<<

FLORENCE AVENUE INTERCHANGE IMPROVEMENT PROJECT Downey City Council Chambers - December 6, 2016 I-5 between the Orange County Line and San Gabriel River Freeway (I-605)

The Golden State Freeway (I-5) is a key transportation route for moving people, goods and services throughout the state. To relieve congestion, Caltrans is improving the I-5 South corridor, between the Orange County line and San Gabriel River Freeway (I-605). The improvements include:

• High Occupancy Vehicle (HOV/carpool), General Purpose Lanes

• Interchange Improvements – Ramps, bridge widenings

• Pedestrian and Railroad Overcrossings Interstate 5 in County

Interstate 5 in Orange County

HOV

HOV

MEDIAN

SHOULDER SHOULDER SHOULDER SHOULDER

BUFFER ZONE BUFFER BUFFER ZONE BUFFER

Upon Completion

Existing Construction Progress Valley View Interchange Bridge (Completed Carmenita Road Interchange Interchange Florence Avenue Interchange Project Overview

• The Santa Ana Freeway (I-5) Florence Avenue Interchange Project will widen I-5 to add 1 HOV or carpool lane, and 1 general purpose lane in each direction

• The project extends through the cities of Downey and Santa Fe Springs to just north of I-605

• Improvements include widening structures at Florence Avenue and Orr and Day Road, shoulder widening, median barriers, new on-ramp and off-ramp designs, and reconfiguring the Florence Avenue interchange at I-5.

• The Florence Avenue overcrossing will be widened from 4 lanes to 6 lanes Florence Avenue Interchange Project Benefits

• Improve the overall traffic circulation along the I-5 corridor including interchanges, ramps and surface streets

• Enhance air quality

• Increase safety

• Accommodate future projected traffic demands and capacity

• Revitalize our I-5 community Florence Avenue Interchange Construction Facts • Project cost is $215.4 million

• Construction began February, 2015. Anticipated traffic opening is late 2019.

• Current work includes retaining wall construction, pile driving, and roadway embankment work

• Dollison Drive (between Quinn Street and southbound I-5 on- ramp) and southbound I-5 Dollison Drive have been permanently closed

• Southbound I-5 Florence Avenue on-ramp long-term closure will continue through early 2018 Florence Avenue Current Configuration Florence Avenue Construction Stage 1 – Phase 3B Florence Avenue Construction Stage 1 – Phase 4 Florence Avenue Construction Stage 2 - Phase 1 Florence Avenue Construction Stage 2 - Phase 2 Florence Avenue Final Improvement Florence Avenue – Bridge Renderings Florence Avenue – Bridge Renderings Florence Avenue – Eastbound Alternative Route Florence Avenue – Northbound Alternate Route Florence Avenue – Westbound Alternate Route Santa Fe High School Bussing System Google Map Closure Information

• Visit www.my5LA.com to check out the project Google Map for closure & detour info. How to Contact Us? Florence Avenue Interchange

Thank you.