Sample-BLN-A5.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Santa Fe Railway Collection – L.M
Santa Fe Railway Collection – L.M. HURLEY MANUSCRIPTS L. M. (Mike) HURLEY MANUSCRIPTS COLLECTION The Hurley Manuscripts Collection contains paper materials collected by Mike Hurley. He filed the documents in categories in a four-drawer filing cabinet. The filing cabinet is located in the southwest portion of the Archives within the area dedicated to the various collections which comprise the Santa Fe Railway Collection. The numbering system is Hurley’s. The document categories are: Amtrak and busses; baggage checks; blotters/calendars; books; classification cards; Consists of trains; correspondence of Claude Cravens; Date Nail List; depots; Dispatcher’s Sheet; Engines; Engine 1880 (in Military Park in Newton, KS); Foreign Lines; Harvey House and Dining Cars; Cyrus K. Holliday; I.D. Cards; Line Up and Progies; Lt. Wt.; Magazines; Manuscripts (Inventory of Santa Fe Records at the KHS Topeka, KS); Maps; Mergers; Morse Code; Newton History; Northern Pacific; Oil Lamps; Orders-Train; Passenger Schedules; Passes-Train; Pay Roll; Poems (Railroad); Railroad History; R.P.O.; Research Data; Retirees; Roundhouse; RX. Tower Movement; Seniority Roster; Railroad Slang; Street Cars and A.V.I. Ry; Strike; Telegrams and Line Ups; Tickets; Time Service Department; Track Warrants; Trade Marks; Union Pacific #844 and “City of Wichita”; Water Tower; Work Train Reports; and, Wrecks. FILE DRAWER 5: A-E Amtrak and Busses 1. Amtrak Tickets 25 May 1989 2. Amtrak News Article Topeka Daily Capital-Journal May 12, 1985 321. “All Aboard for Amtrak’s 20th Birthday Rocky Mountain News April 30, 1991 332. “Trains, A Part of Dodge City History, Threaten to Fade Away” Dodge City Daily Globe February 9, 1979 342. -
Light Rail and Tram Statistics, England: 2017/18
Statistical Release 28 June 2018 Light Rail and Tram Statistics, England: 2017/18 About this release This statistical release presents the latest annual information on light rail and tram systems in England during the 2017/18 covers light rail and tram use, infrastructure, revenue and passenger experience. This publication covers eight urban systems that are predominantly surface-running (see table 1 for a list of systems covered). Smaller systems, e.g. heritage railway and airport transit systems, are not included. London and Glasgow undergrounds and Edinburgh Trams are also excluded but statistics for these systems are However, outside London passenger journeys increased available online. by 2.4%. There were 267.2 million passengers journeys In this made on the eight light rail and tram systems in publication England, a 0.2% (416,000 passenger journeys) 3 passenger journeys decrease compared with the previous year. Passenger journeys 4 0.2% Concessionary journeys 6 decreased since 2009/10. since 2016/17 Vehicle mileage 7 Infrastructure 7 Despite this, passenger journeys on Blackpool Revenue 8 Tramway, Manchester Metrolink and Nottingham Express Transit increased when compared to the 45% Vehicle occupancy 9 previous year. of passenger Passenger satisfaction 9 journeys are by Docklands Contextual information 11 Almost half (45%) of journeys in 2017/18 Light Railway 12 consisted of those made on Docklands Light Background 15 Railway. RESPONSIBLE STATISTICIAN: Claire Pini AUTHOR: Fazeen Khamkar FURTHER INFORMATION: Media: 020 7944 3066 Public: 020 7944 3094 [email protected] Light Rail and Tram Factsheet Passenger journeys Concessionary journeys 15.4 passenger journeys passenger journeys passenger journeys per head 12% of all light rail passenger journeys were Passenger journeys decreased by 0.2% in 2017/18. -
Framework Capacity Statement
Framework Capacity Statement Network Rail December 2016 Network Rail Framework Capacity Statement December 2016 1 Contents 1. Purpose 1.1 Purpose 4 2. National overview 2.1 Infrastructure covered by this statement 6 2.2 Framework agreements in Great Britain 7 2.3 Capacity allocation in Great Britain 9 2.4 National capacity overview – who operates where 10 2.5 National capacity overview – who operates when 16 3. Network Rail’s Routes 3.1 Anglia Route 19 3.2 London North East & East Midlands Route 20 3.3 London North Western Route 22 3.4 Scotland Route 24 3.5 South East Route 25 3.6 Wales Routes 27 3.7 Wessex Route 28 3.8 Western Route 29 4. Sub-route and cross-route data 4.1 Strategic Routes / Strategic Route Sections 31 4.2 Constant Traffic Sections 36 Annex: consultation on alternative approaches A.1 Questions of interpretation of the requirement 39 A.2 Potential solutions 40 A.3 Questions for stakeholders 40 Network Rail Framework Capacity Statement December 2016 2 1. Purpose Network Rail Framework Capacity Statement December 2016 3 1.1 Purpose the form in which data may be presented. The contracts containing the access rights are publicly available elsewhere, and links are provided in This statement is published alongside Network Rail’s Network Statement section 2.2. However, the way in which the rights are described when in order to meet the requirements of European Commission Implementing combined on the geography of the railway network, and over time, to meet Regulation (EU) 2016/545 of 7 April 2016 on procedures and criteria the requirements of the regulation, is open to some interpretation. -
