% ~ ~ _ _q~~~~~~~~~~~~~~~~~~I
Documentof y ) The World Bank
FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No. 9794-ANG
STAFF APPRAISAL REPORT
ANGOLA Public Disclosure Authorized LOBITO BENGUELA URBAN ENVIRONMENTALREHABILITATION PROJECT
NOVEMBER 27, 1991 Public Disclosure Authorized
South-Centraland Indian Ocean Department Public Disclosure Authorized InfrastructureOperations Division Africa Region
Thi document ha a roficted dltdbidtlon myo be used by rdpkntsondy In tbepeformauia of their officeaddutoe Its cottes way not oherwise be disosed wthout Wofid Bank anthozaton. CURRENCY EQUIVALENTS
Currency nitew Kwnza Mar.91-Nov.91 US$1.00 NKz6O From Nov.16, 1991 US$1.00 NKz9O Base Ratel/
If Applicableto petroleumand diamondexports, official financialtransactions and five basic consumer imports. Other rates apply as follows: NKz18Ofor raw materialsand selected other consumer imports; and NKz55Ofor remainingexports and imports. Individualtransactions may be conductedthrough the commercialbanks at parallel market rates (NKz780 as of Nov. 25, 1991).
MEASURES AND EQUIVALENTS 1 Meter (m) 3.28 Feet 1 Kilometer 0.625 Miles 1 Square Meter (mi)- 10.76 Square Feet 1 Hectare 10,000 ni2 or 2.47 Acres 1 Liter 0.264 Gallons (0.22 Imp. Gal.) 30 Liters per day 7.92 Gallonsper day 1 m3 (1,000 Liters) 264 Gallons (220 Imp. Gal.) 1 rn3 per hour 6,336 Gallons per day
ABBREVIATIONSAND ACRONYMS
AfDB African DevelopmentBank CFB = BenguelaRailway Company DNPT = National Directorateof Territorial Planning DPS ProvincialDirectorate of Health DPSC ProvincialDirectorate of Commun ty Services EPAB ProvincialWater Companyof Benguela GIS GeographicInformation System GPB ProvincialGovernment of Benguela GPP ProvincialPlanning Office ICB InternationalCompetitive Bidding INPF National Instituteof PhysicalPlanning KAP KnowledgeAttitude Practice Survey LARGIS Land RegistrationGeographic Information System LCA Lobito Corridor Authority LCB Local CompetitiveBidding MINFIN Ministry of Finance MINPLAN Ministry of Planning NA Not Applicable NORAD NorwegianAgency for DevelopmentCooperation ORT Oral RehydrationTherapy PPF Project PreparationFacility SADCC SouthernAfrica DevelopmentCoordination Conference SATCC Southern Africa Transport & CommunicationsCommission SEUHA State Sec tariat for Urbanism, Housingand Water SIDA Swedishinternational Development Authority TA TechnicalAssistance UNDP United Nations DevelopmentProgram UNV United NationsVolunteers
FISCAL YEAR January 1- December31 FOR OFFICIAL USE ONLY
ANGOLA LOBrTO BENGUELAURBAN ENVIRONMENTALREHABILITATION PROJECT
TABLE OF CONTENTS Page No CREDIT AND PROJECT SUMMARY i-v
I. BACKGROUND A. Introduction I B. Sectoral Context 2 C. Sectoral Issues 2 D. Rationale for Bank Group Involvement S
II. THE PROJECT A. Project Objectives 5 B. Project Description 5 Environmental Sanitation 6 Low IncomeSanitation 8 Institutional Development 9 Studies 11 C. Project Costs 12 D. Project Financing Plan 14
HI. PROJECT IMPLEMENTATION A. Institutional Arrangements 14 B. Project Implementation Staff 15 C. Action Plan 16 D. Procurement 19 E. Disbursements 21 F. Project Accounting, Auditing, and Reporting 21 G. Key Indicators 22 H. Mid-Term Review 22
IV. FINANCIAL AND ECONOMIC ANALYSIS A. Empresa Provincial de Aguas de Benguela (EPAB) 23 B. Cost Recovery 24 C. Private Sector Development 25 D. Project Benefits 25 E. Project Justification 26 F. Project Risks 26 G. Lessons Learned 27
V. AGREEMENTS, CONDITIONSAND RECOMMENDATION A. Agreenents Prior to Negotiations 28 B. AgreementsReached at Negotiations 28 C. Conditions of Credit Effectiveness 29 D. Conditions of Disbursement 29 E. Recommendation 29
This report is based on the findingsof an apptaisal missionto Angola in May, 1991, consistingof Mr. R. Chavez (senior urban planner and missionleader), Ms. T. Genta-Fons(senior counsel), and consultantsMessrs./Mesdames B. Brandberg(sanitation specialist), E. Echeverria(engineer and planner), J. Ladd (financialanalyst), M. Lar-Resnde (ecologicalplanner), M. Pamer (geographer), and G. Tannerfeldt(architect planner, SIDA). Messrs. B. Menezesand R. Beardmorewere the poer reviewers for the project. Mr. M. Blancand Mr. F. Aguirre-Sacasaarm the managingdivision chief and director respectivelyfor the operation.
This document has a restricted distribution and may be used by recipients only in the performance of their oMficiolduties. Its contents may not otherwise be disclosedwithout WorldBank authorization. .jj, Tableof Contents(Cont'd)
ANNEXES
PROJECT-RELATED I PreliminaryEnvironmental Assessment 2 Water, Sewer, and Storm DrainageRehabilitation 3 Low Income Sanitation 4 Solid Waste Management 5 ImplementationPlan and Key Indicators 6 Detailed Project Costs 7 Financial Analysis 8 GeographicalInformation System
TERMS OF REFERENCE 9 Water and Sewer Tariff and InstitutionalReorganization Study 10 EnvironmentalManagement and MonitoringStudy 11 Land RegistrationStudy 12 GPP Key Staff
BACKGROUND 13 SelectedDocuments Available in the Project File
MAPS IBRD No. 23181 Angola - Project LocationMap IBRD No. 23182 Lobito Benguela- Project ComponentMap -iii-
ANGOLA
LOBITO BENGUELA URBAN ENVIRONMENTALREHABILITATION PROJECT
CREDIT AND PROJECT SUMMARY
Borrower: People's Republicof Angola
Beneficiary: Provincial Govemmentof Benguela(GPB)
Amount: SDR 33.6 million (US$45.58 million equival.nt).
Tenns: StandardIDA Terms with 40 years maturity.
Co-Financing: Norway (NORAD)and Sweden (SIDA)
Project Objectives: The project is a free-standingenvironmental project whosemain objectivesare to: (a) restoie the water supply and failed sanitary services in order to help eliminate life-threatening epidemics,improve the health of the population,and halt the degradationof the physical environment;(b) improve living conditionsin the squatter settlementsby providingaccess to clean water and improvedlatrines; (c) strengthenthe institutionsresponsible for project managementand for operation, management,and control of urban servicesand the environmentby providing technicalassistance, logisticalsupport, and training;and (d) assist in policy reform through water and sewer tariff, land registration, and environmentalstudies.
Project Description: The project consistsof the followingcomponents:
a) Environmental Sanitation - rehabilitationand expansionof the water supply and distributionand sanitary sewer systems; rehabilitationof the solid waste managementsystem; and rehabilitationof the storm drainage and erosion control network;
b) Low Income Sanitation - provision of clean urban water to all unplanned settlementsvia a network of 500 standpipesand laundry facilities; a massiveimproved latrine and sanitary- environmentaleducation program; and a modest urban revegetationprogram in the unplanned settlements;
c) Istitutional Development - consistingof technicalassistance and training, and logistical and administrativesupport for the ProvincialWater Company (EPAB);for the Provincial CommunityServices Department (DPSC); and for the ProvincialPlanning Office (GPP) to manage and monitor the project as a whole.
d) Studies - to assist the Govermmentto reorganizethe ProvincialWater Company and set economicwater and sewer tariffs; to define policy issuesand action plans for environmental managementand monitoring;and to developa geographicinformation system and land registrationpilot program. The project would also financethe detailed engineeringdesign and supervisionof the water, sewer, and storm drainage components;and studies for the preparationof follow-upprojects in the infrastructuresector identifiedduring project implementation. -iv-
Benrits and Risks:
While justified on health and tnvironmental concernsalone, the proposed project would facilitatethe developmentof the larger LobitoCorridor rehabilitationprogram. Major direct benefits of the project would be measuredin terms of improvedhealth of the population, and in particular of womenand children; alleviationof poverty among the lowest income groups in the squatteTsettlements; increased productivity of the urban population;positive impactson the physical and socidl envirornment;and increasedefficiency of key institutionsserving the cities of Lobito and Benguela. The risks inherentin the proposedproject are due to institutionaland technicalweaknesses which may cause delays in project implementationand lead to further environmentaland economicdeterioration. There is a potentialrisk that the govermmentmay interfere in the administrativeautonomy of the provincial water companythereby hindering reorganizationefforts and the cost recovery objectivesof the project. Unfamiliaritywith Bank procedures,problems with communications,and a potentiallyunstable politicalenvironment could lead to significantdelays as well. Delays in the overall urban rehabilitationeffort could affect the rehabilitationof the Lobito corridor, once it gets underway. Technicalassistance, training, and logisticalsupport, initiatedduring project preparation, are intended to minimize these risks.
Project Cost:
The total cost of the project is estimatedat US$58.88million equivalentwith foreign costs of US$49.20 million which represent 84 percent. The detailed cost estimatesin prices as of July 1991 are shown below.
Project Cost Estimates (USS million) Percent Local Foreign Totat Totat Foreign 1. EIVIRONNENTALSANITATION S4.94 $21.24 126.18 45X 81X A. WaterRehabilitation 1.44 8.16 9.60 16 85 B. Sewer Rehabititation 1.18 6.70 7.88 13 85 C. StormDrainage Works 1.74 4.06 5.80 10 70 D. SolidWaste Collection & Disposal 0.58 2.32 2.90 5 80 11. LOWINCOhE SANITATION $1.55 $2.37 $3.92 7X 601 A. ImprovedLatrines 1.08 1.72 2.80 5 61 B. Sanitary-EnvironmentalEducation 0.15 0.48 0.63 1 77 C. UrbanRevegetation 0.32 0.18 0.50 1 35 III.INSTITUTIONAL DEVELOPMENT $0.59 S8.08 58.67 15S 931 A. TechnicalAssistance 0.31 5.45 5.76 10 95 B. Training 0.04 0.34 0.38 1 90 C. Aclninistrative/LogisticalSupport 0.25 2.29 2.54 4 90 IV. STUDIES $0.16 S6.13 56.29 11X 97X A. Engineering Design & Supervision - 3.49 3.49 6 100 B. Water& SewerTariff & Reorganiz,Study 0.67 0.67 1 100 C. GIS/LandRegistration Study 0.08 0.31 0.39 1 80 D. EnvironmentatMgt& MonitoringStudy 0.08 0.70 0.78 1 90 E. OtherStudies - 0.95 0.95 2 100 V. TOTALBASE COST $7.24 $37.83 $45.06 77X 84K PhysicalContingencies 0.99 3.81 4.80 8 79 PriceContingencies 1.45 7.56 9.01 15 84 VI.TOTAL PROJECT COST $9.68 S49.20 S58.88 1001 841 Pricecontingencies are basedon estimatedinternational inflation over the lifeof the project,averaging 3.9X p.a. per recentIDA guidelInes. Basecosts include taxes on locallyprocured goods estimated at USS1.3million equivalent,financed entirely by Government. Financing Plan: (US m;llion) Percent Locat Foreign Total of Total IDACredit $3.38 $42.20 $45.58 77K NORADCo-Financing - 3.50 3.50 6Z SIDA Co-Financing - 3.50 3.50 6X
Goverirwent 6.30 - $6.30 11X Total $9.68 $49.20 $58.88 100l
Estimated Disbursenents: (USMzillion) FY93 FY94 FY95 FY96 FY97 FY98 Total Co-Financing 4.92 2.08 - - - 7.00 IDA - 5.81 10.52 13.14 7.89 8.23 45.58 Govermrient 0.63 0.94 1.26 1.57 0.95 0.95 6.30 Total 5.55 8.83 11.78 14.72 8.83 9.17 58.88 Percent 9% 15% 20% 25% 15% 16X 100X IDACueulative - 5.81 16.32 29.47 37.35 45.58 Percent of Total - 13X 36K 65X 82 100S
Economic Rate of Return: Not applicable
Staff Appraisal Report: Angola-LobitoBenguela Urban EnvironmentalRehabilitation Project Report No. 9794-ANG
Maps: IBRD No. 23181 AngolaProject LocationMap IBRD No. 23182 LobitoBenguela Project ComponentMap I. BACKGROUND
A. Introduction
1.1 Angola is one of the richest countries in Africa in land and mineral endowment. In the years since Independencein 1975, however, the economyhas becomehighly distorted because of the rass exodus of skilled manpower,a debilitatingcivil war, war-inducedrationing and ill-designedeconomic policies. The oil industry, developedas an enclave, has grown rapidly and represents about half of GDP. In contrast, non-oil sectors have performedpoorly; growth has been negative and output is significantlyless today than in the early 1970s. Manufacturingindustries are crippled by lack of raw materials,spare parts, and maintenance. Commerceis atrophied by rationing, state ownership, and rigid govermmentcontrols. Personal incentivesare a pervasivecasualty, reflected in low wages, high absenteeism,and flourishinginformal markets. The foreign exchangemarkets provide a measureof the distortionwith a street rate, NKz800,thirteen times the official rate of NKz6Oper US$1.00. Agriculturalproduction and distributionhave been severely curtailed by the disruptivecivil war in the countryside. Prior to IndependenceAngola was an importantnet exporter of agriculturalproducts, but in recent yeara has become increasinglydependent on food imports, includingfood aid, to supply urban populations,which have burgeonedbecause of the civil war.
1.2 The Port of Lobito heads the major transportationroute of central Angola, the Lobito transportationcorridor, serving 99 market towns, one-thirdof Angola's populationof about 10 million, and the neighboringcountries of Zaire and Zambia. Prior to Independencethe Port of Lobito was one of the most important shippingterminals of South-CentralAfrica. By 1973port traffic exceededthree million tons, more than half Angola's shippingtonnage; and exports were more than half the total. Agriculturalexports accounted for about 20% of total tonnage; and trans-shipmentof minerals from Zaire and Zambia, especiallycopper, magnesium,zinc, and cobalt, represented35% of port traffic.
1.3 Caminhos de Ferro de Ben&uela (CFB), Angola's only internationalrailway, links the port of Lobito and the provincial capital, Benguela,33 kilometersdown the coast, with the mineral belts of Zaire and Zambia, traversing a total distanceof 1,336 kilometers (see Map IBRD No. 23181). Freight rail activity has been severely curtailed since Independencebecause of the civil war. The rai way is closed to internationaltraffic; and national traffic, mostly within Benguelaprovince, has fallen by about 70%. With the signing of the peace accord on May 31, 1991, a major objectiveof the Governmentis to reactivate the flow of goods along the route served by CFB. IDA and other donors are actively involved in the preparationof a rehabilitationprogram of the Lobito transportationcorridor
1.4 Lobito and Beneuela, twin cities on the coast of central Angola, reflect the problems which afflict the country. The populationof Lobitoand Benguelahas nearly quadrupledto 800,000 since Independence,but the deliveryof basic services, especiallyclean water, has diminishedby as much as two-thirds. The problems brought on during the civil war have led to a breakdownof the water, sewer and waste collectionsystems in the face of rapidlygrowing populations. The cities now face public health and environmentalcrises of major proportions. Lack of water and basic sanitationhave led to chronic outbreaks of cholera, typhoid and yellow fever. Child mortalityis reported at 325 per thousand, exceedingthe Angolannational average, 292 per thousand,and more than twice the rate for Sub-SaharanAfrica (157 per thousand). Morbidityrates, i.e., the incidenceof debilitatingdisease, are in excess of 35%. Environmentaldegradation is manifestedby other factors, includingincipient desertification,erosion, and pollution of wetlands. 2
1.5 The proposed urban rehabilitationproject was first identifiedat the Southem Africa Transport and CommunicationCommission (SATCC) Coordinating Conference held in Luanda in January 1989 to review the 10 Year DevelopmentPlan for the Lobito Transport Systemof the Lobito Corridor Authority (LCA), SADCC ProjectG-CE-1. The Swedishand Norwegiandelegations expressed interest in the rehabilitationof Lobito and proposed that the World Bank, as executingagent, undertakeproject preparationand appraisal. A Bank identificationmission in June 1989 included both Lobito and Benggwlabecause the two cities form an enviicnmvuialmicroregion and socio-economicconurbation. In April 1990 the SwedishInternational Development Agency (SIDA) and the Norwegian Agencyfor DevelopmentCooperation (NORAD) created a Project Preparation Trust Fund of SwedishKroners (SEK)6.8 million (US$1.2 million) to support the project. SIDA also provided an Emergency EquipmentFund of SEK 10 million (US$1.8 million) to provide short-termsupport to the water and seweragesystems. In May, 1990 the Bank approved an advanceunder the Project PreparationFacility of $750,000to completethe preparationprocess.
B. Sectoral Context
1.6 The Bank's Introductory Economic Review (Rerort No. 8906-ANG)indicates Ont Angr!&_s estimatedurban populationrose from 15% in 1970 to 23 % in 1985. Urban growthhas been most dramatic in the relativelysecure cities along the Atlanticcoast. Despite lack of census data it is estimatedthat the populationof Luanda, the capital city, tripled from 450,000 to 1.3 million in the ten years followingIndependence in 1975, and that the Lobito-Benguelaconurbation grew from about 200,000 at Independenceto more than 800,000 today.
1.7 Lobito and Benguelano longer stand alone as they did a few years ago. The intensivewar- induced urbanizationbrought a proliferationof small communitiesaround the cities and rapid, unplannedsettlement in the low hills parallel to the coast (see Map IBRD No. 23182). The alluvial plain between the hills and coast is well irrigated and intenselycultivated with sugar cane and vegetables,providing work, food and head-loadedwater for many. The railway, unable to ply its cross-countryroute, provides the prncipal means of tra sportation betweenLobito and Benguelafor the urban poor. CFB shutdes over four million passengersper year, averagingfour round trips daily. Though somewhatsmaller than Lobito, Benguelais the provincial capital and has an airport which serves the two cities.
C. Sectoral Issues
1.8 Environmental Deradation. Environmentaldegradation in Lobito and Benguelastems from the intensity of the urbanizationprocess and the deteriorationof urban infrastructureand services. The populationhas quadrupledsince 1975, due in part to the destabilizingeffects of the war, while the deliveryof urban services has fallen sharply. Negativeenvironmental impacts include coastal, surface and groundwaterpollution, soil erosion and depletionof arable land, changes in surface water regimes and aquatic ecosystems, deforestationand incipientdesertification around the conurbation. The adverse impactsof the degradationof the environmenton land and water resources, and in tum on human health and economicpotential, have reachedcritical proportions.
1.9 Infrastructureand Services. The newer urban populationhas severely over-burdenedthe infrastructureand public utility systems. There has been a significantdecline in service and coverage from levels prior to Independence. With limited investment,severe shortages of replacement equipmentand spare parts, and inadequatemaintenance, the basic urban servicesof water supply, sewerage, sanitation, and refuse collectionare now in a critical state. The CatumbelaRiver basin and aquifer serving Lobito hold an abundanceof water year round; however, the Catumbelawehfield and pumpingequipment are badly deteriorated. Many older wells have been abandonedand of the four water pumps serving Lobito and Catumbelaten years ago, only two are now in operation. The BenguelaweUlfield is likewise totally inadequate. Nearly 80% of the urban populationof Lobito- Benguelareceive no piped municipalwater whatsoever. These people use grey water in the streets and 3 canals or rely on private trucks selling water at exorbitantprices to meet minimumdaily needs. The price of trucked water is NKz5Ofor 30 liters or more than 50 4imesthe base rate (see para 1.15).
1.10 Sanitation. The sanitary sewer networksof the central residentialareas ate inadequateand largely inoperativedue to lack of rnaintenance. Their reconstructionwill serve only 42,000 people in Lobito and 34,000 in Benguela,about 10%of the present urban population. Hence, Were is an urgent need for a massive sanitary latrineprogram to counter observedhealth and environmentalhazards. The managementof increased volumesof solid waste is well beyondthe municipalities'present capacity. The vehicle fleet, 80% non-operational,is obsolete and has been largely cannibalizedfor spare parts. Consequently,there are numerousspontaneous garbage dumps along roadsides,in gullies and vacant lots within the urban area.
1.11 Improvedsanitation is critical to hygiene, health and general living conditionsin any developingcountry. This is especially true in the cities of Lobito and Benguelaand their environs. Even the casual visitor to the unplannedsettlements of the Lobito-Benguelaconurbation will be shocked at the lack of water and sanitation, and especiallyby the open fields of human faeces. Cholera, often reaching epidemicproportions, has been the most recent killer with a faecal-oralcycle of transmission, but other diarrhoeal diseasesalong with malaria and schistosomiasispoint to the urgent need for imnprovementin basic sanitationand sanitary-environmentaleducation. Morbidityrates average 35 % in the urban area; child mortality in the Province is reported at 325 per thousand, among the -;;hest in the world, exceedingthe national average, 292 per thousand,and more than twice the average for Sub- SaharanAfrica (157 per thousand).
