South Bay Arterial System Detection Project

Total Page:16

File Type:pdf, Size:1020Kb

South Bay Arterial System Detection Project South Bay Arterial System Detection Project Infrastructure Working Group Meeting September 9, 2020 South Bay Arterial System Detection Project Topics Covered • Jurisdictions in the Project area • Project Background • Project Scope • Preliminary Design • Design Phase I • Design Phase II • Anticipated Construction Schedule • Map and List of Intersections Jurisdictions • Unincorporated Los Angeles County • Carson • El Segundo • Gardena • Hawthorne • Hermosa Beach • Lawndale • Manhattan Beach • Redondo Beach • Torrance Project Background • Conceptual Design Plan identified and recommended improvements in the South Bay Region, including: • Closed-Circuit Television (CCTV) cameras • Communication Upgrades (Fiber) • Arterial System Detection • These enhancements improve traffic flows and reduce traffic congestion. • This project centers on the arterial performance Example CCTV camera measurement as part of the following south bay regional programs: 1. Los Angeles County Public Works South Bay Signal Synchronization and Bus Speed Improvements Plan 2. South Bay Cities Council of Governments South Bay Highway Program Strategic Transportation Element Project Scope Identify and install arterial system detectors at select locations within South Bay Cities to support traffic signal operations and network performance measures • Types of detector technologies studied and available: • Split advance loops, Bluetooth readers, Wi-fi readers, Radar, and Video detection • These devices can provide the following benefits • Enable traffic responsive signal operations • Collect traffic data such as volume, occupancy and speed • Measure travel times on key arterials Example Video Detection with Radar Combo Unit Example Radar Example Video Pole Mounted Bluetooth or Wi-fi readers Unit Detection Examples Camera Preliminary Design (Arterial Detection Assessment Reports) Project Consultant: Iteris • Carry out the field review and design Data Requirements Development • Requirements Definition: collect and/or derive requirements for the data needed to support Traffic Responsive Plan Selection (TRPS), which is the targeted functionality Technology Assessment • Technologies assessed: inductive loop, video, microwave, magnetometer, radar, infrared, hybrid video and radar, Bluetooth Methodology for Locating Detectors • Created an approach to identify detector locations based on the data requirements developed Identify Recommended Detector Locations Project Development Design Phase I (Complete) Two Objectives for Phase I 1. Field Investigation • Traffic Responsive Plan Selection (TRPS) – Iteris confirmed the existence and functionality of detectors and confirmed with the County’s inventory of detectors which ones need to be split for optimum responsive operation • Bluetooth Travel Time – Iteris evaluated potential placement of Bluetooth reading devices which included checking traffic signal cabinet and conduits for available space • Video Detection System – Iteris verified conduit fill and any equipment upgrades necessary in the signal cabinet to accommodate video detection systems and evaluate if intersection needs a stop-bar video detection upgrade 2. Video Detection System Design • Iteris designed traffic signal plans for 4 intersections which will receive new video detection systems Design Phase II – Plans, Specifications and Estimates (In progress) Three Objectives of Design Phase II 1. Field Investigation of the remaining intersections not included in Design Phase I (complete) 2. Traffic Responsive Plan Selection (TRPS) Design Plans (In progress) • Iteris will produce design plans for 19 locations requiring detector work for TRPS operation 3. Travel Time Device Design Plans (In progress) • Travel time device installation