.__ fL.!\.,fv, .. - ) 1 -·- .:·r ..P P International Bank for Reconstruction and Developmenf ·-r· International Development Association Public Disclosure Authorized

SecM86-564 FROM: Vice President and Secretary 1. May 19, 1986 Public Disclosure Authorized

MONTHLY OPERATIONAL SUMMARY

OF BANK AND IDA PROPOSED PROJECTS (~s of April 30, 1986) Public Disclosure Authorized

Distribution: Executive Directors and Alternates President Public Disclosure Authorized Senior Vice Presidents Senior Management Council Vice Presidents, IFC Directors and Department Heads, Bank and IFC , I . I

I i ! , ; TABLE OF CONTENTS

SECTION REGION PAGES

I. EASTERN AND SOUTHERN AFRICA 1 13 Botswana 1 Burundi 1 Comoros 2 Djibouti 2 Ethiopia 2 Kenya 3 Lesotho 4 Madagascar 4 Malawi 6 Mauritius 6 Mozambique 7 Rwanda 7 Somalia 8 Sudan 8 Swaziland . 9 Tanzania 9 Uganda 9 Zaire 10 Zambia 11 Zimbabwe 12 Regic;,nal 13 I II. WESTERN AFRICA 14 28 Benin 14 Burkina Faso . 14 Cameroon 15 Cap~ Verde • 16 Cen.tral African Republic 16 ~ ... -. Chad 17 Congo, People's Republic of the 17 Cote d'Ivoire 17 Equatorial Guinea 19 The Gambia 19 Ghana 20 Guinea 21 Guinea-Bissau .. 22 Liberia 22 Mali 22 Mauritania 23 Niger 23 Nigeria 24 Sao Tome and Principe . 26 Senegal 26 Sierra Leone 27 - ii -

SECTION REGION PAGES

WESTERN AFRICA (Cont'd) Togo 27

III. EAST ASIA AND PACIFIC 29 - 40 China 29 Fiji 32 Indonesia. 32 Korea 34 Lao People's Democratic Republic 35 Malaysia 35 Papua New Guinea 36 Philippines 37 Solomon Islands . 39 Thailand 39 Vanuatu 40

IV. SOUTH ASIA 41 - 54 Bangladesh 41 Bhutan 42 Burma 42 India 44 Maldives 49 Nepal 49 Pakistan 50 Sri Lanka • 53

v. EUROPE 2 MIDDLE EAST AND NORTH AFRICA 55 - 65 Algeria 55 Cyprus 55 ,i Egypt, Arab Republic of 55 111 Hungary 57 ,1 I Jordan 58 I .! Morocco 58 I Oman 59 Portugal 60 Romania 60. ,I, Syrian Arab Republic 60

I, 'I Tunisia 61 I Turkey 62 ·I I Yemen Arab Republic 63 Yemen, People's Democratic Republic of 64 Yugoslavia 64

VI. LATIN AMERICA AND CARIBBEAN 66 - 78 Argentina 66 - iii -

SECTION REGION PAGES

VI LATIN AMERICA AND CARIBBEAN (Cont'd) Bahamas 67 Barbados 67 Belize 67 Bolivia 67 68 Caribbean Region 70 Central America Regional 71 Chile 71 Colombia 71 Costa Rica 72 Dominica 72 Dominican Republic 73 Ecuador 73 El Salvador 73 Guatemala 73 Guyana. 74 Haiti 74 Honduras 74 Jamaica 75 Mexico 75 Panama 77 Paraguay 77 Peru 77 Uruguay 78

VII. NEW PROJECTS 79 - 82

EASTERN AND SOUTHERN AFRICA 79 Uganda 79

WESTERN AFRICA 79 Ghana. 79 Senegal 79

EAST ASIA AND PACIFIC 79 China. 79 Indonesia 79 Mailaysia 80 Philippines • 80

SOUTH ASIA 80 Bangladesh • 80 Pakistan 80 Sril Lanka • 81 - iv -

SECTION REGION PAGES

VII NEW PROJECTS (Cont'd)

EUROPE, MIDDLE EAST AND NORTH AFRICA 81 Morocco 81 Turkey 81

LATIN AMERICA AND CARIBBEAN 81 Argentina 81 Bolivia • 81 Brazil 82 Chile 82 ------

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j ~1) Consulting Services Action on Procurement!!_/

I, EASTERN AND SOUTHERN AFRICA

Ministry of 7,6 (R) Selebi-Phikwe - Technical Consultants will be re­ Negotiations completed, Finance and (Bank) assistance for diversification quired for technical Board presentation Development of mining town; regional devel­ assistance for multi­ on May 15, Planning opment. Total project cost sectoral promotional about $12,0 million, of which unit, industrial deve 1- $7 .6 million in foreign ex­ opment/promotion, and change. irrigation agronomy; studies for various as­ pects of small scale industry and irrigation development and market­ I ing; and technical assistance for housing policy implementation at national/regional level.

I Water Utilities About Fourth Water Supply - Augment­ No decision made on Project under Corporation 25,0 ation of water supply to extent of consultant preparation. (Bank) Gaborone/Lobatse area. services required. ,/

I Ministry of About (R) Agriculture Muyinga - Pilot set­ FAO Cooperative Program Appraisal mission in the Agriculture 10,0 tlement scheme and development is preparing project. field. (IDA) of coffee and foodcrop produc­ l tion in the Muyinga Province. Total project cost to be deter­ mined.

Ministry of About (R) Agricultural Services, Total A consultant has been re­ Project under prepar­ Agriculture 12,0 project cost to be determined. cruited for preparation. ation. I (IDA) Ministry of 10.0 (R) Health/Population I - Strength­ Consultants are being Appraisal mission tentat­ ! Health (IDA) ening of basic maternal/child recruited. ively scheduled for health services; support to fam­ September, ily planning activities. Total project cost estimated at $11.0 million.

Ministry of About (R) Structural Adjustment Credit. Consultants have been Negotiations completed. Planning 15,0 The structural adjustment pro­ recruited for project Board presentation sched­ (IDA) gram consists of measures: ( i) preparation. uled for May 22, 35,0 to strengthen macroeconomic ma­ (SAF) nagement; (ii) to improve the efficiency of use of public sector services; and (iii) to rationalize incentives for ex­ port growth and efficient import substitution. Total project cost estimated at $50,0 million,

Ministry of About Economic and Public Enterprise Consultants will be Appraisal mission tent­ Planning 3,0 Management - Strengthening of required. atively scheduled for (IDA) services of Ministry of Plan­ September, ning, Finances and Technical Ministries in support of struct­ ural adjustment program.

Ministry of About Education IV - To be identified No decision has been made Project being identified. Education 10,0 in context of preparation of whether consultants will (IDA) UNDP Round Table on Education. be required.

1/ Addresses of the Implementing Agencies of new projects are given in Section VII of the Summary. J./ The amount is in millions of U.S. dollars and is approximate and tentative. SAF is the acronym for the Special Facility for Sub-Saharan Africa. 1/ The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary contains a recapitulation of the new projects listed in this issue. !!._/ This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA. - 2 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1) ~?:/ Consulting Services Action on Procurement !!I

~ (Cont'd)

Ministry of About (R) Urban II - The project will Consul tan ts have been Project preparation Pub lie Works, 14.0 comprise ( i) investments in recruited for feasibility under way. Energy and Mines (IDA) support of non-farm employment study. and institutional strengthening in five secondary centers; and ( ii) support to local government financial management in the five secondary centers. Total proj­ ect cost estimated at $16.0 million.

Ministry of About Public Sector Management - To Consultants will be re­ Project under prepara­ Planning 2.5 assist Government in improving quired. tion. (IDA) formulation of economic policy, planning, and management of key IDA Project Preparation sectors. Facility advance of $300 1 000 approved to finance start up of technical assistance activities.

Ministry of About (R) Education II - Educational plan­ No consultants required. Negotiations in late Hay. National Educ­ 7 .3 ning and technical assietance; ation, Culture, (IDA) vocational management and Youth and Sports teacher training. Total project (MEN) cost estimated at $7. 7 million.

Institut 5.0 Geothermal II - Follow up Consultants will be Project under Superieur (IDA) project to Cr. 1488. required. preparation. d'Etudes et de Recherches Techniques et Scientifiques (ISERST)

Ministry of To be (R) Livestock IV - To be defined. No decision made whether Appraisal report under Agriculture deter­ consul tan ts will be re­ preparation. mined quired. (IDA)

Ministry of About (R) Energy - Rehabilitation of Consultants will be re­ Negotiations completed. Mines and 62.0 electric generation and trans­ quired for technical as­ Board presentation sched­ Energy; and (IDA) mission, rural electrification, sistance. uled for May 20. Ethiopian and household energy. Total Electric Light project cost estimated at $99 .5 IDA Project Preparation and Power million, of which $67 .8 million Facility advances total­ Authority in foreign exchange. ling $980,000 approved to (EELPA) finance consulting ser­ vices.

Ministry of To be (R) Peasant Agriculture Development Consultants will be re­ Appraisal mission sched­ Agriculture deter­ I - Support for expansion and quired for technical as­ uled for May/June. mined intensification of integrated sistance. (IDA) agricultural services, including construction of rural roads, seed multiplication programs; provision of training facilities in oelected areas. Total proj­ ect cost to be determined.

Ministry of To be (R) Gas Engineering - Engineering Consultants likely to be Appraisal mission sched­ Mines and Energy deter­ for subsequent development of required. uled for October. mined natural gaa resources. (IDA)

Ministry of About (R) Forestry - Farm forestry and Consultants likely to be Negotiations in progress. Agriculture 43.0 fuelwood plantations. Total required, possibly under (IDA) project coat to be determined. a Project Preparation Facility advance.

Agricultural and To be DFC V - Fifth line of credit to No decision made whether Project processing Industrial deter­ agricultural and induotrial de­ consul tan ta will be re­ deferred. Development Bank mined velopment bank. Total project quired. (IDA) cost to be determined.

See page 1 for footnotes. ------

- 3 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender 'l,/ Consulting Services Action on Procurement 4/

ETHIOPIA (Cont'd)

Ministry of To be Family Health - Strengthening of Consultants will be Project preparation under Heal th deter­ family planning and heal th required. way. mined services; support for training, (IDA) information, education and An IDA Project Prepara­ communication and pharmaceutical tion Facility advance of development. $0.5 million approved for consul tan ts for manpower development; pharmaceu­ tical development; in­ I formation, education and communication; insti­ I tutional development; I preparation of a zonal project; overall project preparation and archi­ tectural services.

Ministry of 5.5 (R) Port Engineering and Construc­ Consultants will be Approved by the Executive and (IDA) tion - Engineering and other required. Directors on April 1. Communications studies; and urgent civil works for Assab port. Total project cost about $8.5 million, of which $5.5 million in foreign exchange.

Kenya Industrial 6.0 Small-scale Enterprises - Second Consultants will be re­ Board presentation Estates (KIE) (IDA) line of credit to KIE. quired. awaiting Government action on project conditions.

Ministry of 15 .o Livestock III - Support to dairy No decision made whether Project preparation Agriculture and (IDA) production. consul tan ts will be re­ under way. (!FAD Livestock quired. cofinancing being Development considered.)

Kenya Posts and 32.6 Telecommunications III - Expan­ Consultants will be Approved by the Executive Telecommunica­ (Bank) sion, improvement and moderni­ needed for various insti­ Directors on June 6, tions Corpora­ zation of telecommunications tutional management stu­ 1985. (Cofinancing tion (KPTC) services. Institutional deve­ dies, including tariff arranged with EIB for lopment and strengthening of structure. $14.6 million; export management systems. Total credits $16. 7 million.) project cost estimated at $86.1 million, with $65.3 million in foreign exchange.

Ministry of About Railways II - Institutional Consultants have been en­ Draft appraisal report Transport and 25.0 development, motive power and gaged •. awaiting Cabinet approval Communications (Bank) ro~ling stock and operations. of Kenya Railways special 5.0 action plan. (IDA)

Ministry of About Agricultural Research - Support No decision made whether Project under prepara­ Agriculture and 20.0 for a national research program. consul tan ts will be re­ tion. Livestock (IDA) quired. Development

Ministry of 11.0 (R) Agricultural Management Assist­ Previously engaged con­ Negotiations under way. Agriculture and (IDA) ance - Phase II of agriculture sul tan ts expected to Livestock technical assistance. continue. Development

Ministry of 20.0 (R) Agricultural Sector Operation - No decision made whether Negotiatons under Agriculture and (IDA) Policy-oriented sector operation consultants will be way. Livestock 40.0 to be supported by Agricultural required. Development (SAF) Management Assistance Project.

Ministry of 37.5 Education VI - Training col­ Consultants will be Approved by the Exec­ Education (IDA) leges, and zone primary schools, needed for education utive Directors on secondary curriculum deyelop­ planning, teacher ­ March 27. ment, media support services, ing, management methods education planning and statis­ and resource mobilization tics, and project administra­ and use. tion. Total project cost about $56 million, of which $22 million in foreign exchange.

See page 1 for footnotes. - 4 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency]} Lender!:./ Consulting Services Action on Procurement 4/

KENYA (Cont'd)

Ministry of About Population III - Project to be No decision made whether Project preparation will Health and 30.0 second timeslice of ongoing consul tan ts will be depend on progress of Ministry of Home (IDA) program. required. ongoing project. Affairs

Ministry of About Agricultural National Extension No decision made whether Project preparation will Agriculture and 45.0 II - Followup project to consul tan ts will be depend on progress of Livestock (IDA) National Extension Project now required. ongoing project. Development under implementation.

Ministry of 6.0 Petroleum Exploration Technical Consultants may be Approved by the Executive Energy and (IDA) Assistance - Continuation of required for technical Directors on March 27. Regional ongoing assistance in promoting assistance. Development oil exploration and development with foreign companies. Total project cost about $9.6 million, of which $6.0 million in foreign exchange.

Nairobi City About Nairobi Water III - Rehabili­ Consultants may be Project at early stage of Commission, so.o tation and expansion of the required for technical preparation. Water and Sewer­ (Bank) Nairobi water supply and assistance. age Department sewerage systems; training and technical assistance.

Ministry of About (R) Highlands Water - Preparation of Consultants will be re­ Negotiations in May. Water, Energy a.s engineering designs and tender quired for engineering (Cofinancing with EEC, and Mining (IDA) documents for Phase I of deve­ designs and tender docu­ UNDP , USA , RSA and UK lopment of Lesotho's water ments. being explored.) resources for export and hydro­ electricity, and technical assistance for project entity. Total project cost estimated at $43.2 million.

MADAGASCAR

Ministry of About (R) Agricultural Sector Adjustment Consultant services will Board presentation Agricultural 20.0 Credit - To support major policy be provided under on May 8. ~pecial Joint Production (IDA) reforms in agriculture by Agricultural Institutions Financing will be provi­ (plus providing inputs and spare parts Technical Assistance II. ded by Japan for p mil­ 40.0 to the sector. Total project lion and Germany for $4 expec­ cost estimated at $60.0 million. million. ted from SAF/ SJF)

Ministry of About (R) Railways III - To assist in Consultants will be Board presentation on Transport/Reseau 12.0 rehabilitation of track and required for technical May 8. National Chemin (IDA) telecommunication system, im­ assistance, training and de Fer Malgache provement of rolling stock, technical aspects. IDA Project Preparation (RNCFM) workshops, staff training Facility advance of through technical assistance, $200,000 approved to training facilities and studies finance technical and emergency repairs/rehabil­ assistance activities. itation of cyclone damaged faci­ lities for the railway and the Port of Toamasina. Total proj­ ect cost estimated at $16.9 mil­ lion, with $12.0 million in for­ eign exchange.

Ministry of 10.3 (R) Accounting & Management Training Consultants will be Credit signed on Finance and (IDA) - To assist in the moderniza­ needed to carry out April 16. RIND RA, Mal a gas y tion and improvement of the man­ project. Auditing Firm agement and operation of Mala­ gasy enterprises and support the Government in the implementation of policies geared to the revit­ alization of the economy. Total project cost estimated at $13.1 million, of which $9.3 million in foreign exchange.

See page 1 for footnotes.

!•: i I ------

- 5 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender 1_/ Consulting Services Action on Procurement!±,/

MADAGASCAR (Cont'd)

Ministry of 10.0 (R) Agricultural Institutions Tech­ Consultants required for Board presentation Agricultural (IDA) nical Assistance II - Follow-up technical assistance to scheduled for June 10. Production and to ongoing agricultural institu­ be provided in the field (Cofinancing being Ministry of tions technical assistance proj­ of pricing policy, explored with USAID.) Livestock ect, including policy analysis, budgetary and planning and general management sup­ policy. IDA Project Preparation port. Total project cost estim­ Facility advance of ated at $16.3 million. $875,000 approved to finance start-up activities.

Ministry of About Forestry Ill - To provide fuel­ Consultants likely to be Project under prepar­ Agricultural 5.0 wood supplies (charcoal) to required. ation. (Cofinancing will Production (IDA) Antananarivo, Mahajanga and be required.) Toliary. Total project cost to be determined.

Ministry of About (R) Ports - Rehabilitating physical Consultants will be Appraisal report being Transport 14.0 infrastructure in the ten prior­ required. prepared. (Cofinancing (IDA) ity ports; improving cargo hand­ being sought.) ling, navigation aids, dredging and international and coastal An additional advance of shipping; developing the instit­ $560,000 under the Proj­ utional capability, and particu­ ect Preparation Facility larly at the Port of Toamasina, was approved on March 14 required to operate and maintain to cover technical as­ physical assets at a reasonable sistance required to level of efficiency. Total pro­ complete the reorg­ ject cost estimated at $35.0 anization of the ports­ million. sub-sector. A first advance under the PPF for $450,000 was approved on January 4, 1985.

Ministry of About Financial Industrial Sector Consultants may be Project being identi-· Industry; and 29.0 Adjustment Credit - Follow-up required. fied. Banking ny (IDA) Project to 1541 MAG. , lndostria (Plus (National 30.0 Industrial expec­ Development ted Bank) from SAF)

Ministry of About (R) Education III - Credit to Consultants may be Project being prepared. Education 10.0 support Government education required. (IDA) policy reform by financing education materials and equipment.

Ministry of In­ About (R) Energy I - Integrated energy Consultants will be Appraisal mission tent­ dustry, Energy 15.0 program, including rehabil- required. atively scheduled for and Mines/ (IDA) itation and expansion of power June/July. (Cofinancing National Power facilities. being sought.) Authority (JIRAMA)

Ministry of About (R) BTM - Line of credit to rehab­ Consultants will be Negotiations scheduled Agricultural 5.0 ilitate agricultural holdings required, for technical for mid-July. Production/Na­ (IDA) and provide institutional assistance program. tional Agricul­ support. Total project cost tural Bank (BTM) estimated at $10.8 million.