1.12 HousiLg. While the urban expansionon the peripheryof Lobito is characterizedby unservicedsquatter settlements,the housing stock in the consol;datedareas, includinghigh-rise apartment buildings, is severely deterioratedfrom lack of maintenance. Some buildingswith broken pipes and plumbinghave becomealmost uninhabitable. In general the housing stock of the peripheryis of fair standard: a common house type is two room adobe or cement block. Traditional roofing material is no longer available, and most houses are covered with corrugatedsheet metal, which offers little insulation. In addition, there are pockets of grass-thatchedshelters throughoutthe spontaneous settlements. The unplannedlayout of settlementswill further complicateeventual upgrading. The main problem, however, is the almost total lack of services and infrastructure.
1.13 During project preparationIDA and SIDA initiated investigationsinto the housing situation with a view to possible inclusionof housing componentsin the project. The investigationsrevealed many serious protbems, includinga general housing shortage; acute shortages of building materials; outdated maps and cadastralinformation; lack of socioeconomicinformation; non-existence of a housing policy; lack of clear ownershipstatus of buildings and land; and lack of a housing finance system. The conclusionduring appraisalwas that the problemsof the housing sector are of a magnitudeand complexitythat will require a concertedeffort by governmentand donors commencing with policy reform at the national level.
1.14 Institutions. The ProvincialGovermment of Benguelaovershadows the municipal and local governmentswhich are weak. As is the case throughoutthe country, administrativebodies at all levels were depletedof qualifiedhuman resources after independence. The main problems continue to be lack of managersand techniciansat all levels, lack of equipmentand spare parts, low salaries, and excessive absenteeism. Among institutionsthere are conflictsin jurisdiction, overlappingresponsibility and authority. A system of 'dupla suborcdLao", or double subordinationto central ministriesand provincial government,prevails althoughthere is a trend toward decentralization. The Director of the ProvincialPlanning Office, for example,reports both to the ProvincialGovernor and to the Ministry of Planningin Luanda. Until March, 1990 the water and electricalauthorities were provincial branchesof national parastatals;today they are provincialauthorities. 4
1.15 Financial Constraints: Low Rents and Tariffs. Rents, tariffs, uses charges and taxes are totally inadequate. For example, monthlyrunts of state-ownedapartments and houses are fixed at NKz2000for a two bedroomhouse or apartmentwith a living room, kitchen and bath, and NKz2S00 for a three bedroomunit. These figures represent US$33 and US$42per mon'that the official rate (NKz60per US$), and a nominalrent of only US$2-3per month at the parallel market rate (NKz800 per USS). Many tenants opt to pay twelve monthsrent at a time as a matterof convenience. Water tariffs are fixed at the rate of NKz1Oper cubic meter of estimatedconsumption. Proposalsare pending to double or triple the water rate to NKz2Oor NKz3Oper cubic meter, US$0.33-0.50at the official exchange rate, but only US$0.03-0.04at the parallel market rate. There is apparent willingnessto address the problem of inadequaterents and tariffs in the Government'sfinancial and economic adjustmentplans. A tariff study to determine economnicwater and eeweragetariffs is included in the project.
1.16 Financial Constraints: Control of Loal Resources. The state of disrepair of local infrastructureis partially explainedby the centralizedbudgetaiy and financialmanagement system in effect in recent years. Local revenueswere ehannelledentirely to the central governmentwhich made partial budgetary allocationsto local service providers. Althoughthere is movementtoward decentralizationin some sectors, housing rents continue to accrue to the central budget. The allocationto the SecretariadoProvincial de Habitacao,Urbanismo e Aguas (SEUHA), the agency charged with managementof the state-ownedhousing stock, has averagedabout 20% of rents collected, sufficientto meet payroll and administrativeoverheads but inadequatefor even rudimentary maintenance.
1.17 International Aid. Several foreign governmentsand many private non-governmental organizationshave active aid programs in Angola. Prominent among these are Sweden, Norway, Portugal, France, Germany, Italy, Spain and Canada. The United Nationsgroup has a large presence in Angola ranging from military observers of the cease fire agreement to numerouseconomic, social and humanitarianassistance programs. The UNDP, for example, has identifiedover 100 projects which it is fundingor promotingto other donors. The African DevelopmentBank (AfDB)is also active in Angolawith projects planned in infrastructureand productivesectors.
1.18 Angolajoined the World BankGroup in September1989. Bank lendingstrategy is in three parts. The initial focus is on technicalassistance and pre-investmentoperations, which has led to the first two IDA credits: the EconomicManagement Capacity Building Project (US$23.0 million) and an InfrastructureRehabilitation Engineering Project (US$42.0). These projects will help formulate economicpolicy strategiesand recommendations,and provide studies for the rehabilitationof key transportand urban infrastructuresystems. A secondpart of Bank lending strategy is assistancein the rehabilitationof key infrastructures. The proposedLobito Benguela Urban Environmental Rehabilitation Project is the first of these. Other projects in the social services, transport (including the Lobito/Benguelarail corridcr), and electric power sectors are in preparation. Finally, the Bank may consider financialsupport for the Government'seconomic adjustment program, once the authorities have demonstrateda commitmentto reform and made sufficientprogress in adoptingkey policy measures emanatingfrom the studies financedin this and other Bank supportedprojects.
1.19 Sectoral Obiectives - The Government'smain objectivesfor the sector are:
a) Rehabilitationof basic urban services; b) Provisionof water and basic urban servicesto the lower incomepopulation; C) Decentralizationof managementand control of public utilitiesserving principal municipalities; d) Gradual divestitureof public enterprisesresponsible for manufactureand distribution of building materials; e) The gradual divestitureof the publiclyowned housing atock; and 5
f) Introuuctionof cost recovery principlesthrough economnic rents, tariffs, and user charger.
D. Rationale for Bank Group Involvement
1.20 The Bank's IntroductoryEconomic Review identifiedrehabilitation of urban infrastructureand services as one area vital to the renewedeconomic viabilityof the country. In this case, the project would help reverse the environmentaldegradation which has reached crisis proportionsand threatens tho sustaineddevelopment of one of the country's key urban areas, It would also have a major impact on public health and make a significantcontribution to the alleviationof poverty. Experiencegained from the project, and the studies financedby the project, will deepenthe Bank's '-nowledgeof the urban sector and of related environmentalissues, thereby contributingto the dev ;lopmentof Bank- supportedinfrastructure projects in other urban centers. The project will also lay the foundationfor urban policy reforms, includingcost recovery. In addition, by taking the lead in this project, with the supportof Sweden and Norway, the Bank will better be able to coordinatethe contributionsof numerous donors in the large projects emanatingfrom the Lobito Corridor DevelopmentProgram, estimatedat nearly a billion dollars over the next 15 years.
II THE PROJECT
A. Project Objectives
2.1 Environmentalimprovements were a major focus of project preparationwhich led to its classificationas a CategoryD EnvironmentalProject under the guidelinesof OperationalDirective 4.00, Annex A on EnvironmentalAssessments. The main objectivesof the project are: (a) to eliminate life-threateningepidemics, improve the health of the population,and halt the degradationof the physical environmentby restoring the water supply and failed sanitary services; (b) to improve living conditionsin the squatter settlementsby providing clean wLer, improvedlatrines, and a revegetation program; (c) to strer ,then the institutionsrespr. -ble for current operation, management,and control of urban services and the environmentby prov.. X technical ass.stance, logisticalsupport, and training; and (d) assist in policy reform througii water and sewer tariff, land registration, and environmentalstudies.
2.2 Worldwideexperience documents a high rate of falure of sanitationprograms and projects when focus on the technologydisregards socio-economic, cultural, religious, and politicalfactors. Therefore, the low cost sanitationcomponent includes a major sanitary-environmentaleducation program designedon the interests, needs and knowledgelevel of communityparticipants, identified through intensivedialogue. Initial talks with communityleaders in the squatter settlements,the director and staff of the ProvincialMinistry of Health, and the director of public health of the Universityof Luanda show a high level of concern for emergencymeasures, and a deep commitmentto long-term developmentof a successfulsanitary-environmental education program. Elements under consideration include emergencymeasures, studies, education and training, describedbelow.
B. Project Description
2.3 The project would consist of the followingfour basic components(detailed analysis of each of the componenesis shown in the respectiveannexes):
a) Environmental Sanitation, includingrehabilitation of the water and sanitary sewerage networks; the solid waste managementsystems; and the storm drainage networks; 6 b) Low lncomeSanitation, includingmajor improvedlatrine and sanitary-enviromental educationprograms and a small urban revegetationcomponent;
c) Institutional Development, includingtechnical assistanceand training for Provincial ,enlementing agencies responsiblerespectively for the operationand maintenanceof the provincial water and sewer systems(EPAB); solid waste management;low cost sanitation,and sanitary- environmentaleducation programs (DPSC); and overall planning, project management,and monitoring (GPP). Administrativeand logisticalsupport to the project includesacquisition of vehicles, telecomnmunicationand office equipment,supplies, and spare parts for project use.
d) Studihf, includingdetailed engineeringdesign and supervisionof the water, sewer, and storm drainagecomponents; and the followingarea-specific studies: a water and sewer tariff and institutionalreorganization study; an environmentalmnanagement and monitoringstudy; and a geographicinformation system and land registrationstudy. The project would also financeannual audits of project accounts,and studies for the design and preparationof follow-upprojects in the infrastructuresector, identifiedduring project implementation.
Environmental Sanitation
2.4 Water Supply - Lobito. The objectivesof this componentare to rehabilitatethe present networks, to double the water supply in both cities, and to extend the municipalwater supply to the entire urban area, via public standpipesin all squatter settlements,nearly 400,000 people, or half the urban population. Expecteddemand for water at the standpipesin both cities is estimatedat about 20% of the total urban demand (10,000 m3 of the combinednew capacityof 48,000 m3 per day). In Lobito installedcapacity will be increased from 300 m3 (nominal600 n3) to 1,000 m3 per hour (24,000 m3 per day) with the rehabilitationof the existing wellfieldand the installationof a new wellfieldof six new wells along the Catumbelariver; a new chlorinationstation; and a new 500 mm transmissionmain feeding the existing 500 mm main to Lobito, Bela Vista, and Alto Liro. Pumping stations and reservoirs will be refurbishedto provide storage capacity of over 50% of daily production. The rehabilitatednetwork is designedto supply about 100 liters per capita per day to those with house connections. A network of 300 standpipeswill provide 25-30 liters per capita daily to other settlements. Each standpipewith four taps and laundry facilitieswould serve about 150 families (800- 1,000 persons)within a maximumwalking distanceof 200 meters. Each standpipewill be equipped with a securely lockedwater meter set into the standpipe. The main commercialand industrial enterprises,apartment buildings,and residentialareas will be connectedwith new water meters that will remain the property of EPAB. The estimatedcost of the Lobito water supply rehabilitationis US$5.4 million.
2.5 Water Supply - Beneuela. In Benguelathe existingwellfield is surroundedby residentialand industrial buildingswith no room for expansion. Present capacity is a nominal470 m3 per hour; however current output is estimatedat less than one-third, or about 150 m3 per hour. Water demand in Benguelain 1990 is calculatedat 760 m3 per hour. The increasedwater productionto 1,000 n3 per hour correspondsto projected demand for Benguelain the year 2000. Nine non-functioningwells will be abandonedwhile three will be rehabilitatedby cleaning,video inspection, repairs, well head improvements,testing, and disinfection. In addition, a new wellfieldwould be constructedalong the Cavaco River aquifer consistingof six new wells. The new wellfieldhas been designedfor a peak flow of 500 m3per hour. The treatmentplant has a present capacityof 500 m 3 per hour and is designedto remove iron and manganesefrom the water. Water quality in terms of bacteria count is satisfactorywith no harmful pathogens;therefore, the project does not includeexpansion of the treatment plant. A network of 200 standpipesand wash basins would be providedfor the squatter settlementson the peripheryof Benguelain a pattern similar to the Alto Liro and Bela Vista programs describedabove. As in Lobito, the standpipeswould be equippedwith water meters; and the main commercialand industrialusers and larger apartment buildingswould also be metered. The estimated cost of the Benguelawater supply rehabilitationis US$4.2 mnillion. 7
2.6 SantrSE~rs - Lobito. The present network, serving the main commercialarea and low- rise aparment buildings, is clogged in at least half its length, while in the other half raw sewage drains directly into the tidal lagoon - a habitat of the pink and white flamingos. A new gravity networkwould be provided with two lift stations and a force mainconnected to the Cornpao system. The Compao networkand lift stationswere virtuallycomplete in 1975;however, since Independence,no work has been done. The gravity lines have becomechoked and the abandonedpumping station filled with debris and sludge. This networkwould be rehabilitatedalong wish the house connections. Two lift stations would be rehabilitatedand equippedwith new pumps and controls, and a third would be equipped with a force main to a series of oxidationponds two kilometerssouth of the city. The ponds will be located on what is waste land today. The treated effluent would be used to irrigate fruit trees and a tree nursery to close the cycle. The estimatedcost of Lobito sewer rehabilitationis US$3.9 million.
2.7 Sanitary Sewers - Benouela. The sanitary sewage network, serving only a small portion of the center of Benguela,is partially broken and clogged. Part of the raw sewage eventuallyleaks onto the beaches in front of the city. Most of the buildingshave septic tanks that overflow into hallways, back patios and streets. This conditionis one of the main sources of cholera in Benguela. The central area of Benguelaincluding all buildingsabove two stories will be connectedto a new gravity network. An interceptorsewer will pick up the open sewer pipes that dump raw sewage into the Coringe storm drainae channel. Two sewage pumpingstations would be providedalong with a force main of four kilometers that will connect to a series of oxidationponds to the south of the city, where there is adequatecapacity for future needs. As in Lobito, the treated effluentwould irrigate fruit trees and a tree nursery to close the cycle. The estimatedcost of Benguelasewer rehabilitationis US$3.98 million.
2.8 Storn DrainaFe - Beng_uela. The Vala do Coringe drains a major portion of the city of Benguelaand has a drainagebasin of 60 square kilometersextending inland about 18 kilometers. Over the years the four kilometerchannel that traversesthe urban area has becomechoked with garbage, raw sewage and vegetation. With the scarcity of fresh water, slum dwellershave dug mud holes amongst the debris to wash their clothing. The mud holes attract childrenwho play in the dirty water, thus turning the Vala into a rzajor source of disease and a health hazard to the city. The project would provide a 3.8 kilometerdressed open channelthat follows the present alignmentand gradientto a sea outfall. Lateral storm drains with large inlets on the south side have been included to reduce the flash floods in adjacent neighborhoods(bairros). To lower peak flows an earthen retentionpond has been designedeast of the airport to provide a five to six hour retentionof about 600,000 cubic meters capacity. In additioneight small velocity check dams of 2.5 to 3.0 meters in height, using gabions, would be built upstreamaand downstreamof the main dam as well as the parallel tributary. Trees would be plantedalong both sides of the chasnel to provide a canopy of shade. The estimatedcost of Benguelastorm drainage rehabilitationis US$3.18 million.
2.9 Stor-mDrainage - Lobito. The sevenmajor storm drainage gullies in the bairros of Alto Liro, Bela Vista, and Vila de Catumbela,overlooking the port and industrialarea, have become heavily eroded as squattershave occupied the slopes, cutting the vegetationand notcbing small ledges to build their huts. Many have built in the bottoms of the gullies, The April rains this year demolishedmany huts and caused fourteen deaths. Before Independencethe Portuguesebuilt a few erosion control dams. Most of these are now filled with debris and sedimentbut do functionas velocitycheck dams. The project would provide a series of retention/velocitycheck dams in each of the seven drainage basins. A prototypicaldesign using gabionshas been preparedwith heights of dam between three and four meters. A total of fifty such dams would be provided, set 300 to 400 meters apart. The estimatedcost of Lobito storm drainage rehabilitationis US$2.56 million,
2.10 Solid _WsteMananemnt. While some equipmenthas been acquired recently to improve the capacityof the DPSC to managesolid waste, only about 15%of urban waste is now collected, primarily in the downtownareas, and only part of that is disposedin the garbage dumps of Lobito and 8 Benguela. Service to the peripheral settlementsis hamperedby lack of equipmentand poor road conditionswhich in turn contribute to the breakdownof vehicles. As a result, spontaneousdumps have proliferatedalong the main roads and in vacant areas in the low income settlements,where pigs and chickensfeed and children scavengefor recyclablematerials. Due to the lack of latrines, the dumps have a high content of human faeces. The situation results from lack of resources for equipmentand spare parts (85% of the recurrent budget is dedicatedto salaries), low technicalcapacity, inefficient organizationand weak management. Not surprisingly,the work force is poorly motivated and productivityis very low.
2.11 The solid waste managementcomponent would respond to this situation with a two phaseplan providing the municipalauthorities of Lobito and Benguelawith vehicles, tools and equipment, technical assistanceand training. The first phase would consist of the urgent removalof the spontaneousdumps from the peripheral settlements,while beginningto establisha system of 2.5 m3 and 10 m3 containers in these areas, and repair of the municipal vehicle maintenance workshops, accompaniedby techhicalassistance and the sani-.ry-environmentaleducation campaign described below. The second phase would completethe distributionof containers in the periphery and introduce the use of 800 liter containersin the built-up downtownareas of Lobito, Benguelaand Catumbela. Provisionof equipmentfor shop rehabilitation,vehicle maintenance,and enclosureand managementof the dumps would be concludedin the second phase. Technicalassistance would develop the strategic plan for solid waste managementand train staff at the various levels. Completionof the program is scheduledtwo years after the arrival of the managementadvisors (see institutionaldevelopment below) and the first part of the tools, materialsand equipment. The estimatedcost of the solid waste managementcomponent for Lobito and Benguelais US$2.9 million.
Low Income Sanitation
2.12 Improved Latrines. This componentconsists of the disseminationof a low cost sanitation technology,based on the productionand sale of a dome-shapedimproved latrine slab. The slab incorporatesimportant features for hygiene and child safety, and can be easily installedon the top of a simple pit (1.10 meters in diameter). During project preparationa pilot program was launched,in which over 1,0(X)latrine slabs were built, to test the design, methodsof production,and acceptability of the improvedlatrine. DPSC has organizedcentralized materials storage and productionin Lobito and Benguelain order to control quality and the use of cement. As a consequence,trucks will be required to transport buildingmaterials to productioncenters in Lobito and Benguela,and finishedslabs to distributioncenters throughoutthe urban area. The latrine slabs are sold for cash (NKz3000in July 1991) directly to beneficiaries,with free advice on proper ways to prepare pits for installation. Local cart transport will deliver the slabs from the point of sale to the latrine building sites. While trucks will be imported, the hand-pushedcarts will be produced locally. The improvedlatrine program aims to install 100,000 units by 1998 representingnearly 90% of the estimatedrequirements of the low income population.
2.13 A vigorous promotionalcampaign is necessary to support the program, as use of latrines is not yet customary. Particular attentionwill be given to the active involvementand training of community leaders who will conduct the bulk of the promotionalprogram using a wide range of media, including conventionalsanitary-environmental education, drama and festivals, communitysports competitions, leadershiptraining and commercialstratagems. Promotionalmaterials include T-shirts, caps, ball-point pens, stickers, etc., featuring hygiene and the use of improvedlatrines. The goal of the promotional componentis to create a strong sustaineddemand for latrines. On-the-jobtraining will be supervised by the resident sanitationadviser with the assistanceof two United NationsValunteers, an instructor in sanitary-environmentaleducation and a constructionsupervisor. In addition, draft manuals have been prepared on managementof the program, constructionof improvedlatrines, promotion, sanitary education, and how to work with people. Study tours will be arranged to visit similar programs in other Africancountries (e.g., Mozambiqueand Zimbabwe),to exchangeexperience and encourage conmmitmentto the project. The estimatedcost of the improvedlatrine componentis US$2.80 million. 9
2.14 Sanitarv-Environmental Education. The low income sanitationprogram includesa major element in sanitary-environmentaleducation, designedto safeguardthe investmentin improved infrastructure(water and sewerage),and to improve the health of the population. Initial talks with communityleaders in the squatter settlements(musseques), with the director and staff of the Provincial Ministry of Health, and the director of public health of the Universityof Luanda show a high level of concem and deep commitmentto long-termdevelopment of a successfulsanitary-environmental education program. Elementsunder considerationinclude emergency measures, studies, educationand training. Current disease patterns highlightwater-borne and water-washeddisease transmission, especially cholera and diarrhoeal diseases. While teachingoral rehydration therapy (ORT) and personal hygiene, health workers should also emphasizethe basic links betweenhealth, water and sanitation. As the ORT program is enhanced,a sanitary-environmentaleducation componentcan easily be introduced in a way that concern about diseaseswould lead to increaseduse of latrines.
2.15 Base-linestudies would be carried out in selectedpilot areas to help determine the actual environmentalhealth profile of the musseques.The studies would be undertakenwith the assistanceof public health studentsof the Universityof Angola, and should includea knowledge,attitude, 'nd practice survey (KAP-study)covering such specificsas water, sanitation, personalhygiene, faecal-oral disease transmission,and latrine use. There are various channels for community-basededucation which can successfullyreach the targetedpopulation. Officialchannels would include sanitary-envirommental educationelements in the broader program of health educationand in the schools. As in the latrine program, leadershiptraining is crucial to the success of sanitary-environmentaleducation; and communityreligious, political, and cultural leaders would receive maximumsupport from the project. Educationaltechniques include radio, television,posters, music, theater, puppets, and promotional material. Several radio interviewshave already been aired; selectedmusicians and artists have shown interest in developingpopular materialto amplifythe community-basededucation focus. The estimated cost of the sanitary-environmentaleducation component is US$0.63 million.
