THE TRI NGLE DEVELOPMENT OPPORTUNITY at South Market Place in the REVITALIZED CITY of INGLEWOOD

Total Page:16

File Type:pdf, Size:1020Kb

THE TRI NGLE DEVELOPMENT OPPORTUNITY at South Market Place in the REVITALIZED CITY of INGLEWOOD RARE MIXED-USE THE TRI NGLE DEVELOPMENT OPPORTUNITY at South Market Place IN THE REVITALIZED CITY OF INGLEWOOD BARBARA ARMENDARIZ President & Founder CalDRE #01472088 213.266.3333 x404 501, 509 & 513 S LA BREA AVE [email protected] 425, 451, 467 & 475 S MARKET ST This conceptual design is based upon a preliminary review of entitlement requirements INGLEWOOD, CAand on unverified 90301 and possibly incomplete site and/or building information, and is EAST HILLCREST BLVD + SOUTH LABREA AVE PERSPECTIVE intended merely to assist in exploring how the project might be developed. Signage PAGE THE TRIANGLE AT S. MARKET PLACE 05.07.2020 shown is for illustrative purposes only and does not necessarily reflect municipal 3 code compliance. All colors shown are for representative purposes only. Refer to INGLEWOOD, CA - LAX20-0000-00 material samples for actual color verification. DISCLAIMER All materials and information received or derived from SharpLine Commercial Partners its directors, officers, agents, advisors, affiliates and/or any third party sources are provided without representation THE TRI NGLE or warranty as to completeness , veracity, or accuracy, condition of the property, compliance or lack of compliance with applicable governmental requirements, developability or suitability, financial at South Market Place performance of the property, projected financial performance of the property for any party’s intended use or any and all other matters. TABLE of CONETNTS Neither SharpLine Commercial Partners its directors, officers, agents, advisors, or affiliates makes any representation or warranty, express or implied, as to accuracy or completeness of the any materials or information provided, derived, or received. Materials and information from any source, whether written or verbal, that may be furnished for review are not a substitute for a party’s active conduct of Executive Summary 03 its own due diligence to determine these and other matters of significance to such party. SharpLine Commercial Partners will not investigate or verify any such matters or conduct due diligence for a party unless otherwise agreed in writing. Property Overview 05 EACH PARTY SHALL CONDUCT ITS OWN INDEPENDENT INVESTIGATION AND DUE DILIGENCE. Any party contemplating or under contract or in escrow for a transaction is urged to verify all information and to conduct their own inspections and investigations including through appropriate Conceptual Renderings 11 third party independent professionals selected by such party. All financial data should be verified by the party including by obtaining and reading applicable documents and reports and consulting appropriate independent professionals. SharpLine Commercial Partners makes no warranties and/or representations regarding the veracity, completeness, or relevance of any financial data or assumptions. Area Demographics 15 SharpLine Commercial Partners does not serve as a financial advisor to any party regarding any proposed transaction. All data and assumptions regarding financial performance, including that used for financial modeling purposes, may differ from actual data or performance. Any estimates of market rents and/or projected rents that may be provided to a party do not necessarily mean that rents can Area Overview 16 be established at or increased to that level. Parties must evaluate any applicable contractual and governmental limitations as well as market conditions,vacancy factors and other issues in order to determine rents from or for the property. South Market Place 20 Legal questions should be discussed by the party with an attorney. Tax questions should be discussed by the party with a certified public accountant or tax attorney. Title questions should be discussed by the party with a title officer or attorney. Questions regarding the condition of the