SHARED SERVICE JOINT COMMITTEE

4 SEPTEMBER 2020

Report by the Interim Head of Ayrshire Roads Alliance ______

SUBJECT: ROADWORKS PROGRAMME 2020/21 ______

PURPOSE OF REPORT

1. The purpose of this report is to advise the Joint Committee of the progress made with the road improvement programmes within and for financial year 2020-2021.

RECOMMENDATIONS

2. It is recommended that Joint Committee:

(i) Notes the Ayrshire Roads Alliance works progress for 2020/21, (ii) Otherwise, notes the contents of this Report.

BACKGROUND

3. The East Ayrshire Council programme for the roads asset management investment programme for 2020/21 was approved on 4 March 2020.

4. The East Ayrshire budgets for 2020/21 are £5.200m for carriageways; footways £0.150 million; street lighting £0.250 million; traffic &road safety £0.265 million; bridges £2.0 million; CWSS (Cycling Walking and Safer Streets) £0.563million; Smarter Choices, Smarter Places £0.112million; Spaces for People £0.555m; and SPT £1.475million.

5. The South Ayrshire Council Road Improvement Programme budgets for 2020/21 are for carriageways £2.336m;bridge works £0.324m;bridge strengthening £0.178m;Streetlighting £0.250m;20mph rural villages £0.279m;Traffic signals 0.174m;LED Replacement £1.709m; Harbour £0.279m and Girvan HGV £0.196m;CWSS £0.496m;Smarter Choices Smarter Places £0.103m;Spaces for People £1.065m; and SPT £0.525m.

DETAIL

6. The programmes for 2020-2021 are contained within Appendix One and Two. The Ayrshire Roads Alliance understands the need to monitor and manage the extensive programme of works for 2020-21. For the road, surfacing schemes in East Ayrshire and South Ayrshire two weekly programme meetings are chaired by the Network & Operations Manager and attended by the Interim Head of Ayrshire Roads Alliance and other relevant operational staff. For the traffic, road safety, structures and externally funded schemes, four weekly meetings are chaired by the Operations Manager and attended by the Head of Roads, Traffic & Road Safety Manager, Design & Environment Team Manager and other relevant operational staff.

7. A two weekly update is provided to all elected members in East Ayrshire and South Ayrshire together with an update for Corporate Communications.

8. Timber Transport Grant awards have been received by South Ayrshire Council for B741 ;B743 Barr and C88 Crosshill £0.588m

9. Timber Transport Grant awards have been received by East Ayrshire Council for A713 Hollybush and B741 Manneight £0.294m.

10. At the start of Lockdown a suspension of works was implemented across all networks and depots provided emergency cover only, with operational staff allocated to other duties and office based staff working from home. All Depot staff have now returned and works recommenced on 22 June 2020.The default position for office based staff is to remain working from home, although rotas will be put in place for office attendance when required.

POLICY/COMMUNITY PLANNING ISSUES

11. A well -maintained road network will contribute to achieving the Community Plan objectives in relation to Economy & Skills and Safer Communities to maintain good access to our communities within East Ayrshire.

12. The matters referred to in this report contribute to the South Ayrshire Council strategic objective of ‘Enhanced Environment through Social, Cultural and Economic Activities’ and within that to the outcome of ‘Work with partners to improve roads and other infrastructure, to encourage house building and business investment that sustains local communities’.

LEGAL IMPLICATIONS

13. By virtue of the relevant statutory provisions, principally detailed within the Roads () Act 1984, the Council as local roads authority is required to manage and maintain all publicly adopted roads within its area other than those which are maintained and managed by the Scottish Ministers.

HUMAN RESOURCES IMPLICATIONS

14. The work programmes have direct impact on human resources and the Alliance will ensure all works are suitably resourced to maintain satisfactory progress.

EQUALITY IMPACT IMPLICATIONS

15. An equality impact assessment is not needed because the proposal does not have a differential impact on any of the protected characteristics.