2.16 Urban Revenetation,including trees, shrubs, and grasses, will improve soil fertilityand the microclimateand provide an important measure of erosion control. The program is divided in two parts, revegetationof poor neighborhoods,linked to the latrine program; and erosion control on the beaches and major storm water channels. A tree plantingprogram started in March 1991by the GPP and DPSC, followingguidelines provided during project preparation, met with good initial acceptance. The program would be extended to all standpipe-washbasin stations; to the Vala do Coringe in Benguela;and to escarpmentslopes and drainage channelssuffering major erosion in Lobito. To strengthenthe program the project would provide three water trucks, cacimbas(open wells) with pumps, and other tools and equipmentto developthe capacityof DPSC nurseries to produce and distributethe required stock and assist the communitiesin planting, care, and maintenance. Trees distributedby the latrine program would be irrigatedwith domesticwastewater. Benefits include increasingthe life span of latrines and decreasingstagnant water in backyards, streets and common areas. The estimatedcost of the urban revegetationcomponent is US$0.5 million.
Institutional Development
2.17 Technical Assistance. An importantaspect of project preparationhas been the assessmentof the capacity and work load of the implementingagencies: GPP, DPSC, and EPAB. All three agencies are staffed with a nucleus of dedicatedand capable people. Each agency, however, is faced with multiple tasks and responsibilities,in additionto the project. It was therefore deemedessential to support the existing structureswith importantinputs of technicalassistance in order to ensure timely implementationand to meet the institutionalimprovement objectives of the project. With this in mind teams have been designedto support each implementingagency with long- and short-term consultants, includingtwo United Nations Volunteers. A conditionof credit effectivenessis appointmentof the key staff of GPP, including confirmationof the Director as Project Manager, and employmentof the project technical coordinator, the financialcontroller, and the procurementadvisor, on terms satisfactoryto IDA. Terms of Reference for GPP Key Staff are included at Annex 12. 10
2.18 The proposedDPSC consultingsupport is in two parts: a) the solid waste management component, comprisingtwo long-termresident engineersto organize and operate solid waste collection and disposaland to organize the vehicle and equipmentmaintenance workshops; and b) the low income sanitationprogram, consistingof a long-termresident sanitationadvisor, assistedby two United Nations Volunteers,for sanitary-environmentaleducation, and for constructionsupervision. The proposed technical assistance for EPAHconsists of three resident long term nanagers, an operations manager, a mechanicalengineer, and a financial manager. Terms of reference for technicalassistance to EPAB would be defined during the EPAB institutionalreorganization studies (para 2.24). Consultantswill be hired through experiencedfirms insofar as possible in order to ensure team integrityand responsibility, and to minimizeBank supervisionrequirements. All consultants,firms and individuals,will be contractedin accordancewith the Bank's Guidelines:Use of Consultantsby World Bank Borrowersand bv World Bank as Executina Agency, dated August, 1981. The budget for Terhnical Assistance, in Annex 6 Detailed Project Costs, covers the cost of ten long term resident advisors, includingtwo United Nations Volunteers,at 36 monthseach (360 months), and three short term advisors (30 months), a total of 390 man monthsat an average monthly cost of about US$15,000. The estimated cost of technical assistanceis US$5.76 million.
2.19 Training. The principal form of training in the proposed project is on-the-job trainingwhich is a direct benefit of the technicalassistance inputs describedabove. A limited amount of overseas training would supplementon-the-job training, a total of US$375,000for GPP, DPSC, and EPAB staff. GPP overseas training includes six man/monthsof seninars for the project director and key staff in project management,six man/monthsof training for specialistsin the GeographicalInformation System, and three man/monthsin environmentalissues. DPSC overseas training anticipatestwelve man/monthsin municipalmanagement, solid waste management,and low cost sanitation. EPAB overseas training would be formulatedin the Water and Sewer studies describedin parm2.24 below. The educationbudget for sanitary-environtental educationand promotionof improvedlatrines, described above, is US$625,000. Thus, the total estimatedcost of the trainingbudget is US$1.0 million.
2.20 Adninistrative and Logistical Support. The project contains a substantialadministrative equipmentbudget of US$2.54 million to support the implementingagencies and their respective consultingteams. Need for administrativeand logisticalsupport has been clearly establishedduring project preparationand confirmedat appraisal; it is a consequenceof the poor condition of equipment and scarcityof suppliesas a result of the civil war. The largest item, US$850,000,is budgetedfor office repair and equipmentfor GPP, DPSC, and EPAB, including furniture, computers,printers and software, photocopiers,and drafting and reproductionequipment. US$500,000is budgetedfor project vehicles, allowing one each for the use of long-termresident foreign consultantsand their local counterparts. The telecomrmunicationsequipment budget, US$250,000,provides for small networks of Walkie Talkie type equipmentfor key emnployeesof the implementingagencies, and a dedicated telecommunicationssystem for direct communicationswith Luanda, not now possible becauseof the obsolete, mostly inoperative,phone system in place. Finally, there is provision in the project for US$150,000to purchase furnitureand appliancesfor the housing of long-termexpatriate consultants, US$15,000 for each of ten households. The balance of the administrativeand logistical support budget is for spare parts (15%), and office supplies(10% per annum for three years).
2.21 For its part the ProvincialGovernment provided assurances during negotiationsthat it would provide counterpartpersonnel and adequateoffice facilities for the technical, administrative,and consultingstaffs of GPP, EPAB, and DPSC. The project would finance the repair of office facilities for GPP, EPAB, and DPSC, and the Governmentwould be responsiblefor ongoingmaintenance and operationof these facilities. The Governmentwould be responsiblefor the provision, necessary repair, and maintenanceof appropriatehousing for each of the long-termconsultants. In addition, the Governmentwould pay all costs of vehicle operation and maintenance,including fuel costs, insurance, and repair services of the vehiclespurchased by the project for the use of staff and consultants. 12
ecologicalbaseline for the area. The action plan will assist local authoritiesresponsible for enviromnentalmanagement and economicdevelopment within the region. The findingsand recommendationsof the environmentalstudies will provide the comerstone for environmental rehabilitationand sustainablemanagement of the area's resources and ensure proper monitoringof the impacts of the project. The studieswill organize environmentalinformation in an applied form to permit direct use by local decisionmakers and to assist local governmentbuild a capacity for environmentalrehabilitation, planning, management and monitoringwithin the Lobito-Benguelaregion and the Province. In addition, specific monitoringstudies will complementdata collected for the diagnostic, thus contributingto the implementationof all major componentsof the project. The environmentalstudies will be carried out by GPP to ensure adequateconsideration at an approprIate level of governmentin the context of overall economicand social planning. This work will be complementedby the sanitary-environmentaleducation program, which will provide the educationand training necessary to introduceand ensure enviromnentalmanagement at the communityand individual levels. The studies call for a total of 33 man/monthsof effort, includinga project manager/environmentaladvisor in residence for 21 months. The proposedstudies are scheduled to commencein March 1992 and have a duration of 21 months, until December 1993. An interim report will be completedby December 1992 in anticipationof the project mid-term review. Total cost of the environmentalstudies is estimatedat US$783,000.
2.2, Land Reaistration Study (Annex 11). The cadastral informationsystem in Lobito Benguela covers only part of the built up downtownareas and has not been updated since Independence. There is essentiallyno socio-economicor geographicdata for 80% of the present urbanizedareas. Cost recovery, or any other measures of control requiring basic spatial and economicinformation, are virtually impossible. The Land RegistrationGIS (LARGIS)is a simplifiedcomputer-based land registrationsystem which will make it possible to identifyall taxable property. User charges and property taxes would be assessableand levied for the first time, thereby recoveringcosts and generatingfinancial resources for the provisionof improvedurban services. The objectiveof the proposed two-yearstudy is to utilize the GIS componentof the project to develop a Land Registration G3IS(LARGIS) application and pilot program. While the specificuse of LARGISis to support taxation managementfor project cost recovery, a more general use of LARGISextends to overall project management. The tasks of physicaladdressing, land registration, and popular participationwould require substantialfieldwork in the pilot study areas, involvinglocal staff and local training. Study implementationis programmedover nine calendarmonths and would involve 13.5 man/monthsof expatriate effort, two-thirdson site, and 27 mnan/monthsof local input. The budget for the land registrationstudy is estimatedat US$393,000.
C. Project Costs
2.27 Total Project Costs are estimatedat US$58.88 million of which US$49.20 million is foreign and US$9.68 million local expenditure. The Detailed Cost Tables are set forth in Annex 6 and summarizedin Tables 2.1 and 2.2 below. Base cost estimates are in constantprices as of July 1991. The cost of civil works was estimatedbased on the consultant'sfinal designs and recent bid prices or quotations for similar works or equipment. Importedgoods and equipmentwould be free of customs duties and internal taxes. Taxes on locally procured goods, mainly fuel, are estimatedat 15 percent of local costs, or US$1.287 million, and have been included. These would be financed entirely by counterpartfunds. Physical contingenciesof 15% have been added to the base cost of civil works and equipment,since the final cost of rehabilitationof the water and sewer systemswill not be known until the networks are cleaned and tested. No physical contingencieshave been allowed for technical assistance, training and education, studies, or other consultingservices. 11
2.22 GeonamuhicalInforMation System. The GeographicInformation System (GIS) is a user friendly, low cost, desktop conmputingfacility for processing, using and printing digital maps and images. Preparation of the GIS componentstarted followingthe June 1989 identificationmission, when it was discoveredthat the most recent mnapswhere almost twenty years old. The work thus far includes installationof equipment,spatial data acquisitionand processing, developmentof appropriatetools and methods,training, hardcopy imagemapproduction, and documentation. The two primary tasks of the GIS are: a) to design and implementa Land RegistrationGIS system (LARGIS)in support of tax managamentfor overall project cost recovery; and b) to provide technicalsupport for the environmental and low income sanitationcomponents, and mappingfor the environmentalmanagement and monitoring studies. The budigetto completedevelopment of the GIS is US$336,000,of which US$135,000is for short term consultancy;US$79,000 is for computer equipment,site preparation, and supplies;and US$57,000is for overseas training. The balance, US$65,000, is the value assigned to local salaries, the responsibilityof the ProvincialGovernment. The GIS technology,progress to date, and program, including the Termnsof Reference for the consultant,are describedin Annex 8.
Studies
2.23 The studies budget for the proposedproject is US$6.29 million includingUS$3.49 million for engineeringdesign and supervisionand US$1.85 for three studies agreed during appraisal: a) Water and Sewer Tariff and ReorganizationStudies; b) EnvironmentalManagement and MonitoringStudies; and c) a Land RegistrationStudy. In addition, US$750,000is includedto prepare follow-upprojects to be agreed during implementation;and US$200,000is reserved for annual audits of project accounts during the six-year life of the project. The studies agreed during appraisal, along with draft Terms of Reference, are describedbriefly in the followingparagraphs and in detail in the respective Annexes.
2.24 Water & Sewer Tariff and Reorganization Studies (Annex 9). The water and sewer studies are integral componentsof the proposed project. The objectiveof the tariff study is to assist the ProvincialGovernment to define and implementeconomic rates for water and sewer services so that the full costs of investment,operation, maintenance,and replacementof the rehabilitatedsystems can be recovered without recourse to subsidy. The purpose of the institutionalreorganization study is to assist the ProvincialGovernment in the establishmentof an autonomousand efficientservice company capable of assumingoperating responsibilityfor the rehabilitatednetworks. To this end the institutional reorganizationstudy wili assist provincial authoritiesin the design of the reorganizedentity, in an analysis of alternativeownership and operating arrangements,and in the selectionof appropriate manAagemenAt,technical assistance, and training inputs. In addition, the stuOyteam will design and monitor a Rilotvrogram to test selected methodsof organization,billing and collectionof water sold at standpipesin Lobito and Benguela(pam 3.15). It is anticipatedthat one firm will be awarded a contract to undertakethe water and sewer tariff and institutionalreorganization studies and to organize and monitor the standpipepilot program. The studies would involve a total of 30 man/monthsof consultantinputs. Contract signature,scheduled for March 1992, is a conditionof effectivenessof the IDA Credit. Mobilizationof the consultingteam will begin immediatelythereafter, and the first of three visits to Lobito and Benguelais scheduledfor May 1992. All studieswould be completedby lanuary 31, 199?. The findingsand recommendationsof the reorganizationand tariff studies constitute important inputs into the decision-makingprocess incorporatedin the annual water and sewer tariff review (pam 4.7) and the project mid-term review (pam 3.38). Startup of civil works on rehabilitation of the water and sanitary sewerage networksis scheduled for July 1992;and the mid-term review is scheduledto begin in September, 1993. Thus the consultant'sfinal reports and recommendations would be available for review by the ProvincialGovernment and the World Bank approximatelyeight monthsprior to the mid-term review. The estimatedcost of the water and sewer institutional reorganizationand tariff studies is US$670,000.
2.25 Environmental ManaWaMentand Monitoring Studies (Annex 10). The primary objectiveof the shudiesis to prepar an enviromnentaldiagnostic and action plan for the Lobito-Benguela microregion. The diagnosticwill complementthe preliminaryenvironmental assessment and set the 13 Table 2.1 Project Cost Estimates (USS million) Percent Locat Foreign Total Total Foreign 1. EWVIROWIENTALSANITATION $4.94 $21.24 $26.18 45X 81 A. WaterRehabilitation 1.44 8.16 9.60 16 85 B. SewerRehabititation 1.18 6.70 7.88 13 85 C. StormDrainage Works 1.74 4.06 5.80 10 70 D. SolidWaste Collection & Disposal 0.58 2.32 2.90 5 80 II. LOW INCOMESANITATION $1.55 $2.37 $3.92 72 60 A. ImprovedLatrines 1.08 1.72 2.80 5 61 B. Sanitary-Environmentaleducation 0.15 0.48 0.63 1 77 C. UrbanRevegetation 0.32 0.18 0.50 1 35 111. INSTITUTIONALDEVELOPNENT $0.59 $8.08 $8.67 15X 93 A. TechnicalAssistance 0.31 5.45 5.76 10 95 B. Training 0.04 0.34 0.38 1 90 C. Administrative/LogisticalSupport 0.25 2.29 2.54 4 90 IV. STUDIES $0.16 $6.13 $6.29 11X 97 A. EngineeringDesign & Supervision(15%) - 3.49 3.49 6 100 B. Water& SewerTariff & Reorganiz.Study - 0.67 0.67 1 100 C. GIS/LandRegistration Study 0.08 0.31 0.39 1 80 D. EnvironmentalMgt & MonitoringStudy 0.08 0.70 0.78 1 90 E. OtherStudies * 0.95 0.95 2 100 V. TOTALBASE COST $7.24 $37.E3 $45.06 77X 842 PhysicalContingencies (15%) 0.99 3.81 4.80 8 79 PriceContingencies 1.45 7.56 9.01 15 84 VI. TOTALPROJECT COST $9.68 $49.20 $58.88 lOO1 84X Pricecontingencies are basedon estimatedinternationaL inflation over the lifeof the project,averaging 3.9% p.a.per recentIDA guidelines. Base costsinclude taxes on Locallyprocured goods estimated at US$1.3million equivalent,financed entirely by Government.
Table 2.2 Prqject Cost Summaryby Type of Expenditure CUSSMillion) Percent Local Foreign Total TotalForeign Works $5.77 $18.92 $24.69 42% 77X Goods 0.82 6.50 7.32 12X 89X TechnicaLAssistance 0.31 5.45 5.76 10% 95X Design,Supervision, Studies 0.16 5.38 5.54 9X 97X Training 0.18 0.82 1.00 21 82% TotalBase Costs $7.24 $37.07 S44.31 75x 842 PhysicalContingencies 0.99 3.81 4.80 8% 791 PriceContingencies 1.45 7.56 9.01 151 84K Refinancingof PPF - 0.75 0.75 2% 100X Total Project Costs $9.68 $49.20 $58.88 10X2 84(
2.28 Price Contingencieshave been added to base costs plus physical contingencies. Lnsumuchas there is no index of domestic inflationin Angola (underlyinginflation is esti-natedat 20% per annum), local and foreign costs are calculatedin dollars, and all price contingenciesare based on recent estimates of intemationalinflation. Followingcurrent IDA guidelinesan averageannual rate of inflationof 3.9% is assumed for the years of projected disbursement,Fiscal Years 1993-1998. Price contingenciesso calculatedare estimatedat US$9.01 million, or 19.99% of total base costs (including the Project Preparation Facility). 14
D. Project Financing Plan
2.29 IDA, together with the Swedishand Norwegianaid agencies, would finance 100% of the foreign exchangecosts of the project and 90% of the total cost of the erosion control and low income sanitation components. The Governmentwould financeapproximately 65% of local currency expenditures,primarily in the form of locally procuredlabor and building materials. The Swedishand Norwegian Governmentshave expressedinterest in participatingvia project grants in the amount of US$7.0 million. These grants would be administeredby IDA. Thus the Financing Plan in the table below shows IDA's participationat US$45.58million, the Government'sparticipation at US$6.30 million, and co-financingof US$7.0 million, representing77%, 11 %, and 12% respectivelyof total project costs.
Table 2.3 Project Financing Plan CUS$sit I ion) Percent Locat Foreign Total of Total IDA Credit $3.38 S42.20 $45.58 77X NORADGrant - 3.50 3.50 6X SIDA Grant - 3.50 3.50 6X Goverrunent 6.30 $6.30 11% Total $9.68 $49.20 $58.88 100X
III. PROJECT IMPLEMENTATION
A. Institutional Arrangements
3.1 Gabinete Provincial do Piano (GPP . Overall responsibilityfor project implementation resides with the Director of GPP, who reports directly to the ProvincialGovernor and, under the systemof "doublesubordination", to the Ministry of Planningin Luanda. In additionto its role as chief planningoffice, GPP enjoys broad executivepowers and is generally well regarded in the Province. An importantaspect of project preparationhas been to obtain assurancesfrom the Central Governmentof adequateprovincial autonomy for project implementation. At negotiationsthe Governmenthas furnishedIDA with: (i) a MinisterialDecree signed by the Ministries of Planningand Finance, empoweringthe ProvincialGovernment of Benguela,represented by its Planning Office, GPP, to act as project executingagency; and (ii) ImplementationAgreements, acceptable to IDA, between GPP and EPAB and between GPP and DPSC, for the implementationof the respectiveproject components. The draft documentswere prepared and submittedto the Associationduring the appraisal mission.
3.2 Emgresa Provincial de Aguas de Benguela (EPAB). EPAB is the provincial water company,with a common Director, but separateoperating personnel, for Benguelaand Lobito, which are, in effect, subsidiariesof the Provincialholding company. The present conditionof the water companiesin both Lobito and Benguelareflects the uncertainmandate, lack of resources, and deteriorationof physical plant during the years since Independence. During project preparationIDA and the local authoritieshave confirmedthat the water companiesare indeed in bad shape. Officeand technical facilitiesare inadequa-te;there is no masterplan of water supply and distributionfor the cities or the province, and except for the proposed IDA supportedproject, there are no investmentprograms. Human resources are inadequatein nearly all key positions, includingfinancial management. The financialorganization of EPAB is analyzedin the followingcihapter, Financial and Economic Analysis. 15
3.3 The local authoritieshave been willing to address EPAB's shortcomingsfrankly and have assured IDA they are ready to take the necessarysteps to build efficient organizations. IDA strategy is to begin as soon as possible the water and sewer tariff and reorganizationstudies to effect an in-depth analysis of technicaland administrativeproblems, as well as alternativesof operation and ownership. The studies would develop and recommenda program of action, to be agreed upon at mid-term, during the period when rehabilitationand constructiontake place. In addition, the project would finance technicalassistance to EPAB to reorganizethe accountingsystem (see pam 4.2), and to operate and maintainthe water and sewer networksupon completionof rehabilitationwork supervisedby the consultingengineer.
3.4 Direcao Provincial de Servicos Comunitarios (DPSC). DPSC's mandatecovers a broad spectrumof municipal services, includingsolid waste collectionand disposal, urban road maintenance, licensingand collectionof fees for public market operations, cemeteries, parks, gardens, and sport facilities. DPSC faces problems of inefficiencyand reorganizationsimilar to those of EPAB. The ProvincialGovernment is aware of DPSC's problems, and with budgetary support of the Central Govermmenthas contractedlong-term expatriate consultants to assist in the reorganizationeffort. IDA's strategy is to support this effort with additionaltechnical assistance, logisticaland administrative support, directed specificallyto the relevant project components,i.e., solid waste management,and the low incomesanitation and revegetationprograms, describedin paras 2.17-2.22 above.
3.5 DPSC will implementthe solid waste managementand low incomesanitation programs, includingthe sanitary-environmentaleducation component, in conjunctionwith the DiretoriaProvincial de Saude (DPS), the ProvincialDirectorate of Health. Technicalassistance under the project would include developingand coordinatingthe sanitary-environmentaleducation component, one of the principaltasks of the resident sanitationadviser, who will coordinateand train local staff in the implementationof the program.
B. Project Implementation Staff
3.6 GPP would have overall managementresponsibility for the project, including contract managementand coordinationof the various componentsthrough the implementingagencies, EPAB and DPSC. The Director of GPP would be the project manager, supportedby a project technical coordinator, a financialcontroller, and a procurementadvisor, as key support staff, financedby the prK,ectunder the program of technical assistanceoutlined in paras 2.17-2.22 Institutional Development above. The appointmentof the key staff of GPP, includingconfirmation of the Director as Project Manager, and employmentof the project technicalcoordinator, the financialcontroller, and the procurementadvisor, on terms satisfactoryto the Association,would be a conditionof gdi Efftivenes (para 5.3). Tenrs of Reference of GPP Key Staff are includedin Annex 12.