for most locations will be in table format with typical details • For locations where plans are being developed as part of the other tasks above, travel time devices will be shown on the other task’s plans Construction Schedule Estimated Schedule for Construction List of Project Intersections (1 of 3) Proposed Equipment Corridor Cross Street Located Within Travel time TRPS Device Proposed Equipment Lawndale & 19 Inglewood Avenue Marine Avenue X X Corridor Cross Street Located Within Travel time Redondo Beach TRPS Device 20 Marine Avenue Hawthorne Boulevard Lawndale X X 21 Prairie Avenue Marine Avenue Hawthorne X X 1 Hawthorne Boulevard 104th Street LA County X LA County & 22 Marine Avenue Crenshaw Boulevard X X 2 Imperial Highway Inglewood Avenue Hawthorne X X Gardena 3 Imperial Highway Hawthorne Boulevard Hawthorne X Manhattan Beach 4 Imperial Highway Prairie Avenue Inglewood X 23 Aviation Boulevard Manhattan Beach Boulevard X X & Redondo Beach 5 Aviation Boulevard 118th Street LA County X 24 Inglewood Avenue Manhattan Beach Boulevard Redondo Beach X X 6 Crenshaw Boulevard 120th Street Hawthorne X 25 Hawthorne Boulevard Manhattan Beach Boulevard Lawndale X X El Segundo & 7 Aviation Boulevard El Segundo Boulevard X X LA County & Hawthorne 26 Crenshaw Boulevard Manhattan Beach Boulevard X X Gardena LA County & LA County & 8 El Segundo Boulevard Inglewood Avenue X X 27 Crenshaw Boulevard Redondo Beach Boulevard X Hawthorne Gardena 9 Hawthorne Boulevard El Segundo Boulevard Hawthorne X Manhattan Beach 28 Artesia Boulevard Prospect Avenue X 10 El Segundo Boulevard Prairie Avenue Hawthorne X & Hermosa Beach 11 Crenshaw Boulevard El Segundo Boulevard Gardena X X Redondo Beach & 29 Aviation Boulevard Artesia Boulevard X X LA County & Manhattan Beach 12 Western Avenue El Segundo Boulevard X X Lawndale & Gardena 30 Artesia Boulevard Inglewood Avenue X X LA County & Redondo Beach 13 El Segundo Boulevard Vermont Avenue X X Gardena 31 Artesia Boulevard Crenshaw Boulevard Torrance X Manhattan Beach Torrance & 14 Rosecrans Avenue Village Drive X 32 Artesia Boulevard Western Avenue X & El Segundo Gardena 33 Albertoni Street Avalon Boulevard Carson X Hawthorne, El 34 Victoria Street Avalon Boulevard Carson X X 15 Aviation Boulevard Rosecrans Avenue Segundo & X X 35 Victoria Street Bishop Avenue Carson X Manhattan Beach 16 Inglewood Avenue Rosecrans Avenue Hawthorne X X 17 Hawthorne Boulevard Rosecrans Avenue Hawthorne X Hawthorne & 18 Crenshaw Boulevard Rosecrans Avenue X Gardena List of Project Intersections (2 of 3) Proposed Equipment Corridor Cross Street Located Within Travel time TRPS Device 53 Artesia Boulevard Prairie Avenue Torrance X 54 Victoria Street Broadway Carson X 55 Victoria Street Central Avenue Carson X 56 Del Amo Boulevard Central Avenue Carson X 57 Carson Street Central Avenue/Vera Street Carson X 58 Sepulveda Boulevard Alameda Street Carson X 59 Imperial Highway S Van Ness Avenue LA County X 60 Imperial Highway Normandie Avenue LA County X 61 Rosecrans Avenue Yukon Avenue Hawthorne X Proposed Equipment 62 Marine Avenue Cedar Avenue Manhattan Beach X N Peck Avenue/Gateway Corridor Cross Street Located Within Travel time 63 Marine Avenue Manhattan Beach X TRPS Drive Device Redondo Beach & 64 Marine Avenue Redondo Beach Avenue X Hawthorne 36 Avalon Boulevard Del Amo Boulevard Carson X X LA County & 65 Marine Avenue Yukon Avenue X 37 Carson Street Vermont Avenue LA County X X Hawthorne 38 Carson Street Main Street Carson X X Manhattan Beach 66 Target Driveway Manhattan Beach X 39 Carson Street Avalon Boulevard Carson X X Boulevard 40 Carson Street Wilmington Avenue Carson X X Manhattan Beach 67 N Peck Avenue Manhattan Beach X 41 Carson Street Alameda Street Carson X X Boulevard 42 Figueroa Street 223rd Street Carson X X 68 Artesia Boulevard Van Ness Avenue Torrance X 43 Main Street 223rd Street Carson X X 69 Artesia