FINANCIAL IMPLICATIONS

16. The Ayrshire Roads Alliance will deliver the strategic and local services as stated in the Service Plan. The budget is provided by East Ayrshire Council, South Ayrshire Council, and other external organisations. Appropriate scrutiny arrangements are in place to manage these budgets.

RISK IMPLICATIONS

17. The Ayrshire Roads Alliance Risk Register is reviewed and presented to very Joint Committee.

18. The Works Programmes, Service Plan and the Risk Register do not expose either Council to an increased risk as they have been developed from existing budgets and existing service commitment.

TRANSFORMATION STRATEGY

19. This Report aligns with the following design principle stated in the “Transformation Strategy 2017-2022”.

• “Maximum value for our communities”, by ensuring the various elements of the Ayrshire Roads Alliance improves transport provision throughout East Ayrshire.

BACKGROUND PAPERS East Ayrshire Council Cabinet Report - 2019/20 Roads Asset Management Plan – Investment and Programme - 4 March 202

South Ayrshire Council Road Improvement Plan 2020/21-6 April 2020

LIST OF APPENDICES

Appendix 1 - Ayrshire Roads Alliance South Ayrshire Programme 2020/21 Appendix 2 - Ayrshire Roads Alliance East Ayrshire Programme 2020/21

Person to Contact:

Kevin Braidwood, Interim Head of Ayrshire Roads Alliance Tel. No. 01563 503164 E- mail: [email protected]

Implementation Officer: Kevin Braidwood, Interim Head of Ayrshire Roads Alliance Tel. No. 01563 576441 E- mail: [email protected] Appendix 1 - South Ayrshire Council - Ayrshire Roads Alliance

Carriageway Structural Maintenance Programme 2020/21

Route Estimated Cost to Variance Town Description Work Type Comments Status No Cost Date +/- Final Uncl Speed table Complete Carrick Place Measure Final Uncl Prestwick Edminston Drive Speed table Complete Measure Final Uncl Prestwick Meadowbank Lane Speed table Complete Measure Final Uncl Prestwick Brandon Gardens Speed table Complete Measure Final Uncl Prestwick St Nicholas Road Speed table Complete Measure Final B730 Montgomerie Street Resurfacing £42,337 Complete Measure B730 Council Boundary At Milton - By Final B730 Montgomerie Resurfacing £34,164 Complete Tarbolton Measure Street/Tarbolton, Tarbolton B744 Jcn At B743 - By Final B744 B730 S Of Tarbolton, Resurfacing £13,000 Complete Tarbolton Measure Tarbolton A70 Holmston A70 By Roundabout - B744 At Resurfacing £168,000 Belston, Ayr A719 Council Boundary A719 By Craigie - S To B730 Jcn At Resurfacing £146,000 March Bridge, Craigie A719 Raith Cottage At By B739 - A77(T) At A719 Resurfacing £60,720 Tarbolton Sandyford Toll Roundabout, ? C16 Dutch House Roundabout - C16 By Monkton Resurfacing £30,240 Road/Monkton, Monkton B730 Rabbit Wood At By B730 A719 - A77(T) Jcn At Resurfacing £101,760 Symington Bogend, Symington UNCL Ayr West Sanquhar Road Resurfacing £32,762 C148 Ayr North harbour Street Resurfacing £24,480 UNCL Symington Brewlands Crescent Resurfacing £37,740 UNCL Station Road Resurfacing £37,018 C142 Preswick East Road Resurfacing £20,400 C39 Ayr Greenfield Avenue Resurfacing £42,900 Corton Bridge to C39 By Ayr Resurfacing £124,800 Sessionfield Road UNCL Ayr Meadow Park Resurfacing £67,500 UNCL Hunter Crescent Resurfacing £64,464 UNCL Ayr Annfield Glen Road Resurfacing £36,448 UNCL Ayr St Phillans Avenue Resurfacing £90,163 UNCL Ayr Dalmilling Drive Resurfacing £29,104 UNCL Prestwick Kyle Street Resurfacing £21,930 By U99 Dundonald/Symington Resurfacing £45,500 Symington C21 By Craigs Road Resurfacing £35,750 U115 By Coylton Barbieston Resurfacing £26,000 A713 Bankfield A713 By Ayr Resurfacing £80,500 Roundabout - Se Past To Council Boundary, Ayr UNCL Ayr Carrick Avenue Resurfacing A79 Ayr Allison Street () Resurfacing £48,705 By B7034 Carcluie Dalrymple Resurfacing £32,500 Dalrymple A719 By ) Resurfacing £270,100 B741 Linfern Road/Dailly - B7023 B741 By Dailly Resurfacing £384,000 Jcn At Knockroon, Dailly B734 Barr - Hawkhill B734 By Girvan Resurfacing £234,000 Road/, Girvan B734 Barr - Pinmore, B734 By Girvan Resurfacing £136,800 Girvan C88 By Crosshill Dalhowan Road Resurfacing £86,130 Ladywell Avenue UNCL By Girvan Resurfacing Phase 1 C102 Road Balvaird Road Resurfacing Uncl Girvan North Drive Resurfacing £19,355 UNCL Shore Road Resurfacing £22,950 U2 By Maybole Auchencross Resurfacing £21,840 U27 By Crosshill Deils Elbow Resurfacing Estimated Total £2,670,059