3.7 The project manager would be responsibiefor coordinatingand monitoring all managerialand technical aspects of project implementation. His duties would include liaison of project activitieswith central, provincial, and local governmentauthorities; compliance with the provisionsof the ImplementationAgreements, annual action programs, and implementationschedules for the respective project components;supervision of procurementarrangements; timely contracting and overall performanceof the technical assistanceand studies providedfor in the project; ensuring and maintainingappropriate counterpart staff during project implementation;prompt allocationof housing and office space for project consultants;supervision of project financialaccounts; and timely compliancewith the reporting and auditingobligations of the project.
3.8 The project technical coordinator,supported by appropriatelocal counterpartstaff, would assist the project manager in the supervisionand monitoringof all work and study contracts under the project; and jointly with the financialcontroller, would develop and maintainbudgets and systems of 16 cost control, critical path, and physical and financialperformance indicators for each project component.
3.9 The financialcontroller, supportedby appropriatelocal counterpartaccounting staff, would keep financialaccounts for all project components;ensure appropriatecompilation and maintenanceof project documentationand files; and prepare and maintainconsolidated accounts of expenditure, quarterly reports, annual financialplans and reports, and internal audits, in sufficient detail and format satisfactoryto IDA.
3.10 The procurementadvisor would carry out, in close coordinationwith the project manager, the technical coordinator,and the financialcontroller, all procurementarrangements for project implementation,including packaging lots for consultants'services; purchaseof vehicles, equipment, and material, computer systems, hardware and software, printed material, office equipmentand supplies;and housing repair and acquisitionof furnitureand appliancesto meet the housing needs of long-termconsultants, to be financed under the project.
3.11 In order to ensure timely project implementationa key objectiveof the project would be to provide each of the three executingagencies with ample technical and logisticalsupport as describedin Jntitutional Development (paras 2.17-2.22) above. The organizationof the project is outlinedin the Project Coordination Arrangements Chart 3.1, and in the Action Plan set forth below.
Chart 3.1 Project Coordination Arrangements
C.DAretor
bOther Depteb t Gnh o rocurementte, Thea echt nicalro ormentatl GPP Control Advisor Coordination Advisor staffUwouldnexpediteiportcernooUnit
Superyisory _ _ _ _ _ Consulting _ ~~~~~~~~~~~~~Engineer |Accountin Stafffl
|Tchrial Technia|
C. Action Plan
3.12 Water Rehabilitation. GPP will be responsible for contracting the major civil works through ICB & LCB. Cost controls and rnanagement would be provided by the supervising engineering consultants. The implementation schedule of the ICB civil works of water and sanitary sewage would be coordinlated by the GPP project management team, headed by the technicai coordinatorwith the assistance of the financial controller and procurement advisor, who, with the assistance of OPP local staff would expedite port clearance of the many items of material and equipment that the contractor 17 must import in a timely manner. Detailedcoordination of constructionand cost control would be providedby the supervisoryengineering consultant.
3.13 The start-up in July 1992, in both cities, is scheduledthree monthsafter the contracts are signed as shown in the attached Scheduleof Works in Annex 5 Key Indicators and Schedule of Works. The rehabilitationof the Catumbelawellfield and the eight wells in the Benguelawellfield would start simultaneously. Well rehabilitationin Lobito and Benguelawould be completenine months after start-up, along with eight of the twelvewells in Lobito and all six new wells in Benguela. Thus, the increased supply could be delivered to the completedportions of the standpipesin both cities by mid-1993.
3.14 The schedulefor standpipesand washbasinsis based on one work brigade installingone unit per week. With six brigades ICB contractor would completethe 300 units in Lobito (in the neighborhoodsof Alto Liro, Bela Vista and Vila da Catumbela)in one year. The installationof the 63 mm and 75 mm distributionlines would be undertakenby different constructionteams who would coordinatetheir work to connectthe lines as the standpipesand washbasinsare completed. For Benguelathe 200 standpipesand washbasinswould be installedby four work brigades in the same twelve month period as in Lobito. Each standpipewill be equipped with a recessedwater meter inside a locked steel box, installedby the ICB contractor. The 300 water meters for commercial, industrial, and apartment building users in Lobito, and a similar number in Benguela,will be installed,owned, and maintainedby EPAB.
3.15 For each of the 500 standpipeand washbasin facilitiesDPSC would organize groups of approximately150 families. The communitieswould participate in maintenanceof the washbasins, periodic cleaningof the sandtrap,and in tree planting. Various schemesfor collectingwater tariffs at the standpipeswere consideredduring project preparation. At negotiationsagreement was reached on the preferred method of organization,billing, and collectionof water sold at the standpipes. EPAB will franchise private individuals,similar to gas station concessionaires,who would resell water to individualconsumers at agreed prices and margins. EPABwould make periodicvisits to ensure proper maintenanceand to read the water meter for purposes of billing and collection. This approachhas been used successfullyin other projects in the region and would be tested in a Rilotprogram as part of the water and sewer tariff and institutionalreorganization studies describedin para 2.24 and in Annex 9. The interim water tariff would take into account cost recovery, affordability, and cross subsidy considerationsdiscussed in the followingchapter, Financial and Economic Analysis (paras 4.4-4.7).
3.16 Sewer Rehabilitation. Constructionof the sanitary sewers for both cities has been coordinatedto ensure that the gravitynetworks and pumpingstation are in place and connectedto the force mains and completedsanitary sewagelagoons before the full supply of water is turned on. This is a necessary precautionto prevent sewagebackup and overflow. Sewagemanagement functions are being transferred from DPSC to EPABunder the project. Operationand maintenanceof the oxidation ponds would also be the responsibilityof EPAB; whereasmanagement and usage of the treated effluent would be controlledby DPSC.
3.17 For Lobito, the rehabilitationof the Compaogravity networkwill start simultaneouslywith the start of the water supply works three monthsafter contract signature. At the same time work on the new gravity sewer networks and pumpingstation for the CommercialZone and Capontewill start as noted on the schedule. The work is scheduled for completionin one year to coincidewith the completionof the full water supply hook up. Two emergencypower generators are providedat the key pumping stations to eliminatesewage overflowsin the networks.
3.18 For Bengiela, the task is easier since the city drains toward the beach. Only one pumping station and short force main are required within the city center. The major portion of the network will flow by gravity to the main pumpingstation on the south sides of the Vala dy Coringe, 2.70m below the present grade. This main gravity sewer must be built before the concretelining machine for the 18 channel reaches this locationat the bridge to Baia Farta. The demolitionof the bridge must Alsobe coordinatedand the bridge completedbefore the gravity main is installed. While these are simple tasks, they require careful coordination. 3.19 Valado CoringeStorm Drainage Channel. The sixmonths construction schedule for the Vala do Coringe Channel must be first coordinatedwith the rainy season which ends in April and begins in October. If the Coringe Channelcannot start in May '92, due to delays in effectiveness,it must be re-scheduledto May '93. This would not affect the sanitary sewer schedule, but would mean that the people of Benguelawould suffer another year with the Vala do Coringe's unsanitarycondition.
3.20 The manpowerrequirement of each of the civil works componentshas been analyzedto ensure that constructionactivity employs appropriatelabor-intensive construction methods using small pre-st or cast-in-placecomponents. A careful accountingof employmentgeneration would be maintainedand fully reported by the contractorand supervisingengineer during project implementation. GPP would assemblethis informationin quarterly employmentreports as part of its normal reporting responsibility.
3.21 The project implementationschedule of major civil works is planned over a two-and-a-half- year period with some of the storm drainage dams, latrine program, and lines of credit for building materialsextending to six years. The contractapproval proceduresof the major works have been packagedto reduce processingtime to the minimum. GPP and the project technicalcoordinator would monitor the progress of each componentand coordinatethe overall project. A series of action plans have been developedfor the various componentswhich would be updated for the mid-term review. For each municipalitywork scheduleswould be overlaid to determine the criteria for implementationof the project as follows:
Table 3.1 Sunmary Work Schedule
PHASE DETAILED EXECUTION ENGINEERING& BID OF WORKS DOCUMENTS
E.lm
I Water Supply-Rehab& Expansion 05/91 - 09/91 07/92 - 7/94
II Sanitary Sewers 05/91 - 09/91 07/92 - 7/94
III Vala do Coringe DrainageChannel 05/91 - 09/91 05/92 - 12/92
IV Storm DrainageWorks 04/92 - 10/92 07/92 - 12/97
V Latrine Program 02/91 - 07/91 05/91 - 12/97
VI Solid Waste Collection& Disposal 03/91 - 07/91 07/92 - 12/94 MunicipalServices Support
3.22 Plans I & II, Water Supply& Sanitary Sewers, would be phased to ensure early deliveryof water to the first completedsections of standpipesand water networksin the two cities and to coordinate the rehabilitationof the utility networksand installationwith the surface and sub-surface drainage works. Effectivenessis expectedin March, 1992 and the completiondate for these works would be July 1994. The 24 month schedule for major civil works is consideredrealistic in view of the urgent need for water supply and sanitary sewerage, the close attention paid to the packagingof the 19
project, and the combinedmanagement skills of GPP and the supervisingengineers. Completiondate for the Storm DrainageWorks (Plan IV) and the Latrine Program (Plan V) would be December 1997. The completionof the project is scheduled for March 31, 1998, with the closing date Se-ptember30, 1998. The project implementationperiod of approximatelysix years is comparableto that of a similar larger project in Mozambiqueand seven years generally for urban projects supportedby the Bank.
1. Procurement
3.23 Contractsfor works and goods valued greater than US$500,000would be awardedunder procedures for InternationalCornpetitive Bidding (ICB), as set forth in Guidelinesfor Procurement under IBRD Loans RodIDA Credit, publishedby the Bank in May 1985. Contractsfor works and goods less than US$500,000would be awardedon the basis of local competitivebidding (LCB), under procedures satisfactoryto the Association. Accordingly,contracts for the major civil works (US$27.92 million)would be awarded, after prequalification,on the basis of ICB. The works would be packaged into two contracts includingsupply, installationand commissionof a) water supply and distribution, and b) sanitary sewerageand storm drainage. Contractsfor lesser works such as repair of the municipal vehicle maintenanceshops and other offices, and constructionof the small erosion-control retention dams (aggregatevalue of about US$4.63 million)would be awarded th:ough Local CompetitiveBidding (LCB). as these are labor-intensivesmaller contracts unlikelyto attract foreign bidders. These LCB contracts would, nevertheless,be open to foreign bidders, following local proceduresthat are being revised with IDA's assistance(see para 3.24 below). Minor works, including the fabricationof improvedlatrine slabs, sold at cost, and the revegetationprogram, scattered throughoutthe project area and spread over time, would be carried out through force accountby the DPSC. The aggregate amount of works carried out under force accountwould not exceed US$S(.8 million.
3.24 Contracts for the acquisitionof vehiclesand equipment(US$ 4.56) for the solid waste managementand low incomesanitation components would be awardedon the basis of ICB, in accordancewith Bank guidelinescited above. Other logisticalsupport, includingproject management vehicles, office and telecommunicationsequipment, furniture and supplies, with an aggregate value of US$3.11 million would be purchasedin several lots (up to US$500,000each) through LCB because of the variety of goods and the need to have servicerepresentatives in the country, especially for computersand office equipment. Finally, local constructionmaterials and seedlingsfor revegetation, with an aggre.gatevalue of US$2.22 million, would be purchasedthrough LCB as defined in the procurementguidelines, as these are locally availableat competitiveprices.
3.25 Consultantswould be selectedin accordancewith the Bank's Guidelines:Use of Consultants by World Bank Borrowers and by The World Bank as ExecutingAgency, dated August, 1981, for technical assistance (US$6.91million), detaileddesign and supervision(US$3.44 million), studies (US$3.35million) and training (US$1.2 million). Technicalassistance would be provided to OPP, the main implementingagency responsiblefor carrying out all procurementunder the project, except the force accountworks carried out by DPSC. GPP's procurementcapacity would be strengthenedby employingan experiencedprocurement expert, a financialcomptroller and a technicalcoordinator. This team would also be responsiblefor training local counterpartstaff throughoutthe life of the project (see para 2.19).
3.26 Under the EconomicManagement Capacity Building project (CR 2274-ANG),the Borrower's procurementregulations and procedureswill be reviewedand streamlined,including the design of standardbidding documentsand contracts. For the purposes of the proposedproject the Borrowerhas agreed to apply the Bank's guidelinesand proceduresset forth in Guidelinesfor Procurementunder IBRD Loans and IDA Credits, May 1985. Localcompetitive bidding procedureswould be reviewedby the Bank prior to application;these will includelocal advertising,public opening of bids, clarity in evaluation criteria, award to the lowest bidder, and non-exclusionof foreign bidders. 20 3.27 To encouragean early start up of project implementation,the followingconditions have been introducedin the project implementationschedule: a) completionof the draft bidding documents satisfactoryto the Associationfor the major civil works, prior to negotiations;and b) employmentof key technical assistancestaff satisfactoryto the Associationas a conditionof effectiveness(para 5.3).
3.28 During project supervision,all works contracts above a thresholdof US$ 200,000 would be subject to IDA's prior review procedures.The review process would cover about 95% of total works value procured through ICB and LCB ( 100% ICB and 70% LCB). Goods contracts above US$ ! 100,000would also be subjectto prior review, covering about 80% of total value of goods financedby i the Project. All consultant'scontracts would also be subject to prior IDA review.
3.29 Procurementinformation will be collectedand recorded as follows:a) comprehensivequarterly reports will be prepared by GPP, indicatingi) revised cost estimatesfor individualcontracts and the total project, includingbest estimates of physical and price contingencies;ii) revised timing of procurementactions includingadvertising, bidding, contract award, and contract completiontimes.; and, b) a completionreport prepared by GPP within three months of the closing date.
3.30 Table 3.2 summarizesthe procurementprocedures to be applied to the various components. Table 3.2 Procurement Arrangenents (USSmillion) Percent of Project Elements ICa LCB Other KA Totat Totat 1 WORKS a) WaterRehabilitation 12.96 12.96 (11.02) (11.02) 21X t; Sewer& StormDrainage 14.96 14.96 (12.07) (12.07) 23X c) RetentionDams 3.51 3.51 (3.14) (3.14) 6X cl BuildingRepair (1) 1.12 1.12 (1.00) (1.00) 2X e) low IncomeSanitation (2) 0.79 0.79 (0.71) (0.71) 1X 2 G(.0S a 'thictes& Equipment 4.56 1.00 5.56 (4.56) (1.00) (5.56) 11X b) S4aterials 2.22 2.22 (1.99) (1.99) 4X c) Lo ,aticalSupport 2.11 2.11 (2.11) (2.11) 4X 3 CONSUL(ANTS a) Tachnical Assistance 6.91 6.91 (6.54) (6.54) 122 b) Design& Supervision 3.44 3.44 (3.44) (3.44) 72 c) Studies 3.35 3.35 (3.17) (3.17) 6X 4 TRAINING 1.20 1.20 (1.08) (1.08) 2X 5 REFINANCINGOF PPF 0.75 0.75 (0.75) (0.75) 1X TOTAL $32.47 $9.96 $15.70 $0.75 $58.88 ($27.64)($9.25) ($14.94) (0.75)($52.58) 100X 54% 162 282 1X 1002 Notes: (1) Repairof DPSC workshopsand GPP, DPSC,and EPABoffices. (2) Fabricationof improvedlatrine stabs and urban revegetationby DPSC forceaccount. (3) Figuresin parenthesesare amountsto be financedby IDAand Co-Financing. (4) Cost figuresinclude contingencies. 21
E. Disbursements
3.31 Disbutrsementsunder the IDA credit are proposedat the rate of 100% against eligible foreign expendituresaJ 90% of total expendituresof selectedcategories. All disbursementswould be net of taxes and duties. Amountsto be disbursedby IDA are indicatedin Table 3.3 Disbursement Arrangements. Disbursementsagainst Statementsof Expenditure(SOEs) would be made for contracts for works, goods, and services valued at less than $20,000. Documentationin support of the SOEs would be retained by the executingagencies for inspectionby IDA's supervisionmissions.
Table 3.3 Disbursement Arrangements (USSMiltion) Percentage of Amount Expeditures Category Allocated to be Financed 1 Works S17.95 a) WaterRehabilitation $7.07 100Xof Foreign b) Sewer& StormDrainage Rehab 7.75 100%of Foreign c) RetentionDams 2.03 90X of Total d) BuildingRepair 0.64 90X of Total e) Low IncomeSanitation 0.46 90X of Total 2 Goods $6.21 a) Vehicles& Equipment $3.57 100Xof Foreign b) Materials 1.28 901 of Total c) LogisticalSupport 1.36 100Xof Total 3 Consultants $9.40 a) TechnicalAssistance $4.73 100Xof Foreign b) Design& Supervision 2.38 100X of Foreign c) Studies 2.29 100Xof Foreign 4 Training $0.78 901 of Total 5 Refinancingof PPF $0.75 AmountDue 6 Unatlocated $10.50 Total $45.58
3.32 In order to accelerate disbursementsand project implementation,a SNecialAccount would be establishedin a commercialbank to serve all project components. In addition, the Governmentwould establish a Project Accountin US dollars for counterpartfunds. The Financial Controllerin the Provincial PlanningOffice would approve all paymentsfrom the Special Accountand would be responsiblefor record keeping, aggregationof documents,and reconciliationof bank statementsas required by IDA, and for preparationof applicationsfor replenishmentfor signatureby authorized officials. Assuranceson disbursementarrangements were obtained from the GovernmentMa negotiations.
3.33 Conditionsof Disbursementof specificcomponents would be: a) confirmationof the availabilityof SIDA and NORADco-financing for the project; and b) proof of ownership or non- existenceof encumbrancesof the lands occupied by the proposednew wellfields,the oxidationponds, and the pumpingstations for the water supply and sanitary sewer civil works. The Closing Date for the Credit is September30, 1998.
P. Project Accounting, Auditing, and Reporting
3.34 GPP will maintainconsolidated accounts in dollars and in kwanzas for the entire project. Responsibilityfor detailed accountingfor all provincialwater and sewer works would be with the 22
EPAB, with separateaggregation for Lobito and Benguela. DPSC would maintainseparate detailed accounts in dollars and in kwanzasfor the solid waste component,the storm drainage works, and the latrineprogram.
3.35 At neeotiati the Governmentprovided assurances that audited financialstatements for GPP, EPAB, and DPSC, includingoperating statements,comparative balance sheets, and funds flow statemente,acceptable to IDA, would be submittedto IDA within six monthsof the end of each fiscal year. Statementsof Expenditure(SOEs) would be included in the audit and specificallyaddressed in the audit report. The studies budget includesUS$200,000 to cover the costs of annual audits over the life of the project (para 2.23).
3.36 In addition to their annual accountingand audit reportingresponsibilities, the GPP would prepare auarterly progress reports which shall includephysical, financial,and employmentbudget indicatorsfor each component,showing actual and projected expenditures,disbursements by category, and performance. These quarterly reports shall be the responsibilityof the implementingagencies, EPAB and DPSC, reporting to GPP, and of the project technical coordinatorand financialcontroller, who will compile the consolidatedreport. Quarterlyreports would be due within one month of the close of each quarter. GPP will also provide a project completionreport in a format stipulatedby IDA within six monthsof the Closing Date of the Credit.
G. Key Indicators
3.37 A detailed timetableand scheduleof physical works for each of the major componentsof the project is set forth in Annex 5 Implementation Plan Key Indicators and Schedule of Works. Other monitoringcriteria would include data on employmentgeneration attributable to the project and basic indicatorsof public health and sanitationdeveloped by the project with the assistance of the low income sanitationadvisor (para 2.15 above) and the environmentaladvisor as outputs of the environmental managementand monitoring studies (paras 24-32 of Annex 1). In addition, the Project Implementation Schedulesets forth target dates for importantproject milestones,including the contractingof consultants,major works, and studies financed by the project, with expectedcompletion and delivery dates of interim and final reports.
H. Mid-Tenn Review
3.38 During negotiationsagreement was reachedto hold a mid-term review approximately18 months after the date of credit effectiveness. The purpose of the mid-term review is to assess progress achievedin: i) project implementationbased on the agreed key indicatorsfor each component; ii) reorganizationof EPAB and implementationof economicwater and sewer rates based on the findings and recommendationsof the water and sewer reorganizationand tariff studies; iii) cost recovery of the golidwaste and improved latrines programs; iv) implementationof the environmentalaction plan, based on the environmentalstudies; and, v) implementationof the land registrationpilot program based on the land registrationstudies. The rmd-termreview would result in a revised implementationprogram, includingan action plan and timetablefor: i) revisionof water and sewer tariffs; ii) the institutional reorganizationof the water authority; and iii) applicationof cost recoverymechanisms for the project components. The mid-term review would also result in a revised list of Key Indicators, including criteria for monitoring the performanceof EPAB and DPSC. 23
IV. FINANCIALAND ECONOMICANALYSIS
A. Empresa Provincial de Aguas de Benguela (EPAB)
4.1 OQraniation. During the Portuguese colonialregime the Water Service of Benguelawas one of the multiple Departmentsof the extinct MunicipalCouncil (Camara Municipal)of Benguela. In 1976 the ProvincialWater Central (CentralProvincial de Aguas), the predecessorof EPAB, was created as a dependencyof the Ministry of Construction. In 1980 the Water Central was transferredto the Secretaryof State for Urbanism,Housing, and Waters (SEUHA), which administersstate owned housing property. In March 1990 operatingcontrol of the local water companiesand water authorities was transferredto the provincialgovernments by decision of the Council of Ministers. The intentof this decision is to decentralizethe operation of the local water companies;however, appropriate corporate charters, by-laws, and regulationsto ensure local autonomy are not yet in place. These and other important issues would be addressedand clarified in the water and sewer reorganizationan.; tariff studies financedby the project, includingthe power to set tariffs, and questions of title, ownershlp,and organizationalstructure. A logical structurewould includea provincialholding companyand operating subsidiariesfor the municipalitiesof Lobito, Benguelaand oiher towns in the interior of the province.
