Baltic-Adriatic TEN-T Core Network Corridor – Project List, 31/05/2017

Total Page:16

File Type:pdf, Size:1020Kb

Baltic-Adriatic TEN-T Core Network Corridor – Project List, 31/05/2017 Baltic-Adriatic TEN-T Core Network Corridor – Project list, 31/05/2017 Disclaimer: this list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter. Project Member States / Total costs Project name Project promoter Project end date category Countries involved (€ million) Upgrade Nordbahn Wien Süßenbrunn – Rail ÖBB-Infrastruktur AG AT 592.0 12/2025 Bernhardsthal Data networks and mobile radio Wien - Rail ÖBB-Infrastruktur AG AT 2.1 12/2018 Bernhardsthal Train condition checkpoints Wien - Rail ÖBB-Infrastruktur AG AT 0.7 12/2018 Bernhardsthal Integration of interlockings into signalling & Rail ÖBB-Infrastruktur AG AT 10.5 12/2018 dispatching centres Wien - Bernhardsthal Noise protection Wien – Bernhardsthal Rail ÖBB-Infrastruktur AG AT 3.6 12/2020 Upgrade Stadlau-Marchegg Rail ÖBB-Infrastruktur AG AT 550.0 12/2022 Train condition checkpoints Marchegg – Rail ÖBB-Infrastruktur AG AT 9.5 12/2020 Arnoldstein Integration of interlockings into signalling & Rail ÖBB-Infrastruktur AG AT 98.6 12/2016 dispatching centres Marchegg - Arnoldstein Pottendorf line Rail ÖBB-Infrastruktur AG AT 618.2 12/2022 Upgrade Wien Meidling / Altmannsdorf Rail ÖBB-Infrastruktur AG AT 44.6 12/2023 Wien Zvbf Rail Freight Station - Alignment To be Rail ÖBB-Infrastruktur AG AT 12/2037 optimization of exit lines defined Reconfiguration of the accessibility of Rail ÖBB-Infrastruktur AG AT 10.5 12/2020 Himberg Station Link between Vienna Airport - Bruck/Leitha To be Rail ÖBB-Infrastruktur AG AT 12/2017 (- border AT/HU) defined Extension Wien Erdberger Lände Rail Bridge To be Rail ÖBB-Infrastruktur AG AT 12/2034 (section Wien Simmering - Wien Praterkai) defined Integration of interlockings into signalling & Rail ÖBB-Infrastruktur AG AT 25.7 12/2017 dispatching centres (Vienna) Noise protection (Vienna) Rail ÖBB-Infrastruktur AG AT 13.4 12/2020 Train condition checkpoints Wien – Rail ÖBB-Infrastruktur AG AT 0.8 12/2017 Nickelsdorf Noise protection Wien – Nickelsdorf Rail ÖBB-Infrastruktur AG AT 1.7 12/2017 Electronic interlocking: Wr. Neustadt - Graz Rail ÖBB-Infrastruktur AG AT 64.3 12/2022 Data networks and mobile radio Wien – Rail ÖBB-Infrastruktur AG AT 15.7 12/2017 Villach Noise protection Wien – Villach Rail ÖBB-Infrastruktur AG AT 17.9 12/2021 To be Upgrade Wampersdorf - Wiener Neustadt Rail ÖBB-Infrastruktur AG AT 12/2022 defined Upgrade Wiener Neustadt – Gloggnitz Rail ÖBB-Infrastruktur AG AT 81.2 12/2018 Ternitz station reconfiguration Rail ÖBB-Infrastruktur AG AT 41.3 12/2022 Semmering base tunnel Rail ÖBB-Infrastruktur AG AT 3,315.0 12/2026 Station reconfigurations Mürzzuschlag - Rail ÖBB-Infrastruktur AG AT 116.3 12/2019 Bruck a.d.M. Station reconfigurations Bruck a.d.M - Graz Rail ÖBB-Infrastruktur AG AT 204.9 12/2023 Graz Hauptbahnhof Rail ÖBB-Infrastruktur AG AT 150.2 12/2017 Upgrade Graz - Spielfeld-Straß Rail ÖBB-Infrastruktur AG AT 19.1 12/2026 Graz - Klagenfurt; Koralm line Rail ÖBB-Infrastruktur AG AT 5,539.3 12/2023 ETCS deployment Wien – Süßenbrunn Rail ERTMS ÖBB-Infrastruktur AG AT 16.4 12/2017 ETCS deployment in ETCS gap between Rail ERTMS ÖBB-Infrastruktur AG AT 9.8 12/2019 Westbahn and Ostbahn