Ministry of About (R) Highway VII (Rural Roads) - No decision made whether Project being ident­ Pub lie Works 20.0 Maintenance and rehabilitation consultants will be ified. (Cofinancing (IDA) of roads network. required. prospects being explored.

Investment and 7.8 (R} Industrial and Agricultural Consultants will be Loan signed on Development Bank (Bank) Credit Project - Second line of required to staff Agri­ April 17. of Malawi credit to INDEBANK for indus­ cultural Department of ( INDEBANK) ; and trial and agricultural estate INDEBANK. Reserve Bank of financing. Total project cost Malawi about $14.4 million of which $9.0 million in foreign exchange.

See page 1 for footnotes. - 6 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )j ~~/ Consulting Services Action on Procurement !!./

MALAWI (Cont'd)

Ministry of About (R) Health II - Expansion of health Consul tan ts will be re­ Appraisal report being Health 25.0 care delivery and maternal and quired for management and prepared. (Cofinancing (IDA) child health and family planning financial planning, and to be confirmed.) services. Total project cost to primary health care be determined. evaluation. Pharmaceu­ tical specialists will also be required.

Lilongwe Water About Water II - Extension of water Consultants will be Appraisal report being Board 25.0 supply to Lilongwe. Total required to help improve prepared. (Cofinancing (IDA) project cost about $30.0 mil­ management planning and under consideration.) lion. technical capabi 1 ities.

Ministry of About Transport I - Upgrading Northern Consultants selected and Appraisal report being Works and 19.0 Access Corridor. Total project are undertaking detailed prepared. (Cofinancing Supplies; and (IDA) cost about $85.0 million. engineering studies. with USAID, KfW Ministry of (Germany), ODA, and EEC Transportation under discussion.) and Communica­ tions

Ministry of About Education VI - Education Sector Consultants will be Project preparation under Education 25.0 Loan - Extension of primary/ required to help improve way. (Cofinancing will (IDA) secondary education; ins ti­ management and quality of be sought.) tutional strengthening; improve­ education. ment in quality of teaching materials, training and exam­ ination systems.

Ministry of 16.7 Wood Energy II - Fuelwood prod­ Consultants will be Approved by the Executive Forestry and (Bank) uction and protection; research required for training and Directors on March 25. Natural in improved-agro-forestry sys­ management assistance. Resources tems and institutional strength­ ening. Total project cost about 19.6 million, including $8.4 million in foreign exchange.

Ministry of About Highways VI - Highway No decision made whether Project being identified. Works and 20.0 rehabilitation and phase IV of consultants will be Supplies (IDA) district roads improvement required. maintenance program.

Agricultural About (R) ADMARC Rehabilitation Loan. A To be determined. Preparation mission Development and 10.0 policy based lending operation in the field. Marketing Corp­ (IDA) to support reforms related to oration .(ADMARC) Plus food security· policy and organ­ and Ministry of 30,0 izational reform for ADMARC, the Finance expec­ parastatal which markets small ted holder produce. from (SAF) inc­ luding Spe­ cial Joint Finan­ cing

MAURITIUS

Government of About Industrial Sector Adjustment No consultants required. Appraisal report being Mauritius (DBM) 23.0 Loan - Finance for export prepared. (Cofinancing (Bank) industry. with AfDB probable.)

Central About Energy I - Rehabilitation of Consul tan ts wil 1 be Project under prepar­ Electricity 10.0 power systems, and technical required. ation. (Cofinancing Board (CEB) (Bank) assistance. Project cost to be with CCCE and EIB determined. possible.)

Ministry of About (R) Sugar I - To support implement­ Consultants will be Negotiations in Agriculture 25.0 ation of the Sugar Industry required. mid-May. (Bank) Action Program and help improve productivity of land use among smallholders. Total project cost estimated at $39 .9 million.

See page 1 for footnotes. ------

- 7 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lf Lender J:_/ Consul ting Services Action on Procurement !!_/

MAURITIUS (Cont'd)

Ministry of About Structural Adjustment Loan Ill. No decision made whether Project identification Economic 40.0 consul tan ts will be under way. Planning and (Bank) required. Development

Development Bank About (R) DBM/Industrial Sites - To sup­ To be determined. Project being identified. of Mauritius 10.0 port development of industry (DBM) (Bank) (including small-scale industry) through line of credit and est­ ablishment of industrial sites for export manufacturing industries.

MOZAMBIQUE

Bank of About Rehabilitation II - Follow-up to No decision made whether Project being Mozambique 40.0 first rehabilitation program; consultants will be identified. (IDA) expected to focus on agricul­ required. ture.

Bank of About Technical Assistance. Consultants will be Discussions with Mozambique 3.0 required. Government under (IDA) way.

Ministry of 10.8 (R) Health/Population/Nutrition - Consultants have been Approved by the Executive Public Health (IDA) Strengthening the maternal/child recruited for project Directors on April 1, health and family planning ser­ preparation. (Cofinancing with WHO for vices within the Ministry of o.7 million.) Public Health, and reinforcing coordinating family planning­ related activities within the National Population Office (ONAPO). Total project cost estimated at $14.5 million, of which $7.9 million in foreign exchange.

Ministry of 15 .6 (R) Education Ill - Technical and Consultants will be re­ Approved by the Executive Education (IDA) Vocational training. Establish­ quired for civil works Directors on April 15. ment of educational materials and textbooks design. (Cofinancing with UNDP distribution system. Total for $1.3 million con­ project cost estimated at $19.0 firmed.) million, of which $13.6 million in foreign exchange.

Ministry of 12. 7 GITARAMA/ Agriculture Services - Consultants will be Approved by the Executive I Agriculture (IDA) Application of extension ser­ required. Directors on March 20. vices, financial, marketing and (Cofinancing with UNDP I processing operations, and re­ for $3.0 million inforcement of Ministry of confirmed. ) Agriculture. Total project cost I estimated at $22.7 million, of which $11.3 million in foreign j exchange. Ministry of About Water Supply II - Rehabilitation To be determined. Appraisal mission tentat­ Public Works 10.0 and expansion of rural water ively scheduled for June. (IDA) supply systems. Total project (Cofinancing with BADEA, cost estimated at $52.0 million. CCCE and AfDB possible.)

Ministry of About Coffee Food Crop -Follow up to To be determined. Project preparation Agricu 1 ture 20,0 Lake Kivu Coffee. Project may under way. (IDA) be incorporated in an Agric­ ultural Services II operation. Component would establish and implement development policies and objectives with emphasis on research, input supply, proces­ sing and marketing.

See page 1 for footnotes. - 8 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender];_/ Consulting Services Action on Procurement 4/

RWANDA (Cont'd)

Ministry of About .-:-(R) Foree try II - Follow up to on­ To be determined Appraisal mission in the Agriculture 28.0 going integrated Fores try/ field. (IDA) Livestock Project. Total proj­ ect cost estimated at $28.0 million.

Ministry of About Agricultural Services II - Proj­ To be determined. Project being identified. Agriculture 35.0 ect. would consist of two dist­ (IDA) inct components: veterinary services and national coffee development program.

Ministry of About (R) Public Sector Management Ill - Consultants will be Appraisal mission in the Planning 5.o Project would assist Government required. field. (IDA) to Strengthen its institutional development and to improve eco­ nomic and financial management in key sectors.

Ministry of About (R) Mining Sector Rehabilitation - Consultants will be Project preparation Industry 6.0 Content not yet identified. required. under way. (IDA)

~ Ministry of 22.6 (R) Ports Modernization - Mainten- Consultants will be Negotiations completed. Public Works (IDA) ance and rehabilitation of exie- required. ting ports. Total project cost about $23.9 million.

Ministry of About Shebelli Irrigation Consul tan ts will be Project preparation under Agriculture 11.0 Rehabilitation - To be required. way. (IDA) determined. An IDA Project Preparation Facility advance of up to $ l. O' million approved to engage consultants.

Ministry of 30.0 (R) Agricultural Sector Adjustment To be determined. Negotiations under Finance (IDA) Credit - The Credits would en­ way. 40.0 hance the dialogue on agricul­ (SFA) tural sector issues, enlarge private sector participation in input supply and distribution, support macro-economic reforms, and provide foreign exchange through an auction system.

Ministry of 34.5 - (R) Cotton Processing and Marketing Consultants will be Appraisal mission Agriculture (IDA) - Rehabilitation of ginneries required for telecommun­ scheduled for and strengthening of cotton ications, training September. production and marketing policy officer, market analyst, institutions. Total project cotton trader technician, An IDA Project Prepar­ cost estimated at $47 .S million. procurement advisor, ation Facility advance of civil, mechanical and up to $800,000 approved electrical engineers, and to help finance start-up short-term technical as­ of the project. sistance for evaluation, grading, and testing.

Ministry of 30.0 Agriculture Rehabilitation, No consultants required. Technical discussions Finance and (IDA) Credit Ill - Support to the completed. Economic irrigation sub-sector for Planning recurrent inputs such as fertilixers, pesticides and spare parts.

See page 1 for footnotes. ------

- 9 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency JJ Lender JJ Consulting Services Action on Procurement 4/

~ (Cont'd)

Ministry of About Gas Engineering - To be defined. No decision made whether Project in reserve Mining and 5.0 consultants will be re­ status. Energy (IDA) quired. )r:; National To be Power IV - Power generation and No decision made whether Project issues under Electric deter­ transmission distribution/expan­ consultants will be-re­ review. Corporation mined sion. Total project cost esti­ quired. (NEC) (IDA) mated at $105 million.

Ministry of To be Technical Assistance - Macro­ To be determined after Appraisal mission Finance and deter­ economic management; public project is defined. scheduled for October. Economic mined enterprise management. Planning (IDA)

SWAZILAND

Ministry of About (R) Education IV - Vocational and No decision made whether Project under Education 10.0 teacher training; population consultants will be prepare tion. {Bank) education and management train­ required. ing

Ministry of About (R) Highways VI - Rehabilitation/ Consultants will be re­ Bank presentation on May Communications 50.0 strengthening of the Tan Zam quired for supervision of 6. (Cofinancing being and Works (IDA) Highway, and other priority road civil works, equipment arranged with DANIDA $2 maintenance; equipment rehabili­ rehabilitation, technical million, Norway $6.9 tation and spares for trucking; assistance and studies. million and AfDB $19.4 and training. Total project million.) cost estimated at $108 million with for~·ign exchange component of about $78.3 million.

Ministry of About Agricultural Rehabilitation - No decision made whether Project being prepared. Agricu 1 ture and 30.0 Rehabilitation of cotton sub­ consultants will be re­ (Cofinancing being · Livestock (IDA) sector or other crops yet to be quired. explored.) deterniined.

Ministry of About (R) Power Rehabilitation - Rehabili­ Consultants will be re­ Board presentation on Water, Energy 40.0 tation of power system (primar­ quired for technical May 6. (Cofinancing and Minerals; {IDA) ily distribution and transmis­ assistance. being arranged with and TANESCO sion), household fuel pilot Canada $10.2 million, schemes, training, and tech­ FINNIDA $2.3 million, nical assistance. Total project Norway $8.3 million, and cost estimated at $89 million, EIB $6.0 million.) including foreign exchange cost of $76 million.

Ministry of About Industrial Rehabilitation - In­ No con~ultant~ required. Project being prepared, Industry and 35.0 dustrial Rehabilitation through Trade {IDA) lines of credit to Tanzania In­ vestment Bank, Tanganyika Devel­ opment Finance Ltd. and National Bank of Commerce.

Ministry of About Agricultural Research - No decision m&de whether Project being Agriculture and 20.0 Strengthening national agri­ consul tan ts will ·be re­ prepared. Livestock {IDA) cultural research services. quired.

UGANDA

Ministry of 28 .o Tee Rehabilitation - Rehabi­ Consultants ~ill be re­ Appraisal report under Agriculture and {IDA) litation of estate tea holdings quired. preparation. Forestry and smallholder tea gardens and of tea processing facilities,· and strengthening of institut­ ions in the tea sector. Total project cost estimat,ed at $72 million.

Uganda Poe ts and 10.0 Telecommunications II - Contin­ Consultants already Appraisal report under Telecommuni­ (IDA) uation of rehabilitation program recruited. preparation·. cations in pos ta and telecommunications Corporation sector. Total project cost estimated at $32 mil lion.

Ministry of 27.0 Transport - Institutional assis­ Consultants will be Project under Transport {IDA) tance to railways; and assis­ required. preparation. tance to road transport industry (maintenance, wOrkshops).

See page 1 for footnotes, - 10 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency y Lender J:/ Consulting Services Action on Procurement!±./

UGANDA (Cont'd)

Ministry of 32.0 Sugar Rehabilitation - Rehabili­ Consultants will be re­ Appraisal report Industry/Kakira (IDA) tation of cane production, fac­ quired to assist with under preparation. Sugar Works tory and infrastructure in project implementation. Kakira sugar scheme; support to (Short-list by borrower sector policy and institu­ under review.) tions. Total project cost estimated at $65 million.

Ministry of 27.0 Fourth Highway Project - Consultants will Appraisal report under Works (IDA) Rehabilitation of four major be required. preparation. artery roads prepared under Third Highway Project. Total project cost estimated at $70.0 million.

Ministry of 15.0 (N) Forestry - Social forestry, Preparation completed by Appraisal mission sched­ Agricu 1 ture and (IDA) peri-urban fuelwood plantations, ESMAP. uled for late June. (Co­ Forestry improved management of the financing being ex­ national forests and softwood plored.) plantations, rehabilitation of the forestry department. Total project cost about $30 million.

Gecamines 110.0 (R) Gecamines II - Rehabilitation No consultants required Aprproved by the Exec­ (Bank) and maintenance of existing for project preparation. utive Directors on April mining facilities. Total 29. (Cofinancing arran­ project cost estimated at ged with EEC/SYSMIN for $703.0 million, including $436 $27 million, AfDB $65 million in foreign exchange. million, EIB $48 million end CCCE $28.6 million.

Ministry of About (R) Kwango Kwilu - Agricultural De­ No consultants required Appraisal report Agriculture 15.Q velopment Project in Bandundu for project preparation. being prepared. (IDA) Region. Total project cost estimated at $15 million.

Ministry of About Petroleum Distribution Engineer­ Consultants required for Project being prepared. Mines and Energy 2.5 ing and Technical Assistance - studies and audits. (IDA) Technical and Economic Studies An IDA Project Prepara­ to design a least cost policy tion Facility advance of for the importation and distri­ $900,000 has been ap­ bution of petroleum products and proved to finance tech­ to specify the role of the SOZIR noeconomic study. Con­ refinery in such a policy. sultants to conduct study Total project cost estimated at have been Relected. $3.0 million.

Societe About (R) Power II - Rehabilitation and Consultants will be re­ Negotiations in pro­ Nationale 37 .o expansion of the Kivu region hy­ quired for training and gress. Board present­ d'Electricite (IDA) draulic network, including the engineering services. ation tentatively sched­ (SNEL) Ruzizi I facility. Total proj­ Consultants have been uled for June. (Cofinan­ ect cost estimated at $41.2 mil­ recruited for studies cing with UNDP identi­ lion. financed under the fied.) Project Preparation Facility. An IDA Project Prepara­ tion Facility advance of $440,000 has been ap­ proved to finance cost and engineering studies.

Ministry of About Bateke. Management of forest Consultants for project Project under prepar­ Environment 15.0 resources, and fuelwood develop­ preparation being fi­ ation. (Cofinancing (IDA) ment in Bateke Plateau if nanced by EEC and are likely.) necessary. Total project cost already appointed. to be determined.

Ministry of About Kabinda Agriculture - Develop­ No decision made whether Appraisal mission Agriculture 10.0 ment of agriculture in the consultants will be re­ postponed, pending reor­ (IDA) Kabinda sub-regions. Total quired. ganisation of cotton project cost estimated at $15.0 industry in project area. million.

See page 1 for footnotes. ------

- 11 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ ~1:_/ Consulting Services Action on Procurement 4/ ZAIRE (Cont'd)

Societe About (R) DFC VIII - Eighth line of credit Project financed studies Approved by the Executive Financiere de 50.0 to SOFIDE. Ongoing assistance may require consul tan ts. Directors on April 29. Developpement (IDA) to the development of the prod­ (SOFIDE) uctive sectors in Zaire, partic­ ularly private investments in manufacturing and agro­ industries. Total project cost about $140.3 million, of which $103.9 million in foreign exchange.

Regie des Voies About (R) Navigation Improvement - Streng­ Consultants to prepare Negotiations in earlv Fluviales (RVF); 25.0 thening management rehabilita­ project financed under June. (Cofinancing being Regie des Voies (IDA) tion of facilities, and intro­ Credit 1335-ZR. explored.) Maritimes (RVM) duction of new techniques for Regies des Voies Fluviales/Mari­ times. Total project cost es­ timated at $45.0 million.

Ministries of About Technical assistance for Consultant being Appraisal mission sched­ Finance, Plan­ 20.0 public sector management and identified. uled for October. A ning and Higher (IDA) higher education. Total project $500,000 IDA Project Pre­ Education cost to be determined. paration Facility advance for public sector manage­ ment has been approved.

Regie de About Water Supply and Urban Deve­ To be determined. Project under Distribution 20.0 lopment - Improvement and preparation. d 'Eau (REGIDESO) (IDA) construction of water systems in some eight centers. Total project cost to be determined.

Societe About Power III - Energy I - High Consultants have been Project under prepar­ d 1 Electricite 25.0 priority items of SNEL Invest­ retained to assist in ation. (Cofinancing. (SNEL) (IDA) ment Program; management assis­ preparation. will be required.) tance, and possibly support for charcoal production and demand management of household fuels. Total project cost estimated at $198.0 million.

Department of About Railways III - Continuation of Consultants will be Project in early Transportation 40.0 the Rehabilitation Program of needed. stage of identification. (IDA) the Railways.

Department of About ONATRA -·Continuation of the Consultants will be Project in early stage Transportation 20.0 Rehabilitation of the rail and needed. of identification. (IDA) river transport systems.

Department of About (R) Industrial Sector Adjustment Consultants will not be Negotiations subs tan­ Plan 20.0 Credit - To increase the needed. tially completed. Board (IDA) efficiency of the sector, and presentation scheduled 60.0 provide financing for imported for June 17. ( Co finan­ (SAF) inputs. Total project cost cing arrangements being estimated at $80.0 million. explored.)

Ministry of About Feeder Roads - Rehabilitation No decision made on Project under Agriculture 20.0 and maintenance of key agricul­ consul tents yet. preparation. (IDA) tural roads will emphasis on institution building and train­ ing. Total project cost estim­ ated at $40.0 million.

