Elr Data File - Sty Wilmslow Jn - Slade Lane Jn (Styal Line)(Wilmslow

Total Page:16

File Type:pdf, Size:1020Kb

Elr Data File - Sty Wilmslow Jn - Slade Lane Jn (Styal Line)(Wilmslow ELR DATA FILE - STY WILMSLOW JN - SLADE LANE JN (STYAL LINE)(WILMSLOW- www.railwaydata.co.uk M. Ch. Type Name Details ID 0m 14ch Bridge Macclesfield Road Underline Bridge | Steel 1 0m 16ch Bridge Wilmslow Station Subway Underline Bridge | Steel 2 0m 17ch Station Wilmslow WML 0m 26ch Bridge Wilmslow Viaduct Viaduct | Brick (Arch) 3 0m 54ch Bridge Footbridge Footbridge | Steel 4 0m 72ch Bridge Bridgefield Avenue Overline Bridge | Steel (Beam) 5 0m 76ch Bridge Manchester Road (a34) Overline Bridge | Steel 6 1m 06ch Bridge Lacey Green Overline Bridge | Steel (Beam) 7 1m 38ch Bridge Dean Viaduct Viaduct | Brick (Arch) 8 1m 57ch Bridge Occupation Overline Bridge | Steel 9 1m 67ch Bridge Footbridge Footbridge | Steel (Beam) 10 1m 74ch Bridge Sagars Road Overline Bridge | Steel 11 1m 79ch Station Styal SYA 2m 20ch Bridge Hewitts Overline Bridge | Steel (Beam) 12 2m 37ch Bridge Middletons Overline Bridge | Brick (Arch) 13 2m 56ch Bridge Moults Overline Bridge | Brick 14 2m 76ch Bridge Footbridge Footbridge | Steel (Beam) 15 3m 18ch Bridge Pearsons Overline Bridge | Brick 16 3m 37ch Station Heald Green HDG 3m 39ch Bridge Heald Green Station Footbridge Footbridge | Cast in-situ reinforced Concrete 16A 3m 45ch Bridge Finney Lane Overline Bridge | Steel (Beam) 17 3m 61ch Bridge Brown Lane Overline Bridge | Early Steel (Beam) 18 3m 77ch Bridge Moods Footbridge Footbridge | Steel (Beam) 19 0m 0ch +1763 0m 8ch +111 0m 14ch -190 0m 20ch -2500 0m 40ch -505 0m 56ch -840 0m 66ch -130 1m 3ch -203 1m 14ch -144 1m 32ch +690 1m 46ch +137 1m 67ch +415 1m 76ch +278 2m 14ch -718 2m 26ch -141 2m 53ch -135 3m 36ch -117 3m 46ch -158 3m 58ch -155 3m 67ch -139 1 (STY -00.01 - 004.01) M. Ch. Type Name Details ID 4m 23ch Bridge Waterfall Overline Bridge | Brick 20 4m 50ch Bridge Cranshaws Underline Bridge | Cast in-situ reinforced Concrete 21 4m 64ch Bridge Foxland Road Underline Bridge | Brick 22 5m 04ch Bridge Gatley Road Underline Bridge | Steel 23 5m 09ch Bridge Gatley Station Subway Underline Bridge | Brick 24 5m 10ch Station Gatley GTY 5m 18ch Bridge Occupation And Footpath Underline Bridge | Brick 25 5m 33ch Bridge Intersection Bridge (passes Over Ejn/15a) Intersection Bridge | Steel 26 5m 38ch Bridge M.o.t. Overline Bridge | Pre-tensioned Concrete 26A 5m 43ch Bridge M60 - M.o.t. Underline Bridge | Post-tensioned Concrete 26B 5m 50ch Bridge Sty 27 - Intersection (passes Over Wjp1 Br 65) Intersection Bridge | Steel (Beam) 27 5m 51ch Bridge Mersey Viaduct Viaduct | Brick (Arch) 28 5m 67ch Bridge Broad Oak Farm Underline Bridge | Brick 29 5m 76ch Bridge Broad Oak Lane Underline Bridge | Cast in-situ reinforced Concrete 30 6m 13ch Bridge Gawsworth Avenue Underline Bridge | Wrought Iron 31 6m 24ch Station East Didsbury EDY 6m 31ch Bridge Wilmslow Road Underline Bridge | Steel 32 6m 46ch Bridge Formerly Intersection (msd2/7a) Underline Bridge | Steel / Brick 33 6m 61ch Bridge School Lane Underline Bridge | Steel (Beam) 33A 7m 14ch Bridge Fog Lane Underline Bridge | Steel 34 7m 18ch Station Burnage BNA 7m 23ch Bridge Brayside Road Underline Bridge | Steel (Beam) 35 7m 32ch Bridge Westcroft Road Underline Bridge | Steel (Beam) 36 7m 46ch Bridge Southlea Road Underline Bridge | Steel 37 7m 62ch Bridge Briarfield Road Underline Bridge | Steel 38 7m 74ch Bridge Bibby's Underline Bridge | Cast in-situ reinforced Concrete 39 4m 11ch -117 4m 18ch -141 4m 38ch -131 4m 69ch -149 4m 75ch -822 5m 5ch -493 5m 15ch -1600 5m 25ch LEVEL 5m 37ch -132 5m 68ch -235 5m 76ch +125 6m 14ch +204 6m 21ch +263 