Boulevard Yukon Avenue Torrance X Lawndale & 44 Avalon Boulevard 223rd Street Carson X X 70 Artesia Boulevard Grevillea Avenue X Redondo Beach 45 Sepulveda Boulevard Normandie Avenue LA County X 46 Sepulveda Boulevard Vermont Avenue LA County X 47 Sepulveda Boulevard Figueroa Street Carson X X 48 Sepulveda Boulevard Avalon Boulevard Carson X 49 Sepulveda Boulevard H Avenue Carson X 50 Sepulveda Boulevard Intermodal Way Carson X 51 El Segundo Boulevard Continental Boulevard El Segundo X 52 Rosecrans Avenue Hindry Avenue Hawthorne X List of Project Intersections (3 of 3) Proposed Equipment Corridor Cross Street Located Within Travel time TRPS Proposed Equipment Device Corridor Cross Street Located Within Travel time Gardena & LA TRPS 89 Normandie Avenue El Segundo Boulevard X Device County Los Angeles & LA 90 Vermont Avenue Del Amo Boulevard X 71 Artesia Boulevard Slauson Lane Redondo Beach X County 91 Vermont Avenue Torrance Boulevard LA County X 72 Inglewood Avenue 104th Street LA County X X LA County & Los 73 Inglewood Avenue Lennox Boulevard LA County X 92 Vermont Avenue Knox Street X Angeles Lawndale & 74 Prairie Avenue Rosecrans Avenue X 93 El Segundo Boulevard Ocean Gate Avenue LA County X Hawthorne 94 El Segundo Boulevard Yukon Avenue Hawthorne X Lawndale & LA 75 Prairie Avenue Manhattan Beach Boulevard X Hawthorne & County 95 El Segundo Boulevard S Van Ness Avenue X Gardena LA County & 76 Prairie Avenue Redondo Beach Boulevard X 96 S Main Street Del Amo Boulevard Carson X Torrance 97 S Main Street W Torrance Boulevard Carson X Redondo Beach LA County & 77 Yukon Avenue X 98 S Main Street Sepulveda Boulevard Carson X Boulevard Torrance Carson & LA Lawndale, 99 Wilmington Avenue University Drive X Redondo Beach County 78 Hawthorne Boulevard Redondo Beach & X Carson & LA Boulevard 100 Wilmington Avenue Del Amo Boulevard X Torrance County Gardena, LA 101 Wilmington Avenue 223rd Street Carson X 79 Crenshaw Boulevard 135th
Recommended publications
  • Hollywood Hotel – the Hotel of Hollywood®
    Hollywood Hotel – The Hotel of Hollywood® Media Contacts: Relevance PR Karen Gee-McAuley / 818-541-7724 [email protected] Hannah Hurdle 805-601-5331 [email protected] Address: 1160 North Vermont Avenue Los Angeles, CA 90029 Reservations: 323-746-1248 www.thehollywoodhotel.com Social Media: Facebook: https://www.facebook.com/thehollywoodhotel Twitter: https://twitter.com/hollywoodhotel1 Pinterest: http://www.pinterest.com/hollywoodhotel/ Instagram: hollywoodhotel Established: 1903 Introduction: Situated in the heart of Hollywood, Hollywood Hotel fuses old Hollywood glamour with a modern take on deluxe amenities and newly refreshed, comfortable rooms in a centrally-located urban setting. Hollywood Hotel pays homage to the City of Angels’ creative and artistic spirit, incorporating exquisite design elements and a sense of beauty and inspiration into every guest’s stay, with a nod to the hotel’s Hollywood roots. From elegant and contemporary décor to state-of-the-art extras, thoughtful amenities and unparalleled service, Hollywood Hotel makes each guest’s stay a masterpiece. Hollywood Hotel Fact Sheet Page 2 Location: Hollywood Hotel is located in the District of Hollywood in the City of Los Angeles and is the only Hollywood hotel located most closely to the world-famous Route 66. The hotel is steps away from shopping, world-class dining and cutting edge culture and nightlife. The hotel is only minutes away from the Greek Theater, Los Angeles Zoo, the world-famous Hollywood sign, Hollywood Walk of Fame, Griffith Park Observatory, Grauman’s Chinese Theater, Gene Autry National Center and Lake Hollywood. The hotel is also adjacent to the hip streets of Los Feliz, Silver Lake (voted “Best Hipster City” by Forbes) and Echo Park (backdrop for the film “The Kids Are All Right”), filled with restaurants, one-of-a-kind boutiques and nightclubs.