South Ayrshire Council - Ayrshire Roads Alliance Footway Programme 2020/21

Work Estimated Cost to Route No Town Descripton Variance Comment Type Cost Date Status +/- Uncl Drive £12,678 U98 Symington Main Street £13,680 Uncl Troon Gillies Street £16,185 Uncl Troon £5,589 Crescent Uncl Troon Polo Avenue £6,126 B744 Tarbolton Burns Street £7,650 McCalls C146 Ayr £44,100 Avenue Uncl Prestwick Craigie Street £8,592 Ayr Arthur Street £21,425 Holmston A70 Ayr £9,000 Road Southpark Ayr £29,700 Road Uncl Ayr Abbots Way 1 £38,700 Ayr Kersepark 1 £33,750 Cambusdoon Ayr Drive

Dundonald A759 Troon Road Gabion Installation South Ayrshire Council - Ayrshire Roads Alliance

Lighting Programme 2020/21

Route Work Estimated Costs Town Description Variance Comment Status No Type Cost to Date

Troon, Renewal of lighting columns and Bradan Rd Capital Replacement £110,000.00 & Welbeck underground cable Cresc network

Ayr Renewal of lighting columns and Dalmilling & Capital Replacement £140,000.00 Thornyflat underground cable area network

South Ayrshire Council-Ayrshire Roads Alliance LED Lighting Programme 2020/21

Route No Town Description Programmed Date

- Completion of Ayr April-August 2020 outstanding units - Completion of Prestwick June-July 2020 outstanding units - Completion of Troon August-October 2020 outstanding units - Completion of Rural Villages August –October 2020 outstanding units

South Ayrshire Council- Ayrshire Roads Alliance Traffic and Transportation Programme 2020/21

Calculated Funding Cost to Varianc Totals Sub-bid Total Bids Project Description Stage Bid Status Date e +/- Status Ayrshire/ Prestwick SQP £75,000 Infrastructure Improvements Construction Confirmed £0 Ongoing SPT Local Cycle Network Improvements Design/ £450,000 £525,000 (Match for various Sustrans projects) Construction Confirmed £0 Detail Design Follow on from to Burton Technical Completion £19,448 Cycleway (Underpass) Design Confirmed £0 of Design Follow on from Alloway to Burton Procurement £200,000 Cycleway (Underpass) Construction Confirmed £0 stage Follow on from Dundonald to Technical Technical £51,380 Design Confirmed £0 Design Follow on from Access for All - Developed Developed £15,043 Dunure Design Confirmed £0 Design Sustrans - Places for Follow on from Access for All - Technical Technical Everyone £80,000 Dunure Design Confirmed £0 Design Follow on from Access for All - Procurement £125,000 Coylton Construction Confirmed £0 Stage Follow on from Loans to Troon Technical Technical £50,000 Railway Station Design Confirmed £0 Design Follow on from Loans to Troon Work £115,000 Railway Station Construction Confirmed £300 ongoing Strategic Procurement £60,000 £715,871 Active Travel Strategy - SAC Definition Confirmed £0 Stage Sustrans - Cycle Funding for the supply and Supply and Procurement Confirmed £4,000 Shelter Fund £40,000 £40,000 installation for school cycle shelters Install stage Smarter Choices, Ongoing Smarter Places £103,000 £103,000 Active Travel Hub, Ayr Project Delivery Confirmed £16,329 Ongoing Cycling, Walking, To provide match funding to a Safer Routes (CWSR) £496,000 £496,000 number of the projects listed above Various Confirmed £0 Ongoing Estimated Total £1,879,871 £20,629

