JMA Wireless Empowers Italy's Longest Metro Train System With

Total Page:16

File Type:pdf, Size:1020Kb

JMA Wireless Empowers Italy's Longest Metro Train System With PO Box 678 | 7645 Henry Clay Blvd. | Liverpool, New York 13088 USA 315-431-7116 | jmawireless.com JMA Wireless Empowers Italy’s Longest Metro Train System with Wireless Communications Thanks to Teko DAS and CommsCon Italia Over One Million Passengers Each Day Experience Mobile Connectivity During Their Commute Liverpool, NY, January 22, 2015 - JMA Wireless, a global mobile communications leader, and one of their top system integration partners, CommsCon Italia, enabled cellular coverage and capacity throughout the Milan Metro Rapid Transit System and in the Milan Central Station. The Milan Metro is the longest transit system in Italy consisting of four lines totaling 94.5 kilometers (58.7 miles) and includes 103 stations, many in hard to reach underground locations. Both the operators of the Milan transit systems (a public company for historic lines and a private company for new lines), wanted to extend network connectivity to provide seamless high-speed mobile communications to its over one million daily commuters. For many passengers, their daily commute has translated into additional work time, and as a result they need to be reachable and able to communicate. CommsCon managed both the projects as a neutral host linked to all the wireless Italian mobile operators. "We needed to ensure the solution would be flexible and provide robust cellular coverage and capacity for our clients. The state-of-the-art Teko DAS (distributed antenna system) from JMA Wireless enabled us to offer high-speed wireless connectivity to enrich the mobile experience for Milan Metro commuters,” stated Piercarlo Giannattasio, CEO and Founder of CommsCon Italia. Thanks to the modularity and flexibility of the Teko DAS, new LTE technology was added easily to support high performance communications across multiple operators. Once LTE was added to the BTS (base transceiver station) on the DCS band, the DAS platform was able to accommodate the new technology utilizing the existing remote units on the network. Furthermore, the solution optimized the use of pathways and fiber. A single fiber and common remote unit delivers signal for multiple operators and multiple bands. Multiple technologies often coexist on a single band too due to the excellent linearity and wide bandwidth of the high quality power amplifiers. To accommodate the varying environments across the metro transit system, Teko’s dual- band and tri-band remote units with varying power levels (from low to very high) were deployed to ensure a single managed system provided the seamless wireless coverage. “Our proven expertise and ability to deliver robust cellular coverage and capacity even in difficult environments such as high speed trains and underground rail stations has PO Box 678 | 7645 Henry Clay Blvd. | Liverpool, New York 13088 USA 315-431-7116 | jmawireless.com made us a top solution provider for many railway operators. We are thankful to our partner for the high level of competence in designing, installing and managing the system,” said Remo Ricci, Managing Director, Teko Systems Group at JMA Wireless. The Teko system is being implemented at transit systems around the globe. Besides deployments in Milan, Turin and Rome, it is currently powering wireless communications for metro rail systems in Singapore, Denmark, and the Dominican Republic too. About JMA Wireless JMA Wireless is the leading global innovator in mobile wireless connectivity solutions that assure infrastructure reliability, streamline service operations, and maximize wireless performance. Employing powerful, patented innovations its solutions portfolio is proven to lower the cost of operations while ensuring lifetime quality levels in equipment and unrivaled performance for coverage and high-speed mobile data. JMA Wireless solutions cover macro infrastructure, outdoor and indoor distributed antenna systems and small cell solutions. JMA Wireless corporate headquarters are located in Liverpool, NY, with manufacturing, R&D, and sales operations in over 20 locations worldwide. For more information visit jmawireless.com or follow JMA Wireless on Twitter at @JMAwireless. For further information contact: Sean Griffin [email protected] © 2015 JMA Wireless. All rights reserved. All trademarks identified by ® or ™ are registered trademarks of their respective owners. .
