Swaziland Rail Link Partnering to Develop Inter-African Trade
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Railways of the MENA Region, Tools of National and Foreign Policy
DHEEI – Mediterranean Studies Railways of the MENA Region, tools of national and foreign policy Master’s Thesis submitted by GALLOY Théophile Academic year: 2018-2019 Thesis Supervisor: Dr. Silvia Colombo Acknowledgements I wish to express my appreciation to my family, my co-students and CIFE for their valuable support throughout this year. I am also very grateful for the advice given by my fantastic supervisor Dr. Silvia Colombo, who has kindly dedicated some time to read, correct and advise me on my work, whilst allowing me to remain creative in my approach and research. I would also like to extend my thanks to my previous manager, Mr. Stephane Downes, and my previous employer, Mr. Stephane Rambaud-Measson, for opening me the doors of the railway industry and for passing on to me their knowledge and passion for this fascinating sector. I would also like to thank Dr. Ayadi Soufiane, the surgeon who successfully removed my infected appendix in Tunis, which allowed me to continue my work unimpeded. 2 Acknowledgements_____________________________________________________2 Table of Contents_______________________________________________________3 Introduction___________________________________________________________4 Part I: Understanding the political benefits of railway infrastructures______________6 1) The economic and social benefits of rail_____________________________6 2) Rail as a nation building infrastructure, a tool of power________________12 3) Rail as a region building infrastructure, a tool of integration____________19 Part II: -
Rolling Stock | Perway | Infrastructure | Signalling | Operators | Logistics Issue 1 // 2016
ROLLING STOCK | PERWAY | INFRASTRUCTURE | SIGNALLING | OPERATORS | LOGISTICS ISSUE 1 // 2016 EDITOR’S COMMENT RAILWAYS AFRICA 1-2016 Luck Of The Irish A guy called Murphy has this well-known law: if anything can go wrong, it will. For instance, if a train from East London hits a cow early in January, damaging the locomotive, a 17-coach express heading for the coast with anything up to 1,200 passengers on-board won’t be able to get past. If the passenger train has already spent five hours in a heatwave at Burgersdorp, standing face-to-face with another train in the middle of nowhere, it will have run out of water and the toilets will be overflowing. Not all that far away, Murphy seems to have had his hands full, with a train from Port Elizabeth that was Photographed this in the municipal transport supposed to take 20 hours to Johannesburg. It was workshops at Seattle. battling with binding brakes, overflowing toilets and no water. In the end it was to take 33 hours to complete its journey. Attempts to contact Shosholoza Meyl offices were unsuccessful. Nobody answered (Murphy again). The train manager said there was nothing she could do. Eastern Cape area operations manager for Shosholoza Meyl, Nosipho Mancotywa wasn't aware of any complaints regarding the lack of water but she confirmed the lengthy delays with News24. Mancotywa said the signals were not working at Cradock because the electricity was off. Murphy can be a real devil where electricity is involved and he is a dab hand with cockroaches. -
Lok Sabha ___ Synopsis of Debates
LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Monday, March 11, 2013 / Phalguna 20, 1934 (Saka) ______ OBITUARY REFERENCE MADAM SPEAKER: Hon. Members, it is with great sense of anguish and shock that we have learnt of the untimely demise of Mr. Hugo Chavez, President of Venezuela on the 5th March, 2013. Mr. Hugo Chavez was a popular and charismatic leader of Venezuela who always strived for uplifting the underprivileged masses. We cherish our close relationship with Venezuela which was greatly strengthened under the leadership of President Chavez. We deeply mourn the loss of Mr. Hugo Chavez and I am sure the House would join me in conveying our condolences to the bereaved family and the people of Venezuela and in wishing them strength to bear this irreparable loss. We stand by the people of Venezuela in their hour of grief. The Members then stood in