South Ayrshire Council - Traffic and Transportation Signal Replacement 2020/21

Signal Town Description Work Estimated Variance Costs to Date Comment Status No Type Cost +/-

Junction Central Troon Ave/Dundonald Replacement TBC Rd

Junction Station Prestwick Replacement TBC Rd/Main St

Pedestrian Mossblown Replacement TBC Crossing

South Ayrshire Council - Ayrshire Roads Alliance Structures Capital Programme 2020/21

Route Town Description Work Type Estimated Cost Costs to Date Variance +/- Comment Status No Gadgirth Bridge Bridge Corrosion £324,000 Protection

Bridge of Coyle Deck Replacement £178,904

Appendix 2 - East Ayrshire Council - Ayrshire Roads Alliance

Carriageway Structural Maintenance Programme 2020/21

Estimated Road Type Location Work Type Comment Cost Costs Variance Status to Date +/-

A Class Rural A713 From B7034 To Craigs Road, Hollybush Resurfacing £120,000.00 Final Complete Measure A Class Rural A70 2 x Sections Resurfacing £300,000.00 Partially Complete A Class Rural A71 Priestland Resurfacing £30,000.00 A Class Urban A759 From B7064 To Gatehead Resurfacing £224,000.00 A Class Rural A77 From B764 To East Boundary, Resurfacing £128,000.00 Eagle A Class Rural A719 from B744 to A76 at Crossroads Galston Resurfacing £132,300.00 A Class Rrual A719 GALSTON ROAD END TO WATERSIDE Resurfacing £123,200.00 A Class Rural A735 From Brackenburn Bridge To Townhead, Resurfacing £84,000.00 Resurfacing A Class Urban Hill Street, Kilmarnock Resurfacing £56,000.00 A Class Urban A735 From Mill Avenue To Kirkton Road, Kilmaurs Resurfacing £26,000.00 A Class Urban Witch Road, Kilmarnock Resurfacing £39,000.00 A Class Urban Dunlop Road, Lugton Resurfacing £28,000.00 B Class Rural B743 From at Grassyards Farm Resurfacing £104,000.00 B Class Rural B741 From Maneight to Benbain Resurfacing £143,000.00 B Class Rural B751 From C117 To Ladeside Road, Kilmaurs Resurfacing £71,500.00 B Class Rural B764 From A77 Eaglesham Turnoff To East Resurfacing £77,000.00 Renfrewshire B Class Rural B742 From A713 To South Ayrshire Boundary At Resurfacing £26,000.00 Snipe Loch

B Class Rural B7046 From Sinclairston To Resurfacing £121,000.00

B Class Rural B713 From A76 T To Shawwood Link Road, Resurfacing £84,000.00 B Class Rural B7046 From Sinclairston To U728 Glenconner, Resurfacing £143,000.00 Final Complete Drongan Measure

B Class Rural B778 From Boundary Resurfacing £99,000.00 B Class Urban B7081 Troon Walk to B7064 Resurfacing £84,000.00 C Class Rural C108 Stewarton/Cabroc Hill From B769 Nr Stewarton Resurfacing £90,750.00

