A New Public Transit Network for the East End of Montreal

Total Page:16

File Type:pdf, Size:1020Kb

A New Public Transit Network for the East End of Montreal A new public transit network for the east end of Montreal Technical presentation Décember 2020 Subsidiary of Caisse de dépôt et placement du Québec This document contains privileged and confidential information, and cdpqinfra.com may not be transmitted or shared without prior consent from CDPQ Infra. East and northeast sector of Montréal Well-known challenges in the east and northeast Low modal share of public Very few major transit for travel between investments made in public attraction centers in the The current situation is transit in recent decades East a major hindrance to development in Residential neighbourhoods Bus networks impacted by the east poorly connected to public traffic transit networks 1 Analysis of the east and northeast sector of Montréal Analysis of the east and northeast sector 1 2 3 Exhaustive mobility Multi-criteria assessment Analysis of the stakes analysis of identified scenarios ü Technical feasibility ü Regional diagnosis in terms of ü Service for the population and ü Social and environmental mobility services travel hubs acceptability ü Corridor options ü Consideration of the city’s ü Economic viability of the project development plans and policies ü User travel modes ü Optimization of connections with other transit networks 2 Analysis of the east and northeast sector of Montréal Strategic areas to service Pointe-de-l’île industrial sector PDUES for Sherbrooke street Vieux Pointe-aux-Trembles Notre-Dame East Corridor Louis-H.-Lafontaine Hospitals Hospital Employment districts Des Faubourgs Green spaces Knowledge hubs Assomption Sud Strategic sectors identified by the City of Montréal 3 – Longue-Pointe Analysis of the east and northeast sector of Montréal The travel corridors studied 4 Stategic hubs Analysis of the east and northeast sector of Montréal Technology to be identified Tramway analysis results 1/4 of the ridership Non-competitive travel time: 20 km/h Capacity not compatible with current needs Not flexible to evolving requirements Low transport cost = performance 5 Analysis of the east and northeast sector of Montréal Technology to be identified Light rail analysis results Competitive travel time: 40–45 km/h Capacity compatible with current needs Flexible to evolving requirements Economic performance of the transport cost and speed of realization 6 Analysis of the east and northeast sector of Montréal Advantages of the elevated structure Optimizes corridors of active transport and public transit Offers flexibility for Limits future network expropriations expansion Highlights the city and the Saint- Lawrence River Prevents Offers new public with aerial views fragmenting the spaces beneath the area structure Limits the footprint on the ground Avoids impact on buried Minimizes impact on the infrastructures road network 7 The proposed solution: REM de l’Est 7 days/week $10 billion total estimated project cost Schedule synchronized with the Montréal metro 32 km 2 to 4 min. Dedicated tracks: Frequency during rush hours 7 km underground and 25 km above ground 100% 23 stations electric and automated all universally accessible Stations Above ground Intermodal stations Underground Potential station Scenic river views Boul. Notre-Dame Marie-Victorin Sherbrooke René-Levesque Street Branch Street ü Avoids numerous buried ü Will harmonize with future ü Integrates into a dense ü Minimizes impact on existing infrastructures (catch basins, redevelopment as an urban residential area composed of development metro, public utilities, boulevard low-height buildings ü Maximizes safety for foundations) ü Maximizes the safety of ü Prevents expropriations pedestrians, cyclists and cars ü Offers new views of pedestrians, cyclists and cars ü No impact on commercial or downtown and the river residential driveways ü Offers new views from the river bank Elevated route Elevated route Elevated route above along the north Primarily above the central side of Notre- underground the central median Dame Street route median 9 The proposed solution A network integrated with other modes 133,000 users/days (by 2044) Intermodal 380 million connections passenger-km per year (by 2044) • Mascouche line • Green, blue and orange lines • SRB • REM • STM, STL, RTL, exo bus networks 10 Four structuring effects for Greater Montréal Mobility Integration Economy Environment 11 Mobility Mobility Generates significant time saved By current With REM % of time saved By car public transit de l’Est compared to car Pointe-aux-Trembles 40 to 80 45 to 60 minutes minutes 25 to ↔ Downtown on average on average minutes 35 70% Cégep Marie-Victorin 40 to 75 55 to 70 minutes minutes 30 25 to 60% ↔ Downtown on average on average minutes Maisonneuve Park 15 to 35 35 to 55 minutes minutes 10 30 to 70% ↔ Downtown on average on average minutes 13 Monday 