    [Show full text]
  • Chapter 3 - Environmental Setting, Impacts, and Mitigation Measures
    Environmental Setting, Impacts, and Mitigation Measures CHAPTER 3 - ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION MEASURES 3-1 INTRODUCTION The purpose of this chapter is to provide the reader with the information necessary to understand and evaluate the potential environmental impacts due to implementation of the proposed Los Angeles Valley College Facilities Master Plan (Master Plan). In accordance with the State CEQA Guidelines (§15128 and §15143), this EIR focuses on the impacts identified in the NOP and during project scoping as needing further analysis (visual resources; air quality, historical resources; archaeological resources; paleontological resources; geology/soils/seismicity; hazardous materials; hydrology and water quality; land use and planning; noise; population and housing; public services; transportation, traffic and parking; and public utilities). A list of the impacts determined to be less than significant and the reasons for that determination are provided in Chapter 5. To assist the reader, each environmental impact category in this EIR is discussed separately. These discussions include a description of the environmental setting, the criteria used to determine significance of potential effects, the potential environmental impacts of the proposed project, mitigation measures, and any unavoidable significant adverse effects that would remain after implementation of the proposed mitigation measures. The environmental setting discussions contain a description of the physical environmental conditions in the vicinity of the project as it existed at the time the Notice of Preparation was distributed (January 2003). The existing environmental conditions described in the setting sections serve as a baseline for the impact analyses in this EIR. The significance criteria identified for each environmental impact category are based on the definitions that have been developed and established by the Los Angeles Community College District, various public agencies, or professional organizations and are consistent with the State CEQA Guidelines.
    [Show full text]
  • City of La Mirada City Moves Ahead with Capital Improvement Projects Measure I to Fund Infrastructure Repairs
    City of La Mirada WINTER 2013 City Moves Ahead with Capital Improvement Projects La Mirada has received competitive bids for a number of project, which is scheduled infrastructure improvement projects set to be under construction to begin construction in by spring. 2014. In preparation for the Much of this year’s Capital Projects Budget is dedicated to freeway work, a number of addressing items in a recent engineer’s report, which identified roadway improvements are more than $67 million in needs for streets, sewers, storm drains, being completed in the area traffic signals, curbs, gutters, sidewalks, bridges, and access ramps. near the freeway. Street repairs will begin soon for portions of Alondra Boulevard, Stage Road, Trojan Way, and South Firestone Boulevard. This work is being completed with Measure R funds. Major sidewalk improvements planned for Santa Gertrudes Avenue from Lemon Drive to Rosecrans Avenue are scheduled to begin in February and be completed in April. Work includes a new meandering sidewalk, curb and gutter repairs, new curb access ramps, street tree removal, landscaping treatments, and an automatic irrigation system. Street repairs to 42 neighborhood streets throughout La Mirada are scheduled to begin in February and be completed by July. These Resurfacing work has been completed on Knott Avenue as a joint streets have been rated as being in the greatest need, according project with the City of Buena Park. Knott Avenue was among the to engineering reports. The work will include street rehabilitation, streets identified as in need of maintenance in the engineer's report. curb, gutter, and sidewalk repairs, and storm drain improvements.
