<<

LAND SOUTH OF CAMPSIE ROAD, WELCOME

Have your say

Gladman Developments is preparing an application for Planning Permission in Principle for a proposed new cemetery and residential development with associated infrastructure and landscaping on land south of Campsie Road, Strathblane. The total site area comprises approximately 27.2 acres (11 hectares).

The site is currently greenfield agricultural land. Gladman want to hear your views with regard to the quantity, mix and design of the proposed development. Your views will help us to shape the masterplan which will be submitted as part of the planning application. This is your opportunity to comment and influence the planning of the site before the application is lodged with Council. You will also have a further opportunity to provide comment to the Council during the planning application process.

A questionnaire is available today for you to submit your comments. Alternatively, comments can be submitted online at http://www.your-views.co.uk/strathblane-comment, e-mailed to [email protected] or posted to Gladman Developments, 2 Eliburn Office Park, Livingston, West Lothian, EH54 6GR.

A dedicated web page will update you with information relating to this development as the project progresses: http://www.your-views.co.uk/strathblane LAND SOUTH OF CAMPSIE ROAD, STRATHBLANE PLANNING CONTEXT

Settlement Map: Adopted Local Development Plan Spatial Strategy: Proposed Local Development Plan Settlement Map: Proposed Local Development Plan

The Council has identified the site in both its adopted and proposed Local Development Plans as being appropriate for release from the green belt and has accepted the principle of development on the site. In both plans, the part of the site immediately adjacent to the recently completed housing has been allocated for a cemetery extension. The surrounding area has been proposed to remain as part of the green belt.

Our proposal is to develop the first part of the site for residential use, and move the proposed cemetery extension further to the east. This makes more efficient use of land released from the green belt, allowing fuller use of the site and providing a more logical, defensible boundary to the green belt, following existing field boundaries and barriers.

Stirling Council seeks to meet its housing needs through the provision of a range and choice of housing in sustainable locations in both the Core Area (Stirling, , , and the Eastern Villages) and the Rural Villages Area (including villages such as Strathblane, , and etc).

The adopted Local Development Plan requires the delivery of 434 houses per year, and this requirement is increased slightly in the Proposed Local Development Plan to some 476 units per year. When the current Local Development Plan was examined by Reporters for the Scottish Ministers, they determined that the plan was not providing for enough housing land to meet the needs of the Stirling Council area and that the plan should be reviewed in the short term. The same background information from the adopted LDP was used to establish the housing land requirement in the second Proposed LDP.

Scottish Planning Policy also requires that Stirling Council maintain a five-year supply of effective housing-land, to meet the established needs and demands of the area. Unfortunately, the level of supply in Stirling has fallen, and currently stands at 60% of the required level. As such, further housing sites are required, and Scottish Planning Policy has a mechanism in place to allow Councils to deal with this. It is our view that this site will allow Stirling Council to begin to meet its housing needs in a sustainable, suitable way through the development of additional sites whilst minimising the impact on the green belt, and ensuring that a site is preserved and made available for the cemetery extension. LAND SOUTH OF CAMPSIE ROAD, STRATHBLANE SITE PHOTOS

1 View looking south east across site from Campsie Road (A891).

2 View looking north east across site from the Strathkelvin Railway Path. The recently constructed Cala Homes development can be seen to the left of view.

3 View looking west from within the site back along the A891 towards Strathblane.

4 View looking north west from Dunglass. The Cala Homes development can be seen prominently to the far side of the site. Photograph Location Plan LAND SOUTH OF CAMPSIE ROAD, STRATHBLANE OPPORTUNITIES / CONSTRAINTS

VIEWS TO

R VIEWS TO CAMPSIE FELLSWEAK OBUS BOUNDARY T N E W G R RE WEAK OBUS E BOUNDARY SUDS NB E T L N T

E E W VIEWSD TO CAMPSIE FELLS VIEWS TO CAMPSIE FELLS GE VIEWS TO CAMPSIE FELLS G VIEWS TO CAMPSIE FELLS RE R E IV NB ER SUDS SID E E L L OC T ATI ON R E R R D WEAK OBUS WEAK R OBUS WEAK OBUS WEAK GE ROBUSBOUNDARYOBUS BOUNDARYVIEWS TO CAMPSIE FELLS T BOUNDARY NEW T R BOUNDARY GRE T N T IV ENB N N ER T E E S N LTE E W E IDE W DGE W LO POTENTIAL ELINK TO CA W G TIO G RE G VIEWS TO CAMPSIE FELLS N STRATHKELVIN RAILWAY G PATHRE RE E RE E NB E NB SUDS E NB SUDS NB SUDSE E L E SUDS L T L E T T L E T E VIEWS TO DUNGLASSD E D E GE D POTENTIAL LINK TO VIEWS TO CAMPSIE FELLS ScheduledD MoundGE Core PathVIEWS TO DUNGLASS GE R Site Boundary 1:200 Flood Risk GE WEAK OBUS STRATHKELVIN RAILWAY PATH R R IV R BOUNDARY IVE ER IV Blane Water RIV GreenRS Belt Key ViewsSID Out Right of Way ER T ER IDE E L SID N S L OC E L WEAK IDE OCA ATIO OCA E LOC TION N N TIO W AVIEWSTIO TO DUNGLASSTIO N BOUNDARY N R CA G OPPORTUNITIES LOBUSOCONSTRAINTS RE WEAK E SID E BOUNDARY ER NB RIV SUDS • Development could better integrate existing settlement • TT he western part of the site would need to be released E N L edge with wider landscape setting fromE the greenPOTENTIAL belt LINK to TO POTENTIALfacilitate residential LINK TO development T SUDS POTENTIALW LINK TO POTENTIAL LINK TO E POTENTIAL LINK TO D G STRATHKELVIN RAILWAY PATH GE • Development could work with topography to minimiseSTRATHKELVIN • Setting RAILWAY of the PATH Scheduled Mound (SM4765) would need STRATHKELVIN RAILWAY PATH STRATHKELVIN RAILWAYRE PATHSTRATHKELVIN RAILWAY PATH potential impact to be respectedE NB RIV SUDS ER E SID • Development could create a new and robust edge to the • PotentialL development would need to be located away VIEWS TO DUNGLASS E L T VIEWS TO DUNGLASS VIEWS TO DUNGLASS OCA green belt with structural landscape from 1 in 200 E year flood plainVIEWS to southern TO DUNGLASS edge of the site TIO D N GE • Creation of a new cemetery - serving the needs of the R wider community IVE RSI DE L • Potential to enhance biodiversity OCA POTENTIAL LINK TO TION STRATHKELVIN RAILWAY PATH • Celebrate Iconic views • Potential to improve recreational access