12:00 From the Cégep Marie-Victorin to the Place des Festivals Time saved even outside peak hours REM de l’Est Bus 444 Orange line Green line 14 Place des Car Festivals Mobility Improves the fluidity of travel Better quality of life Simplified travel 133,000 ü Reduces traffic congestion associated ü Doubles the coverage of the metro users/day (by 2044) with “solo cars” network in Montréal’s east end (x 2.5) ü Offers frequent service, even outside rush ü Services destinations other than downtown 380 million hours passenger-km per year (by 2044) ü Relieves congestion in the Montréal metro ü Allows communities to benefit from the 165 million advantages of urban environments vehicle-km saved (2044) 15 Integration Integration An architectural signature to distinguish Montréal Elevated structures and stations Upstream development of A design that adapts to the designed with a modern and guidelines through a concerted defining elements of each emblematic aesthetic for approach led by experts for the segment downtown Montréal, in the architectural, urban and manner of major metropolises landscape integration of the around the world network 17 Integration REM de l’Est advisory committee on urban integration Proposed mandate Examples of subjects dealt with by the committee • The stations > Make recommendations to the design team in order to ensure a harmonious integration of the REM de l’Est’s • Works of art infrastructures into their environment • The materials > Comment on the guidelines for the architectural • Indoor and outdoor furniture signature and urban integration of the REM de l’Est • Landscaping • Integration of works of art • The ambiance (visual, sound, tactile) • Distinctive elements according to the neighborhoods 18 Model underground station – Saint-Léonard Contributes to revitalization of Notre-Dame Street Examples of international station architecture Examples of international urban integration Environment Environment Contributes to sustainable development More environmentally More service friendly ü Favours sustainable mobility ü Acts as an important vector for rehabilitation of contaminated 35 000 tons brownfields in Montréal’s east end of GHGs prevented per year ü Encourages modal transfer from “solo car” to public transit ü Contributes to improving the overall environmental performance in ü Reduces noise pollution associated with Montréal's east end 165 million traffic congestion vehicle-km prevented ü Includes a GHG compensation ü Fits within the government's strategy to strategy during the construction phase electrify transport 24 Economy Economy Structures development in the east + Largest investment ever made in public transit infrastructure in Quebec DURING CONSTRUCTION ü Services industrial parks, including the Port ü Contributes to revitalizing of Montréal and the Olympic Stadium commercial arteries + 6.3 B $ ü Serves as a lever for the development of the ü Improves recruiting and retention of contributed to Quebec’s GDP Pointe-de-l'Île and Assomption Sud – Longue- the workforce Pointe industrial sectors ü Serves 27 million square feet of ü Decreases economic losses associated with vacant land, conducive to + 60,000 jobs traffic congestion (estimated at $4.2B/year in redevelopment and indirect jobs the greater Montréal area) 26 The next steps The next steps Detailed analysis Construction phase Discussions with citizens Establishment of the Environmental BAPE and consultation with advisory committee for impact study stakeholders urban and architectural integration 28 In the next decade In the next decade Integrated networks to support Montréal's growth 30 For users: breathtaking views of the city and its districts, an enhanced mobility experience Thank you.
Recommended publications
  • Réseau Électrique Métropolitain (REM) | REM Forecasting Report
    Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Réseau Électrique Métropolitain (REM) | REM Forecasting Report Réseau Électrique CDPQ Infra Inc. Métropolitain (REM) REM Forecasting Report Our reference: 22951103 February 2017 Client reference: BC-A06438 Prepared by: Prepared for: Steer Davies Gleave CDPQ Infra Inc. Suite 970 - 355 Burrard Street 1000 Place Jean-Paul-Riopelle Vancouver, BC V6C 2G8 Montréal, QC H2Z 2B3 Canada Canada +1 (604) 629 2610 na.steerdaviesgleave.com Steer Davies Gleave has prepared this material for CDPQ Infra Inc.. This material may only be used within the context and scope for which Steer Davies Gleave has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer Davies Gleave shall be deemed to confirm their agreement to indemnify Steer Davies Gleave for all loss or damage resulting therefrom. Steer Davies Gleave has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. Réseau Électrique Métropolitain (REM) | REM Forecasting Report Contents 1 Introduction ............................................................................................................................