4.2 Financial Accounting. Meaningfulfinancial information is not available owing to weak financialmanagement and the absence of accrual accountingsystems. Bookkeepingis essentiallycash accountingwhich is very deficient. There are no annual reports, no inventories,or depreciation,and no funds flow statements. The income and expense statementsinclude a mix of unreconciledcurrent and capital accounts. Charges from the sale of water are mixed with subsidiesand grants from central govemment,advances and sales of materialto other provinces, sales of basic food stocks to employees, and loan repaymentsof employees. Expenseitems includesalaries and loans to employees, expendituresfor repair and for purchaseof equipment. Furthermore,accounting treatment is inconsistentfrom year to year making comparisonshazardous. Difficultiesof financialanalysis are compoundedby the foreign exchangevaluation structurewhich may make translationsinto dollars quite misleading. For example, EPAB Benguelareceived annual subsidiesof NKz12.0 and NKzl5.1 million in 1989 and 1990 for investments,worth US$400,000and US$500,000respectively at the then prevailingofficial rate of Kz3Oto the dollar. If valued at the unofficialmarket rate (NKz800 to the dollar), similar kwanza amounts would yield only about US$15,000and US$19,000. Not surprisingly, there has been no attempt to consolidatethe accounts of Lobito, Benguela,and the other municipalities of the province. A priority of the technicalassistance to EPAB will be the establishmentof coherent accrual accountingsystems in Lobito and Benguela.
4.3 Financial Projections. The objectiveof the Financial Projections (Annex 7) is to determine a range of rates from breakevento an economiclevel of full cost recovery of the rehabilitatedand expandedwater and sewer networks. The financialprojections start from a number of key assumptions: a) in the absence of balance sheets, funds flow and income statementsonly the investmentsof the project are considered;in other words the project investmentis viewed as zero-based or standingalone; b) only incrementalwater is considered;c) productionis assumed at 85% of marginalcapacity; d) consumptionis taken at 75 % of marginalproduction; e) the annual cost of operation and maintenanceis assumed at 7.5% of initial investment,based on experiencein other countries. Thus a breakevenoperating tariff for the rehabilitatedand expandedwater and sewer 3 networks works out in the projections to about US$0.28 per i . Full cost recovery requires an additional return on investment. A combinedwater and sewer tariff of US$0.44 would provide an annual return on investment(ROI) of about 10%, sufficientto allow for depreciationand eventual replacementof plant and equipment. 24
4.4 Affordability. These values seem high when comparedto present or proposed tariffs of the water company. They are, in fact, conservativewhen comparedto the prevailing prices of vendor- distributedwater at free market rates, as shown in Annex 7 Financial Analysis (Page 3). A family of six may p.irchase today only 60 liters per day (10 liters per person), or 1.8 m3/monthto meet sub- minimal householdneeds, paying NKz3000per monthat vendor rates, equivalentto US$3.75 at the parallel rate of NKz800per US$. After completionof the new standpipeprogram, the same family would be able to purchase the design standard,30 liters per person per day, or 5.4 m3 per monthat the suggested'economic rate* of US$0.44 (NKz352)per m3, costing NKz1900(US$2.37) - three times the volume for 63 % of the price. Thus, despitethe lack of reliable socio-economicsurvey data, there is little doubt based on observedconsumption patterns that suggestedeconomic rates are affordableto much of the population.
4.5 Residentsin outlyingareas and squatter settlementswould not benefit directly from the rehabilitatedsewer networkand, contrary to current practice, should pay less for water than residents in the inner city. The water and sewer tariff and reorganizationstudies would make appropriate allowancefor these importantdifferences in benefits in recommendingan economicallysound rate structure incorporatinggenerally acceptedprinciples of equity and cross-subsidization.
B. Cost Recovery
4.6 Cost recoveryis a major issue addressedby the project. The problem is manifestedin the low tariff levels prevailing in the water sector, the absence of user charges for the sewer network;and the extremely low rents paid by occupants of state-ownedhousing. The problem is exacerbatedby the overvalued, artificialexchange rate. The project proposes to address the problem of cost recovery through cost accountingin both dollars and kwanzas, and through studies and agreements. The maincenanceof all project accountsin dollars will provide a useful benchmarkfor cost recovery objectives.
4.7 Water and Sewer Tariffs. A proposal has been pending for over one year to double the 3 prtsent rate to NKz20 per m . Preliminary indicationsfrom the financialprojections, however, are that the proposed rate increase, based on the official rate of exchange, is artificial and quite inadequate. During negotiationsa Water and SewerTariffs Action Plan was agreed, which is attached to the Terms ot Reference.for the Water and Sewer Tariff and ReorganizationStudies (Annex 9, Appendix 1). The agreed underlyingprinciple is that tariffs will be revised annually to reflect the true economiccost: a) of the cxistingwater networks;and b) of the rehabilitatedand expandedwater and sewer networks. True economiccosts are defined as full costs of operation, maintenance,and replacement,converted at a realistic exchange rate. The exchangerate, in tum, is defined as a ReferenceValue taken as the approximateaverage of the official and unofficialexchange rates (NK400as of October 1991). Based on these principles, a first interim water tariff of NK53 per m3 was agreed, which is 5.3 times the present rate, to become effectiveJanuary 1, 1992 upon ratificationby the ProvincialPrice Commission and the ProvincialGovernment. The agreementcalls for a second interim water tariff, at least equal to 80% of the breakevencost at the prevailingReference Value for the dollar, to become effectiveno later than January 1, 1993, based on the findingsof the studies financedunder the credit (para 2.24). Subsequenttariff reviewswould be scheduledduring the mid-term project review to take place approximately18 months after the date of credit effectiveness(para 3.38).
4.8 Solid Waste Collectionand Disposal. Cost recoverywould be achievedthrough the gradual introductionof garbage collectionfees and charges for emptyingof septic tanks and for the disposalof waste at the municipal garbage dumps. Beginningin January 1991, the DPSC began to charge a fee for garbage collectionin the served downtownareas. The nominal fee of 100 NKz is collectedtogether with apartment rental paymentsat the local branches of the BancoPopular de Angola. The technical assistancefor the solid waste managementcomponent will includea study to determine an appropriate fee structure and methodsof collectionfor the different levels and types of service provided, with the 25 objectiveof covering recurrent expendituresof the system. The proposedrate structure will be agreed upon during the mid-term review.
4.9 Improved Latrines will be sold at cost plus a small charge for overheads to eligible beneficiaries. Costs would be maintainedin both Kwanzasand U.S. dollars. The mechanismfor price setting was agreed during negotiations.
C. Private Sector Development
4.10 After fifteen years of a highly centralizedeconomic system, Angola is beginningto move towards a market economy. The provincialgovernment has begun to divest some real estate and a number of businesses,including small scale industriesand fishing enterprises. The proposedproject will stimulatelocal private sector initiativesat various levels. The informal sector will play i significantrole in the low cost sanitationprogram, by transportinglatrine slabs, and providing local materialssuch as sand and gravel. Repairs of municipalbuildings and offices, as well as the constructionof small erosion-controlretention dams, will provide opportunitiesfor small contractors. Finally, the study for the reorganizationof the w'ter company, EPAB, will consider a range of options from managementcontracts to full privatization. After rehabilitationof the solid waste management system a similar approach would be considered.
D. Project Benefits
4.11 Major benefits of the project would be measuredin terms of improvedhealth of the population,positive impactson the physical and social environmentand increasedproductivity of the urban population. These are summarizedas follows:
Realthand Environmental Benefits:
a) Expansionof the water supplywill bring clean water for the first time to 80% of the largely low incomepopulation, thus elimninatingthe single most important cause of disease and directly contributingto a reduction in the criticallyhigh rates of infant mortalityand morbidity;
b) Rehabilitationof the existing water distributionnetwork of Lobito and Benguelawill help reduce water lossesdue to leakage, currently in excess of 50%;
c) Rehabilitationand extensionof the sewage networkwill divert sewage from the city streets, squatter settlements,wetlands, and bays to oxidation ponds where the treated efflut'ntcan be usefully recycled;
d) Storm water control will decrease peak flows, thus diminishingerosion and associated flood hazards in the major natural and man made storm water channels; rehabilitationof the Vala do Coringe will clean up one of Benguela's major sources of disease;
e) Solid waste managementwill improvesanitary conditionsby providing daily waste collectionin most neighborhoods,thus eliminatingthe accumulationof waste throughoutthe urban area;
f) The improvedlatrine program will introducenew technologyto bring affordablypriced sanitationto 80% of the mostly low incomepopulation in the project area beyond the reach of the sanitary sewer networks;
g) The sanitary-environmentaleducation component will design, promote and implement intensive education in public health and hygiene, control of water-bornediseases, and water- soil conservation;and 26
h) Neighborhoodrevegetation will help improve the microclimate,soil fertility, erosion control, and nutrition, thus contributingto the ecological,scenic, health and recreational conditionof the Lobito-Benguelaconurbation.
Economic and Social Benet:
a) The entire populationwill benefit economicallyfrom access to affordableclean water and improvedsanitation, which are expectedto reduce morbidityrates measurably,enabling more of the populationto work productivelymore of the time;
b) Women and childrenwill be the biggest beneficiariesof ready access to urban water inasmuchas they are primarily responsiblefor householdwater suppliesand now spend inordinateamounts of time and energy hauling water at great distances;
c) Abundantwater in the low income settlementsfor the first time will permit important increasesin gardening and productionof edible vegetablesfor home consumptionthus helping reduce the real cost of living of the urban poor; and
d) The project will create an estimated2,800 man-yearsof employmentfrom the construction of the rehabilitatedwater and sewer networks, the storm drainage works, the solid waste managementprogram, and the low cost sanitationprogram, includingthe improvedlatrine, sanitary-environmentaleducation, and urban revegetationcomponents.
Institutional Benefits:
The proposed project will help establishsound institutionsresponsible for water supply and sewage and solid waste management. By establishingappropriate cost recovery mechanisms, the project will enable these institutionsto operate and maintain the rehabilitatedinfrastructure.
B. Project Justification
4.12 The proposed project is justified on the health, environmental,social, economic, and institutionalbenefits outlinedabove. The fact that over half a million people are presentlywithout water lends urgency to the justification. In additionthe project would facilitate the developmentof the larger Lobito Corridor RehabilitationProgram. Bank experiencein similar cases shows that dealing with the urban problems a posteriori can result in costly delays. No EconomicRate of Return has been calculatedowing to the difficultiesin quantifyingthe major benefits of the project. While justified on health and environmentalconcerns alone, the proposedproject would facilitate the developmentof the larger Lobito Corridor rebabilitationprogram. Major direct benefits of the project would be measured in terms of improvedhealth of the population,and in particularof women and children; aleviation of poverty among the lowest incomegroups in the squatter settlements;increased productivity of the urban population;positive impacts on the physical and social environment;and increasedeconomic efficiency of the cities of Lobito and Benguela. The project involvesmostly rehabilitationof existing infrastructure. Althoughthe Governmenthas not yet been able to formulatea public investment program, the proposed investmentis clearly a top priority in the reconstructionof Angola's war- ravaged economy.
F. ]Project Risks
4.13 The risks inherent in the proposedproject ate due to institutionaland technicalweaknesses which may cause delays in project implementationand lead to further environmentaland economic deterioration. There is a potential risk that the governmentmay interfere in the administrative autonomyof the provincialwater companythereby hinderingreorganization efforts and the cost 27 recovery objectivesof the project. Unfamiliaritywith Bankprocedures, problems with communications,and a potentiallyunstable political environment could lead to significantdelays as well. Delays in the overall urban rehabilitationeffort could affect the rehabilitationof the Lobito corridor, once it gets underway. Other minor risks involvethe effectivenessof some of the environmentalrehabilitation efforts such as the revegetationcomponent. Technicalassistance, training, and logisticalsupport, initiatedduring project preparation, are intended to minimizethese risks.
0. Lssons Learned
4.14 Applyinga lesson leamed during preparation, the Bofrowerhas agreed to delegate to the Provincial Governmentfull authority to execute the project and manageproject funds, thus avoidingthe costly delaysof central governmentinvolvement in project management. The proposed project is the first investmentproject supportedby IDA in Angola, and there are no implementationlessons yet to draw from Bank experience. Nevertheless,Angola presents institutionaland technical weaknessesthat make it comparableto other African countries,and in particular to the Portuguese-speakingnations that share a commoncolonial heritage and gained Independenceat the same time. One of the main sources of lessons learned is Mozambique. In particularthe MozambiqueUrban Rehabilitationproject (Cr. MOZ 1949) which became effectivein January, 1989, has componentsand methodsof implementationsimilar to those in the proposedproject.
4.15 A number of these lessons have been applied to the project concept. The project has been scaled down from its original design and now involvesfewer components,fewer agencies, and more realistic objectivesand expectations. With regard to implementation,the use of an ad hoc Project ImplementationUnit has been abandonedin favor of strengtheningexisting institutionalstructures. In Mozambiquethe role of the implementingagency has been successfullydefined to that of contract M.nnuementfor civil works, supervision,and technicalassistance. This managementapproach, rather than attemptingto perform implementationtasks directly, is being applied in the proposed project. In order to avoid time-consumingcontract review, the Borrowerhas agreed to use standardbidding documentsand Bank ICB contracts for works and technicalassistance.
4.16 The technicaldesign of two project componentshas also benefitted from the Mozambique experience. Both the solid waste managementand the improvedlatrine programs are designedafter successful, wel tested programs in Mozambique,and some early flaws have been avoided. The improved latrine design, which uses no structural reinforcementother than its slightly conical shape, was perfected in Mozambique. Through completionof over 1,000 slabs during project preparation, IDA has effectivelytransferred a successfullow cost technology. 28
V. AGREEMENTS, CONDITIONS AND RECOMMENDATIONS
A. Agreements Prior to Negotiations
5.1 Prior to negotiationsthe Governmentfurnished IDA with:
a) a Joint MinisterialDecree, satisfactoryto IDA, signed by the Ministriesof Planningand Finance, empowering the ProvincialGovernment of Benguela,represented by its Planning Office, GPP, to act as project executingagency (para 3.1);
b) ImplementationAgreements, satisfactory to IDA, betweenGPP and EPABand between GPP and DPSC, for the implementationof the respectiveproject components(para 3.1);
c) draft tender documents,satisfactory to IDA, for the water and sewer reorganizationand tariff study includingterms of reference, draft contract, proposedshort list of firms, and letters of invitation, prepared by GPP and approved by the Ministriesof Planningand Finance (para 2.24); and
d) draft bidding documentssatisfactory to the Associationfor the major civil works, i.e., the water, sewer, and storm drainage rehabilitation(para 3.27).
B. Agreements Reached at Negotiations
5.2 During negotiationsassurances were obtained from the Governmenton the followingmatters:
a) terms of reference and a timetableof employmentof key project consultants(pam 2.17);
b) a Water and Sewer Tariffs Action Plan (para 4.7 and Annex 9, Appendix 1);
c) a mid-term review to be carried out 18 monthsafter the date of credit effectiveness(para 3.38), to monitor progress achievedin:
i) project implementationbased on the agreed key indicatorsfor each component (parm 3.37);
ii) cost recovery of the water and sewer systems and of the solid waste and improved latrine programs (paras 4.6 - 4.9);
iii) implementationof the environmentalaction plan, based on the environmental studies (para 2.25); and,
iv) implementationof the land registrationpilot program based on the land registration studies (para 2.26).
d) in conjunctionwith the mid-term review, agreementon an implementationprogram, includingan action plan and timetable, for: i) revision of water and sewer tariffs; ii) the institutionalreorganization of the water authority basedon the findingsand recommendations of the water and sewer reorganizationand tariff studies (para 2.24); and iii) applicationof cost recovery mechanismsfor the project components(paras 4.6-4.9);
e) the establishmentand maintenanceof a SpecialAccount in U.S. dollars for IDA funds and a Project Accountin U.S. dollars for Governmentcounterpart funds (pam 3.32); 29 f) adoption of accountingand reportingprocedures, satisfactory to IDA, includingmaintenance of all project accountingin dollars and in kwanzas(para 3.34); the timely preparationand submissionof quarterly and annual financialreports (paras 3.35-3.36); and of external audits within six months of the end of each fiscal year (pam 3.35); and
g) appointmentof project counterpartstaff and provisionof adequateoffice space for the technical, administrativeand consultingstaffs of GPP, EPAB, and DPSC; provision of adequatetransportation for all project consultants;and appropriatehousing for long-term consultants(para 2.20-2.21); C. Conditionsof Credit Effectiveness
5.3 Conditionsof Effectivenesswould be:
a) appointmentof the key staff of GPP, includingconfirmation of the Director as Project Manager, and employmentof the project technicalcoordinator, the financialcontroller, and the procurementadvisor, on terms satisfactoryto the Association(paras 2.17 and 3.25); and
b) signatureof the contract for the water and sewer institutionalreorganization and tariff studies on terms satisfactoryto the Association(para 2.24); and
c) approval by the ProvincialGovernment of Benguelaof the Water and Sewer Tariffs Action Plan and implementationof the first interim water tariff increase, agreed at negotiations(paras 4.7 and 5.2 (b) and Annex 9, Appendix 1).
D. Conditions of Disbursement
5.4 Confirmationof the availabilityof SIDA and NORADco-financing for the project would be a conditionof disbursementfor specificitems under the project (para 3.33).
5.5 Proof of ownershipor non-existenceof encumbrancesof the followinglands occupiedby the proposed new wellfields,the oxidationponds, and the pumpingstations would be a conditionof disbursementfor the water supply and sanitary sewer civil works:
(i) the new wellfield, 150 by 1000 meters (15 hectares), on the west bank of the Catumbela River, approximatelythree kilometersupstream from the existing well field (pam 2.4);
(ii) the new wellfield, 150 by 1000 meters (15 hectares), on the south bank of the Cavaco River, approximately1.3 kilometersupstream from the existingwell field (parm2.5);
(iii) sanitary sewer pumpingstations located in: (1) the Lobito CommercialZone; (2) Caponte; (3) the Benguelacentral area; and (4) adjacent to the Coringe Channel, as located on the consultant'sdrawings (paras 2.6-2.8); and
(iv) sanitary sewage oxidationponds of four hectareseach for the Lobito lagoon, located on the waste land approximatelytwo kilometerssouth of the Bairro Cabata, and the Beaguela lagoon, located approximatelytwo kilometerssouthwest of the airport (paras 2.6 and 2.7).
E. Recommendation
5.5 On the basis of the above actions, conditions, and agreements, the proposed project would be suitable for an IDA credit of US$45.58 million. TABLE OF ANNEXES
PROJECT-RELATED 1 Preliminary EnvironmentalAssessment 2 Water, Sewer, and Storm DrainageRehabilitation 3 Low Income Sanitation 4 Solid Waste Management 5 ImplementationPlan and Key Indicators 6 DetailedProject Costs 7 Financial Analysis 8 GeographicalInformation System
TERMS OF REFERENCE 9 Water and Sewer Tariff and InstitutionalReorganization Study 10 EnvironmentalManagement and MonitoringStudy 11 Land RegistrationStudy 12 GPP Key Staff
BACKGROUND 13 SelectedDocwments Available in the Project File
MAPS IBRD No. 23181 Angola- Project LocationMap IBRD No. 23182 Lobito Benguela Project ComponentMap AnnxI Page I of 18
LOBITO-BENGUELAURBAN ENVIRONMENTALREHABILITATION PROJECT
THE LOBITO-BENGUELACONURBATION
PRELIMINARY ENVIRONMENTALASSESSMENT
I. INTRODUCTION
1. This annex containsa brief environmentalanalysis of the Lobito-BenguelaConurbation (LBC). It provides a first understandingof the LBC's natural environmentand its interactionwith the social, technologicaland economicconditions of the region; identifiesthe features and characteristicsof the Conurbationleading to or undergoingenvironmental degradation, and the possiblecauses of such degradation;and outlines the potential environmentalimpact of planned or proposedprojects.
2. The data available for the area is limitedand the existing socio-enviromnentalinteractions are complex. Therefore, this report introducesthe issues as a first step for further action. The information outlinedbelow is restricted to identifyingmost immediateissues, and raising questions about the needs and potentials of the Lobito-BenguelaConurbation in relation to the present Project. The information reviewedprovides a minimumbase for identifyingthe need for specificenvironmental impact statements,and for establishingthe data necessary for ecologicallybased planning and management within the Conurbation. Specificcomponents and actionsnecessary to reverse environmental degradationand prevent or mitigatefurther negativeimpacts in the project area are identified, and monitoringof project componentsis proposed to guaranteeproper attention to potentialor unforeseen negative impacts. The analysiswill be complementedby the environmentalstudies componentof the Project, and followedby preparationof a medium-termenvironmental action plan.
3. The environmentalissues in the Lobito-BenguelaConurbation reflect conditionswithin and beyond its urban limits and need to be consideredwithin the context of a larger region. These conditionsresult largely from lack of infrastructre and basic services, and the destabilizingeffects of the war, which have caused massive in-migrationinto the area. The resulting environmental degradationaffects land, water, and human resources beyondthe Lobito-BenguelaConurbation.
