Utbyggingsprosjekter Vestfoldbanen APRIL 2017

Total Page:16

File Type:pdf, Size:1020Kb

Utbyggingsprosjekter Vestfoldbanen APRIL 2017 Vestfold Line Projects Supplier Meeting 2019-04-04 Agenda • Overview Vestfold Line Projects ‒ UDK ‒ UNB • Future tenders 2 Gulskogen Current and future projects on the Vestfold Line • Kobbervikdalen-Skoger 1995 • Skoger-Holm 2001 • Nykirke passing loop 2002 • Barkåker – Tønsberg 2011 • Holm-Nykirke opened 2016 • Farriseidet – Porsgrunn opening 2018 • Nykirke – Barkåker 2024 • Drammen-Kobbervikdalen 2025 • Stokke-Sandefjord 2028 ? • Tønsberg-Larvik 2032 ? • Porsgrunn-Skien 2032 ? • Grenland Line 2034 ? 3 Project Nykirke – Barkåker • Time: 2019-2024 • 12 km double track • Two turnkey contracts for ground work and railway engineering, respectively • Suppliers have been qualified and the competition is taking place during the spring of 2019 Future competitions: • Depositioning Tønsberg 2022 • Track works Tønsberg 2022 (JBT/Signalling) Project Drammen – Kobbervikdalen Main facts • Time: 2019-2025 • Planning phase: Construction start / Investment decision • 12 km double track from Drammen to Kobbervikdalen • Renovation of Drammen station • 850 metre concrete tunnel - open construction pit • 275 m soil tunnel • 6 km rock tunnel • Preliminary cost estimate approximately NOK 12 billion NOK The project in general • Challenging construction works ‒ Urban area ‒ 5 main construction phases – 32 sub- phases ‒ Railway operations during construction • Requires good interaction between the client and contractors before and during the implementation phase ‒ This will be important during the selection of contractors • Tender for Vestfold Line (2024) • Tender for Sundhaugen – Gullskogen (2025) 7 Contract strategy UDK 8 Contract strategy UDK 9 UDK 33 Preparatory ground and technical works Construction contract Scope of contract: • Various ground works and railway engineering works, including west of Rødgata, Gulskogen station, Nybyen, Sundhaugen, Kreftingsgate and Drammen station, etc. ‒ Reconstruction of culvert at Kreftingsgate ‒ Conduits ‒ Pipe pressing ‒ Demolition of railway facilities Activity Guideline dates Competition to be announced (one step) 01.07.2019 Due date for tenders 01.10.2019 Signing of the contract 01.02.2020 Start of work Spring 2020 10 UDK 05 Track/OCL – Drammen station - Sundhaugen and tunnels Construction contract Scope of contract: • Tracks and catenary system on the section between Drammen station - Sundhaugen and in the tunnel on the Vestfold Line ‒ Approx 1 km double track to Sundhaugen ‒ 6 tracks at Drammen station ‒ Approx. 7 km double track tunnel ‒ Temporary depositioning at Nybyen - approx. 10 tracks of 240 metres ‒ Demolition of railway facilities at Skamarken Activity Guideline dates Competition to be announced (pre-qualification) 01.04.2020 Deadline for applications for qualification phase 15.05.2020 Due date for tenders 01.10.2020 Signing of the contract 10.01.2021 Start up/interaction phase Q1 2021 Start of work Spring 2021 11 UDK 06 Electrical/Telecommunications (high and low voltage) Construction contract Scope of contract: • Electrical and telecommunications work on the section between Drammen station - Gulskogen station and in the tunnel on the Vestfold Line and surface zone at Skoger ‒ Technical installations in 10 technical buildings and some niches ‒ Point heating for approx. 80 trains ‒ 7 km of tunnel/culvert, installation of hand rails/emergency lighting ‒ Lighting and conduits to be installed on the ceiling of evacuation tunnels, in additional to radiation cables for approx. 