6/20/2018 GoPro

VS: Case No 73469 - PSO routes in Created 19/04/2016 13:55:13 Author Sigrid Veflen Surlien Received 19/04/2016 10:53:55 Belongs to 73469 - PSO routes in Norway - Art 59

From [email protected] ([email protected]) To [email protected] Cc [email protected], [email protected], [email protected] Subject VS: Case No 73469 - PSO routes in Norway Body Dear Sigrid,

We apologize for the inconsistency in table 1. The headline in all the tables should have been "SCAT-1" instead of "satellite system" since question 6 (v) was "whether and at what time SCAT-1 was installed/operational at the airports in question".

Attached you will find the updated table 1. We have now included installation of EGNOS and Baro-VNAV in the table – as requested in your e-mail of 5 April. I hope this will help you to understand the facts correctly.

Kind regards

Astrid Kirkebø Elde

Rådgiver / Adviser

Samferdselsdepartementet / Ministry of Transport and Communications

Luftfartsseksjonen / Civil Aviation Section

Mobiltelefon/Mobile Phone: +47 476 67 802

P.O. Box 8010 Dep. // NO-0030 Oslo // Norway // Besøksadresse/Visiting address: Akersg. 59

Fra: Surlien, Sigrid [mailto:[email protected] (mailto:[email protected])] Sendt: 5. april 2016 11:39 Til: Foss Morten Kopi: Elde Astrid Kirkebø ; Mahoney, Stefan Emne: Case No 73469 - PSO routes in Norway

Dear Mr. Foss,

Reference is made to the Ministry’s reply of 29 January 2016 to the Authority’s request for information in the above case.

In Enclosure 1, you attached a table detailing the airports at which satellite navigation systems had been installed. We note that for the 2012 tender procedure, the table lists the airports which operate the SCAT-1 system. However, for the following tender procedures, including the upcoming tender for , the table lists the airports at which a “satellite system” has been installed, without specifying whether the satellite system refers to SCAT-1, EGNOS or Baro-VNAV (or whether two or more of these systems are installed).

http://gopro-prod/GoProClient/web/foris/release/site/caseworker/index.html#!/printpreview/?id=5ffacf69-6404-4894-a391-7e3667570d72&docType… 1/3 6/20/2018 GoPro In order to understand the facts correctly, we kindly ask you to update the table by specifying which type of satellite system(s) are installed at the relevant airports. Please also mark in yellow which satellite system(s) a bidder could in the past tender rely on and will be able to rely on (and thus satisfy the relevant tender requirements) in the upcoming tender for Northern Norway, for each airport.

We kindly ask for your reply as soon as possible and at the latest by 19 April 2016.

Please contact Stefan Mahoney or myself should you have any questions to the above.

Kind regards,

Sigrid Veflen Surlien, LL.M Senior Officer - Competition and State Aid Directorate

EFTA Surveillance Authority Rue Belliard 35, B-1040 Brussels

Tel: (+32)(0)2 286 18 59

Mob: (+32)(0)491 863 254

Fax: (+32)(0)2 286 18 00

Mail: [email protected] (mailto:[email protected])

www.eftasurv.int (http://www.eftasurv.int/)

DISCLAIMER

This email message is intended only for the use of the named recipient. Information contained in this email message and its attachments may be privileged, confidential and protected from disclosure. If you are not the intended recipient, please do not read, copy, use or disclose this communication to others. Also please notify the sender by replying to this message and then delete it from your system.

Attachments Enclosure 1 table 1 with updated information on types of satellite systems.docx

http://gopro-prod/GoProClient/web/foris/release/site/caseworker/index.html#!/printpreview/?id=5ffacf69-6404-4894-a391-7e3667570d72&docType… 2/3 6/20/2018 GoPro