property and whether the property complies with applicable governmental requirements should be discussed by the party Major Developments 23 with appropriate engineers, architects, contractors, other consultants and governmental agencies. All properties and services are marketed by SharpLine Commercial Partners in compliance with all applicable fair housing and equal opportunity laws. Exclusively Listed by: BARBARA ARMENDARIZ President & Founder CalDRE #01472088 213.266.3333 x404 [email protected] THE TRI NGLE at South Market Place EXECUTIVE SUMMARY SharpLine Commercial Partners (SharpLine) is pleased to exclusively present the opportunity to acquire The Triangle at South Market Place. The property is strategically located a half mile from Hollywood Park, the Forum and the recently approved Rams Stadium. The Triangle at South Market Place is approximately ±1.21 acres located within the Transit Oriented Development zoning of Inglewood. The TOD Mixed-Use 1 zone provides for larger-scale development at a higher density. The ideal uses include retail, services or public-serving office on the ground floor and residential, office, hotel or institutional on the upper floors. Centrally located in the heart of Inglewood, the project is only half a mile away from Hollywood Park, the Forum and with close proximity to the newly approved 298 acre Stadium. Hollywood Park is a hub for entertainment, cultural and recreational activities that will attract people from all over Los Angeles. The Forum is a world-class entertainment venue which draws up to 17,000 people to the edge of Downtown for each of the many concerts held there. PURCHASE PRICE: BEST OFFER 3 INGLEWOOD, CA www.SouthMarketPlace.com PROPERTY OVERVIEW S LA BREA AVE E HILLCREST BLVD S MARKET ST THE TRI NGLE at South Market Place PROPERTY DETAILS PROJECT ADDRESSES No. Adress APN Land Size 1 501 S La Brea Ave 4021-021-001 9,634 SF 2 509 S La Brea Ave 4021-021-002 11,006 SF 3 513 S La Brea Ave 4021-021-005 8,967 SF 4 425 S Market St 4021-021-010 10,364 SF 5 451 S Market St 4021-021-008 5,617 SF 6 467 S Market St 4021-021-006 7,238 SF TOTAL ESTIMATED LOT AREA ±52,826 SF ±1.21 ACRES 1 5 4 E Hillcrest Blvd 6 2 S Market St 3 S La Brea Ave 5 INGLEWOOD, CA www.SouthMarketPlace.com THE TRI NGLE at South Market Place ZONING DETAILS TOD MIXED-USE 1 - provides for larger scale transit oriented development at a higher density. Uses should be mixed with retail, services, or public- serving office on the ground floor and residential, office, hotel or institutional on the upper floors. HOSPITALITY OFFICE MULTI-FAMILY Conceptual Design by 6 INGLEWOOD, CA www.SouthMarketPlace.com This conceptual design is based upon a preliminary review of entitlement requirements and on unverified and possibly incomplete site and/or building information, and is SOUTH MARKET STREET PERSPECTIVE intended merely to assist in exploring how the project might be developed. Signage PAGE THE TRIANGLE AT S. MARKET PLACE 05.07.2020 shown is for illustrative purposes only and does not necessarily reflect municipal 4 code compliance. All colors shown are for representative purposes only. Refer to INGLEWOOD, CA - LAX20-0000-00 material samples for actual color verification. THE TRI NGLE at South Market Place PROPERTY HIGHLIGHTS • Excellent opportunity to develop a mixed-use project • Build approximately 6 stories high or 80 feet • ±1.21 Acre Transit Oriented Development • Located at the intersections of S Market St, S La Brea Ave and E Hillcrest • Zoned TOD Mixed Use 1 – Transit Oriented District • High traffic intersection • Zoning allows for hospitality, office, residential and retail uses • 12 minute drive to LAX • Dense Urban Infill Location • Excellent street frontage and visibility • Property is strategically located 0.5 miles away from • Over 280,000 people within a 3 mile radius Hollywood Park and the Forum • Easy access to prime Los Angeles shopping, dining, and entertainment areas El Segundo LAX Playa Del Rey Venice Santa Monica Brentwood S La Brea Ave E Hillcrest Blvd S Market St 7 SHARPLINE www.SouthMarketPlace.com