2 km • Telecoms ‒ 4x4 MIMO in tunnel, 2 telecom masts ‒ KARI (public communications system in stations) Activity Guideline dates Competition to be announced (pre-qualification) 01.04.2020 Deadline for applications for qualification phase 15.05.2020 Due date for tenders 01.10.2020 Signing of the contract 10.01.2021 Start up/interaction phase Q1 2021 Start of work Spring 2021 12 UDK 07 Signal NSI-63 Construction contract Scope of contract: • Adaptation and modification of NSI-63 system in stations and on section between Drammen and Gulskogen stations across 3 main phases • Signalling at Nybyen - temporary stabling • Interface Sundland • Relaying of cables Drammen – Gulskogen Activity Guideline dates Competition to be announced (pre-qualification) 01.04.2020 Deadline for applications for qualification phase 15.05.2020 Due date for tenders 01.10.2020 Signing of the contract 10.01.2021 Start up/interaction phase Q1 2021 Start of work Spring 2021 13 UDK 10 Tracks/Caternary system Sundhaugen – Gulskogen Station Construction contract Scope of contract: • Tracks and catenary/OCL system on the section between Sundhaugen – Gulskogen station ‒ Double track and single goods line of approx. 2 km ‒ 4 tracks at Gulskogen station • Tender is currently scheduled to 2022 14 UDK 11 Catenary system/Auto transofmrs Kobbervikdalen – Holm EPC contract Scope of contract: • Catenary/OCL system on the section Kobbervikdalen - Holm ‒ Existing double tracks of approx. 15 km (operational line) ‒ Replacement of catenary system for approx. 4 km ‒ Reinforcement of power supply (AT) 15 km Activity Guideline dates Competition to be announced (one step) 01.07.2020 Due date for tenders 01.10.2020 Signing of the contract 01.02.2021 Start of work Spring 2021 15 Information • Contact details UDK • Contact details UNB Eirik Harding Hansen Per Gunnar Johansen Head of Contracts and Procurements Head of Contracts and Procurements Drammen-Kobbervikdalen (UDK) Nykirke-Barkåker (UNB) Mobile: +47 932 49 943 Mobile: +47 474 74 080 Email: [email protected] Email: [email protected] • Information on our website: • Information on our website: https://www.banenor.no/Prosjekter/prosjekter/ve https://www.banenor.no/Prosjekter/prosjekter/ve stfoldbanen/drammen- stfoldbanen/nykirke-barkaker/anskaffelser/ kobbervikdalen/anskaffelser/ 16 Thank you for listening! 17.
Recommended publications
  • Representing the SPANISH RAILWAY INDUSTRY
    Mafex corporate magazine Spanish Railway Association Issue 20. September 2019 MAFEX Anniversary years representing the SPANISH RAILWAY INDUSTRY SPECIAL INNOVATION DESTINATION Special feature on the Mafex 7th Mafex will spearhead the European Nordic countries invest in railway International Railway Convention. Project entitled H2020 RailActivation. innovation. IN DEPT MAFEX ◗ Table of Contents MAFEX 15TH ANNIVERSARY / EDITORIAL Mafex reaches 15 years of intense 05 activity as a benchmark association for an innovative, cutting-edge industry 06 / MAFEX INFORMS with an increasingly marked presence ANNUAL PARTNERS’ MEETING: throughout the world. MAFEX EXPANDS THE NUMBER OF ASSOCIATES AND BOLSTERS ITS BALANCE APPRAISAL OF THE 7TH ACTIVITIES FOR 2019 INTERNATIONAL RAILWAY CONVENTION The Association informed the Annual Once again, the industry welcomed this Partners’ Meeting of the progress made biennial event in a very positive manner in the previous year, the incorporation which brought together delegates from 30 of new companies and the evolution of countries and more than 120 senior official activities for the 2019-2020 timeframe. from Spanish companies and bodies. MEMBERS NEWS MAFEX UNVEILS THE 26 / RAILACTIVACTION PROJECT The RailActivation project was unveiled at the Kick-Off Meeting of the 38 / DESTINATION European Commission. SCANDINAVIAN COUNTRIES Denmark, Norway and Sweden have MAFEX PARTICIPTES IN THE investment plans underway to modernise ENTREPRENEURIAL ENCOUNTER the railway network and digitise services. With the Minister of Infrastructure The three countries advance towards an Development of the United Arab innovative transport model. Emirates, Abdullah Belhaif Alnuami held in the office of CEOE. 61 / INTERVIEW Jan Schneider-Tilli, AGREEMENT BETWEEN BCIE AND Programme Director of Banedanmark. MAFEX To promote and support internationalisation in the Spanish railway sector.