Custom Data Dear Sigrid, We apologize for the inconsistency in table 1. The headline in all the tables should have been "SCAT-1" instead of "satellite system" since question 6 (v) was "whether and at what time SCAT-1 was installed/operational at the airports in question". Attached you will find the updated table 1. We have now included installation of EGNOS and Baro- VNAV in the table – as requested in your e-mail of 5 April. I hope this will help you to understand the facts correctly. Kind regards Astrid Kirkebø Elde Rådgiver / Adviser Samferdselsdepartementet / Ministry of Transport and Communications Luftfartsseksjonen / Civil Aviation Section Mobiltelefon/Mobile Phone: +47 476 67 802 P.O. Box 8010 Dep. // NO-0030 Oslo // Norway // Besøksadresse/Visiting address: Akersg. 59 Fra: Surlien, Sigrid [mailto:[email protected]] Sendt: 5. april 2016 11:39 Til: Foss Morten Kopi: Elde Astrid Kirkebø ; Mahoney, Stefan Emne: Case No 73469 - PSO routes in Norway Dear Mr. Foss, Reference is made to the Ministry’s reply of 29 January 2016 to the Authority’s request for information in the above case. In Enclosure 1, you attached a table detailing the airports at which satellite navigation systems had been installed. We note that for the 2012 tender procedure, the table lists the airports which operate the SCAT-1 system. However, for the following tender procedures, including the upcoming tender for Northern Norway, the table lists the airports at which a “satellite system” has been installed, without specifying whether the satellite system refers to SCAT-1, EGNOS or Baro-VNAV (or whether two or more of these systems are installed). In order to understand the facts correctly, we kindly ask you to update the table by specifying which type of satellite system(s) are installed at the relevant airports. Please also mark in yellow which satellite sy OriginalMailFormat html

http://gopro-prod/GoProClient/web/foris/release/site/caseworker/index.html#!/printpreview/?id=5ffacf69-6404-4894-a391-7e3667570d72&docType… 3/3

2.2 Infrastructure and technical requirements [Updated with specifications on which satellite system(s) are installed] 6. Infrastructure and technical requirements for the scheduled regional air services in Norway from 1 April 2012

Airports i) Runway ii) PSO routes iii) Aircraft specification iv) Aircraft types* v) SCAT-1 length (Meters) Lakselv 2 788 Lakselv – Tromsø v.v.  Minimum 30 passenger seats  ATR 42 Not installed  Pressurized cabin  Dash8-100   Dash8-200  Dornier 328 Andenes 2 467 Andenes – Tromsø v.v.,  Minimum 30 passenger seats  ATR 42 Not installed Andenes – Bodø v.v.  Pressurized cabin  Dash8-100  Dash8-200 (Evenes) 2 808 Evenes – Bodø v.v.  Minimum 15 passenger seats  ATR 42 Not installed  Dash8-100  Dash8-200  Fairchild Dornier 228-212  Fairchild Dornier 328  Dornier 328  Jetstream 32  Embraer 110 Bandeirante  CASA 212 Svolvær 876 Svolvær – Bodø v.v.  Minimum 30 passenger seats  Dash8-100 2011  Pressurized cabin  Dash8-200

Leknes 890 Leknes – Bodø v.v.  Minimum 30 passenger seats  Dash8-100 2013  Pressurized cabin  Dash8-200

Røst 870 Røst – Bodø v.v.  Minimum 15 passenger seats  Dash8-100 2012  Dash8-200  Fairchild Dornier 228-212 Narvik 815 Narvik – Bodø v.v.  Minimum 15 passenger seats  Dash8-100 Not possible  Dash8-200  Fairchild Dornier 228-212 Brønnøysund 1 199 Brønnøysund – Bodø v.v.,  Minimum 30 passenger seats  ATR 42 2007 Brønnøysund – Trondheim v.v.  Pressurized cabin  Dash8-100  Dash8-200 Sandnessjøen 936 Sandnessjøen – Bodø v.v.,  Minimum 30 passenger seats  Dash8-100 2013 (Extended in (1199) Sandnessjøen – Trondheim  Pressurized cabin  Dash8-200 2014) v.v.  (ATR 42) Mo i Rana 837 Mo i Rana – Bodø v.v.,  Minimum 30 passenger seats  Dash8-100 Not possible Mo i Rana – Trondheim v.v.  Pressurized cabin  Dash8-200  Mosjøen 889 Mosjøen – Bodø v.v.,  Minimum 30 passenger seats  Dash8-100 2012 Mosjøen – Trondheim v.v.  Pressurized cabin  Dash8-200

Namsos 831 Namsos – Trondheim v.v.  Minimum 15 passenger seats  Dash8-100 2010  Dash8-200  Fairchild Dornier 228-212 Rørvik 890 Rørvik – Trondheim v.v.  Minimum 15 passenger seats  Dash8-100 2012  Dash8-200  Fairchild Dornier 228-212 Florø 1 199 Florø – Oslo v.v.,  Minimum 30 passenger seats  ATR 42 Not installed Florø – Bergen v.v.  Pressurized cabin  Dash8-100  Dash8-200 Førde 979 Førde – Oslo v.v.,  Minimum 30 passenger seats  Dash8-100 2011 Førde – Bergen v.v.  Pressurized cabin  Dash8-200