THE TRI NGLE at South Market Place 1.0 10.0 4.1 MAJOR AREA MILE TO STADIUM MILES TO DTLA MILES TO LAX RETAILERS NEW LA RAMS STADIUM LAX SUBJECT SITE THE FORUM Locust St ® La Brea Ave Market St Florence Ave Hillcrest Blvd 8 SHARPLINE www.SouthMarketPlace.com THE TRI NGLE at South Market Place SUBJECT LOCATION W Manchester Blvd SUBJECT SITE Manchester Blvd E Hillcrest Blvd E Spruce Ave 0.75 MILES TO THE FORUM Pincay Dr S Prairie Ave 1.0 MILE TO THE NEW STADIUM S La Brea Ave STADIUM W Arbor Vitae St 1.5 MILES TO HOLLYWOOD PARK HOLLYWOOD 1.5 MILES TO 9 SHARPLINE www.SouthMarketPlace.com THE TRI NGLE at South Market Place REGIONAL MAP HOLLYWOOD WEST HOLLYWOOD 13.2 MILES TO DODGER BEVERLY HILLS STADIUM WESTWOOD 10.0 MILES TO DOWNTOWN LA EAST LA CULVER CITY SANTA MONICA 10 MILE RADIUS 10 MILES TO COMMERCE VENICE BEACH SUBJECT 5 MILE RADIUS SITE 3 MILE RADIUS 1 MILE RADIUS 1.0 MILE TO 4.1 MILES TO RAMS STADIUM LAX EL SEGUNDO MANHATTAN 10 SHARPLINE BEACH www.SouthMarketPlace.com THE TRI NGLE at South Market Place CONCEPTUAL RENDERINGS EAST HILLCREST BLVD PERSPECTIVE Conceptual Design by This conceptual design is based upon a preliminary review of entitlement requirements and on unverified and possibly incomplete site and/or building information, and is EAST HILLCREST BLVD PERSPECTIVE intended merely to assist in exploring how the project might be developed. Signage PAGE THE TRIANGLE AT S. MARKET PLACE 05.07.2020 11 INGLEWOOD, CA shown is for illustrative purposes only and does not necessarily reflect municipal 2 code compliance. All colors shown are for representative purposes only. Refer to INGLEWOOD, CA - LAX20-0000-00 www.SouthMarketPlace.com material samples for actual color verification. THE TRI NGLE at South Market Place CONCEPTUAL RENDERINGS EAST HILLCREST BLVD + SOUTH LABREA AVE PERSPECTIVE Conceptual Design by This conceptual design is based upon a preliminary review of entitlement requirements and on unverified and possibly incomplete site and/or building information, and is EAST HILLCREST BLVD + SOUTH LABREA AVE PERSPECTIVE intended merely to assist in exploring how the project might be developed.
Recommended publications
  • Historic-Cultural Monument (HCM) List City Declared Monuments
    Historic-Cultural Monument (HCM) List City Declared Monuments No. Name Address CHC No. CF No. Adopted Community Plan Area CD Notes 1 Leonis Adobe 23537 Calabasas Road 08/06/1962 Canoga Park - Winnetka - 3 Woodland Hills - West Hills 2 Bolton Hall 10116 Commerce Avenue & 7157 08/06/1962 Sunland - Tujunga - Lake View 7 Valmont Street Terrace - Shadow Hills - East La Tuna Canyon 3 Plaza Church 535 North Main Street and 100-110 08/06/1962 Central City 14 La Iglesia de Nuestra Cesar Chavez Avenue Señora la Reina de Los Angeles (The Church of Our Lady the Queen of Angels) 4 Angel's Flight 4th Street & Hill Street 08/06/1962 Central City 14 Dismantled May 1969; Moved to Hill Street between 3rd Street and 4th Street, February 1996 5 The Salt Box 339 South Bunker Hill Avenue (Now 08/06/1962 Central City 14 Moved from 339 Hope Street) South Bunker Hill Avenue (now Hope Street) to Heritage Square; destroyed by fire 1969 6 Bradbury Building 300-310 South Broadway and 216- 09/21/1962 Central City 14 224 West 3rd Street 7 Romulo Pico Adobe (Rancho 10940 North Sepulveda Boulevard 09/21/1962 Mission Hills - Panorama City - 7 Romulo) North Hills 8 Foy House 1335-1341 1/2 Carroll Avenue 09/21/1962 Silver Lake - Echo Park - 1 Elysian Valley 9 Shadow Ranch House 22633 Vanowen Street 11/02/1962 Canoga Park - Winnetka - 12 Woodland Hills - West Hills 10 Eagle Rock Eagle Rock View Drive, North 11/16/1962 Northeast Los Angeles 14 Figueroa (Terminus), 72-77 Patrician Way, and 7650-7694 Scholl Canyon Road 11 The Rochester (West Temple 1012 West Temple Street 01/04/1963 Westlake 1 Demolished February Apartments) 14, 1979 12 Hollyhock House 4800 Hollywood Boulevard 01/04/1963 Hollywood 13 13 Rocha House 2400 Shenandoah Street 01/28/1963 West Adams - Baldwin Hills - 10 Leimert City of Los Angeles May 5, 2021 Page 1 of 60 Department of City Planning No.
