Interstate 5 HOV Lane & Widening Project

Total Page:16

File Type:pdf, Size:1020Kb

Interstate 5 HOV Lane & Widening Project 12 I-5 South Corridor Improvement Projects California Department of Transportation Interstate 5 HOV Lane & Widening Project Rosecrans Avenue & Bloomfield Bridges FACT SHEET The Project The Santa Ana Freeway (Interstate 5) HOV/Widening and Rosecrans and Bloomfield Avenue Bridges Project extends from Shoemaker Avenue to Silverbow Avenue in Norwalk. The project will widen 1.2 miles of I-5 to add one High Occupancy Vehicle (HOV), carpool lane, and one general- purpose lane in each direction. Three bridges at Shoemaker, Rosecrans and Bloomfield avenues, and a pedestrian overcrossing at Silverbow Avenue will be reconstructed to accommodate a wider freeway. The project includes shoulder widening, concrete median barriers, new ramp designs and realignment to Firestone Boulevard frontage road. Summary The Rosecrans/Bloomfield Bridges Project is the third project to begin construction as part of the I-5 South Corridor Improvement Projects from the Los Angeles/Orange County Project Costs line to the San Gabriel River Freeway (I-605). Motorists can $214 million (M) funded by State and local resources: expect to see four construction zones for the various State Proposition 1B (2006): Corridor Mobility Improvement segments at Alondra Blvd., Carmenita Rd., Rosecrans Ave. Account: $146.9M and Imperial Highway/Pioneer Blvd. A fifth segment, the Transportation Congestion Relief Program: $.78M Florence Avenue Interchange Project will begin construction Regional Improvement Program: $10.6M by late 2013. In mid-2014, the Valley View Avenue Project is State Transportation Improvement Program: $10.4M anticipated to begin construction. Interregional Transportation Improvement Plan: $3M Metro Proposition C (Local): $42.3 M Benefits The I-5 South Corridor Improvement Projects will add Project Status capacity by widening the freeway and structures, and realign The Shoemaker Avenue Bridge was demolished in Feb- and reconstruct adjacent frontage roads. The improvements March 2013. A pile driving operation began in April for will enhance the overall traffic circulation on the 7-mile bridge reconstruction. Shoemaker Avenue, which includes corridor, thereby increasing safety and reducing congestion. the structure, will fully close for approximately one year The improvements will better accommodate future between Rosecrans Avenue and Excelsior Drive. North projected traffic demands and reduce bottleneck congestion Firestone Blvd. frontage road will fully close from just north at the Los Angeles County/Orange County line. of northbound I-5 on-ramp at Carmenita Road to the northbound I-5 off-ramp at Rosecrans. Flatiron West, Inc. is Contact the contractor for this project. Maria Raptis, Caltrans District 7 Public Affairs: 213-897-9372 I-5 Toll-free Info Line: 855-454-6335 REV. 7/31/13 www.dot.ca.gov/dist07 www.I-5info.com .