Ministry of About (R) Agricultural Research and Consultants will be re­ Project delayed indefin­ Agriculture and 15.0 Extension - Agricultural re­ quired; various experts itely pending redesign. Water (IDA) search and extension service and specialists in Development support for Ministry of Agri­ research and extension. culture. Total project cost estimated at $60.0 million.

Ministry of s.o (R) Technical Assistance II - Tech­ Consultants will be re­ Approved by the Executive Finance (IDA) nical assistance and training to quired. Macro-economic Directors on April 1.

upgrade economic management analysis I budget I and Credit eistning on Hay 2. capacity of key Government and revenue analysis and (Cofinancing being prov­ parastatal agencies in policy management information ided by Ireland for ~1.0 analysis and implementation. systems. million.) Total project cost estimated at $9.4 million, of which $7.8 mil­ lion in foreign exchange.

See page 1 for footnotes. - 12 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1f Lender];/ Consulting Services Action on Procurement 4/

ZAMBIA (Cont'd)

Ministry of About Family Health - Objectives are Consultants will be re­ Project under prepar­ Health 8.0 to improve primary health care quired to prepare clinic ation. (Cofinancing (IDA) services, expand family planning designs and tender doc­ being explored.) activities, and introduce cost­ uments, and help design recovery in the health sector. and install financial and An IDA Project Prepar­ Total project cost estimated at procurement systems. ation Facility advance $12-15 million. of $500,000 approved for technical assistance and consultants services.

Ministry of About Coffee II - To expand the pro­ No decision made whether Appraisal report being Agriculture 10.0 duction of coffee for export. consultants will be re­ prepared. (IDA) Total project cost estimated at quired. $26. 7 million.

ZIMCO About (R) Tazama Pipeline Rehabilitation - Consultants will be re­ Appraisal mission timing 10.0 Rehabilitation of Tazama Petrol­ quired, but terms of ref­ awaiting completion of (IDA) eum Pipeline and modification as erence still not fully engineering studies. Co­ necessary to Indeni Refinery. defined. financing being explored Total project cost estimated at with EIB and others.) $38 million.

Ministry of About Agricultural Credit - Develop­ Consultants will be Project under Agriculture 10.0 ment of rural financial institu­ required but purpose not preparation. (IDA) tions and support to financia~ yet defined. intermediaries.

Development Bank About (R) DBZ III - Third Line of Credit No decision made whether Appraisal report being of Zambia (DBZ) 15.0. to Development Bank of Zambia. consul tan ta will be prepared. (IDA) required.

Ministry of About Highway IV - Rehabilitation of To be determined. Project under. Works and Supply 20.0 priority roads; improvement in preparation. (Bank) road maintenance and training of Ministry Works staff.

Ministry of About (R) Economic Recovery Support - Consultants will be President's Report Finance so.a Provision of minimum level of required for mining under preparation. (IDA) imports needed to raise capacity audits, debt management utilization in the economy and and foreign exchange support economic recovery management. efforts.

Ministry of About Family Health - Provide rural No decision made whether Date of negotiations to Health 25.0 health services and preventive consultants will be re­ be determined. (Possi­ (Bank) interventions; family planning quired. bilities for cofinancing activities. Total project cost are being explored.) es_timated at $45. 7 million.

Ministry of About Petroleum Fuels II - Detailed Consultants have been re­ Project definition await­ Energy, Water 25.0 cost and engineering package for cruited. ing Government decision Resources and (Bank) petroleum fuels supply. Total on the results of the Development project cost to be determined. study financed under the first Petroleum Funds Supply project.

Ministry of About (R) Power II - Power system rehabil­ No decision made whether Project under Energy, Water 30.0 itation and manpower develop­ consultants will be re­ preparation. (Co­ Resources and (Bank) ment. Total project cost estim­ quired. financing likely.) Development/ ated at $150 million. Electric Supply Comm.is s ion

Ministry of About (R) Irrigation - Medium- and No decision made whether Date of negotiations to Land, Agricul­ 10.0 small-scale schemes in communal consultants will be re­ be determined. (Co­ ture and Rural (Bank) lands. Total project cost esti­ quired. financing being ex­ Resettlement mated at $20.0 million. plored.) (MLARR)

Ministry of About Export Promotion - Support of No decision made whether President's Report Finance, Econom­ 125.0 Government export promotion consultants will be under preparation. ic Planning and (Bank) program; provision of foreign required. Development; and exchange for imported inputs for Reserve Bank of Zimbabwe exporters. Zimbabwe

See page l for footnotes. - 13 -

Member Country, Amount & and Implementing Probable Stage of Proceo1ing end Agency 1/ ~Ji Consulting Service, Action on Procurement}!/ ZIMBABWE (Cont'd)

Ministry of About Rural Financial Services - No decia ion made Project under Land, Agricul- 20.0 Development of rural financial whether consultant, preparation. ture and Rural (Bonk) in1titutiona, navinga orsaniza­ will be required. Resettlement tion1, etc., including continued (MI.ARR) support for the Agricultural Finance Corporation.

Reoerve Bank of About DFC II - Line of Credit to No decision mnde whether Appraisal miOBion tentat­ Zimbabwe (RBZ); 40.0 Zimbabwe Development Bank and consultants will be ively scheduled for and Zimbabwe (Bank) other financial inotitutiona, required. August. Development Bank (ZDB)

To be determined About Education I - Technical No decision made whether Project under 40.0 education; vocational training; conoultants will be preparation. (Bank) and management training. required.

~ East African About Dli'C 111 - Continuation of aup­ No conoultanta required. Project under Development Bank 10,0 port through a third line of preparation. (IDA) credit, with empha1ia on region­ al project•,

See page 1 for footnotea, .. 14 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lJ Lender J) Consulting Services Action on Procurement 4/

II. WESTERN AFRICA

BENIN

Ministry of 15.0 (R) Public Enterprises - Provide Consultants have been Negotiations substan­ Justice in (IDA) studies, line of credit, techni­ recruited for studies. tially completed. Charge of State cal assistance and training to Enterprise certain key state enterprises. An IDA Project Prepara­ Inspection Total project cost estimated at tion Facility advance of $23.0 million, of which $15 .o $1,000,000 has been ap­ million in foreign exchange. proved to help finance project preparation.

Office des 7.5 Telecommunications - Rehabilita­ Consultants are being re­ Project under prepara­ Postes et des (IDA) tion and expansion of local tel­ cruited for studies. tion. Telecommunica­ ephone networks, and technical tions assistance to the Office des An IDA Project Prepara­ Postes et Telecommunications du tion Facility advance of Benin. $500,000 has been ap­ proved to help finance project preparation.

Ministry of 19.5 (R) Transport Infrastructure - Roads Consultants• report on Appraisal report being Transport and (If>A) and Ports rehabilitation and preliminary design com­ prepared. (Possible co­ Equipment maintenance; institution buil­ pleted. Tender documents financing with, BOAD, ding, training and transport being prepared. CCCE, FAC, OPEC, lsDB, planning studies. Total project EDF and Kuwait Fund,) cost about $56.2 million, of which $40.0 million in foreign IDA Project Preparation exchange. Facility advances total­ ing $980,000 have been approved to help finance project preparation. ·

Societe 10.0 (R) Water II - Expansion of urban Consultants for detailed Negotiations scheduled Beninoise (IDA) water supply facilities in studies and tender for end-May. (Cofinan­ d 1 Electricite et Cotonou, and Porto Novo. Re­ documents selected. cing with CCCE and OPEC d'Eau (SBEE) inforcement of SBEE I s managerial (Financed under ongoing to be confirmed.) and financial capabilities. engineering credit). Total project cost about $34.3 million, of which $24.8 million Technical assistance in foreign exchange. consultants to be selected.

Ministry of 15.0 (R) Phase II Borgou Province Rural Consul tan ts selected for Appraisal mission in the Rural Develop­ (IDA) Development - Cotton and food­ livestock preparation field. (CCCE and IFAD ment and crop development through input study. have expressed interest Cooperative supply, expansion of draft cul­ in cofinancing.) Action, Centre tivation, credit for purchase of d Action Region­ inputs, oxen and draft equip­ al pour le ment, increased local production Developpement of ox-drawn equipment, foodcrop Rural (CARDER), storage at farmers• level, and Societe the strengthening of CARDER and Nationale pour SONAPRA's administrative la Promotion de services. l 'Agriculture (SONAPRA)

Ministry of 1.9 (R) Borgou Rural Development Consultants will not be Approved by the Executive Rural (IDA) Supplementary Credit - Con­ required. Directors on April 1. Development struction of two new ginnerie.s (Co financing with CCCE.) to deal with increasing cotton production. Total project cost about $15.0 million, of which $9.0 million in foreign exchange.

BURKINA FASO

Regie Abidjan­ To be Railways II (Transport Sector Consultants to assist Project processing awaits Niger (RAN)/ deter­ Credit) - IDA funds would help with procurement of spare discussions on transport Ministere du mined finance (i) repayment of parts and for project sector with Government Transport et des (IDA) Burkina•s arrears to RAN as part preparation. and clarification of RAN Communications of a financial rehabilitation status following Cote plan, (ii) Burkina's share of d 1 Ivoire 1 s recent indic­ railways project cost, and ation to split the RAN. ( iii) other investments in transport sec tor.

See page 1 for footnotes. - 15 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender]:_/ Consulting Services Action on Procurement!!._/

BURKINA FASO (Cont'd)

Ministere de la 10.0 Technical Assistance - Estab­ Consultants will be re­ Project processing depen­ Planification et (IDA) lishment of Development Invest­ quired to help prepare dent upon Government's du Developpement ment Budget and assistance in and execute project. broad agreement on in­ financial management to vestment priorities and strengthen investment budget­ financial restructuring ing and monitoring development which are under active expenditures. Total project discussion. cost estimated at $13.0 million.

Ministere de 20.0 (R) Highways V - Upgrading of the Consultants will be re­ Project processing depen­ l'Equipement (IDA) Ouagadougou-Kaya road and im­ quired. dent upon resolution of proving the Kaya-Dori road to transport sector issues all weather standards. Total which are under active costs are estimated at $60.0 discussions with the million. Government. (The Italian Government has agreed to finance all-weather gravel road between Kaya­ Dori. KfW Germany has allocated DM 3 mil lion for Ouaga-Kaya road. )

Ministere de 11.6 Livestock II - Improving ani­ Consultants will be re­ Appraisal mission sched­ 1 1 Agriculture et (IDA) mal production and upgrading quired for the study on uled for November 1986. de l 'E levage the institutions involved in integration of livestock livestock development; estab­ and agriculture. IDA Project Preparation lishment of a livestock input Facility (PPF) advance of delivery service and a line of $55,000 approved to fi­ credit for livestock activities. nance the completion of preparation activities.

Ministere de 20.0 (R) Agricultural Research - Streng­ Consultants will be Appraisal mission sched­ I 'Agriculture et (IDA) thening of Burkina Institute for required. uled for September 1986. de l'Elevage Agricultural and Zoological Research (IBRAZ), improving IDA Project Preparation production systems, development Facility advance of of research, infrastructure, $275,000 approved to fin­ strengthening of linkage between ance research advisor and research and extension services. workshop/seminar. An additional advance of $225,000 approved to continue preparation activities.

Ministere de 10.0 (R) Urban II - Financial and human Consultants provided by Appraisal mission I 'Administration (IDA) resource mobilization for Consortium BCEOM/Groupe scheduled for July. Territoriale et Ouagadougou and Bobo Dioulasso Huit are already in place de la Securite to improve (a) tax collection; carrying out feasibility (b) urban municipal management study.· and resource allocation includ­ ing civil works and detailed engineering. Total project cost estimated at $15.0 million.

Minis tere de 30 .1 (R) Education and Vocational Train­ Consultant for vocational Approved by the Exec­ I 'Education (Bank) ing - Expansion of primary training component rem­ utive Directors on Nationale et teacher training colleges; reha­ ains to be selected April 29. Ministere du bilitation of technical second­ (short-list already Travail ary schools. Improvement of established). vocational training capabili- ty. Strengthening of key ins.ti­ tutions responsible for educa­ tion and manpower planning. Total project cost about $61.2 million, of which $32.6 million in foreign exchange.

See page 1 for footnotes. - 16 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency}_/ Lender 1,_/ Consulting Services Action on Procurement!±_/

CAMEROON (Cont'd)

Ministere de 16. 5 Agricultural Research - Improv­ Technical staff will be Negotiations to be sched­ 1 'Enseignemeht (Bank) ing scope and application of required for research uled. (Cofinancing with Superieur et de national agricultural research programming and ODA probable.) la Recherche through institution building in­ management. Scientifique volving The Ministry of Higher Educat_ion and Scientific Re­ Consultants will be search, and crop and livestock required to assess research institutes. Particular specific technical and emphasis on training, organi­ financial problems, and zation, evaluation and building for training. pre-extension linkages to re­ gional research and develop­ ment. Total project cost about $41.0 million, of which $21.3 million in foreign exchange.

Ministere de 75.0 (R) Cocoa Sector Rehabilitation - To Consultants will be Appraisal report 1 1 Agriculture & (Bank) establish the basis for a required for export being prepared. Societe de dynamic cocoa industry in strategy, technology Developpement du Cameroon, Snd improve rural development and monitor­ Cacao (SODECAO) incomes and living conditions. ing and evaluation.

Ministere de 20.0 (R} Technical Teacher Training - Consultants will be Appraisal report being l 'Enseignement (Bank) Increasing the output and im­ required for the mainten­ prepared. Superieur et de proving the quality of technical ance of equipment and for la Recherche teachers. Improving planning workshop organization and Scientifique and management of resources. maintenance.

Ministere de 107 .o (R) Douala Infrastructure - Removal Consultants have sub­ Appraisal report being 1 1 Urbanisme et (Bank) of major infrastructure cons­ mitted feasibility stu­ prepared. (Cofinancing de I 'Habitat traints in Douala through dies for roads and for being sought for tech­ traffic management plan, rehab­ drainage. Contracts for nical assistance and ilitation and construction of detailed engineering training.) primary and secondary urban studies are under roads, improvements and cons­ preparation. truction of major storm drains, institutional strengthening for efficient operation and main­ tenance of urban transportation and drainage system. Total project cost about $240.0 mil­ lion, of which $115. 0 million in foreign exchange.

Ministere de 25 .o National cadastre project - Aims Consultants will be Appraisal mission 1 1 Urbanisme et (Bank) to extend secure land ownership required for project scheduled for de I 'Habitat to urban dwellers. Project implementation and November. elements include: geodetic net­ technical assistance. work for the whole country, aer­ ial photographs at various scales; equipment, material, vehicles and facilities for the services and technical assis­ tance and training programs.

CAPE VERDE

Ministry of 3.0 (R) Basic Education Development - Technical assistance (yet Preparation under way. National (IDA) Support of basic education to be determined) expect­ Appraisal mission planned Education development and strengthening of ed to be required. for June/July. education administration.

CENTRAL AFRICAN REPUBLIC

Ministere du 11.9 (R) National Livestock Project - Consultants will be Approved by the Executive Developpement (IDA) Establish largely self-financing required for technical Directors on April 15 Rural support services for livestock assistance. and signed on April 29. sector. Total project cost (Cofinancing by EDF about $37.3 million, of which $5. 4 million, !FAD $19.6 million in foreign $3.8 million, and FAC exchange. $1.1 million.)

Ministry of 10.0 Primary Education Rehabilitation To be determined. Preparation under Education School (IDA) - To improve efficiency and way. Building Service management of primary schooling; and Maintenance and maintain quality and Service of enrollment levels during a School Building period of financial crisis. (SCEBS)

See page 1 for footnotes. - 17 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J/ ~]/ Consulting Services Action on Procurement 4/

Ministry of 10.0 Rural Fund II - To help finance To be determined. Identification under Agriculture (IDA) small-scale rural development way. schemes and strengthen Chadian institutions involved with rural development.

Ministry of 17 .o Agriculture Rehabilitation To be determined. Appraisal report Agriculture (IDA) Project - Central objectives under preparation. involve the development of agricultural institutions and pilot actions and studies to expand crop production.

Ministry of 30.0 (R) Agriculture Sector Project - To be determined. Preparation mission Agricu 1 ture (IDA) Strengthening and accelerating (FAO/CP) scheduled for rural development activities to June. improve the organization and management of the Ministry with specific targets to: (i) in­ crease the quantities and rel­ iability of food crop produc­ tion; and (ii) improve the prod­ uction of cotton.

Ministry of 18 .2 (R) Highway Maintenance - Mainten­ Consultants will be President 1 s Report Public Works, (IDA) ance of recently rehabilitated required for transport under preparation. Mines and priority infrastructure and sector planning, road Geology equipment, and development of network management and maintenance capacity in road planning, equipment sector. management, supervision of work and training.

Office National 20.0 Road Rehabilitation and Maint­ To be determined. Project being prepared. des Routes (IDA) enance - Rehabilitation of (OFNAR) transport sec tor infras true ture and related institution building.

Cottontchad 15 .o (R) Cot ton - A two-year program loan To be determined. President's Report (IDA) to support a first phase rehab­ under preparation. ilitation of the cotton sector.

CONGO, PEOPLE.'S REPUBLIC OF THE

Ministere du 15.0 (R) Agriculture Sector Project - Consultants likely to be Preparation under Developpement (Bank) Main components to include required to provide way. Rural selected sectoral reforms, technical assistance rural roads, marketing, and during implementation. ag~icultural research.

To be 15.0 (R) Public Enterprise Reform - Consultants required to Preparation under determined (Bank) Support for rationalization and assist Government in for­ way. reform of public enterprise sec­ mulation of reform plan tor. and for project implem­ entation.

To be determined 4.0 Technical Assistance II - To be determined. Preparation under (Bank) Project being designed to way. support Government adjustment program.

COTE D'IVOIRE

Regie Abidjan­ 30.0 Railways II - Rehabilitation of Consultants may be re­ Project processing awaits Niger (RAN) (Bank) Rolling stock, consulting ser­ quired to provide tech­ outcome of discussions on vices and training. nical assistance in key transportation sector management position. with Government and clar­ ification of RAN status following Cote d'Ivoire• s recent indication to split RAN ( see under Burkina F aeo).

See page 1 for footnotes. - 18 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender J:/ Consulting Services Action on Procurement!!_/

COTE D'IVOIRE (Cont' d)

Office National 24.5 (R) Telecommunications - Implem­ Consulting work required Board presentation on des Telecom­ (Bank) entation of the 1986-1988 Devel­ for institutional deve­ May 15. (Cofinancing munications opment Plan of the National lopment, management with CCCE for $17 .2 (ONT) Telecommunications Office assistance to ONT, impro­ million and EIB for (ONT), consisting of rehabil­ vement of ONT I s operating $8. 7 million.) itation works, and technical efficiency and training. assistance and training; finan­ cial restructuring of ONT. Total project cost about $116.7 million, of which $44.3 million in foreign exchange.

