45354-002: Building Climate Resilience in the Pyanj River Basin
Total Page:16
File Type:pdf, Size:1020Kb
ENVIRONMENTAL MONITORING REPORT _________________________________________________________________________ April 2021 Annual report Project No. 45354-002 Grant: G0352 Reporting period: 1 January 2020- 31 December 2020 TAJIKISTAN: "BUILDING CLIMATE RESILIENCE IN THE PYANJ RIVER BASIN" Component 1 and 2 (irrigation and flood management) (Financing by the Asian Development Bank) Prepared by the Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan (Project Implementation Unit) for the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily reflect the views of ADB's Board of Directors, its managers, or employees, and may in fact only be preliminary. When preparing any country program or strategy, financing any project, or by any indication or reference to a specific territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments regarding the legal or any other status of any of territories or districts ABBREVIATIONS ADB Asian Development Bank. ALRI Agency for Land Reclamation and Irrigation. CEP Committee on Environment Protection TABLE OF CONTENTS 1 INTRODUCTION ................................................................................................................................ 1 1.1 Purpose of the report ................................................................................................................. 2 2 ENVIRONMENTAL MONITORING ................................................................................................. 2 2.1 Soil salinization and groundwater level in the project areas, humus content in the project areas ............................................................................................................................................ 3 2.2 Population health statistics in project areas ........................................................................... 4 2.3 Grievance Redress mechanism ............................................................................................... 6 3 Conclusion ......................................................................................................................................... 6 Annex 1. Information on soil salinity and groundwater level in the pilot districts of Pyanj, Vose, Kulyab, Darvoz, Vanj, Rushan, Roshtkala Ishkoshim as of December 31, 2020 ......... 7 ANNEX 2. Data of the State Institution for Land Reclamation and Irrigation of the Pyanj region........................................................................................................................................................... 9 ANNEX 3. Statistics on public health in the project areas for 2020. ......................................... 10 1 INTRODUCTION 1. The objective of the Project "Building Climate Resilience in the Paynj River Basin" (Project No. 45354-002 G0352), by the Government of the Republic of Tajikistan with the support of the Asian Development Bank, is the reduction of adverse effects of climate variability and climate change in the Pyanj River Basin. 2. The Project comprises four Parts as follows: Part A - Flood Protection; Part B – Irrigation; Part C - Water Supply; and Part D – Microfinance. This monitoring report covers Part A and Part B, while another monitoring report covers Part C. There is no environmental impact anticipated from Part D. 3. Part A - Flood Protection consists of below components; (a) Rehabilitation, upgrading and construction of flood and mud-flow protection infrastructure in the Pyanj River Basin. (b) Provision of capacity building for local MLRWR officers, communities and disaster risk management committees in the areas of flood protection infrastructure maintenance, early flood warning communication, disaster risk management and adaption to the adverse impacts of climate change. 4. Part B - Irrigation consists of below components; (c) Rehabilitation, upgrading and construction of irrigation canals and network systems in the Pyanj River Basin. (d) Piloting of a drip irrigation scheme in the Pyanj River Basin. (e) Provision of capacity building for local MLRWR officers and communities in the areas of water resources management and climate resilient agricultural practices and to strengthen water user associations. 5. The irrigation component of the project includ the rehabilitation of flood protection infrastructure in 10 jamoats and protection of irrigation systems in 8 jamoats in 8 pilot districts: Pyanj, Vose, Kulyab, Darvaz, Vanj, Rushan, Roshtkala and Ishkoshim. 6. The implementation agency of Part A and Part B is the Agency for Land Reclamation and Irrigation (ALRI) under the Government of the Republic of Tajikistan, under which the Project Management Office (PMO) has been established. The construction supervision consultant (CSC) was CC Eptisa. 