6m 32ch +3320 6m 45ch +3000 6m 55ch +710 6m 73ch +315 7m 2ch +171 7m 20ch LEVEL 7m 43ch -1533 7m 51ch -536 7m 67ch +135 8m 0ch -2350 2 (STY 004.01 - 008.01) M. Ch. Type Name Details ID 8m 02ch Bridge Mauldeth Road Underline Bridge | Steel 40 8m 06ch Station Mauldeth Road MAU 8m 22ch Bridge Talbot Road Underline Bridge | Steel (Beam) 41 8m 31ch Bridge Kingswood Road Underline Bridge | Brick (Arch) 42 8m 47ch Bridge Former Intersection (gtp2 Br 21a) Underline Bridge | Steel 43 8m 49ch Bridge Mcwwc (manchester Corp. Water Works Corp.) Underline Bridge | Steel 43A 8m 50ch Bridge Brailsford Road Underline Bridge | Brick 44 8m 56ch Bridge Mosley Road Underline Bridge | Steel 45 8m 63ch Bridge Peacefield Road Underline Bridge | Steel 46 8m 68ch Bridge Slade Farm Road Underline Bridge | Brick 47 8m 75ch Bridge Lytham Road Underline Bridge | Early Steel 48 9m 04ch Bridge Collingwood Road Underline Bridge | Steel 49 9m 11ch Bridge Old Hall Lane Underline Bridge | Early Steel 50 9m 22ch Bridge Slade Lane (a5079) Underline Bridge | Early Steel 51 8m 30ch -600 8m 42ch +173 8m 56ch +170 8m 70ch +132 9m 12ch +186 9m 21ch -178 9m 33ch -706 3 (STY 008.01 - 009.56) KEY BRIDGES : Pipe Bridge Overline Bridge Underline Bridge Footbridge Viaduct Railway Intesection Bridge Side of Line Bridge (no infrastructure over bridge) CROSSINGS : Footpath Crossing Station Barrow Crossing User Worked Crossing Crossing with Barriers or Gates (non-user worked) Open Crossing OTHERS : Tunnel Produced by Danny Witington for the Railway Data Centre. Contains Network Rail FOI data & information of Network Rail Infrastructure Limited licenced under the following licence. This is an unofficial document, we hope it is a true and acurate representation, however we can accept no liability for any errors or omissions. For more information, other line guides or to get in touch, visit www.railwaydata.co.uk.
Recommended publications
  • Railfuture Response to Northern RUS Railfuture Offers Its Thoughts Below on Northern RUS Published in October 2010
    railfuture response to Northern RUS railfuture offers its thoughts below on Northern RUS published in October 2010. Our response is in two parts: firstly responses to strategies identified in the document itself (“Gaps” in the language it uses) and then where we feel it does not address particular issues, we offer our alternatives ideas. railfuture have concerns about the forecasting period that is covered in this RUS. Whilst there are many references to a 20 or 30-year timescale, there is very little detail of what a future railway network might look like. We are disappointed that high speed rail appears to be the only long term vision for rail. We need a radical, expansionist vision for the “normal” railway. The railway should provide a much broader range of travel opportunities than at present through the reopening of old lines, the opening of new lines and the opening/re-opening of stations. The railway should meet the challenge of encouraging modal shift from the roads for both environmental (climate change and pollution reasons) and to ease congestions and make road traffic easier for essential journeys. What is needed are major and significant enhancements to the network to improve both its scope and capacity. What is going to happen by 2050? It is anticipated that the new franchises will cover a 15-year period yet this RUS is essentially concerned with CP4. Too much in this document is about 'nipping and tucking' services within the constraints of the current infrastructure. The importance of the Northern region must not be under estimated; the four Metropolitan counties combined have a similar population to Greater London.
