NETWORK RAIL Western and Wales Route WW 11

Total Page:16

File Type:pdf, Size:1020Kb

NETWORK RAIL Western and Wales Route WW 11 Page 1 of 223 PRIVATE AND NOT FOR PUBLICATION NETWORK RAIL Western and Wales Route Week No. WW 11 WEEKLY OPERATING NOTICE Containing SAFETY NOTICES TEMPORARY SPEED RESTRICTIONS ENGINEERING ARRANGEMENTS SIGNALLING AND PERMANENT WAY ALTERATIONS (NEW ITEMS) (DETAILS OF WORK ALREADY CARRIED OUT) GENERAL INSTRUCTIONS AND NOTICES (AMENDMENTS TO OPERATING PUBLICATIONS) (MISCELLANEOUS INSTRUCTIONS) SATURDAY 10 JUNE 2017 to FRIDAY 16 JUNE 2017 THIS NOTICE COVERS ALL LINES SHOWN IN THE WESTERN AND WALES ROUTE SECTIONAL APPENDIX If the weekly supply of this notice is not received at the normal time, application must be made to your local Manager Western and Wales Route WON 11 2017/18 Page S1 Page 2 of 223 *** Items marked thus will not appear in future issues and a note must be taken of them by all concerned A thick vertical line denotes new or amended items WESTERN AND WALES ROUTE SAFETY NOTICES NEW MEASUREMENT TRAIN (N.M.T) The N.M.T is comprised of a specially adapted High Speed Train set and operates frequently on most Main Line routes within Network Rail Routes, except Southern. Staff are to note that during movements the N.M.T emits a powerful light source which could be mistakenly identified as a binding brake or sparks being emitted from the bogies, and as such, does not require to be reported to the controlling Signaller. However, if in any doubt, then normal operating procedures should be carried out. (25/03/05 REV 17/02/10) (UFN) WARNING THE EQUIPMENT IDENTIFIED BELOW HAS BEEN ENERGISED AT 25000V AC AND MUST BE REGARDED AS LIVE AT ALL TIMES OVERHEAD LINE SYSTEM: Maidenhead Stabling Sidings Maidenhead Loop and Bourne End Branch Line on the Great Western Main Line The following equipment is being energised: New overhead line equipment on the Maidenhead Sidings Roads 1 to 6, from MLN1 24m 32ch to 24m 59ch; the Maidenhead Loop in its entirety, from MLN1 24m 3ch to 24m 51 ch; and the Bourne End Branch Line up from MLN1 25ch to WBB 24m 39ch. Group standard GE/RT8000 Module AC (AC Electrified Lines) and Company Standard NR/SP/ELP/29987 (Working on or about 25kV AC Electrified Lines) shall apply and all persons concerned shall ensure that they are supplied with a copy. There is no danger to persons providing these instructions are strictly observed. The Electrical Supply will be under the control of DIDCOT Electrical Control Room This is manned continuously and can be contacted on the following numbers British Telecom 0330 854 1051 Railway ETD 085 41051 Railway ETD 085 41050(BT Emergency 0330 854 1050) Short Code 170 Queries in connection with the energisation of the OLE extension dealt with in this notice (other than situations requiring emergency action) should be referred to the Designated Project Engineer, Contact Address:- Network Rail Section 40 (1) Dawley Road Project Office Hayes and Harlington UB3 1EH (SN1012) (30/04/17) (12) Western and Wales Route WON 11 2017/18 Page S2 Page 3 of 223 *** Items marked thus will not appear in future issues and a note must be taken of them by all concerned A thick vertical line denotes new or amended items WESTERN AND WALES ROUTE SAFETY NOTICES – Continued WARNING FROM 2200 HOURS ON SATURDAY 17JUNE 2017 THE EQUIPMENT