Interstate 5 Corridor Improvements

Total Page:16

File Type:pdf, Size:1020Kb

Interstate 5 Corridor Improvements Soundwall construction on northbound I-5, Santa Fe Springs, CA. New abutment for the Alondra Blvd. Bridge in Santa Fe Springs. Construction for the new southbound I-5 o-ramp at Imperial Hwy./Pioneer Blvd. in Norwalk. About the Santa Ana Freeway The Interstate 5 Corridor (Interstate 5) South Corridor Interstate 5 Improvement Projects OF TRAN T SP Improvement Projects EN O Interstate 5 in California is a vital north/south artery R M T T A R T A I O P for the travelling public and it is one of the state’s most E N D Six I-5 South Corridor Improvement Projects, extending U A heavily-used corridors to move goods and services N I C T I Corridor E R 6.7 miles between the Los Angeles County/Orange D E M ST A between the borders of Mexico and Canada. County line to the San Gabriel River Freeway (Interstate ATES OF 605), are identied by their location at Valley View Avenue, Improvements The California Department of Transportation (Caltrans) Alondra Boulevard, Carmenita Road, Rosecrans Avenue, District 7, serving Los Angeles and Ventura counties, Imperial Highway and Florence Avenue in the cities of I-5 Corridor Improvement Partners and its regional partners, the Los Angeles County La Mirada, Santa Fe Springs, Norwalk and Downey. South Los Angeles County Metropolitan Transportation Authority (Metro) and the Federal Highway Administration (FHWA), are A $1.6 billion investment on the Santa Ana Freeway investing approximately $3 billion in several Interstate includes widening the roadway to add one High I-5 HOV/Florence Avenue Interchange 5 Corridor Improvement Projects, funded through a Occupancy Vehicle (HOV), or carpool lane, and one combination of federal, state and local resources. general purpose lane, constructing concrete center I-5 HOV/Imperial Highway and Pioneer Boulevard median barriers, widening shoulders and many other I-5 HOV/Rosecrans Avenue and The I-5 Corridor Improvement Projects are safety features. Interchanges, bridges, ramps, a Updated September 2013 Downey Bloomeld Avenue Bridges distinguished by two segments: the Golden State pedestrian overcrossing, soundwalls and adjacent Freeway (I-5 North Corridor Projects) in northern Santa Fe I-5 HOV/Carmenita Road Interchange Los Angeles County and the Santa Ana Freeway (I-5 frontage roads will be constructed, reconstructed or Springs modied. A total of 22 structures will be reconstructed, I-5 HOV/Alondra Boulevard Bridge South Corridor Projects) in southern Los Angeles County. relocated or upgraded. Norwalk I-5 HOV/Valley View Avenue Bridge Caltrans began construction on the I-5 North Corridor The I-5 South Corridor in Los Angeles County will be Projects in early 2011 and has completed four of the widened from the existing three or four general purpose 11 projects in northern Los Angeles County between lanes to 10 lanes --- four lanes, plus one HOV lane in each State Route 134 and the Kern County line. Five more direction. Once completed, these improvements will projects are currently underway on the I-5 North Corridor. relieve current and future congestion, improve trac ow and air quality, reduce freeway noise and encourage In late 2011, the rst of six I-5 South Corridor Projects ridesharing. Motorists will experience an easier, smoother began construction. Today, four consecutive segments and less congested transition at the Los Angeles County/ are in construction on I-5 in the cities of Norwalk and Orange County line. Santa Fe Springs and the nal two segments will begin in early to mid-2014. Today, four consecutive segments are in construction: the Carmenita Road Interchange Project, the Alondra Between 2016 and 2017 throughout the I-5 North and Boulevard Bridge Project, the Rosecrans/Bloomeld/ South Corridors, various project segments from the Los Shoemaker Bridges Project, and the Imperial Highway/ Angeles County/Orange County line to north of State Pioneer Boulevard Project. The Florence Avenue Route 126 will complete construction. Interchange Project will begin construction in early 2014 For more information about the I-5 Corridor and the nal segment, the Valley View Avenue Improvement Projects in Los Angeles County, please Interchange Project is scheduled to begin construction visit www.I-5info.com or call the toll-free information in mid-2014. line at 855-454-6335. Column construction for the new Shoemaker Ave. Bridge in Norwalk. TOLL-FREE INFO LINE: I-5 South Corridor WEBSITE: (855) 454-6335 I-5info.com Improvement Projects Weekdays, 8 a.m.