silence for a short while. *MATTERS UNDER RULE 377 (i) SHRI ANTO ANTONY laid a statement regarding need to check smuggling of cardamom from neighbouring countries. (ii) SHRI M. KRISHNASSWAMY laid a statement regarding construction of bridge or underpass on NH-45 at Kootterapattu village under Arani Parliamentary constituency in Tamil Nadu. (iii) SHRI RATAN SINGH laid a statement regarding need to set up Breeding Centre for Siberian Cranes in Keoladeo National Park in Bharatpur, Rajasthan. (iv) SHRI P.T. THOMAS laid a statement regarding need to enhance the amount of pension of plantation labourers in the country. (v) SHRI P. VISWANATHAN laid a statement regarding need to set up a Multi Speciality Hospital at Kalpakkam in Tamil Nadu to treat diseases caused by nuclear radiation. -
Current Affairs January-2021
CURRENT AFFAIRS JANUARY-2021 1. Where did Union Minister for Road Transport and Highways Nitin Gadkari announced the setting up of multi-model logistics park? (a) Durgapur (b) Bhilai (c) Tezpur (d) Silchar (e) Rourkela Ans. (d); 2. Indian Railways completed successful speed trials of the new design Vistadome Tourist Coaches made by Integral Coach Factory (ICF) at what speed? (a) 150 kmph (b) 180 kmph (c) 130 kmph (d) 160 kmph (e) 190 kmph Ans. (b); 3. The Union Cabinet approved the export of which missile system in order to boost domestic defence manufacturing? (a) Akash (b) BrahMos- II (c) Dhanush (d) Nirbhay (e) BrahMos Ans. (a); 4. Where did Prime Minister Narendra Modi laid the foundation stone of All India Institute of Medical Sciences (AIIMS) in December 2020? (a) Surat (b) Bareilly (c) Rajkot (d) Pushkar (e) Hisar Ans. (c); 5. Which bank has collaborated with Salesforce, a leader in customer relationship management, to build a next generation technology platform to power the retail lending business? (a) Yes Bank (b) Axis Bank (c) Kotak Mahindra Bank (d) IndusInd Bank (e) Federal Bank Ans. (a); 6. Which foreign bank in India has introduced ‘Travel Now’, a one-stop travel marketplace within its app? (a) Qatar National Bank (b) DBS Bank (c) The Bank of Nova Scotia (d) Deutsche Bank (e) SBM Bank Ans. (b); 7. Pimpri Chinchwad Municipal Corporation (PCMC) of Pune signed an MoU with which of the following to co-create India’s first Social Impact Bond (SIB)? (a) United Nations Environment Programme (b) United Nations Development Programme (c) United Nations Human Settlement Programme (d) United Nations Population Fund (e) United Nations Capital Development Fund Ans. -
JICA Preparatory Survey on Greater Cairo Metro Line No.4 in the Arab Republic of Egypt FINAL REPORT
No. In the Arab Republic of Egypt JICA Preparatory Survey On Greater Cairo Metro Line No.4 Ministry of Transport, National Authority for Tunnels The Arab Republic of Egypt JICA Preparatory Survey On Greater Cairo Metro Line No.4 In the Arab Republic of Egypt FINAL REPORT FINAL REPORT Volume 1 (Feasibility Study Report 1) (Feasibility Study Report 1) Volume 1 JUNE 2010 JAPAN INTERNATIONAL COOPERATION AGENCY JUNE 2010 NIPPON KOEI CO., LTD. JAPAN RAILWAY TECHNICAL SERVICE NIPPON CIVIC CONSULTING ENGINEERS CO., LTD EID JR 10-125 No. In the Arab Republic of Egypt JICA Preparatory Survey On Greater Cairo Metro Line No.4 Ministry of Transport, National Authority for Tunnels The Arab Republic of Egypt JICA Preparatory Survey On Greater Cairo Metro Line No.4 In the Arab Republic of Egypt FINAL REPORT FINAL REPORT Volume 1 (Feasibility Study Report 1) (Feasibility Study Report 1) Volume 1 JUNE 2010 JAPAN INTERNATIONAL COOPERATION AGENCY JUNE 2010 NIPPON KOEI CO., LTD. JAPAN RAILWAY TECHNICAL SERVICE NIPPON CIVIC CONSULTING ENGINEERS CO., LTD EID JR 10-125 JICA Preparatory Survey on Greater Cairo Metro Line No.4 in the Arab Republic of Egypt CONTENTS OF FINAL REPORT Volume 1 : Feasibility Study Report 1 Data Collection, Diagnosis of the Existing Public Transport System and Urban Development Hypothesis Volume 2 : Feasibility Study Report 2 New Transportation Study, Data Analysis and Alternative Corridors for Greater Cairo Metro Line No. 4 Volume 3 : Feasibility Study Report 3/4 Preliminary design on Greater Cairo Metro Phase 1 and Economic Financial Analysis Volume 4 : Drawings Exchange Rates 1.00 LE = JPY17.28 USD1.00 = JPY95.25 USD1.00 = 5.512 LE Preface In response to the request from the government of the Arab Republic of Egypt, the Government of Japan decided to conduct “JICA Preparatory Survey on Greater Cairo Metro Line No.4”, and entrusted the study and to the Japan International Cooperation Agency (JICA). -
Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______
LOK SABHA ___ SYNOPSIS OF DEBATES* (Proceedings other than Questions & Answers) ______ Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______ SUBMISSION BY MEMBERS Re: Farmers facing severe distress in Kerala. THE MINISTER OF DEFENCE (SHRI RAJ NATH SINGH) responding to the issue raised by several hon. Members, said: It is not that the farmers have been pushed to the pitiable condition over the past four to five years alone. The miserable condition of the farmers is largely attributed to those who have been in power for long. I, however, want to place on record that our Government has been making every effort to double the farmers' income. We have enhanced the Minimum Support Price and did take a decision to provide an amount of Rs.6000/- to each and every farmer under Kisan Maan Dhan Yojana irrespective of the parcel of land under his possession and have brought it into force. This * Hon. Members may kindly let us know immediately the choice of language (Hindi or English) for obtaining Synopsis of Lok Sabha Debates. initiative has led to increase in farmers' income by 20 to 25 per cent. The incidence of farmers' suicide has come down during the last five years. _____ *MATTERS UNDER RULE 377 1. SHRI JUGAL KISHORE SHARMA laid a statement regarding need to establish Kendriya Vidyalayas in Jammu parliamentary constituency, J&K. 2. DR. SANJAY JAISWAL laid a statement regarding need to set up extension centre of Mahatma Gandhi Central University, Motihari (Bihar) at Bettiah in West Champaran district of the State. 3. SHRI JAGDAMBIKA PAL laid a statement regarding need to include Bhojpuri language in Eighth Schedule to the Constitution. -
2019 Annual Report Annual 2019
a force for good. 2019 ANNUAL REPORT ANNUAL 2019 1, cours Ferdinand de Lesseps 92851 Rueil Malmaison Cedex – France Tel.: +33 1 47 16 35 00 Fax: +33 1 47 51 91 02 www.vinci.com VINCI.Group 2019 ANNUAL REPORT VINCI @VINCI CONTENTS 1 P r o l e 2 Album 10 Interview with the Chairman and CEO 12 Corporate governance 14 Direction and strategy 18 Stock market and shareholder base 22 Sustainable development 32 CONCESSIONS 34 VINCI Autoroutes 48 VINCI Airports 62 Other concessions 64 – VINCI Highways 68 – VINCI Railways 70 – VINCI Stadium 72 CONTRACTING 74 VINCI Energies 88 Eurovia 102 VINCI Construction 118 VINCI Immobilier 121 GENERAL & FINANCIAL ELEMENTS 122 Report of the Board of Directors 270 Report of the Lead Director and the Vice-Chairman of the Board of Directors 272 Consolidated nancial statements This universal registration document was filed on 2 March 2020 with the Autorité des Marchés Financiers (AMF, the French securities regulator), as competent authority 349 Parent company nancial statements under Regulation (EU) 2017/1129, without prior approval pursuant to Article 9 of the 367 Special report of the Statutory Auditors on said regulation. The universal registration document may be used for the purposes of an offer to the regulated agreements public of securities or the admission of securities to trading on a regulated market if accompanied by a prospectus or securities note as well as a summary of all 368 Persons responsible for the universal registration document amendments, if any, made to the universal registration document. The set of documents thus formed is approved by the AMF in accordance with Regulation (EU) 2017/1129. -
Managing Supply Chain Risk and Disruption in Capital Projects Africa