IDENTIFIED BELOW WILL BE ENERGISED AT 25,000 VOLTS A.C. AND FROM THIS TIME MUST BE REGARDED LIVE AT ALL TIMES OVERHEAD LINE SYSTEM ON THE DOWN MAIN LINE, UP MAIN LINE AND DOWN RELIEF LINE ON THE GREAT WESTERN ROUTE The following equipment is being energized: The overhead line equipment on the Down Main Line and the Up Main Line from Reading West Junction Structure No. MLN 59/858 (37m 14ch), to Scours Lane Junction Structure No. MLN 60/854 (37m 63ch) and on the Down Relief Line from Reading West Junction Structure No. MLN 59/614 (37m 0ch) to Reading West Junction Structure No. MLN 59/849 (37m 14ch.) Group Standard GE/RT8000 Module AC (AC Electrified Lines) and Company Standard NR/SP/ELP/29987 (Working on or about 25kV A.C. Electrified Lines shall apply and all persons concerned shall ensure that they are supplied with a copy. There is no danger to persons, provided these instructions are strictly observed. The Electrical Supply will be under the control of Didcot Electrical Control that is staffed continuously and can be contacted on the following numbers British Telecom 0330 854 1051 Railway ETD 085 41051 Railway ETD Emergency Only 085 41050 Railway ETD short code 170 (SN1014 (17/06/17) (15) Page 4 of 223 Western and Wales WON 11 2017/2018 Page A-1 SECTION A - TEMPORARY SPEED RESTRICTIONS (Until further notice unless otherwise specified) Warning Boards and Indicators provided unless otherwise shown. † Indicates that the Warning Boards and Indicators will be moved as the work progresses. Where two speeds are shown for a restriction e.g 20 the Rule Book Module SP, Section 4.3, (differential speed restrictions) applies. 40 Item Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h ** REFLECTORISED WARNING BOARDS ARE APPROVED FOR USE ON ALL NETWORK RAIL LINES ** GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) T2017/ West Drayton and Down - 15 4 16 13 90 High Output Renewals 135377 Slough Main From 0300 Tue 13/06/17 Network Rail High Output (NRHO) T2017/ Slough West and - Up Main 18 45 18 16 80 Track Renewals 134062 Dolphin Jn From 0200 Mon 12/06/17 Babcock International GW105 GW1 AT UFFINGTON TO FORDGATE VIA BOX T2017/ South Marston and Down - 74 70 75 25 60 Track Renewals 134162 Highworth Jn Main From 0400 Mon 12/06/17 Babcock International T2017/ Chippenham and - Up Main 83 42 83 22 60 Track Renewals 133614 Wootton Bassett Jn From 0100 Mon 12/06/17 S&C South Alliance (Western) T2017/ Bath Spa and Bath Down - 106 75 106 78 20 Condition Of Structure 137400 Goods Main (17/10) Network Rail Maintenance (Bristol) ROUTE RUNNER TIME LOSS 0.68 MINS DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [1 MINUTE] Western and Wales WON 11 - 2017/2018 Page 5 of 223 Western and Wales WON 11 2017/2018 Page A-2 SECTION A - TEMPORARY SPEED RESTRICTIONS Item Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW4501 GW450C STOKE GIFFORD JN TO BRISTOL BULK HANDLING TERMINAL T2017/ Bristol Bulk Engine - 15 3 117 13 30 Condition Of Track 137551 Handling Terminal Release/Up From 0800 Tue and Charlton Departure/Up 13/06/17 Tunnel West Avonmouth Network Rail Dock Maintenance (Bristol) GW4501 NOT AVAILABLE TO CHECK IN ROUTE RUNNER. NO PUBLISHED TIMETABLE PLANNING RULES ALLOWANCE. GW500 GW5 A READING TO COGLOAD JN VIA WESTBURY & FROME A/LS T2016/ Hungerford and - Up 58 45 58 42 50 Condition Of Track 133915 