Ministry of 50.0 Agricultural Extension Project - Consultants will be Project appraisal in Agriculture; and (Bank) Improving extension services in required for study progress. Ministry of three main extension agencies and assistance in Rural Develop­ CIDT, SATMACI and SODEPALM. financial management. ment

To be determined 250.0 Structural Adjustment Loan (SAL) No consultants required Negotiations substan­ (Bank) III - Further support to Govern­ at this time. tially completed. ment's program of economic policy reform.

Ministry of 30.0 Agricultural Research - To cre­ Requirements not yet Project preparation in National (Bank) ate a new institutional frame­ defined. progress with assistance Education and work for research. Project from FAO/Bank Cooperative Scientific would emphasize expansion of Program. Research food crops and farming systems research and consolidation of tree crops research.

Ministere des 100.0 (R) Urban Ill - (a) assistance to: Consultants will be Negotiations tentat­ Travaux Publics, (Bank) ( i) re-orient the policies and required for studies and ively scheduled for end­ de la Cons­ programs of the public sector technical assistance. June. (Cofinancing with truction, des housing and land servicing agen­ AID for $10.0 million:) Postes et cies; and (ii) introduce Telecommu­ mechanisms to provide long-term nications resources to encourage private sector finance for housing and for households; and (b) finan­ cing of complementary invest­ ments required to make optimal use of infrastructure and public transportation facilities finan­ ced under the on-going second project. Total project cost estimated at $240.0 million.

Port Autonome 9.5 (R) Port rehabilitation and Consultants will be Appraisal mission sched­ d' Abidjan (PAA) (Bank) improvement, institutional requir~d for project uled for October. Appli­ development, training and preparation, for improve­ cation for Project Prep­ consul ting services. ment in management, oper­ aration Facility advance ations and planning, and is expected from Govern­ for carrying out tech­ ment to finance prepar­ nical studies. ation.

Societe 40.0 (R) Rubber V - Planting additional Consultants may be Preparation completed. Africaine de (Bank) outgrower rubber on small- and required for land use Appraisal mission in Plantations medium-size holdings and ex­ survey. mid-May. d'Heveas tending a nucleus estate; main­ (SAPH)/Ministry taining into production rubber of Agriculture planted under projects Ill & IV; construction of a rubber fac­ tory; land use survey of tree· crop development in the South­ west.

Ministry of 15.0 (R) Education Renovation - Improved Technical assistance Appraisal report Education (Bank) use of educational resources would be required to being prepared. through renovation and upgrading supervise renovation, of institutions and facilities. maintenance and science components, and will also be needed for planning and general finance administration.

See page 1 for footnotes. - 19 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender 1/ Consulting Services Action on Procurement 4/

COTE D'IVOIRE (Cont'd)

Ministry of Eco­ 150.0 (R) Agricultural Sector Loan - To Requirements not yet Project being identified. nomy and Fin­ (Bank) conso 1 ida te, and in the future defined. ance; Ministry expand, structural adjustment of Agriculture, reforms mainly in the field of Water and For­ agricultural sec tor pricing estry; and Min­ policy and institutional is try of Rural improvements. Development

Ministere de 20.0 Municipal Development - Country­ Consultants required for Appraisal mission 1 1 Interieur - (Bank) wide strengthening of local project implementation scheduled for October/ Direction des government institutions through and technical assistance. November. Collectivites technical assistance to Ministry Locales of Interior; creation of a municipal development fund, and implementation of urban infra­ structure works in selected cities.

EQUATORIAL GUINEA

Minis terio de 6.0 (R) Rehabilitation Import Credit - Consultants (macro­ Board presentation on F inanzas; Banco (IDA) Financing of urgently needed economist, procurement May 8. Central de Los 4.0 imports in agriculture, infra­ specialist, and two civil Estados de (SAF) structure and other sectors engineers) will be re­ IDA Project Preparation Africa Central aimed at increasing agricultural quired to implement the Facility advance of production and exports. Total project. $90,000 approved for project cost estimated at $10.0 consul tan ts to set up million, of which $10.0 million arrangements and to begin in foreign exchange. implementation.

THE GAMBIA

The Gambia 5.0 (R) IDF II - Line of Credit for re­ Consultants for project Project preparation Commercial and (IDA) structuring some existing enter­ preparation financed by started with an indus­ Development Bank prises, and new investments in the Project Preparation trial sector review '! (GCDB) agro-business and manufacturing; Facility. mission in February. technical assistance to small­ scale enterprises support agen­ IDA Project Preparation f cies and entrepreneurs as well Facility advance of as for GCDB for improvement in $250,000 approved to both commercial and development finance consultant ser­ I banking operations and in vices to provide audit­ accounting systems. ing, accounting and other technical assistance to I the GCDB. Ministry of 5.8 {R) Highway Maintenance II - Repa­ Consultants required Approved by the Executive Public Works and (IDA) ving and regraveling of existing for tr·ansport planning; Directors on April 15. Communications roads. Total project cost esti­ management assistance and (Cofinancing with AfDF (MWC) mated at $16.4 million, of which training; workshop man­ for $4.5 million, UNSO $13. 2 million in foreign ex­ agement; and assistance for $600,000 and UNDP for change. to domestic contractors. $700,000, EEC expected to provide $2.0 million.)

IDA Project Preparation Facility Advance of $550,000 approved to fin­ ance engineering studies, a reorganization study of MWC, road design reduc­ tions and consulting services for road maintenance management.

The Gambia 7.0 (R) Water Supply/Electricity Project Consultants for detailed Board presentation on May Utilities (IDA) - Rehabilitation and expansion engineering design being 27. (AfDB, EDF and Corporation of water supply systems in selected. Consultant for Islamic Development Bank (GUC) Greater Banjul and provincial technical assistance and have expressed interest urban areas. Banjul electricity training will be requir­ in cofinancing.) system rehabilitation, technical ed. assistance and training. Total project cost estimated at $19.4 million, of which $15.l million in foreign exchange.

See page 1 for footnotes. - 20 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender]/ Consulting Services Action on Procurement!!/

THE GAMBIA (Cont'd)

Ministry of 4.0 Population, Health and Nutrition Consultants for project Appraisal report being Health, Labor (IDA) Project - Strengthening of fami­ preparation financed by prepared. (AfDB, Italy and Social ly planning, health, and nutri­ the Project Preparation and the Netherlands have Welfare tion facilities through financ­ Facility, expressed interest in co­ ing of drugs, rehabilitation, financing.) acquisition of essential equip­ ment, nurse training, improve­ IDA Project Preparation ment in communications infra­ Facility advance of structure. Total project cost $400,000 approved to estimated at $14.0 million, of finance consultant which $13.0 million in foreign services to complete exchange. necessary preparation studies and detailed plans.

Ministry of 5.0 Structural Adjustment Credit - To be determined. President's Report being Economic (IDA) Support to the Government's prepared. (Cofinancing Planning and 10.0 recovery program. Total program confirmed with UK for Industrial (SAF) cost estimated at $30.0 million, $5.0 million under Spe­ Development 5.0 cial Joint Financing, and (SJF) AfDF for $10.0 million.)

GHANA

Ghana Cocoa 15.0 Cocoa Ill - Replanting and reha­ To be determined. Project preparation Marketing Board (IDA) bilitation of existing cocoa under way. areas; technical assistance for training and institution build­ ing.

Office of the 20.0 Public Enterprises Rehabilita­ External consultants Project scope to be dis­ Chairman, (IDA) tion - Institutional and policy have completed prepar­ cussed with Government. Provisional reforms to improve performance ation study. Phase II of (Cofinancing will be re­ National Defense of the public enterprise sector, the study formulating in quired.) Council and rationalization of size depth rehabilitation through divestiture. Total programs will be prepared IDA Project Preparation project cost estimated at $20.0 for a selected number of Facility advance of million. key enterprises in the $308,000 approved to first half of 1986. finance consultant ser­ vices required to com­ plete preparation work. UNDP is also contributing $308,000 to finance their preparatory work of Phase I.

GHAIP 10.0 (R) Refinery and Distribution Rehab­ Consultants are likely Appraisal mission Ministry of (IDA) ilitation - To rehabilitate and to be required but in the field. Fuel and Power improve Tema Refinery and the details are still to be transportation and distribution worked out. of.petroleum products.

Bank of Ghana; 28.5 (R) Industrial Sector Adjustment Proposals for consulting Credit signed on Ministry of Ind­ (IDA) Credit - Reform of incentive services to train local April 17. ustry, Science 25.0 policies; provision of finance bank staff invited. and Technology; (SAF) for industrial inputs and rehab­ Short-term consultants IDA Project Preparation Ministry of Fin­ ilitation; strengthening of for studies under PPF Facility advance of ance and Econo­ policy planning and project selected. Further con­ $284,000 approved to mic Planning implementation capabilities in sultant services will be assist in preparation Ministry of Finance, Bank of required for various activities. Ghana, support institutions. studies.

Ministry of 25.0 (R) Education Sector Adjustment Bud­ Under an IDA Project Appraisal report being Education (IDA) getary Support for 1986-88 plan Preparation Facility prepared. (British ODA, period, based on structural re­ advance (yet to be ap­ AFDB and UNDP have ex­ forms in educational system and proved), consultants will pressed interest in policy changes in financing of be required for school cofinancing.) education sector. Total project location planning, and cost about $55-70 million. universities rational­ ization planning. During project implementation, the need for consultants dealing with both mana­ gerial and technical aspects of implementation ie anticipated.

See page 1 for footnotes. ------

- 21 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency .!f Lender Y Consulting'Services Action on Procurement !±/

~ (Cont'd)

Ministry of 30.0 (R) Structural Adjustment Credit - To be determined. Appraisal mission Finance and (IDA) Reform of incentives, partic­ scheduled for June. Economic Plan­ 70.0 ularly through trade liberal­ ning (SAF) ization and cocoa producer prices; financial sector re­ forms; strengthening the econo­ mic management capabilities of key government institutions, improving the allocation of resources through formulation of a 3-year public expenditure program; monitoring of state enterprise.

Ministry of 4.0 (R) Technical Assistance in Support To be determined. Appraisal mission Finance and (IDA) of Structural Adjustment scheduled for June. Economic Program. Planning

Ministry of 17 .o (R) Agriculture Rehabilitation - To To be determined. Appraisal mission Agriculture (IDA) assist in rehabilitating Ghana's scheduled for end-May. food and industrial crops. (Cofinancing will be Total project cost estimated at required.) $55.0 million.

Volta River s.o (N) Northern Grid Extension - Re­ To be determined. Appraisal mission in the Authority (IDA) inforced extension of Volta field. (Cofinancing will River Authority (VRA) Trans­ be required.) mission Grid to Northern Ghana with related distribution. r Ministry ·9.s (R) Livestock Sector Rehabilitation Long-term consultants Board presentation of Rural (IDA) Development Project. Program to likely to be financed by scheduled for June. (Co­ I Development improve animal health, veter­ CCCE and FAC. Some financing will be re­ I \, inary services and support to short-term consultants quired. CCCE FAC, and r herders. Total project cost will be required for BADEA have agreed in \ about $19.8 million, of which various studies. principle to parti­ $18.l million in foreign ex­ cipate.) change. I IDA Project Preparation Facility advance of $465,000 to finance proje~t start-up.

Ministry for 1s.o Second Water Supply Project. Consultants for prepar­ Pre-appraisal mission i Natural (IDA) Medium-term investment program ation ~elected, financed scheduled for June. (Co­ Resources, and_ support to operating entity. under the Project Prepar­ financing will be re­ Energy, and the ation Facility Advance. quired.) Environment Consultant report expec­ ted in June. IDA Project Preparation Facility advance of $400,000 to finance inventory of customers, investment program, water tariff, legal framework preparation, as well as preparation of terms of reference for the private partner to be twinned to the existing water authority.

Ministry of 20.0 (R) Transport Sector Adjustment - No consultants required Appraisal mission Equipment and (IDA) Rehabilitation and reorgan­ at this time. scheduled for Urban Affairs ization of transport sector, September. including road transport, ports, and aviation.

Ministry of a.o Rural Health Project - Quant­ Consultants will be IDA Project Preparation Health and (IDA) itative and qualitative im­ required. Facility advance of Social Affairs provements in rural heal th $800,000 to finance pr­ system and development of family eparation assistance planning services with primary (technical coordinator, heal th care. architect, epidemo­ logist), equipment and vehicles.

See page 1 for footnotes. - 22 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender J:./ Consulting Services Action on Procurement 4/

GUINEA (Cont'd)

Secretariat of 5.0 (R) Reorganization of Post and Tele­ To be determined. Identification mission State for (IDA) communications Sector - Program planned for May-June. Telecom­ for strengthening new entities munications to manage and operate the sec­ tor, program for rehabilitation' of local and trunk network, vehicles and miscellaneous equipment.

GUINEA-BISSAU

Ministry of 3.0 (R) Institutional development in Preparation report Appraisal report Rural (IDA) agricultural sector planning; completed by consult­ being prepared. Development and specific investmen~s. ants. (Cofinancing being sought.)

Ministry of 2.0 (R) Agricultural inputs to the rural Preparation report Project processing post­ Planning (IDA) sector linked to policy reforms. completed by consult­ poned pending assess­ 5.3 ants. ment of reforms under (SAF) way.

LIBERIA

Ministry of To be Structural Adjustment Credit to Technical assistance to Will require reappraisal. Finance deter­ bring about an improvement of be provided under sep­ mined the Government's fiscal perform­ arate IDA credit. (IDA) ance in the quality of its in­ vestment program, in the effi­ ciency of public enterprises and in export performance.

Ministry of 3.3. Technical Assistance in support Consultants for technical Will require reappraisal. Planning and (IDA) of structural adjustment pro­ assistance to new Bureau (Cofinancing with UNDP Economic Affairs gram. Total project cost about of State Enterprises have for $0.4 million envis­ $3.8 million, of which $3.3 mil­ been selected and terms aged.) lion in foreign exchange. of reference and con­ tracts are being negotia­ ted.

Ministry of 5.1 (R) Population and Health - To help Consultant to be Appraisal report being Planning and (IDA) develop a national population appointed by the reviewed. Economic policy and program and streng­ Government. Affairs; and then the health service delivery IDA Project Preparation Ministry of support systems. Total project Facility (PPF) advance Health and cost estimated at $5 .6 million, of $300,000 approved. Social Welfare of which $3.2 million in foreign exchange.

Ministere de 10.0 (R) Office du Niger II - Streng­ Consultants will be re­ Appraisal mission sched­ l' Agriculture (IDA) thening and rehabilitation of quired for assistance in uled for June. (Cofi­ 20.0 Office du Niger. Total project project implementation, nancing with KfW Germany (SAF) cost estimated at $67 .3 million, and in financial for $16.0 million, and of which $47.3 million in for­ restructuring of the CCCE for $20.0 million eign exchange. Office du Niger. confirmed. The Netherlands bas expressed interest for $13.2 mil­ lion.)

Minis tere du 12.3 (R) Public Entreprises - Rationali­ Consultants to provide Appraisal report being Plan (IDA) zation of the size of the public overall advisory services prepared. 35.0 enterprise sector to reduce bur­ to Bureau des Entreprises (SAF) den on Mali's economy; policy Publiques have been sel­ An advance of $992,000 and institutional reforms to im­ ected, and proposals for under the IDA Project prove the performance of the specific aspect& of proj­ Preparation Facility public enterprise sector and ect preparation have been approved for the financ­ financial restructuring of the received from short­ ing of studies and audits sector. Total project cost listed firms. Consul­ of public enterprises to estimated at $63.3 million of tants will also be re­ be closed, rehabilitated which $42.0 million in foreign quired to assist Govern­ or transferred to the exchange. ment in project implem­ private sector for the entation. proposed public enter­ prise project.

See page 1 for footnotes. - 23 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency)) Lender 1,_/ Consulting Services Action on Procurement 4/

MALI (Cont'd)

Ministere de 28.0 (R) Urban II - Urban infrastructure Consultants will be re­ Approved by the Executive 1 1 Interieur (IDA) and traffic management and land quired for project imple­ Directors on April 1. development programs; resource mentation and technical (Cofinancing with France mobilization through simplified assistance. for $750,000 is confir-. cadastre and reform of land ten­ med; cofinancing with Gl'Z ure law and strengthening of Germany for $800,000 is a municipal finances; institu­ possibility.) tional strengthening, in partic­ ular land development, technical IDA Project Preparation assistance and training. Total Facility advance of project cost estimated at $34.5 $745,000 approved for million, of which $21.4 million preparatory work on land in foreign exchange. tenure law, preparatory training and completion of detailed engineering studies.

Energie du Mali 20.3 (R) Energy Sector - Policy and Consultants have been re­ Appraise 1 miss ion (EDM) (IDA) institutional reforms, and fin­ cruited to prepare the scheduled for June. 20.0 ancial restructuring, to improve studies under ongoing (CIDA, KfW (Germany), (SAF) performance of the energy Power Project. Consul­ OPEC Fund, Kuwait sector. Reinforcement and ex­ tants will be required to Fund, DIGIS, AfDF, tension of the services of EDM Provide technical assis­ CCCE , and E IB have by constructing a transmission tance, including addi­ been approached line between Bamako and Segou; tional studies. for cofinancing.) reinforcement and extension of distribution system, rehab­ ilitation of Felou and Sotuba Hydro plants, technical assis­ tance training, spare parts and studies. Total project cost about $64 .1 million, of which $60.5 million in foreign exchange.

MAURITANIA

Ministere du 7,6 (R) Livestock Development II - Es­ Consultants will be re­ Credit signed on Deve 1 oppemen t (IDA) tablishment of pastoral associa­ quired for financial man­ April 24. Rural tions, strengthening of live­ agement (long-term) and stock services, vaccination, for pastoral organiza­ distribution of drugs, applied tion, preparation of le­ research. Total project cost gislation, training and estimated at $18.1 million, of civil works tenders which $12.1 million in foreign (short-term). exchange.

Ministere de 3.o (R) Development Management - Tech­ To be determined. Preparation under way. l'Economie et (IDA) nical assistance to key Govern­ Appraisal mission tentat­ des Finances ment agencies to aid in implem­ ively scheduled for entation of economic recovery Sept/Oct. (Cofinancing program and to initiate reform needs to be determined.) of public administration. IDA Project Preparation Facility advance of $500,000 approved for financing of studies and technical assistance.