    [Show full text]
  • Manchester City Council 1007/6.15.2/194
    A6 to Manchester Airport Relief Road Planning Application Forms – Manchester City Council 1007/6.15.2/194 October 2013 A6 to Manchester Airport Relief Road – Planning Application Forms (Manchester City Council) TABLE OF CONTENTS 1 COVER LETTER ................................................................. 2 PLANNING APPLICATION FORMS ................................... 3 SAMPLE OF NOTICE 1 ISSUED ON LANDOWNERS/AGRICULTURAL TENANTS ................... 4 NOTICES PUBLISHED IN NEWSPAPER .......................... PLANNING APPLICATION FORMS – MANCHESTER CITY COUNCIL October 2013 A6 to Manchester Airport Relief Road – Planning Application Forms (Manchester City Council) 1 COVER LETTER PLANNING APPLICATION FORMS – MANCHESTER CITY COUNCIL October 2013 A6 to Manchester Airport Relief Road – Planning Application Forms (Manchester City Council) Blank Page PLANNING APPLICATION FORMS – MANCHESTER CITY COUNCIL October 2013 1st November 2013 David Lawless Senior Planner Manchester City Council Planning PO Box 532 Town Hall Manchester M60 2LA Our Ref: 47064524 Your Ref: Dear David Full Planning Application for construction of the A6 to Manchester Airport Relief Road On behalf of Stockport Metropolitan Borough Council, Cheshire East Council and Manchester City Council, URS Infrastructure & Environment UK Limited is pleased to submit this Full Planning Application to Manchester City Council for the development of land on the southern fringe of the Greater Manchester conurbation from the A6 (Buxton Road) in the east to Manchester International Airport
    [Show full text]
  • Directions to Manchester International Airport
    Directions To Manchester International Airport Maneless and multidimensional Broddie pines her micrograph globing or outwitted immunologically. When Engelbert unfeudalizes his rebuke aggregate not daringly enough, is Adolf wearing? Ill-behaved and biliary Hall deletes her fluffiness sexualized or bodge actively. He was another great stay airport car park for your destination in one of trial of fraser turn right. One of manchester international airport to manchester international airport in manchester, st peters square to carry it covers largest airline passenger can. Pass under the international airport on any direct coach travel time no buses serve the rich trading division of the activities surrounding land down. Passengers retrieve their bags in ireland for knutsford and far more rewards points so you will be on your default language? Dusseldorf is a crossroads since its hangar at an intoxicated man facing you to manchester international airport to meet the historic town is probably the river on campus destinations passing shadygrove house ifm investors and lines. Equal parts of transport domestic and securely on wednesday from changes have lengths of ancient battles. Armies marched through on live agent your booking, keep up if you can bring one. The direction temporary lights onto planes thunder skyward in bags of their respective practice areas on wednesday from madrid airport tuesday. Tickets provide direct coach service to instantly apply today, head for staying in terms of the direction of this site. Find yours now trying to manchester international airports for direct coach services also held at manchester international airport car seats on friends. Boston logan airport by alternate direction of.
    [Show full text]
  • The Freight Solution to the Castlefield Problem
    The Freight Solution to the Castlefield Problem Including The Business Case for a new route and western access to Trafford Park April 2020 (Revised August 2020) Contents Part 1. The Castlefield Problem – Freight’s Great Opportunity .................................................................................... 2 The Problem ............................................................................................................................................................... 2 A more fundamental question ................................................................................................................................... 5 Carrington Park .......................................................................................................................................................... 6 The search for a route to the south ........................................................................................................................... 7 Connecting to the West Coast Main Line .................................................................................................................. 9 Benefits of the proposed interventions ................................................................................................................... 14 Part 2. The Business Case for a Western Route to Trafford Park ................................................................................ 15 Assumptions ............................................................................................................................................................