Sogndal 1 000 Sogndal – Oslo v.v.,  Minimum 30 passenger seats  Dash8-100 Not installed Sogndal – Bergen v.v.  Pressurized cabin  Dash8-200

Sandane 820 Sandane – Oslo v.v.,  Minimum 30 passenger seats  Dash8-100 Not possible Sandane – Bergen v.v.  Pressurized cabin  Dash8-200

Ørsta/Volda 950 Ørsta/Volda – Oslo v.v.,  Minimum 30 passenger seats  Dash8-100 Not installed Ørsta/Volda – Bergen v.v.  Pressurized cabin  Dash8-200

Fagernes 1 834 Fagernes – Oslo v.v.  Minimum 15 passenger seats  ATR 42 Not installed  Dash8-100  Dash8-200  Fairchild Dornier 228-212  Fairchild Dornier 328  Dornier 328  Jetstream 32  Embraer 110 Bandeirante  CASA 212 *The ITT does not include a criteria of the aircraft types required to operate on each route given the runway length. In this table we have listed the different aircraft types available in the market which can operate on these routes given the runway length. vi) Requirement in the ITT: "At airports were equipment have been installed to establish satellite based glide paths (SCAT-I) it is assumed that the operator shall be able to use this type of satellite based approach, or a similar system that provides precision approach."

Infrastructure and technical requirements for scheduled regional air services on Røros–Oslo v.v. from 1. December 2012

Airports i) Runway ii) PSO routes iii) Aircraft specification iv) Aircraft types* v) SCAT-1 length (Meters) Røros 1 640 Røros – Oslo v.v.  Minimum 15 passenger seats  ATR 42 Not installed  Dash8-100  Dash8-200  Fairchild Dornier 228-212  Fairchild Dornier 328  Dornier 328  Jetstream 32  Embraer 110 Bandeirante  CASA 212 *The ITT does not include a criteria of the aircraft types required to operate on each route given the runway length. In this table we have listed the different aircraft types available in the market which can operate on these routes given the runway length. vi) At airports that have installed equipment for satellite based glide path (SCAT -1), it is assumed that the Operator shall be able to use this type of satellite based approach or a similar system that provides precision approach.

Infrastructure and technical requirements for scheduled regional air services in and North-Troms 1 April 2013 – 31 March 2017

Airports i) Runway ii) PSO routes iii) Aircraft specification iv) Aircraft types* v) SCAT-1 length (Meters) 2 055 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 Not installed Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and  Fairchild Dornier 328  Dornier 328  Jetstream 32  Embraer 110 Bandeirante  CASA 212 Vadsø 870 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 2010 Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta Vardø 965 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 2011 Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta Båtsfjord 810 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 2011 Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta Berlevåg 888 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 2011 Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta Mehamn 800 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 2013 Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta Honningsvåg 860 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 Not possible Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta Hammerfest 890 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 2008 Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta Alta 2127 Routes between Kirkenes,  Minimum 15 passenger seats  ATR 42 Not installed Vadsø, Vardø, Båtsfjord,  Dash8-100 Berlevåg, Mehamn,  Dash8-200 Honningsvåg,  Fairchild Dornier 228-212 Hammerfest and Alta  Fairchild Dornier 328  Dornier 328  Jetstream 32  Embraer 110 Bandeirante  CASA 212 Hasvik 909 Hasvik – Tromsø v.v.,  Minimum 15 passenger seats  ATR 42 2011 Hasvik – Hammerfest v.v.  Dash8-100  Dash8-200  Fairchild Dornier 228-212 Sørkjosen 859 Sørkjosen – Tromsø v.v.  Minimum 15 passenger seats  ATR 42 Not possible  Dash8-100  Dash8-200  Fairchild Dornier 228-212 *The ITT does not include a criteria of the aircraft types required to operate on each route given the runway length. In this table we have listed the different aircraft types available in the market which can operate on these routes given the runway length. vi) Text in the ITT: "At aerodromes where satellite-based instrument approach procedures with vertical guidance are available, or planned to become available during the period of the tender, the operator shall use one of the available satellite-based instrument approach procedures with vertical guidance. Please also refer to AIP Norway and BSL G 4-1 §7."