    [Show full text]
  • Fichetechnique REM Mesures D'attenuation ANGLAIS
    2020 REM MITIGATION MEASURES Montréal's east end area RIVIÈRE- DES-PRAIRIES SHERBROOKE/GOUIN STATION TERMINAL 25 VAVARENNESRENNN ANJOU 646400 SSTTAATION 9 44 POINTE- 30 LAVAL 0 AUX-TREMBLES 486 43 SSTTAATIOTIONN 440 OUCHE LINE 432 SC 40 0 SAINT-LÉONARD/ MA 41 MONTRÉAL-NORD STSTAATION 15 43 9 HONORÉ-BEAUGRAND 19 25 SSTTAATIOTIONN 44 9 RADISSON BOUCHERE VILLVI E SAINT-MICHEL/ 43 SSTTAATIOTIONN 2 BusBus terminalterminal MONTRÉAL-NORD 13 STATIOTIONN 9 43 20 TTrainrain station 9 CADILLAC SSTTAATIOTIONN MONTRÉAMOMO ÉÉAALAL MetroMetro stationstation 30 PIE-IX RReservedeserved lanelane AHUNTSIC towaVerseerrs rdlele STATIOTIONN CENTRE-CCEENENTRTRREE 430 0 SSTTAATIOTIONN VILLVILLLLE 41 LOLONGUEUILNGUE L TRAVEL OPTIONS RUSH HOURS (WEEKDAYS) POINTE-AUX-TREMBLES STATION - Line 410 – Express Notre-Dame to downtown - Line 430 – Express Pointe-aux-Trembles to downtown - Line 486 – Express Sherbrooke to the Honoré-Beaugrand station RIVIÈRE-DES-PRAIRIES STATION - Line 449 – Express Rivière-des-Prairies to the Radisson station SAINT-LÉONARD/MONTRÉAL-NORD STATION - Line 432 – Express Lacordaire to the Cadillac station SAINT-MICHEL/MONTRÉAL-NORD STATION - Line 139 – Pie-IX and Line 439 Express Pie-IX to the Pie-IX station* * Please note that major detours are planned northbound on lines 139 and 439 due to work related with the Pie-IX BRT (except from January to March as work will be suspended during winter) 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. 2020 REM MITIGATION MEASURES Montréal's east end area LAVAAVAVAAL 15 19 40 25 440 SAUVÉ SSTTAATIONTION MONMOMOONNTRÉALN RRÉÉÉAAALL MONTMORENCY MASCOUCHE LINE SSTTAATIONTION AHUNTSIC 13 SSTTAATIONTION LONGUEUILONNGGGUU UIL CENTRALE CÔTE-VERTU SSTTAATIONTION SSTTAATIONTION 520 134 TrainTrain stationstation 10 15 20 Metro stationstation 132 20 Mount Royal bypassbypass MASCOUCHE LINE EXTENSION MOUNT ROYAL BYPASS • 3 departures during the morning peak hours and 3 departures during the evening peak hours.
    [Show full text]
  • Titre De La Présentation
    RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN Fact sheets (Alignment optimization) Environmental Impact Study 0 Nom de la présentation Process and approach RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN (REM) • The Environmental Impact Study for the REM comprises thousands of pages, including three addenda. With a transparency objective in mind, CDPQ Infra has prepared several information documents summarizing the study to make the contents of the study more accessible: – A summary report on the study which shows the project’s evolution over the past few months; – A shorter summary setting out the main elements; and – Fact sheets showing the most recent changes in the project’s route. • The following fact sheets provide an overview of the most recent optimizations of the route, made since June. • Various fact sheets will be issued from time to time to track progress on the project and maintain ongoing dialogue. Environmental Impact Study – July 28, 2016 FACT SHEET 1 – Cultural heritage RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN (REM) Objective: prevent and minimize impacts on buildings with heritage potential caused by the connection between REM and Central Station in the Griffintown neighbourhood. The access to Central Station, using CN elevated tracks, allows the various branches to be connected in a single integrated network. • At present, the scenario analyzed for the construction of civil-engineering structures between Notre-Dame Street West and St. Paul Street West might require partial demolition of the rear section of the Rodier Building. • Other options that would avoid affecting this heritage building are however still being analyzed. • Optimization of the route in this sector has made it possible to avoid affecting the New City Gas Building, as well as various buildings in the block formed by Wellington-Ann-Brennan streets, eliminating the need for demolition of the Drummond-McCall Building*.