Ministere de s.o (R) Structural Adjustment Credit - To be determined. Appraisal mission sched­ l 1 Economie et (IDA) Support to Government's recovery uled for July. des Finances 25.0 program. Total project cost (SAF) estimated at $30.0 million in foreign exchange.

Ministere du 7.0 Small Rural Operations - Small­ No decision made whether Preparation under way by Plan (IDA) scale irrigation and bottomland consultants will be re­ FAO/CP. development schemes; cooperative quired. and group support activities; Financing to help prepar­ medium term loans to farmers. ation was provided for Total project cost estimated at by an advance of $430,000 $9,0 million. from the IDA Project Preparation Facility.

See page 1 for footnotes.

'/ I 'r - 24 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency J./ ~1/ Consulting Services Action on Procurement 4/

~ (Cont'd)

Ministere des 15,0 (R) Transport Sector Credit - Road Consultants will be Board presentation Travaux Publics (IDA) maintenance, rural road improve­ required for equipment scheduled for May 27, et de l 'Habitat 15,0 ments, workshop rehabilitation, management, supervision, (Cofinancing confirmed (SAF) training and institution build­ training and special with ADF for $16 ,3 20,0 ing, Total project cost estim­ studies (short-term), million; CCCE for $7 ,8 (SJF) ated at $212,9 million, of which million; CIDA for $19,6 $159,7 million in foreign ex­ million; EDF for $39,4 change, million; IDB for $24,2 million; UNSO for $11.4 million and UNDP for $0,5 million.)

Ministere de 17 ,9 Primary Education Development - Consultants in textbooks, Appraisal report being l 1Education (IDA) Expansion and rehabilitation of editing and publishing, prepared. (Cofinancing primary schools; education plan­ in project management and with KfW Germany for ning, textbooks, teacher train­ systems analysis will be $1,4 million confir­ ing and institution building. required. med.) Total project cost estimated at $20,8 million, of which appro­ ximately 65% in foreign ex­ change.

Ministere de la 27,8 (R) Health - Improvement of maternal No consultants will be Credit signed on Sante (IDA) and child heal th services; required. April 14, retraining of health workers; health education; development of nutrition activities; upgrading of rural health facilities. Total project cost estimated at $29,3 million, including $18,2 million in foreign exchange.

Ministere de 35 ,6 (R) Public Enterprise Rehabilitation Consultant was selected Preparation under way. Tutelle des (IDA) - Policy and institutional re­ to design and implement Entreprises forms to improve the performance public enterprise reform IDA Project Preparation Publiques of the sector; and rehabilita­ measures. Facility advance of tion of selected public enter­ $500,000 approved to fin­ prises. Total project cost ance start-up, studies of estimated at $36, 7 million. enterprises and audits.

Federal Ministry 25,0 Southern Berno Agricultural Dev­ Short-term consultant Awaiting final agreement. of Agriculture, (Bank) elopment - Farm support services services would be re­ Water Resources and general rural infrastructure quired in areas of inter­ Procurement: Retroactive and Rural Devel­ aimed at crop and livestock dev­ mediate technology, financing up to $1 mil­ opment elopment. Total cost estimated small-scale irrigation, lion recommended to cover at $39,3 million, of which $19,0 land use planning, train­ start-up activities. mi 11 ion in foreign exchange. ing, and maintenance of feeder roads and rural water supplies. Other consultant services to be determined.

Federal Ministry 71,0 (R) Forestry II - The project will Consultants will be re­ Negotiations scheduled of Agriculture, (Bank) (1) support an afforestation quired for post planting for end-May. Water Resources program; (2) establish pulpwood management. and Rural Devel­ and timber plantations; and pro­ opment vide support to forest manage­ ment in three middle belt, states. Total project cost estimated at $110, 7 million, of which $41,4 million in foreign Exchange,

Federal Ministry 162,0 Multi-etate Agriculture Develop­ Consultants services Awaiting final agreement. of Agriculture, (Bank) ment Project - Phased financing would be required for: (Cofinancing with IFAD Water Resources of agriculture development pro­ (i) agricultural planning for $12,0 million,) and Rural Devel­ jects, in seven southern states. data studies; (ii) food opment Total cost estimated at $256,4 co-op marketing study; Procurement: Retroactive million, of which $143,6 million ( iii) water supply feas­ financing of about $16,0 in foreign exchange. ibility study for seven million proposed for fin­ states and ( iv) prepar­ ancing start-up activ­ ation study for second ities. phase of project,

See page 1 for footnotes, ------

- 25 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency J,/ ~]:_/ Consulting Services Action on Procurement 4/

NIGERIA (Cont Id)

Federal Ministry 81.0 Second Livestock Development - Consultants will be re­ Awaiting final agreement. of Agriculture, (Bank) National smallholder livestock quired for management and Water Resources production project supported by technical support on Bank Project Preparation and Rural Devel­ credit, extension research and project management unit. Facility advance of $1,0 opment training services. Total cost million approved for estimated at $128,0 million, of bridge financing from which $69,7 million in foreign Livestock I and for short exchange. term training of Niger­ ians.

National 100- (R) Power VII - Distribution system To be determined. Continued processing of Electric Power 200 expansion to match ongoing gen­ Power VII is related to Authority (NEPA) (Bank) eration projects; spare part resolution of sector purchases; and technical assis­ policy issues and tance to improve all aspects of progress on Power V and NEPA's operations and systems VI Projects, facilities. Total project cost estimated at $150-320 million, of which $100-200 million in foreign exchange.

Federal Ministry 20,9 Transport Parastatals - Spare Required in areas of man­ Awaiting final agreement. of Transport and (Bank) parts, workshop equipment, agement information sys­ Aviation training and technical assist­ tems, accounting, work­ Procurement: Retroactive ance to improve management and shop operations, and port financing of $2 ,0 million operations of transport para­ technical training. proposed for financing statals, especially Nigerian start-up activities in­ Ports Authority and Nigerian cluding procurement for Railway Corporation. Total cost emergency spare parts. estimated at $30,3 million of which $25,6 million in foreign exchange.

Federal Ministry 5,0 Industrial Technical Assistance Consultant services will Approved by the Executive of Commerce and (Bank) Project. To assist in (a) be required to design Directors on September Industry strengthening the institutional specific policy packages 10, (Cofinancing being framework for formulation and aimed at stimulating in­ sought with EEC, UNDP/ coordination of industrial poli­ vestment growth in the UNIDO,) cies; (b) developing industrial private industrial sector incentives policies and promo­ and improve efficiency of Procurement: Retroactive tion measures to stimulate more public sector invest­ financing up to $400,000 efficient private sector growth; ments. to cover start-up activ­ and (c) improving the efficiency ities. of public sector industrial incentives. Total cost estimat­ ed at $8,6 million, of which $4,1 million in foreign ex­ change.

Federal Ministry 75,0- Water Supply Sector Rehabilita­ Consultants being Preparation under way. of Agriculture, 150 tion - Provision of funds through appoip.ted to carry out Water Resources (Bank) FMAWR to assist states with reha­ assessment of urban water Bank Project Preparation and Rural bilitation of existing water sup­ facility rehabilitation Facility advance of Development ply faci~ities, provide sector needs. $0,3 million approved to training; accounting systems; finance technical assis­ rural water supply development; tance/rehabi 1 itation technical assistance. Total cost studies. estimated at $115-150 million, of which $75-100 million in foreign exchange.

Lagos State 90- (R) Lagos Water Supply - Rehabilita­ Consultants are final­ Appraisal mission in the Water Cor­ 150,0 tion and extension of distribu­ izing hydraulic analysis field, (Cofinancing is poration (Bank) tion system; organization and of distribution network envisaged,) management studies; supervision and organization and man­ of cons true tion; technical agement studies. Consul­ Project Preparation Fa­ assistance and training. Total tants for construction cility advance of $0,5 project cost estimated at $375- supervision have not yet million approved by 524 million, of which $180-347 been selected, Bank to facilitate million in foreign exchange. hydraulic analysis.

See page l for footnotes, - 26 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency Jj Lender Jj Consulting Services Action on Procurement!!_/

NIGERIA (Cont'd)

Ministry of 80- Urban II - Infrastructure Technical assistance for Appraisal mission tentat­ Works and 150.0 Development Fund. This would Fund operation. De~ign ively scheduled for May/ Housing (Bank) involve establishment of a new and supervision of Fund June. agency. The Infrastructure subprojects. Technical Development Fund, which would assistance to borrowing identify, prepare,and finance States and local author­ urban infrastructure investment ities for improved finan­ in Nigeria. I~ would finance cial management. technical assistance for the setting up and operations of the Fund and would include financing for pilot operations in several States. Financing, for a second tranche of subprojects to be selected and appraised during the implementation of the project, would also be included.

Ministry of 75.0- (R) Road Rehabilitation - Strength­ To be deteterm.ined. Appraisal report Works and 200.0 ening, rehabilitation and per­ being prepared. Housing (Bank) iodic maintenance of Federal highways, bridge replacement, rehabilitation and maint­ enance. Total project cost estimated at $168.0 million, of which $102.0 million in foreign exchange.

SAO TOME AND PRINCIPE

Ministry of 1.0 (R) Cocoa - Rehabilitation of cocoa Two foreign firms have Negotiations scheduled Foreign Affairs (IDA) plantations through improved or­ been selected for man­ for end-May/June. (Most and Cooperation ganization and management, tech­ agement service contracts cofinanciers have been nical assistance, and provision with the Government to identified.) of inputs. manage one plantation each, with the possib­ ility of adding a further plantation each after 2-3 years.

Societe 22.0 (R) Telecommunications II - Exten­ 48 man-months of consul­ Board presentation Natiociale de (IDA) sion of Dakar telephone ex­ tant services to assist scheduled for June 10. Telecom­ changes; extension of transmis­ SONATEL in areas of plan­ (BOAD, CCCE, and AfDB munication sion network to the South and ning, data processing, likely to cofinance; EIB (SONATEL) East of country; technical as­ management information, considering co financing.) sistance. Total project cost tariffs and supply estimated at $150.0 million, of logistics. which $90.0 million in foreign exchange.

SENELEC 20.0 Energy Sector - Rehabilitation A consultant has been Board presentation ten­ (IDA) and extension of generation, selected for the gener­ tatively scheduled for transmission and distribution ation component engin­ June. (Cofinancing system and power ·plant, and eering and construction confirmed with AfDB for related technical assistance. supervision. $8 million, BOAD for $5 Estimated project cost $84.1 million and CCCE for million of which $64.3 million $28.0 million.) in foreign exchange.

Ministry of 11.2 (R) Education IV - Primary Education Consultants will be re­ Appraisal report being Education (IDA) Development. Total project cost quired in education prepared. (AfDB will estimated at $18 .3 million, of planning, financial cofinance about $5.0 which $11.9 million in foreign management and school million of project cost.) exchange. construction design.

Societe 20.0 (R) Irrigation IV - Irrigation and To be determined. Appraisal report being d 'Amenagemen t et (IDA) drainage rehabilitation works on prepared. (Cofinancing d 1 Exploitation existing perimeters; electrific­ confirmed with France and du Delta (SAED) ation program for pumping sta­ IFAD for $5.0 million tion; agricultural credit train­ each; BADEA,' Kuwait Fund, ing, adapted research; and stu­ and Saudi Fund have also dies. Total project cost estim­ expressed interest.) ated at $40. 0 million, of which $25.6 million in foreign ex­ change.

See page 1 for footnotes. - 27 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency )j Lender J:.I Consul ting Services Action on Procurement 4/

~ (Cont'd)

To be determined 15.0 Transport Sector Rehabilitation To be determined. Project preparation in (IDA) Project - Road construction and progress. (Cofinancing strengthening; road maintenance will be required.) and safety program, credit line

for truck fleet renewal I tech­ nical assistance and studies.

Ministry of 10.0 (R) Municipal and Management Devel­ Consultants for studies Project preparation in Works; Ministry (IDA) opment - Project would consist and technical assistance progress. of Urbanism; of: ( i) establishment of a solid will be required. Municipality of waste management program; (ii) Dakar small scale investments in the Dakar metropolitan area; (iii) generation of sources of reve­ nues for the municipalities of Greater Dakar; (iv) reorganiz­ ation of the municipal adminis­ tration; and (v) provision of finance to the land development agency.

Ministere du Plan 8.0 (N) Development Management - Tech­ To be determined. Identification/ prepar­ et de la (IDA) nical assistance, equipment, and ation mission in May. Cooperation training to key government agen­ (Cofinancing needs to cies to strengthen economic and be determined.) financial management and to ini­ tiate reform of public admi­ nistration.

SIERRA LEONE

National Power 14.0 (R) Power Rehabilitation V - Elec­ Individual consultants Negotiations substant­ Authority (IDA) tric System Rehabilitation Proj­ have been engag~d. ially completed. Final­ (NPA) ect. Total project cost esti­ izing of negotiations mated at $25.4 million, of which subject to issue of $20.0 million in foreign ex­ tariff increases being change. resolved. (Cofinancing with EIB for about $5.0 million has been agreed.)

Ministry of 5.3 (R) Population and Health - To Consultants may be re­ Board presentation on Health; and the (IDA) strengthen health and family quired. Details not yet May 13. National Popu­ planning services. Total decided. lation Commis­ project cost estimated at $5.7 Two IDA Project Prepar­ sion Secretariat million, of which $4.1 million ation Facility advances in foreign exchange. totaling $250,000 approved to complete project preparation.

TOGO

Office Togolais 50.0 Phosphoric acid plant. Feasibility study by Phosphate sector strategy des Phosphates (Bank) consul tan ts completed. under study.

Ministry of 14.4 (R) Agricultural Extension Services Consultants selected and Appraisal mission tentat­ Rural (IDA) Improvement - Extension services contracted for project ively scheduled for Development rehabilitation, with emphasis on preparation. September. improving organization of field operations. IDA Project Preparation Facility advance of $200,000 to defray cost of consul tan ts to prepare project.

Ministry of 14.0 Agricultural Services Rehabi­ No decision made on need Project being identified. Rural (IDA) litation - Rehabilitation of for consul tan ts. Development General Agricultural Support Services including input supply, seed production, applied research and cooperative deve­ lopment.

Ministry of 10.0 (R) Cocoa/Coffee III - Replanting Consultants Yill be Appraisal report being Rural (IDA) and maintenance of 10-15,000 ha required for technical prepared. (Cofinancing Development old cocoa and coffee; disease assistance and training. will be required.) control over 5-10,000 ha mature cocoa; pruning of 5-10,000 ha mature coffee; integration of food crops; research in cocoa, coffee, food crops.

See page 1 for footnotes. f - 28 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency 1f Lender]/ Consulting Services Action on Procurement 4/ TOGO (Cont'd)

Ministry of 10.0 (R) Road Rehabilitation and Main­ Preparatory study under Pre-appraisal mission Equipment, (IDA) tenance Project - Road main­ vay by consultants. scheduled for June. Mines and Post tenance and rehabilitation, and (Substantial cofinancing and Telecommuni­ related institutional strength­ will probably be cations ening. Coastal protection may required.) be added.

Ministry of 6.9 (R) Rural Development II in Cotton Consultants will not be Approved by the Executive Rural (IDA) Areas - Supplementary IDA Credit required. Directors on April 1. Development to SOTOCO for construction of Credit signing on May 1. possible fourth ginnery and transport equipment needed be­ cause of record cotton harvest.

CEET ( Compagnie 10.0 Power Distribution - Institu­ Consultants required for Project preparation under Energie E lec­ (IDA) tional diagnostic study and institutional studies, way. trique du Togo) action plan. Rehabilitation and technical assistance and extension of distribution system training, and engineering in Lome; purch_ase of spares and for rehabilitation and equipment; technical assistance extension of system. and training at all levels to improve all aspects of opera­ tions.

Ministry of 7.0 (R) Small- and Medium-Enterprise Study on SME support Appraisal mission tentat­ Planning and (IDA) (SME) Development - Line of system under way by ively scheduled for Industry credit, and technical assistance consultants. September. for development of SME projects. Consultants required for !. back-up for further economic/sector work.

See page 1 for footnotes. - 29 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender Y Consul ting Services Action of Procurement!!/

III. EAST AS IA AND PACIFIC

CHINA

State Education 120.0 Provincial Universities Develop­ Consultants to inter­ Approved by the Executive Commission (IDA) ment - Assistance to Provincial national advisory panel Directors on March 25. Universities: Pre-service edu­ will be required. cation and in-service training of secondary school teachers, and preparation of teacher edu­ cators. Total project cost estimated at $477 million, with $275 million in foreign ex­ change.

Shanghai Machine 100.0 (R) Shanghai Machine Tools - Ration­ Evaluation of consult­ Negotiations tentatively Tool Works (Bank) alization and product upgrading ants' proposals for scheduled for end-August. (SMIW) and of the industry in Shanghai. feasibility studies Corporation completed. (SMIC)

Ministry of 225.0 (R) Power III - Construction of a Consultants have Negotiations substan­ Water Resources (Bank) coal-fired thermal power station been selected. tially completed. and Electric of 1200 MW at Beilungang; coal Power (MWREP) handling, and other related facilities; technical assistance and training.

China Investment 75.0 (R) DFC Ill - To finance expansion No decision yet made. Loan and Credit signed Bank (Bank) and modernization projects in on April 16. 25.0 light industry, principally. (IDA)

Ministry of 65.0 (R) Health II,- Two main parts: Consultant services to be Negotiations substan­ Public Health (IDA) preventive medicine and rural financed by Government; tially completed. 15.0 health. For preventive medi­ Management of consultants (Bank) cine, assistance to 1) National by WHO. Center for Preventive Medicine; 2) rehabilitation of vaccine production; 3) improvement of drug quality testing. For rural health, support to county level activities in 8 provinces.

Ministry of 150.0 Beij ing-Tanggu Expressway - Consultant services Appraisal mission Communications (Bank) Civil works; training and provided under bilat­ scheduled for end-May. possibly technical assistance. eral aid.

Ministry of 130.0 (R) Tianjin Port - The project will: Consultant services will Board presentation Communications (Bank) (a) increase capacity of the be required. on May 6. Tianjin port by constructing 2,150 m of quaywalls for timber, construction material and gener­ al cargo berths with the neces­ sary works like dredging, rec­ lamation, railways, pavement, roadways, utilities, and supply of equipment; (b) provide tech­ nical assistance and training for port personnel to minimize siltation, to extend computer control of operations, to prep­ are a master plan for the port and to further develop manage­ ment information systems; and· (c) establish the Tianjin Port Development Center and provide the necessary equipment and technical assistance. Total project cost about $282 million, of which $14.3 million in for­ eign exchange.