Kintbury Westbury 70 (16/29) Network Rail Maintenance (Swindon) GW5001 GW50 B BEECHGROVE GF (INCL) TO WESTBURY SOUTH JN T2015/ Westbury North Jn All Lines - 108 75 110 38 30 Geometric - Cyclic Top 129043 and Westbury 40 (15/35) South Jn Network Rail Maintenance (Swindon) GW510 GW51 B WESTBURY NORTH JN TO BATHAMPTON JN T2015/ Westbury North Jn All Lines - 108 75 110 38 30 Geometric - Cyclic Top 129043 and Westbury 40 (15/35) South Jn Network Rail Maintenance (Swindon) T2015/ Youngs LC (UWC) Down - 3 16 3 10 30 Condition Of Track 127316 and Claverton Trowbridge 60 (15/24) Crossing Network Rail Maintenance (Bristol) ROUTE RUNNER TIME LOSS 0.72 MINS DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [1 MINUTE] T2015/ Claverton Crossing - Up 3 10 3 16 40 Condition Of Track 127924 and Youngs LC Trowbridge 70 (15/24) (UWC) Network Rail Maintenance (Bristol) ROUTE RUNNER TIME LOSS 0.45 MINS DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [1 MINUTE] Western and Wales WON 11 - 2017/2018 Page 6 of 223 Western and Wales WON 11 2017/2018 Page A-3 SECTION A - TEMPORARY SPEED RESTRICTIONS Item Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW560 GW56 B HEYWOOD ROAD JN TO FAIRWOOD JN VIA WESTBURY T2015/ Westbury North Jn All Lines - 108 75 110 38 30 Geometric - Cyclic Top 129043 and Westbury 40 (15/35) South Jn Network Rail Maintenance (Swindon) GW570 GW57 B CLINK ROAD JN TO BLATCHBRIDGE JN VIA FROME T2016/ Frome North Jn and - Up Frome 115 23 114 50 20 Condition Of Track 136232 Clink Road Jn (17/51) Network Rail Maintenance (Swindon) GW580 GW58 B EAST SOMERSET JN TO CRANMORE T2015/ East Somerset Jn Single - 0 21 2 0 20 Condition Of Track 128357 (Witham) and Cross (15/26) Cottage LC (UWC) Network Rail Maintenance (Swindon) GW700 GW70 B GLOUCESTER, BARNWOOD JN TO SEVERN TUNNEL JN T2016/ Gloucester West - Up Main 114 20 114 16 30 Condition Of Track 134173 and Gloucester (Reversible) 40 (16/31) Network Rail Maintenance (Bristol) DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [0 MINUTE] TIMETABLE PLANNING RULES ALLOWANCE [1 MINUTE] T2017/ Ley LC and Broken Down - 120 48 120 53 30 Condition Of Track 136990 Cross LC Main 90 (17/05) Network Rail Maintenance (Bristol) Condition of track ¿ Cyclic top fault NO PUBLISHED TIMETABLE PLANNING RULES ALLOWANCE ROUTE RUNNER TIME LOSS 1.1 MINS DECISION - W17-955-WC - WEEK 05 - 19/04/17 Western and Wales WON 11 - 2017/2018 Page 7 of 223 Western and Wales WON 11 2017/2018 Page A-4 SECTION A - TEMPORARY SPEED RESTRICTIONS Item Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW700 GW70 B GLOUCESTER, BARNWOOD JN TO SEVERN TUNNEL JN - Continued T2017/ Chepstow and Awre - Up Main 137 25 † 132 35 50 High Output Renewals 133752 LC (CCTV) (17/10) Network Rail High Output (Swindon) GW730 GW73 B SEVERN BRIDGE JN TO NEWPORT, MAINDEE WEST JN T2017/ Vineyard Farm No.1 - Up Main 14 70 15 0 50 Condition Of Track 137363 LC (UWC) and From 0400 Mon Llancillo Hall LC 12/06/17 (UWC) Works Delivery Wales T2017/ Llancillo Hall LC Down - 15 0 14 70 50 Condition Of Track 137364 (UWC) and Main From 0400 Mon Vineyard Farm No.1 12/06/17 LC (UWC) Works Delivery Wales GW731 ABBEY FOREGATE TO RUABON T2016/ Weston Rhyn LC All Lines - 191 56 191 60 20 Condition Of Culvert 135631 (AHB) and Chirk Until 1300 Tue Tunnel 13/06/17 Network Rail Maintenance (Shrewsbury) GW734 DOVEY JN.