    [Show full text]
  • An Innovative Model, an Integrated Network
    RÉSEAU ÉLECTRIQUE MÉTROPOLITAIN An innovative model, an integrated network / Presentation of the #ProjetREM cdpqinfra.com THE REM: A PROJECT WITH IMPACT The REM is a fully automated, electric light rail transit (LRT) system, made up of 67 km of dedicated rail lines, with 50% of the tracks occupying existing rail corridors and 30% following existing highways. The REM will include four branches connecting downtown Montréal, the South Shore, the West Island, the North Shore and the airport, resulting in two new high-frequency public transit service lines to key employment hubs. A team of close to 400 experts is contributing to this project, ensuring well-planned, efficient and effective integration with the other transit networks. All sorts of elements are being considered, including the REM’s integration into the urban fabric and landscape, access to stations and impacts on the environment. Based on the current planning stage, the REM would become the fourth largest automated transit network in the world, with 27 stations, 13 parking facilities and 9 bus terminals, in addition to offering: • frequent service (every 3 to 12 minutes at peak times, depending on the stations), 20 hours a day (from 5:00 a.m. to 1:00 a.m.), 7 days a week; • reliable and punctual service, through the use of entirely dedicated tracks; • reduced travel time through high carrying capacity and rapid service; • attention to user safety and security through cutting-edge monitoring; • highly accessible stations (by foot, bike, public transit or car) and equipped with elevators and escalators to improve ease of travel for everyone; • flexibility to espondr to increases in ridership, with the possibility of having trains pass through stations every 90 seconds.
    [Show full text]
  • Evaluating Greenhouse Gas Emissions Benefits of Emerging Green Technologies in Passenger Transportation in the Quebec Context
    Evaluating Greenhouse Gas Emissions Benefits of Emerging Green Technologies in Passenger Transportation in the Quebec Context Sabrina Chan Department of Civil Engineering and Applied Mechanics McGill University, Montreal November 2012 A thesis submitted to McGill University in partial fulfillment of the requirements of the degree of Master of Engineering. © Sabrina Chan 2012 ABSTRACT The transport produces 43.5% of Quebec’s greenhouse gas (GHG) emissions; more than half of these emissions come from passenger transportation. In Quebec, transport emissions have grown by 30% from 1990 to 2009. Accordingly, this research evaluates the impact on GHG of alternative fuels and technologies in public transit and personal motor vehicles in the Quebec context using link-level GHG estimation methods. The transit technologies examined were analyzed using a lifecycle approach, mainly focusing on fuel production and vehicle operation phases, with the aid of GHGenius and MOVES. The demand for hybrid vehicles, its determinants as well as some potential market penetration scenarios were also investigated for Quebec City and the Island of Montreal. Different sources of data were combined to generate GHG inventories and estimate motor vehicle travel demand including: GPS, train and vehicle fleet fuel consumption rates, the Canadian Census, origin- destination surveys, and vehicle registration records. The results demonstrate that the use of alternative technologies can lead to significant GHG reductions. Among the bus technologies, it was found that hybrid buses are the best option with savings of 43.3%, followed by compressed natural gas (20.5%) and biodiesel (12.5%). For commuter rail, electric technology can reduce emissions by 98%; however, hydrogen fuel cell trains may be competitive in terms of cost-benefit ratio.