Recommended publications
  • Chapter Two General Provisions and Distribution of Court Business Appendix 2.A Maps
    SUPERIOR COURT OF CALIFORNIA COUNTY OF LOS ANGELES CHAPTER TWO GENERAL PROVISIONS AND DISTRIBUTION OF COURT BUSINESS APPENDIX 2.A MAPS Reference Local Rule 2.2 DISTRICTS AND COURT SESSION LOCATIONS Subdivision (a) Districts 2.A SUPERIOR COURT OF THE STATE OF CALIFORNIA FOR THE COUNTY OF LOS ANGELES INDEX MAP @ @ ll ,, •u I CENTRAL DISTRICT c NORTHWEST DISTRICT 3 NORTHEAST DISTRICT 4 EAST DISTRICT 5 SOUTHEAST DISTRICT 6 SOUTH DISTRICH 1 SOUTHWEST DISTRICT FOR FURTHER DETAILS ON 8 WEST DISTRICT DISTRICT BOUNDARIES CALL DEPT. OF PUBLIC WORKS 9 NORTH CENTRAL DISTRICT (626) 458 - 7035 10 SOUTH CENTRAL DISTRICT II NORTH VALLEY DISTRICT I"MrT /fAll£ r 1/SS.SI"D.CKIMIJI'"COtmr 12 NORTH OISTRICT l'f.(}T F4E t MIS.I'ACKII,fiii'·C{)IJIITJI,OT· /llr. lJAT£ I 1;·01·#.1 2.A SUPERIOR COURT OF THE STATE OF CALIFORNIA FOR THE COUNTY OF LOS ANGELES CD CENTRAL DISTRICT NORTH CENTRAL DISTRICT .... !::! ....a: Ul c .... Ul UJ ~ • -1 SOU'Uiw£ST SOUTH SOUTHEAST DISTRICT CENTRAL DISTRICT DISTRICT FOR FURTHER DETAILS ON DISTRICT BOUNOAAIES CAL DEPT. OF PUBLIC WORKS AUIT' 1/AJK I 1/U.fiiii'IU:KII.St.IP•COIIRT (626) 458- 7035 I'I.IJT nu tiiSS.P/JCKli.SIH'·CrxJHT.ff..OTI 2.A '''1.16.070 of the Los Angeles, CA County Code: Central District. The Central District hereby established shall consist of all that part of the county of Los Angeles lying within the following described boundaries: Beginning at the intersection of the west line of Section 6, Township 1 South, Range 14 West, S.B.M., with the centerline of Mulholland Drive; thence easterly along said centerline and following the same in all its various courses and curves to a line that is perpendicular to the northeasterly line of Cahuenga Boulevard West and that passes through the intersection of the southwesterly line of said Cahuenga Boulevard West with the easterly line of said Mulholland Drive; thence northeasterly along said perpendicular line to said northeasterly line of Cahuenga Boulevard West; thence northwesterly along said northeasterly line to the southeasterly line of Lot D, as shown on map filed in Case No.
    [Show full text]
  • City of La Mirada City Moves Ahead with Capital Improvement Projects Measure I to Fund Infrastructure Repairs
    City of La Mirada WINTER 2013 City Moves Ahead with Capital Improvement Projects La Mirada has received competitive bids for a number of project, which is scheduled infrastructure improvement projects set to be under construction to begin construction in by spring. 2014. In preparation for the Much of this year’s Capital Projects Budget is dedicated to freeway work, a number of addressing items in a recent engineer’s report, which identified roadway improvements are more than $67 million in needs for streets, sewers, storm drains, being completed in the area traffic signals, curbs, gutters, sidewalks, bridges, and access ramps. near the freeway. Street repairs will begin soon for portions of Alondra Boulevard, Stage Road, Trojan Way, and South Firestone Boulevard. This work is being completed with Measure R funds. Major sidewalk improvements planned for Santa Gertrudes Avenue from Lemon Drive to Rosecrans Avenue are scheduled to begin in February and be completed in April. Work includes a new meandering sidewalk, curb and gutter repairs, new curb access ramps, street tree removal, landscaping treatments, and an automatic irrigation system. Street repairs to 42 neighborhood streets throughout La Mirada are scheduled to begin in February and be completed by July. These Resurfacing work has been completed on Knott Avenue as a joint streets have been rated as being in the greatest need, according project with the City of Buena Park. Knott Avenue was among the to engineering reports. The work will include street rehabilitation, streets identified as in need of maintenance in the engineer's report. curb, gutter, and sidewalk repairs, and storm drain improvements.