I. REGIONAL SETTING
4. The BenguelaProvince. The Lobito-BenguelaConurbation is located on the coast of the BenguelaProvince, on the Southwestof Angola. With a territory of 32,927 kn2, the Province holds around 1.2 million inhabitants,some of the higher populationdensities in the country, and Angola's secondmost important industrialcenter. The Province's major economic activitiesare agriculture, fisheries,industry, and port and railroad tansport, all concentratedwithin the Lobito-Benguela Conurbationand Baia Farta, about 23 km south of Benguela. At present, these activitiesare significandybelow potentiallevels as a result of both difficultiesfollowing independence and the war. Nonetheless,they continue to play a major role in the developmentof the Angolan economy. The BenguelaProvince's industrial developmentis responsiblefor approximately35% of the country's industrialcomplex. Fish catch accounts for roughly 40% of the Angolan total catch. The Province provides sonm of the major export agriculturd products, and raw materialfor the Lobito-Benguela
1 Annal Page 2 of 18
Conurbation'sagro-industries. 'rotal agriculturl productionis difficult to assess since production, except for state-ownedagriculture, is largely in the subsistencesector, and surplus is traded in the parallel market, for which statisticsare not available.
S. The BenguelaProvince las three climaticareas varying from desert to humid tropical, with an averageof 230C and a rainfall ranging from 100-1000mm/yr. About half the Provinceis identifiedas inappropriatefor agriculture due to poor soils; only 1/10 of it presentsgood agriculturalpotential. Patches of alluvial soils, however, are spread throughoutthe poor soils region allowing localizedhigh value agriculturaldevelopment. The coastal plain holds the Province's best agricultural soils (calcareos pardos and arildicospardos), and the two largest patches of alluvial deposits. The BenguelaProvince 2 has two river basins, the Catumbelaand Coporolo, with a total catchmentarea of 28,010 km. The surface water potentialof both rivers is low due to the watersheds' high rates of soil absorptionand high evaporation(1300-1500 mm), and low precipitation. The water table is generally 5 metrs deep.
6. The Province's flora and fauna are diverse, albeit poorly managed. The vegetationvaries on an eastwardaxis from the coastal plain, changingfrom steppes to forests, open forests, and savannas nixed with shrubs. The rate of regenerationfor the natural forests where wood has an economic importau-e is reported at 846 m31yr,and the rate of sustainableexploitation at 750 m3/yr. Current 3 wood demand largely exceeds supply, and the Province's deficitis estimatedat 45,390 m /yr. The rate of deforestationis high due to clearings for cash crop cultivation,use of wood as fuel and construction material, and war activities. The area currently cut specificallyfor wood exploitationadds to 700 ba/yr. Reforestationis limited and the only plantationssomewhat managed are those belonging to the paper industry. These plantationsare generally of exotic species, mostly eucalyptusspp. and pints spp. The Benguelarailroad owns the country's largest eucalyptusplanttion. The Provinceis tich in land and aquatic fauna. TLe meetingof the cold and warm sea currents of Benguelaand Agulhas provide optimumconditions for sardine and horse mackerel, Angola's main commercialspecies. Tropical species predominateoff the coast of the Province, which is rich in fish, as well as mollusks and cretaceans. Coastal wetlandsprovide habitat and resting areas for land and aquatic species, especiallybirds and fish. Hunting as currently practiced has a certain economicimportance within the Province, and is considereda major potentialattraction in the developmentof a tourist industry. The Provincehas two nature reserves (Chimolaveraand Buffalo)about 45 km from Benguela. The BonguelaProvince's wildlife and tourist potential, and coastal and marine resources remain largely untapped. On going proposaisrecommend implementation of a wetland reserve in the Lobito coast, and rehabilitationof the ChimolaveraReserve.
7. The infrastructureand the economicand socio-culturalframework of the BenguelaProvincoe is damagedpartly as a result of the war. Its coastal area, however, is relativelysecure which accountsin part for the currently high populationrates and the Province's high participationin the country's agicultural and industral performance. m. THE LOBITO-BENGUELACONURBATION 8. Physical d ClimaticSetting. The Lobito-BnguelaConurbation lies on the northwestcosal plainsof the BenguolaProvince. It has a tropical,dry, semi-desertclimate, with a precipitationof 100D-300mm/yr. The rainfallis distributedin a six monthseason rnning fromOctober to April,and often consistsof intensestorms. lTe averageevaporation rate is 1300mm/yr. The soilsthroughout the Conurhationare alluvialdeposits on quaternarybedrock. In the surroundingregion, the soilsarm mostly calcakos pardos and aridicospardos of cretaceousand tertiary formation. The native
2 Ana@xU Page 3 of 18
vegetationisformacao de estepes (steppes). Two major rivers, the Catumbelaand Cavaco, provide the Conurbationwith rich estuary ecosystems. On the alluvial depressionsof the Catumbelaand Cavaco rivers, the we er table is at 0.5-4 meters. The chemical compositionof well water is that of naturally potable water.
9. Lobito and lBenguelaare connectedby a railroadand a parallel paved road cutting southward through the coastalplain. The Lobito-BenguelaConurbation is limitedby the Atlantic ocean on the west and a escarpmenton the east, and presents the most fertile land of thABenguela Province. The Conurbation'scoastal plain is currently cultivated,the main crop being sugar cane. Lobito and Catumbelaare locatedjust beyond the border of the coastal plain and the central plateau.
10. Ih LUrbanSetting. The urban areas of Lobito and Benguelaare 33 km apart. There is however an overlap of the current land use and environental conditionsof both cities and the region connectingthem. The area linking Lobito to Benguelais presentlytaken by almost continuous spontaneoussettlements; only Damba Maria and Catumbelaare planned towns. The 1990 populationof the Conurbationis estimatedat around 800,000 p.ople, over half the total for the BenguelaProvince and roughly 89%of Angola's total population. The LBC is located in the Province's highest density area, which reached 95-111people/km 2 by 1989, and is the major determinantof the urban infrastructureof the BenguelaProvince.
11. The spatialpattem of the LBC results from insecure conditionsof the rural areas rather than from opportunitiesprovided by the urban setting. The Angolan state of war has taken a toll on the Province's natural and human resources, setting forth migrationout of the inland agriculturalareas. The Lobito-Benguelaregion provide one of the few pockets in the country with relativelystable economicactivities and safety. This has led to a rapid increasein the Conurbation'spopulation and resulted in overburdeningthe area's already meager infrastructure. Most of the populationexpansion occurred in squatter areas with no basic infrastructure.Urbanization of the incomingpopulation is restricted to urban clusterswith no access to agriculturalland. The massive presenceof urban- unskilledwar immigrantscomplicates planning and policy making for the area's development. There is no local consensuson whether the migrantpopulation will return to agriculturalland following establishmentof peace. The most commonassumption seems to be that the majoritywill return, but part of the younger generationmay remain in the cities.
12. The Coastal-UrbanContext. Benguelais the center for the Province's administrationand has one of Angola's main airports. Lobito providesa transportationnetwork combitiinga coastal outlet directly connected to the east-west railroad axis, which links Lobito and Zaire; it is a natural port and a major export outlet. It is believedlocally that Lobito's privilegednatural characteristics,complemented by its connectionto the TransAfricanPathway, the Benguelarailroad, and the new Catumbelaairport six kilometerssouth of Lobito will lend it regionaland intemationalimportance. These charderistcs of the Conurbationat the same time provide a base for the region's economicdevelopment, and set the frameworkfor degradationof its coastal zone and marine resources.
13. Lobito: The city of Lobito has a populationof approximately415,000 people, while the Municipalityof Lobito reaches 545,700 people (See Figure 1). Only about 1/5 of this populationlives in the former Portuguesecity area, and the major neighborhoodsare the Restinga, Compao,Caponto and Bela Vista. The rest of the populationinhabits mostly spontaneoussettlements (musseqtu) on the hill slopes beyond the city limits, above the port and towards Catumbela,around Bela Vista, and on the plateau Alto Liro. Lobito is characterizedby the NE hills, the SW plains and the Peninsula do Lobito
3 Annex 1 Page 4 of 18
(Restinga),five kilometerslong and 200-300meters wide. The city's environment is complementedby the Mousld.o do Lito bay, about1-2 km wideand 35 ms deep, the coastalwetlands and salt Sede(Lobito Sed 410.000 ponds. The peninsulaprovides a Jomb* 326 naturalbreakwater to the portand holds Hlan Noun 4,600 one of the majorresidential areas, with Hot" PrA_ buildingsof two and three colonial Cauumbcla Vila Caum 98,21 stories. Lobito holds the largest SiopioAucareIo 931 industrialdevelopment within the LBC. Lanlo 569 Angola'sfishing industry is partlybased -- in Lobito, Benguelaand Baia Farta. Biopio Biopio 3,90 - Estimatesfor Lobito'sannual population Canjala C4jala 5$22 growthvary from 7% to 10%. C..nd 986 - Sat lnon 2,417---- 14. Benguela:Benguela has about 300,000inhabitants. The city has a EgPoPa Egit Pf i multi-storecentral core concentrated betweenthe railroadstation and the sea, Priat dehinl 322C.- and houxsesabout 60,000 people. The 27"MOwr 328 centralcore is surroundedby one and two-floorplanned residentialareas and Toal Population 5455729 spontaneoussettlements. The Source:ConaaadodoLobito, Lobito,Jasuaz i991. Municipalityof Benguelais formed of -aver54 bairrosover 4(neighborhoods). barros(neigborhods)Tie TFe 1 Populationof tbo LobitoMunicipality. industrialarea of Benguelalies mostly betweenthe Cavaco river, the railroad and the Benguela-Lobitoroad. Most fish processingindustries are along the coast. Benguelaenjoys no natural harbor as such; its roadsteadis used chiefly for fishing boats, and the city has Angola's second largest fleet of artisanalfishing boats. Benguela'sannual growth is roughly 7 %.
15. The housing stock of the Lobito-BenguelaConurbation is made up of mostly adobe. Thatched roofs are rare, and most older constructionshave roof tile. These original materialsare being replaced by cement and roof sheets, either corrugatedasbestos-cement or tin sheets. The replacementresults from the current inaccessibilityto wood suppliesfor roof structuring, lack of roofing leaves and grass, lower prices of the new roofing sheets, and a belief that adobe is both of inferior quality to cement and an inferior technique.The roofing cement-asbestosand metal sheets have raised dissatisfactiondue to microcimatic discomfortand a perceived increasein health problemsaffecting young children. A number of old adobe buildingswithin the cities are dilapidatedor near collapse, threateningthe region's colonial architecturalheritage.
16. Industry in Lobito-Benguelais largely agro-industry,responsible for 29 % of the Province's labor. Industrialactivities are often located next to the water on the coast or the river edge. The major fish-packingindustries are in Baia Farta. Along the coast, from Benguelato the Namibe desert, there are several small fishingcommunities and a few former Portuguesetourist developments.
4 Anex 1 Page 5 of 18
17. The Lobito-BenguelaConurbation suffers from a general lack of infrastructureand basic services, particularlyof sanitation,water, low cost energy, and waste management. The LBC also lacks the institutionalcapability, technical skills and financialability necessary towards the environmentalrecovery, planning, implementationand managementof its coastal zone resources.
IV. MAJOR ENVIRONMENTAL ISSUES
18. Environmentaldegradation resulting from man's activitieswithin the Lobito-Benguela Conurbationis manifestedboth within and beyond the Conurbation'slimits. Water and land resources are affected, in turn degrading human health and potentialeconomic resources. Negative impacts include coastal, surface and groundwaterdegradation; soil erosion; changes in aquatic ecosystems;and desertification.l/ Lack of adequateinfrastructure and services, and the poverty conditions of the war refugeesare major contributorsto the current environmentaldegradation. This degradation, followed by depletion of usable resources --particularlycontamination of water and food sources-- increasesthe vulnerabilityof the poor further stressing the scant socio-economicconditions of the Conurbation. Followingis a brief discussionon the status of some of the major current problems.
Water Resources
19. The impact of the Lobito-BenguelaConurbation on the region's water resources currently relates to decrease in water quality, rather than quantity. This results from lack of adequatewater supply for both urban use and irrigation. Nonetheless,the lack of water conservationpolicies, the state of degradationof the water distributionnetwork, and the lack of water-savingtechniques and devices, have lead to high water waste. Water losses in the existing water distributionsystem of both cities is conservativelyestimated at 50%. Further unaccountedlosses occur in the local open-surfacedaylight irrigation system which is inefficientin use and conservationof water. Washingstreets to keep down the dust is a common sight where water is available. It is crucial that increasesin water supply be precededby an awarenessprogram to avoid escalationof water waste.
20. Water Supplyand Demand. Estimates of supply and demand within the Conurbationare complicatedby lack of data, as well as by uncertaintiesconcerning the future of the region's refugee population. Deteriorationof the existing water supply systemsand monitoringequipment results in that there are no actual estimates of the amount of either surface or groundwaterwithdrawn for urban use. Estimatesof consumptionare at best shaky.
21. Consideringcurrent populationtrends, estimates of water demand for the Lobito-Benguela Conurbationby 1995 add to 51,500 m3/day. Lobito's pumpingcapacity is about 7,000 m3/day,and Benguela's roughly 10,000m 3/day. The Water and Sewerageproject would increasepumping capacity to 24,000 m3/day each for Lobito and Benguela.This will supply the populationof the urban core of both cities with in-house piped water, and provide standpipesfor most of the Conurbation'ssettlements at a maximumdistance of 200ms for each and all residences. The rural settlementsof Damba Maria and Praia Bonita, in the Municipio of Lobito, will not be servicedby the project. Project estimates indicate that both short and medium-tern water demand(up to the year 2020) within the Lobito- BenguelaConurbation can be met throughexploitation of the region's groundwaterresources. Water
I/ Informationon desertificationaround the project ares is not available.lTis reportdeals onlywith the causesof existingdesertification (man-induced desentiztion) as identifiedduing proect prepartion, and by the local commnuitiesand authorties.
5 Annex I Page 6 of 18
losses will be minimizedand monitoredin the proposedsystems. Overall water conservation,however will depend on both policy developmentand irmplementation,and user awareness(See par. 19).
22. Lone-TermWater Supplvand Demand. Plans to increasewater supply for the region include the constructionof a medium-sizedan on the Catumbelariver and a series of small dams upstreamfor cattle and agriculturaluse. There are to date no official proposalsor feasibilitystudies for the above plans; small dams and ponds for agriculturaland cattle use are currently built on an ad hoc individual basis. It is recommendedthat an environmentaland resources analysis shouldbe incorporatedat the first stage of the above plans, since they may negativelyaffect downstreamwater quality and quantity, eventuallyaffecting the Lobito-BenguelaConurbation and its coastal resources.These projects -as well as future projects for industrial, residentialand agricultual water use- shouldbe analyzed for their possiblenegative impact on the water .,sources of the region.
Water Oualitv. Sanitationand PublicHealth
23. The majority of the Conurbation'spopulation inhabits squatter areas lacldng water supply and latrines. The few existing public standpipes(cwfarizes) have intermittentor no water, the few communallatrines are out of service, and the local governmentdoes not have enoughtrucks to provide water delivery on a regular basis. It is estimatedthat Benguelaproduces 60 tons of solid waste/day, and Lobito-Catumbela90 tons/day. Both cities lack the equipmentand financingto provide for waste collection,so most of the solid waste accumulatesin the streets. The portion collected is dumped in open sites (lixeiras)which are inappropriatelylocated, close to residentialareas, water sources and environmentallysensitive areas. Waste collectedfrom septic tanks is dumped on abandoned agriculturalsites belonging to the sugar cane plantationin Lobito, and in the BenguelalUxera.
24. Most settlementsbetween Lobito and Catumbelaare relativelyclean, as consumptionis very limited and householdwaste is usually burnt or buried either in commonpiles or near the houses. Household,commercial, and industrialwaste within the cities are all combined. Where available, industrial garbage collectionand disposalis inappropriateand further exposes workers and the public to contamination.
25. Fecal matter, frequentlydisposed of with the garbage, is present throughoutLobito's and Benguela' streets exacerbatinghealth problems. Wastewaterdrips from broken sewage and water pipes in multi-storebuildings, and sewageseeps onto the cities' streets and sidewalks,providing play ares for children. Existing sewageand drainage channelsare often open, and Lobito's major drainag channelsare cloggedby trash and silt. Faeces are found next to and inside irrigation and drainage channelsthroughout the Lobito-Benguelaroad. In unpavedsettlements, literal accumulationof faeces clearly indicatesproduction has long surpassed the soils capacityto recycle organic waste. Breeding sites for mosquitoesand rats abound, closing a cycle of environmentalcontamination and disoase.
26. These conditionspose furter health hazard in areas subject to floodingduring the rain season, and are complicatedby the regular use of wastewater by the populationin areas lacling watr supply. In Lobito, water from drainagechannels and stagnantpools is used for householdcores especially in Alto Liro, Bela Vista and Consta. Wells dug next to and even inside the sewage/stormwater outlet Vala do Coringe provide water to neighboringpopulation; and the irrigation-dainage channelparallel to the Lobito-Benguelaroad provides a major source of water for washingand bathing for nearby populations. Sewage and storm water are used to prepare adobe blocks.
6 Annex Page 7 of 18
27. The combinedlack of sanitationand adequatewater and food increasesvulnerability to diseasesspread by air, contaminatedwater and faeces. Lack of water leads to inadequatehygiene fosteringinfections. Use of contaminatedwater for washing or cleaning hands and food related utensils lead to increasedrisks of typhoid, cholera, diarrhoea and hepatitis. Stagnantwater provides habitat for mosquito,s increasingincidence of malaria. Infectiousdiseases are rampant, and five out of the eight most reported diseasesin the Provinceare water related. Table I lists major diseasesin the Benguela Prvince, their relationshipto water supply and quality, their rank in the Province's mortalityand morbidity rates for 1989, and Angola's infant and child motality rates. Cholera and typhoid often reach epidemicproportions. Diarrhoea is a major cause of malnutrition,which in turn increases vulnerabilityto diarrhoea. Diarrhoea, malaria and mralnutritionare among the six major causes of infnt and child deaths in Angola. The 1990 morbidity ates for the municiplosof Benguela,Lobito and Baia Farta are 59.2%, 18.1% and 45.4% respectively. Mortality for the saue period is 6.6/1000, 1.3/1000, and 4.5/1000 respectively. Table II ranks the major causes of morbidityand mortalityfor diseaes in the three municipiosand the BenguelaProvince in 1990. The actual figures may be more alarming, consideringthat existing statisticsdo not estimateunreported cases.
Table 1: Maior Diseasesof the BenruelaProvince
DISEASE WATER 1989 RATES polluted inad. inapprop. most. morb. supply storap
typhoid x x 12 cholera x x 6 8 diarrhoea x x 1 2 hepatiis x 8 6 bilhardizia x 4 nularia x 2 1
infan 16911000 child 325/1000
Sources: Adaptedfrom WB/UNDP(1989) in Camposand Ramos, 1990. 4 Stuwacoda Saudeer. Angola'. Draft. ps. 40, 41/Tab. 5-2, 424Tab.5-3.
Table H: Rankinz of Maior Diseasesin the Benmela Provincefor 1990
diseas Lobito Benguela Bais Farta BenpuelaPrvince * .. e *. a ** a a
diarrhoea 1 2 1 2 1 2 12 malaria 3 1 2 1 3 1 31 cholera 5 S 4 5 4 7 5 8 hepatitis 7 7 7 4 6 6 7 6 bilhardizia 6 10 10 5 11 4 typhoid 10 16 1118 12 17
mnortality rate ** morbidity rate
Source:lffonnacao Anuai, 1990. Quadrosno. 3 a 4. DelegacaoProvinial da Saude, Benguela,1990.
7 Annex-1 Page 8 of 18
28. 'The situation is worse where settlementsare concentrated. However, the consequencesof this environmentaldegradation reaches beyond the urban-corridorlimits. The resulting diseasesspread throughoutthe countrysidethrough direct and indirect means, and the conditionsdescribed lead to contaminationof coastal, surface and groundwateraffecting existing and potentialwater supplyand water related activities. Bacterial contaminationof groundwaterposes especialproblems in the lower area of Lobito, where the water table is high; groundwaterfrom the well field of Catumbelais contaminatedfrom periodicflooding of the adjacent river. Surfacewater contaminationaffects daily activities such as washingand bathing. At major risk are those in direct contact with the river, irrigation water and irrigation canals. Childrenprovide the highest risk group due to their constant exposure to water through either playing or carrying on householdtasks, and their higher vulnerability to diseases.
29. The industrial complexof the Lobito-BenguelaConurbation is formed by heavy, medium, light, and a number of cottage industries. No records are available for either water or air pollutiondue to industrial activitieswithin the LBC, and it is generally reported that the existing industries manage their own wastes. Lobito employsabout 30,000 industrialworkers. Benguela's industrialdevelopment includes 262 light and 26 heavy industries; and '8 fish and derivatives,24 food processing, and 24 constructionindustries, employingabout 25,000 people.