C Class Rural C100 From Lugton Road To U28 Dunniflat, Lugton Resurfacing £82,500.00 C Class Rural C89 From B730 To Littlemill Place, Resurfacing £22,000.00 C Class Rural C104 Sornhill/ From Windyhill Road To Resurfacing £33,000.00 Sorn C Class Rural C103 Drumdroch/Stoneyhall From C104 To B744, Resurfacing £33,000.00 Galst C Class Rural C125 Dunlop To Crossgates, Stewarton Resurfacing £90,750.00 C Class Rural C113 Cutstraw Road Stewarton Various Sections Resurfacing £99,000.00 C Class Rural C53 Treeswoodhead Road, Kilmarnock Resurfacing £33,000.00 C Class Rural C123 /Trabboch From B730 To Mote Toll, St Resurfacing £84,700.00 C Class Rural C120 Kilmarnock/Gatehead From South Ayrshire Resurfacing £84,700.00 Bound U Class Rural U1 Galstonmoor Galston Resurfacing £61,600.00 U Class Rural U55/56 Meikle Carleith From B7037 To U1, Galston Resurfacing £44,000.00 Final Complete Measure U Class Rural U728 Glenconner From A70 Nr Ochiltree To B7046, Resurfacing £160,000.00 U Class Rural U74 Bardarroch From A70 At Killoch To B7046 Resurfacing £61,600.00

U Class Rural U13 Aiket From Nether Oldhall To Brae, Dunlop Resurfacing £13,200.00 Carry Over Urban Road Kilmarnock Woodlands Grove to Resurfacing £86,400.00 from 2019- Knockinlaw Road 2020 Carry Over Urban B7038 Glasgow Road Southcraigs Roundabout to Resurfacing £184,800.00 from 2019- A77 Slips 2021 Carry Over Urban B7038 Fenwick Resurfacing £88,000.00 from 2019- 2022 Carry Over Urban Beansburn Kilmarnock Knockinlaw Road to Gilsburn Resurfacing £128,000.00 from 2019- Gardens 2020 Carry Over Urban Dean Road Kilmarnock Dean Castle to Esson Place Resurfacing £16,800.00 from 2019- 2020 Carry Over Urban West Langlands Street Kilmarnock Resurfacing £54,600.00 from 2019- 2020 Carry Over Urban Cunningham Drive Kilmarnock 200 £20,400.00 from 2019- 2020 Carry Over Urban Annanhill Avenue Kilmarnock 200 £20,400.00 from 2019- 2020 Carry Over Urban Grange Street Kilmarnock 315 £37,485.00 from 2019- 2020 Carry Over Urban Park Street Kilmarnock 340 £46,240.00 from 2019- 2020 Carry Over Urban Nelson Street Kilmarnock 115 £11,730.00 from 2019- 2021

APPENDIX 2: East Ayrshire Footway Programme 2020/21

Cost Estimated Variance Section Street Name Location Environment to Comment Status Cost Date +/-

Dalrymple Barbieston Terrace No 2 to No 24 Residential £8,700 £8,510 Patna Blainey Avenue No 12 to Main Street Residential

Dalmellington Broomknowe No 33 to Gateside Road Residential £6,000

Drongan Lane Crescent No 56 to Taiglum Place Residential £12,690

Ochiltree Broom Crescent No 1 to Gallowlee Ave Residential £12,900

Catrine St Germain Street Car Park to Ayr Street Residential £6,000

Auchinleck Sorn Road No. 19 to No. 31 Residential £6,000

Kilmarnock Sannox Road No 1 to No 31 Residential £8,000

Newmilns McLead Street Full Length Residential £16,200

Hurlford Craigie Road One Section Residential £8,000

Fenwick Kirkton Road Various Sections Residential £12,000

Stewarton Nether Robertland Various Sections Residential £6,000

Kilmaurs Main Street Various Sections Residential £12,000

Waterside Main Road Various Sections Residential £12,000

APPENDIX 2: Environmental Improvement Programme 2020/21

Estimated Year Project Description of Works Benefit Cost

Improve environment in village and road 2020/21 Hayhill, by Drongan, Environmental Kerb, upgrade verge and safety by formalising parking area. £15,000 Improvement form parking bay

Improve environment and road safety by 2021/22 Craigie Avenue, Kilmarnock Form Lay-by - street reducing on street parking problems. £15,000 parking bays

Improve environment and road safety by Future Years Wellpark Crescent Kilmarnock, widen road. Re-kerb and widen over- run reducing on street parking problems. £7,000 grassed area

Future Years Kilmarnock Rd Service Rd , widen road. Re-kerb and widen over- run Improve environment and road safety by £8,000 grassed area reducing on street parking problems.