    [Show full text]
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • Norconsult Annual Report 2015 Rev.Indd
    ANNUAL REPORT 2015 No. 1 Career Barometer 3,000 Employees NEW BUSINESS CONCEPT, VISION >10,000 AND MISSION Projects Business Concept: «Norconsult ensures the quality of clients’ infrastructure and building projects by providing value-enhancing 28 consulting expertise» Employees with a PhD Vision: «We create solutions for the most challenging projects» 3,975 Mission: Sales MNOK «We use our know-how to enhance the world around us» 52 Countries with projects Countries with permanent offi ces Countries with projects in 2015 Countries with projects since 1956 Cover photo: Fornebuporten. Photo: NTB Scanpix. 2 CONTENT 4 CEO’s Report 6 This is Norconsult 8 Annual Report 2015 15 Income Statement 16 Balance Sheet 18 Strategy towards 2018 19 Corporate Governance 20 Expertise 21 BIM 22 Community Involvement 23 Working Environment 24 Our Market 30 Selected Projects from 2015 38 Offi ces and Addresses 3 CEO’s Report Strong momentum entering 2016 With sales of almost NOK 4 billion, Norconsult has confi rmed its position as a market leader in Norway, and as an established international challenger. Norconsult enters 2016 with strong momentum, having achieved the fi nancial targets the company set itself at the start of the year. External conditions became increasingly to boost the company’s competitiveness Professional Survey. We believe that our hostile in 2015, leaving many of our moving forward. focus on further education, management colleagues in the oil industry facing an development, professional network- uncertain future. It is therefore pleasing The industry’s leading lights ing, innovation courses, BIM (Building to confi rm that Norconsult has held its Norconsult’s workforce is selected from Information Systems) and other types of course in the face of such turbulence.
    [Show full text]
  • Annual Report | 2016
    Annual Report | 2016 A word from the CEO Strategy towards 2018 This is Norconsult Our market areas Selected projects 2016 Board of Directors’ report Consolidated financial statements Offices and addresses Career Barometer # 1 (2016, 2015) Employees 3,250 Contents 2016 3,250 2015 3,090 2014 A word from the CEO 4 2,900 2013 Strategy towards 2018 6 2,650 2012 This is Norconsult 8 2,400 Our market areas 20 Selected projects 2016 28 Board of Directors’ report 40 Consolidated financial statements 56 Sales Offices and addresses 60 4,236 MNOK MNOK 4,500 4,000 3,500 3,000 2,500 2,000 1,500 1,000 500 2012 2013 2014 2015 2016 A word from the CEO Strategy towards 2018 This is Norconsult Our market areas Selected projects 2016 Board of Directors’ report Consolidated financial statements Offices and addresses A word from the CEO ”At Norconsult we create added value by maintaining close proximity to our clients and the market and by using smart and effective working methods.” 2016 was a good year for Norconsult. We continued to deliver profitable growth in a market in which prices are coming under pressure, competition is intensifying and clients’ requirements are changing. The industry is in a state of constant flux, year with record revenues of NOK 4.2 framework agreement with the City of with changes taking place more quickly billion, and a solid bottom line. We have Copenhagen to expand and convert a and less predictably than in the past. worked on more than 20,000 projects.
