CP Railway Mileage Between Cities Rail Industry Index Legend Athabasca AGR Alabama & Gulf Coast Railway ETR Essex Terminal Railway MNRR Minnesota Commercial Railway TCWR Twin Cities & Western Railroad CP Average scale y y y a AMTK Amtrak EXO EXO MRL Montana Rail Link Inc TPLC Toronto Port Lands Company t t y i i er e C on C r v APD Albany Port Railroad FEC Florida East Coast Railway NBR Northern & Bergen Railroad TPW Toledo, Peoria & Western Railway t oon y o ork éal t y t r 0 100 200 300 km r er Y a n t APM Montreal Port Authority FLR Fife Lake Railway NBSR New Brunswick Southern Railway TRR Torch River Rail CP trackage, haulage and commercial rights oit ago r k tland c ding on xico w r r r uébec innipeg Fort Nelson é APNC Appanoose County Community Railroad FMR Forty Mile Railroad NCR Nipissing Central Railway UP Union Pacic e ansas hi alga ancou egina as o dmon hunder B o o Q Det E F K M Minneapolis Mon Mont N Alba Buffalo C C P R Saint John S T T V W APR Alberta Prairie Railway Excursions GEXR Goderich-Exeter Railway NECR New England Central Railroad VAEX Vale Railway CP principal shortline connections Albany 689 2622 1092 792 2636 2702 1574 3518 1517 2965 234 147 3528 412 2150 691 2272 1373 552 3253 1792 BCR The British Columbia Railway Company GFR Grand Forks Railway NJT New Jersey Transit Rail Operations VIA Via Rail A BCRY Barrie-Collingwood Railway GJR Guelph Junction Railway NLR Northern Light Rail VTR
    [Show full text]
  • Réseau Électrique Métropolitain (REM) | REM Forecasting Report
    Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Prepared by: Prepared for: Steer Davies Gleave CDPQ Infra Inc. Suite 970 - 355 Burrard Street 1000 Place Jean-Paul-Riopelle Vancouver, BC V6C 2G8 Montréal, QC H2Z 2B3 Canada Canada +1 (604) 629 2610 na.steerdaviesgleave.com Steer Davies Gleave has prepared this material for CDPQ Infra Inc.. This material may only be used within the context and scope for which Steer Davies Gleave has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer Davies Gleave shall be deemed to confirm their agreement to indemnify Steer Davies Gleave for all loss or damage resulting therefrom. Steer Davies Gleave has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. Réseau Électrique Métropolitain (REM) | REM Forecasting Report Contents 1 Introduction ............................................................................................................................
    [Show full text]
  • Fichetechnique REM Mesures D'attenuation ANGLAIS 4
    REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNG Y MASCOUCHUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNENES TERMINAL S H U T T 15 L E MONTRÉAMMOONTRÉAR L- ESST 25 LAVAL 30 30 640 BUS SHUTTLE 440 E 140 IN L E H BOUCHEBOUCB CHERH RVILLEVIV E C 40 SAUVÉ U Bus terminal O 20 C STATION S MONMOONNTRÉALNTTRÉA A RADISSON M Train station STATION Metro station AHUNTSIC LOLONGUEUIN U L STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) or line 140 from Lachenaie to the Radisson station (±60 min) or bus shuttle from the Terrebonne station to the Radisson station (±35 min) or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) to the Sauvé1 metro station 2 Walk ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne
    [Show full text]
  • BONAVENTURE Quartier Bonaventure Transportation Objectives: Environment
    QUARTIER BONAVENTURE THE NEW MONTREAL Transformation of the Bonaventure Expressway, Phase 1 Summary of the Detailed Pre-project Design Studies, March 2009 QUARTIER BONAVENTURE THE NEW MONTREAL Transformation of the Bonaventure Expressway, Phase 1 Summary of the Detailed Pre-project Design Studies, March 2009 A city gateway to be redefi ned. Quartier Bonaventure A neighbourhood steeped in history, focused on the future The logo and signature represent drive and ambition by a moving line pointing towards the sky. The inter- secting lines demonstrate a determination to mend the east and west axes in order to create a true living environment in the heart of a historic site that will live once again. The colours represent the