Recommended publications
  • A Cardiff City Region Metro: Transform, Regenerate, Connect
    A Cardiff City Region Metro: transform, regenerate, connect by Mark Barry A Cardiff City Region Metro: transform, regenerate, connect A Cardiff City Region Metro: transform, regenerate, connect Metro Consortium The Metro Consortium is a group of stakeholders who have come together with the common aim of promoting the Metro concept as a regional regeneration project and to actively lobby for a step change in the approach to and investment in, transport across the Cardiff City Region. Membership of the consortium represents a diverse range of interests from the business community, developers, major employers, planning and transport experts who proactively liaise with Welsh Government, Regional Transport Consortia, Local Government and service providers. The core membership of the Consortium includes Capita Symonds, Cardiff Business Partnership, M&G Barry Consulting, Powell Dobson Urbanists, Institute of Welsh Affairs, Jones Lang LaSalle, British Gas, Admiral, Cardiff Business School, Capita Architects, Curzon Real Estates, Paramount Office Interiors, Wardell Armstrong and J.R. Smart. www.metroconsortium.co.uk The Cardiff Business Partnership consists of leading employers in the Capital. Its mission is to represent leading businesses in the Capital of Wales, ensuring that the views of enterprise are at the heart of the development of Cardiff as a competitive business location. The Partnership aims to identify key issues facing the capital’s economy. Through its members who represent the city’s biggest employers, the Partnership has the unique ability to go beyond advocacy to action. The Partnership also serves as a resource of expertise and creative thinking for policy makers, media and others concerned with taking forward the Cardiff and Wales economy.
    [Show full text]
  • Network Rail Response to Grand Union Trains Wales Application- 30
    OFFICIAL 30 October 2020 Gareth Clancy Head of Access and Licensing By email only Dear Gareth Grand Union Trains Section 17 Application between London and Carmarthen: Capacity and Performance Assessment I am writing in response to your letter of 16 October 2020. Network Rail has been working on assessing the Grand Union Trains Ltd (GUTL) applications in good faith. We have taken a methodical and logical progression of work to assess the applications. A timeline showing the work undertaken by Network Rail to assess the GUTL applications is in Annex 1. This demonstrates the volume of work which has been undertaken to assess the applications, as well as the considerable effort by Network Rail to assist GUTL in finding compliant proposals for train slots. It is only with the latest iteration of the proposed service specification that Network Rail and GUTL are in a position to understand which parts of the proposition can have a compliant train and platform plan; this will now allow meaningful performance modelling to be carried out. The static performance analysis conducted so far on the various GUTL applications using historic performance data shows there is a potential performance risk which is why the detailed modelling is required. The Coronavirus pandemic has significantly impacted the railway industry, with a collapse in passenger numbers, which has been sustained for several months. As service levels were reduced, there was an immediate improvement in punctuality and performance on the network. Indeed, during the early months of the pandemic, punctuality reached record levels with the proportion of trains arriving on time, to the minute, rising to 80-90% and around 95% of trains routinely arriving within 5-10 minutes of their scheduled time.
    [Show full text]
  • Route Utilisation Strategy November 2008  Foreword
    Wales Route Utilisation Strategy November 2008 2 Foreword I am delighted to present Network Rail’s Route Principally this is in south Wales, where capacity Utilisation Strategy (RUS) for Wales. This use is at its highest. This is a result of a growth covers the entire rail network in Wales, as well in the number of trains serving Cardiff and the as some parts of the network in the English building of a number of new stations. On this border counties. part of the network, in the most populous part of the country, the RUS builds on the successful This network is extensive and diverse. past introduction of more services and the There are main line links from Wales into selective growth of the network. England, a long-distance line along the border connecting north and south Wales, a busy A major programme to renew signalling urban passenger network serving Cardiff, and equipment in the Newport and Cardiff areas branches traversing sparsely populated rural will take place in the next five to seven years, areas. Some parts of the network are subject and much of the work described in this to fluctuating demand according to the time of strategy to enhance the network is planned year, most notably on the Cambrian Coast and in conjunction with this signalling work to in the Conwy Valley. increase cost-effectiveness. The High Level Output Specification (HLOS), published in The context in which this RUS has been July 2007, contained a specific requirement to produced, as has often been the case with increase seating capacity into Cardiff during other RUSs, is one of growing demand for the morning peak.