7. ALRI was supposed to prepare and submit such monitoring report semi-annually, however, a report was not prepared for January-June 2020, therefore this report covers two monitoring periods; January – June 2020 and July – December 2020. 8. For Part A and Part B, there were 7 contractors in total. The completion dates of each subproject and their warranty periods are shown in Table 1. Table 1. Data on the period of implementation of subprojects Expiration Date of Date of date of the Description of sites Contractor contract completion warranty signing period Rehabilitation, modernization and climate resilient irrigation systems and flood LLC "Behbudi" 2016.22.02 2017.22.02 February 2018 protection infrastructure in Pyanj region Rehabilitation, modernization and climate resilient irrigation systems and flood LLC 2016.22.04 2017.15.10 October 2018 protection infrastructure / target areas of «Mostotryad" Vose Rehabilitation, modernization and climate resilient irrigation systems and flood LLC November 2016.23.05 2017.06.11 protection infrastructure / target districts of "Umed-1" 2018 Vose and Kulyab 1 Rehabilitation, modernization and climate resilient irrigation flood protection LLC 2016.18.03 2017.18.08 Аugust 2018 infrastructure for Rushan, Darvaz and Vanj «Jovid" districts Rehabilitation, modernization and climate LLC resilient irrigation flood protection "Кupruksosii 2016.31.10 2018.31.03 Мarch 2018 infrastructure for Roshkala and Ishkoshim Paivand" districts Rehabilitation and modernization of LLC November pumping stations Pogranichnik 0 and 1 in 2017.27.11 2017.27.11 "Sobir SAM" 2018 the river. Pyanj "Rehabilitation and cleaning of the Roharv river bed and reconstruction of the Bovid December LLC "Jovid" 2018.09.04 2018.09.12 siphon in the Bovid village of the Vanj 2019 region" "Flood protection of Sari Angur village in A. LLC 2018.05.04 2019.05.06 June 2020 Rudaki jamoat, Vose district" "Umed-1" "Construction of a demonstration area for drip irrigation (10 hectares) in the Pyanj LLC "Rohat" 2018.08.07 2019.03.07 July 2020 region" 9. A grievance redress mechanism was established at all project sites and stakeholders were consulted to keep them informed of the progress of the project. 1.1 Purpose of the report 10. This report includes information on environmental monitoring in the project areas during the operation and maintenance phase from January to December 2020. 11. The location of the project sites in country scale is shown on the map below. Map 1. Location of project sites in country scale 2 ENVIRONMENTAL MONITORING 12. All construction works were completed in March 2019. 2 13. It should be noted that all completed facilities are located at a great distance from settlements and during the operation phase, noise and vibration of pumping units do not have a negative impact on the local people, since they are located in closed areas and operate only during the irrigation season. 14. According to the Monitoring Plan developed for the operational phase, it was necessary to monitor the following parameters: 1) soil salinity and humus content in the zone of rehabilitated irrigation schemes within the project; 2) the level of groundwater in the project areas; 3) statistics on the health of the population in the project areas. 15. In addition, ALRI monitored the GRM functioning in all project districts. 2.1 Soil salinization and groundwater level in the project areas, humus content in the project areas 16. During the reporting period (January-December 2020), according to the confirmation of the environmental authorities of the project areas, operational work did not have an additional impact on the pollution of water sources. According to the State Institution "Supervision of Land Reclamation and Water Use" in the project areas, soil salinity is insignificant in the Pyanj and Vose districts, and in Kulyab, Darvaz, Vanj, Rushan, Roshtkala and Ishkoshim. Soil salinization was not observed, and the land reclamation is considered as satisfactory. Groundwater levels are mainly located at a depth of more than 2 m, which does not cause the soil salinization process. The humus content has not changed (see Annex 1). 17. Since the project facility came into operation, specialists-observers of the State Institution for Supervision of Land Reclamation and Water Use under ALRI have been measuring the groundwater level 3 (three) times a month at observation amelioration wells located in all districts of Tajikistan with irrigation agriculture and enter the data into the groundwater measurement log. This organization is authorized to observe and monitor the level of groundwater in observation