overriding presence of the St. Lawrence River and the need for the project to refl ect sustainable development. Finally, the contrast between dark blue and electric blue shows the balance between the strength of a structuring project for Montreal and the will to redefi ne this area in an imaginative and inspiring way, from both architec- tural and urban planning perspectives. Quartier Bonaventure CONTENTS PREFACE ° The Quartier Bonaventure: redefi ne Montreal of the future in an imaginative and inspiring way 1 ° The mission of the Société du Havre de Montréal : Bring the City to the St. Lawrence River 2 ° A project that has developed over time 3 SECTION 1 BACKGROUND ° A district at the centre of Montreal history 6 ° An urban reconstruction project inspired by the magic of its historic site 7 ° Creating Quartier Bonaventure
    [Show full text]
  • An Innovative Model, an Integrated Network
    RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN An innovative model, an integrated network / Presentation of the #ProjetREM cdpqinfra.com THE REM: A PROJECT WITH IMPACT The REM is a fully automated, electric light rail transit (LRT) system, made up of 67 km of dedicated rail lines, with 50% of the tracks occupying existing rail corridors and 30% following existing highways. The REM will include four branches connecting downtown Montréal, the South Shore, the West Island, the North Shore and the airport, resulting in two new high-frequency public transit service lines to key employment hubs. A team of close to 400 experts is contributing to this project, ensuring well-planned, efficient and effective integration with the other transit networks. All sorts of elements are being considered, including the REM’s integration into the urban fabric and landscape, access to stations and impacts on the environment. Based on the current planning stage, the REM would become the fourth largest automated transit network in the world, with 27 stations, 13 parking facilities and 9 bus terminals, in addition to offering: • frequent service (every 3 to 12 minutes at peak times, depending on the stations), 20 hours a day (from 5:00 a.m. to 1:00 a.m.), 7 days a week; • reliable and punctual service, through the use of entirely dedicated tracks; • reduced travel time through high carrying capacity and rapid service; • attention to user safety and security through cutting-edge monitoring; • highly accessible stations (by foot, bike, public transit or car) and equipped with elevators and escalators to improve ease of travel for everyone; • flexibility to espondr to increases in ridership, with the possibility of having trains pass through stations every 90 seconds.
    [Show full text]
  • Last Update: JUNE 19, 2020
    Last update: JUNE 19, 2020 City’s actions that provide food and support in public places Services Locations Schedule Additional information Outdoor Emilie-Gamelin (Ville-Marie) 7/7 : 8 am – 11 am Breakfast day centers 11 am – 1 pm Lunch (cold) Cabot Square (Ville-Marie) 7/7 : 8 am – 11 am Breakfast 11 am – 1 pm Lunch (hot) 1 h 30 pm – 2 h 30 pm Take-out sandwiches Place Jeanne-Mance 7/7 : 11 am – 1 pm Lunch (cold) Each site can accommodate 250 people per day; food and (Plateau Mont-Royal) intervention services Square Dézéry 7/7 : 8 am – 11 pm Breakfast 11 am – 1 pm Lunch (cold) 3250 St.Catherine East (Hochelaga-Maisonneuve) Place du Canada (Ville-Marie) 7/7 : 8 am – 11 pm Breakfast 11 am – 1 pm Lunch (cold) 7/7 : 8 am – 3 pm Indoor day Dawson College – 2100 Atwater Rest area near the Cabot Square center Street food distribution services Three mobile Downtown YMCA : Metro stations L’Anonyme and Dans la rue : RAP Jeunesse canteens Cremazie/Jarry : 12 :30 p.m. – 1 :15 Morgan/St.Catherine: 3:30 p.m.– AHUNTSIC operated by the p.m. 4:30 p.m. • Henri-Bourassa/Berri : 1:15p.m. – 2p.m. Downtown Jean-Talon : 1 :30 p.m.– 2 p.m. Langelier Station: 4:45 p.m.–5:30 • St-Laurent/Cremazie (under the Parc : 2:15 p.m. – 3 p.m. p.m. YMCA, Metropolitain) : 2:15p.m. – 3p.m. Radisson Station: 5:45 p.m. –6:15 L’Anonyme and Charlevoix: 3:30 p.m.– 4:00 p.m.