To be ERTMS deployment Wien – Marchegg Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 defined To be ERTMS deployment Wien – Parndorf Rail ERTMS ÖBB-Infrastruktur AG AT 12/2022 defined ERTMS deployment Parndorf – Kittsee / To be Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 Petrzalka (border AT/SK) defined ERTMS deployment Wampersdorf – To be Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 Gramatneusiedl defined To be ERTMS deployment Wampersdorf – Wien Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 defined ERTMS deployment Wr. Neustadt – To be Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 Wampersdorf defined To be ERTMS deployment Graz – Wr. Neustadt Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 defined To be ERTMS deployment Werndorf – Graz Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 defined ERTMS deployment Sentilj / Spielfeld-Strass To be Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 (border AT/SLO) – Werndorf defined To be ERTMS deployment Klagenfurt – Werndorf Rail ERTMS ÖBB-Infrastruktur AG AT 12/2023 defined ERTMS deployment Border AT/IT – To be Rail ERTMS ÖBB-Infrastruktur AG AT 12/2030 Klagenfurt defined Bundesministerium für Upgrade Austrian locomotives to ERTMS Rail ERTMS Verkehr, Innovation und AT 9.0 12/2019 Baseline 3 Technologie Planning and construction of the A5 North ASFINAG (Austrian Road Road AT 283.0 12/2017 motorway. Schrick-Poysbrunn section Infrastructure Manager) A5 Construction Poysbrunn - Border AT/CZ ASFINAG (Austrian Road Road AT 49.6 12/2018 1st Part Infrastructure Manager) A5 Construction Poysbrunn - Border AT/CZ ASFINAG (Austrian Road Road AT 91.1 06/2027 2nd Part Infrastructure Manager) Planning of the A5 North motorway, section ASFINAG (Austrian Road between Poysbrunn and the Austria-Czech Road AT 5.0 02/2018 Infrastructure Manager) border S1 - Vienna Outer Ring Expressway - ASFINAG (Austrian Road Schwechat - Süßenbrunn (1st part: Road AT 271.1 12/2020 Infrastructure Manager) Großenzersdorf - Süßenbrunn) S1 - Vienna Outer Ring Expressway - ASFINAG (Austrian Road Schwechat - Süßenbrunn (2nd part: Road AT 1,612.1 09/2025 Infrastructure Manager) Schwechat - Großenzersdorf) A4 - Fischamend – Bruck a. d. Leitha 6-lane ASFINAG (Austrian Road Road AT 151.7 11/2020 expansion and rehabilitation Infrastructure Manager) A2 motorway: northern by-pass Klagenfurt, ASFINAG (Austrian Road Road AT 14.6 06/2018 general overhaul (stage 2) Infrastructure Manager) ASFINAG (Austrian Road Roadside network information system Road AT 4.1 11/2018 Infrastructure Manager) Bundesministerium für eCall.at Road Verkehr, Innovation und AT 8.0 12/2017 Technologie Bundesministerium fur C-Roads Austria Road Verkehr, Innovation und AT 19.1 12/2020 Technologie Planning and construction of the expansion Wiener Hafen, Gmbh & Co IWW AT 57.0 12/2025 of the trimodal Port of Freudenau/Vienna KG Improving of the multimodal Wiener Hafen, Gmbh & Co interconnections at Port of IWW AT 9.0 n.a. KG Freudenau/Vienna Expansion of the container terminal - Wiener Hafen, Gmbh & Co IWW AT 5.1 12/2017 construction Stage 1 KG Third runway for the Vienna International Airport Vienna Airport PLC AT 800.0 12/2028 Airport Sustainable airport area - CO2 neutral Airport Flughafen Wien AG AT 80.0 12/2025 Airport Cargo Center Vienna South (Inzersdorf) Multimodal ÖBB-Infrastruktur AG AT 245.5 12/2017 Steiermärkische Terminal Graz Süd Expansion Multimodal Landesbahnen / Cargo- AT 39.8 n.a. Center-Graz Vienna Central Railway Station (Wien Hbf) Rail ÖBB-Infrastruktur AG AT 997.1 12/2015 Airport Schwechat – Long distance rail Rail ÖBB-Infrastruktur AG, PGO AT 5.8 2014/2015 connection to Bratislava/Budapest Works and studies for upgrading the Wien- Rail ÖBB-Infrastruktur AG AT 846.6 12/2015 Bratislava railway line (6 sub-projects) Implementation of GSM-R on Austrian A- Rail ÖBB-Infrastruktur AG AT 81.4 12/2014 network A4 motorway: section Airport Vienna - ASFINAG (Austrian Road Fischamend, additional lane for each Road AT 45.1 11/2015 Infrastructure Manager) direction A2 motorway: northern by-pass Klagenfurt, ASFINAG (Austrian Road Road AT 54.58 06/2015 general overhaul (stage 1) Infrastructure Manager) Wiener Hafen, Gmbh & Co OPTIHUB IWW AT 0.6 12/2016 KG Studies for the expansion of the trimodal Wiener Hafen, Gmbh & Co IWW AT 5.4 12/2015 port of Freudenau/Vienna KG Expansion of the tri-modal inland port of Wiener Hafen, Gmbh & Co IWW AT 12.8 12/2015 Vienna by land recovery (2012-AT-18070-P) KG Wiener Hafen, Gmbh & Co Port mobile Crane IWW AT 2.7 12/2015 KG Wiener Hafen, Gmbh & Co Land recovery Part 2 IWW AT 6.6 12/2015 KG Connection Ostbahn – Flughafenschnellbahn Airport ÖBB-Infrastruktur AG AT 63.1 12/2014 near Kledering with Vienna Central Station Adaptation of Passenger Rail Station ÖBB-Infrastruktur AG / Airport AT 118.8 12/2014 (platform extension to min. 400 m length for Flughafen Wien long-distance passenger trains) AT, BE, BG, CY, CZ, DE, I_HeERO - Harmonized eCall European pilot Road ERTICO – ITS Europe EI, ES, FI, GR, IT, LU, 31.0 12/2017 (Partnership Project) NL, PT, RO, SI, UK AT, BE, CZ, CY, DE, DK, EE, FI, FR, GR, HU, HR, Navigation performance implementation Airport EUROCONTROL IE, IT, LU, LV, LT, NL, 4.9 12/2019 tooklit MT, PL, PT, RO, SK, SI, ES, SE, SI, UK AT, BE, CZ, DE, DK, EE, Coordinated and harmonised FI, FR, GR, HU, HR, IE, implementation of rail freight corridors and Rail RailNetEurope IT, LU, LV, LT, NL, PL, 7.8 12/2017 freight and passenger telematics PT, RO, SK, SI, ES, SE, applications SI, UK AT, BE, CZ, DE, DK, EE, FI, FR, GR, HU, HR, IE, Support to the implementation of ERTMS Rail ERTMS EEIG ERTMS Users Group IT, LU, LV, LT, NL, PL, 11.5 12/2017 PT, RO, SK, SI, ES, SE, SI, UK AT, BE, CZ, DE, DK, EE, FI, FR, GR, HU, HR, IE, Joint Application for PDP Implementation - Airport ENAV S.p.A. IT, LV, NL, PL, PT, RO, 643.8 12/2020 Cluster 1 (DP Implementation) SK, SI, ES, SE, UK, BH, NO SESAR Deployment Manager AT, BE, DE, DK, ES, FI, SESAR Deployment Programme Airport (NATS (En-Route)Pic on FR, IE, IT, MT, NL, PT, 529.1 12/2018 implementation 2015-Cluster 1 behalf) SE, SI, UK CLOSER, Lindholmen Science Swiftly Green Innovation AT, BE, DE, IT, SE 2.9 12/2015 Park Regional and Transport Development in the Regional Government of AT, BG, DE, HR, HU, Danube-Black Sea Region towards a IWW 2.2 06/2019 Lower Austria MD, RO, RS, SK, UA Transnational Multiport Gateway Region - DBS Gateway Region AT, BG, HR, HU, MD, DAPHNE - Danube Ports Network IWW Pro Danube International 3.0 06/2019 RO, RS, SK, UA CN Administratia Porturilor AT, BG, HU, RO, RS, SK, GETUP Green Danube Ports IWW 2.0 n.a.