Managing supply chain risk and disruption in capital projects Africa Construction Trends Report 2020 Africa Construction Trends Report 2020 | Contents Africa Construction Trends Report 2020 | Foreword Contents Foreword Foreword 01 The COVID-19 pandemic has created an imperative to reconfigure the supply chain Africa construction in focus 03 in capital projects by highlighting supply chain risks and disruptions. This offers an Africa’s economic stance 10 opportunity to transform how capital projects can be managed more effectively to deliver more value. Regional construction in focus 14 East Africa 14 The COVID-19 pandemic has radically challenged project execution While managing risk and disruption in the supply chain can be strategy to integrate supply chain, procurement and logistics complex, a successful outcome can be characterised very clearly Southern Africa 17 during the planning process to achieve real-time visibility across and simply by: the end-to-end supply chain and improve agility, productivity and • building a digitally enabled resilient supply chain to proactively stakeholder management. Hence, “Managing Supply Chain Risks Central Africa 20 identify and manage risk and Disruption in Capital Projects” – discussed in this year’s Africa West Africa 23 Construction Trends (ACT) Report – has become more important • improving capital and operational efficiency through supply now than ever to re-think the entire project value chain from a chain integration, while managing supply chain disruption North Africa 26 supply chain perspective. • aligning skills and competency with the future of work to improve value delivery Managing supply chain risk and disruption in capital projects 30 At its core, the annual Africa Construction Trends Report tracks infrastructure and capital projects (I&CP) activity in Africa. -
Support for Development of Egypt Cairo Metro's TVM System and Financial Procurement
2016/17 AfDB Joint Consulting Project : Project 2016/17 AfDB Joint Consulting 2016/17 AfDB Joint Consulting Project : Support for Development of Egypt Cairo Metro's TVM System and Financial Procurement Support for Development of Egypt Cairo Metro's TVM System and Financial Procurement TVM System Metro's Cairo of Egypt Development Support for Ministry of Strategy and Finance, Republic of KoreaⅠGovernment Complex, Sejong, 30109, Republic of Korea www.mosf.go.kr The Export-Import Bank of KoreaⅠ38 Eunhaeng-ro, Yeongdeungpo-gu, Seoul, 07242, Republic of Korea www.koreaexim.go.kr 2016/17 KSP-AfDB Joint Consulting Project Project Title Support for Development of Egypt Cairo Metro's TVM System and Financial Procurement Prepared by SMDev, Korea Smart Card Corporation, Seoul Metro Financed by Ministry of Strategy and Finance, Republic of Korea Supported by The Export-Import Bank of Korea (Korea Eximbank) - Seung Ho Sohn, Director General - Jae Jeong Moon, Director of KSP Team - Su Min Han, KSP Specialist of KSP Team - Kun Young Lee, Researcher of KSP Team - Hee Kyung Ryoo, Researcher of KSP Team African Development Bank (AfDB) Prepared for Ministry of Transportation, Egypt Project Manager Young Wook Park, SMDev Researchers Sung Hoon Cho, SMDev Gil Woung Park, Korea Smart Card Corporation Ju Gil Yoon, Seoul Metro Eun Sook Hong, Seoul Metro i Contents 2016/17 KSP-AfDB Joint Consulting Project Summary Ⅰ. Project Outline ·············································································································· 1 1 . B a c k g r o u n d & P u r p o s e ··················································································································· 1 2 . D e t a i l s a n d S c o p e ····························································································································· 2 Ⅱ. -
NEWSBAND 198.Pmd
25 December VOL. 13 • ISSUE 198 PAGES 12 • PRICE ` 1 2019 WEDNESDAY RNI No. MAHEN/2007/21778 POSTAL REGN. NO. NMB/154/2017-19/VASHI MDG POST OFFICE NEWS IN Chain protest held at Airoli BRIEF No detention camp demanding completion of Dr. Babasaheb Ambedkar’s Mayor from to come up in NM: Yiwu City, China Memorial in 90 days praises The work has been going on Navi Mumbai Uddhav Thackeray for the last 9 years The Mayor of Yiwu City, China who came for By Chandrashekhar Hendve protest was held by a visit to the satellite city AIROLI: Angry Dr. Babasaheb said that Navi Mumbai is The government doesn’t want to with the slow pace of Ambedkar Smarak “unique city” and its future is “even brighter”. He was create fear among citizens welcomed by Navi Mum- bai’s Mayor Jaywant Su- tar… By Abhitash D.Singh (More on page 5) NAVI MUMBAI: In view of the nationwide pro- 3 kg 600 grams test against the Citizen- ship Amendment Act, of marijuana