    [Show full text]
  • The Vision of Montreal's Downtown at the Core of a Polycentric City And
    Page 1 Montreal, November 3, 2016 Anton Dubrau The Vision of Montreal’s Downtown at the Core of a Poly­Centric City And How to Get there With Public Transit A Contribution to the Office de la Consultation Publique de Montreal on the “Strategie Centre­Ville”. Page 2 1. Intro 4 2. What is a Poly­Central City? 4 3. A Transit System for a Poly­Centric City: An S­Bahn 6 4. What would an S­Bahn look like in Montreal? 10 5. The REM ­ The North­South S­Bahn? 15 5.1. Intro 15 5.2. Low Capacity 17 5.4. Monopolization of Mount Royal Tunnel 20 5.4.1. A Second Tunnel? 25 5.4.2. A Solution: Shared System of REM, AMT, VIA 26 5.5. Bad Transfers At Gare Centrale 29 5.5.1. REM ⟷ Orange Line 29 5.5.2. Improving the transfer REM ⟷ Orange Line 30 5.5.3. Further Improving the transfer ­ Moving a Metro Station 31 5.5.4. REM ⟷ Reneve­Levesque 32 5.7. REM: bypassing Griffintown, the Old Port, Pt­St­Charles 35 5.8. Summary 35 5.9. Ridership 35 5.10. An Alternative: CN Rail Viaduct 36 5.11. A Note on Cost 40 6. Summary 41 7. APPENDICES 42 7.1. APPENDIX A: Description of a Shared System between AMT, VIA & REM 42 7.1.1. Frequency, Dwell times & Schedule 42 7.1.2. Track Layout and Station 47 7.1.3. The McGill Station 47 7.1.4. Signalling system / automation 48 7.1.5.
    [Show full text]
  • Total Closure Deux- Montagnes Train Line
    Professional Auto Body Repair & Painting 364, DUBOIS STREET, SAINT-EUSTACHE 833-977-1726 Insurance Work Accepted All Work Guaranted Expert Color Matching Factory Genuine Parts Import Car Specialists American Muscle Cars Towing Major & Minor Repairs CHEVROLET EQUINOX BUICK ENCORE GX GMC TERRAIN CHEVROLET BOLT $1,800 REBATE $1,500 REBATE $2,300 REBATE $1,850 REBATE FREE ESTIMATES! t. 514-476-4565 Blainville, Boisbriand, Bois-des-Filion, Deux-Montagnes, Lorraine, Rosemère, 1385 Boul. des Laurentides, local 103, Vimont, Laval Pointe-Calumet, Sainte-Marthe-sur-le-Lac, Sainte-Thérèse, Saint-Eustache Vol. 16 - No.26 September 25, 2020 450-978-9999 www.ns-news.com [email protected] Covid Tests Total Ramped Closure Up of the Deux-Montagnes line anticipated Page 3 Page 5 Enhanced offer for Deux- Montagnes train line Page 9 At IGA extra Daigle, we always take our time to serve you better. BestVE Choice IEENNVENNUUEE Our services BBI CHEZ NOUS! • Packers • Order online at Chez IGA extraSince Daigle, 1983 • Delivery service igadaigle.com nous aimons prendre le temps de bien vous servir. • Phone orders 450-430-9897 • Open from 8 am Nos services LCOM to midnight Emballeurs E E W AT OUR STORES Looking forward to serving you Service de livraison Visit-usVisit-us at at igadaigle.com igadaigle.com Commandes téléphoniques 450,450, Blainville Blainville Str. Str. East East 220, 220,Saint-Charles Saint-Charles Str. 25,Str. Des 25, Entreprises Des Entreprises Blvd. Blvd.2605, D’Annemasse2605, D’Annemasse Str. Str. andand make make wonderful wonderful discoveries!
    [Show full text]
  • Bois-Franc Station — Rail Shuttle and Trainbus Shuttle 964 of the Société De Transport De Montréal (STM)
    Frequently asked questions Bois-Franc station — rail shuttle and Trainbus shuttle 964 of the Société de transport de Montréal (STM) ....... 3 1. How frequent will rail shuttle departures be? ................................................................................................................................................... 3 2. Will bus departures from the Bois-Franc station be coordinated with the arrival of rail shuttles? ................................................................... 3 3. How will boarding bus shuttles work at the Bois-Franc Station? ..................................................................................................................... 3 4. Will a bus boarding platform be built at the Bois-Franc station? ..................................................................................................................... 3 5. How long will bus shuttle 964 need to reach the Côte-Vertu metro station? ................................................................................................... 3 6. How will evening rush hours work, given that the rail shuttle will depart every 30 minutes? ........................................................................... 3 7. Can we park at the Bois-Franc station to use bus shuttles during the work? .................................................................................................. 4 8. Major work is planned at the Côte-Vertu metro station. How will users be impacted by the work? ...............................................................