    [Show full text]
  • Great Western Route Utilisation Strategy March 2010 Foreword
    Great Western Route Utilisation Strategy March 2010 Foreword I am delighted to present the Great Western Development of this strategy has followed Route Utilisation Strategy (RUS), which sets a now well-established process. Initially, an out the strategic vision for the future of this analysis was carried out into the capacity and vital part of the rail network. As well as the capability of the existing network and train Great Western Main Line itself, the strategy services taking into account major changes covers the network north to Ashchurch and planned over the next 10 years. Future Bicester Town and south to Basingstoke, demand was then analysed with a number of Salisbury and Dorchester. “Gaps” identified and options to resolve these gaps appraised. Those which demonstrated This August will see the 175th anniversary the best value for money are included in of the Great Western Railway. Today, that the strategy. railway carries tens of millions of passengers a year through the Thames Valley, the West The dominant issue is the need to provide Country and Wales. Working closely with our sufficient capacity on peak services, train operating customers, Network Rail is specifically to and from London but also for delivering an ever improving service for those Bristol and Exeter. In the short to medium term passengers, and for freight users. the approach focuses on enabling longer trains to serve these routes, particularly through the More people are choosing to travel by train, introduction of IEP, which will increase capacity and high levels of growth are predicted through new rolling stock and an enhanced to continue, particularly around London timetable, but also through train lengthening Paddington and Bristol.
    [Show full text]
  • Magor Station - Integrated Transport Report
    Magor Station - Integrated Transport Report Christopher Waller On behalf of MAGOR 1 | 11009776 Front and rear cover images from Tom Curtis: http://tomcurtisrailgallery.weebly.com/january-2016. html 11009776 | Magor with Undy Walkway Station - Integrated Transport Report 2 Contents 1. About This Document 4 1.1 Document Outline 4 2. Introduction 4 2.1 Local Context 4 2.2 Route Description 7 2.3 Concurrent Works 7 3. Local Plan Context 9 3.1 Monmouthshire County Council’s local plan 9 4. Project History 9 4.1 Overview 9 4.2 Wales and Borders Rail 9 4.3 GRIP 1 10 4.4 GRIP 2 10 4.5 Footfall Survey 11 4.6 Census Data 13 4.7 Seven for Severnside (Accessible Transport Plan) 13 5. Rail Market Context 13 5.1 Welsh Route Study 13 5.2 Welsh Route Study Goals 14 5.3 Technical Considerations 14 6. Comparator Projects 15 6.1 Station Proposals 15 6.2 Llanharan 15 6.3 Pontyclun Station 16 7. Integrated Transport 16 7.1 Theory / Context 16 7.2 Role of Community Rail Partnerships 16 7.3 Station Demand 17 8. Station Site and Proposal 17 8.1 Overview 17 8.2 Proposed Facilities 18 9. Access Arrangements 18 9.1 Overview 18 9.2 Bus 20 9.3 Cycle 21 9.4 Demand Responsive Travel 22 9.5 Private Cars 23 9.6 Taxis and Private Hire 23 9.7 Walking 23 9.8 Community Facilities / Co-location 24 9.9 Ticket Office / co-selling 25 10. Discussion 25 10.1 General 25 11.