Derailment and Collision Between Coal Trains Ravenan (25Km from Muswellbrook), New South Wales, on 26 September 2018
Derailment and collision between coal trains Ravenan (25km from Muswellbrook), New South Wales, on 26 September 2018 ATSB Transport Safety Report Rail Occurrence Investigation (Defined) RO-2018-017 Final – 18 December 2020 Cover photo: Source ARTC This investigation was conducted under the Transport Safety Investigation Act 2003 (Commonwealth) by the Office of Transport Safety Investigations (NSW) on behalf of the Australian Transport Safety Bureau in accordance with the Collaboration Agreement Released in accordance with section 26 of the Transport Safety Investigation Act 2003 Publishing information Published by: Australian Transport Safety Bureau Postal address: PO Box 967, Civic Square ACT 2608 Office: 62 Northbourne Avenue Canberra, ACT 2601 Telephone: 1800 020 616, from overseas +61 2 6257 2463 Accident and incident notification: 1800 011 034 (24 hours) Email: [email protected] Website: www.atsb.gov.au © Commonwealth of Australia 2020 Ownership of intellectual property rights in this publication Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this publication is owned by the Commonwealth of Australia. Creative Commons licence With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence. Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work. The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. -
Muswellbrook to Ulan Balloon Loop
Division / Business Unit: Enterprise Services Function: Operations Interface Document Type: Route Access Standard Route Access Standard HHN Section Pages H4 - Muswellbrook to Ulan Balloon Loop Applicability ARTC Network Wide SMS Publication Requirement External Only Primary Source Document Status Version # Date Reviewed Prepared by Reviewed by Endorsed Approved 1.7 Nov 2017 Manager Stakeholders Manager GM Technical Standards Procedures Standards Development Amendment Record Amendments to the RAS are published at the following link https://www.artc.com.au/uploads/RAS_Amendments_Register.xlsx © Australian Rail Track Corporation Limited (ARTC) Disclaimer This document has been prepared by ARTC for internal use and may not be relied on by any other party without ARTC’s prior written consent. Use of this document shall be subject to the terms of the relevant contract with ARTC. ARTC and its employees shall have no liability to unauthorised users of the information for any loss, damage, cost or expense incurred or arising by reason of an unauthorised user using or relying upon the information in this document, whether caused by error, negligence, omission or misrepresentation in this document. This document is uncontrolled when printed. Authorised users of this document should visit ARTC’s intranet or extranet (www.artc.com.au) to access the latest version of this document. CONFIDENTIAL Page 1 of 10 Route Access Standard HHN Section Pages H4 - Muswellbrook to Ulan Balloon Loop Muswellbrook to Ulan Balloon Loop 1 Muswellbrook to Ulan Balloon Loop NB: These line maps are indicative only and should be reviewed in conjunction with the legend on page 3. For more detailed map information refer to the ARTC website. -
Paris: Trams Key to Multi-Modal Success
THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com JANUARY 2016 NO. 937 PARIS: TRAMS KEY TO MULTI-MODAL SUCCESS Innsbruck tramway enjoys upgrades and expansion Bombardier sells rail division stake Brussels: EUR5.2bn investment plan First UK Citylink tram-train arrives ISSN 1460-8324 £4.25 Sound Transit Swift Rail 01 Seattle ‘goes large’ A new approach for with light rail plans UK suburban lines 9 771460 832043 For booking and sponsorship opportunities please call +44 (0) 1733 367600 or visit www.mainspring.co.uk 27-28 July 2016 Conference Aston, Birmingham, UK The 11th Annual UK Light Rail Conference and exhibition brings together over 250 decision-makers for two days of open debate covering all aspects of light rail operations and development. Delegates can explore the latest industry innovation within the event’s exhibition area and examine LRT’s role in alleviating congestion in our towns and cities and its potential for driving economic growth. VVoices from the industry… “On behalf of UKTram specifically “We are really pleased to have and the industry as a whole I send “Thank you for a brilliant welcomed the conference to the my sincere thanks for such a great conference. The dinner was really city and to help to grow it over the event. Everything about it oozed enjoyable and I just wanted to thank last two years. It’s been a pleasure quality. I think that such an event you and your team for all your hard to partner with you and the team, shows any doubters that light rail work in making the event a success. -