Recommended publications
  • The Bulletin JOHN E
    ERA BULLETIN — SEPTEMBER, 2019 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 62, No. 9 September, 2019 The Bulletin JOHN E. PAPPAS, 1943-2019 Published by the Electric Railroaders’ by Alexander Ivanoff Association, Inc. P. O. Box 3323 John Emanuel Pappas, ERA First Vice itation of the two remaining Illinois Terminal Grand Central Station New York, NY 10163 President and Associate Editor of Head- PCCs that were used during a reconstruction lights magazine, died on the morning of project on the Shaker Heights Line (one of For general inquiries, or Bulletin submissions, Monday, July 29, 2019 at the age of 75. He these cars is now preserved at the Connecti- contact us at had been battling cancer for almost a year. cut Trolley Museum). At the close of the bulletin@erausa. org John was a latecomer to the Electric Rail- 1970s, John moved to Texas where he or on our website at erausa. org/contact roaders’ Association, having joined in 2000. worked for Houston METRO for almost two He quickly rose to the position of First Vice decades before returning to Ohio where he Editorial Staff: President, a title he held for 10 years until his worked for several years as head of opera- Jeffrey Erlitz death. As Associate Editor of Headlights, his tions for the Greater Dayton Regional Transit Editor-in-Chief prolific content contributions since 2006 con- Authority. Ronald Yee tinued growing until he wrote and mostly It was his role as Senior Director of Sched- Tri-State News and photographed full issues himself. He collabo- ules for the New York City Transit Authority Commuter Rail Editor rated with Sandy Campbell on the multi-year that took John to New York City.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • Final Exploitation Plan
    D9.10 – Final Exploitation Plan Jorge Lpez (Atos), Alessandra Tedeschi (DBL), Julian Williams (UDUR), abio Massacci (UNITN), Raminder Ruprai (NGRID), Andreas Schmitz ( raunhofer), Emilio Lpez (URJC), Michael Pellot (TMB), Zden,a Mansfeldov. (ISASCR), Jan J/r0ens ( raunhofer) Pending of approval from the Research Executive Agency - EC Document Number D1.10 Document Title inal e5ploitation plan Version 1.0 Status inal Work Packa e WP 1 Deliverable Type Report Contractual Date of Delivery 31 .01 .20 18 Actual Date of Delivery 31.01.2018 Responsible Unit ATOS Contributors ISASCR, UNIDUR, UNITN, NGRID, DBL, URJC, raunhofer, TMB (eyword List E5ploitation, ramewor,, Preliminary, Requirements, Policy papers, Models, Methodologies, Templates, Tools, Individual plans, IPR Dissemination level PU SECONO.ICS Consortium SECONOMICS ?Socio-Economics meets SecurityA (Contract No. 28C223) is a Collaborative pro0ect) within the 7th ramewor, Programme, theme SEC-2011.E.8-1 SEC-2011.7.C-2 ICT. The consortium members are: UniversitG Degli Studi di Trento (UNITN) Pro0ect Manager: prof. abio Massacci 1 38100 Trento, Italy abio.MassacciHunitn.it www.unitn.it DEEP BLUE Srl (DBL) Contact: Alessandra Tedeschi 2 00113 Roma, Italy Alessandra.tedeschiHdblue.it www.dblue.it raunhofer -Gesellschaft zur Irderung der angewandten Contact: Prof. Jan J/r0ens 3 orschung e.V., Hansastr. 27c, 0an.0uer0ensHisst.fraunhofer.de 80E8E Munich, Germany http://www.fraunhofer.de/ UNIVERSIDAD REL JUAN CARLOS, Contact: Prof. David Rios Insua 8 Calle TulipanS/N, 28133, Mostoles david.riosHur0c.es
    [Show full text]
  • IMESA Electrical Engineering COMPANY PROFILE
    IMESA Electrical Engineering COMPANY PROFILE …ho sempre creduto che al “…my commitment and personal primo posto, nella mia azienda, belief is that in my company dovesse esserci la qualità: quality must always come first, as del prodotto, del servizio, dei for products, service and business rapporti con i clienti, con i quali è relationship alike. With customers necessario dialogare, coordinarsi, it is necessary to dialog, cooperate condividere. La qualità pensai, ci and share experiences. Quality deve differenziare. È quindi per must differentiate us. questo che, nel 1972, ho scelto As a matter of fact, in 1972, I di produrre tutto internamente: chose to manufacture on my controllare l’intero processo, own to get the whole process dall’acquisto della lamiera al under control from the purchase collaudo finale, avrebbe garantito of raw materials to final testing: la qualità e ci avrebbe aiutato a this would have guaranteed crescere. the quality of our products and Oggi, che l’azienda è una helped us to grow. Today, that the realtà mondiale, che ha clienti company is a worldwide reality , importanti in ogni settore e che which as important customers in dispone di molte sedi, uffici, every sector and that has many Sergio Schiavoni mezzi e, soprattutto di personale offices, equipment, and, above all, highly qualified staff, I can say that Presidente della Holding altamente qualificato, posso affermare che quella scelta si è choice has been a winning one: Holding’s President rivelata vincente: la qualità è il the quality is our true heritage, nostro vero patrimonio, che ci which has allowed us to arrive ha consentito di arrivare fino ad until today and allows us to look to oggi e ci permette di guardare al the future with optimism, knowing futuro con ottimismo, sapendo di that we are on the right way.