See Page 1 for footnotes. - 30 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender J:/ Consulting Services Action on Procurement 4/

CHINA (Cont'd)

Ministry of 60.0 (R) Freshwater Fisheries - Con­ No decision yet made. Board presentation on Agricu 1 ture, (IDA) struction of new fishing ponds May 6. Animal Husbandry and improvement/expansion of and Fisheries existing fishing ponds; tech­ nical assistance for staff training, and strengthening of fishery research and exten­ sion. Project area covers eight major cities. Total project cost about $197.7 million, of which $60 million in.foreign exchange.

Municipality of 70.0 (R) Shanghai Environmental - Cons­ Consultant services being Appraisal mission tentat­ Shanghai (Bank) truction of sewers to remove and provided under bilateral ively scheduled for 75.0 dispose of wastewater from the aid. August. (IDA) central commercial district, areas with high population dens­ ity and industrial concentration in Shanghai; and for institu­ tional strengthening to improve the environmental conditions in the city of Shanghai.

Ministry of 20.0 (R) Technical Cooperation Credit II To be determined in each Credit signed on Finance (IDA) - Technical assistance for pro­ sub-project. April 16. ject preparation and implement­ ation.

Ministry of 160.0 (R) Railways Ill - Provision of Consultant services will Approved by the Railways (Bank) civil works, materials, equip­ be required. Executive Directors on 70.0 ment, technical assistance and April 15. (IDA) training, to increase transport capacity, moderllize and increase production of a signalling fac­ tory, inititate mechanized track maintenance and to continue dev­ elopment and implementation of the management information sys­ tem. Total project cost about $577 .5 million,. of which $297 million in foreign exchange.

Ministry of 40.0 (R) Red Soils Area Development - Consultant services will Negotiations Agriculture, (IDA) Agricultural development in :r be required. scheduled for end-May/ Animal Husbandry certain counties of Jiangxi June. and Forestry and Fujian Provinces.

Administration 100.0 (R) Cement - Rehabilitation and Consultant services will Preparation report for Building (Bank) modernization compriSing new be required. being prepared. Materials plant, wet-to-dry process con­ Industry version, and technical assis­ tance for optimization of small­ scale plant design and for. design and research institutes.

Ministry of 10.0 (R) Xinjiang Development - Integra­ Need for consultants to Appraisal mission Agriculture, (IDA) ted development in agricultural be determined. scheduled for June. Animal Husbandry production, livestock and pas­ and Forestry ture improvement, irl".igation, (MAAF) hydropower, and agro-proceseing.

Ministry of 108.0 (R) Huangpu Port - Construction of Need for consultants to Appraisal report Connnunications (Bank) new berths and technical assist­ be determined. being prepared. ance and training.

Ministry of 170.0 (R) Power V - Shuikou Hydro-power. Consultants have been Appraisal report Water Resources (Bank) Provision of peaking and reserve appointed. being prepared. and Electric capacity to the East China power Power (MWREP) grid, by construction of a con­ crete gravity dam with navig­ ation facilities and trans­ mission lines, installation of generating units, resettlement of people, and relocation of railroad and highways.

See page 1 for footnotes. - 31 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender 1=_/ Consulting Services Action on Procurement!±_/

CHINA (Cont'd)

Ministry of 90.0 (R) Dongpu Basin Natural Gas - Ex­ Need for consultants to Post-appraisal mission Petroleum . (Bank) ploration, appraisal and prod­ be determined. tentatively scheduled for Industry uction of natural gas in Dongpu June. Basin. Also introduction of integrated approach to planning for gas development, transport and utilization.

Ministry of 52.0 (R) Power IV - Yan tan Hydro-power. Consultants for review of Negotiations substan­ Water Resources (Bank) Provision of construction equip­ design, preparation of tially completed. and Electric ment and materials, technical tender documents and Power (MWREP) aSs is tance ani· tZ'ain:i.ng. staff training required.

Bohai Oil 30.0 (R) Liaodong Bay Petroleum Appraisal Extensive consultant Negotiations substan­ Corporation (Bank) and Technical Assistance - Ap­ services required. tially completed. praisal and development of pe­ troleum reserves in Liaodong Procurement: Advanced Bay. contracting of up to $10.6 million and retro­ active financing of up to $3.8 million are recom­ mended.

China Investment To be (R) DFC IV - To finance expansion No decision yet made. Appraisal mission Bank deter­ and modernization in light scheduled for June. mined industry, principally.

Gansu Provincial To be (R) Gansu Agriculture - Completion No decision yet made. Appraisal report Government deter­ of irrigation projects serving being prepared. mined 90,000 ha and land development for rainfed agriculture on 200,000 ha.

Ministry of 120.0 (R) Coal II - Rehabilitation of Consultants will be Appraisal mission Coal Industry (Bank) existing mines in Shanxi required for design and scheduled for June. Province. engineering.

State Education To be (R) Educational material. Modern­ Need for consultants to Preliminary sector Commission deter­ ization of textbook design, be determined. mission in May. mined production and distribution for primary, secondary_and higher education.· The project wollld assist inter alia a National Curriculum Development Center, and production and distribution facilities.

Ministry of To be (R) Fertilizer II - Plant rehabilit­ Need for consultants to Preparation mission in Chemical deter­ ation; production diversifica­ be determined. May. Industry mined tion; energy saving modifica­ tions; technical assistance to improve financial management and accounting systems; training.

Agricultural To be (R) Rural Credit III - To provide Need for consultants to Appraisal mission Bank of Chin& deter­ funds to ABC for medium to long­ be determined. tentatively scheduled (ABC) mined term. loans to individual farmers for September. and households, collectives and enterprises.

China National To be (R) South China Sea Gas - Provision Consultants will Project identifica­ Offshore Oil deter­ of well-head services, technical be required. tion mission in May. Corporation mined assistance and training to CNOOC (CNOOC) for the development of natural gas at Sou~h China Sea. Project would include construction of a pipeline, gas-fired power plant and possibly some distribution network.

Gansu Provincial To be (N) Gansu Industrial Credit - Line No decision yet made. Preparation mission Government deter­ of Credit to several financial in Ma}' mined institutions or agencies in Gansu to support light industry development in the province.

See page 1 for footnotes. - 32 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender 1_/ Consulting Services Action on Procurement 4/

CHINA (Cont'd)

Gansu Provincial To be (N) Gansu Basic Education - Upgrading No decision yet made. Appraisal mission tent­ Government deter­ primary schools, improving atively scheduled for mined training for primary and lower August. secondary teachers, improving the planning and information systems, and establishing supervision and inspection.

FIJI

Ministry of 14-0 (R) Road Improvement Project - Up­ No decision yet made. Project preparation under Communications, (Bank) grading of selected road seg­ way. (Co-financing with Transport and ments in Government's develop­ ADB for $15 .O million.) Works ment program.

INDONESIA

Ministry of 58.1 (R) Manpower Development and Train­ Consulting services will Negotiations completed. Manpower (Bank) ing - Strengthening of manpower be required for manage­ Board presentation sched­ development and training man­ ment development train­ uled for June 3. agement systems; establish na­ ing, physical resource tional standards; upgrade train­ planning and management, ing; extend and upgrade in-plant national training system training and improve vocational development and project guidance and job placement. management.

Bank Tabungan 250.Q (R) Housing Sector Loan - Provision Consulting services will Negotiations in early Negara (BTN) and (Bank) of finance for low-cost housing be required for streng­ May. Perum Perumnas and related institutional thening management infor­ assistance. mation systems and for studies.

Agency for Agri- 60.0 {R) Agricultural Extension III - To Consulting services will Negotiations in cultural Educa- (Bank) re-order subsectoral extension be needed in extension, early May. tion, Training services into a unified exten­ training, rural socio­ and Extension sion service for rice and non­ logy, monitoring and eva­ (AAETE) rice food crops, estate crops, luation, and different livestock and fisheries. commodities as well as for engineering design :, and supervision of civil I works. l· Ministry of 64.5 (R) Export Development - To support Consulting needs in areas Negotiations completed. Trade and (Bank) Indonesia's drive to increase of export estate design; Board presentation sched­ Cooperatives non-oil exports including devel­ export promotion and uled for May 27. opment of plans for an export training. estate, provision of investment credit for export industries, and technical assistance to im­ prove export quality, to streng­ then key export institutions and provide training in export­ related topics.

National 230.0 (R) Power Transmission and Engineering consultants Negotiations tentat­ Electricity (Bank) Distribution. To expand the already in place. Other ively scheduled for June. Authority (PLN) transmission and distribution consultancy needs relate facilities in Java. to equipment selection for Testing and Research Center; and establishment of an Engineering Center within PLN.

Perum 14-5 (R) Telecommunications Technical Likely to include cons­ Negotiations scheduled Telekomunikasi (Bank) Assistance - Technical assis­ truction management, fin­ for early June. (Perumtel) tance to the telecommunications ancial management infor­ organization in achieving its mation system develop­ expansion program during the ment, and training. fourth five year development plan.

Ministry of 38.0 Maritime Training - To develop Consultant services will Appraisal repor.t being Communications (Bank) manpower within the maritime be required for training prepared. sector by establishing large­ services and technical scale training systems in the assistance. sector.

See page 1 for footnotes. ------~------

- 33 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J/ ~1.I Consulting Services Action on Procurement~/ INDONESIA (Cont'd)

Agency for 45.0 Agricultural Research III - The Consultants will be re­ Appraisal report Agricultural (Bank) project would strengthen re­ quired to coordinate being prepared. Research and search administration and pro­ manpower training and Development gramming, and develop research research programming. (AARD) programs in agroeconomics; post­ Local consultants would harvest technology; germ-plasm be engaged to prepare collection; horticultural crops; detailed designs and selected industrial crops like tender documents of civil cotton, coconut; fresh water and works. marine fisheries.

National 210.0 Paiton Thermal - The project Consultants are already Project preparation Electricity (Bank) includes construction of 2/400 in place. under way. Authority (PLN) MW coal fired generating units at Paiton in East Java, 500 kV transmission lines from Paiton to Krian and associated substations at Paiton and Krian.

Directorate so.a (R) Regional Cities Urban Transport Consultants have been Appraisal mission in the General for (Bank) - Road improvements and traffic recruited for project field. Highway Con­ management measures for the preparation; need for struction, largest cities. other consultants to be Ministry of determined. Public Works (Bina Marga)

Directorate 235 .5 (R) Highway Maintenance and Better­ Consultants will be Negotiations in early General for (Bank) ment - Periodic maintenance of required for construction May. Highway Con­ about 6,600 km and betterment of supervision and technical s true ti on, about 1,000 km of National and assistance. Ministry of Provincial Roads, and replace­ Pub lie Works ment of about 7,000 m. of (Bina Marga) bridges; assistance to improve road maintenance.

Perusahaan Umum 34.0 (R) Gas Distribution Project - Re­ ·Assistance has been Board presentation on May Gas Negara (PGN) (Bank) habilitation/extension of gas obtained for operating 6. distribution networks in three gas utility. cities in Java. Total project cost about $86 million, of which $46.6 million in foreign ex­ change.

Director General 24.0 (R) Treecrops Human Resources Consultants may be Project preparation of Estates (Bank) Development - To ease manpower required for the under way. (DGE), Ministry constraints in the implement­ technical assistance of Agriculture ation of the estate crop pro­ component. gram, through training to small­ holders and to DGE provincial and headquarters staff.

Indonesia State 24.0 (R) Railways Technical Assistance Consultants will be Project preparation under Railways (PJKA) (Bank) To assist the Indonesian State required for technical way. Railway in raising operational assistance and training. efficiency through training and technical assistance and select­ ed items of equipment needed to improve operations and mainten­ ance.

Ministry of 25.0 Industrial Energy Conservation - Consultants will be Appraisal report Mines and (Bank) Establishment of national energy required in the area of being reviewed. Energy/P. T. conservation center to assist energy audits/ feasibility Pupuk Sriwidjaja the industrial sector in redu­ studies. Indonesia cing energy costs through con­ (PUSRI) , ( a gov­ servation and rationalization ernment-owned activities, modification in fertilizer PUSRI ammonia plants to reduce company) energy use and optimize produc­ tion capacity, and carrying out of feasibility studies in four other fertilizer plants to eval­ uate potential for energy savings.

See page 1 for footnotes.

' - 34 -

Member Country, Amount & and Implementing Probable Stage of P·rocessing and Agency lf ~1=/ Consulting Services Action on Procurement 4/ INDONESIA (Cont'd)

Ministry of Home 125.0 Rural Roads II - Civil works for Consul tan ts will be Project preparation under Affairs (Bank) road construction; rehabilita­ required for technical way. tion equipment; workshops for assistance and training. maintenance, and technical assistance and training.

Directorate 35.0 Riau Oil Palm Project - To pro­ Need for consultants to Appraisal report being General of (Bank) mote private sector involvement be determined. prepared. Estates Crops, in the development of approxim­ Ministry of ately 13,000 ha of oil palm in Agriculture Riau Province; half for outlying smallholders,

Ministry of 75,0 Forestry Institutional Develop­ No decision yet made. Project preparation under Forestry (Bank) ment - Forestry planning, mana­ way. gement, research, conservation, and assistance to prepare future forestry projects.

Directorate 35,8 Fisheries Support Services - To Consultants needed for Appraisal report. General of (Bank) strengthen fisheries technique construction supervision, being prepared. Fisheries, development, program support, technical assistance to Ministry of credit, input supply, infra­ hatcheries, and marketing Agriculture structure and marketing support support. services for fisheries in Aceh, Sulawesi and Fores. ·

Ministry of 38,5 (N) Library Development - To streng­ Consulting services Proj~ct preappraisal Education (Bank) then five major parts of the will be required. mission scheduled for library and information sys­ June/July, tem: policy/planning/management capability; personnel resources; public libraries; specialized libraries; and the publishing/ printing/ translation serviC.es.

BAP INDO-B ank 175,0 (N) Development Banking/Bapindo - ·~o decision yet made. Project preparation Pembangunan (Bank) Follow up to BAPINDO'V with under way. Indonesia emphasis on institution building and portfolio rehabilitation.

Ministry of 175,0 (N) Rural Electrification - A No consul tan ts Identification of project Mines and (Bank) timeslice of the investment required. The project components will be car­ Energy; and program for transmission and will be prepared by PLN. ried out during a Bank National distribution, including mission in late 1986. Electricity extension of supply to rural Corporation areas. (PLN)

Ministry of 111.0 Small/Medium Industries - Line Consultants may be re­ Approved by the Executive Finance (Bank) of credit to selected financial quired for the technical Directors on April 16, institutions to support term assistance component. 1985, lending to small and medium in­ dustries; and technical assist­ ance to small and medium indus­ try development, Total project cost· estimated at $182 million including $111 million in for­ eign exchange.

Korean Maritime 141.0 (R) Pusan Port - To provide addi­ Need for consul tan ts to Negotiations completed. and Port (Bank) tional container facilities at be determined. Awaiting final agreement. Authority Pusan to handle the increased port traffic,

Ministry of 50,0 (R) Urban Transport II - Construc­ Project no longer in the Construction (Bank) tion of traffic engineering im­ lending program. provements in Busan and Taegu. Reporting will be discontinued.

Korea E lee tric 230,0 Second Power (Transmission and Consultants will be Approved by the Executive Power Company (Bank) Distribution) - To finance a needed for a lOad Directors on March 27. (KEPCO) part of KEPCO' s 1986-89 trans­ management program. mission and distribution pro­ gram, and technicl assistance and training. Total project cost estimated at $3,068 million including $1,028 million in for­ eign exchange.

See page 1 for footnotes, - 35 -

Member Country, Amount & and Implementing Probable Stage of Processing and I Agency J/ Lender ]:_/ Consulting Services Action on Procurement!±./ I KOREA (Cont'd) I Korea Land 150.Q (R) Urban Land Development - Deve­ Consultants needed for Negotiations completed. Development (Bank) lopment of urban land for hou­ land development and for Board presentation sched­ Corporation sing and industrial estates. studies of land pricing, uled for June 17. (KLDC) financial management and I computerization of KI.DC I operations.

Ministry of 250.0 Kyonggi Region Multi-Modal Detailed engineering to Project preparation under I Construction; (Bank) Transport - To provide int­ be carried out by Korean way. and Korean. egrated network of suburban Highway Corporation and National expressways and railways in KNR plus consultant I Railroad (KNR) Seoul Greater Metropolitan area. assistance.

Ministry of Home 250.0 Second Highway Sector - To Need for consultants to Project preparation under I Affairs and (Bank) support Korea I s highway improve­ be determined. way. Ministry of ment program under Sixth Five­ Construction Year Plan.

LAO PEOPLE'S DEMOCRATIC REPUBLIC

Electricite du 35.0 Electrification of Southern Consultants have. been Appraisal to take place Laos (EDL) (IDA) Provinces - Transmission, and recruited for preparatory after LAO FDR/Government distribution of electricity in engineering consultant of Thailand price nego­ selected provinces. services to be funded out tiations completed. No of existinJ IDA credit. ~~te _yet. established.

Ministry of 3.9 (R) Telecommunications Rehabilita­ Consultant shortlist for Approved by the Execu.tive Transport, (IDA) tion - Rehabilitation and re­ engineering and planning, Directors on April 2i. Posts, and equipping of existing telephone financial management and (Cofinancing with UNDP Telecommuni­ network, institutional develop­ project coordination and for $1.23 million cations ment, training, and preparation implementation ( to be confirmed.) of a phased expansion program. financed from UNDP funds) Total project cost estimated at to be prepared by $7.8 million, of which $4.3 O.P.E/U.N. million in foreign exchange.

Ministry of 55.0 Western Johore II - Integrated Super.vision consultants Negotiations completed. Agricuiture (Bank) Agricultural Development - required. Construction of farm roads and drainage facilities, and pro­ vision of agricultural support services.

National 100.0 (R) Energy Efficiency and Plant Consultants will be re­ Appraisal mission in the Electricity (Bank) Rehabilitation (Power XII) - quired for feasibility field. (Cofinancing may Board (NEB) Power transmission and dis­ study. be sought.) tribution facilities. Total project cost estimated at $227 million, of which $155 million in foreign exchange.

Ministry of 127 .o (R) Primary and Secondary Education Consultants required for Approved by the Executive Education (Bank) Sector - Improvement of primary studies relating to cost Directors on April 29. and secondary school system. efficiency, equity and Total cost estimated at $313 .quality. Procurement: Retroactive million, of which $127 million financing recommended. in foreign exchange.

Bank Kemajuan 65.0 Development Finance - Financing No consultants required. Appraisal report Perusahaan (Bank) of medium- and large-scale being prepared. Malaysia Berhad enterprises in the Industrial (BKPHB); Sabah sector through participation Of Development Bank public and private financial (SDB) institutions.