the Swindon and Cricklade Railway
The Swindon and Cricklade Railway Construction of the Permanent Way Document No: S&CR S PW001 Issue 2 Format: Microsoft Office 2010 August 2016 SCR S PW001 Issue 2 Copy 001 Page 1 of 33 Registered charity No: 1067447 Registered in England: Company No. 3479479 Registered office: Blunsdon Station Registered Office: 29, Bath Road, Swindon SN1 4AS 1 Document Status Record Status Date Issue Prepared by Reviewed by Document owner Issue 17 June 2010 1 D.J.Randall D.Herbert Joint PW Manager Issue 01 Aug 2016 2 D.J.Randall D.Herbert / D Grigsby / S Hudson PW Manager 2 Document Distribution List Position Organisation Copy Issued To: Copy No. (yes/no) P-Way Manager S&CR Yes 1 Deputy PW Manager S&CR Yes 2 Chairman S&CR (Trust) Yes 3 H&S Manager S&CR Yes 4 Office Files S&CR Yes 5 3 Change History Version Change Details 1 to 2 Updates throughout since last release SCR S PW001 Issue 2 Copy 001 Page 2 of 33 Registered charity No: 1067447 Registered in England: Company No. 3479479 Registered office: Blunsdon Station Registered Office: 29, Bath Road, Swindon SN1 4AS Table of Contents 1 Document Status Record ....................................................................................................................................... 2 2 Document Distribution List ................................................................................................................................... 2 3 Change History ..................................................................................................................................................... -
Part 3 of the Bibliography Catalogue
Bibliography - L&NWR Society Periodicals Part 3 - Railway Magazine Registered Charity - L&NWRSociety No. 1110210 Copyright LNWR Society 2012 Title Year Volume Page Railway Magazine Photos. Junction at Craven Arms Photos. Tyne-Mersey Power. Lime Street, Diggle 138 Why and Wherefore. Soho Road station 465 Recent Work by British Express Locomotives Inc. Photo. 2-4-0 No.419 Zillah 1897 01/07 20 Some Racing Runs and Trial Trips. 1. The Race to Edinburgh 1888 - The Last Day 1897 01/07 39 What Our Railways are Doing. Presentation to F.Harrison from Guards 1897 01/07 90 What Our Railways are Doing. Trains over 50 mph 1897 01/07 90 Pertinent Paragraphs. Jubilee of 'Cornwall' 1897 01/07 94 Engine Drivers and their Duties by C.J.Bowen Cooke. Describes Rugby with photos at the 1897 01/08 113 Photo.shed. 'Queen Empress' on corridor dining train 1897 01/08 133 Some Railway Myths. Inc The Bloomers, with photo and Precedent 1897 01/08 160 Petroleum Fuel for Locomotives. Inc 0-4-0WT photo. 1897 01/08 170 What The Railways are Doing. Services to Greenore. 1897 01/08 183 Pertinent Paragraphs. 'Jubilee' class 1897 01/08 187 Pertinent Paragraphs. List of 100 mile runs without a stop 1897 01/08 190 Interview Sir F.Harrison. Gen.Manager .Inc photos F.Harrison, Lord Stalbridge,F.Ree, 1897 01/09 193 TheR.Turnbull Euston Audit Office. J.Partington Chief of Audit Dept.LNW. Inc photos. 1897 01/09 245 24 Hours at a Railway Junction. Willesden (V.L.Whitchurch) 1897 01/09 263 What The Railways are Doing. -
Alberta-To-Alaska-Railway-Pre-Feasibility-Study
Alberta to Alaska Railway Pre-Feasibility Study 2015 Table of Content Executive Summary ...................................................................................................... i Infrastructure and Operating Requirements................................................................ ii Environmental Considerations and Permitting Requirements .................................... ii Capital and Operating Cost Estimates ......................................................................... iii Business Case .............................................................................................................. iii Mineral Transportation Potential ................................................................................ iii First Nations/Tribes and Other Contacts ..................................................................... iv Conclusions .................................................................................................................. iv 1 | Introduction ........................................................................................................ 1 This Assignment............................................................................................................ 1 This Report ................................................................................................................... 2 2 | Infrastructure and Operating Requirements ........................................................ 3 Route Alignment .......................................................................................................... -
Solent Connectivity May 2020