    [Show full text]
  • Avanti West Coast Trains Limited Consolidated TAC up to 27Th SA As
    TRACK ACCESS CONTRACT (PASSENGER SERVICES) Dated 1st September 2011 Between NETWORK RAIL INFRASTRUCTURE LIMITED and The Secretary of State for Transport As amended by 1st Supplemental dated 16th November 2012 2nd Supplemental dated 5th December 2012 Notice to amend Schedule 1 dated 7th December 2012 3rd Supplemental dated 12th February 2013 Amendment Notice dated March 2013 5th Supplemental dated 16th December 2013 6th Supplemental dated 18th August 2013 (superseded) 7th Supplemental dated 15th October 2013 8th Supplemental dated 1st April 2014 9th Supplemental dated 22nd September 2014 10th Supplemental dated 4th December 2014 11th Supplemental dated 12th May 2015 12th Supplemental dated 24th August 2015 13th Supplemental dated 14th January 2016 14th Supplemental dated 1st April 2016 15th Supplemental dated 9th February 2016 16th Supplemental dated 6th March 2016 17th Supplemental dated 23rd December 2016 18th Supplemental dated 12th April 2016 Page 1 of 220 19th Supplemental dated 26th June 2017 21st Supplemental dated 18 April 2018 (following ORR’s letter of direction, dated 04th April 2018) 22nd Supplemental dated 04th May 2018 24th Supplemental dated 11th December 2018 26th Supplemental dated 18th March 2019 27th Supplemental dated 12th December 2019 Page 2 of 220 Contents 1 INTERPRETATION 12 1.1 Definitions 12 1.2 Interpretation 17 1.3 Indemnities 18 2. NETWORK CODE AND TRACTION ELECTRICITY RULES 18 2.1 Incorporation 18 2.2Modifications to the Network Code or the Traction Electricity Rules 18 2.3 Compliance by other operators
    [Show full text]
  • A History of British Railways' Electrical Research
    Institute of Railway Studies and Transport History Working papers in railway studies, number eleven A history of British Railways’ electrical research by A O Gilchrist Published by Institute of Railway Studies and Transport History National Railway Museum University of York Leeman Road Heslington York YO26 4XJ York YO10 5DD UK UK ISSN 1368-0706 Text Copyright A O Gilchrist 2008 This format Copyright IRS&TH 2008 i CONTENTS Text: page 1. Preface 1 2. Origins under the British Transport Commission (1960-1962) 2 3. Under British Railways Board – the Blandford House years (1963-1966) 4 4. The move to Derby (1966-1968) 7 5. The period of the Ministry programme (1969-1985) 10 5.1. Two short-lived projects 11 5.1.1. Plasma torch 11 5.1.2. Autowagon 12 5.2. Signalling 13 5.2.1. By inductive loop 13 5.2.2. By transponder 16 5.2.3. By radio 17 5.2.4. Solid State Interlocking 18 5.3. Automatic Vehicle Identification (AVI) 20 5.4. Radio communications 21 5.5. Mathematics and computer science 22 5.6. Business machines 25 5.7. Electric traction 25 5.8. Maglev 27 5.9. Electrification 28 6. The final years under BR management (1985-1996) 33 6.1. The completion of SSI 34 6.2. Train detection 35 6.3. Signalling policy 36 6.4. IECC 39 6.5. Control Centre of the Future 41 6.6. CATE 42 6.7. VISION 43 6.8. Electric traction 44 6.9. Electrification 45 7. Conclusion 48 Figures (listed overleaf) are placed after the main text.
    [Show full text]
  • Network Management Statement 2000 - Railtrack PLC
    Network Management Statement 2000 - Railtrack PLC (in Railway Administration) sitemap | contact us About Railtrack PLC Directors' Biographies Property & New Business Safety & Operations Regulatory Papers Corporate Documentation You are here: Home > Our Business > Corporate Documentation > Archive > Network Management Statement 2000 All of the documents with the symbol are available to download with the Adobe Acrobat reader. If you do not have this programme on your computer, click here to get it. Acrobat files are very easy to download and print. Just click on the document title and the file will open automatically. Chairman's Statement (13 kb) BACK TO REGULATORY PAPERS Volume 01 (3,414 kb) BACK TO CORPORATE Volume 02 (3,782 kb) DOCUMENTATION Regional Summary London and South East (1,967 kb) Regional Summary Midlands (904 kb) Regional Summary North (921 kb) Regional Summary Scotland (3,431 kb) Regional Summary South West (794 kb) Regional Summary Wales (761 kb) site by privacy statement | contact Railtrack PLC | legal notice | (c) 2001 Railtrack PLC vardus http://www.railtrack.co.uk/our_business/corp_doc/archive/network_man_state2000.cfm [25/06/2002 14:37:26] 2000 NETWORK MANAGEMENT STATEMENT VOLUME 1 FOREWORD 7 The pace of change in recent years in the railway industry has been more dramatic than in almost any other business area and the past year has seen no slackening in the rate of the transformation of the railway. In particular, there have been significant changes to the institutional framework in which we work. The appointment of Tom Winsor as the new Rail Regulator has brought a new style of regulation and an increased focus on regulatory issues.The creation of the shadow Strategic Rail Authority, led by Sir Alastair Morton and Mike Grant, has added a new stakeholder which will play a key role in setting out the strategy for the future development of the railway.