Ministry of 40.0 Muda III - Construction of No decision made whether Project preparation under Agriculture (Bank) irrigation canals and drainage consultants will be way. systems and upgrading of water required. control communications system in the Muds. basin.

See page 1 for footnotes. I - 36 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ ~l.l Consulting Services Action on Procurement_i/ ~(Cont'd)

Port Kelang 18.8 (R) Port Kelang - Construction of Consultants will be Approved by the Executive Authority (Bank) one berth, relocation of the required. Directors on April 29. marine base, provision of en­ hanced berthing facilities for Procurement: Retroactive liquid bulks and paving of apace financing recommended. behind two berths. Total proj­ ect cost estimated at $34.9 mil­ lion, of which $18.8 million in foreign exchange.

Pub lie Works 85.0 Road Rehabilitation and Improve­ No decision made whether Project preparation under Department (Bank) ment - Rehabilitation and consultants will be way. maintenance program for federal required. and state highways.

Ministry of 5.0 (N) Industrial Energy Rationaliz­ Consultants may be Project preparation Energy (Bank) ation Project - Technical required. under way. Assistance to reduce energy consumption of industrial sector.

Forest Research 5.0 (N) Forest Research and Technical Consultants may be Project preparation Institute of (Bank) Assistance - Strengthening of required. under way. Malaysia (FRIM) research and forestry related studies in Peninsular Malaysia and Sarawak.

PAPUA NEW GUINEA

Agricultural 18.8 Agricultural Credit III - The No consultants required. Approved by the Executive Bank of Papua (Bank) project will provide funds to Directors on September New Guinea the Agricultural Bank for term 19. (ABPNG) lending in tree crop develop­ ment, poultry and agro-proces­ sing. It will also provide training to strengthen the Agri­ cultural Bank and technical as­ sistance on the crop diversifi­ cation program. Total project cost about $31.3 million, in­ cluding $17.0 million in foreign exchange.

Department of 48.9 Transport I - Construction and Consultants will be re­ Appraisal report being Transport and (Bank) improvement of about 90 km of quired for detailed en­ prepared. Civil Aviation national roads, improvement of gineering, institution (DTCA) and De­ four national aerodromes, road building for DTCA and partment of maintenance, and consultant ser­ DWS, and local staff Works and Supply vices and technical assis­ training. (DWS) tance. Total project cost estimated at $65 .o million.

Electricity About (R) Third Power Project - Construc­ Consultants for project Negotiations completed. Commission 28.S tion of dam at Yonki to firm up preparation are being fi­ Awaiting final agree­ (ELCOM) (Bank) existing capacity at Ramu POwer nanced by the Bank Proj­ ment. (To be cofinanced Station and provision of two ad­ ect Preparation Facility. with OECF/EIB.) ditional generating units (2xl5 Consultants also required MW), plus training and technical for supervision of proj­ A $1.0 million advance assistance for Rural Electrifi­ ect construction and to from Bank Project Prep­ cation Study. Total estimated review the design and aration Facility approved cost is $119 million. safety of the dam. to finance consultant services for preliminary design and detailed engineering.

Ministry of 39.0 (R) Education IV - (Primary educa­ No decision made whether Appraisal report being Education (Bank) tion) - Improvement of quality, consultants will be prepared. enrollment rates and sub-sector required. management. Total project cost estimated at $60 million.

Department of 15.0 Land Evaluation and Demarcation Consultants will be re­ Project preparation to Lands; Depart­ (Bank) Project - Institution building quired for project prep­ begin in June. ment of Primary for Department of Lande; demar­ aration. Consultants Industry; and cation of alienated and custom­ would also be required Department of ary land; land resources and for the project to assist Forest forest inventories; national in institution building mapping and coordination of and training. mapping activities; and prepar­ ation of selected agricultural and forestry projects.

See page l for footnotes. - 37 -

Member Country, Amount & Stage of Processing and and Implementing Probable Action on Procurement 4/ I Agency Jj ~J) Consulting Services I PHILIPPINES Negotiations postponed. I National 28,0 (R) Central Visayas Regional Project Consultants have been re­ I (Cofinancing is envi­ Economic and (Bank) II (Urban) - Emphasis on urban cruited. saged,) Development development supporting upgrading I Authority (NEDA) of municipal infrastructure, management of municipal enter­ prises, transportation, traffic management, maintenance and I training, Total project cost estimated at $42,2 million. i Negotiations substan­ Ministry of 82,0 (R) Rural Roads II - To provide Consultants will be Local Gove:I'nment (Bank) further support for the Govern­ required for project tially completed, (MLG); Ministry ment I s program of rural road implementation. of Pub lie Works construction, rehabilitation and and Highways maintenance, and institutional (MPWH) strengthening of MLG, provincial Governments, and MPWH. Tcital project cost estimated at $122,2 million, of which $63.6 million in foreign exchange.

Ministry of 11.0 (R) Export Technical Assistance - To Consultants will be Negotiations postponed. Trade and (Bank) finance technical assistance required for project Industry (MTI); including recruitment of implementation. and Bureau of experts, training and related Customs (.BOC) equipment in support of the Government I s export promotion efforts and rehabilitation program, including development of adequate administrative arrangements for the present export financing system and designing appropriate supporting policies. Total project cost estimated at $16,6 million, of which $10,0 million in foreign exchange.

Philippine 50,0 Geothermal Development - Bacon­ Consultants aill be re­ Project being prepared by the Government. (Co­ National Oil (Bank) Manito I - To finance the drill­ quired for engineering Company (PNOC) ing of about 17 additional studies and drilling man­ financing is envisaged.) wells, plus the installation of agement. 21 kilometers of steam-gathering and reinjec tion lines and 2 steam separator stations for a 110 MW power plant in Bacon-Man­ ito (Southern Luzon), Total cost estimated at $95 million, of which about $50 million in foreign exchange.

National 45,0 (R) Irrigation Operations Support No Consultants required. Appraisal mission sched­ Irrigation (Bank) Assistance to National Irri­ uled for September. Authority gation Authority for systems (NIA) improvement, maintenance and rehabilitation.

Metropolitan 69,0 (R) Manila Water Distribution - To Consultants will be Loan signed on Water Works and (Bank) finance the continuation of con­ required for engineering April 10, Sewerage System struction of major water supply studies and technical (MWSS) trunk mains started under the &fsistance. ongoing Water Supply II project; extension of distribution mains, installation of service connect­ ions; and institutional support., including computer, equipment, training and consultancy ser­ vices. Total cost estimated at $96,3 million, of which $51 mil­ lion in foreign exchange.

To be determined 50,0 Manila Urban Transport - Pro­ Consultants for project Project being prepared by (Bank) vision of improved road system preparation are being Government. capacity and safety; strength­ financed under an ongoing ening the Government' a trans­ loan, Consul tan ts will portation planning, prograuning, be required for project and policy formulation acti­ implementation. vities; and encouraging an in­ creased role for affected local Governments in project implem­ entation and financial respons­ ibilities.

See page 1 for footnotes. - 38 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )j Lender J:/ Consulting Services Action on Procurement ~/

PHILIPPINES (Cont'd)

To be determined 150.0 Public Corporate Sector Ratio­ Consultants will be Project being prepared (Bank) nalization Loan - To support a required for technical by Government. program of reform to rationalize assistance. and improve the efficiency of government owned or controlled corporations; including tech­ nical assistance to strengthen the performance monitoring and control functions, cost recov­ ery, personnel and compensation policies, and management audits of selected corporations.

Central Bank of 65.0 Small and Medium Industries IV - No decision made whether Project preparation under the Philippines (Bank) To provide funds for relending consultants will be way. (Cofinancing may be to small and medium industry, required. sought.) including exporting, and sup­ porting technical assistance to specific subsectors.

To be determined 10.0 Sugar Area Development and No decision made whether Project being prepared by (Bank) Diversification - To assist crop consultants will be Government. (Cofinancing diversification in sugar areas required. may be sought.) through increased productivity of the sugar sector; rational­ ization of sugar milling, and watershed management. Total project cost estimated at $100 million, of which $70 million is foreign exchange.

Ministry of 50.0 Population/Health - To assist Consultants will be Project being prepared Health and (Bank) the Government in the implement­ required. by the Government. (Co­ Comm.i~sion on ation of policy reforms per­ financing is envisage~.) Population taining to the decentralization of program implementation, inte­ gration of rural health and hos­ pital services, intensification of family planning service deli­ very, unification of outreach networks, improvement in finan­ cial management logistics and maintenance. Total project cost estimated at $92 million, of which $52 million in foreign exchange.

To be determined 8.0 Land Classification and Titling No decision made whether Appraisal mission tentat­ (Bank) - To establish the foundation consultants will be ively scheduled for mid­ for a national land program required. June. which would include a sub­ program to finalize land adju­ dication and titling in settle­ ment areas on a phased basis.

To be determined 100.0 Housing Sector Loan - To support No decision made whether Project preparation (Bank) the needed expansion in low-cost consultants will be under way. housing and address the institu­ required. tional weaknesses with emphasis on consolidating decision­ making, facilities-planning and strengthening financial management •

National Council 10.0 (R) Rural Development (Mindanao) - No decision made whether Project being prepared by for Integrated (Bank)· To improve the standard of li­ consultants will be Government. Area Development ving of the population in the required. (NACIAD) provinces of Bukidnon, Davao and Lanao Del Sur (Mindanao) through coordinated planning and implem­ entation of multi-sectoral rural development activities.

Philippine Ports 40.0 Port IV - Secondary Ports Devel­ No decision made whether Project preparation under Authority (PPA) (Bank)..... opment Program for Calapan, San consultants will be way. Jose, Nasipit Pulupandan, required. Tagbilaran, rehabilitation of typhoon damaged port of Surigao and other ports, technical assistance and improvement of inter-island shipping.

See page 1 for footnotes. ------

- 39 -

Member Country, Amount & Stage of Processing and I and Implementing Probable Consulting Services Action on Procurement !!/ I Agency l/ ~]j I PHILIPPINES (Cont'd) ! Ministry of so.a Secondary Education - To improve No decision on whether Project being prepared Education (Bank) quality, increase efficiency and consul tan ts will be by Government. expand access to secondary required. j education.

Central Bank of 100,0 (NJ DFC - Industrial Finance II - No decision made whether Project preparation J. the Philippines (Bank) Follow-up to the ongoing consul tan ts will be under way. industrial finance (Apex) required. project; to support lending through accredited financial I intermediaries to industrial enterprises, and continued strengthening of financial sector through strengthening I term lending capabilities of I accredited intermediaries, and possibly selected financial sec tor re form measures. I SOLOMON ISLANDS Ministry of s.o (R) Education II - Expansion of No decision made whether Approved by the Executive Education and (IDA) junior secondary education. To consul tan ts will be re­ Directors on April 29. Training widen educational opportunity quired. (Cofinancing with ADAB and improve equity, quality and for $4,3 million has been educational management. Total arranged. project cost estimated at $10.0 million, of which $5.8 million in foreign exchange.

Ministry of 175,0 Third Structural Adjustment Loan Consultants will be re­ Further processing in Finance (Bank) - To help the Government imple­ quired for public re­ abeyance pending Govern­ ment the next phase of its source management reform. ment decision to borrow structural adjustment policies Previously engaged con­ for the program. related to pub lie resource man­ sultants expected to con­ agement and export development. tinue.

Bangkok 51.9 Bangkok Flood Control - To Consultants will be re­ Further processing in Metropolitan (Bank) provide flood protection and quired for construction abeyB.nce pending Govern­ Administration drainage in the city core area, supervision and advis·ory ment decision to borrow (BMA) technical assistance, and train­ services for institution­ for the project. ing. Total project cost estima­ al development, and for ted at $90,8 million, of which training in drainage man­ foreign exchange component $26.6 agement, and corporate million. management.

National Housing 40,0 Third Shelter - To support the No decision made whether Project preparation under Authority (NHA) (Bank) National Housing Authority's consultaµts will be re­ way. (NRA) low-income housing pro­ quired. grams in metropolitan Bangkok and regional cities, and to introduce mortgage financing. by the Government Housing Bank as a part of NHA's program.

Electricity 100,0 Power XVI (Transmission) - Main Engineering and super­ Project preparation under Generating (Bank) components might include: (a) vision consultants will way. Authority of transmission system for Mae Moh be required. Thailand (EGAT) Unit 9; (b) transmission link between the southern and central regions as well as related in­ vestments; (c) seventh trans­ mission system expansion; and (d) load dispatch centers.

Office of Rubber 60,0 (R) Third Rubber Replanting - Rubber Previously engaged con­ Board presentation on May Replanting Aid (Bank) replanting; technical assistance sultant expected to con­ 13, (Cofinancing with Fund (ORRAF) and training. Total project tinue. CDC for $14 million.) cost estimated at $263,5 mil­ lion, of which $71.9 million in foreign exchange.

To be determined 30,0 Rural Land Use - Financing of Consultants have been Project preparation under (Bank) land policy and management selected for project way. center, resource inventory, land preparation. reclassification, land •ownership titling, infrastructure develop­ ment and fores try.

See page l for footnotes, - 40 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency!/ ~1./ Consulting Services Action on Procurement 4/ THAILAND (Cont'd)

Electricity 50.0 Lignite III Mae Moh Expansion - No decision made whether Project preparation under Generating (Bank) Lignite development in support consultants will be way. Authority of of power generation expansion at required. Thailand (EGAT) Mae Moh Units iJ 8 and (J 9.

Petroleum 50.0 Energy IV (Oil/Gas) - Project To be determined. Discussions on project Authority of (Bank) could consist of expansion of scope in progress. Thailand (PTT) LPG plant, products pipeline, and new gas pipeline to Southern Thailand.

Ministry of 100.0 Highway Sector - To support the No decision made whether Project preparation under Communications (Bank) road strengthening and rehabil­ consultants will be way. itation program including over­ required. lay, road safety program, train­ ing and technical assistance.

State Railway of 15.0 Rail Efficiency Improvement - To Consultants will be Project preparation Thailand (SRT) (Bank) support a package of efficiency needed in marketing, under way. enhancing policy and operational traffic, and operation. changes and certain investments.

Ministry of 2.0 Multi-project Credit including Consultants for project Approved by the Executive Agriculture, (IDA) rural roads upgrading, port preparation are financed Directors on March 20. Forestry and development, and school recon­ by ADB. (Project is cofinanced Fisheries struction. Total project cost with ADB in the lead.) estimated at $6.4 million, of which $5.0 million in foreign exchange.

Ministry of 3.0 (R) Education - Scope to be To be determined. Project will be identi­ Finance (IDA) determined. fied after completion of Education Sector Invest­ ment plan.

See page 1 for footnotes. I I ------

-41-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J.I Lender 1=_/ Consulting Services Action of Procurement !!_/

IV, SOUTH AS IA

BANGLADESH

Bangladesh Up to Inland Water Transport III - To Consultants to conduct First phase of Inland Water 40,0 assist Bangladesh Inland Water feasibility study on consultants'study Transport (IDA) Transport Authority (BIWTA), movement of containers by completed, Authority Bangladesh Inland Water Trans­ inland waterways in t"he port Corporation (BIWTC) and field. Ministry of Ports, Shipping and Inland Waterways (MPSI),

Dhaka Water About (R) Dhaka WASA III - To continue Consultants for project Negotiations under and Sewerage 35,0 development of ground water sup­ preparation financed way. Authority (IDA) ply in Dhaka and of secondary under ongoing project. system; to further institutional development of DWASA through Consultants will be technical assistance; and to required for leak promote the use of low cost detection study and sanitation through-a pilot production study. project.

Bang lade sh Bank 75,0 (R) Agricultural Credit 11 - To sup­ Consultants being Project preparation will (IDA) port further reform of agricul­ recruited to assist in be coordinated with Fin­ tural credit system, strengthen project preparation. ancial Sector Review. agricultural financial institu­ tions and to provide credit to farmers for on-farm investments •.

Bangladesh Bank 60,0 Industrial Investment Project - As part of the project, Project timing dependent (IDA) Provision of term finance to consul tan ts will be re­ on improved recovery private sector industry through quired for training in rates for industrial financial institutions to be the preparation of sub­ loans. selected. sec tor studies.

Bangladesh 56,0 Refinery Modification and LPG Consultants have been re­ Negotiations tentatively Petroleum (IDA) Recovery - To establish a cruited for feasibility scheduled for June. Corporation secondary conversion capacity at study financed under on­ facilities of Eastern Refinery going project. Limited.

Bangladesh Rural 15 .o Hand Tubewells II - To increase FAO/CP assisted in Project preparation under Development (IDA) agricultural production and em­ project preparation. way. Appraisal mission Board ployment by providing low cost te;ntatively scheduled for manual irrigation facilities. September.

Ministry of 150.0 (R) Roads Rehabilitation and Mainte­ Consultants conducting Pre-appraisal mission in Communications (IDA) nance - To rehabilitate national feasibility and finan­ mid-May. roads. cial/engineering studies are in the field,

Cabinet Division 6,0 R~ral Employment and Training - Consultant requirements Project preparation under (IDA) To promote rural non-farm emp­ to be determined. way. Appraisal mission loyment opportunities in .15 has been postponed. upazilas of Faridpur and Rajbari districts.

Bangladesh Water 19,0 Flood Control and Drainage IV - Consultant requirements Negotiations scheduled Development (IDA) To improve physical production to be determined. for late June. Board environment by controlling floods and improving drainage system. Total project cost estimated at $26,0 million, of which $5,8 million in foreil\n exchange.

Ministry of 20,0 Urban Development - To improve Consultants (Louis Berger Appraisal mission find­ Works; and (IDA) the efficiency of delivery of International Inc,) have ings under review. Ministry of urban infrastructure, services been selected for project Local Govern­ and affordable shel ,:,,, at local preparation. ment, Rural level, and to strengthen the Development and management of sector agencies Cooperatives and increase reliance on local resource mobilization.

See page 1 for footnotes. -42-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender 1/ Consulting Services Action of Procurement!!/

BANGLADESH (Cont'd)

Ministry of 190.0 (R) Industrial Sector Credit - Prov­ Consultants may be Negotiations tentatively Finance (IDA) ision of foreign exchange for employed to help scheduled for August. procurement of essential strengthen export imports. administration and financing.

Ministry of 19.0 (R) Industrial Energy Efficiency - Consultants will be Pre-appraisal mission in Energy and (IDA) To reduce energy import require­ required during project the field. Mineral ments and enhance industrial implementation to assist Resources efficiency by providing credit Energy Management Unit. for investments to improve energy efficiency of existing industries.

