Interstate 5 Corridor Improvements

Interstate 5 Corridor Improvements

Soundwall construction on northbound I-5, Santa Fe Springs, CA. New abutment for the Alondra Blvd. Bridge in Santa Fe Springs. Construction for the new southbound I-5 o-ramp at Imperial Hwy./Pioneer Blvd. in Norwalk. About the Santa Ana Freeway The Interstate 5 Corridor (Interstate 5) South Corridor Interstate 5 Improvement Projects OF TRAN T SP Improvement Projects EN O Interstate 5 in California is a vital north/south artery R M T T A R T A I O P for the travelling public and it is one of the state’s most E N D Six I-5 South Corridor Improvement Projects, extending U A heavily-used corridors to move goods and services N I C T I Corridor E R 6.7 miles between the Los Angeles County/Orange D E M ST A between the borders of Mexico and Canada. County line to the San Gabriel River Freeway (Interstate ATES OF 605), are identied by their location at Valley View Avenue, Improvements The California Department of Transportation (Caltrans) Alondra Boulevard, Carmenita Road, Rosecrans Avenue, District 7, serving Los Angeles and Ventura counties, Imperial Highway and Florence Avenue in the cities of I-5 Corridor Improvement Partners and its regional partners, the Los Angeles County La Mirada, Santa Fe Springs, Norwalk and Downey. South Los Angeles County Metropolitan Transportation Authority (Metro) and the Federal Highway Administration (FHWA), are A $1.6 billion investment on the Santa Ana Freeway investing approximately $3 billion in several Interstate includes widening the roadway to add one High I-5 HOV/Florence Avenue Interchange 5 Corridor Improvement Projects, funded through a Occupancy Vehicle (HOV), or carpool lane, and one combination of federal, state and local resources. general purpose lane, constructing concrete center I-5 HOV/Imperial Highway and Pioneer Boulevard median barriers, widening shoulders and many other I-5 HOV/Rosecrans Avenue and The I-5 Corridor Improvement Projects are safety features. Interchanges, bridges, ramps, a Updated September 2013 Downey Bloomeld Avenue Bridges distinguished by two segments: the Golden State pedestrian overcrossing, soundwalls and adjacent Freeway (I-5 North Corridor Projects) in northern Santa Fe I-5 HOV/Carmenita Road Interchange Los Angeles County and the Santa Ana Freeway (I-5 frontage roads will be constructed, reconstructed or Springs modied. A total of 22 structures will be reconstructed, I-5 HOV/Alondra Boulevard Bridge South Corridor Projects) in southern Los Angeles County. relocated or upgraded. Norwalk I-5 HOV/Valley View Avenue Bridge Caltrans began construction on the I-5 North Corridor The I-5 South Corridor in Los Angeles County will be Projects in early 2011 and has completed four of the widened from the existing three or four general purpose 11 projects in northern Los Angeles County between lanes to 10 lanes --- four lanes, plus one HOV lane in each State Route 134 and the Kern County line. Five more direction. Once completed, these improvements will projects are currently underway on the I-5 North Corridor. relieve current and future congestion, improve trac ow and air quality, reduce freeway noise and encourage In late 2011, the rst of six I-5 South Corridor Projects ridesharing. Motorists will experience an easier, smoother began construction. Today, four consecutive segments and less congested transition at the Los Angeles County/ are in construction on I-5 in the cities of Norwalk and Orange County line. Santa Fe Springs and the nal two segments will begin in early to mid-2014. Today, four consecutive segments are in construction: the Carmenita Road Interchange Project, the Alondra Between 2016 and 2017 throughout the I-5 North and Boulevard Bridge Project, the Rosecrans/Bloomeld/ South Corridors, various project segments from the Los Shoemaker Bridges Project, and the Imperial Highway/ Angeles County/Orange County line to north of State Pioneer Boulevard Project. The Florence Avenue Route 126 will complete construction. Interchange Project will begin construction in early 2014 For more information about the I-5 Corridor and the nal segment, the Valley View Avenue Improvement Projects in Los Angeles County, please Interchange Project is scheduled to begin construction visit www.I-5info.com or call the toll-free information in mid-2014. line at 855-454-6335. Column construction for the new Shoemaker Ave. Bridge in Norwalk. TOLL-FREE INFO LINE: I-5 South Corridor WEBSITE: (855) 454-6335 I-5info.com Improvement Projects Weekdays, 8 a.m.