30. Most industries are operatingbelow capacity, and pollution is thus held relatively low. However, the existing industrieshave high pollutingpotential indoors as well as outdoors. Water pollutionposes a threat, along with human exposure to fumes and wastes. The most direct environmentalimpacts of the existing industriesresult from their productionof liquid and solid wastes, and the consequentpollution of the area's water resources. Their effluenttypically includehigh BODs (biologicaloxygen demand), SS (suspendedsolid contents), organic matter (which results in high BOD and SS), organic wastes (highly putrescentand with high bacterial population),relatively high pH, and toxic chemicals. Some industries regularly dispose of waste and wastewaterinto the streets or neighboringrivers. Africatextil(textiles) releases wastewaterdirectly into the Cavaco river; children are seen playing in blackwaterstreams in the surroundingsof EmbalagensD'Angola (packaging)and other smaller industries. Changes in wind patterns often lead dust from Lupral (cement)to the residential area of Morro da Quileva.
Coasta Resources
31. The Lobito-BenguelaConurbation's coastal resources are affected by water pollution and lack of coastal zone management. Wetlands,bays and estuaries are degraded,with a consequentdecline in the products and functions of these systems. Lobito's coast is lined with salt ponds and marshes. Shallowdepressions along the north side of the bay provide a natural area for salt extraction. The coasta wedands play a dual role in maintainingthe coastal zone. First, they support aquatic and semi- aquatic species at different levels of the food-chain,and provide habitat for economicallyand aestheticallyimportant species. Second, they provide storm protectionfor inland areas. Aside from their importancein maining such goods and services, coastal wetlandsas well as bays provide major potential for recreation and touristdevelopment. The salines are exploitedby fishermen's families, providingdirect (salt) and indirect (salted/driedfish) income especially to the Alto Liro's population. About 56% of the fish consumedand 24% of fish landing in Angola is salted/dried exclusivelyby hand and mostly by women. This labor intensiveoperation provides a long-lasting,easy storage and light weight product ideal for a domestic market in search of increasingprotein availability, and Lobitohas the only salt refining factory in the country. Present production is 4,000 tons, with potec ial for greatly increasing, consideringthe instaled capacity of 80,000 tons.
8 Annex 1 Page 9 of 18
32. Lobito's wetlands, however, are heavilypolluted. Few patches of mangrovesare left, between Conata and Compao. The wetlandsare used for dumpingwastes and are further contaminatedby urban and storm water runoff mixed with sewage. The salt flats are degraded due to wastepollution and lack of maintenance. There is a proposal that the wetlandshousing the pink flamingosbecome a protected area; other wetlandshowever are consideredto interfere with port maintenanceand urban expansion, and are supposed to be filled; similarly, the salt flats are seen as hinderingurban order. Lackinga working sewerage network, some of residentsof the Compaoare installing their own private sewage outlets into the lagoons. Lobito's bay is pollutedby sewageand waste from surroundingresidential areas, untreated liquid and solid waste from industries located at the edge of the bay, and untreated waste and oil leaks from the ships. Faeces, garbage and trash mixes in with the sand and water at the bay's beaches.
33. The rich tropical waters of the Benguelacoast provide Angola with one of its major fishing territories, and the base for two of the Conurbation'smost promisingeconomic activities, fisheries and its related industry. The BenguelaProvince owns the second largest fleet of artisanal fishingboats, and the country's only sNltrefining factory. Fish consumptionin the coastal provinces of Angola is 44.5 kg/capita; the nationalaverage is 21 kg/capita. Domesticconsumption is expectedto reach 23.2 kg/capita by 1995. Consumptionat Angola's hinterlands -currently at a low of 2.7 kg/capitadue to the war- should increase followingimproved security and food distribution, further strengtheningthe fisheries sector. This economicimportance is complementedby the fact that fish provides 40% of the animal protein consumedby the Angolan population,and provides the basic -and often the only- food source for the poor along the coast. Fisheries are recognizedas one of the major resources for potential developmentin the BenguelaProvince. Existing data show official fish landingsin Benguela add to 31.4% of the nationaltotal. It is estimatedthat current local catch will more than double by the year 2000.
34. Demand for high quality species provided by artisanal and coastal fishing is increasingrapidly. This has led the Angolan governmentto adopt a strategy towards increasedsupport for artisanal and coastal fisheries, which are especiallyimportant in generatingemployment for the local population. Artisanalfishing is importantespecially in Benguela.However, this promising economicactivity as well as all related industrialdevelopment could be threatenedby pollutionof the BenguelaProvince's coastal waters. Experience from other countries show localized pollutiondue to urban runoff and sewage, wetlandspollution, and coastal erosion affects coastal fishingresources through changes in habitat and food chain; and regular use of ports for oil transportingincreases the potential for coastal water pollution due to oil leaks and waste. Demersalspecies and crustaceans,of major importanceto artisanal fishing, are especiallyvulnerable to water pollution.2/ Contaminationof shellfishcan lead to health hazards, posing specialproblems in the presence of cholera. Studies on the status of Angola's coastal fisheries are limited, and informationon catch declinesare limited to the effects of over-fishing. Fishermen throughoutthe Lobito-BenguelaConurbation and Baia Farta, however, report steady decline in fish catch along the coast. Further threats to the Province's coastal water resources result from erosion of the Benguelacoast, above Lobito, and especiallyaround the city of Benguela.
Land Resouxrces
35. Degradationof land resouces within the Lobito-BenguelaConurbation involves localized degradationresulting from urban sprawl, as well as from lack of natural resources managementat the
21 Denmeralspecies live close to theseabed, and ae abundantin the shallowwaters of the coast.
9 Annex 1 Page 10 of 18
local and nationallevels. This involvesdegradation of agriculturaland urban land, forests and living resources, and desertification.
36. AgriculturalLand. The poor agriculturalpotential of most of the BenguelaProvince naturally increasesthe agriculturalvalue of the Province's patches of alluvial land. The Lobito-Benguela Conurbation,however, is located on the Province's largest stretch of alluvial land. This siting has directly affectedthe Province's potentialagricultural development by divertingprime agriculturalland into urban use. Agriculturalland within the LBC is increasinglyallocated to urban uses. Erosion of the hillsides bordering farmlandnegatively affects agriculturalperformance. The Conurbation's agriculturalland is further degraded throughhigh rates of soil erosion resulting from upstream deforestationand a generalizedlack of soil management.Relatively large scale deforestationfor cultivationof land in the headwatersof the Caimbambodirectly affects land and water quality in the Cavaco river basin.
37. Urban Land. In Lobito, the hiUsidesand escarpmentsof Alto Liro and Bela Vista are seriously eroded, threateningpart of the existing housing. In Bela Vista, squatter houses are built inside the major storm water channel, further carving the channel's heavilyeroded sides. Streets and paths in settlementsthroughout the escarpmentarea from Lobito to Benguelaare rapidly eroding away. In some areas, carving the soil for the productionof adobe blocks ignores on-going or potentialerosion, and negativeeffects in soil fertility. Urban trees are often illegallypruned --and sometimescut- for fuel wood, regardless of the existenceof heavy fines (NKz 50,000).
38. Degradationof Forest Land and Desertifi . Lobito and Benguela's energy is provided mostly by charcoal, togetherwith bottled gas. Fuel wood is the major source of energy for aU other LBC's households. Charcoal is largely used in commercialoperations. Availableestimates show total demand for wood at the Lobito-BenguelaConurbation, considering the BenguelaProvince's rate of consumptionof 0.04 mn/person/yr,adds to 24-28,000 m3/yr. The current sustainablesupply of wood within the BenguelaProvince is estimatedat 750 m3yr. Assumingthat the LBC, with roughly half the populationof the Province, consumes350-400 m 3 yr of the sustainablesupply, the LBC's wood deficit 3 adds to 23,600-27,600 m 1yr. This accounts for roughly 60% of the Province's estimated deficit of wood supply. There are currently no plantationstargeting fuel wood production.
39. Insecurity caused by the war lead to a pattern of concentrationof wood exploitationin areas of relative security. As a result, wood exploitationoutnumbers natural regenerationwithin specific forest land in Angola, contributingto the current degradationof forest resources. Irregularity in the supply of wood to urban areas due to the war, and high prices, lead to uncontrolledcutting of fuel wood within and new urban land. The result is depletionof vegetation,followed by increased erosion and decreasedsoil fertility, and the formationof patches of desert-likeland. Women report collectingwood up to 30 kilometersaway from the LBC. AroundBaia Farta, Caota and Caotinha, the traditionally careful selectionof tree branches for fuel wood has been replaced by drastic cuttings, often leading to death of the whole tree. Existing regulationsconcerning forest reserves prevents legal exploitationof wood resources up to a distanceof 75-100 kms from the LBC, adding to the costs of commercialwood and fuelwoodwithin the ar considered.
40. Desertificationof land along the border of the Namibe desert south of Baia Parta poses a tra to the survival of the Lobito BenguelaConurbation. No estimatesare available on the rate at which desertificationis spreadingtowards the north. However, it is locally reported that the desett, beyond Baia Farta in the mid 1970s, already engulfedmost of the city's spontaneoussettlements. The shnzbs and small trees successfullygrown in the area as part of a 1970's desertificationcontrol project were
10 Annex I Page 11 of 18
cut for fuel wood followingsupply shortages due to the war. A pilot reforestationproject started within the last two years is failing mostly due to goat gmzing. Despite major difficulties, the Provincialauthorities are lookingat appropriatealternatives to address the problem, includingextending efforts in reforestationand establishingthe use of solar stoves.
41. The Lobito-BenguelaConurbation's living resources includea full spectrumof aquatic fauna, ranging from salt to fresh water species. The economic,nutritional and aestheticvalues of this fauna prosent excellentpotential for developmentof the local communities. Particularlyimportant are coastal fisheriesand the pink flamingosof Lobito. However,although fish, mostly coastal species, are locally and nationallyrecognized as an importantresource, other fauna do not have the &%meeriuomic connotation.
42. Poliution of waterways, wetlands, bays and estuariesaffects flora and fauna, decreasingthe local wealth of aquatic, semi-aquaticand terrestrialspecies. Speciesdiversity is affected, potentially threateningpossible economicactivities includingcoastal and fresh water fishing, tourism, and recreation;and directly affectingnutrition and health of the poorest sectors of the LBC's population, which are largely dependenton fish protein. Decline in the number of flamingosand egrets is reported by Lobito's populationand authorities.Decrease in coastal fish catch and contaminationof fish and shellfishby sewage water and faeces are reported throughoutthe LBC's coast. Use of mangrove vegetationfor fuelwoodfollowing expansion of Catumbelaled to a near extinctionof Lobito's oyster, a major former local resource both as a shellfishand raw materialfor limekilns.
43. The terrestrial fauna around the Lobito-BenguelaConurbation is varied, and presentsa potential both towards economicand nutritional uses. Small species as well as large game offer a special attration. About eight hunting ranches exist within a 125 km radius of Benguela;however, some of the locals report that uncontrolledhunting and lack of resources managementalready led to decline of local and national species.
44. Angola's lack of management,regulations, control and/or enforcementof existing legislation concerning fisheriesdirectly affects artisanalfishing within the Lobito-BenguelaConurbation. Foreign fleets are consideredresponsible for over fishing, leadingto stock depletionsand over-exploitation. Angolan and foreign industrialfishing vesselsillegally compete with artisanal fishingby invading territory officiallyset aside for artisanal and coastal fishing. A managementplan for sea water fishing exploitationis being drawn at the national level. However,the LBC needs a local plan able to guarantee the sustainableexploitaltion of said resources along its own coast.
V. CONCLUSIONSAND RECOMMENDATIONS
45. The Lobito-BenguelaCorridor's environmentaldegradation range from decrease in water quality to fast advanceof desertification. The consequencesof such degradationinclude serious health deterioration,depletion of existing and potential natural and human resources, and destruction of the physicalcharacteristics that provide the base for the region's survival as an economic center. Water resourcesare degraded due to pollution caused by lack of sanitationand waste management,erosion of upstreamand urban soils, and deforestationwithin the Catumbelaand Cavaco watersheds. This degradationis present at both the urban and rural settings, and directlyaffects the Lobito-Benguela
11 Annex 1 Page 12 of 18
Conurbation'scoastal resources;coastal, surface and groundwater;bays; estuaries; wetlandsand beaches.
46. Environmentaldegradation takes a special toll on the population'shealth. The resulting diseasesdecrease the population'sability to perform at the individual,social and economic levels, posing a constraint to economicproductivity and thus becominga burden on the State. Other effects of the LBC's current environmentaldegradation include decreasesin the economicperformance of seeminglyunrelated sectors. For example,pollution of wetlandsmay decrease their ability to support and replenish stocks of coastal fisheries, which in turn affects economic returns from existing and potential activities such as fisheries, fishing and fish related industries,and tourism. Desertification, still beyond the geopoliticallimits of the Lobito-BenguelaConurbation, is approachingBenguela from Baia Parta at an alarming speed. Its implicationson the medium-termreach beyond natural resources' depletion to threat the very survivalof the individualsand societies withinthe LBC. Its most immediateimpact in the LBC is the potential increasein populationpressure followingmigration out of affected areas.
47. The direction taken by developmentwithin the cities of Lobito and Benguelawill largely determine the environmentalfuture of the BenguelaProvince. The extent to which the Lobito-Benguela Conurbation'simpact on the region's natural resourcesand environmentis negative or positive will depend on carefil considerationof both the opportunitiesand the constraintspresented by the coastal zone and its resources.
48. The local governmenthas recognizedthe significanceof the Conurbation'senvironmental issues, along with the need to considerenvironmental rehabilitation of the region, and base its further developmenton enviromnentallysustainable decisions. The lack of data, particularlyapplied informationis recognizedas hinderingboth correction of policiesnegatively affectingthe environment and natural resources, and the developmentof appropriatepolicies and projects. Assistancewas requestedto start a basic informationand data center targetingsolution of major environmental problems, determine these problems' sources and degree, and stressing short-term, on-the-jobtraining of local staff to carry out environrment-relatedprojects.
49. The serious degradationof the environmentand of natural resourceshighlights the need to establishenvironmental priorities accordingto an emergencystrategy. That is, consideringimmediate solutionto problems posing highest threat to public health, and to the physical and economic survival of the Lobito-BenguelaConurbation. These include lack of sanitationand water supply, soil erosion, and desertification. Parallel to providing emergencysolution to these problems, it is necessary to develop basic informationand local capacity towards further rehabilitation,planning and policy making conceming developmentand conservationof the region's resources.
A. SHORT-TERM MEASURES
5o. Sanitationand Water Supply: a) Accelerateand expand the latrine and basic water supply programs to reach the totalityof the population.
b) Expand the latnne program to include environmentaleducation relating to existing and potentialwater-health issues; treat said education as a prerequisiteto water supply particularlyto residentialneighborhoods as to prevent uncontrolledincrease in
12 Annex 1 Page 13 of 18
diseases. Include awarenessof the dangersof inadequatewater use and storage in both its urban and rural aspects, due to the urban-ruralnature of activities and conditionswithin the LBC. Environmentaleducation should emphasizewater conservation,erosion controland rehabilitationof areas immediatelythreatened by desertification;each and all these items should be combinedwith health improvements.
c) Implementservice areas as to provide for minimumconditions towards health improvement.These areas should include a minimumof commonwater (chqfariz), sink for washing clothes, and a well for disposalof used water. The surface next to the water shouldbe paved with permeable materialto prevent formationof pools of stagnantwater. Used water should be used to irrigate shade and fruit trees.
d) Expand the sewerage system to cover the central urban cores of Lobito and Benguela; develop a system to allow rapid rehabilitationof the sanitary core of all existing multi- store buildings.
51. Soil and LWaterConservation a) Stabilizedirt streets and eroding slopes by planting the cactus spp. common in the region (and locally used for protective fences, erosion control, medicineand food) until resources for implementationof better acceptedspecies (e.g., fruit trees) become available.
b) Implementstorm water control above Lobito and Benguela to decrease erosion and other floodinghazards along major storm water channels; reinforce existing legislation concerning removalof housing inside storm water channels.
c) Implementregular cleaningof all major storm water channels.
d) Stabilizethe borders of secondarystorm water channelswith the local cacts spp. to both provide for erosion control, and act as a barrier in the use of the channelsas playgroundareas and for bathingand washing clothes.
e) Develop policiesand public awarenessconcerning water use and conservationprior to implementationof new water distributionsystems.
f) Implementwater re-use systemsand techniques.
52. DesertificationControl a) Re-institutethe desertificationcontrol project, preferablyconsidering methods approved 'in loco' in the 1970's.
b) Develop and implementre-vegetation projects targeting local supply of fuelwood, constructionmaterial and improvementof microclimate;extend and support on-going efforts by local agenciesand communitiesto implementreforestation.
13 Page 14 of 18
c) Create incentiveand maintenancesystems for re-vegetationof poor residential neighborhoodsas part of project(s)in improvementof child nutrition and health.
53. Envi_c'nmentalMAngement and,Monitoring a) Complementthe preliminaryenvironmental analysis of the LBC, focusing on the gatheringand organizationof informationnecessary for ecologicalplanning and monitoring.
b) Prepare a phased environmentalaction plan for the LBC focusing on control of existing, as well as preventionof futureenviromnental degradation and resources depletion.
c) Strengthenlocal capacityfor environmentalplanning, monitoringand management.
B. MEDIUMAND LONG-TERM MEASURES
54. Preventing the occurrenceof negative environmentalimpacts from economic developmentis an essential part of a region's rational developmentpolicy. The Lobito-Benguelaregion, as Angola in itself, is undergoinga transition period characterizedby the need of substantialphysical and economic rehabilitation. As difficult as this situationmay be, it offers the unique opportunityof re-ordering development. As it stands now, such rehabilitationmay result either in an uncontrolledincrease of ecologicaland environmentalproblems, or in a solid base towards sustainabledevelopment. The difference lies largely on the choice of products and technologiesto be applied to and implementedby said rehabilitation.The followingconcerns should play a part in an environmentalaction plan for the region in question.
55. Urban Rehabilitation. Plans for developmentand improvementof the BenguelaRegion include focus on public health, energy and water supply for residentialand industrial use, revanping existing industries and establishingnew ones. These plans imply eventualrehabilitation of the majorityof Lobito's and Benguela's housing, infrastructureand induistrialoperations. It is possible to direct this rehabilitationas to prevent the increase and/or introductionof environmentaland ecologicalproblems, correct existingproblems, and create a base for sustainabledevelopment of the Lobito-Benguela Conurbationand the Benguelaregion. This requires selectionand regulationof the use of materials, equipment,techniques and methodsutilized; and identifyingsolutions compatiblewith the local natural and human resources and conditions.
56. Water Supplv. The ecologicalconditions of the BenguelaProvince determine the need for maumum conservationof its hydrologicresources. Environmentaleducation stressingwater conservationshould be developedwithin the sanitary-environmentaleducation component of the latrine program. However, this componentis, by itself, unable to guaranteeoptimum use and conservationof the region's water. It is crucial that policy making be directed towards developingand establishingthe use of techniques,technologies and systems which are able to guarantee long-termwater conservation within the region. (e.g., low-flowwater devices;drip and night irrigation).
57. IndustrialDevelopment. The indirect impacts of the LBC's industrial activitieson the larger environmentof the BenguelaProvince need to be revisedas to allow for policies and regulationsto both prevent environmentaland resources degradationand enhancethe region's economic resources.
14 nnA l Page 15 of 18
i'Iist of the industrieswithin the Lobito-BenguelaConurbation utilize equipments and methods relativelyoutdated leading to highpollution and low etxiNencyin the use of raw materials. It is crucial that:
a) Rehabilitationof the industrialcenter considers methods and technologieswhich at the same time maximizesuse of raw materialand leads to minimumdegrees of environmentalpollution (e.g., the sugar-caneindustry can functionas a closedcircuit by utilizingits ownwaste for combustion,thus avoiding river pollution and freeingcapital from other fueluse; disposaland wastefrom the fish processingindustry should be re-used;and the tobaccocuring industry shouldhave a majorrole in reforestation). b) Implementadequate industrial waste water and solidwaste management. c) Developand implementindustrial pollution legislation and regulation.
d) Developlocal capacity to evaluate,monitor, and controlindustrial pollution. 58. Agriculture,Inadequate agricultural management lead to soil exhaustion,salinization, and waterloggingwithin the Lobito-BenguelaConurbation, largely contributing to the sector'spoor performance.It is necessaryto: a) Introduceand re-introduce methods and technologiespromoting soil and waterconservation, preventinghealth hazards, and allowingsustainable development;
b) Developalternative systems of productionand of exploitationof the region'snatural resources as to includewild flora and fauna;and c) Provideincentive towards an adequateproduction system both adapted to the region'snatural conditions(e.g., speciesresistant to salinesoils) and localneeds (e.g., promoteproduction and use of coconutfor healthtreatment and complementationof childnutrition).
59. Institutionsand Le2islation. Angola's environmentallegislation is still largely limitedto the former Portugueselegislation, which covers mostly forest developmentand wildlifeprotection, and hunting. Coastal and sea fishing legislationis being reviewed on economicterms, and several individualefforts are on the way to complementlegislation at the agriculture and energy ministries. Discussionsare on the way both at the govermnentaland NGO levels, to develop a system (committee, secretary, ministry, or other similar structure)to oversee environmentalissues. Legislationand regulationsat the Provinciallevel are restricted to those existing at the national level. The institutions, technical resources, informationand data currently available at the national level or in the Lobito- BenguelaConurbation microregion are limitedin scope, and inadequatefor either its environmental rehabilitation,or for its resource analysis,planning, managementand monitoring. In addition, the local govermmentdoes not have the human and technicalresources necessaryto prepare an environmental action plan for the region. Regardlessof efforts at the national level, the BenguelaProvince needs to:
a) Establishthe integrationof and/or eooperationamong different departmentsand institutionsin charge of services directly related to environmentaland ecologicalissues.
b) Review the existingenvironmental legislation to complementlaws and regulationsaccording to current environmentaland resources' status.