    [Show full text]
  • Of Mallbu ~~~— I 23825 Stuart Ranch Road •Malibu, California• 90265-4861 ,~.`~~~~, (310)456-2489 •Fax(310) 456-7650 • °~+T~ Nma~
    ~~~~ ~~Z1 ~'~~ '~\ ~ r ~- ~ ~ ~1ty of Mallbu ~~~— i 23825 Stuart Ranch Road •Malibu, California• 90265-4861 ,~.`~~~~, (310)456-2489 •Fax(310) 456-7650 • www.malibucity.org °~+t~ nMa~ October 22, 2013 Glen Campora, Assistant Deputy Director California Department of Housing and Community Development 2020 W. EI Camino Avenue Sacramento, CA 95833 Subject: City of Malibu 2013-2021 Draft Housing Element(5 t" cycle) Dear Mr. Campora: The City of Malibu is pleased to submit its draft 5th cycle Housing Element for your review. The element has been revised to update the analysis of need, resources, constraints and programs to reflect current circumstances. Since the City's 4th cycle Housing Element was found to be in compliance and all zoning implementation programs have been completed, the City requesfs a streamlined review of the new element. If you have any questions, please contact me at 310-456-2489, extension 265, or the 'City's consultant, John Douglas, at 714-628-0464. We appreciate the assistance of Jess Negrete during the 4th cycle and look forward to receiving your review letter. Sincerely, 1 ~: !, <_ .~ Joyce Parker-Bozylinski, AICP Planning Director Enclosures: Draft 2013-2021 Malibu Housing Element(5 th cycle) Implementation Review Completeness Checklist HCD Streamline Review Form CITY OF MALIBU 2013-20212008 - 2013 Housing Element Draft October 2013 August 26, 2013 City Council Resolution No. 13-34 This page intentionally left blank City of Malibu 2013-20212008-2013 Housing Element Contents I. Introduction ................................................................................................................................. I-1 A. Purpose of the Housing Element ............................................................................................ I-1 B. Public Participation ................................................................................................................... I-2 C. Consistency with Other Elements of the General Plan .....................................................