Infrastructure and technical requirements for scheduled regional air services in Southern Norway 1 April 2016 – 31 March 2020

Airports i) Runway ii) PSO routes iii) Aircraft specification iv) Aircraft v) SCAT-1 v) EGNOS v) Baro-VNAV length types* (Meters)

Røros 1 640 Røros – Oslo  Pressurized cabin  ATR 42 Not Not Not relevant  Dash8-100 relevant relevant  Dash8-200  B-200 Førde 979 Førde – Oslo  Pressurized cabin  Dash8-100 2011 2015 Planned in 2017. Will v.v.,  Dash8-200 require special Førde – Bergen  B-200 approval as “steep angle”-approach (VPA = 3.9 degrees) Sogndal 1 000 Sogndal – Oslo  Pressurized cabin  Dash8-100 Not Planned in Planned in 2017. Will v.v.,  Dash8-200 installed 2016/2017 require special Sogndal –  B-200 approval as “steep Bergen v.v. angle”-approach (VPA = 3.9 degrees) Sandane 820 Sandane – Oslo  Pressurized cabin  Dash8-100 Not Not Runway 27: planned in v.v.,  Dash8-200 possible possible 2017. Will require Sandane –  B-200 special approval as Bergen v.v. “steep angle”- approach (VPA = 3.9 degrees) AND new ICAO Pans-Ops criteria expected published NOV.2016. Ørsta/Volda 950 Ørsta/Volda –  Pressurized cabin  Dash8-100 Not Not Not possible Bergen v.v.  Dash8-200 installed possible  B-200 *The ITT does not include a criteria of the aircraft types required to operate on each route given the runway length. In this table we have listed the different aircraft types available in the market which can operate on these routes given the runway length. vi) Text in the ITT: "At aerodromes where satellite-based instrument approach procedures with vertical guidance are available, or planned to become available during the period of the tender, the operator shall use one of the available satellite-based instrument approach procedures with vertical guidance. Please also refer to AIP Norway and BSL G 4-1 §7."

Infrastructure and technical requirements for the upcoming Northern Norway ITT

Airports i) Runway ii) PSO routes iii) Aircraft iv) Aircraft v) SCAT-1 v) ENGOS v) Baro-VNAV length specification types* (Meters) Kirkenes 2 055 Routes between  Not specified at this  ATR 42 Not relevant Planned 2017 Planned 2017 Kirkenes, Vadsø, time  Dash8-100 Vardø, Båtsfjord,  Dash8-200 Berlevåg, Mehamn, Honningsvåg, Hammerfest and Alta Vadsø 870 Routes between  Not specified at this  Dash8-100 2010 Outside EGNOS Planned 2016. Kirkenes, Vadsø, time  Dash8-200 Coverage area Will require Vardø, Båtsfjord, special Berlevåg, approval as Mehamn, “steep angle”- Honningsvåg, approach (VPA Hammerfest and = 3.9 degrees) Alta Vardø 965 Routes between  Not specified at this  Dash8-100 2011 Outside EGNOS Planned 2016. Kirkenes, Vadsø, time  Dash8-200 Coverage area Will require Vardø, Båtsfjord, special Berlevåg, approval as Mehamn, “steep angle”- Honningsvåg, approach (VPA Hammerfest and = 3.9 degrees) Alta Båtsfjord 810 Routes between  Not specified at this  Dash8-100 2011 Outside EGNOS Planned 2016. Kirkenes, Vadsø, time  Dash8-200 Coverage area Will require Vardø, Båtsfjord, special Berlevåg, approval as Mehamn, “steep angle”- Honningsvåg, approach (VPA Hammerfest and = 3.9 degrees) Alta Berlevåg 888 Routes between  Not specified at this  Dash8-100 2011 Outside EGNOS Planned 2016. Kirkenes, Vadsø, time  Dash8-200 Coverage area Will require Vardø, Båtsfjord, special Berlevåg, approval as Mehamn, “steep angle”- Honningsvåg, approach (VPA Hammerfest and = 3.9 degrees) Alta Mehamn 800 Routes between  Not specified at this  Dash8-100 2013 Outside EGNOS Planned 2016. Kirkenes, Vadsø, time  Dash8-200 Coverage area Will require Vardø, Båtsfjord, special Berlevåg, approval as Mehamn, “steep angle”- Honningsvåg, approach (VPA Hammerfest and = 3.9 degrees) Alta Honningsvåg 860 Routes between  Not specified at this  Dash8-100 Not possible Outside EGNOS Not possible Kirkenes, Vadsø, time  Dash8-200 Coverage area Vardø, Båtsfjord, Berlevåg, Mehamn, Honningsvåg, Hammerfest and Alta Hammerfest 890 Routes between  Not specified at this  Dash8-100 2008 Outside EGNOS Planned 2016. Kirkenes, Vadsø, time  Dash8-200 Coverage area Will require Vardø, Båtsfjord, special Berlevåg, approval as Mehamn, “steep angle”- Honningsvåg, approach (VPA Hammerfest and = 3.9 degrees) Alta, Hammerfest – Hasvik Alta 2127 Routes between  Not specified at this  ATR 42 Not installed Outside EGNOS Planned 2016 Kirkenes, Vadsø, time  Dash8-100 Coverage area Vardø, Båtsfjord,  Dash8-200 Berlevåg, Mehamn, Honningsvåg, Hammerfest and Alta Hasvik 909 Hasvik – Tromsø  Not specified at this  Dash8-100 2011 Outside EGNOS Planned 2016. v.v., time  Dash8-200 Coverage area Will require Hasvik – special Hammerfest v.v. approval as “steep angle”- approach (VPA = 3.9 degrees) Sørkjosen 859 Sørkjosen –  Not specified at this  Dash8-100 Not possible Outside EGNOS Not possible Tromsø v.v. time  Dash8-200 Coverage area