15 Anne" Page 16 of 18
c) Utilize environmentallegislation as an integral part of planning for resources' use and development.
d) Establish awarenessof the environmentas a major factor in economic developmentand a basic element in the maintenanceof the quality of both individualand social life. This awareness acts to minimize the need for environmentallegislation and control, maximizessustainable use and developmentof natural resources, and improves living conditions (e.g., understandingthe cycle of waterbome environmentaldiseases leads to improvedhealth, decreasinghealth costs for both the State and individuals).
d) Develop the local capacity for coastal zone management.
VI. ENVIRONMENTALIMPACTS OF THE PROPOSED PROJECT
60. Subsequentto informationin the Preliminary EnvironmentalAssessment, environmental rehabilitationis approachedby each of the project's componentsby includingsolutions to both their inherent environmentalproblems and the current critical environmentalstatus of the Conurbation. The following sectiondescribes major characteristicsof each project component.
Envirnm,ental Sanitation
61. The environmentalsanitation components of the project will divert sewageand solid waste from the wetlands, bays and ocean water and from the cities and settlements'streets. The project should result in a decrease of the current water and other environmentalpollution, with a consequent decrease in related diseasesand improvedhealth status, and overall improvementof the scenic and recreationalconditions of the Lobito-BenguelaConurbation. The different componentsof the project are integratedto allow for rehabilitationand maintenanceof vital environmentalfunctions and properties presently under stress due to enviromnentaldegradation (e.g., soil fertility, wetland and estuary productivity, and clean water); correctionof natural constraints(e.g., microclimatemanagement throughneighborhood reforestation); and enhancementof environmentalopportunities (e.g., wetlands and beach rehabilitationand protection).
62. Sewage and Water Supply. Rehabilitationand extensionof the sewage network includes diverting the wastewaterinto oxidationponds. The treated effluentand sludge wiU be used in tree plantationsnext to the ponds, supervisedand managedby the DPSC. These plantationswiU produce fuelwoodfor low income groups, and shadeand fruit trees for a combinedlatrine-neighborhood revegetationproject (See par. 66, 67). Quality of the effluentfrom the oxidationponds will be monitoreddhrough the environmentalstudies. Expansionof the water supply will draw on the region's groundwaterresources to provide water for unservicedsettlements. The wells will be sealed to avoid wster contamination,and monitoredfor changes in both water quality and quantity. Rehabilitationof the existing water networkof Lobito and Benguelawill involve minimizingand monitoringwater losses, currently over 50%. Wastewaterfrom the standpipe-washbasin stations (dhqfarizes)will pass through a grease trap and a natural filteringsystem, and be directed to irrigate shade trees around the stations. Daily managementand maintenanceof these stations wiUlbe the responsibilityof the communitiesand communitycenters, under the supervisionof the DPSC, which wil be in charge of ovrall managementand maintenance. Health and water conservationeducation will be provided as part of the sanitay-environmentaleducation of the Low Income SanitationProgram (See par. 65, 66). The project opted for the use of asbestos-cementpipes for the sewage systembecause it involves the
16 Annex 1 Page 17 of 18
use of local products, is less expensivethan imported material, and impliesnegligible health risks for final users. In the event that this helps revampingthe local industry, occupationalhealth hazards will arise and need to be considered;tender documentsfor the project require that asbestoscement pipes be produced in environmentallyand health acceptableconditions.
63. Stonn Water Control. Storm water control will be providedto decrease peak flow and speed of the water, thus diminishingerosion and associatedflood hazards in the major natural and man made storm water channels. The project involvesa series of small check dams above Lobito and Benguela, correctionof the capacity of the channels in Alto Liro and Bela Vista, and rehabilitationof the Vala do Coringe in Benguela. Rehabilitationof the Vala do Coringewill remove one of Benguela's major source of diseases. The developmentof drainage works in Lobito's Caponteand CommercialZone will considercompatibility with Lobito's lagoons' daily regime and capacity to avoid negativeeffects of large inflows. Along with the series of check dams there will be a revegetationand tree planting program implementedthrough the sanitary-educationand revegetationprogram and drawing largely on communityparticipation (See par. 68). Private and communityefforts towaid controllingstorm water are seen speciallyin Alto Liro and Bela Vista, and will provide the base for communityparticipatior. in erosion control. The checkldams will keep the water for a maximumof five hours on peak days and dry out for the rest of the time. Therefore, they do not pose potentialthreats toward increasingthe incidenceof water-bomediseases, particularlyschistosomiasis.
64. SolidWaste Management. This program will improve the sanitary conditionsof Lobito and Benguelaby eliminatingthe current accumulationof waste throughoutthe cities and by providing daily waste collectionat most of the cities' neighborhoods.Periodic waste collectionwill be providedto eiiminate the illegal dumps (lixeiras)of other urban and peri-urban neighborhoodsuntil daily collection becomesavailable. The program will be developedto minimizepollution and health hazards, and consider maximumuse of altemative management,appropriate technology, and resources recycling. Environmentaleducation in regard to solid waste recycling and re-use will be dealt with as part of the sanitary-environmentaleducation project of the Low Income SanitationProgram.
LowIncome Sanitation
65. The Low Income SanitationProgram is designedto introduceimproved latrine construction and techniques, allowingreasonably priced sanitationfor about 80% of the populationin the project area. Most of the latrines will be built in the escarpmentsettlements, and groundwaterpollution is not anticipated. Monitoringof groundwaterquality will be provided, and a latrine installationand waste (faeces) removalmonitoring program -already started- will comnplementlocal data to determinehealth and overall improvementwithin differentneighborhoods following increased utilization of improved latrnes.
66. The~Program's sanitary-environmentaleducation component will desigu, promote and implementan intensiveprogram combiningeducation in public health and hygiene, control of water- bome diseases, andwater-soil conservation. The componentincludes neighborhood revegetation and erosion control based on distributionof fruit and shade tree saplingsin connectionwith the sales of improvedlatrine slabs, and will draw largely on communityparticipation.
67. Neighborhoodrevegetation will provide for improvementof microclimate,soil fertility and nutrition, and erosion control. The program isdivided in two parts, the latrine-revegetationof poor neighborhoods,and erosion control in Lobito and Benguela'sbeaches and major storm water channels.
17 Annex Page 18 of 18
The trees distributedby the latrineprogram will be irrigated by the owner with wastewaterproduced by kitchen and bath use, avoiding filling of the latrines (thus increasingtheir life span), and decreasingthe stagnantwater streams and ponds frequentlyseen in the settlements'backyards, streets and common areas. A revegetationproject was started in March 1991 by the GPP and DPSC followingguidelines providedduring project preparation, to test the acceptance,interest and participationresponse from latrine slab buyers and from the communities. The project will be strengthenedto carry out tree plantingin all standpipe-washbasin stationsand along the Vala do Coringe, and revegetation(trees, shrubs or grasses) of the escarpmentslopes and drainagechannels undergoing major erosion. The program also considersa more extendedurban project includingschool, hospital and neighborhood afforestation. Strengtheningthe program involvesproviding basic equipmentto develop the capacity of the DPSC's nurseries to produce the required tree ssPlings, provide for their distribution, and supply basic maintenancewhere applicable, that is, where maintenanceis outside the scope of private or communitycare.
Studies
68. The environmentalmanagement and monitoringstudies will organize environmental informationfor direct use by local decision makers, and assist the local govermmentbuild the capacity for enviromnentalrehabilitation, planning, managementand monitoring. An EnvironmentalDiagnostic and an EnvironmentalAction Plan will be prepared to identifyresources and constraints,develop priorities for environmentalissues, and provide the frameworkfor enviromnentalrehabilitation of the Lobito-Benguelamicroregion (See par. 49, 54). Monitoringwill cover informationneeded for health improvement;identification, correction, control and preventionof water poRutionsources; recovery and/or maintenanceof economicaUyiraportant or unique living resources; and soil conservation. This work will be complementedby the sanitary-environmentaleducation program, which will provide the education and training necessary to introduceand ensure environmentalmanagement at the community and individuallevels.
18 Annex 2 Page 1 of 5
LOBITOBENGUELA URBAN ENVIRONMENT REHABILITATION PROJECT
WATER, SEWER AND STORM DRAINAGE REHABILITATION
1. WATER REHABILITATION
A. Objectives
1. Over the past decade the urban populationof Lobito and Benguelahas more than doubled, during which time there has been no expansionnor real maintenanceof the water supply and networks. What water arrives in Lobito is both insufficientand inferior in quality. As a result more than 60% have no house connectionstoday, and over one-thirdof these familieshave no water within one kilometer. Those that can pay have to purchasewater from clandestinesuppliers at exorbitantprices. Sanitaryconditions in Lobito and Benguelaare a serious public health risk. The raw sanitary sewage in the back patios, hallways, and the main streets is a major source of cholera, especiallyin Benguela.
2. The prime objectivesof this componentare: (a) to double the present water supply in both cities so as to provide a minimumlevel of service to the squatters; (b) to rehabilitateand expand the present networkof water supply to cover the entire urban area and to provide public fountainsin all the squatter settlements;(c) to rehabilitateand rebuild the sanitary sewer networkand pumping stations to serve the central area; and (d) to provide sanitary sewagetreatment to close the cycle - eliminatingraw sewage in the streets of both cities.
B. Population and Water Demand
3. Detailedpopulation and water demand statisticsare providedin the consultant's Feasibility Study (August 1991),available in the project file, and summarizedbelow. Population is estimatedat about 480,000 in Lobito, Catumbela,and environsand 320,000 in Benguela,Baia Farta and environs, or a total of about 800,000 in the conurbationin 1994, when the rehabilitatedand expandedwater works will come on stream. Specificdomestic water consumptionis estimatedat 70-100 liters per capita in the serviced areas, and 25-30 liters in the squatter settlements. Industrial, commercial,public, and municipalconsumption is presentlyvery low, about 10%, althoughit is expectedto increaseto about 40% over the next 20 years. The unservicedpopulation is estimatedat 52% in Lobito and 49% in Benguela. Thus, while populationof the unservicedsettlements is about half the total urban population,daily demand in the unservicedareas is estimatedat 10,000 n3, about 21% of the total expandedproduction capacity of 2,000 m3 per hour, or 48,000 m3 per day.
C. Lohito Water Supplv
4. The supply for Lobito comes from a wellfieldin Catumbela,consisting of cacimbas (infiltrationsumps) and shallow wells plus direct pumpingof raw water from the river. Mhetotal installedcapacity is about 600 m3 per hour, but it is barely able to discharge300 m3 per hour. The supply must be increasedto 1,000 m3 per hour. Six new wells 50 meters deep would be drilled and connectedto the existing 300 mm diameterrising main to the open reservoirs at the old treatmentplant. The water supply for the Town of Catumbelawill also be improvedalong with the transmissionmain.
1 Annex 2 Page 2 of 5
5. The new wellfieldlocated two kilometersupstream, east of Catumbela,would be developedas a gallery of six wells 50 meters deep along with observationwells and a cniorinationstation at the beginningof a new 500 mm transmissionline. This would feed directly into the existing 500 mm transmissionto Lobito, Bela Vista and Alto Lira.
6. Treatment Plant - The existing plant, built around 1947, has three slow filtration units and th-se open reservoirs. With the shift from surface to ground water sources, the raw water quality will be satisfactoryso that only chlorinationwill be required. Therefore, the inefficientfiltration plant can be closed down. The three open reservoirs should be roofed as protectionagainst contamination; however, this investmentcan be postponeduntil the future of the existing reservoirs can be determined.
7. Pumping Stationsand Reservoirs- The pumpingstation EE2, built in 1972, was designedto serve the lower ponion of Bela Vista, but has never worked. The existing inlet pipe will be moved to the bottomof the suctionchamber so that the pumps can becomeoperational. The EE 3 pumps, between the circular reservoirs of R3, also have never worked for lack of water. Only minor repairs are needed to make them operational,so they will not be included in the internationaltenders. Today Bela Vista is supplied by two old smaller stations that barely reach the service contour of 150 meters serving less than one-third of the population. Reservoir4, which is the highest at elevation 170 meters, has also never functionedfor lack of water. It will be served by an existing 300 mm main. When all of the above reservoirs in service, there will storagecapacity for 54% of the daily production.
8. Networks - The First Phase will supply about 100 liters per capita for those with house connections. For the squatter settlementsof Alto Lira, Bela Vista and Catumbela,a networkof 300 standpipeswould be providedalong with washingfacilities. Each standpipeof four taps would serve 150 families (800-1,000persons) within a maximumwalking distance of 200 meters. Each standpipe will be equippedwith a securelylocked water meter set into the standpipe. The main commercialand industrialenterprises and apartmentbuildings, includingthe Restingaresidential area, will be connected with water meters that will remain the property of EPAB.
D. Benguela Water Suppyi
9. Benguelarelies entirely on groundwater pumped from the existing wellfield in the vicinity of the water treatmentplant. The wellfieldhas graduallybeen surroundedby residentialand industrial buildings,with no space for future expansion.The present output is a theoretical470 e 3 per hour; however, this rated capacitydoes not representthe true outputas there are no measuringdevices. Only the three wells drilled after 1980 are presentlyoperating. The rising main from the wellfieldto the treatmentplant increasesin diameter from 250 mm to 500 mm.
10. In the existing wellfield, nine non-functioningwells will be abandonedwhile three will be rehabilitatedby cleaning, video inspection,repairs, well head improvements,testing and disinfection. A new wellfieldwould be constructedalong the Cavaco River aquifer consistingof six new wells along 3 with two observationwells. Supplywill be increasedto 1000 m per hour.
11. TreatmentPlant - The Italian designedplant has a present capacity of 500 m3 per hour. The final engineeringexists for a second phase of 500 m3 per hour to double the present capacity. The plant is designedto remove the iron and manganesefrom the water, but the water quality in terms of bacteria count is satisfactorywith no harmful pathogens. Therefore, the first phase does not include the expansionof the plant. Nevertheless,thereshould be periodicmonitoring of the iron and manganesecontent.
2 Annex 2 Page 3 of 5
12. Pumping Stations - The EEI pumpingstation is located at the treatment plant (ETA) which pumps into the reservoir RI. From there the main part of the town is suppliedalong with reservoirs R2 and R3; however, the availablehead is only 11 meters. The project would double the capacity of EE;I where three new pumps would to be installedwith a 400 or 500 mm main to reservoirR6. Pumping station EE2, located at reservoir R3 pumps water to reservoirR5. An emergencypower supply of 50 kilowatt would be installedat this critical link. Pumping station EE3, located at the small reservoir R4, serves reservoir R7 which suppliesBaia Farta. A new pump set would be installedas a standby for EE3. The existing storage is 45 % of the present water consumption. At a later stage, the storage capacityof ROshould be increased.
13. Networks - The increasedproduction to 1,000 m3/hour correspondsto the projected demand by the year 2000. The 1990 water demand is calculatedat 760 m3/hour. The demand at Baia Farta today is 63 m3/hour; while the populationreceives less than one-third. The capacityof the main pumping station EE1 would be doubled and a new rising main of 400 mm would be provided to the rehabilitated reservoir R6. In the near future, a new transmissionline from the new wellfieldto the airport will be required along with new reservoirs to serve the expansionareas and Baia Farta. For the squatter settlementson the peripheryof Benguelaa networkof 200 standpipesequipped with water meters would be provided along with washing facilities similar to the pattern for Alto Lira and Bela Vista. The main commnercialand industrialusers and large apartment buildingsof Benguelawould also be metered.
I1. SEWER REHABILITATION
A. Lobito Sanitary Sewers
14. The present network, serving the main commercialarea and low-riseapartment buildings, is clogged in at least half the length, while in the other half raw sewagedrains directly into the tidal lagoon - a habitat of the red and pink flamingos. A new gravity networkwould be providedwith two lift stations and force main connectedto the Compaosystem. The Compaonetwork and lift stations were virtually completein 1975; however, since Independenceno work has been done. The gravity lines have become choked and the abandonedpumping station filled with debris and sewage sludge. This networkwould be rehabilitatedalong with the house connections. The lift stations EE9 and EE1O would be rehabilitatedand equippedwith new pumps and controls. EE1Owould be equippedwith a force main to the series of oxidation ponds two kilometerssouth of the city. A section of the main will be submergedunder the lagoon. This system can be expandedeasily to serve the 'restinga' residential and commercialareas. The ponds are located on waste land today. The treated effluentwould be used for irrigating fruit trees, tree nurseries and grain crops to close the cycle. The cost estimates for the commercialarea are based on an entirely new network;however, the cost of rehabilitationof the Compaowill be half that of a new system.
B. Benguela Sanitary Sewers
15. The sanitary sewagenetwork, serving only a small portion of the center of Benguela,is partially broken and clogged. Part of the raw sewageeventually leaks onto the beaches in front of the city. Most of the buildings have septic tanks that are continuallyoverflowing into the back patios, hallways, and streets. This conditionis one of the main sources of cholera in Benguela. The central area of Benguela includingall the buildings above two stories will be connectedto a new gravity network. Included in the networkis an interceptorsewer that will pick up all the small sewers that dump raw sewage into the Coringe channel today. One small lift station and one main sewage pumping
3 Annex 2 Page 4 of 5 station would be provided along with a force main of four kilometers that will connect to a series of oxidationponds to the south of the city where there is adequateroom for expansionfor future needs. As in Lobito, the treated effluent would irrigate tree nurseries and grain crops.
Ill. VALA DO CORINGE STORM DRAINAGE CHANNEL
16. The Vala do Coringe drains a major portion of the city of Benguelaand has a drainage basin of 60 square kilometersextending inland about 18 kilometers. Over the years the four kilometer channel that traverses the urban area has becomechoked wi.h garbage, raw sewage and vegetation. With the scarcityof fresh water, slum dwellershave dug mud holes amongst the debris to wash their clothing. The mud holes attract childrenwho play in the dirty water, thus turning the Vala into a major source of disease and a health hazard to the city.
17. The project would provide a 3.8 kilometerdressed open channel that follows the present alignment and gradientto a sea outfall. Lateral storm drains with large inlets on the south side have been included to reduce the flash floods in adjacentbairros. Since the annual rainfall is between 100- 300 mm per year and falls mainlyduring the summer months, February, March, and April, the channel will be virtuallydry for about seven monthsof the year. The lower sectionof the channelfrom the sea outlet to the airport bridge, 1,400 meters, will be reinforcedconcrete 120 mm thick to withstandthe ground water lift pressure, with side drainage weep holes at two meter (o.c.) intervals. Above the bridge, the channel would be pre-cast slabs of 100 to 120 mm thickness set in mortar bed with geotextilemesh and strategicallylocated drains for the periodic rise in the water table.
18. Five pedestriancrossings (fords) have been designedwith raised steppingtreads across the bed of the channel and steps notched into the slopes. While the channelis essentiallyself-cleaning, it would be cleaned manuallyof debris to eliminate any vegetativegrowth. The accesdramps for the two vehicular fords have been designedfor small tractors and wagons to haul the debris out from each section. An additionalaccess ramp has been providedbetween the three vehicular bridges for the same purpose. The sea outfall has been designedfor self-cleaningunder all weather conditions.
19. There are two existing vehicular bridges, one to the airport and the other to the south along the coast to Baia Farta. The consultantshave determinedthat the sub-gradegirder on the first bridge can be lowered to enlarge the channelsection under the bridge so that the bridge does not have to be replaced. However, the second bridge must be replacedas it has temporaryreinforcements under one of the main girders that failed. A third bridge is planned at the rnid-pointof the length of the channel so that the main traffic generated by the cemeteryand the seven adjacent barrios on the south side will have a conventionalvehicular bridge crossing. Upstream two vehicular fords will provide access to the spontaneoussettlements extending to the southeast. Vehiculartraffic volumesprojected for the next ten years do not justify another grade level bridge crossing. Pre-cast pavers would be set on edge to provide a curb and gravel stop along the stabilizedearth and gravel walk and cycle path along the south side and a service road on the north side. Trees would be planted to provide a canopy of shadealong both sides of the channel.
20. To lower peak flows an earthen retentiondam has been designedabout 1,200 meters east of the airport to provide a five to six hour retentionof about 600,000 cubic meters capacity. The dam has been designedwith a three meter head. It would serve as a recharge basin and sedimentationtrap which would be cleaned periodically. In additioneight small velocitycheck dams of 2.5 to 3.0 meters in height, using gabions, would be built upstreamand downstreamof the main dam as well as on the
4 Annex 2 Page 5 of 5 parallel tributary. Trees would be planted along both sides of the channelto provide a canopy of shade.
21. Preliminary cost estimate of the channel is $2.64 rnillion and for the eight check dams $540,000. Detailed engineeringwill be completedby July 1991 and bidding documentswill be issued to pre-qualifiedbidders by September, 1991.
IV. LOBITO STORM DRAINAGE FOR ALTO LIRO AND BELA VISTA
22. The seven major storm drainage galleyshave becomeheavily eroded as squatters have occupied the slopes, cutting the vegetationand notching small ledges to build their huts. Many have built in the bottomsof the gullies. The April rains this year demolishedmany huts and caused fourteen deaths. Before Independencethe Portuguesebuilt a few erosion control dams. Most of these are now filled with debris and sedimentbut do functionas velocitycheck dams.
23. The project would provide a series of retention/velocitycheck dams in each of the seven drainage basins. A prototypicaldesign using gabions has been prepared with heights of dam between three and four meters. A total of fifty such dams would be provided, set 300 to 400 meters apart. The average cost of these check dams is $50,000; total cost is $2.56 million.
5 ' 4 A