    [Show full text]
  • Freeway and Campus Combo
    Los Angeles Freeway Map: California State University, Dominguez Hills 0) ) Y (1 ONICA FWY (10 POMONA FW SANTA M ) LOS I ) N 0 SANTA 0 T 1 E MONICA S ANGELES 1 R 1 A 7 ( S N ( T A Y D Y T I E E W G W F F O F W F R Y H W O C (5 Y B A ) R ( E 4 A B 0 ) H 5 G 5 ) 0 N 6 Avalon Blvd. ( Central Ave. O LAX L 105 FWY Y W W F F R R E COMPTON E V V I Artesia Blvd. I R R L Victoria Street L E ARTESIA E I I R REDONDO FWY (91) R B B A BEACH A G 190th Street G N N A A S TORRANCE S CARSON LONG BEACH PALOS VERDES SAN PEDRO N ➢ From Los Angeles Civic Center From Santa Monica From San Bernadino 110 SOUTH - Follow the Harbor Freeway (110) 10 EAST - Follow the Santa Monica Freeway 10 WEST - Follow the San Gabriel Freeway to the Artesia Freeway (91) east to Avalon Blvd. (10) east to the San Diego Freeway (405) south (605) south. Take the Artesia Freeway (91) Take Avalon Blvd. south to Victoria Street, turn toward Long Beach. Exit at the Vermont Avenue west toward Redondo Beach. Take the Central left. The entrance to campus is a right turn at off-ramp. Turn left (east) at the end of the off- Avenue exit and turn left; turn right onto Victoria Tamcliff Avenue. ramp onto 190th Street.
    [Show full text]
  • AVIATION/96TH STREET FIRST/LAST MILE PLAN APPENDIX Appendix a Walk Audit Summary Inglewood First/Last Mile Existing Conditions Overview Map
    Next stop: our healthy future. /96 / 3/22/19 Draft Inglewood First/Last Mile Strategic Plan A Los Angeles Metro Jacob Lieb, First/Last Mile Planning My La, First/Last Mile Planning Joanna Chan, First/Last Mile Planning Los Angeles World Airports Glenda Silva, External Affairs Department Consultants Shannon Davis, Here LA Amber Hawkes, Here LA Chad So, Here LA Aryeh Cohen, Here LA Mary Reimer, Steer Craig Nelson, Steer Peter Piet, Steer Christine Robert, The Robert Group Nicole Ross, The Robert Group B Aviation/96th St. First/Last Mile Plan Contents D Executive Summary 22 Recommendations 1 Overview 23 Pathways & Projects 26 Aviation / 96th St. Station 2 Introduction 3 Introduction 40 Next Steps 4 What is First/Last Mile? 41 Introduction 5 Vision 42 Lessons Learned 6 Planning for Changes 43 Looking Forward 8 Terminology Appendix 10 Introducing the A Walk Audit Summary Station Area B Existing Plans & Projects Memo 11 First/Last Mile Planning Around C Pathway Origin Matrix the Station D Costing Assumptions / Details 12 Aviation / 96th St. Station E Funding Strategies & Funding Sources 14 Process 15 Formulating the Plan 16 Phases Aviation/96th St. First/Last Mile Plan C EXECUTIVE SUMMARY This section introduces the Aviation/96 St. Station first/last mile project, and lists the key findings and recommendations that are within the Plan. D Aviation/96th St. First/Last Mile Plan Overview of the Plan The Aviation/96th St. First/Last (where feasible) separation from Next Steps Mile Plan is part of an ongoing vehicular traffic This short chapter describes effort to increase the accessibility, > More lighting for people walking, the next steps after Metro safety, and comfort of the area biking, or otherwise ‘rolling’ to Board adoption, focusing on surrounding the future LAX/Metro the station at night implementation.