    [Show full text]
  • Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02
    Long Term Planning Process Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02 Foreword 03 Executive summary 04 Chapter 1 – Strategic Planning Process 06 Chapter 2 – The starting point for the Welsh Route Study 10 Chapter 3 - Consultation responses 17 Chapter 4 – Future demand for rail services - capacity and connectivity 22 Chapter 5 – Conditional Outputs - future capacity and connectivity 29 Chapter 6 – Choices for funders to 2024 49 Chapter 7 – Longer term strategy to 2043 69 Appendix A – Appraisal Results 109 Appendix B – Mapping of choices for funders to Conditional Outputs 124 Appendix C – Stakeholder aspirations 127 Appendix D – Rolling Stock characteristics 140 Appendix E – Interoperability requirements 141 Glossary 145 Foreword March 2016 Network Rail – Welsh Route Study 03 We are delighted to present this Route Study which sets out the The opportunity for the Digital Railway to address capacity strategic vision for the railway in Wales between 2019 and 2043. constraints and to improve customer experience is central to the planning approach we have adopted. It is an evidence based study that considers demand entirely within the Wales Route and also between Wales and other parts of Great This Route Study has been developed collaboratively with the Britain. railway industry, with funders and with stakeholders. We would like to thank all those involved in the exercise, which has been extensive, The railway in Wales has seen a decade of unprecedented growth, and which reflects the high level of interest in the railway in Wales. with almost 50 per cent more passenger journeys made to, from We are also grateful to the people and the organisations who took and within Wales since 2006, and our forecasts suggest that the time to respond to the Draft for Consultation published in passenger growth levels will continue to be strong during the next March 2015.
    [Show full text]
  • Printed Minutes PDF 115 KB
    MONMOUTHSHIRE COUNTY COUNCIL Minutes of the meeting of Strategic Transport Group held at County Hall, The Rhadyr, Usk, NP15 1GA on Wednesday, 7th February, 2018 at 10.00 am PRESENT: County Councillor D. Dovey (Chairman) County Councillors: A. Easson, S.B. Jones, J.Becker, and S. Woodhouse OFFICERS IN ATTENDANCE: Wendy Barnard Democratic Services Officer Roger Hoggins Head of Operations Christian Schmidt Transport Planning and Policy Officer Hywel Price Assistant Engineer Paul Keeble Traffic and Network Manager James Woodcock Business Insights Manager ALSO IN ATTENDANCE: Dick Cole David Flint Ted Hand Graeme Nelmes Paul Turner 1. Declarations of Interest No declarations of interest were made. 2. To receive the notes of the last meeting The notes of the last meeting were confirmed as an accurate record. 3. Magor Station Update (Paul Turner and Ted Hand) Paul Turner and Ted Hand reported on the meeting held with James Price, Chief Executive, Transport for Wales and Andrew Bold, Transport for Wales, to update them regarding the Magor Station campaign and GRIP studies, Severn Tunnel Junction and the Southern Line. It was emphasised that whilst the application was not in the list of successful applications, the Minister/DfT has made clear that the bid for a new station is still viable and has a strong business case; feedback overall was of encouragement to continue with the GRIP studies and not to wait for the next round before submission. Discussions also took place about the successful meeting with Network Rail, Arriva Trains and Mott Macdonald to consider the remaining stages of GRIP 3 and the announcement that Magor MONMOUTHSHIRE COUNTY COUNCIL Minutes of the meeting of Strategic Transport Group held at County Hall, The Rhadyr, Usk, NP15 1GA on Wednesday, 7th February, 2018 at 10.00 am Walkway project will be sponsored by Network Rail.