-8 p.m. hablamos Weekends,12 p.m.-2 p.m. español! All six I-5 South Corridor Improvement Projects include IN CONSTRUCTION freeway widening to accommodate one HOV, or carpool Project: I-5 HOV/Rosecrans Avenue and Bloomeld Avenue Bridges lane, and one general purpose lane. Other improvements include ramp, bridge and interchange reconstruction and Location: From Shoemaker Avenue to Silverbow Avenue reconguration, shoulder widening, concrete median Improvement: Widen freeway to add one HOV lane and one general purpose lane in each direction, barriers and other safety enhancements. widen and reconstruct structures at Shoemaker Avenue, Rosecrans Avenue, Bloomeld Avenue, construct a pedestrian overcrossing at Silverbow Avenue, recongure the Once completed, the I-5 South Corridor Improvement O rr and D ramps at Rosecrans Avenue, upgrade and realign Firestone Boulevard frontage road. Projects will benet the motoring public and the surrounding F Schedule: Construction Start: late 2012 communities of Downey, Norwalk, Santa Fe Springs and La lorenc e A a Completion: mid-2016 Mirada by reducing trac congestion, improving trac ow v y Rd e Cost: $214 million and air quality, enhancing safety and promoting carpooling. N Bloomeld Ave Shoema P o ioneer r Downey w COMING SOON alk IN CONSTRUCTION k B B er l l Project: I-5 HOV/Florence Avenue Interchange v v d Project: I-5 HOV/Carmenita Road Interchange A er d iv v Cecilia St e Location: From Orr and Day Road overcrossing to the iel R ail Location: North of Alondra Boulevard to Shoemaker Avenue r Santa Fe abr I-605 bridge id T North Fork Improvement: Widen freeway to add one HOV lane and one general purpose lane in M an G Coyote Creek Springs Improvement: Widen freeway to add one HOV lane and S each direction, reconstruct the Carmenita Road Bridge as a 10-lane O Ma one general purpose lane in each direction, Imperial Hwy rr and D Silverbow structure with tight diamond ramps, realign and upgrade Freeway r widen structures at Florence Avenue and Ave qua Drive and Firestone Boulevard frontage roads. C armenita Rd r dt Schedule: Construction Start: late 2011 Orr and Day Road, and recongure the a y Rd r A Florence Avenue Interchange. D v Completion: late 2015 Firestone Blvd e nio to Cost: $380 million Schedule: Construction Start: early 2014 n A n a Completion: late 2016 S Rosecrans Ave Firestone Blvd Cost: $198 million Bloomeld Ave IN CONSTRUCTION V alley Sh Project: I-5 HOV/Alondra Boulevard Bridge o ema IN CONSTRUCTION V Norwalk iew Location: From North Fork Coyote Creek to Marquardt Avenue k Freeway Dr Project: I-5 HOV/Imperial Highway and Pioneer Boulevard er Firestone Blvd A La Mirada A Improvement: Widen freeway to add one HOV lane and one general v v e Location: From Silverbow Avenue to Orr and Day Road e Alondra Blvd purpose lane in each direction, reconstruct structures at Ma Improvement: Widen freeway to add one HOV lane and one general purpose lane in each direction, Alondra Boulevard, Coyote Creek and North Fork Coyote r widen and reconstruct bridges at San Antonio Drive, Imperial Highway and Pioneer qua Creek, realign and upgrade Freeway Drive and Firestone widen and reconstruct bridges at San Antonio Drive, Imperial Highway and Pioneer Firestone Blvd r Boulevard frontage roads. dt Coyote Boulevard, and construct a new southbound I-5 o-ramp at Imperial Highway. Firestone Blvd A Creek Schedule: Construction Start: early 2012 v Schedule: Construction Start: early 2013 e Cerritos Completion: mid-2015 Completion: late 2016 Cost: $110 million Cost: $302 million Artesia Blvd ty oun Project: I-5 HOV/Valley View Avenue Interchange ngeles C ty CoyoteBikeway Creek Los A oun Location: From Artesia Boulevard to North Fork Coyote Creek Orange C Improvement: Widen freeway to add one HOV lane and one general purpose lane in each direction, 91 reconstruct the interchange and bridges at Valley View Avenue, Artesia Boulevard, and Coyote Creek, and realign Firestone Boulevard frontage road. NORTH Schedule: Construction Start: mid-2014 Completion: 2017 Note: Cost and schedule are approximate. This map is not to scale. Cost: $416 million.