    [Show full text]
  • Annual Report 2004
    Annual Report 2004 1 Contents Time for trains 3 What is Jernbaneverket? 4 Organisational structure 5 Safety 6 Finance and efficiency 10 Operations 10 Maintenance 11 Capital expenditure – rail network development 12 State Accounts for 2004 14 Human resources 16 Personnel and working environment 16 JBV Ressurs 16 Competitiveness 18 Train companies operating on the national rail network 18 Infrastructure capacity – Jernbaneverket’s core product 18 Operating parameters 19 Key figures for the national rail network 21 Traffic volumes on the national rail network 23 Punctuality 24 Environmental protection 26 International activities 28 Contact details 30 www.jernbaneverket.no 2 Cover: Jernbaneverket’s celebrations to mark 150 years of Norwegian railways. Photo: Øystein Grue Time for trains The past year marked the 150th anniversary of the railways in Norway and proved a worthy celebration. Punctuality has never been better, rail traffic is growing, and in summer 2004 the Norwegian Parliament took the historic decision to invest NOK 26.4 billion in developing a competitive rail network over the ten years from 2006 to 2015. In other words, the anniversary year not only provided the opportunity for a nostalgic look back, but also confirmed that the railways will continue to play a central role in the years ahead. In line with Parliament’s decision, value our good working relationship with autumn 2005. This brings us one step clo- Jernbaneverket has drawn up an action the trade unions. The railway has a culture ser to our goal of an efficient, modern rail programme which, if implemented, will and a historic legacy which need to be network in the Oslo region.
    [Show full text]
  • Jernbaneverket
    On track in 2008 A brief look at the activities of Jernbaneverket Director General Elisabeth Enger is preparing for record railway investments and recruiting more and more young people to Jernbaneverket, the Norwegian National Rail Administration ALL ABoard! 155 years of Norwegian Contents railway history All aboard! 155 years of Norwegian railway history 2 1854 Norway’s first railway line opens, linking Kristiania As Jernbaneverket’s new Director General, I see a high level of commitment to Key figures 2 (now Oslo) with Eidsvoll. the railways – both among our employees and others. Many people would like 1890-1910 Railway lines totalling 1 419 km are built in Norway. All aboard! 3 to see increased investment in the railway, which is why the strong political will 1909 The Bergen line is completed at a cost equivalent to This is Jernbaneverket 4 the entire national budget. to achieve a more robust railway system is both gratifying and inspirational. 2008 in brief 6 1938 The Sørland line to Kristiansand opens. Increased demand for both passenger and freight transport is extremely positive Working for Jernbaneverket 8 1940-1945 The German occupation forces take control of NSB, because it is happening despite the fact that we have been unable to offer our Norwegian State Railways. Restrictions on fuel Construction 14 loyal customers the product they deserve. Higher funding levels are now providing consumption give the railway a near-monopoly on Secure wireless communication 18 transport. The railway network is extended by grounds for new optimism and – slowly but surely – we will improve quality, cut Think green – think train 20 450 km using prisoners of war as forced labour.
    [Show full text]
  • Project Portfolio Infrastructure Construction Division
    1 Project portfolio Infrastructure Construction Division www.banenor.no | 2019 3 We rely on close cooperation In the upcoming years there will be a large increase in About Bane NOR rail investments in Norway. As described in this folder the investments will be spread out on several projects. Bane NOR is a state-owned company respon- These investments create great value for all travelers. In the coming sible for the national railway infrastructure. Our years, departures will be more frequent, with reduced travel time mission is to ensure accessible railway infra- within the InterCity operating area. We are living in an exciting and Photo: Anne-Mette Storvik structure and efficient and user-friendly ser- changing infrastructure environment, with a high activity level. Over Einar Kilde vices, including the development of hubs and the next three years Bane NOR plans to introduce contracts relating goods terminals. to a large number of mega projects to the market. Investment will Executive Vice President continue until the InterCity rollout is completed as planned in 2034. Infrastructure Construction Division As of today, the Follo Line and Venjar-Langset are in production, The company’s main responsible are: and Sandvika-Moss-Såstad, Drammen-Kobbervikdalen and Ny- • Planning, development, administration, operation and kirke-Barkåker are out for tender. In 2019 and 2020 our plan is to maintenance of the national railway network • Traffic management start the pre-qualification process for Kleverud-Sørli-Åkersvika and • Administration and development of railway property The Ringerike Line and E16 highway. Additionally, Bane NOR plans together with The Norwegian Bane NOR has approximately 4,500 employees and the head office is Public Roads Administration, to build a safer and faster rail and road based in Oslo, Norway.