Maharashtra Chief seized Minister, Uddhav The couple, who Thackeray has reported- used to sell marijuana in ly scrapped the decision Nagzari village in Taloja of the former Chief Min- Ghotkamp, have been ar- ister, Devendra Fad- rested by a special nar- navis to develop a deten- work of Dr. Babasa- Samiti, Navi Mum- cotics team division-2. tion centre in Navi heb Ambedkar bai on 24th December, Memorial at Sector The team has seized Mumbai. He assured Contd. on pg. 5 marijuana weighing 3 kg that his government 15, Airoli, a chain 600 grams from the cou- doesn’t want to create Maharashtra CM Ud- among the Muslim com- ple, who have been iden- fear among the citizens. -
The Use of Underground Metro Stations and Tunnels As Protective Structures in Case of Nuclear Emergencies
Journal of Environmental Science and Engineering B 5 (2016) 35-56 doi:10.17265/2162-5263/2016.01.005 D DAVID PUBLISHING The Use of Underground Metro Stations and Tunnels as Protective Structures in Case of Nuclear Emergencies Mohamed Farahat Department of Siting and Environment, Egyptian Nuclear and Radiological Regulatory Authority, Cairo 11787, Egypt Abstract: This paper discusses the use of Underground Metro stations and tunnels as protective structures in case of nuclear emergencies. Six lines are taken as a case study to investigate the use of their underground stations and tunnels. The research explains the structural design of Underground Metro and the necessary needs for hidden people inside Underground Metro used as shelters. The research investigates the calculations of the number of hidden persons inside Underground Metro used as shelters. A field study has been conducted to an Underground Metro station to determine the peaceful use and the emergency use of all basements of the station. Also, the field study aims to determine the existing spaces and the needed spaces of the Underground Metro station to dual—used as a nuclear shelter. Three Underground Metro stations have been selected and a field study has been conducted to determine the usages of these basements, the planning, general and design features for each one of them, and whether they can be used as protective structures for citizens in emergencies. These basements were compared for their protective factors. Also, their capacities for sheltering were calculated. Key words: Underground Metro, stations and tunnels, protective structures, nuclear shelters, nuclear emergencies. 1. Introduction Underground Metro stations and tunnels as public buildings are special in the fact that most of their The nuclear bomb produces fallout (radioactive spaces are designed for receiving congregations of particles) drop down to the ground near the explosion people and trains. -
Of 77 OPEN E-TENDER TSV Services CIN No
OPEN E-TENDER TSV Services CIN No. L74899DL1999GOI101707 Website: www.irctc.com Email id: [email protected] OPEN E-TENDER BID DOCUMENT FOR PROVISION OF ONBOARD CATERING SERVICES THROUGH TRAIN SIDE VENDING (TSV), IN IDENTIFIED MAIL / EXPRESS / SUPER FAST TRAINS, RUNNING WITHOUT PANTRY CAR, IN PARTIAL / COMPLETE UNBUNDLING MODEL IN FOLLOWING SECTIONS Sec. No. TSV Section Railway I CSMT-Daund-CSMT(Via Pune)/CSMT – Roha-CSMT/Roha-BSR-Roha Central Railway II DAUND-KOLHAPUR-DAUND/PUNE-KOLHAPUR-PUNE Central Railway III MMR-CSMT-MMR Central Railway IV MMR-/Wadi/Latur(Via DD)-MMR & KMV-MRJ-KMV Central Railway V MMR-BSL-MMR Central Railway VI BRC-MMCT-BRC, Western Railway IX Central/West Central Railway NGP-ET-NGP XI Jabalpur (JBP) – Katni (KTE) – Satna (STA) – Manikpur (MKP) / Rewa – Jabalpur West Central Railway (JBP) and Jabalpur (JBP) – Bina (BINA) - Jabalpur (JBP) Via Katni (KTE) XVI Western Railway ADI-VG-DHG-SIOB-GIMB-BHUJ & SIOB-PNU XVII Western Railway VG-SUNR-RJT- HAPA-JAM- KNLS-OKHA and WKR-MVI-DAC-MALB XVIII SUNR-DLJ-SOJN-PIT/BVP; SUNR-DLJ-RLA-MHV; PBR-WSJ-JLR-RJT; PBR- Western Railway WSJ-LPJ-KNLS-JAM-RJT(VIA HAPA)/OKHA(VIA KNLS); SMNH-VRL-JND- JLR-RJT/OKHA(Via WSJ) XIX BINA-ET-BINA West Central Railway XX JBP-ET-JBP West Central Railway XXI BSL-ET-BSL Central/West Central Railway Last date and Time of Submission of bids : 25-02-2020 by 1500 hrs Date and Time of Opening of bids : 25-02-2020 at 1530 hrs Pre-bid Meeting : 14-02-2020 at 1500 hrs E-Tender No.