Recommended publications
  • Chapter Two General Provisions and Distribution of Court Business Appendix 2.A Maps
    SUPERIOR COURT OF CALIFORNIA COUNTY OF LOS ANGELES CHAPTER TWO GENERAL PROVISIONS AND DISTRIBUTION OF COURT BUSINESS APPENDIX 2.A MAPS Reference Local Rule 2.2 DISTRICTS AND COURT SESSION LOCATIONS Subdivision (a) Districts 2.A SUPERIOR COURT OF THE STATE OF CALIFORNIA FOR THE COUNTY OF LOS ANGELES INDEX MAP @ @ ll ,, •u I CENTRAL DISTRICT c NORTHWEST DISTRICT 3 NORTHEAST DISTRICT 4 EAST DISTRICT 5 SOUTHEAST DISTRICT 6 SOUTH DISTRICH 1 SOUTHWEST DISTRICT FOR FURTHER DETAILS ON 8 WEST DISTRICT DISTRICT BOUNDARIES CALL DEPT. OF PUBLIC WORKS 9 NORTH CENTRAL DISTRICT (626) 458 - 7035 10 SOUTH CENTRAL DISTRICT II NORTH VALLEY DISTRICT I"MrT /fAll£ r 1/SS.SI"D.CKIMIJI'"COtmr 12 NORTH OISTRICT l'f.(}T F4E t MIS.I'ACKII,fiii'·C{)IJIITJI,OT· /llr. lJAT£ I 1;·01·#.1 2.A SUPERIOR COURT OF THE STATE OF CALIFORNIA FOR THE COUNTY OF LOS ANGELES CD CENTRAL DISTRICT NORTH CENTRAL DISTRICT .... !::! ....a: Ul c .... Ul UJ ~ • -1 SOU'Uiw£ST SOUTH SOUTHEAST DISTRICT CENTRAL DISTRICT DISTRICT FOR FURTHER DETAILS ON DISTRICT BOUNOAAIES CAL DEPT. OF PUBLIC WORKS AUIT' 1/AJK I 1/U.fiiii'IU:KII.St.IP•COIIRT (626) 458- 7035 I'I.IJT nu tiiSS.P/JCKli.SIH'·CrxJHT.ff..OTI 2.A '''1.16.070 of the Los Angeles, CA County Code: Central District. The Central District hereby established shall consist of all that part of the county of Los Angeles lying within the following described boundaries: Beginning at the intersection of the west line of Section 6, Township 1 South, Range 14 West, S.B.M., with the centerline of Mulholland Drive; thence easterly along said centerline and following the same in all its various courses and curves to a line that is perpendicular to the northeasterly line of Cahuenga Boulevard West and that passes through the intersection of the southwesterly line of said Cahuenga Boulevard West with the easterly line of said Mulholland Drive; thence northeasterly along said perpendicular line to said northeasterly line of Cahuenga Boulevard West; thence northwesterly along said northeasterly line to the southeasterly line of Lot D, as shown on map filed in Case No.