    [Show full text]
  • Rs 2002 Eng 20 Juni
    Annual Report 2002 Contents Director General’s review .............................. 1 What is Jernbaneverket?................................ 2 Organisational structure ................................ 3 Safety .................................................................. 4 Finance and efficiency.................................... 8 Operations and maintenance Capital expenditure – rail network development State Accounts for 2002 Human resources ............................................ 14 Personnel and working environment Competitiveness .............................................. 16 The Norwegian railway network Map: Line priority Key figures for the national rail network Traffic volumes on the national rail network Punctuality ........................................................ 20 Environmental protection ............................ 22 International activities.................................... 24 Cover: Nina Rognved, construction supervisor, in the tunnel under construction between Jong in Bærum and Asker station. Cover photo: Ole Walter Jacobsen Photo: Rune Fossum, Helge Sunde, Njål Svingheim, Jofri Lunde. www.jernbaneverket.no Director General’s review Director General Steinar Killi Norway’s railways are in transition. Like ing the loading gauge and installing environment. Environmental manage- most other European countries, Norway automatic train control. Capacity on the ment forms an integral part of has signed up to international agree- Vestfold line increased by over 16% Jernbaneverket’s management systems.
    [Show full text]
  • Creating Lasting Connections Through Rail
    CREATING LASTING CONNECTIONS THROUGH RAIL WWW.RAMBOLL.CO.UK/RAIL 2 3 Ramboll is a leading engineering, design and consultancy company employing 13,000 experts. Our presence is global with a strong representation in the Nordics, UK, North America, Middle East and Asia- Pacific. We constantly strive to achieve inspiring and exacting solutions that make a genuine difference to our customers, end-users and society as a whole. www.ramboll.com RAIL SERVICES We provide design, consultancy and management services for a complete range of rail-based systems, from high-speed railways to urban transport systems, such as metro and light rail. Our technical 13,000 PEOPLE expertise within the rail consultancy comprises: civil engineering infrastructure including 300 OFFICES viaducts, bridges and tunnels; stations, depots, control centres; signalling, permanent way, electrification and 35 COUNTRIES telecoms; as well as traffic management and rolling stock. BUILDINGS TRANSPORT ENVIRONMENT ENERGY WATER PLANNING & URBAN DESIGN OIL & GAS MANAGEMENT CONSULTING Buildings form a fundamental Mobility fuels economic and Industrial development, Security of power supplies, Water is essential to life and Ramboll’s holistic approach To make it in today’s fast National, regional and local part of our lives by shaping social development and with urbanisation, the extraction of climate change, energy one of our most precious to urban development paced and competitive oil authorities are responsible our communities and daily 50% of the world’s population natural resources and extreme efficiency and resource resources. Working with encompasses strategy, and gas market, companies for issues that affect us all; activities. now living in urban areas, weather events all call for scarcity are top priorities on municipalities, utilities, planning, and world class depend on advanced from health care, education efficient and reliable transport sustainable and responsible the global agenda.
    [Show full text]
  • Meld. St. 20 (2020–2021) Report to the Storting (White Paper) National Transport Plan 2022–2033
    Norwegian Ministry English Summary of Transport Meld. St. 20 (2020–2021) Report to the Storting (white paper) National Transport Plan 2022–2033 Meld. St. 20 (2020–2021) Report to the Storting (white paper) National Transport Plan 2022–2033 Foreword Transport is first and foremost about people – about travelling safely and effici- ently together. In a country like Norway, with its extensive coastline, high moun- tains and long fjords, we need to connect urban and rural areas and the people who live there. We have always needed to travel and to transport goods and commodities. An efficient, environmental-friendly and safe transport system is one of the most Figure 0.1 important cornerstones of a modern soci- Knut Arild Hareide ety, and an important prerequisite for Minister of Transport value creation and welfare. Planning and building infrastructure in Norway is often both difficult and expensive. However, people must be free to live and work where they wish, and our prosperity depends on the value creation that takes place in all parts of the country. That is why we must maintain and develop a transport system that is capa- ble of connecting all parts of the country together. To succeed we must keep up with and encourage technological advances and dare to think differently. At the same time, we have to choose the solutions that give us the highest possible value for the public investments in transport projects. The Government has given transport high priority. Our invest- ments have led to shorter travel times on both rail and road, more fre- quent train departures, better traffic safety and positive urban devel- opment.