    [Show full text]
  • Førende Metropol for Bæredygtig Vækst, Innovation Og Talent
    1 KØBENHAVN – FØRENDE METROPOL FOR BÆREDYGTIG VÆKST, INNOVATION OG TALENT Forord Det er mig en fornøjelse at præsentere de samlede anbefalinger fra Task force for bedre erhvervsvilkår i København. Det har været afgørende for task forcens medlemmer, at anbefalingerne er baseret på dialog med omverdenen. Derfor har vi inddraget brancheorganisationer og deres viden i vores arbejde. Vi har bedt forvaltningerne om at give indspil til udfordringer på deres fagområder og fået input fra andre kommuner, universitetsverdenen og de mange vidensmiljøer i København. Task forcen har lagt vægt på, at anbefalingerne er funderet i analytisk stærke argumenter med fokus på evidens og data af høj kvalitet. Anbefalingerne bygger videre på Københavns Kommunes erhvervs- og vækstpolitik 2015-2020 og er udarbejdet med afsæt i Vækstrapporten 2018, der giver en status for København på parametre som vækst, velstand, ulighed mv. i både nationalt og internationalt perspektiv. Det overordnede billede er, at det går godt i København. Der er et solidt fundament at bygge videre på. Udfordringen er, at udviklingstendensen i Europa er, at metropolerne deler sig i en gruppe højvækstbyer og en gruppe med lavere eller ligefrem negativ vækst. Det betyder, at København, som by og region, hele tiden skal gøre sit bedste for at være en attraktiv erhvervsby for eksisterende og nye virksomheder og lægge sig forrest i kapløbet om at tiltrække internationale investeringer og talenter. Task forcen har set nærmere på kommunens udfordringer med udgangspunkt i de muligheder, som kommunen har for at understøtte vækst via gode erhvervsvilkår for københavnske virksomheder. Derfor er der særligt fokus på de områder, hvor kommunen kan dreje på håndtag med øje for både muligheder og respekt for begrænsninger som fx kommunens styreform.
    [Show full text]
  • Electrical Performance of Polymer-Insulated Rail Brackets of DC Transit Subjected to Lightning Induced Overvoltage
    materials Article Electrical Performance of Polymer-Insulated Rail Brackets of DC Transit Subjected to Lightning Induced Overvoltage Farah Asyikin Abd Rahman 1,* , Mohd Zainal Abidin Ab Kadir 2 , Ungku Anisa Ungku Amirulddin 1 and Miszaina Osman 1 1 Institute of Power Engineering (IPE), Universiti Tenaga Nasional (UNITEN), Kajang 43000, Selangor, Malaysia; [email protected] (U.A.U.A.); [email protected] (M.O.) 2 Centre for Electromagnetic and Lightning Protection Research (CELP), Advanced Lightning, Power and Energy Research Centre (ALPER), Universiti Putra Malaysia (UPM), Serdang 43400, Selangor, Malaysia; [email protected] * Correspondence: [email protected] Abstract: The fourth rail transit is an interesting topic to be shared and accessed by the community within that area of expertise. Several ongoing works are currently being conducted especially in the aspects of system technical performances including the rail bracket component and the sensitivity analyses on the various rail designs. Furthermore, the lightning surge study on railway electrification is significant due to the fact that only a handful of publications are available in this regard, especially on the fourth rail transit. For this reason, this paper presents a study on the electrical performance of a fourth rail Direct Current (DC) urban transit affected by an indirect lightning strike. The indirect lightning strike was modelled by means of the Rusck model and the sum of two Heidler functions. The simulations were carried out using the EMTP-RV software which included the performance comparison of polymer-insulated rail brackets, namely the Cast Epoxy (CE), the Cycloaliphatic Epoxy Citation: Abd Rahman, F.A.; Ab Kadir, M.Z.A.; Ungku Amirulddin, A (CEA), and the Glass Reinforced Plastic (GRP) together with the station arresters when subjected U.A.; Osman, M.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]
  • Traction Systems,General Power Supply Arrangements and Energy