    [Show full text]
  • South Bay Arterial System Detection Project
    South Bay Arterial System Detection Project Infrastructure Working Group Meeting September 9, 2020 South Bay Arterial System Detection Project Topics Covered • Jurisdictions in the Project area • Project Background • Project Scope • Preliminary Design • Design Phase I • Design Phase II • Anticipated Construction Schedule • Map and List of Intersections Jurisdictions • Unincorporated Los Angeles County • Carson • El Segundo • Gardena • Hawthorne • Hermosa Beach • Lawndale • Manhattan Beach • Redondo Beach • Torrance Project Background • Conceptual Design Plan identified and recommended improvements in the South Bay Region, including: • Closed-Circuit Television (CCTV) cameras • Communication Upgrades (Fiber) • Arterial System Detection • These enhancements improve traffic flows and reduce traffic congestion. • This project centers on the arterial performance Example CCTV camera measurement as part of the following south bay regional programs: 1. Los Angeles County Public Works South Bay Signal Synchronization and Bus Speed Improvements Plan 2. South Bay Cities Council of Governments South Bay Highway Program Strategic Transportation Element Project Scope Identify and install arterial system detectors at select locations within South Bay Cities to support traffic signal operations and network performance measures • Types of detector technologies studied and available: • Split advance loops, Bluetooth readers, Wi-fi readers, Radar, and Video detection • These devices can provide the following benefits • Enable traffic responsive signal operations
    [Show full text]
  • Land Use Element Designates the General Distribution and Location Patterns of Such Uses As Housing, Business, Industry, and Open Space
    CIRCULATION ELEMENT CITY OF HAWTHORNE GENERAL PLAN Adopted April, 1990 Prepared by: Cotton/Beland/Associates, Inc. 1028 North Lake Avenue, Suite 107 Pasadena, California 91104 Revision Table Date Case # Resolution # 07/23/2001 2001GP01 6675 06/28/2005 2005GP03 & 04 6967 12/09/2008 2008GP03 7221 06/26/2012 2012GP01 7466 12/04/2015 2015GP02 7751 TABLE OF CONTENTS Section Page I. Introduction to the Circulation Element 1 Purpose of this Element 1 Relation to Other General Plan Elements 1 II. Existing Conditions 2 Freeways 2 Local Vehicular Circulation and Street Classification 3 Transit Systems 4 Para-transit Systems 6 Transportation System Management 6 TSM Strategies 7 Non-motorized Circulation 7 Other Circulation Related Topics 8 III. Issues and Opportunities 10 IV. Circulation Element Goals and Policies 11 V. Crenshaw Station Active Transportation Plan 23 Circulation Element March 1989 LIST OF FIGURES Figure Page Figure1: Street Classification 17 Figure 2: Traffic Volume Map 18 Figure 3: Roadway Standards 19 Figure 4: Truck Routes 20 Figure 5: Level of Service 21 LIST OF TABLES Table 1: Definitions of Level-of-Service 22 Circulation Element March 1989 SECTION I - INTRODUCTION TO THE CIRCULATION ELEMENT Circulation and transportation systems are one of the most important of all urban systems in determining the overall structure and form of the areas they service. The basic purpose of a transportation network within the City of Hawthorne is the provision of an efficient, safe, and serviceable framework which enables people to move among various sections of the city in order to work, shop, or spend leisure hours.
    [Show full text]
  • The Digital Divide in Assembly District 64: Broadband Wireline Service
    The Digital Divide In Assembly District 64: Broadband Wireline Service District 64 Served Underserved Unserved Total 125,312 148 387 125,847 Households 100% 0% 0% 100% 465,036 376 988 466,400 Population 100% 0% 0% 100% Meets and Exceeds State Goal of 98% Served Source: Service availability data submitted by California broadband providers and validated by the CPUC as of December 31, 2014. Prepared by Watsonville GIS Center. This is a graphic representation only of best available sources. The City of Watsonville assumes no responsibility of errors. The Digital Divide in Assembly District 64: Broadband Wireline Service Unconnected and Percent Percent Percentage by Under-Connected Not Connected Connected