    [Show full text]
  • Non-Toxic Drycleaner List
    South Coast Air Quality Management District 21865 Copley Drive, Diamond Bar, CA 91765-4182 (909) 396-2000 www.aqmd.gov Store Name Business address Business city Business zip Equipment type Los Angeles Tic Toc Cleaners 5735 Kanan Road Agoura 91301- Hydrocarbon Jim Dandy Cleaners 28708 Roadside Dr., Suite I Agoura Hills 91301- Hydrocarbon Agoura Cleaners 5009 Kanan Rd. Agoura Hills 91301- Hydrocarbon Galaxy Cleaners 5855 Kanan Road Agoura Hills 91301- Hydrocarbon Dryclean Express Cleaners 1028 East Valley Boulevard Alhambra 91801- Hydrocarbon Buckboard Cleaners 1465 East Valley Boulevard Alhambra 91801- Wet Clean Hill Top Cleaners 151 E. Foothill Blvd. Arcadia 91006- Hydrocarbon Swiss Cleaners 9065 Woodman Avenue Arleta 91331- Hydrocarbon Fulton Cleaners 9081 Woodman Ave Arleta 91331- Hydrocarbon Value Cleaners 11414-B Artesia Boulevard Artesia 90701- Hydrocarbon Ajay Cleaners 11831 Artesia Boulevard Artesia 90701- Hydrocarbon Rosedale Cleaners 1173A East Alosta Avenue Azusa 91702- Wet Clean Quality Cleaners 4077 East Gage Avenue Bell 90201- Hydrocarbon V+M Cleaners 6200 South Eastern Avenue, #H Bell Gardens 90201- Hydrocarbon Dick's Cleaners 6536 Eastern Avenue Bell Gardens 90201- Hydrocarbon Express Cleaners 17210 Lakewood Blvd Bellflower 90706- Hydrocarbon Non Pareil Cleaners 8624 Wilshire Boulevard Beverly Hills 90211- CO2 Best Quality Cleaners 9115 West Olympic Blvd. Beverly Hills 90212- Hydrocarbon Brentwood Village Cleaners 11722 Barrington Court Brentwood 90049- Hydrocarbon 1212 North San Fernando REX 1 hr Cleaners Boulevard, #E Burbank 91504- Hydrocarbon Evergreen Cleaners 2436 West Victory Boulevard Burbank 91505- Hydrocarbon Allen's Dry Cleaning 321 East Alameda, #F Burbank 91502- Hydrocarbon * Please note that this is a list of professional cleaners in the region that use non-perchloroethylene alternative technologies.
    [Show full text]
  • Land Use Element Designates the General Distribution and Location Patterns of Such Uses As Housing, Business, Industry, and Open Space
    CIRCULATION ELEMENT CITY OF HAWTHORNE GENERAL PLAN Adopted April, 1990 Prepared by: Cotton/Beland/Associates, Inc. 1028 North Lake Avenue, Suite 107 Pasadena, California 91104 Revision Table Date Case # Resolution # 07/23/2001 2001GP01 6675 06/28/2005 2005GP03 & 04 6967 12/09/2008 2008GP03 7221 06/26/2012 2012GP01 7466 12/04/2015 2015GP02 7751 TABLE OF CONTENTS Section Page I. Introduction to the Circulation Element 1 Purpose of this Element 1 Relation to Other General Plan Elements 1 II. Existing Conditions 2 Freeways 2 Local Vehicular Circulation and Street Classification 3 Transit Systems 4 Para-transit Systems 6 Transportation System Management 6 TSM Strategies 7 Non-motorized Circulation 7 Other Circulation Related Topics 8 III. Issues and Opportunities 10 IV. Circulation Element Goals and Policies 11 V. Crenshaw Station Active Transportation Plan 23 Circulation Element March 1989 LIST OF FIGURES Figure Page Figure1: Street Classification 17 Figure 2: Traffic Volume Map 18 Figure 3: Roadway Standards 19 Figure 4: Truck Routes 20 Figure 5: Level of Service 21 LIST OF TABLES Table 1: Definitions of Level-of-Service 22 Circulation Element March 1989 SECTION I - INTRODUCTION TO THE CIRCULATION ELEMENT Circulation and transportation systems are one of the most important of all urban systems in determining the overall structure and form of the areas they service. The basic purpose of a transportation network within the City of Hawthorne is the provision of an efficient, safe, and serviceable framework which enables people to move among various sections of the city in order to work, shop, or spend leisure hours.