Solent Connectivity May 2020 Continuous Modular Strategic Planning Page | 1 Page | 2 Table of Contents 1.0 Executive Summary .......................................................................................................................................... 6 2.0 The Solent CMSP Study ................................................................................................................................... 10 2.1 Scope and Geography....................................................................................................................... 10 2.2 Fit with wider rail industry strategy ................................................................................................. 11 2.3 Governance and process .................................................................................................................. 12 3.0 Context and Strategic Questions ............................................................................................................ 15 3.1 Strategic Questions .......................................................................................................................... 15 3.2 Economic context ............................................................................................................................. 16 3.3 Travel patterns and changes over time ............................................................................................ 18 3.4 Dual-city region aspirations and city to city connectivity ................................................................ -
West Midlands & Chilterns Route Study Technical Appendices
Long Term Planning Process West Midlands & Chilterns Route Study Technical Appendices August 2017 Contents August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 02 Technical Appendices 03 A1 - Midlands Rail Hub: Central Birmingham 04 elements A2 - Midlands Rail Hub: Birmingham to 11 Nottingham/Leicester elements A3 - Midlands Rail Hub: Birmingham to 17 Worcester/Hereford via Bromsgrove elements A4 - Chiltern Route 24 A5 - Birmingham to Leamington Spa via 27 Coventry A6 - Passenger capacity at stations 30 A7 - Business Case analysis 50 Technical Appendicies August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 03 Introduction to Technical Appendices Cost estimation These Technical Appendices provide the technical evidence to Cost estimates have been prepared for interventions or packages of support the conclusions and choices for funders presented in the interventions proposed in the Route Study. The estimates are based main Route Study document. The areas of technical analysis on the pre-GRIP data available, concept drawings and high level outlined in these appendices are capability analysis, concept specification of the intervention scope. To reflect the level of development (at pre-GRIP level), cost estimation, business case information available to support the estimate production, a analysis and passenger capacity analysis at stations. contingency sum of 60% has been added. The estimates do not include inflation. Indicative cost ranges have been provided based The appendices are presented by geographical area with the on this assessment. exception of the business case analysis and passenger capacity analysis. Business case analysis The areas of technical analysis are summarised below. Business case analysis has been undertaken to demonstrate to funders whether a potential investment option is affordable and Capability Analysis offers value for money. -
Guided Walks and Folk Trains in the High Peak and Hope Valley
High Peak and Hope Valley January – April 2020 Community Rail Partnership Guided Walks and Folk Trains in the High Peak and Hope Valley Welcome to this guide It contains details of Guided Walks and Folk Trains on the Hope Valley, Buxton and Glossop railway lines. These railway lines give easy access to the beautiful Peak District. Whether you fancy a great escape to the hills, or a night of musical entertainment, let the train take the strain so you can concentrate on enjoying yourself. High Peak and Hope Valley This leaflet is produced by the High Peak and Hope Valley Community Rail Partnership. Community Rail Partnership Telephone: 01629 538093 Email: [email protected] Telephone bookings for guided walks: 07590 839421 Line Information The Hope Valley Line The Buxton Line The Glossop Line Station to Station Guided Walks These Station to Station Guided Walks are organised by a non-profit group called Transpeak Walks. Everyone is welcome to join these walks. Please check out which walks are most suitable for you. Under 16s must be accompanied by an adult. It is essential to have strong footwear, appropriate clothing, and a packed lunch. Dogs on a short leash are allowed at the discretion of the walk leader. Please book your place well in advance. All walks are subject to change. Please check nearer the date. For each Saturday walk, bookings must be made by 12:00 midday on the Friday before. For more information or to book, please call 07590 839421 or book online at: www.transpeakwalks.co.uk/p/book.html Grades of walk There are three grades of walk to suit different levels of fitness: Easy Walks Are designed for families and the occasional countryside walker.