Smartphone Only Statewide 16% 84% 14% Low-Income (<$20,000 Annually) 32% 68% 25% Spanish-Speakers 31% 69% 30% People With Disabilities 29% 71% 13% Seniors (65 or Older) 44% 56% 5% Non-High School Graduates 37% 63% 29% Most Disadvantaged Populations are Unconnected or Under-Connected Source: The Field Poll 2016 │http://www.cetfund.org/progress/annualsurvey Publicly-Subsidized Housing- Assembly District 64 Source: California Tax Credit Allocation Committee (TCAC) Project Name Project Address Housing Total Type Units Rohit Villas 122 E. 120th Street, Los Angeles, CA 90061 Large Family 16 Colden Oaks 225 W. Colden Avenue, Los Angeles, CA 90003 Large Family 38 Figueroa Oaks 10210 South Figueroa Street, Los Angeles, CA 900030000 Large Family 32 Figueroa Court Apartments 9130 S. Figueroa Street, Los Angeles, CA 90003 Special 40 Needs Heavenly Vision
    [Show full text]
  • 1048 S Los Angeles Street Is Located Less Than Three Miles from the Ferrante, a Massive 1,500-Unit Construction Project, Scheduled for Completion in 2021
    OFFERING MEMORANDUM A Signalized Corner Mixed-Use Retail and Office Property Ideally located in the heart of Downtown Los Angeles in the Iconic Fashion District brandonmichaelsgroup.com INVESTMENT ADVISORS Brandon Michaels Senior Managing Director of Investments Senior Director, National Retail Group Tel: 818.212-2794 [email protected] CA License: 01434685 Matthew Luchs First Vice President Investments COO of The Brandon Michaels Group Tel: 818.212.2727 [email protected] CA License: 01948233 Ben Brownstein Senior Investment Associate National Retail Group National Industrial Properties Group Tel: 818.212.2812 [email protected] CA License: 02012808 Contents 04 Executive Summary 10 Property Overview 16 Area Overview 28 FINANCIAL ANALYSIS Executive Summary 4 1048 S. Los Angeles St The Offering A Signalized Corner Mixed-Use Retail and Office Property Ideally located in the heart of Downtown Los Angeles in the Iconic Fashion District The Brandon Michaels Group of Marcus & Millichap has been selected to exclusively represent for sale 1048 South Los Angeles Street, a two-story multi-tenant mixed-use retail and office property ideally located on the Northeast signalized corner of Los Angeles Street and East 11th Street. The property is comprised of 15 rental units, with eight retail units on the ground floor, and seven office units on the second story. 1048 South Los Angeles Street is to undergo a $170 million renovation. currently 86% occupied. Three units are The property is located in the heart of vacant, one of which is on the ground the iconic fashion district of Downtown floor, and two of which are on the Los Angeles, which is home to over second story.
    [Show full text]
  • Downtownla VISION PLAN
    your downtownLA VISION PLAN This is a project for the Downtown Los Angeles Neighborhood Council with funding provided by the Southern California Association of Governments’ (SCAG) Compass Blueprint Program. Compass Blueprint assists Southern California cities and other organizations in evaluating planning options and stimulating development consistent with the region’s goals. Compass Blueprint tools support visioning efforts, infill analyses, economic and policy analyses, and marketing and communication programs. The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) through the U.S. Department of Transportation (DOT) in accordance with the provisions under the Metropolitan Planning Program as set forth in Section 104(f) of Title 23 of the U.S. Code. The contents of this report reflect the views of the author who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of SCAG, DOT or the State of California. This report does not constitute a standard, specification or regulation. SCAG shall not be responsible for the City’s future use or adaptation of the report. 0CONTENTS 00. EXECUTIVE SUMMARY 01. WHY IS DOWNTOWN IMPORTANT? 01a. It is the birthplace of Los Angeles 01b. All roads lead to Downtown 01c. It is the civic, cultural, and commercial heart of Los Angeles 02. WHAT HAS SHAPED DOWNTOWN? 02a. Significant milestones in Downtown’s development 02b. From pueblo to urban core 03. DOWNTOWN TODAY 03a. Recent development trends 03b. Public infrastructure initiatives 04.