    [Show full text]
  • GREAT MIXED-USE VALUE ADD OPPORTUNITY 248-256 Florence Avenue & 7200-7220 Broadway, Los Angeles, CA 90003
    GREAT MIXED-USE VALUE ADD OPPORTUNITY 248-256 Florence Avenue & 7200-7220 Broadway, Los Angeles, CA 90003 Greg Offsay Manuel Napoles-Ramirez [email protected] [email protected] BRE #01837719 BRE #01960910 17547 Ventura Blvd, Suite 304 - Encino, CA 91316 - 818.501.2212 - www.illicre.com - BRE #01834124 This information has been secured from sources we believe to be reliable, but we make no representations or warranties, expressed or implied, as to the accuracy of the information. References to square footage or age are approximate. Buyer must verify the information and bears all risk for any inaccuracies. GREAT MIXED-USE VALUE ADD OPPORTUNITY 248-256 Florence Avenue & 7200-7220 Broadway, Los Angeles, CA 90003 The information contained in the following Marketing Brochure is proprietary and strictly confidential. It is intended to be reviewed only by the party receiving it from illi Commercial Real Estate and should not be made available to any other person or entity without the written consent of illi Commercial Real Estate. This Marketing Brochure has been prepared to provide summary, unverified information to prospective purchasers, and to establish only a preliminary level of interest in the subject property. The information contained herein is not a substitute for a thorough due diligence investigation. illi Commercial Real Estate has not made any investigation, and makes no warranty or representation, with respect to the income or expenses for the subject property, the future projected financial performance of the property, the size and square footage of the property and improvements, the presence or absence of contaminating substances, PCB's or asbestos, the compliance with State and Federal regulations, the physical condition of the improvements thereon, or the financial condition or business prospects of any tenant, or any tenant’s plans or intentions to continue its occupancy of the subject property.
    [Show full text]
  • Appendix L: Design Guidelines: I-5 NCC Project
    Appendix L: Design Guidelines: I-5 NCC Project Appendix L: Design Guidelines: I-5 NCC Project I-5 North Coast Corridor Project Final EIR/EIS page L-1 Appendix L: Design Guidelines: I-5 NCC Project I-5 North Coast Corridor Project Final EIR/EIS page L-2 Design Guidelines Interstate 5 North Coast Corridor Project September 2013 Prepared by: Caltrans District 11 | T.Y. Lin International | Safdie Rabines Architects | Estrada Land Planning Interstate 5 North Coast Corridor Project – Design Guidelines Design Guidelines Interstate 5 North Coast Corridor Project Prepared by: Caltrans District 11 4050 Taylor Street San Diego, CA 92110 T.Y. Lin International 404 Camino del Rio South, Suite 700 San Diego, CA 92108 | 619.692.1920 Safdie Rabines Architects 925 Ft. Stockton Drive San Diego, CA 92123 | 619.297.6153 Estrada Land Planning 755 Broadway Circle, Suite 300 San Diego, CA 92101 | 619.236.0143 Interstate 5 North Coast Corridor Project – Design Guidelines Interstate 5 North Coast Corridor Project – Design Guidelines Table of Contents Design Guidelines Interstate 5 North Coast Corridor Project Table of Contents I. Project Background D. Design Themes....................17 vi. Typical Freeway Undercrossing. 36 vii. Typical Bridge Details. 37 A. Introduction....................1 i. Corridor Theme Elements. 17 ii. Corridor Theme Priorities. 19 - Southern Bluff Theme....................38 B. Purpose.......................1 - Coastal Mesa Theme.....................39 iii. Corridor Theme Units. 20 C. Components & Products. 1 - Northern Urban Theme. 40 - Southern Bluff Theme....................21 D. The Proposed Project. 2 - Coastal Mesa Theme.....................22 B. Walls.............................41 E. Previous Relevant Documents. 3 - Northern Urban Theme. 23 i. Theme Unit Specific Wall Concepts.