    [Show full text]
  • City of La Mirada City Moves Ahead with Capital Improvement Projects Measure I to Fund Infrastructure Repairs
    City of La Mirada WINTER 2013 City Moves Ahead with Capital Improvement Projects La Mirada has received competitive bids for a number of project, which is scheduled infrastructure improvement projects set to be under construction to begin construction in by spring. 2014. In preparation for the Much of this year’s Capital Projects Budget is dedicated to freeway work, a number of addressing items in a recent engineer’s report, which identified roadway improvements are more than $67 million in needs for streets, sewers, storm drains, being completed in the area traffic signals, curbs, gutters, sidewalks, bridges, and access ramps. near the freeway. Street repairs will begin soon for portions of Alondra Boulevard, Stage Road, Trojan Way, and South Firestone Boulevard. This work is being completed with Measure R funds. Major sidewalk improvements planned for Santa Gertrudes Avenue from Lemon Drive to Rosecrans Avenue are scheduled to begin in February and be completed in April. Work includes a new meandering sidewalk, curb and gutter repairs, new curb access ramps, street tree removal, landscaping treatments, and an automatic irrigation system. Street repairs to 42 neighborhood streets throughout La Mirada are scheduled to begin in February and be completed by July. These Resurfacing work has been completed on Knott Avenue as a joint streets have been rated as being in the greatest need, according project with the City of Buena Park. Knott Avenue was among the to engineering reports. The work will include street rehabilitation, streets identified as in need of maintenance in the engineer's report. curb, gutter, and sidewalk repairs, and storm drain improvements.
    [Show full text]
  • GREAT MIXED-USE VALUE ADD OPPORTUNITY 248-256 Florence Avenue & 7200-7220 Broadway, Los Angeles, CA 90003
    GREAT MIXED-USE VALUE ADD OPPORTUNITY 248-256 Florence Avenue & 7200-7220 Broadway, Los Angeles, CA 90003 Greg Offsay Manuel Napoles-Ramirez [email protected] [email protected] BRE #01837719 BRE #01960910 17547 Ventura Blvd, Suite 304 - Encino, CA 91316 - 818.501.2212 - www.illicre.com - BRE #01834124 This information has been secured from sources we believe to be reliable, but we make no representations or warranties, expressed or implied, as to the accuracy of the information. References to square footage or age are approximate. Buyer must verify the information and bears all risk for any inaccuracies. GREAT MIXED-USE VALUE ADD OPPORTUNITY 248-256 Florence Avenue & 7200-7220 Broadway, Los Angeles, CA 90003 The information contained in the following Marketing Brochure is proprietary and strictly confidential. It is intended to be reviewed only by the party receiving it from illi Commercial Real Estate and should not be made available to any other person or entity without the written consent of illi Commercial Real Estate. This Marketing Brochure has been prepared to provide summary, unverified information to prospective purchasers, and to establish only a preliminary level of interest in the subject property. The information contained herein is not a substitute for a thorough due diligence investigation. illi Commercial Real Estate has not made any investigation, and makes no warranty or representation, with respect to the income or expenses for the subject property, the future projected financial performance of the property, the size and square footage of the property and improvements, the presence or absence of contaminating substances, PCB's or asbestos, the compliance with State and Federal regulations, the physical condition of the improvements thereon, or the financial condition or business prospects of any tenant, or any tenant’s plans or intentions to continue its occupancy of the subject property.
