Utbyggingsprosjekter Vestfoldbanen APRIL 2017

Utbyggingsprosjekter Vestfoldbanen APRIL 2017

Vestfold Line Projects Supplier Meeting 2019-04-04 Agenda • Overview Vestfold Line Projects ‒ UDK ‒ UNB • Future tenders 2 Gulskogen Current and future projects on the Vestfold Line • Kobbervikdalen-Skoger 1995 • Skoger-Holm 2001 • Nykirke passing loop 2002 • Barkåker – Tønsberg 2011 • Holm-Nykirke opened 2016 • Farriseidet – Porsgrunn opening 2018 • Nykirke – Barkåker 2024 • Drammen-Kobbervikdalen 2025 • Stokke-Sandefjord 2028 ? • Tønsberg-Larvik 2032 ? • Porsgrunn-Skien 2032 ? • Grenland Line 2034 ? 3 Project Nykirke – Barkåker • Time: 2019-2024 • 12 km double track • Two turnkey contracts for ground work and railway engineering, respectively • Suppliers have been qualified and the competition is taking place during the spring of 2019 Future competitions: • Depositioning Tønsberg 2022 • Track works Tønsberg 2022 (JBT/Signalling) Project Drammen – Kobbervikdalen Main facts • Time: 2019-2025 • Planning phase: Construction start / Investment decision • 12 km double track from Drammen to Kobbervikdalen • Renovation of Drammen station • 850 metre concrete tunnel - open construction pit • 275 m soil tunnel • 6 km rock tunnel • Preliminary cost estimate approximately NOK 12 billion NOK The project in general • Challenging construction works ‒ Urban area ‒ 5 main construction phases – 32 sub- phases ‒ Railway operations during construction • Requires good interaction between the client and contractors before and during the implementation phase ‒ This will be important during the selection of contractors • Tender for Vestfold Line (2024) • Tender for Sundhaugen – Gullskogen (2025) 7 Contract strategy UDK 8 Contract strategy UDK 9 UDK 33 Preparatory ground and technical works Construction contract Scope of contract: • Various ground works and railway engineering works, including west of Rødgata, Gulskogen station, Nybyen, Sundhaugen, Kreftingsgate and Drammen station, etc. ‒ Reconstruction of culvert at Kreftingsgate ‒ Conduits ‒ Pipe pressing ‒ Demolition of railway facilities Activity Guideline dates Competition to be announced (one step) 01.07.2019 Due date for tenders 01.10.2019 Signing of the contract 01.02.2020 Start of work Spring 2020 10 UDK 05 Track/OCL – Drammen station - Sundhaugen and tunnels Construction contract Scope of contract: • Tracks and catenary system on the section between Drammen station - Sundhaugen and in the tunnel on the Vestfold Line ‒ Approx 1 km double track to Sundhaugen ‒ 6 tracks at Drammen station ‒ Approx. 7 km double track tunnel ‒ Temporary depositioning at Nybyen - approx. 10 tracks of 240 metres ‒ Demolition of railway facilities at Skamarken Activity Guideline dates Competition to be announced (pre-qualification) 01.04.2020 Deadline for applications for qualification phase 15.05.2020 Due date for tenders 01.10.2020 Signing of the contract 10.01.2021 Start up/interaction phase Q1 2021 Start of work Spring 2021 11 UDK 06 Electrical/Telecommunications (high and low voltage) Construction contract Scope of contract: • Electrical and telecommunications work on the section between Drammen station - Gulskogen station and in the tunnel on the Vestfold Line and surface zone at Skoger ‒ Technical installations in 10 technical buildings and some niches ‒ Point heating for approx. 80 trains ‒ 7 km of tunnel/culvert, installation of hand rails/emergency lighting ‒ Lighting and conduits to be installed on the ceiling of evacuation tunnels, in additional to radiation cables for approx. 2 km • Telecoms ‒ 4x4 MIMO in tunnel, 2 telecom masts ‒ KARI (public communications system in stations) Activity Guideline dates Competition to be announced (pre-qualification) 01.04.2020 Deadline for applications for qualification phase 15.05.2020 Due date for tenders 01.10.2020 Signing of the contract 10.01.2021 Start up/interaction phase Q1 2021 Start of work Spring 2021 12 UDK 07 Signal NSI-63 Construction contract Scope of contract: • Adaptation and modification of NSI-63 system in stations and on section between Drammen and Gulskogen stations across 3 main phases • Signalling at Nybyen - temporary stabling • Interface Sundland • Relaying of cables Drammen – Gulskogen Activity Guideline dates Competition to be announced (pre-qualification) 01.04.2020 Deadline for applications for qualification phase 15.05.2020 Due date for tenders 01.10.2020 Signing of the contract 10.01.2021 Start up/interaction phase Q1 2021 Start of work Spring 2021 13 UDK 10 Tracks/Caternary system Sundhaugen – Gulskogen Station Construction contract Scope of contract: • Tracks and catenary/OCL system on the section between Sundhaugen – Gulskogen station ‒ Double track and single goods line of approx. 2 km ‒ 4 tracks at Gulskogen station • Tender is currently scheduled to 2022 14 UDK 11 Catenary system/Auto transofmrs Kobbervikdalen – Holm EPC contract Scope of contract: • Catenary/OCL system on the section Kobbervikdalen - Holm ‒ Existing double tracks of approx. 15 km (operational line) ‒ Replacement of catenary system for approx. 4 km ‒ Reinforcement of power supply (AT) 15 km Activity Guideline dates Competition to be announced (one step) 01.07.2020 Due date for tenders 01.10.2020 Signing of the contract 01.02.2021 Start of work Spring 2021 15 Information • Contact details UDK • Contact details UNB Eirik Harding Hansen Per Gunnar Johansen Head of Contracts and Procurements Head of Contracts and Procurements Drammen-Kobbervikdalen (UDK) Nykirke-Barkåker (UNB) Mobile: +47 932 49 943 Mobile: +47 474 74 080 Email: [email protected] Email: [email protected] • Information on our website: • Information on our website: https://www.banenor.no/Prosjekter/prosjekter/ve https://www.banenor.no/Prosjekter/prosjekter/ve stfoldbanen/drammen- stfoldbanen/nykirke-barkaker/anskaffelser/ kobbervikdalen/anskaffelser/ 16 Thank you for listening! 17.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us