    [Show full text]
  • Route Map 5 Ä H339 Æ
    ASTORIA Oregon Department of Transportation Warrenton H104 Svensen Approved routes for Mayger 30 Westport ¤£ Clatskanie Æ 101 Olney Ä Rainier ¤£ H105 Triples Combinations. Æ Gearhart C L A T S O PÄ 47 Prescott SEASIDE Goble H332 202 Mist 73300 Movement is authorized 395 Umapine Necanicum Cold ¤£2 Jewell ¤£ Springs Jct. C O L U M B I A Æ Ä MP 9.76 Umatilla Jct. Milton-Freewater Flora Ä Æ Æ Cannon Beach Route Map 5 Ä H339 Æ H103 Pittsburg Irrigon Ä only under authority of an Columbia City Æ Over-Dimension Permit Unit Ä Elsie 47 730 Holdman 53 ST. HELENS ¤£ Helix 11 Vernonia Boardman 0 207 26 7 30 82 Athena Æ ¤£ Ä Over-Dimension Permit. ¤£ Revised March 2020 HERMISTON 3 ¨¦§ H Heppner Jct. Æ Ä H334 Weston Scappoose Stanfield 3 Nehalem 3 Adams 204 Manzanita HOOD Permission not granted to 5 RIVER cross RR crossing at MP 102.40 30 37 Æ 84 30 Echo Ä Wheeler Buxton £ in Hood River 84 ¤£ Arlington H W A L L O W A ¤ 3 Cascade ¨¦§ Biggs § MP 13.22 ¨¦ 26 Locks Jct. Rufus 3 Æ Rockaway Celilo Blalock Ä H320 1 Æ T I L L A M O O K ¤£ Mosier Ä 82 Beach Banks North H281 PENDLETON Plains PORTLAND Æ Ä Minam Imnaha Odell Wallowa Æ Ä 74 Garibaldi Wasco 207 W A S H I N G T O N The Elgin . Bay City Troutdale Multnomah Æ CorneliusÄ Fairview Dalles t Forest HILLSBORO H O O D H282 206 i 6 Grove Falls G I L L I A M Wood 84 Oceanside Beaverton R I V E R U M A T I L L A Summerville m H131 Village Ione r 8 ¨¦§ Lostine Æ Parkdale 197 Ä Gresham Moro 0 e Tillamook M U L T N O M A H MP 83.00 ¤£ 30 Imbler 5 Netarts ENTERPRISE Æ Ä Pilot 3 Æ Ä £ Æ Ä ¤ p Æ Ä Rock H Gaston Tigard
    [Show full text]
  • Last Link of I-90 Ends 30-Year Saga by Peggy Reynolds, Seattle Times, 9 Sept 1993
    Last Link Of I-90 Ends 30-Year Saga By Peggy Reynolds, Seattle Times, 9 Sept 1993 Erica Clibborn's red convertible will be one of the first cars Sunday across the new Lacey V. Murrow Floating Bridge, last link in a project that started before Erica was born. The University of Washington junior, who will be going home to Mercer Island for Sunday dinner, was born in 1973, the year a federal court sent the Seattle-area stretch of Interstate 90 back to square one. By then, I-90 already reached most of the 3,063 miles from Boston to south Bellevue, and the final major segment had been in the works for 10 years. It would be another 20 years before that last 7 miles would be finished. That completion will be marked this weekend with an array of public events, and Clibborn and other drivers should be able to go across the eastbound span by 5 p.m. Sunday. That opening means that I-90 survived the anti-government sentiment of the late 1960s, the mass-transit worship of the '70s and the budget cutbacks of the '80s - even while other urban interstate projects were biting the dust in New York, Chicago, Baltimore, Philadelphia, Washington, San Francisco and Portland. Nevertheless, whether or not I-90 was really needed was subject to debate at all levels. It attracted a formidable enemies list, and was rescued regularly by a cast of hundreds. Without any one of its friends in local governments, on the state Transportation Commission, in the Legislature and in Congress, I-90 could have ended in south Bellevue instead of making it to its junction with Interstate 5 in Seattle.
    [Show full text]
  • I-90 Tolling Update
    I-90 Tolling Update John White Director of Tolled Corridors Development Paula Hammond Steve Reinmuth Secretary of Transportation Chief of Staff Seattle City Council January 28, 2012 I-90 is part of the Cross-Lake Washington Corridor • Represents two major east-west “Cross- Lake” travel corridors: I-90 and SR 520. • WSDOT is tolling SR 520 as part of a multi- faceted financing strategy to help generate enough revenue to fund replacement of the structurally-vulnerable bridge. • A new 520 bridge will give Cross-Lake WA travelers a safer, more reliable trip. 2 Funding for the SR 520 Program Construction Unfunded Program cost estimate (Oct. 2012): $4.13 billion What’s funded: $2.72 billion (includes sales tax deferral) • Pontoon construction in Grays Harbor. • The floating bridge and landings. • Eastside transit and HOV improvements. • The north half of the west approach bridge. Updated November 2012 Costs and Funding for Replacing SR 520 Bridge SR 520 program cost estimate $4.128 B Funding received to date $2.724 B State and local funding (Nickel and TPA) $0.55 B Federal funding $0.12 B SR 520 Account (tolling and future federal funds) $1.91 B Toll proceeds • TIFIA $300M • Triple pledge bonds $550M • First tier toll $159M • PAYGO $74M Federal proceeds • GARVEE $825M Deferred sales tax $0.14 B Unfunded need $1.404 B Program cost estimate based on 2012 CEVP - updated 10/25/12 4 Early Indicators of 520 Toll Success • Meeting or beating traffic forecasts. • Meeting revenue forecasts. • Most people are paying with Good To Go! accounts. – More than 384,000 active Good To Go! accounts.