Recommended publications
  • Il Calendario Dei Divieti Di Circolazione Della Grecia E Della Spagna Non È Ancora Disponibile
    Driving restrictions, 2008 Austria 1. GENERAL DRIVING RESTRICTIONS Vehicles concerned Trucks with trailers, if the maximum authorised total weight of the motor vehicle or the trailer exceeds 3.5t; trucks, articulated vehicles and self-propelled industrial machines with an authorised total weight of more than 7.5t. Area Nationwide, with the exception of journeys made exclusively as part of a combined transport operation within a radius of 65km of the following transloading stations: Brennersee; Graz-Ostbahnhof; Salzburg-Hauptbahnhof; Wels-Verschiebebahnhof; Villach-Fürnitz; Wien-Südbahnhof; Wien-Nordwestbahnhof; Wörg; Hall in Tirol CCT; Bludenz CCT; Wolfurt CCT. Prohibition Saturdays from 15h00 to 24h00; Sundays and public holidays from 00h00 to 22h00 Public holidays 2008 1 January New Year’s Day 6 January Epiphany 24 March Easter Monday 1 May Labour Day; Ascension 12 May Whit Monday 22 May Corpus Christi 15 August Assumption 26 October National holiday 1 November All Saints’ Day 8 December Immaculate Conception 25 December Christmas Day 26 December Boxing Day Exceptions concerning trucks with trailers exceeding 3.5t · vehicles transporting milk; concerning vehicles with an authorised total weight of more than 7.5t · vehicles carrying meat or livestock for slaughter (but not the transport of heavy livestock on motorways), perishable foodstuffs (but not deep frozen goods), the supply of refreshments to tourist areas, urgent repairs to refrigeration plant, towing services (in all cases, according to § 46 StVO, it is obligatory to leave the motorway at the nearest exit), breakdown assistance vehicles, emergency vehicles, vehicles of a scheduled transport company (regular lines), and local trips on the two Saturdays preceding 24 December.
    [Show full text]
  • Documents.Worldbank.Org
    46730 THE WORLD BANK GROUP WASHINGTON, D.C. TP-23 TRANSPORT PAPERS NOVEMBER 2008 Public Disclosure Authorized Road User Charges: Current Practice and Perspectives in Central and Eastern Europe Cesar Queiroz, Barbara Rdzanowska, Robert Garbarczyk and Michel Audige Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT SECTOR BOARD ROAD USER CHARGES: CURRENT PRACTICE AND PERSPECTIVES IN CENTRAL AND EASTERN EUROPE Cesar Queiroz, Barbara Rdzanowska, Robert Garbarczyk and Michel Audige THE WORLD BANK WASHINGTON, D.C. © 2008 The International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington, DC 20433 Telephone 202-473-1000 Internet: www.worldbank.org This volume is a product of the staff of The World Bank. The findings, interpretations, and conclusions expressed in this volume do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development / The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • Tourist Guide STRAZA
    F D F I N MK L StražaF D INMKL r TTT aT v eT l g u i dT e Straža Travel guide Contents Straža through the Years 4 Krka, the Belle of Dolenjska 8 Vineyards, Cviček, Vineyard Cottages 11 Religious Heritage 13 Footpaths around Straška Gora, Velika Prepadna Cave, Peter Take-Off Site ... 16 And ... 22 Events 28 Inns, Lodging Houses, Tourism in Vineyard Cottages 32 About the Straža Municipality 34 Welcome to Straža 2nd edition, 1st print Text: Marjan Žiberna, Andreja Kren Photographs: Dušan Šetina, Slavko Strmec, Anica Nose, Versatilis Cartography: GURS, data acquisition: Dušan Šetina Design and print: ART 32 d.o.o, Špes, grafični studio, Novo Mesto Cover design: Artisan Overview of the contents: Maja Medic Print run: 1.000 copies Straža, January 2016 2 Invitation to Straža Even though Straža is a small municipality with a surface area of just over two dozen square kilometres and a few thousand inhabitants, that does not mean that it has nothing to offer. Quite the opposite! For one thing, the Krka River, which is also aptly called the ‘Belle of Dolenjska’, runs through this area in the very heart of Dolenjska. However, the Krka is not just lovely to look at, you can go rowing or fishing on it or travel down the river in a raft. Although the numerous mill wheels that used to be turned by the river have long since stopped turning, you can still see these vestiges of the past in Vavta Vas and a few other locations in the municipality. Just a stone’s throw above the green river rises Straška Gora.