    [Show full text]
  • Buskers Underground: Meaning, Perception, and Performance Among Montreal’S Metro Buskers
    Buskers Underground: Meaning, Perception, and Performance Among Montreal’s Metro Buskers by Nicholas Wees B.A., University of Victoria, 2015 A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree of MASTER OF ARTS in the Department of Anthropology © Nicholas Wees, 2017 University of Victoria All rights reserved. This thesis may not be reproduced in whole or in part, by photocopy or other means, without the permission of the author. ii Supervisory Committee Buskers Underground: Meaning, Perception, and Performance Among Montreal’s Metro Buskers by Nicholas Wees B.A., University of Victoria, 2015 Supervisory Committee Dr. Alexandrine Boudreault-Fournier (Department of Anthropology) Supervisor Dr. Lisa M. Mitchell (Department of Anthropology) Departmental Member iii Abstract Supervisory Committee Dr. Alexandrine Boudreault-Fournier (Department of Anthropology) Supervisor Dr. Lisa M. Mitchell (Department of Anthropology) Departmental Member This thesis explores the practices, motivations, and sensorial experiences of Montreal’s metro buskers. By examining the lived experiences of ‘street’ performers in the stations and connecting passageways of Montreal’s underground transit system, I consider what it ‘means’ to be a metro busker from the perspective of the performers. Informed by my ethnographic fieldwork among metro buskers, I detail their performance practices, ‘staging’ strategies, uses of technology, bodily dispositions, and subjective perceptions in relation to the public, each other and the spaces of performance. In the process, I make visible—and audible—the variable and improvisational nature of busking practices, and how these are constituted in relation to the physical features of the performance sites. More broadly, I explore the co-productive relations between body and space, the sensorial experiences and spatial practices of everyday urban life, and the potential for moments of micro-social encounter and appropriations of spaces that are not designed to foster conviviality and creative engagement.
    [Show full text]
  • Bois-Franc Station — Rail Shuttle and Trainbus Shuttle 964 of the Société De Transport De Montréal (STM)
    Frequently asked questions Bois-Franc station — rail shuttle and Trainbus shuttle 964 of the Société de transport de Montréal (STM) ....... 3 1. How frequent will rail shuttle departures be? ................................................................................................................................................... 3 2. Will bus departures from the Bois-Franc station be coordinated with the arrival of rail shuttles? ................................................................... 3 3. How will boarding bus shuttles work at the Bois-Franc Station? ..................................................................................................................... 3 4. Will a bus boarding platform be built at the Bois-Franc station? ..................................................................................................................... 3 5. How long will bus shuttle 964 need to reach the Côte-Vertu metro station? ................................................................................................... 3 6. How will evening rush hours work, given that the rail shuttle will depart every 30 minutes? ........................................................................... 3 7. Can we park at the Bois-Franc station to use bus shuttles during the work? .................................................................................................. 4 8. Major work is planned at the Côte-Vertu metro station. How will users be impacted by the work? ...............................................................
    [Show full text]
  • ADS Chapter 522 Performance of Temporary Duty Travel
    ADS Chapter 522 Performance of Temporary Duty Travel in the U.S. and Abroad Partial Revision Date: 11/03/2020 Responsible Office: M/MS/TTD File Name: 522_110320 11/03/2020 Partial Revision Functional Series 500 – Management Services ADS 522 – Performance of Temporary Duty Travel in the U.S. and Abroad POC for ADS 522: Kenneth Hawkins, (202) 921-5022, [email protected] Table of Contents 522.1 OVERVIEW ................................................................................ 5 522.2 PRIMARY RESPONSIBILITIES ................................................ 5 522.3 POLICY DIRECTIVES AND REQUIRED PROCEDURES ........ 7 522.3.1 Travel Authorizations for Temporary Duty Travel................................. 7 522.3.2 E2 User Requests .................................................................................... 8 522.3.3 Preparation and Approval of TDY Travel Authorizations ..................... 8 522.3.4 Documents Required for TDY Travel Authorizations ......................... 10 522.3.5 Travel Prior to the Issuance of an Authorize Travel Authorization (Emergency Use Only) ........................................................................... 11 522.3.6 Amending an E2 Travel Authorization ................................................. 12 522.3.6.1 Cancelling an E2 Travel Authorization ..................................................... 13 522.3.6.2 An In-conjunction With Travel Authorization ............................................ 13 522.3.7 Ticket Changes .....................................................................................
    [Show full text]