    [Show full text]
  • I-15 Corridor System Master Plan Update 2017
    CALIFORNIA NEVADA ARIZONA UTAH I-15 CORRIDOR SYSTEM MASTER PLAN UPDATE 2017 MARCH 2017 ACKNOWLEDGEMENTS The I-15 Corridor System Master Plan (Master Plan) is a commerce, port authorities, departments of aviation, freight product of the hard work and commitment of each of the and passenger rail authorities, freight transportation services, I-15 Mobility Alliance (Alliance) partner organizations and providers of public transportation services, environmental their dedicated staff. and natural resource agencies, and others. Individuals within the four states and beyond are investing Their efforts are a testament of outstanding partnership and their time and resources to keep this economic artery a true spirit of collaboration, without which this Master Plan of the West flowing. The Alliance partners come from could not have succeeded. state and local transportation agencies, local and interstate I-15 MOBILITY ALLIANCE PARTNERS American Magline Group City of Orem Authority Amtrak City of Provo Millard County Arizona Commerce Authority City of Rancho Cucamonga Mohave County Arizona Department of Transportation City of South Salt Lake Mountainland Association of Arizona Game and Fish Department City of St. George Governments Bear River Association of Governments Clark County Department of Aviation National Park Service - Lake Mead National Recreation Area BNSF Railway Clark County Public Works Nellis Air Force Base Box Elder County Community Planners Advisory Nevada Army National Guard Brookings Mountain West Committee on Transportation County
    [Show full text]
  • 8022 E. Florence Ave. DOWNEY, CA 92040 PROPERTY HIGHLIGHTS
    FOR LEASE OR 8,239 SF FREESTANDING RETAIL GROUND LEASE 8022 E. Florence Ave. DOWNEY, CA 92040 PROPERTY HIGHLIGHTS 8,239 SF freestanding retail building for lease or entire 23,310 SF lot for ground lease with drive- CONCEPTUAL SITE PLAN thru potential 35 designated parking stalls onsite Highly visible location on Florence Avenue, a key thoroughfare in Downey with over 40,000 CPD Strategic location in busy downtown trade area Strong demographics with over 239,537 residents, average household income of $79,266, and 65,636 households within 3 miles AERIAL VIEW N PARAMOUNT BOULEVARD 32,000+ CPD KYOTO SUSHI LOS SOMBREROS 40,000+ CPD RESTAURANT LAS PALMAS 8022 E. Florence Ave FRUIT MARKET FLORENCE AVENUE LAS PALMAS SUPPER CLUB WESTERN AVENUE 375910 DEMOGRAPHICS (2019) 1-Mile 3-Miles 5-Miles Population 28,721 239,537 780,341 Daytime Population 27,479 251,433 770,305 Households 8,894 65,636 204,105 Average Household Income $96,679 $79,266 $72,159 E VALL E 3RD ST VALLEY BLVD E 16TH ST E EAST LOS ANGELES Y B N UV60 UV60 LVD N LINCOLN AVE W BEVERLY BLVD UV19 LA PUENTE EXPOSITION BLVD 5 ARLINGTON AVE AVE E JEFFERSON BLVD BROADWAY PL TELEGRAPH RD E GALE AVE E OLYMPIC BLVD MONTEBELLO WILCOX AVE W MARTIN LUTHER KING JR BLVD MATEO ST MATEO ST N POPLAR AVE S ALAMEDA ST E WASHINGTON BLVD E VERNON AVE BANDINI BLVD DR LEONIS BLVD O SAN PEDRO PL DISTRICT BLVD T SOTO ST SOTO ST 72 UV LECI W 54TH ST S FIGUEROA ST FIGUEROA ST VALVALLECITO DR SLAUSON AVE WASHINGTON BLVD HACIENDA SLAUSON AVE PASSONS BLVD HEIGHTS MAYWOOD AVE MAYWOOD AVE PICO W GAGE AVE NORWALK BLVD
    [Show full text]
  • Inglewood Basketball & Entertainment
    INGLEWOOD BASKETBALL & ENTERTAINMENT CENTER PROJECT- INTERSECTION LIST- EVENT DAY Count Company Index ID# Intersection Day Count Date Time Period Completed Day Count Date Time Period Completed 1 1 Concourse Way & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 2 2 la Cienega Boulevard & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 3 3/3b 1-405 NB off-ramp & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 4 4 Felton Avenue & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 5 5 Inglewood Avenue & Century Boulevard Friday 4/27 /2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 6 6 Firmona Avenue & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 7 7 Grevillea Avenue & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 8 8 la Brea Avenue/Hawthorne Boulevard & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 9 9 Club Drive & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 10 10 11th Avenue/Village Drive & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 11 11 Crenshaw Boulevard & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 12 12 5th Avenue & Century