• IncorporateVIEWS TO sustainable DUNGLASS drainage POTENTIAL LINK TO STRATHKELVIN RAILWAY PATH

VIEWS TO DUNGLASS X:/ JOBS / 0000_Xxxxxxxxxxx / 7_CAD / DRAWINGS / 0000_01_A OS Opendata/©NaturalEnglandDEFRADECCEnglishHeritage.ContainsOrdnanceSurvey data©Crowncopyrightanddatabaseright2013| Aerial Photography-BingMaps This drawingmaycontain:OrdnanceSurvey materialbypermissionofOrdnanceSurvey onbehalfoftheControllerHerMajesty’sStationeryOffice©CrownCopyright2013. All rightsreserved. Referencenumber0100031673 neighbourhood. providing asafe andwell laidoutadditionto thelocal andsizes fortypes bothaffordable andmarket residents inprinciple.permission This allows for amixofdwelling application for oftheforthcoming planning be thesubject plots (approximately 2.6ha) although thefinalprovision will deliver upto 70homeswithintheidentified development The development framework provides theflexibility to ecological enhancement. landscape feature andtheopportunityfor water runoffaswellproviding a development helpingtomanagesurface sustainable drainage strategy for the Detention basinforms partofthe PROPOSED DEVELOPMENT FRAMEWORK into thewiderlandscapesetting. integration ofCala development Proposals helptoimprove CALA HOMESDEVELOPMENT COMPLETED SUMMER2016 Proposed Roads Development Site (SITE H106) space setalongriver corridor. Provision for generous publicgreen PROPOSED RIVERSIDEPARK integrate development. extended alongtheA891tohelp close tovillageandfootpaths Proposed siteentrance located LAND SOUTH OF CAMPSIE ROAD, STRATHBLANE Proposed Development Plots Proposed Cemetery and Dungalss. towards theCampsies the mostofviewsout Roads alignedtomake across thesite. areas helpimprove biodiversity parkalnd andstructural planting Species richplantingmixeswithin the settlement. a robust anddefensible edgeto New structure plantingcreates POCKET PARK / PLAY AREA The proposals are by underpinned four keythemes: NEW BRIDGEANDCONNECTION TO STRATHKELVIN RAILWAY PATH • • • •

I R Enhancing landscapequalit I ncreasing biodiversity ntegrating withthevillage wider countryside. traffic free linkintovillageandtothe Strathkelvin RailwayPath provides Potential newdirect accessto einforcing localcharacter Proposed DetentionBasin Proposed Structural Planting MONUMENT SCHEDULED (SM4765) attractive landscapesetting. space tothecommunitywithinan a minimumof2hanewburial The proposed cemeteryprovides PROPOSED CEMETERY settlement. of characteristic containmenttothe cemetery provides afurther layer Additional structure plantingaround network . incorporated intonewpath farm track maintainedand Existing rightofwayalong PROPOSED RIVERSIDEPARK y CEMETERY PARKING Existing Footpath /Cycleway Proposed Footpath /Cycleway quality. enhance landscape boundaries inorder to dry stonewallstofield damaged andcollapsed such ashedgerows or landscape features reinstate characteristic Opportunity torepair or 0 50m

Sources: LEGEND Area measurementsforindicativepurposesonly. All dimensionsaretobecheckedonsite. No dimensionsaretobescaledfromthisdrawing. © LDADesignConsultingLtd.QualityAssuredtoBS ENISO9001:2008 Development Framework DRAWING TITLE STRATHBLANE LAND SOUTHOFCAMPSIEROAD, PROJECT TITLE E.DESCRIPTION REV. ISSUED BY DATE DWG. NO. SCALE@A1 STATUS Ordnance Survey... 5508_101 Sept 2016 1:1000 Planning Proposed Cemetery Proposed Development Plots Development Site Woodland Planting Proposed Structural Landscape/ Existing Footpath /Cycleway Proposed Footpath /Cycleway Proposed Roads Basin (SUDS) Proposed Surface Water Detention T: 01412229780 DRAWN CHECKED APPROVED APP. ME FD MFi DATE