    [Show full text]
  • SØRLANDET 22. JUNE – 3. AUGUST 2011 in the End of June We Were
    SØRLANDET 22. JUNE – 3. AUGUST 2011 In the end of June we were about to visit Kjell's family in Sandnes. We found out from the weather forecast that there was going to be good weather along the cost of southern Norway, so we planned to have short stages along the trip. Then we could see all the small towns that we never had been in before. We started Wednesday the 22nd of June. The first stop is the house of Olav Duun, just before Holmestrand. Olav Duun was born 21. November 1876 at Jøa in Fosnes and died 13. September 1939 in Holmestrand. He wrote in nynorsk. He is probably most known for the series of novels, Juvikfolket. He lived in the house from 1908 until 1939. It is now a museum. The following is fetched from Wikipedia: Holmestrand was a natural harbor by the Oslofjord where the Dutch traded timber already from around 1550. In 1663 the export harbor became a customs post under Tønsberg and in 1713 it got staple rights. In 1752 Holmestrand got township privileges and became a market town. In the spring 1801 there was erected a battery with canons at the headland Gaasetange to protect the town. The battery was strengthened in 1808 and 1814, but decayed after 1815. In 1881 Holmestrand railway station was opened with train connection to Drammen and Oslo over the The Coat of Arms for Jarlsberg line, later called the Vestfold line. From 1902 to 1938 the station was a part of the Holmestrand- Hvittingfoss line that conveyed wood pulp from Hvittingsfoss to shipment in Holmestrand.
    [Show full text]
  • Upcoming Projects
    Upcoming projects mars 2018 Bane NOR | Upcoming projects 2 Bane NOR | Railway Tender Conference 2018 | The InterCity project 3 Table of content The InterCity project 4 The Ringerike Line and E16 highway 6 Construction projects Vestfold Line Drammen-Kobbervikdalen 8 Nykirke-Barkåker 10 Construction projects East The Østfold Line Sandbukta-Moss-Såstad 12 Haug-Seut 14 The Dovre Line Venjar-Eidsvoll-Langset 16 Kleverud-Sørli-Åkersvika 18 2 Construction projects West/Mid The Bergen Line Arna-Bergen 20 Arna-Stanghelle 22 The Oslo tunnel Oslo S-Lysaker, Nationaltheatret-Bislett 24 Photo by Hilde Lillejord, Bane NOR 4 Bane NOR | Upcoming projects | The InterCity Project 5 Lillehammer The InterCity Moelv Brumunddal Planning status Hamar InterCity Stange Project Municipal master plan Tangen Zoning plan Bane NOR is planning 270 km of new double-track between Under construction Completed Oslo-Lillehammer (Dovre line), Oslo-Halden (Østfold line), Eidsvoll Oslo- Porsgrunn (Vestfold line) and Sandvika-Hønefoss Oslo Lufthavn Hønefoss (Ringerike line). Photo by Hilde Lillejord, Bane NOR Sundvollen Lillestrøm The InterCity Project is a rail project Norway is expecting a strong growth Planning and constructing the remaining Stabling Upcoming contracts Sandvika Oslo S Lysaker Asker in South-Eastern Norway. The project in population the coming years. With infrastructure will take place in four Bane NOR is also planning stabling (train Stabling Drammen area. Stabling tracks involves building 270 km of new double- shorter journeys and increased frequency stages. These stages are described in the parking) in these areas: Moss, Fredrikstad/ for 36 single train sets, each 110 meters, Drammen Ski tracks and 25 stations.
    [Show full text]