    GOVERNMENT OF INDIA MINISTRY OF URBAN DEVELOPMENT REPORT OF THE SUB-COMMITTEE ON TRACTION SYSTEMS, GENERAL POWER SUPPLY ARRANGEMENTS AND ENERGY EFFICIENT SYSTEMS FOR METRO RAILWAYS NOVEMBER 2013 Sub-Committee on Traction System, Power Supply & Energy Efficiency Ministry of Urban Development Final Report Preface 1. Urban centres have been the dynamos of growth in India. This has placed severe stress on the cities and concomitant pressure on its transit systems. A meaningful and sustainable mass transit system is vital sinew of urbanisation. With success of Delhi’s Metro System, government is encouraging cities with population more than 2 milion to have Metro systems. Bangalore, Chennai, Kolkata, Hyderabad are being joined by smaller cities like Jaipur, Kochi and Gurgaon. It is expected that by end of the Twelfth Five Year Plan India will have more than 400 km of operational metro rail (up from present 223 km). The National Manufacturing Competitiveness Council (NMCC) has been set up by the Government to provide a continuing forum for policy dialogue to energise and sustain the growth of manufacturing industries in India. A meeting was organized by NMCC on May 03, 2012 and one of the agenda items in that meeting was “Promotion of Manufacturing for Metro System in India as well as formation of Standards for the same”. In view of the NMCC meeting and heavy investments planned in metro systems, thereafter, Ministry of Urban Development (MOUD) have taken the initiative to form a committee for “Standardization and Indigenization of Metro Rail Systems” in May 2012. The Committee had a series of meetings in June-August 2012 and prepared a Base Paper.
    [Show full text]
  • Innovative, Inspiring: Lrt's Great 12 Months
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tramnews.net JANUARY 2014 NO. 913 INNOVATIVE, INSPIRING: LRT’S GREAT 12 MONTHS Cincinnati: Streetcar scheme to hit the buffers? Adelaide plans all-new LRT network Alstom considers asset disposals Midland Metro growth linked to HS2 ISSN 1460-8324 £4.10 Chicago Kyiv 01 Modernisation and Football legacy and renewals on the ‘L’ reconnection plans 9 771460 832036 FOR bOOKiNgs AND sPONsORsHiP OPPORTUNiTiEs CALL +44 (0) 1733 367603 11-12 June 2014 – Nottingham, UK 2014 Nottingham Conference Centre The 9th Annual UK Light Rail Conference and exhibition brings together 200 decision-makers for two days of open debate covering all aspects of light rail development. Delegates can explore the latest industry innovation and examine LRT’s role in alleviating congestion in our towns and cities and its potential for driving economic growth. Packed full of additional delegate benefits for 2014, this event also includes a system visit in conjunction with our hosts Nottingham Express Transit and a networking dinner open to all attendees hosted by international transport operator Keolis. Modules and debates for 2013 include: ❱ LRT’s strategic role as a city-building tool ❱ Manchester Metrolink expansion: The ‘Network Effect’ ❱ Tramways as creators of green corridors ❱ The role of social media and new technology ❱ The value of small-start/heritage systems ❱ Ticketing and fare collection innovation ❱ Funding light rail in a climate of austerity ❱ Track and trackform: Challenges and solutions ❱ HS2: A golden
    [Show full text]
  • Press Note Milan M4 Metro Line
    PRESS NOTE MILAN M4 METRO LINE: TRIAL RUN ALONG FIRST SECTION BETWEEN LINATE AND FORLANINI FS MILAN, January 10, 2020 – Trial runs have begun for trains between the Linate city airport and the Forlanini FS station that comprise the first section of the new M4 metro line being built in Milan. The project, which will link the airport with the city centre in a mere 12 minutes, is one of the most important projects of sustainable mobility in Europe. It is being commissioned by the city and developed by M4 SpA, the concessionaire in which the city, Salini Impregilo and Astaldi are among its shareholders. The trial runs between the airport and the station marks an important step for the testing of trains built by Hitachi Rail, the signaling and ventilation systems and fire safety before this first section comes into service in 2021. There are 56 work sites across the city for the M4 on which 1,500 people work, 500 of whom for Metro Blu, which comprises Salini Impregilo and Astaldi. A second section between Forlanini FS and Dateo station will open in mid-2022 before a third section reaches San Babila in the heart of the city by December of the same year. The M4 will be 15 kilometres long with 21 stations between the airport and San Cristoforo FS, with trains crossing the historic centre in 30 minutes. It will be connected to the existing network of rail and metro lines to make transport more sustainable across Milan. The line itself will help reduce traffic by 16 million vehicles a year and CO2 emissions by 54,000 tonnes a year.