-8 p.m. hablamos Weekends,12 p.m.-2 p.m. español! All six I-5 South Corridor Improvement Projects include IN CONSTRUCTION freeway widening to accommodate one HOV, or carpool Project: I-5 HOV/Rosecrans Avenue and Bloomeld Avenue Bridges lane, and one general purpose lane. Other improvements include ramp, bridge and interchange reconstruction and Location: From Shoemaker Avenue to Silverbow Avenue reconguration, shoulder widening, concrete median Improvement: Widen freeway to add one HOV lane and one general purpose lane in each direction, barriers and other safety enhancements. widen and reconstruct structures at Shoemaker Avenue, Rosecrans Avenue, Bloomeld Avenue, construct a pedestrian overcrossing at Silverbow Avenue, recongure the Once completed, the I-5 South Corridor Improvement O rr and D ramps at Rosecrans Avenue, upgrade and realign Firestone Boulevard frontage road. Projects will benet the motoring public and the surrounding F Schedule: Construction Start: late 2012 communities of Downey, Norwalk, Santa Fe Springs and La lorenc e A a Completion: mid-2016 Mirada by reducing trac congestion, improving trac ow v y Rd e Cost: $214 million and air quality, enhancing safety and promoting carpooling. N Bloomeld Ave Shoema P o ioneer r Downey w COMING SOON alk IN CONSTRUCTION k B B er l l Project: I-5 HOV/Florence Avenue Interchange v v d Project: I-5 HOV/Carmenita Road Interchange A er d iv v Cecilia St e Location: From Orr and Day Road overcrossing to the iel R ail Location: North of Alondra Boulevard to Shoemaker Avenue r Santa Fe abr I-605 bridge id T North Fork Improvement: Widen freeway to add one HOV lane and one general purpose lane in M an G Coyote Creek Springs Improvement: Widen freeway to add one HOV lane and S each direction, reconstruct the Carmenita Road Bridge as a 10-lane O Ma one general purpose lane in each direction, Imperial Hwy rr and D Silverbow structure with tight diamond ramps, realign and upgrade Freeway r widen structures at Florence Avenue and Ave qua Drive and Firestone Boulevard frontage roads. C armenita Rd r dt Schedule: Construction Start: late 2011 Orr and Day Road, and recongure the a y Rd r A Florence Avenue Interchange. D v Completion: late 2015 Firestone Blvd e nio to Cost: $380 million Schedule: Construction Start: early 2014 n A n a Completion: late 2016 S Rosecrans Ave Firestone Blvd Cost: $198 million Bloomeld Ave IN CONSTRUCTION V alley Sh Project: I-5 HOV/Alondra Boulevard Bridge o ema IN CONSTRUCTION V Norwalk iew Location: From North Fork Coyote Creek to Marquardt Avenue k Freeway Dr Project: I-5 HOV/Imperial Highway and Pioneer Boulevard er Firestone Blvd A La Mirada A Improvement: Widen freeway to add one HOV lane and one general v v e Location: From Silverbow Avenue to Orr and Day Road e Alondra Blvd purpose lane in each direction, reconstruct structures at Ma Improvement: Widen freeway to add one HOV lane and one general purpose lane in each direction, Alondra Boulevard, Coyote Creek and North Fork Coyote r widen and reconstruct bridges at San Antonio Drive, Imperial Highway and Pioneer qua Creek, realign and upgrade Freeway Drive and Firestone widen and reconstruct bridges at San Antonio Drive, Imperial Highway and Pioneer Firestone Blvd r Boulevard frontage roads. dt Coyote Boulevard, and construct a new southbound I-5 o-ramp at Imperial Highway. Firestone Blvd A Creek Schedule: Construction Start: early 2012 v Schedule: Construction Start: early 2013 e Cerritos Completion: mid-2015 Completion: late 2016 Cost: $110 million Cost: $302 million Artesia Blvd ty oun Project: I-5 HOV/Valley View Avenue Interchange ngeles C ty CoyoteBikeway Creek Los A oun Location: From Artesia Boulevard to North Fork Coyote Creek Orange C Improvement: Widen freeway to add one HOV lane and one general purpose lane in each direction, 91 reconstruct the interchange and bridges at Valley View Avenue, Artesia Boulevard, and Coyote Creek, and realign Firestone Boulevard frontage road. NORTH Schedule: Construction Start: mid-2014 Completion: 2017 Note: Cost and schedule are approximate. This map is not to scale. Cost: $416 million.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us