    [Show full text]
  • Sustainability Report for 2017
    SUSTAINABILITY REPORT 2017 SOCIAL FOOTPRINT OF DARS d. d. DARS d. d. IS A COMPANY OF DARS d. d. is well aware of its The Slovenian Government responsibility to people, the environment, introduced toll differentiation with STRATEGIC IMPORTANCE FOR and society. Hence, it exercises social respect to EURO emission classes THE REPUBLIC OF SLOVENIA responsibility in a sustainable manner on 1 January 2010 with the decision AND REPRESENTS THE in all projects and long-term plans at all determining the toll adjustment LARGEST CAPITAL INVESTMENT levels. Ambitious and clearly defined factors for vehicles whose maximum (UNDER THE BALANCE SHEET goals ensure that the public will continue permitted weight exceeds 3,500kg. to identify DARS as a responsible and Vehicles with the lowest emissions BOOK VALUE CRITERION) IN forward-looking company. of harmful particles (higher EURO TRANSPORT. emission classes) are entitled to a reduced tariff. Corporate income tax In EUR 2015: €12,009,362 2016: €19,203,477 2017: €32,981,826 12,009,362 19,203,477 32,981,826 2015 2016 2017 Employees are proud to be employed at VAT In EUR DARS and perform work in a responsible 2015: €67,837,287 and committed manner, as the mirror 2016: €70,538,253 of the Company. That way, employees 2017: €86,370,473 67,837,287 70,538,253 86,370,473 strengthen self-respect, self-confidence 2015 2016 2017 and loyalty, thus enhancing Company reputation. Payment of interest In EUR 2015: €50,020,548 2016: €41,234,923 2017: €40,414,027 50,020,548 41,234,923 40,414,027 2015 2016 2017 Investments in
    [Show full text]
  • Ag4 Discussion Paper on Secondary Networks in the Alpine Region
    ANNEX AG4 DISCUSSION PAPER ON SECONDARY NETWORKS IN THE ALPINE REGION Contributions from AG4 Members concerning good practice examples CONTENT INTRODUCTION .......................................................................................................... 3 Transport Infrastructure in EUSALP Member Regions – Input Slovenia and Trento ........... 3 1. THEMATIC AREA I ...........................................................................................10 1.1. General Overview ...................................................................................................10 1.2. Sustainable and economically efficient accessibility ................................................10 Contributions by Aosta Valley, Bozen/Bolzano, Liguria, Piedmont, Slovenia, Styria, Switzerland, Trentino, Tyrol. 1.3. Management capacity and maintenance of the network .........................................27 Contributions by Bozen/Bolzano, Slovenia, Trentino. 1.4. Cross-border links...................................................................................................34 Contributions by Friuli Venezia Giulia, Slovenia, Styria. 2. THEMATIC AREA II ..........................................................................................36 2.1. General Overview ...................................................................................................36 2.2. Protection of territory, environment and climate ......................................................36 Contributions by Aosta Valley, Bozen/Bolzano, Slovenia, Styria.
    [Show full text]
  • Appendix 9 Concession Experience in the Road
    Louis Berger S.A. APPENDIX 9 CONCESSION EXPERIENCE IN THE ROAD TRANSPORTATION SECTOR IN CENTRAL EUROPE 1. BACKGROUND Introduction During recent years, the goal in several countries in Central Europe has been to aim to bring an increasing participation of the private sector into the development of transport infrastructure. This has occurred in differing ways, with differing results through the whole spectrum from fully privatised, and public/private partnerships to wholly publicly financed projects. This paper summarises some of the key projects which have been realised, or are under realisation, principally in the countries of Hungary, Poland and Croatia in the Road Transport Sector. The focus therefore is on selected concessions for toll motorways in these countries. Hungary Under the previous government, there was a strong policy towards promoting the development of motorways in the Republic of Hungary on a privately financed basis. With enactment of the Concessions Act, the Ministry of Transport actively promoted the development of several Concessions. Poland In the Republic of Poland, the promotion of new motorways was stimulated by the enactment of the Motorway Act in 1994. However it has taken several years to reach realisation of the first toll motorway. The Act was modified in 1999 in order to favour the developments of public-private partnerships, under the management of the Motorway Agency. Eventually, an operating Concession was agreed as part of the A4 motorway between Krakow and Katowice and the first real concession for construction and realisation of a new motorway was closed in October 2000, for a section of the A2 motorway between Poznan and Konin, on the Berlin-Warsaw axis.