    [Show full text]
  • EPA SPCC Tier I Template Instructions for Farms
    SPCC 40 CFR Part 112 Tier I Template Instructions (for farms) Insert Instructor Names Insert HQ Office/Region Insert Date Today’s Agenda I. SPCC/Qualified Facility Applicability II. Tier I Qualified Facility SPCC Plan Template III. Questions and Answers Part I: SPCC/ Qualified Facility Applicability Is the facility or part of the facility (e.g., complex) considered non- NO transportation-related? YES Is the facility engaged in drilling, producing, gathering, storing, NO processing, refining, transferring, distributing, using, or consuming oil? YES The facility is Could the facility reasonably be expected to discharge oil in quantities NO not subject that may be harmful into navigable waters or adjoining shorelines? to SPCC Rule YES Is the total aggregate capacity of completely buried storage greater than Is the total aggregate capacity of 42,000 U.S. gallons of oil? aboveground storage greater than 1,320 U.S. gallons of oil? (Do not include the capacities of: - completely buried tanks and connected (Do not include the capacities of: underground piping, ancillary equipment, - less than 55-gallon containers, and containment systems subject to all of - permanently closed containers, the technical requirements of 40 CFR part - motive power containers, OR 280 or 281, NO - hot-mix asphalt and hot-mix - nuclear power generation facility asphalt containers, underground emergency diesel generator - single-family residence heating tanks deferred under 40 CFR part 280 and oil containers, licensed by and subject to any design and - pesticide application
    [Show full text]
  • Non-Toxic Drycleaner List
    South Coast Air Quality Management District 21865 Copley Drive, Diamond Bar, CA 91765-4182 (909) 396-2000 www.aqmd.gov Store Name Business address Business city Business zip Equipment type Los Angeles Tic Toc Cleaners 5735 Kanan Road Agoura 91301- Hydrocarbon Jim Dandy Cleaners 28708 Roadside Dr., Suite I Agoura Hills 91301- Hydrocarbon Agoura Cleaners 5009 Kanan Rd. Agoura Hills 91301- Hydrocarbon Galaxy Cleaners 5855 Kanan Road Agoura Hills 91301- Hydrocarbon Dryclean Express Cleaners 1028 East Valley Boulevard Alhambra 91801- Hydrocarbon Buckboard Cleaners 1465 East Valley Boulevard Alhambra 91801- Wet Clean Hill Top Cleaners 151 E. Foothill Blvd. Arcadia 91006- Hydrocarbon Swiss Cleaners 9065 Woodman Avenue Arleta 91331- Hydrocarbon Fulton Cleaners 9081 Woodman Ave Arleta 91331- Hydrocarbon Value Cleaners 11414-B Artesia Boulevard Artesia 90701- Hydrocarbon Ajay Cleaners 11831 Artesia Boulevard Artesia 90701- Hydrocarbon Rosedale Cleaners 1173A East Alosta Avenue Azusa 91702- Wet Clean Quality Cleaners 4077 East Gage Avenue Bell 90201- Hydrocarbon V+M Cleaners 6200 South Eastern Avenue, #H Bell Gardens 90201- Hydrocarbon Dick's Cleaners 6536 Eastern Avenue Bell Gardens 90201- Hydrocarbon Express Cleaners 17210 Lakewood Blvd Bellflower 90706- Hydrocarbon Non Pareil Cleaners 8624 Wilshire Boulevard Beverly Hills 90211- CO2 Best Quality Cleaners 9115 West Olympic Blvd. Beverly Hills 90212- Hydrocarbon Brentwood Village Cleaners 11722 Barrington Court Brentwood 90049- Hydrocarbon 1212 North San Fernando REX 1 hr Cleaners Boulevard, #E Burbank 91504- Hydrocarbon Evergreen Cleaners 2436 West Victory Boulevard Burbank 91505- Hydrocarbon Allen's Dry Cleaning 321 East Alameda, #F Burbank 91502- Hydrocarbon * Please note that this is a list of professional cleaners in the region that use non-perchloroethylene alternative technologies.