    [Show full text]
  • Inglewood Basketball & Entertainment
    INGLEWOOD BASKETBALL & ENTERTAINMENT CENTER PROJECT- INTERSECTION LIST- EVENT DAY Count Company Index ID# Intersection Day Count Date Time Period Completed Day Count Date Time Period Completed 1 1 Concourse Way & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 2 2 la Cienega Boulevard & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 3 3/3b 1-405 NB off-ramp & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 4 4 Felton Avenue & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 5 5 Inglewood Avenue & Century Boulevard Friday 4/27 /2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 6 6 Firmona Avenue & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 7 7 Grevillea Avenue & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 8 8 la Brea Avenue/Hawthorne Boulevard & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 9 9 Club Drive & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 10 10 11th Avenue/Village Drive & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 11 11 Crenshaw Boulevard & Century Boulevard Friday 4/27/2018 4-7:30 PM and 9:30-11:30 PM Yes Saturday 4/14/2018 4-6 PM Yes 12 12 5th Avenue & Century
    [Show full text]
  • City of Los Angeles Mayor's Office of Economic Development
    SOUTH LOS ANGELES COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGY Prepared for City of Los Angeles Mayor’s Office of Economic Development Submitted by Figueroa Media Group World Innovations Marketing Los Angeles Harbor-Watts EDC South Los Angeles Economic Alliance USC Center for Economic Development March 2001 COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGY ii REPORT PRODUCED BY THE USC CENTER FOR ECONOMIC DEVELOPMENT Leonard Mitchell, Esq., Director Deepak Bahl, Associate Director Thomas O’Brien, Research Associate Paul Zamorano-Reagin, Research Associate 385 Von KleinSmid Center Los Angeles, California 90089 (213) 740-9491 http://www.usc.edu/schools/sppd/ced SOUTH LOS ANGELES i THE SOUTH LOS ANGELES COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGY PROJECT TEAM Figueroa Media Group Keith Coleman Nathan Freeman World Innovations Marketing Leticia Galindo Zully Gonzalez Los Angeles Harbor-Watts EDC Reynold Blight South Los Angeles Economic Alliance Bill Raphiel USC Center for Economic Development Leonard Mitchell, Esq. Deepak Bahl Thomas O’Brien Paul Zamorano-Reagin COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGY ii ACKNOWLEDGMENTS The South Los Angeles Comprehensive Economic Development Strategy Project Team gratefully acknowledges the assistance of: The Mayor’s Office of Economic Development John De Witt, Director Infrastructure Investment Ronald Nagai, Senior Project Manager Susan Cline, Planning Project Manager The Office of Councilmember Ruth Galanter, Sixth District Audrey King, Field Deputy Tracey Warden, Legislative Deputy The Office of Councilmember
    [Show full text]
  • 1981 Caltrans Inventory of Pacific Electric Routes
    1981 Inventory of PACIFIC ELECTRIC ROUTES I J..,. I ~ " HE 5428 . red by I58 ANGELES - DISTRICT 7 - PUBLIC TRANSPORTATION BRANCH rI P37 c.2 " ' archive 1981 INVENTORY OF PACIFIC ELECTRIC ROUTES • PREPARED BY CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) DISTRICT 07 PUBLIC TRANSPORTATION BRANCH FEBRUARY 1982 • TABLE OF CONTENTS PAGE I. EXECUTIVE SUMMARY 1 Pacific Electric Railway Company Map 3a Inventory Map 3b II. NQR'I'HIRN AND EASTERN DISTRICTS 4 A. San Bernardino Line 6 B. Monrovia-Glendora Line 14 C. Alhambra-San Gabriel Line 19 D. Pasadena Short Line 21 E. Pasadena Oak Knoll Line 23 F. Sierra Madre Line 25 G. South Pasadena Line 27 H. North Lake Avenue Line 30 10 North Fair Oaks Avenue Line 31 J. East Colorado Street Line 32 K. Pomona-Upland Line 34 L. San Bernardino-Riverside Line 36 M. Riverside-Corona Line 41 III. WESTERN DISTRICT 45 A. Glendale-Burbank Line 47 B. Hollywood Line Segment via Hill Street 52 C. South Hollywood-Sherman Line 55 D. Subway Hollywood Line 58 i TABLE OF CONTENTS (Contd. ) -PAGE III. WESTERN DISTRICT (Conta. ) E. San Fernando valley Line 61 F. Hollywood-Venice Line 68 o. Venice Short Line 71 H. Santa Monica via Sawtelle Line 76 I. westgate Line 80 J. Santa Monica Air Line 84 K. Soldier's Home Branch Line 93 L. Redondo Beach-Del Rey Line 96 M. Inglewood Line 102 IV. SOUTHIRN DISTRICT 106 A. Long Beach Line 108 B. American Avenue-North Long Beach Line 116 c. Newport-Balboa Line 118 D. E1 Segundo Line 123 E. San Pedro via Dominguez Line 129 F.