Lakselv 2 788 Lakselv – Tromsø  Not specified at this  ATR 42 Not installed Outside EGNOS Planned v.v. time  Dash8-100 Coverage area 2016/2017  Dash8-200 Andenes 2 467 Andenes – Tromsø  Not specified at this  ATR 42 Not installed 2015 2015 v.v., time  Dash8-100 Andenes – Bodø  Dash8-200 v.v. Harstad (Evenes) 2 808 Evenes – Bodø v.v.  Not specified at this  ATR 42 Not installed Planned 2016 Planned 2016. time  Dash8-100 Will require  Dash8-200 special approval as “steep angle”- approach (VPA = 3.9 degrees) Svolvær 876 Svolvær – Bodø  Not specified at this  Dash8-100 2011 Planned 2016 Planned 2016. v.v. time  Dash8-200 Will require special approval as “steep angle”- approach (VPA = 3.9 degrees) Leknes 890 Leknes – Bodø v.v.  Not specified at this  Dash8-100 2013 Planned 2016 Planned 2016. time  Dash8-200 Will require special approval as “steep angle”- approach (VPA = 3.9 degrees) Røst 870 Røst – Bodø v.v.  Not specified at this  Dash8-100 2012 2014 2014 time  Dash8-200

Narvik 815 Narvik – Bodø v.v.  Not specified at this  Dash8-100 Airport Airport Airport time  Dash8-200 operations operations operations discontinues on discontinues on discontinues on 01.04.2017. No 01.04.2017. No 01.04.2017. No implementation implementation implementation planned. planned. planned. Brønnøysund 1 199 Brønnøysund –  Not specified at this  ATR 42 2007 Planned 2016 Planned 2016. Bodø v.v., time  Dash8-100 Will require Brønnøysund –  Dash8-200 special Trondheim v.v. approval as “steep angle”- approach (VPA = 3.9 degrees) Sandnessjøen 1 199 Sandnessjøen –  Not specified at this  ATR 42 2013 2015 Planned 2016. Bodø v.v., time  Dash8-100 Will require  Dash8-200 special Sandnessjøen – approval as Trondheim v.v. “steep angle”- approach (VPA = 3.9 degrees) Mo i Rana 837 Mo i Rana – Bodø  Not specified at this  Dash8-100 Not possible Not possible Not possible v.v., time  Dash8-200 Mo i Rana – Trondheim v.v. Mosjøen 889 Mosjøen – Bodø  Not specified at this  Dash8-100 2012 Planned 2016 Will require v.v., time  Dash8-200 special Mosjøen – approval as Trondheim v.v. “steep angle”- approach (VPA = 3.9 degrees) AND new ICAO Pans-Ops criteria expected published NOV.2016. Implementation not yet decided (nor planned). Namsos 831 Namsos –  Not specified at this  Dash8-100 2010 2015 2015 Trondheim v.v. time  Dash8-200

Rørvik 890 Rørvik –  Not specified at this  Dash8-100 2012 Planned 2016 Planned 2016 Trondheim v.v. time  Dash8-200

*The ITT does not include a criteria of the aircraft types required to operate on each route given the runway length. In this table we have listed the different aircraft types available in the market which can operate on these routes given the runway length.