    [Show full text]
  • 2012 Chevrolet Volt Owner Manual M
    Chevrolet Volt Owner Manual - 2012 Black plate (1,1) 2012 Chevrolet Volt Owner Manual M In Brief . 1-1 Safety Belts . 3-11 Infotainment System . 7-1 Instrument Panel . 1-2 Airbag System . 3-19 Introduction . 7-1 Initial Drive Information . 1-4 Child Restraints . 3-32 Radio . 7-7 Vehicle Features . 1-17 Audio Players . 7-12 Battery and Efficiency. 1-20 Storage . 4-1 Phone . 7-20 Performance and Storage Compartments . 4-1 Trademarks and License Maintenance . 1-25 Additional Storage Features . 4-2 Agreements . 7-31 Keys, Doors, and Instruments and Controls . 5-1 Climate Controls . 8-1 Windows . 2-1 Instrument Panel Overview. 5-4 Climate Control Systems . 8-1 Keys and Locks . 2-1 Controls . 5-6 Air Vents . 8-8 Doors . 2-13 Warning Lights, Gauges, and Vehicle Security. 2-14 Indicators . 5-9 Driving and Operating . 9-1 Exterior Mirrors . 2-16 Information Displays . 5-29 Driving Information . 9-2 Interior Mirrors . 2-17 Vehicle Messages . 5-45 Starting and Operating . 9-16 Windows . 2-17 Vehicle Personalization . 5-53 Electric Vehicle Operating Universal Remote System . 5-62 Modes . 9-21 Seats and Restraints . 3-1 Engine Exhaust . 9-26 Head Restraints . 3-2 Lighting . 6-1 Electric Drive Unit . 9-28 Front Seats . 3-4 Exterior Lighting . 6-1 Brakes . 9-29 Rear Seats . 3-8 Interior Lighting . 6-4 Ride Control Systems . 9-33 Lighting Features . 6-5 Chevrolet Volt Owner Manual - 2012 Black plate (2,1) 2012 Chevrolet Volt Owner Manual M Cruise Control . 9-36 Service and Maintenance . 11-1 Customer Information .
    [Show full text]
  • EXHIBITD SCOPE of DEVELOPMENT I. General Overview
    EXHIBITD SCOPE OF DEVELOPMENT I. General Overview All capitalized terms not defined herein shall have the meanings set forth in the Ground Lease (Stadium Disposition and Development Agreement (Stadium Lease) entered into by and between the City of Santa Clara, a municipal corporation (the "City"), as ground lessor, and Santa Clara Stadium Authority, a joint exercise of powers entity, created through Government Code Section 6500 et seq. ("Lessee") as ground lessee, to which this Scope of Development is attached and made a part thereof. The proposed project consists of the design, construction and installation of: (a) on the Stadium Site, (i) an outdoor stadium suitable for NFL Games containing approximately 1.85 million square feet, and with a permanent seating capacity of up to approximately 68,500 seats, including all suite, club and general admission seating (with the possibility for expansion to approximately 75,000 seats for larger events such as an NFL Super Bowls) (the "Stadium"), (ii) a plaza surrounding the Stadium that provides a physical and visual transition from the offsite area to the Stadium Site, and (iii) building systems, utilities, infrastructure and other improvements for the Stadium Site (together with the Stadium, collectively, the "Stadium Project"); and (b) in the vicinity of the Stadium Site several infrastructure projects to facilitate the operation of the Stadium, generally described below (the "Ancillary Improvements"), all of which shall be consistent with the Schematic Design Drawings. II. Stadium Structure The Stadium structure will be designed using structural steel and concrete elements with portions of the exterior enclosed by metal panels and glass.
    [Show full text]
  • South Bay Arterial System Detection Project
    South Bay Arterial System Detection Project Infrastructure Working Group Meeting September 9, 2020 South Bay Arterial System Detection Project Topics Covered • Jurisdictions in the Project area • Project Background • Project Scope • Preliminary Design • Design Phase I • Design Phase II • Anticipated Construction Schedule • Map and List of Intersections Jurisdictions • Unincorporated Los Angeles County • Carson • El Segundo • Gardena • Hawthorne • Hermosa Beach • Lawndale • Manhattan Beach • Redondo Beach • Torrance Project Background • Conceptual Design Plan identified and recommended improvements in the South Bay Region, including: • Closed-Circuit Television (CCTV) cameras • Communication Upgrades (Fiber) • Arterial System Detection • These enhancements improve traffic flows and reduce traffic