    [Show full text]
  • Fichetechnique REM Mesures D'attenuation ANGLAIS
    REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNYG Y MASCOUCHEUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNESNES TERMINAL S H U T T 15 L E MONTRÉALMMOONTRRÉAL- ESST 25 LAVAL 30 30 640 440 BUS SHUTTLE E 140 IN L E BOUCHERBOUCHB CHERVILLEVIV E H C 40 SAUVÉ U 20 Bus terminal O STATION C MONMOONNTRÉALNTTRÉA S A RADISSON Train station M STATION Metro station AHUNTSIC LOLONGUEUILN U STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) → or line 140 from Lachenaie to the Radisson station (±60 min) → or bus shuttle from the Terrebonne station to the Radisson station (±35 min) → or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) 2 Walk to the Sauvé1 metro station ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 → or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne
    [Show full text]
  • Coalition Verte Green Coalition
    Mémoire de la Coalition Verte Stratégie Centre-ville Transport et Environnement • Stratégies de la Coalition Verte pour un réseau intégré et intermodal de transport en commun • Alternatives au Réseau électrique métropolitain de Montréal (REM) • Stratégies de conservation des milieux naturels menacés par le REM 3 novembre 2016 Rédaction: opinion écrite: Avrom David Shtern, porte-parole - transport Coalition Verte Affiliations: Partenaires du Parc Écologique de l'Archipel de Montréal (PPÉAM) Membre du Mouvement Ceinture Verte TABLE DES MATIÈRES INTRODUCTION Les stratégies de la Coalition Verte pour un réseau intégré et intermodal de transport en commun Le Système léger sur rail de l'Antenne Doney, pierre angulaire des stratégies de la Coalition Verte Promouvoir le Système léger sur rail de l'Antenne Doney Le modèle de l'Antenne Doney est transférable et applicable au Montréal métropolitain en entier. REM est un hybride et non pas un réel Système léger sur rail AVONS-NOUS BESOIN DU REM, UN SKYTRAIN DE VANCOUVER, ICI, À MONTRÉAL? Coûts L’amortissement Impact AU CHOIX Enfin, l’utilité CONCLUSION Le SkyTrain de Vancouver, ici, à Montréal? NON MERCI ! La Coalition Verte s'oppose au projet du réseau électrique métropolitain de Montréal (REM) La Coalition Verte soutient un réseau intégré et intermodal de trams-train, SLRs, tramways, métros, trains de banlieue et autobus dans toute la région métropolitaine. * * * * * ANNEX (a): Other Issues and Questions ANNEX (b): Background article - Tremblay's rail plan off track, critics say - Gyulai, The Gazette, 2007 RÉFÉRENCE Diagramme: : «COST COMPARISONS» Rappel historique: Coalition Verte, 1988 – 2013, 25e anniversaire 2 Mémoire de la Coalition Verte INTRODUCTION Les stratégies de la Coalition Verte pour un réseau intégré et intermodal de transport en commun La Coalition Verte soutient un réseau intégré et intermodal de trams-train, SLRs, tramways, métros, trains de banlieue et autobus dans toute la région métropolitaine La Coalition Verte, fondée en 1988 par des bénévoles, est une association à but non lucratif.