    [Show full text]
  • Business Park Newport
    CELTIC BUSINESS PARK NEWPORT The Gateway to South Wales Bristol/London M4 East Severn Bridge/ Bristol Channel Cardiff/Swansea M4 West J23a Gwent Euro Park Swansea-Paddington Mainline Wilkinsons Tesco New Llanwern Railway Station Corus Freight Line Queen’s Way Business Park Entrance Glan Llyn Residential (Proposed) Queen’s Way To Newport CGI of proposed scheme Celtic Business Park is a major new 100 acre industrial and warehousing scheme occupying a strategic location at the gateway to South Wales, 12 miles from Cardiff and 30 miles from Bristol. Junction 23a of the M4 is within 2 miles. I]ZWjh^cZhheVg`!XdbW^cZYl^i]djgVY_d^c^c\<aVcAancgZh^YZci^VahX]ZbZ l^aaWZdcZd[i]Zbdhih^\c^ÒXVcicZlanWj^aiXdbbjc^i^Zh^cLVaZhVcYV bV_dg[dXVaed^ci[dgZXdcdb^X\gdli]# L]ZcXdbeaZiZ!i]ZXdbW^cZYhX]ZbZhl^aaegdk^YZVgdjcY)!%%%cZl ]dbZhVcYdkZg&#*bhf[id[cZlZbeadnbZciheVXZ# With planning consent for B1, B2 and B8 uses, Celtic Business Park provides occupiers with excellent road and rail connectivity combined with easy access to Newport’s labour force and numerous local facilities. Delivery Hi#BdYlZc^hVWaZidYZa^kZgWj^aY^c\h[gdb '%!%%%"&#'*bhf[i&!-*."&&+!&'-hfb!l^i] XdcÒ\jgVi^dchidbZZibdYZgcY^hig^Wji^dc VcYbVcj[VXijg^c\gZfj^gZbZcih# GVe^YYZa^kZgnd[WZhed`Zhdaji^dchXVcWZ \jVgVciZZYl^i]VYZY^XViZYYZh^\cVcY egd[Zhh^dcVaiZVb^ceaVXZ# 6aaWj^aY^c\hVgZVkV^aVWaZdcVegZ"aZidg FutureFutFtuturetu ParkPk P 50m500,000 sq ft 50m andanndd Ride Rid incl 5% egZ"hVaZWVh^h!VcYl^aa]VkZi]ZWZcZÒid[ 2 Storey Offices ')]djgjhZ# Rail Access I]Zh^iZXVca^c`^cidi]ZZhiVWa^h]ZYcZildg` d[gV^a[gZ^\]ihZgk^XZhl]^X]XdccZXi
    [Show full text]
  • Parliamentary Debates (Hansard)
    Thursday Volume 671 13 February 2020 No. 27 HOUSE OF COMMONS OFFICIAL REPORT PARLIAMENTARY DEBATES (HANSARD) Thursday 13 February 2020 © Parliamentary Copyright House of Commons 2020 This publication may be reproduced under the terms of the Open Parliament licence, which is published at www.parliament.uk/site-information/copyright/. 949 13 FEBRUARY 2020 950 funding, which we will talk about in much greater detail House of Commons in the Budget and beyond, will see us work with local authorities, particularly in areas such as west Oxfordshire, Thursday 13 February 2020 to get this broadband rolled out there as quickly as possible. The House met at half-past Nine o’clock Gagan Mohindra: Does my hon. Friend agree that no business should be held back because of poor broadband infrastructure? Can he confirm that this one nation PRAYERS Conservative Government are making record investment in levelling up digital infrastructure? [MR SPEAKER in the Chair] Matt Warman: I can. The value of superfast and gigabit broadband to businesses is enormous, and it will allow the businesses of the future to power this country’s Oral Answers to Questions economy. It is the fact that those benefits can be shared so widely that makes the £5 billion Government investment so valuable. DIGITAL, CULTURE, MEDIA AND SPORT David Duguid: The percentage of residents without access to superfast broadband in Banff and Buchan has The Minister of State was asked— decreased from 18% to 16% in the last two years, but that is still far too many and nowhere near fast enough Broadband in both senses.