congestion. • This project centers on the arterial performance Example CCTV camera measurement as part of the following south bay regional programs: 1. Los Angeles County Public Works South Bay Signal Synchronization and Bus Speed Improvements Plan 2. South Bay Cities Council of Governments South Bay Highway Program Strategic Transportation Element Project Scope Identify and install arterial system detectors at select locations within South Bay Cities to support traffic signal operations and network performance measures • Types of detector technologies studied and available: • Split advance loops, Bluetooth readers, Wi-fi readers, Radar, and Video detection • These devices can provide the following benefits • Enable traffic responsive signal operations
    [Show full text]
  • Weekend Glance
    Friday, Jan. 17, 2020 Vol. 13 No. 50 14783 Carmenita Road, Norwalk, CA 90650 Martin Luthern Norwalk holds annual Norwalk King Jr. Day: A restaurant grades Las Posadas event Del Taco day of service 10644 Alondra Blvd. Date Inspected: 1/3/20 Norwalk’s annual traditional cultural celebration featured a candlelight FridayWeekend64˚ and Action procession, caroling of holiday songs, performances by mariachis, ballet Grade: A By Mario Guerra folkloricos, and other family friendly activities. at a Church’s Chicken Contributer Glance Photos courtesy of the City of Norwalk. 15816 s Pioneer Blvd. Saturday 71˚⁰ This week we remember the Date Inspected: 12/26/19 Friday 68 remarkable life of Dr. Martin Grade: A Luther King, Jr. We pay tribute to his dream that one day, children 7 Eleven would live in a nation where they Sunday 75˚ would not be judged by the color 14835 S Pioneer Blvd. 70⁰ of their skin, but by the content Date Inspected: 12/20/19 Saturday of their character. But this Grade: A commemoration is not just about remembering a man who had a McDonalds THINGS TO DO great impact on our nation. 11053 Rosecrans Ave. It is a day to celebrate Dr. Date Inspected: 12/17/19 King’s legacy by engaging in Grade: A community service. In fact, the national theme of Martin Luther Subway King, Jr., Day is, “Remember! 10995 Rosecrans Ave. Celebrate! Act! A Day on, Not a Date Inspected: 12/17/19 Day Off!” Grade: A It is intended to encourage everyone to dedicate the day to Daniel Tiger Day community service and make Pizza Hut their communities better places.
    [Show full text]
  • Appendix L: Design Guidelines: I-5 NCC Project
    Appendix L: Design Guidelines: I-5 NCC Project Appendix L: Design Guidelines: I-5 NCC Project I-5 North Coast Corridor Project Final EIR/EIS page L-1 Appendix L: Design Guidelines: I-5 NCC Project I-5 North Coast Corridor Project Final EIR/EIS page L-2 Design Guidelines Interstate 5 North Coast Corridor Project September 2013 Prepared by: Caltrans District 11 | T.Y. Lin International | Safdie Rabines Architects | Estrada Land Planning Interstate 5 North Coast Corridor Project – Design Guidelines Design Guidelines Interstate 5 North Coast Corridor Project Prepared by: Caltrans District 11 4050 Taylor Street San Diego, CA 92110 T.Y. Lin International 404 Camino del Rio South, Suite 700 San Diego, CA 92108 | 619.692.1920 Safdie Rabines Architects 925 Ft. Stockton Drive San Diego, CA 92123 | 619.297.6153 Estrada Land Planning 755 Broadway Circle, Suite 300 San Diego, CA 92101 | 619.236.0143 Interstate 5 North Coast Corridor Project – Design Guidelines Interstate 5 North Coast Corridor Project – Design Guidelines Table of Contents Design Guidelines Interstate 5 North Coast Corridor Project Table of Contents I. Project Background D. Design Themes....................17 vi. Typical Freeway Undercrossing. 36 vii. Typical Bridge Details. 37 A. Introduction....................1 i. Corridor Theme Elements. 17 ii. Corridor Theme Priorities. 19 - Southern Bluff Theme....................38 B. Purpose.......................1 - Coastal Mesa Theme.....................39 iii. Corridor Theme Units. 20 C. Components & Products. 1 - Northern Urban Theme. 40 - Southern Bluff Theme....................21 D. The Proposed Project. 2 - Coastal Mesa Theme.....................22 B. Walls.............................41 E. Previous Relevant Documents. 3 - Northern Urban Theme. 23 i. Theme Unit Specific Wall Concepts.