    [Show full text]
  • San Fernando Valley
    SHARED HOUSING Regional Area 2: San Fernando Valley (Includes: Burbank, Calabasas, Canoga Park, Canyon Country, Encino, Glendale, La Cañada-Flintridge, San Fernando, Sherman Oaks, Sun Valley, Van Nuys, Woodland Hills) Agency People Serviced Beds Hours Intake Requirements Documentation required ABL My Family House Adults N/A Monday-Friday Call for intake requirements • Picture ID preferred 9am-4pm 9733 Columbus Avenue North hills, CA91343 (818) 810-5250 SHARED HOUSING Regional Area 3: San (Includes: Alhambra, Eagle Rock, Highland Park, Glendale, Pasadena, Arcadia, Claremont, Covina, Diamond Bar, El Monte, Glendora, Monrovia, Pomona, San Gabriel) Agency People Serviced Beds Hours Intake Requirements Documentation required Volunteers of America Single men N/A Monday-Friday Call for intake requirements • Picture ID Homeless Support Services & 8am-4:30pm • SSN women • Proof of income INFROMATION NOT DISCLOSED CALL FOR ADDRESS (626) 442-4357 SHARED HOUSING Regional Area 4: Metro/ Downtown (Includes: Boyle Heights, Central City, Downtown LA, Echo Park, El Sereno, Hollywood, Mid-City Wilshire, Monterey Hills, Mount Washington, Silverlake, West Hollywood, Westlake) Agency People Serviced Beds Hours Intake Requirements Documentation required Kopling House Men only N/A N/A Call to schedule an N/A appointment and set up an INFORMATION NOT DISCLOSED interview (213) 388-9438 SHARED HOUSING Regional Area 6: South Los Angeles (Includes: Athens, Compton, Crenshaw, Hyde Park, Lynwood, Paramount, South Los Angeles, Watts) Agency People Serviced Beds Hours
    [Show full text]
  • Transportation Safety
    IV. ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION SAFETY This section describes the existing transportation setting of the proposed Project and evaluates the potential for transportation safety impacts to occur due to development of the proposed Project. The transportation safety analysis focuses on the potential for the proposed Project to result in driver distraction that compromises the safety of motorists and pedestrians within the Central Terminal Area (CTA), and the potential for Air Traffic Control (ATC) or pilot distraction to occur to a degree that compromises aviation safety. 1. ENVIRONMENTAL SETTING a. Existing Street System The Los Angeles International Airport (LAX) is located in the western portion of Los Angeles County. This area of the county is mostly built out, and very little land remains undeveloped. As the largest airport in the Los Angeles region, LAX receives traffic from throughout the entire region. However, its location in the heart of an urban area and the lack of any direct freeway connection to the CTA requires that LAX be served by many local and arterial roads, with direct CTA access solely provided from Century Boulevard and Sepulveda Boulevard. These roads are in turn served by two freeways (Interstates 105 and 405 [I-105 and I-405]). LAX presently has one primary access system serving the CTA, which requires the use of local and arterial streets from the east for access. Refer to Figure IV.D-1, Project Site and Surrounding Roadways. i. On-Airport Roadways (1) Landside Sub-Area The CTA accommodates all of the origin/destination passenger traffic using LAX. Passengers accessing the CTA use many modes of travel; however, the overwhelming majority of vehicles in the CTA are private vehicles.
    [Show full text]