    [Show full text]
  • Touch & Go and Touch 2 with Go
    Touch & Go and Touch 2 with Go Autumn 2018 map update release notes 4 more pages required in Autumn edition to fit information Keeping up to date with The Toyota Map Update Release Notes Map update information these and many more features: Touch & Go (CY11) helps you stay on track with the map Full map navigation Release date: Autumn 2018 Driver-friendly full map pan-European navigation updates of the Touch & Go and Touch 2 Version: 2018 with clear visual displays for signposts, junctions and lane with Go navigation systems. Database: 2018.Q1 guidance. Media: USB stick or download by user Speed limit and safety Toyota map updates are released at least once a year System vendor: Harman camera alerts Drive safely with the help of a and at a maximum twice. Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, speed limit display and warning, including an optional Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, France, speed warning setting. Alerts Keep up with the product information, map changes, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, Kosovo, Latvia, notify you of fixed safety Liechtenstein, Lithuania, Luxembourg, Macedonia (F.Y.R.O.M), Malta, Moldova, camera locations (in countries premium content and sales arguments. where it is legal). Monaco, Montenegro, Netherlands, Norway, Poland, Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican. Intuitive detour suggestions Real-time traffic information Contents updates* alert you to Touch 2 with Go (CY13/16) congestion ahead on your planned route. The system Map update information 3 Release date: Autumn, 2018 calculates potential delay times and suggests a detour Navigation features 4 Version: 2018 to avoid the problem.
    [Show full text]
  • Doing Business in Novo Mesto.Pdf
    Municipality of Novo mesto About Novo mesto • the capital of the Lower Carniola (in Slovenian: Dolenjska) region of Slovenia • located midway (on the A2 motorway) between two capitals: 70 km southeast of Slovenia’s capital Ljubljana and 80 km west of Croatia’s capital Zagreb • with a population of about 23,300, it is the seventh largest town in Slovenia • total municipal area is 236 square km, with 36,500 inhabitants • the economic, educational, cultural business, administrative, religious and sports centre of the south-eastern part of the country • the town was founded in the year 1365 on a scenic bend of the Krka River Municipality of Novo mesto is initiative-firendly • We think ourselves as the driver for developing the positive environment for private initiatives. • We are happy to participate in regional, national and international platforms and networks. • Our job is to create a solid municipal platform. • We promote ourselves as initiative-friendly. Numerous regional institutions supporting economy www.gzdbk.si www.rc-nm.si www.fos.unm.si www.fis.unm.si www.vsgrm.unm.si www.vs-nm.si www.fini-unm.si The region of ecxellence • Among all regions in Slovenia, economy indicators position the Dolenjska region at the very top. • According to the percentage of net sales realized in foreign markets, the net value added per employee and the net revenues, the region is in the first place, while in terms of revenue per employee in the fourth place. Economy indicators 53,049 EUR net 244.8 M EUR net 23,000 employees value added per profit employee
    [Show full text]
  • Projects Decided 2000-2003
    List of projects decided between 2000 and 2003 amounts in euro number of est. total est.total Ispa project number: projec namet: projects eligible cost contribution country: Bulgaria sector: environment 2000/BG/16/P/PE/002 Regional landfills (group) - waste management:Sozopol, Rousse, Montana, Pernik, Sev 60.577.513 45.433.135 2000/BG/16/P/PE/003 Stara Zagora - Dimitrovgrad: construction of new wastewater treatment plants 43.399.688 32.549.766 2001/BG/16/P/PE/005 Gorna: wastewater collection and treatment 16.633.945 12.475.459 2001/BG/16/P/PE/006 Pazardjik wastewater collection and treatment 19.110.968 12.422.129 2001/BG/16/P/PE/008 Blagoevgrad wastewater treatment plant 12.580.465 8.806.326 2002/BG/16/P/PE/009 Bourgas-Meden Rudnik wastewater collection and treatment 10.206.220 7.654.665 2002/BG/16/P/PE/010 Targovishte wastewater collection and treatment 15.235.915 11.426.936 2002/BG/16/P/PE/011 Lovech wastewater collection and treatment 18.396.575 13.797.431 2002/BG/16/P/PE/012 Montana wastewater collection and treatment 16.741.237 12.555.928 2002/BG/16/P/PE/013 Smoljan Integrated water project 24.471.021 18.353.266 2002/BG/16/P/PE/014 Sevlievo wastewater collection and treatment 13.987.623 10.490.717 2002/BG/16/P/PE/015 Popovo wastewater collection and treatment 11.860.433 8.895.326 2002/BG/16/P/PE/016 Varna integrated water project 25.432.000 19.074.000 2002/BG/16/P/PE/017 Balchik: Integrated water project 21.589.225 16.191.919 2002/BG/16/P/PE/018 Shumen: water cycle improvements 30.130.000 22.597.500 2003/BG/16/P/PE/019 Kardjali:
    [Show full text]
  • Annual Report 2017
    ANNUAL REPORT 2017 Ljubljana, April 2018 2 DARS ANNUAL REPORT 2017 2017 REPORT ANNUAL I. BUSINESS REPORT FINANCIAL REPORT II. 3 DARS ANNUAL REPORT 2017 2017 REPORT ANNUAL 4 DARS ANNUAL REPORT 2017 2017 REPORT ANNUAL I. BUSINESS REPORT 5 DARS ANNUAL REPORT 2017 2017 REPORT ANNUAL CONTENT I.BUSINESS REPORT 5 Statement on the Management's responsibility 8 I.1 Information About the Company and Key Business Data 10 I.2 Letter from the Management 16 I.3 Company mission, vision, values, strategic policies and integrated management system policy 18 I.4 Corporate Governance Statement of DARS d.d. 21 I.5 Non-financial reporting at DARS d.d. 26 I.6 Analysis of business performance 27 I.7 Important business events in the 2017 financial year 29 I.8 Risk management 30 I.8.1 Operational risks 30 I.9 Presentation of the Company's business activities 35 I.9.1 Performance and attainment of plans 35 I.9.2 Toll collection 36 I.9.3 Motorway maintenance 37 I.9.4 Traffic safety management and provision 38 I.9.5 Investments 41 I.9.6 Debt repayment 45 I.10 Motorways and express ways in RS and traffic loads 46 I.11 Investments in motorway development and reconstruction 54 I.11.1 Investments on behalf of RS and for its account 54 I.11.2 Investments on behalf of and for the account of DARS d.d. 54 I.12 International cooperation and acquisition of European grants 55 I.13 Self-assessment using the EFQM excellence model 56 I.14 Integrated management system 57 I.15 Internal audit 58 I.16 Sustainable development 59 I.16.1 Strategic management of sustainable development at DARS d.d.
    [Show full text]
  • Driving Restrictions, Goods Transport Austria 1. GENERAL
    Driving Restrictions, Goods Transport Austria 1. GENERAL DRIVING RESTRICTIONS Vehicles concerned Trucks with trailers, if the maximum authorised total weight of the motor vehicle or the trailer exceeds 3.5t; trucks, articulated vehicles and self- propelled industrial machines with an authorised total weight of more than 7.5t. Area Nationwide, with the exception of journeys made exclusively as part of a combined transport operation within a radius of 65km of the following transloading stations: Brennersee; Graz-Ostbahnhof; Salzburg- Hauptbahnhof; Wels-Verschiebebahnhof; Villach-Fürnitz; Wien- Südbahnhof; Wien-Nordwestbahnhof; Wörg; Hall in Tirol CCT; Bludenz CCT; Wolfurt CCT. Prohibition Saturdays from 15h00 to 24h00; Sundays and public holidays from 00h00 to 22h00 Public holidays 2011 1 January New Year‟s Day 6 January Epiphany 25 April Easter Monday 1 May Labour Day* 2 June Ascension 13 June Whit Monday 23 June Corpus Christi 15 August Assumption 26 October National holiday 1 November All Saints‟ Day 8 December Immaculate Conception 25 December Christmas Day* 26 December Boxing Day * Sunday Exceptions concerning trucks with trailers exceeding 3.5t · vehicles transporting milk; concerning vehicles with an authorised total weight of more than 7.5t · vehicles carrying meat or livestock for slaughter (but not the transport of heavy livestock on motorways); · perishable foodstuffs (but not deep frozen goods) which are as follows: fresh fruits and fresh vegetables, fresh milk and fresh dairy products, fresh meat and fresh meat products, fresh fish and fresh fish products, live fish, eggs, fresh mushrooms, fresh bakery products and fresh cakes and pastry, fresh herbs as potted plant or cut and ready-to- eat food preparations, as well as empty transports linked to the transports of the above mentioned goods or return journeys for carriage of transport facilities and wrapping of the above mentioned goods (a CMR (a consignment note) needs to be carried onboard and presented in case of inspection).
    [Show full text]