    [Show full text]
  • 2017 Annual Report(.Pdf — 6403
    (Translation from the Italian original which remains the definitive version) 2017 ANNUAL REPORT CONTENTS 2017 ANNUAL REPORT 1 Chairwoman’s letter 1 Group highlights 8 DIRECTORS’ REPORT 15 Non-financial information – Methodology for reporting non-financial information 16 The group’s financial position and performance 18 Business model 27 Segment reporting 29 FS Italiane S.p.A.’s financial position and performance 40 Investments 44 Research, development and innovation 53 Context and focus on FS Italiane group 55 Report on corporate governance and the ownership structure 82 Sustainability in the group 102 Stakeholders 117 Main events of the year 136 Risk factors 145 Travel safety 151 Other information 152 The parent’s treasury shares 159 Related party transactions 160 Outlook 161 Consolidated financial statements of Ferrovie dello Stato Italiane group as at and for the year ended 31 December 2017 162 Consolidated financial statements 163 Notes to the consolidated financial statements 169 Annexes 263 Separate financial statements of Ferrovie dello Stato Italiane S.p.A. as at and for the year ended 31 December 2017 276 Financial statements 277 Notes to the separate financial statements 283 Proposed allocation of the profit for the year of Ferrovie dello Stato Italiane S.p.A. 345 Ferrovie dello Stato Italiane group 2 Chairwoman’s letter Dear Shareholder, Ferrovie dello Stato Italiane group posted excellent results for 2017, in line with the challenging 2017-2026 business plan approved by the board of directors in September 2016. In their collective pursuit of the objectives set forth in this business plan, the group companies are highly focused on protecting their businesses and satisfying their stakeholders, with a strong sense of belonging and shared accountability for the achievement of their common strategic goals.
    [Show full text]
  • Project Finance in Underground Works. the Case History of Milan Metro, Line 5
    PROJECT FINANCE IN UNDERGROUND WORKS. THE CASE HISTORY OF MILAN METRO, LINE 5 Pietro Lunardi, Lunardi’s Geoengineering Office, Italy Giovanna Cassani, Rocksoil SpA, Italy Giovanni D’Alò, Astaldi SpA, Italy The line has 9 stations and one depot for vehicle Abstract storage and maintenance; it runs from FS Garibaldi station northwards under Viale Zara and Fulvio Line 5 is a 6.25 Km long fully automated driverless Testi until reaching the city-limit of Sesto San Gio- light metro, with nine stations, single and double vanni. track line tunnels and a depot for vehicle sheltering As can be seen in Figure 2 the line allows transfer and maintenance works. to other means of transport, such as: Construction works were conducted under a Project Financing contract. It is a long term operation - The passerby at Zara station. aimed to carry out a project through the establish- - The Metro lines M2 and M3 at Garibaldi ment of an ad-hoc SPC (Special Purpose Company) station and Zara station respectively. that will guarantee separation of project and financ- - Tramways, trolleybuses and buses at the ing companies assets. street level. Metro 5 S.p.A. has awarded a turnkey Engineering Procurement and Construction (EPC) contract for this project, including supply of the rolling stock, to a Temporary Association of Enterprises consisting of the partners of the Grantor Company. It has also entrusted management and maintenance of the line to ATM-Azienda Trasporti Milanesi S.p.A. Operating profits are paid to Metro 5 S.p.A., the Grantee, by the Municipality of Milan, the Grantor, in a Management Account on the basis of the pas- senger traffic values.
    [Show full text]