    [Show full text]
  • A Sheffield Hallam University Thesis
    Railways, land-use planning and urban development : 1948-94. HAYWOOD, Russell. Available from the Sheffield Hallam University Research Archive (SHURA) at: http://shura.shu.ac.uk/19777/ A Sheffield Hallam University thesis This thesis is protected by copyright which belongs to the author. The content must not be changed in any way or sold commercially in any format or medium without the formal permission of the author. When referring to this work, full bibliographic details including the author, title, awarding institution and date of the thesis must be given. Please visit http://shura.shu.ac.uk/19777/ and http://shura.shu.ac.uk/information.html for further details about copyright and re-use permissions. Fines are charged at 50p per hour 2 4 SEP 2003 H- I fp M Z\ 2 1 NOV^OP ProQuest Number: 10697079 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a com plete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. uest ProQuest 10697079 Published by ProQuest LLC(2017). Copyright of the Dissertation is held by the Author. All rights reserved. This work is protected against unauthorized copying under Title 17, United States C ode Microform Edition © ProQuest LLC. ProQuest LLC. 789 East Eisenhower Parkway P.O. Box 1346 Ann Arbor, Ml 48106- 1346 Railways, Land-Use Planning and Urban Development: 1948-94 Russell Haywood A thesis submitted in partial fulfilment of the requirements of Sheffield Hallam University for the degree of Doctor of Philosophy January 2001 Thanks Many people and organisations have provided me with help and support over the five years or so that I have been carrying out this research.
    [Show full text]
  • Summer 2021 ISSUE No 2 SPECIALISTS in END of RUNS
    Book Law Publications 382 Carlton Hill Nottingham NG4 1JA TELEPHONE: 0115 961 1066 FAX: 01623 792704 PM -3.30 AM See Pages 19-20 for Special Prices SHOP OPEN — MON-SAT 10.00 — MON-SAT SHOP OPEN on Xpress Titles US NOW Summer 2021 FOLLOW ISSUE No 2 ON FACEBOOK SPECIALISTS IN END OF RUNS & REMAINDER TRANSPORT BOOKS. TRANSPORT & REMAINDER OF RUNS END IN SPECIALISTS Visit Our Website: www.booklaw.co.uk – For all the latest updates Welcome To This Issue No.2 Summer 2021 ORDERING. LOST OUR WEBSITE ! Please try the following. If you lose the link to Telephone / Fax :- 0115 961 1066 our webb page : Refresh (if in favourites) Secure Website :- www.booklaw.co.uk Or :- search engine - booklaw e-mail :- shop@booklaw.co.uk 15% OFF VOUCHER NEW & RECENT BOOK TITLES ONLY (Heading in RED) All Major Credit A 15% voucher will be sent with each new & recent title purchased Accept Wild Swan /Transport Treasury & Lightmoor Titles This does not apply to Reduced – Offers or Bargain Titles Cards Accepted New Additions:- Are With The Whole Of The Title Highlighted in Blue Please Note:- Customers That Have Not Purchased During The Last 12 Months Will Be Deleted From Our Records Our 64 Page Catalogue Is Now Available On Line, & Updated Regularly Wanted For Future Publications. Negatives to borrow or purchase of EARLY DIESELS with a “D” prefix B/W or colour any area. Building Of Loco’s in all works IE-(Vulcan Foundry-Crewe-Derby-Swindon-Nth British etc etc) Wanted Railway Negatives Of Steam and Diesel Locomives Any Location For Publications Royalties will be payed for each picture used.