    [Show full text]
  • The Digital Divide in Assembly District 64: Broadband Wireline Service
    The Digital Divide In Assembly District 64: Broadband Wireline Service District 64 Served Underserved Unserved Total 125,312 148 387 125,847 Households 100% 0% 0% 100% 465,036 376 988 466,400 Population 100% 0% 0% 100% Meets and Exceeds State Goal of 98% Served Source: Service availability data submitted by California broadband providers and validated by the CPUC as of December 31, 2014. Prepared by Watsonville GIS Center. This is a graphic representation only of best available sources. The City of Watsonville assumes no responsibility of errors. The Digital Divide in Assembly District 64: Broadband Wireline Service Unconnected and Percent Percent Percentage by Under-Connected Not Connected Connected Smartphone Only Statewide 16% 84% 14% Low-Income (<$20,000 Annually) 32% 68% 25% Spanish-Speakers 31% 69% 30% People With Disabilities 29% 71% 13% Seniors (65 or Older) 44% 56% 5% Non-High School Graduates 37% 63% 29% Most Disadvantaged Populations are Unconnected or Under-Connected Source: The Field Poll 2016 │http://www.cetfund.org/progress/annualsurvey Publicly-Subsidized Housing- Assembly District 64 Source: California Tax Credit Allocation Committee (TCAC) Project Name Project Address Housing Total Type Units Rohit Villas 122 E. 120th Street, Los Angeles, CA 90061 Large Family 16 Colden Oaks 225 W. Colden Avenue, Los Angeles, CA 90003 Large Family 38 Figueroa Oaks 10210 South Figueroa Street, Los Angeles, CA 900030000 Large Family 32 Figueroa Court Apartments 9130 S. Figueroa Street, Los Angeles, CA 90003 Special 40 Needs Heavenly Vision
    [Show full text]
  • Ground Transportation
    Los Angeles Harbor Department Section 3.3 Ground Transportation 1 Section 3.3 2 Ground Transportation 3 SECTION SUMMARY 4 Section 3.3, Ground Transportation, provides the following: 5 • A review of the ground transportation mitigation measures of the 2008 EIS/EIR; 6 • A description of observed existing ground transportation conditions in the study area, and the 7 differences from the 2008 EIS/EIR; 8 • A discussion of the methodology used to determine whether the Revised Project would result 9 in a new or substantially more severe significant impact on ground transportation; 10 • A summary of the ground transportation impacts of the Revised Project; and 11 • A description of revised, feasible mitigation measures proposed to reduce significant adverse 12 impacts, as applicable. 13 Key Points of Section 3.3: 14 Four of the mitigation measures imposed in the 2008 EIS/EIR (MM TRANS-2, -3, -4, and -6, see Section 15 3.3.1) to mitigate potential impacts at study intersections are not included in the Revised Project; this 16 SEIR evaluates future conditions without those measures and determines whether their removal would 17 have new or more serious significant impacts relative to the findings of the 2008 EIR/EIR. Roadway 18 circumstances have changed since the certification of the 2008 EIS/EIR and new information is available 19 concerning traffic conditions at study area intersections that calls into question the need for those 20 measures. Ten of the 17 study area intersections analyzed in the 2008 EIS/EIR have undergone physical 21 changes, including those where mitigation measures were proposed in the 2008 EIS/EIR.
    [Show full text]
  • Inglewood Transit Connector Will Link Sports, Entertainment
    [email protected] • Fax: 310-970-8046 • It must be legible and a color that It must rned to the sender unless an ancillary , and no more than 1½ inches below or inches below 1½ than no more and , nes long and placed within a clear area no the indicia’s background for readability. lly 1 to 3 days. Delivery time is not Tel: 310-970-8041 • Presorted Permit #31050 Permit #31050 First-Class Mail Mail First-Class Los Angeles, CA Los Angeles, U.S. Postage PAID ting otherwise is used. typewritten or hand-drawn. Important Notes: Notes: Important Permit Indicia Sample Sample Indicia Permit Gateway Los Angeles PBID Quarterly Newsletter First Quarter 2021 KES Mail, Inc Permit #31050 Gateway View Presorted First-Class Mail Mail First-Class Presorted Hawthorne CA 90250-4810 • guaranteed by the United States Postal Service. retu are pieces Undeliverable-as-addressed indica endorsement service First-Class Mail Delivery time is typica is time Delivery Mail First-Class Permit indicia minimum type size is 8 points. indicia minimum Permit contrasts sufficiently with the papercontrasts and indicia. the background of A different color may be used to highlight beli may five indicia four or only Permit smaller than ½ inch high and wide piece. the upper right corner of mail left from indicia may notPermit be • • • • • Inglewood Transit Connector Will 12616 ChadronAvenue Link Sports, Entertainment Hub Los Angeles, CA 90045 CA Angeles, Los NEW RAIL LINK IS PART OF CITY’S TRANSFORMATION THAT WILL DRIVE MORE TOURISM #100 Suite Boulevard, Century W. 5901 An exciting transformation is Closing Ceremonies of the 2028 of Inglewood released the Draft ANGELES LOS GATEWAY underway as the City of Inglewood Summer Olympics.