    [Show full text]
  • Railfuture Wales
    Issue 54 Spring 2013 Rail Wales Newsletter of the Welsh branches of Railfuture Semaphore signals at Llandudno (see page 2) More re-signalling in prospect In the last issue we referred to re-signalling and electrification in south Wales. Since then, Network Rail has announced a plan, spread over 10 years, to tackle those parts of Wales and the borders which are still controlled mainly by semaphore signalling. First up will be the north Wales line between Flint and Llandudno. The Marches line would follow (2017), and then the rest of the north Wales line (2020). Lines west of Swansea will have to wait until 2023 for modern signalling, but will benefit before then from the re-doubling of the track through Gowerton to Llanelli, and the rebuilding of the Loughor viaduct. Benefits of investment in modern signalling will include reduced operating costs and higher capacity. The former should, for example, allow Sunday trains to Llandudno all the year instead of only in summer, and the latter could make it easier to accommodate new stations on the main lines, as well as allowing increased service frequency. As to further electrification, the north Wales coast line (Crewe – Chester – Holyhead) has been receiving considerable political attention lately, the Welsh Government having ordered a ‘business case’ to be developed (which would include Wrexham to Bidston and Chester, also Chester to Warrington). It is reasonable to hope that this possibility will be allowed for in designing the resignalling (gantry heights etc.) for subsequent possible electrification. Meanwhile, another scheme affecting, but not in, Wales is commencing: re-doubling the track between Swindon and Kemble.
    [Show full text]
  • Network Rail Limited Annual Report and Accounts 2019
    Network Rail Limited Annual report and accounts 2019 NetworkNetwork Rail Limited’sLimited’s Annual Report andand AccountsAccounts 20192016 PrePresentedsented to Parliament by Theby The Secretary Secretary of Stateof State for forTransport Transport by Command of Her Majesty by Command of Her Majesty 18 July 2019 CmCP 119 9297 © Crown copyright 2019 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/ version/3 Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available on our website at www.gov.uk/government/official-documents Any enquiries regarding this publication should be sent to us at [email protected] ISBN 978-1-5286-1365-1 CCS0519271032 07/19 Printed on paper containing 75% recycled fibre content minimum Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery Office Our year in numbers In this report we outline performance during 2018/2019, the fifth and final year of Control Period 5. Here is a snapshot of how we performed against a selection of key indicators. * Before depreciation and amortisation. Revenue in the year Passenger km travelled (bn) £6,676m 68km (2017/2018: £6,580m) (2017/2018: 67km) Operating costs* Passenger trains on time £3,577m 86.3% (2017/2018: £3,192m) (2017/2018: 87.8%) Loss before tax Freight trains on time £173m 94.0% Freight Delivery Metric (2017/2018: £48m profit) (2017/2018: 93.5%) Net debt Freight moved £54.1bn 17.4bn (2017/2018: £51.3bn) (2017/2018: 16.9bn net tonne km) Number of workforce safety Capital expenditure close calls made against our target of 205,000 £7,043m 256,250 (2017/2018: £6,634m) (2017/2018: 259,009) A higher number represents a better performance.
    [Show full text]
  • Great Western Route Utilisation Strategy Draft for Consultation  Foreword
    Great Western Route Utilisation Strategy Draft for Consultation Foreword I am delighted to present the Great Western growth specifically predicted at Paddington Route Utilisation Strategy (RUS) Draft for and in the Bristol area. Consultation. This sets out a detailed strategy The key themes that have emerged through for a specific part of the rail network over the the RUS are the need for additional capacity next decade, with an indicative strategy to 2030. to handle increasing demand from both As well as the Great Western Main Line itself, passengers and freight users; the need to the document covers the network north to address performance issues on key parts of the Norton Junction and Bicester Town and south route and local connectivity for improvements in to Basingstoke, Salisbury and Dorchester. The journeys into or between key cities and regional Great Western RUS borders the areas of the centres, including to and from those outside the network covered by the South West Main Line RUS area such as Birmingham and Portsmouth. and Wales RUSs, both of which have already A number of options were identified for been published, and has a significant interface development and appraisal to address with the West Midlands and Chilterns RUS, these gaps. Options to increase the length which is currently being developed. of trains, improve service patterns or to The process that has been followed is provide additional infrastructure are proposed well-established. Essentially, this involves solutions. The recommendations from this developing a detailed understanding of the process form the basis of the strategy. current situation, incorporating the implications Three gaps will be addressed further during of committed schemes and forecasts of the consultation period, including connectivity future demand for both passenger and freight and capacity between the West Midlands and services.
    [Show full text]