Building Climate Resilience in the Pyanj River Basin
Total Page:16
File Type:pdf, Size:1020Kb
Bi-annual Environmental Monitoring Report April 2017 Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Prepared by the Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan The bi-annual environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. BI-ANNUAL ENVIRONMENTAL MONITORING REPORT ______________________________________________________________ Project Number 45354-002 G0352 Grant: G0352 Reporting period: July – December 2016 TAJIKISTAN: «BUILDING CLIMATE RESILIENCE IN THE PYANJ BASIN» Component 1 и 2 (Irrigation and flood management) (Financed by the Asian Development Bank) Prepared by the Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan (Project implementation center) for Asian Development Bank. This environmental monitoring report is a borrower's document. The views expressed here do not necessarily reflect the views of the ADB Board of Directors, its managers or employees, and can in fact bear only a preliminary nature. In preparing any country program or strategy, financing a project, or by any indication or reference to a particular territory or geographical area in this document, the Asian Development Bank does not intend to make any judgments about the legal or any other status of any of the Territories or areas January 2017 1 The Agency for amelioration and irrigation under the Government of the Republic of Tajikistan Project Implementation Center (PIC) BCRIPB BIANNUAL PROJECT PROGRESS REPORT ON ECOLOGY for 6 months (from 1 July to 31 December 2016) "BUILDING CLIMATE RESILIENCE IN THE PYANJ BASIN, TAJIKISTAN" Components 1 and 2 (Grant 0352-TAJ) Dushanbe, 2016 2 Content I INTRODUCTION 6 1.1 Project description 6 1.2 Objectives and methodology of the biannual progress report 7 1.3 Review of the project 7 1.4 Changes in project organization and the environment management team 8 1.5 Contract - Construction Supervision Services 11 1.6 Interaction with the Contractor, owners, etc. II Information on the progress of quality control. 11 2.1 Restoration of irrigation systems, collector-drainage network and pumping 12 station Baytudasht №0-jamoats Namun, Mehvar, K. Sayfuddinov and Nuri Vaidat of the Panj district of Khatlon region 2.2 A report on the progress of the inspection and audit in the pilot area of 15 construction and rehabilitation works on bank protection on Dagana sai in jamoats Dagana and Ziraki of Kulyab district. 2.3 Report on the inspection and audit in the pilot area of construction and 19 rehabilitation works of bank protection structures on the rivers Yakhsu, Kyzylsu and single-span Bridge in jamoats M. Mahmadaliyev and in Rudaki Vose district 2.4 Construction and restoration works for bank protection structures along the 24 rivers of devdar, Vishavr and Pyanj as well as irrigation system in jamoats Kalayhumb Vishkharv Darvaz district (GBAO) 2.5 Restoration of bank protection structures, cleaning of the channel and 28 irrigation network in jamoats "Chovidon" and "Vodhud" Vanjsky district (GBAO) 2.6 Restoration of the irrigation network and construction and restoration work 32 on bank protection structures in the Jamoat Dodhudoeva Rushan district (GBAO) III ENVIRONMENTAL MONITORING 34 3.1 Noise and vibration 34 2.2 Water quality 35 3.3 Air Quality 35 3.4 Monitoring of flora and fauna 35 3.5 Hygiene, health and safety, and HIV-AIDS monitoring 36 1Y ENVIRONMENTAL MANAGEMENT 36 4.1 The Environmental Management System (EMS), the Environmental Management Plan for a specific facility (MEMP) and work plans 4.2 Preparation of reports on environmental assessment and environmental 37 management plans for additional work 4.3 Field inspections and audits 39 4.4 Notifications of non-compliance 39 4.5 Corrective action Plans 40 4.6 Consultations and complaints 44 Annex 1. Checklist for environmental audit of completed construction works Annex 2. Noise measurement format 3 MAPS Map 1. Location of pilot sites 8 Map 2. The scheme of bank protection structures of Kulyabsky area 16 Map 3. The scheme of the irrigation system of Vose district 20 Map 4. The scheme of the Darvaz river system 25 Map 5. The scheme of the river system of the Vanj district 28 Map 6 The scheme of the river system of the Rushan district 32 DRAWINGS Drawing 1. Institutional scheme of the organization on security policies 9 (protective measures) for the environment. Drawing 2 The scheme of the irrigation, collector-drainage network of the 13 Pyanj district Drawing. 