    [Show full text]
  • Destination REM
    Destination REM October 7, 2019 – Upcoming work 3 First tracks installed on the South Shore South Shore branch Stations are taking shape Future Du Quartie station Connecting to the heart of the city Future McGill station Excavating 20 storeys underground Future Édouard- Montpetit station A new maintenance centre St-Eustache centre Construction techniques previously unseen in Québec An elevated structure makes headway on the West Island A 14.5-km elevated structure stretching to Sainte-Anne-de-Bellevue A tunnel-boring machine heads to Montréal 3.5 km to be dug to the airport A direct line to the airport Credit: Aéroports de Montréal (ADM) UPCOMING WORK 12 A major modernization project MONT-ROYAL TUNNEL Key phases Deux-Montagnes line January 2020 Suspension of train service at Bois-Franc Mid-2021 Full suspension of train service Opening of the REM’s central segment at Du 2022 Ruisseau Late 2023 Complete opening of the REM Key phases Mascouche line January 2020 Suspension of train service at Ahuntsic station 2022 Connection to Correspondance A40 station A NEW TRANSITIONAL NETWORK IN 2020 BY AREA METROPOLITAN PARTNERS 16 DEUX-MONTAGNES 17 PREFERRED ROUTE (peak hours) Rail shuttle Shuttle 964 ①Côte-Vertu metro ② ③ SHUTTLE 964 TRANSITIONAL NETWORK – 2020 18 Departures in sync 3 buses boarded with trains at a time Buses waiting BOIS-FRANC STATION DEUX-MONTAGNES 19 EXPRESS SHUTTLE BUS OPTION (peak hours and weekends) - Shuttle 404 DEUX-MONTAGNES TRAVEL TIMES 20 • CURRENT TIME 45 min. • PREFERRED ROUTE TIME 65 min. • TRANSFER TIME ± 15 min. • DRIVING TIME Up to 75 min. LAVAL 21 PREFERRED ROUTE (peak hours) Rail shuttle Shuttle 964 ①Côte-Vertu metro ② ③ LAVAL TRAVEL TIMES 22 • CURRENT TRAVEL TIME 38 min.
    [Show full text]
  • 433, Chabanel Montréal Ahuntsic-Cartierville
    Jusqu'à 240 000 pi bureaux contigus disponibles 2 d'espaces 433, CHABANEL MONTRÉAL AHUNTSIC-CARTIERVILLE ESPACE BUREAU HAUT DE GAMME À UNE FRACTION DU PRIX ! MONTRÉAL | Ahuntsic-Cartierville 433, CHABANEL OUEST Espaces de bureaux disponibles Points saillants 1 500 – 40 000 pi2 sur un étage • Nouvelle gestion et édifice récemment rénové, avec (multiples étages disponibles) beaucoup de lumière naturelle, offrant de superbes 6 étages complets disponibles vues sur la ville et les parcs • Loyer très abordable • Dépanneur sur place, restaurant, café, service complet Détails de la propriété TD Banque, cabinet dentaire, garderie, gym, lave-auto Année de construction : 1985 et agence de voyage Superficie locative : 845 000 pi2 • Concierge et sécurité 24/7, caméras et système d’accès par carte Stationnement : Vastes espaces de stationnement intérieurs et extérieurs • Programme de recyclage complet, station de recharge pour voiture électrique et ruche sur le toit Transport : À deux pas des stations de métro Crémazie et Sauvé en autobus • Nombreux espaces de stationnement intérieurs et extérieurs Nombre d’étages : 12 étages Hauteur des plafonds : 11'6" Loyer demandé* : À partir de 9,49 $ par pi2 Emplacement Taxes foncières : 1,88 $ par pi2 • Situé sur Chabanel dans l’arrondissement Ahuntsic- Cartierville, au coin du boulevard St-Laurent Nettoyage quotidien disponible : 1,45 $ par pi2 • Près du Marché Central, Costco, SAQ, Bureau en Gros, Chauffage et climatisation : Disponibles Cinéma Guzzo et beaucoup plus Électricité : À la responsabilité du locataire • Facilement accessible par transport en commun Quais de chargement : 18 et arrêt d'autobus devant le bâtiment Monte-charges : 8 • À distance de marche de la station de train Chabanel (Ligne Saint-Jérôme) et les futurs stations Ahuntsic Ascenseurs : 7 et Sauvé (Ligne Mascouche) Fibre optique disponible • Emplacement central, à l’intersection des autoroutes 40 et 15, près des stations de métro Crémazie et Sauvé * Toute augmentation au-dessus de l’année de base sera en sus.
    [Show full text]