    [Show full text]
  • Route Map 5 Ä H339 Æ
    ASTORIA Oregon Department of Transportation Warrenton H104 Svensen Approved routes for Mayger 30 Westport ¤£ Clatskanie Æ 101 Olney Ä Rainier ¤£ H105 Triples Combinations. Æ Gearhart C L A T S O PÄ 47 Prescott SEASIDE Goble H332 202 Mist 73300 Movement is authorized 395 Umapine Necanicum Cold ¤£2 Jewell ¤£ Springs Jct. C O L U M B I A Æ Ä MP 9.76 Umatilla Jct. Milton-Freewater Flora Ä Æ Æ Cannon Beach Route Map 5 Ä H339 Æ H103 Pittsburg Irrigon Ä only under authority of an Columbia City Æ Over-Dimension Permit Unit Ä Elsie 47 730 Holdman 53 ST. HELENS ¤£ Helix 11 Vernonia Boardman 0 207 26 7 30 82 Athena Æ ¤£ Ä Over-Dimension Permit. ¤£ Revised March 2020 HERMISTON 3 ¨¦§ H Heppner Jct. Æ Ä H334 Weston Scappoose Stanfield 3 Nehalem 3 Adams 204 Manzanita HOOD Permission not granted to 5 RIVER cross RR crossing at MP 102.40 30 37 Æ 84 30 Echo Ä Wheeler Buxton £ in Hood River 84 ¤£ Arlington H W A L L O W A ¤ 3 Cascade ¨¦§ Biggs § MP 13.22 ¨¦ 26 Locks Jct. Rufus 3 Æ Rockaway Celilo Blalock Ä H320 1 Æ T I L L A M O O K ¤£ Mosier Ä 82 Beach Banks North H281 PENDLETON Plains PORTLAND Æ Ä Minam Imnaha Odell Wallowa Æ Ä 74 Garibaldi Wasco 207 W A S H I N G T O N The Elgin . Bay City Troutdale Multnomah Æ CorneliusÄ Fairview Dalles t Forest HILLSBORO H O O D H282 206 i 6 Grove Falls G I L L I A M Wood 84 Oceanside Beaverton R I V E R U M A T I L L A Summerville m H131 Village Ione r 8 ¨¦§ Lostine Æ Parkdale 197 Ä Gresham Moro 0 e Tillamook M U L T N O M A H MP 83.00 ¤£ 30 Imbler 5 Netarts ENTERPRISE Æ Ä Pilot 3 Æ Ä £ Æ Ä ¤ p Æ Ä Rock H Gaston Tigard
    [Show full text]
  • Last Link of I-90 Ends 30-Year Saga by Peggy Reynolds, Seattle Times, 9 Sept 1993
    Last Link Of I-90 Ends 30-Year Saga By Peggy Reynolds, Seattle Times, 9 Sept 1993 Erica Clibborn's red convertible will be one of the first cars Sunday across the new Lacey V. Murrow Floating Bridge, last link in a project that started before Erica was born. The University of Washington junior, who will be going home to Mercer Island for Sunday dinner, was born in 1973, the year a federal court sent the Seattle-area stretch of Interstate 90 back to square one. By then, I-90 already reached most of the 3,063 miles from Boston to south Bellevue, and the final major segment had been in the works for 10 years. It would be another 20 years before that last 7 miles would be finished. That completion will be marked this weekend with an array of public events, and Clibborn and other drivers should be able to go across the eastbound span by 5 p.m. Sunday. That opening means that I-90 survived the anti-government sentiment of the late 1960s, the mass-transit worship of the '70s and the budget cutbacks of the '80s - even while other urban interstate projects were biting the dust in New York, Chicago, Baltimore, Philadelphia, Washington, San Francisco and Portland. Nevertheless, whether or not I-90 was really needed was subject to debate at all levels. It attracted a formidable enemies list, and was rescued regularly by a cast of hundreds. Without any one of its friends in local governments, on the state Transportation Commission, in the Legislature and in Congress, I-90 could have ended in south Bellevue instead of making it to its junction with Interstate 5 in Seattle.
    [Show full text]