Improve environment and safety by Future Years Hillcrest, , Parking Form 6 No Off-Street reducing on street parking problems. £15,000 Bays parking bays

Future Years North Hamilton Place Kilmarnock, parking bays. Additional Parking Area Improve environment and road safety by £8,000 reducing on street parking problems.

Improve environment and road safety by Future Years Gateside Road, Galston, widen road. Re-kerb and widen over- run reducing on street parking problems. £7,000 grassed area

APPENDIX 2: Street Lighting Programmes 2020/2021

Estimated Variance Location Cost to Date Comment Status cost (k) +/-

Cumnock, Caponacre Ind. Est. 50

Dalrymple, Forglen and Hillview 40

Darvel, Drumclog Crescent and Murdoch Road and Causeway 50 road

Fenwick, Raith Road, Auchans 40 Place

Newmilns, Ladeside 70

Total £250k

APPENDIX 2: Bridge and Culvert Strengthening Programme 2020/21

Structure Estimated Cost to Variance Structure Reference Proposed Works Comment Status Name Cost Date +/-

Bridge Strengthening and Replacement U22/10 Burnfoot Replacement £36,000 Design Bridge, near C127 Low Ashyard Infill and vertical alignment Programmed Bridge improvement and tie-in with Funding cyclepath discussions ongoing with HRE U26/10 West Clerkland Replacement – currently closed £210,000 Tender Bridge, near to traffic Stewarton B730/10 Littlemill Bridge, Replacement £12,000 Tender near Rankinston A71/280/C80 Mathew’s Burn Replace section of Culvert below £4,000 Design/Tender Culvert, West West Donnington Street Donnington Street, Darvel Various Multiple Topographical and ground £10,000 Tender structures investigation works Catrine/Sorn area B741/30/C72 Rigghill Culvert Repair works Programmed

C108/00 C44 Gateside Farm Replacement £10,000 Design/Tender Culvert U22/10/63 CG10 Burnfoot Cattle Replacement Grid U32/10 Clearmount Refurbishment £200,000 On Site – Bridge started end of July 2020 A70/40 Coyle Bridge, Drainage repairs and scour £12,000 Design/Tender near Coalhall protection U3/20 Braidley Bridge Strengthening and masonry £40,000 Design/Tender repairs A735/130/C58 Gills Burn Part deck replacement and £10,000 On hold (as Culvert, retaining wall repairs part of FPM Dunlop wider ECC build) U45/10 Kirkland Bridge, Replacement of boundary bridge Programmed Springside North Ayrshire Council is lead with NAC authority. East Ayrshire Council funding 50%

A735/058 C Woodhill culvert Replacement/Repair TBD Programmed

B7036/10/C05 Stevenson Scour repair TBD Programmed Culvert B705/10/C91 Cowan Place Scour repair TBD Programmed Culvert, Catrine B705/20 Shellies Bridge, Scour and masonry training wall TBD Design Catrine repair B705/10/C37 Mill Lead Strengthen/infill TBD Programmed Culvert U/PATN/10 Patna New Expansion joint replacement TBD Programmed Bridge A71/300 Priestland Retaining wall strengthening £20,000 On-site Bridge 60% complete U764/10 Glenmuir Scour Repair TBD Programmed Bridge U/NEWM/46C Isles Burn Outlet and retaining wall repair £35,000 On site – Culvert, almost Newmilns complete A70/130 W31 Thornwood Replacement £30,000 Design Wall, Lugar Queen’s Training wall repairs £120,000 Tender Crescent riverbank, Newmilns Galston Emergency Armour Rock works £33,016 Tender to Newmilns returned and Cyclepath – ready for issue River Irvine but delayed to erosion May 21 due to Covid-19 and wildlife timing constraints B741 Coal Glen TBD Design Embankment Slip