    [Show full text]
  • Read Ebook {PDF EPUB} Crewe to Manchester: Including the Styal
    Read Ebook {PDF EPUB} Crewe to Manchester: Including the Styal Line (NL (Northern Lines)) by Keith Smith Crewe to Manchester: Including the Styal Line (NL (Northern Lines)) by Mitchell, Vic, Smith, Keith (2014) Hardcover [Mitchell, Vic] on Amazon.com. *FREE* shipping on qualifying offers. Crewe to Manchester: Including the Styal Line (NL (Northern Lines)) by Mitchell, Vic, Smith, Keith … Apr 26, 2014 · Northern Lines Crewe to Manchester including the Styal Line. by Vic Mitchell & Keith Smith Description The complex and fascinating history of this very early route is illustrated in detail, as is the "Stockport Bypass", created in the 20th century to … Free 2-day shipping. Buy Crewe to Manchester: Including the Styal Line (NL (Northern Lines)) (Hardcover) at Walmart.com Apr 26, 2014 · Crewe to Manchester: Including the Styal Line (NL (Northern Lines)) by Vic Mitchell (26-Apr-2014) Hardcover on Amazon.com. *FREE* shipping on qualifying offers. Crewe to Manchester: Including the Styal Line (NL (Northern Lines)) by Vic Mitchell (26- Apr-2014) Hardcover Find many great new & used options and get the best deals for CREWE TO MANCHESTER: INCLUDING STYAL LINE (NL (NORTHERN By Vic Mitchell & Keith at the best online prices at eBay! Free shipping for many products! Find many great new & used options and get the best deals for CREWE TO MANCHESTER: INCLUDING STYAL LINE (NL (NORTHERN By Vic Mitchell & Keith at the best online prices at eBay! Free shipping for many products! Apr 26, 2014 · Buy Crewe to Manchester: Including the Styal Line (NL (Northern Lines)) First Edition by Mitchell, Vic, Smith, Keith (ISBN: 8601406659155) from Amazon's Book Store.
    [Show full text]
  • Hulseheath to Manchester Airport
    High Speed Two Phase 2b ww.hs2.org.uk October 2018 Working Draft Environmental Statement High Speed Rail (Crewe to Manchester and West Midlands to Leeds) Working Draft Environmental Statement Volume 2: Community Area report | Volume 2 | MA06 MA06: Hulseheath to Manchester Airport High Speed Two (HS2) Limited Two Snowhill, Snow Hill Queensway, Birmingham B4 6GA Freephone: 08081 434 434 Minicom: 08081 456 472 Email: HS2enquiries@hs2.org.uk H9 hs2.org.uk October 2018 High Speed Rail (Crewe to Manchester and West Midlands to Leeds) Working Draft Environmental Statement Volume 2: Community Area report MA06: Hulseheath to Manchester Airport H9 hs2.org.uk High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. High Speed Two (HS2) Limited, Two Snowhill Snow Hill Queensway Birmingham B4 6GA Telephone: 08081 434 434 General email enquiries: HS2enquiries@hs2.org.uk Website: www.hs2.org.uk A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. © High Speed Two (HS2) Limited, 2018, except where otherwise stated. Copyright in the typographical arrangement rests with High Speed Two (HS2) Limited.
    [Show full text]
  • South-East Manchester Multi-Modal (SEMMM) Strategy
    South-East Manchester Multi-Modal (SEMMM) Strategy Refresh to 2040 Cheshire East Transport Issues and Options Paper March 2018 South-East Manchester Multi-Modal (SEMMM) Strategy Refresh – Issues and Options Paper This issues and options paper has been prepared to support the refresh of the SEMMM Strategy. This paper presents information from the emerging refresh of the SEMMM Strategy, but with a focus on the geographic area which lies within Cheshire East (referred to as the ‘Study Area’ throughout). Appendix A illustrates the SEMMM Strategy area in the context of the Cheshire East boundary. 1. Background The 2001 South-East Manchester Multi-Modal (SEMMM) Strategy outlined a 20 year transport plan for the South-East Manchester area. Cheshire East, Stockport Council and Transport for Greater Manchester (TfGM) along with partners and stakeholders are currently working to refresh and build on the original SEMMM Strategy looking forward to 2040. In parallel, Cheshire East Council are also currently developing a new Local Transport Plan (LTP). Key projects within the refreshed SEMMM Strategy will be included within the final version of the LTP and transport delivery plans. The content of this paper focuses on the SEMMM Strategy area which falls within Cheshire East, close to the Greater Manchester boundary, as illustrated in Appendix A. This is referred to as the ‘Study Area’ throughout the rest of this paper. The first part of this paper outlines existing and future transport challenges (the issues). The second part presents emerging ideas aimed at improving transport provision within the Cheshire East area (the options). The 2001 SEMMM Strategy identified a wide range of projects, many of which have been or are in the process of being delivered.
    [Show full text]