3 Scheme of the connection of the coast-protecting structures in 25 Viskharv in the jamoat "Vishharv" daira Visharv. Drawing. 4. Scheme of connection of bank protection structures in Kish. 28 Vakhdat of the No. 1 site of the Volzhsky District TABLES Table 1. Progress of construction works for the reporting period - Kulyab 16 district Table 2. Progress of construction works for the reporting period – Vossey 20 district Table 3. Progress of construction works for the reporting period – Darvaz 25 district Table 4. Progress of construction works for the reporting period – Vanch 28 district Table 5. 33 Progress of construction works for the reporting period – Rushan district Table6. Notifications of non-compliance 39 Table 7. Corrective action plan for July-December 2016 40 4 ABBREVIATIONS ADB Asian Development Bank. AAI Agency for Amelioration and Irrigation BPA Bank Protecting Activities BPS Bank Protecting Structures CDN Collector and Drainage Network CEP Committee for Environment Protection CC EPTISA Consulting Company Eptisa DI Drip Irrigation DDAI District Department for Amelioration and Irrigation EIA Environment Impact Assessment EAP Environment Action Plan EMP Environmental Management Plan EMP Environmental Management Plan. EP Environment Protection EA Executive Agency IN Irrigation Network IEE Initial Environmental examination MoA Ministry of Agriculture ME Monitoring and Evaluation NGO Non-government Organization NDRMC Natural Disaster Risk Management Committee OM Operation and Management PIC Project Implementation Centre PMO Project Management Office SEE State Ecological Expertise SSEMP Site-Specific Environmental Management Plan SLMC State Land Management Committee. WUA Water Users Association. WUA Water Users Association 5 I. INTRODUCTION 1.1. Project description 1. This second semi-annual report on environmental monitoring for the reporting period from July to December 2016 covers Panj, Vose, Kulyab, Darvaz, Vanj and Rushan districts, which are pilot areas of the ADB project "Building Climate Resilience In The Pyanj Basin" (Grant 0352 ) For component 1 and 2 - irrigation and flood management. 2. The project aims to increase the resilience of the communities located in the Pyanj River Basin to climate vulnerability and climate change. The project consists of four components: (i) more sustainable flood protection systems, including the rehabilitation of a small flood management infrastructure and building the capacity of disaster risk management committees; (ii) more sustainable irrigation systems, including rehabilitation of small irrigation infrastructure and capacity building of water user associations; (iii) more sustainable drinking water supply systems, including rehabilitation of drinking water infrastructure in highly vulnerable communities and building the capacity of water user groups; And (iv) a microfinance component to provide financial services to vulnerable groups, especially women, and promote climate resilience. 3. Funding includes the following project components Component 1. Restoration of infrastructure for flood protection and its climate resistance in 10 jamoats. Component 2. Climatic protection of irrigation systems in 8 jamoats. 4. Monitoring is carried out in accordance with environmental action plans (EMP / MEMP) and ADB's environmental safety policies, as well as environmental legislation of the Republic of Tajikistan. 5. This report describes the results of monitoring the construction work carried out during the last 6 months of 2016. 6. Environmental monitoring consists of the following two parts: (1) monitoring compliance with the environmental management plan (EMP / MEMP or MEMP) to review the conditions necessary for compliance during the construction phase of the project; And (2) monitoring of environmental conditions. The EMP compliance assessment began with a review of the environmental management conditions required for compliance during the construction phase of the project. 7. The Executive Agency (EA) is the Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan. The EA established the Project Management Center (PMC) to manage, on a daily basis, the coordination, monitoring and organizational arrangements of the project. 1.2. Goals and methodology of the report 8. The purpose of the report for 6 months of environmental monitoring is to monitor the compliance of the project activity with the requirements of the EMP and also meet the environmental protection requirements of the Republic of Tajikistan and the Asian Development Bank (ADB) registered in the loan