C90-35 CG02 Craig Farm Replacement Nil – being Design Cattle Grid funded by windfarm developer A713-60-C02 Smithston Burn Masonry and scour repairs Tender Culvert F/DARV/10 Waterhaughs Replacement Works start Footbridge, Sept 2020 Darvel A735-60 C84 Lochridge Repair Design Culvert F/LUGA/10 Design

A71/190 and A71/200 River Irvine and Refurbishment Tender Riccarton Viaduct B741/50 Nith Lodge Replacement TBD Programmed Bridge U/LOG/10 Old Lugar Strengthening, masonry repairs On site – Bridge and scour protection started July 2020 Parapet Upgrades A70/70 Burnock Bridge Parapet Upgrade TBD Programmed

A713/90 Dunaskin Widening to create footway Design Bridge C125/00/C36 Spout Lynn Masonry arch refurbishment £40,000 Design/Tender Bridge, near including Stewarton upstream parapet

A735/20 Victoria Bridge, Refurbishment of parapets and £20,000 Design Kilmarnock replacement of expansion joints B743/80 Cleuch Bridge, Parapet upgrade TBD Programmed Sorn A713/70/C53 Drumgrange Pressure point arch barrel and TBD Awaiting start Bridge other masonry repairs date from contactor

APPENDIX 2: Traffic, Transportation and Road Safety Programmes 2020/21

(i) Road Safety Programme

Location Project Estimated Costs to Date Variance +/- Cost Status A713, North of Anti-skid and enhanced signage

A71/B7073 roundabout, Junction improvement Design

Beansburn at Dean Road, Kilmarnock Anti-skid and enhanced signage

Cutstraw Road, Stewarton Speed reduction measures and pedestrian facilities Preliminary Design & Consultation A70 Lugar Speed reduction measures Consultation

Barony Road, Speed Limit extension and bus stop lighting Design improvements Various locations Minor low-cost safety schemes to be implemented ongoing to deal with emerging problem locations.

(ii) Safer Neighbourhoods

Location Project Estimated Costs to Date Variance +/- Status Cost Main Street, Kilmaurs Improved Pedestrian Facilities £1,125 N/A Preliminary Design

Hayhill & Sinclairston Traffic management and footway improvements. Tender

Cowgate, Traffic calming and pedestrian improvements Habbieauld Road, Kilmaurs Speed reduction measures

Hurlford Road, Kilmarnock 30mph speed limit extension and traffic calming

(iii) Rural Route Action Plans

Location Project Estimated Costs to Date Variance +/- Status Cost B778 B778 Fenwick to Stewarton Route Study

(iv) Cycling, Walking and Safer Streets (CWSS)

Estimated Location Project Costs to Date Variance +/- Status Cost B7081 Irvine Road, Kilmarnock Installation of Puffin Crossing £7,250 N/A Preliminary Design & Consultation Grougar Road, Crookedholm localised road widening and pedestrian crossing facility Preliminary Design & Consultation Fenwick pedestrian safety measures at Fenwick Primary School

Crosshouse Phase 2 of Kilmarnock to Crosshouse Cycle Route Preliminary Design & (part funded by SPT) Consultation A719 at Loudoun Academy new Zebra or Puffin crossing facility to facilitate Safe Preliminary Design Routes to School B7038 Dean Street, Kilmarnock Installation of Puffin Crossing Works start 24/08/20

B7073 Main Road, Crookedholm Installation of Puffin Crossing £10,665 N/A Works in progress

B7073 London Road, Kilmarnock Installation of pedestrian refuge islands Contract awarded.

B743 & U719, Mauchline New footway to Hilltop path and viewing area To be programmed Various Locations New cycle and scooter parking (part funding by Sustrans)

(v) Partnership for Transport (SPT)

Estimated Location Project Costs to Date Variance +/- Status Cost Crosshouse Phase 2 of Kilmarnock to Crosshouse Cycle Route Preliminary Design & (part funded by CWSR) Consultation Kilmaurs Park & Ride facility at Yardside Road Final measure Completed