    [Show full text]
  • Carmen A. Trut Anich
    City Hall East (213) 978-8100 Tel 200 N. Main Street (213) 978-83!2 Fax Room 800 [email protected] Los Angeles, CA 90012 www.lacity.org '\ \ ) / CARMEN A. TRUTANICH City Attorney REPORTNO. __~R_1_'_)_-~0~3~6~Z-- REPORT RE: DRAFT ORDINANCE AMENDING SECTION 88.00 OF CHAPTER VIII OF THE LOS ANGELES MUNICIPAL CODE TO ADD SUBSECTION 83 TO ESTABLISH THE NEW WESTCHESTER PARKING METER ZONE AT A METER RATE OF $1.00 PER HOUR The Honorable City Council of the City of Los Angeles Room 395, City Hall 200 North Spring Street Los Angeles, California 90012 Council File No. 12-0940 Honorable Members: Pursuant to your request, this Office has prepared and now transmits for your consideration the enclosed draft ordinance, approved as to form and legality. The draft ordinance would amend Section 88.00 of Chapter VIII of the Los Angeles Municipal Code (LAMC) to add the newly created Westchester Parking Meter Zone with an adopted meter rate of $1.00 per hour. If you have any questions regarding this matter, please contact Deputy City Attorney Michael Nagle at (213) 978-8141. He or another member of this Office will be present when you consider this matter to answer any questions you may have. Very truly yours, CARMEN A. TRUTANICH, City Attorney By PEDRO B. ECHEVERRIA Chief Assistant City Attorney PBE:MN:fa Transmittal M:\GENERAL COUNSEL DIVISION\MICHAEL NAGLE\REPORTS TO COUNCIL\Report re ORO. amending LAMC 88,00 to add Subsec,83,Westchester.doc ORDINANCE NO.~--~-~~ An ordinance amending Section 88.00 of Chapter Vlll of the Los Angeles Municipal Code to add Subsection 83 to establish the new Westchester Parking Meter Zone.
    [Show full text]
  • THE TRI NGLE DEVELOPMENT OPPORTUNITY at South Market Place in the REVITALIZED CITY of INGLEWOOD
    RARE MIXED-USE THE TRI NGLE DEVELOPMENT OPPORTUNITY at South Market Place IN THE REVITALIZED CITY OF INGLEWOOD BARBARA ARMENDARIZ President & Founder CalDRE #01472088 213.266.3333 x404 501, 509 & 513 S LA BREA AVE [email protected] 425, 451, 467 & 475 S MARKET ST This conceptual design is based upon a preliminary review of entitlement requirements INGLEWOOD, CAand on unverified 90301 and possibly incomplete site and/or building information, and is EAST HILLCREST BLVD + SOUTH LABREA AVE PERSPECTIVE intended merely to assist in exploring how the project might be developed. Signage PAGE THE TRIANGLE AT S. MARKET PLACE 05.07.2020 shown is for illustrative purposes only and does not necessarily reflect municipal 3 code compliance. All colors shown are for representative purposes only. Refer to INGLEWOOD, CA - LAX20-0000-00 material samples for actual color verification. DISCLAIMER All materials and information received or derived from SharpLine Commercial Partners its directors, officers, agents, advisors, affiliates and/or any third party sources are provided without representation THE TRI NGLE or warranty as to completeness , veracity, or accuracy, condition of the property, compliance or lack of compliance with applicable governmental requirements, developability or suitability, financial at South Market Place performance of the property, projected financial performance of the property for any party’s intended use or any and all other matters. TABLE of CONETNTS Neither SharpLine Commercial Partners its directors, officers, agents, advisors, or affiliates makes any representation or warranty, express or implied, as to accuracy or completeness of the any materials or information provided, derived, or received. Materials and information from any source, whether written or verbal, that may be furnished for review are not a substitute for a party’s active conduct of Executive Summary 03 its own due diligence to determine these and other matters of significance to such party.
    [Show full text]