    [Show full text]
  • Idaho Transpo Rtation De Partm
    IDAHO TRANSPORTATION DEPARTMENT TRANSPORTATION IDAHO RP 226 Assessing Feasibility of Mitigating Barn Owl-Vehicle Collisions in Southern RESEARCH REPORT RESEARCH Idaho By Jim Belthoff, Erin Arnold, Tempe Regan Boise State University Tiffany Allen, Angela Kociolek Western Transportation Institute Prepared for Idaho Transportation Department Research Program, Contracting Services Division of Engineering Services http://itd.idaho.gov/highways/research/ November 2015 Standard Disclaimer This document is disseminated under the sponsorship of the Idaho Transportation Department and the United States Department of Transportation in the interest of information exchange. The State of Idaho and the United States Government assume no liability of its contents or use thereof. The contents of this report reflect the view of the authors, who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official policies of the Idaho Transportation Department or the United States Department of Transportation. The State of Idaho and the United States Government do not endorse products or manufacturers. Trademarks or manufacturers’ names appear herein only because they are considered essential to the object of this document. This report does not constitute a standard, specification or regulation. 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA-ID-15-226 4. Title and Subtitle 5. Report Date Assessing feasibility of mitigating barn owl-vehicle collisions in southern Idaho December 2015 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Jim Belthoff, Erin Arnold, Tempe Regan, Tiffany Allen, and Angela Kociolek 9. Performing Organization Name and Address 10. Work Unit No.
    [Show full text]
  • Interstate 5 Corridor Improvements
    Soundwall construction on northbound I-5, Santa Fe Springs, CA. New abutment for the Alondra Blvd. Bridge in Santa Fe Springs. Construction for the new southbound I-5 o-ramp at Imperial Hwy./Pioneer Blvd. in Norwalk. About the Santa Ana Freeway The Interstate 5 Corridor (Interstate 5) South Corridor Interstate 5 Improvement Projects OF TRAN T SP Improvement Projects EN O Interstate 5 in California is a vital north/south artery R M T T A R T A I O P for the travelling public and it is one of the state’s most E N D Six I-5 South Corridor Improvement Projects, extending U A heavily-used corridors to move goods and services N I C T I Corridor E R 6.7 miles between the Los Angeles County/Orange D E M ST A between the borders of Mexico and Canada. County line to the San Gabriel River Freeway (Interstate ATES OF 605), are identied by their location at Valley View Avenue, Improvements The California Department of Transportation (Caltrans) Alondra Boulevard, Carmenita Road, Rosecrans Avenue, District 7, serving Los Angeles and Ventura counties, Imperial Highway and Florence Avenue in the cities of I-5 Corridor Improvement Partners and its regional partners, the Los Angeles County La Mirada, Santa Fe Springs, Norwalk and Downey. South Los Angeles County Metropolitan Transportation Authority (Metro) and the Federal Highway Administration (FHWA), are A $1.6 billion investment on the Santa Ana Freeway investing approximately $3 billion in several Interstate includes widening the roadway to add one High I-5 HOV/Florence Avenue Interchange 5 Corridor Improvement Projects, funded through a Occupancy Vehicle (HOV), or carpool lane, and one combination of federal, state and local resources.
    [Show full text]