To be determined 45.0 (R) Cyclone Protection II - To pro­ Consultants will be Discussions being held (IDA) vide assistance to establish required for project with Government on scope infrastructure to reduce the preparation. of project. loss of life and property due to cyclones. Project will provide for coastal embankments, feeder roads, and technical assistance.

To be determined 120.0 (N) Energy Sector - To encourage the Consultants have been Project preparation (IDA) efficient use of resources and identified to assist in under way. improve resource mobilization; project preparation. support institutional reforms and sectoral coordination; and identify and assist GOB in implementing a core least-cost investment program for the energy sector.

BHUTAN

Ministry of 10.0 (R) Forestry II - Salvage logging Consultants may be Pre-appraisal mission Trade, Industry (IDA) and reforestation in forest .required. scheduled for late May. and Forests areas near Paro affected by insects and fungal attacks.

Department of 5.0 Education - To assist the Consultants Will be Pre-appraisal mission Education c/o (IDA) Government in meeting both required for education postponed to September. Ministry of qualitative and quantitat- planning, curriculum Development ive demands in its primary development, school schools. The project would design, etc. aim to (a) strenghten planning and the administration of the education sector; (b) improve Grade l participation rates and reduce dropout; and (c) improve teacher effectiveness in the cl4ssroom especially in the primary grades.

Ministry of 20.0 (R) Irrigation Rehabilitation - To Consultants will be re­ Negotiations tentat­ Agriculture and (IDA) rehabilitate existing gravity quired. ively scheduled for June. Forests irrigation systems in the Cen­ tral Dry Zone of Burma. Main Technical assistance component would comprise: major ($1. 7 million) would be civil work including repairs to financed by UNDP. and remodelling of major struc­ tures, canal des il ting and land development; provision of equ·ip­ ment and vehicles and agricul­ tural support services. Total project cost estimated at $27 .O million, of which $12.6 million is in foreign exchange.

Ministry of 30.0 (R) Grain Storage II - Follow-up of Consul tan ts will be Board presentation Agriculture and (IDA) the first grain storage project required. scheduled for May 27. Forests to add new and rehabilitate (Technical Assistance in existing storage and milling amount of $2.1 million by facilities; transportation; UNDP. Switzerland will technical assistance and staff provide grant of $5.5 training. Total project cost million.) estimated at $65 million, of which $30 million will be in foreign exchange.

See page 1 for footnotes. -43-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ ~1/ Consulting Services Action of Procurement!!_/ BURMA (Cont'd)

Posts and 30.0 Telecommunications III - Follow­ Consultants will be Project preparation by ,Telecommunica­ (IDA) up for expansion of domestic and required. Government under way. tions Corpor­ international services. Techni­ (Substantial cofinancing ation cal assistance and training needed.) would be provided.

Ministry of 45.0 (R) Industrial Rehabilitation - Consultants selected to Project identification Industry (IDA) Pilot project with aim of deve­ undertake studies for. under way. loping a program to rehabilitate project identification. existing facilities of selected subsectors/ corporations in the manufacturing sector through modernization, rationalization, balancing and upgrading of sys­ tems and operational practices.

Ministry of 20.0 (R) Tank Irrigation II (Crop Divers­ Consultants will be Project preparation Agriculture and (IDA) ification) - The project would required. under way. Forests (a) complement the GoverIU11ent 1 s efforts in agricultural divers­ ification with particular empha­ sis on production of export pro­ moting and import substituting crops; and (b) increase food production and farm incomes in areas where Government invest­ ments in irrigation have been relatively small. Major compon­ ents of the project are (a) con­ struction of one or two earth­ fill dams in Yin Basin with heights ranging from 90-160 ft.; (b) construction of main canals and irrigation distribution systems for each command area ranging from 10 1 000 to 40,000. ac.; (c) agricultural support including extension, research and inputs for crop diversific­ ation; (d) technical assistance and training; and (e) monitoring and evaluation.

Ministry of 20.0 Groundwater II (Crop Diversi­ Consultants will be Project preparation under Agriculture and (IDA) fication) - The project would required. way. Forests expand diversified crop produc­ tion and farm incomes in Taze/Ye U, Budalin and Pale/Salingyi by increasing the irrigation area from 400 ac. to 43,500 ac., using groundwater resources. The project would include: (a) construction of 255 new deep tubewells and provision of pumping equipment; (b) con­ struction of irrigation and drainage systems for these 255 new wells; (c) construction of a 132 kV transmission line from Mandalay t~ Ye U, to provide power to the Taze/Ye U wells; (d) construction of power distribution lines to serve the new wells in all three areas; (e) provision of agricultural extension,incremental fertilizer and agro-chemicals requirements for crop diversification; ( f) technical assistance and train­ ing; and (g) monitoring and evaluation.

Ministry of 40.0 Onshore Natural Gas Phase I - To Consultants will be Appraisal mission sched­ Energy (IDA) include drilling of appraisal required. uled for September. Sub­ and development wells, con­ stantial technical as­ struction of surface facilities sistance and training and a 16-inch pipeline from component; considerable Payagon to Ywama. Technical cofinancing involved. assistance and training.

See page 1 for footnotes. -44-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency};_/ ~1/ Consulting Services Action of Procurement !±J INDIA

Haldia Water 100.0 Haldia Water Supply and Sewerage Consultants' services Project preparation under Development (IDA) Project - Construction of 225 likely to assess techni­ way. Authority, million liters/day treatment cal options for the proj­ Government of plant, 4 pumping stations and a ect. West Bengal 90 km long water transmission main to serve the Haldia Devel­ opment Authority, 2 towns and rural communities en route. Total project cost estimated at $150 million.

Narmada 350.0 Narmada (Madhya Pradesh) Dam and Project preparation Appraisal report being Planning (Bank) Power (formerly Narmada MP I) - assisted by mainly local prepared·. (Cofinancing Agency Construction of the Narmada consultants financed from of approximately $100 Sagar dam and hydropower station Project Preparation Faci­ million under consider­ to generate 1,000 MW of power lity advance included in ation.) and to evaluate future irrig­ Credit 1332-IN. ation of about 300,000 ha, of land. Total project cost is Consultants will be used estimated at $925 million, of for design and construc­ which $250 million in foreign tion management. exchange.

Narmada 70.0 Narmada (Madhya Pradesh) Reset­ Project preparation as­ Appraisal report being Planning (IDA) tlement and Rehabilitation ( for­ sisted by mainly local prepared. Agency merly Narmada MP I) - Resettle­ consultants financed from ment of about 100,000 people Project Preparation Fund affected by Narmada Sagar reser­ advance included in voir submergence. Total project Credit 1332-IN. No deci­ cost is estimated at $250 mil­ sion yet made whether lion, of which $5 million in consultants are required foreign exchange. during implementation.

Industrial 200.0 Cement Energy Savings - Assis­ Consultants in cement Approved by the Executive Credit and (Bank) tance, through financial inter­ technology will be re­ Directors on March 20~ Investment mediaries, to a number of cement quired; no decision yet Corporation of plants to convert from wet to .on choice of consultants. India, Ltd. dry process technology. Total (ICICI); and project cost about $470 million, Industrial of which about $211 million in Development foreign exchange. Bank of India (IDBI)

Gujarat Housing 62.0 (R) Gujarat Urban - Program of land No expatriate consulting Credit signed on Board, Govern­ (IDA) and infrastructure development; services required. April 15, ment of Gujarat slum improvement and municipal services, and small- and medium­ town development for selected cities and towns in Gujarat. Total project cost estimated at $130,5 million, of which $15,8 million in foreign exchange.

Indian Council ao.o Forestry, Research, Education Foreign technical assist­ Project preparation under for Forestry (IDA) and Training - The project will ance to upgrade forestry way. (Cofinancing Research; and develop and support forestry research, education and likely,) Indian Council research, education and manpower training methodology is for Agricultural development at all levels, and likely to be required, Research support the proposed Indian Council for Forestry Research. Total project cost estimated at $160 million, of which $10 million in foreign exchange.

Department of 131.0 (R) Andhra Pradesh II Irrigation - Consultants have been re­ Approved by the Executive Irrigation, (Bank) Development of the Sri Salem cruited. Directors on March 20. Ministry of 140.0 Right Branch Canal (SRBC) and Agriculture, (IDA) Sriramasagar (SRS) schemes in­ Government of cluding the modernization and Andhra Pradesh completion of irrigation network in 165,000 ha of the SRS area, and further extension of its irrigable area of 163,000 ha, as well as provision of irrigation facilities to 65,000 ha in the SRBC area, Total project cost estimated st $475,8 million, of which $76.4 million in foreign exchange.

See page 1 for footnotes, ------

-45-

· Member Country, Amount & and Implementing Probable Stage of Processing and Agency};./ ~];_/ Consulting Services Action of Procurement 4/

~ (Cont'd)

National Bank 375.0 NABARD I - Assistance, over a Banking, rural credit and Approved by the Exec­ for Agriculture (Bank) three-year period, to National institutional development utive Directors, on and Rural Devel­ Bank for Agriculture and Rural specialists will be February 25. (Cofinan­ opment (NABARD) Development in providing rural required. cing arranged with KfW credit to farmers. Total proj­ (Germany) for $21.2 mil­ ect cost estimated at $5.3 bil­ lion, and the Netherlands lion, of which $507 million in for $5.5 million.) foreign exchange.

Bombay Municipal 10.0 (R) Bombay III Water Supply - Pro­ Local and expatriate Corpoz::ation (Bank) duction of an additional 100 mgd consul tan ts required for Negotiations completed. 70.0 of water for the Bombay Metro­ project management and (IDA) politan area from the Bhatsai implementation. River, trunk distribution, dis­ tribution mains and sewage collectors, low-cost sanitation, and studies to determine the next incremental production of water required to serve the Bom­ bay area. Total project cost about $304 million, including a $52 million foreign exchange component.

Central Water 100.0 (R) National Water Management - Sup­ No decision on consult­ Appraisal mission Commission, and (IDA) port for improved water manage­ ants. in May. Irrigation ment activities in selected Departments of projects covering 500,000 ha in participating three States (Andhra Pradesh, States Karnataka, and Tamil Nadu). Total project cost estimated at $200 million.

India Department 300.0 Telecommunications IX - Provi­ No decision on con­ Appraisal report being of Telecom­ (Bank) sion of imported equipment and sultants. prepared. (Cofinanc~ng munications raw materials to support reha­ likely.) bilitation and expansion of telecommunications networks in Procurement: Standard four major metropolitan areas, bidding documents and provide for· expansion and approved. modernization of long-distance transmission links. Total cost of 3 year investment program estimated at $2.3 billion.

National Thermal 350.0 (R) Capital Region Thermal - Instal­ Consul tan ts may be Appraisal report being Power (Bank) lation of four coal/oil-fired required for design of prepared. (Cofinancing Corporation 200 MW units as first stage of a ash disposal facility. possible.) new plant in Ghaziabad District in the State of Uttar Pradesh, together with associated 400 kV tI'ansmission lines; rehabilita­ tion of power station at Badarpur; completion of trans­ mission ring around Delhi; ex­ ecution of a series of technical managerial and financial stu­ dies. Total project cost about $1.3 billion, of which $528 mil­ lion in foreign exchange.

Ministry of 85.0 (R) National Agricultural Extension No expatriate consultants Negotiations postponed Agriculture; and (IDA) Project III (NAEP III) - Assist­ required. to end-May at the request State Govern­ ance to: (a) the State of Assam of the Government. ments of Uttar in strengthening its trainirig Pradesh, and visit (T&V) system; (b) the Himachal Pradesh introduction of T&V system to and Assam the States of Uttar Pradesh and Himachal Pradesh; and (c) the replenishment of the Special Sub-project Fund established under NAEP I. Total project cost estimated at $140 million, of which $5.5 million in foreign exchange.

See pag~ 1 for footnotes. -46-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency]_/ ~1=.I Consulting Services Action of Procurement !!_I INDIA (Cont'd)

Coal India Ltd. 135.0 (R) Gevra Thermal Coal Project - No decisions on Technical discussions and (Bank) Assistance to CIL Subsidiaries consul tan ts. negotiations in progress. in expanding pro'duction of ther­ mal quality coal at two mine sites. Total project cost about $422 million, of which $142 million in foreign exchange.

Roads and 100.0 Gujarat Rural Roads Project - Expatriate consul tan ts Negotiations postponed to Buildings (IDA) Assistance to GOG to upgrade not likely to be end-May at request of Department, rural road construction, main­ ;equtred. Government • Government of tenance, and ma"n8.gemellt capab­ Gujarat (GOG) ilities. Total project cost estimated at $158 million of which $33 million in foreign exchange.

Indian Farmers 302.2 (R) Corporative Fertilizer Industry Process technology and Negotiations in pro­ Fertilizer (Bank) Project - Construction of a consultant have been gress. (Cofinancing of Cooperative Ltd. large ammonia/urea plant to selected. $150-200 million with expand domestic production capa­ OECF and others to cover city. Total project cost esti­ equipment packages.) mated at $609 million, of which $350 million in foreign ex­ change.

Government of 90.0 Cauvery Delta Modernization - No decision on con­ Project preparation under Tamil Nadu (IDA) Modernization of about 64,500 ha sul tan ts. way. of existing irrigation and drainage facilities in the delta area including improved system operation and training pro­ grams. Total project cost estimated at $154 million.

National Thermal 485.0 (R) Combined Cycle Power Project - Consultants will be Approved by the Executive Power Corpor­ (Bank) Installation of 3 combined-cycle required for design Directors on April 1. ation gas power stations in the West­ aspects of combined cycle (Co financing possible.) ern and Northern Regions. Total plant, and for monitor­ project cost estimated at $1.2 ing, testing and commis­ billion, of which about $666 sioni~g of equipment. milliOn in foreign exch8nge.

Industrial 250.0 Automotive Products Project - No decision on con­ Project preparation Credit and (Bank) Modernization, rationalization sultants. under way. Investment and integration of vehicle Corporation of ancillary equipment manufact­ India Limited urers.

Karnataka Power 210.0 (R) Karnataka State Power Project No decision on con­ Appraisal mission in the Corp. (Bank) (formerly Kalinadi II Hydro) - sultants. field. ( Cofinancing Increase the power supply and likely.) reduce the power outages in the State of Karnataka (Southern Region) through the development of the hydroelectric potential of the Kalinadi River. It would provide 300 MW of additional in­ stalled geri.eration capacity. Total project cost estimated at $589 million, of which $233 million in foreign exchange.

Governments of 80.0 Bombay and Madras Population - No decision on con­ Project preparation Tamil Nadu and (IDA) Reduce infant/child/maternal sultants. under way. Maharashtra mortality; moderate fertility; and improve municipal author­ ities' abilities to design and implement health and family welfare programs.

Government of 70.0 (R) Bihar Tubewells - Construction No decision on con­ Negotiations sched­ Bihar (IDA) of new public tubewells and the sultants. uled for end-May. rehabilitation of existing tube­ wells; construction of power lines to serve only public tube­ wells; and organization and management improvements. Total project cost estimated at $100 million, of which $15 million in foreign exchange.

See page 1 for footnotes. ------~------

-47-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1f ~1/ Consulting Services Action of Procurement!:!./ INDIA (Cont'd)

Steel Authority 200,0 Steel Energy Saving - Restruct­ Consultant requirements Project preparation under of India Limited (Bank) uring of SAIL and its opera- not known at this time. way. (Cofinancing ·(st.IL) . tiOn's, 'and 'mOderniiation of one· likely.}· · of SAIL'S existing integrated steel mills. Total project cost estimated at $665 million, of which $250 million in foreign exchange.

Oil India · 150.0 Northeast India Petroleum Pro­ Consultants services not Project preparation under Limited (OIL) (Bank) ject - To accelerate India's known at this time. way. (Cofinancing exploration ·effcirfs, · to build up likely;)· the institutional capabilities .of OIL; .and. to facilitate the introduction of the private sector into the petroleum sector in India. Total project cost estimated at approximately $900 million or $1.0 billion.

Government of 350,0 (R) Nathpa Jhakri Hydro - To support Consultant requirements Pre-appraisal mission India; and State (Bank) the development of the hydro­ not yet determined, but scheduled for November. Electricity electric potential of the Satluj unlikely to be needed. (Cofinancing likely.) Board of River, as well as add 1,500 MW Himachal Pradesh of power ge~erating capacity to the Northern Region thereby helping to alleviate critical power shortages there. Total project cost estimated at $1,9 billion, of which $465 million in foreign exchange.

Indian Telephone 100,0 Telecommunications Equipment Consultant services may Project preparation under Industries (Bank) Restructuring Project - To meet be required. way. (Cofinancing (ITI); efficiently the growing domestic likely.) Hindustan Cab lea demand for telecommunications Limited (HCL); equipment, and to support the Hindustan Government's decision to Teleprinters increase domestic competition (HTL); for the telecommunications Industrial cable, subscriber and trans­ Credit and• mission eqU:ipmerit ·supplied to Investment the DT, Total project cost Corporation of estimated at $170 million. India Ltd, (ICICI)

Department of so.a Karnataka Irrigation II - The No expatriate consul­ Project preparation Irrigation, (Bank) objectives of the project are tants required. under way. Government of 150,0 to: (a) develop over five years Karnataka (IDA) a total of about 200,000 ha out of a command area of 425,000 ha, and (b) provide a modern irrig­ ated agriculture based on rota­ tiona~ water supply. t.ech­ niques. Total project cost estimated at $390 million,

Madras 100,0 Madras Water Supply and Sewerage Consultants expected for Project preparation under Metropolitan (Bank) - To increase the effectiveness operational efficiency. way. Water Supply and of abstraction, distribution and Sewerage Board usage of water supply; ensure (MMWSSB) full recovery of MMWSSB I s in­ vestment and operational costs; support appropriate programs for conjunctive water sharing. Total project cost estimated at $150 million.

Department of 100,0 Uttar Pradesh Urban Development Expatriate and local Project preparation Housing and (IDA) - Serviced land, core housing, consultants expected for under way. Urban Devel­ slum upgrading, area develop­ institution building. opment, Govern­ ment, water supply, sewerage, ment of Uttar sanitation in about 12 towns. Pradesh Total project cost estimated at $200 million.

See page 1 for footnotes. -48-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency}) Lender J:/ Consulting Services Action of Procurement !!/

INDIA (Cont'd)

Metropolitan 75,0 Tamil Nadu Urban Development - Consultants expected for Project preparation .Development (Bank) Improve sector institutions management improvement. under way •. Authority 125,0 responsible for managing urban (IDA) development and public urban investment; strengthen local government financial and mana­ gerial capability; secure pri­ vate participation in land dev­ elopment; and reform procedures for revising tariffs for public services. Total project cost estimated at $400 million.

Government of 70,0 Kerala Urban Development - Area Local consultants ex­ Project preparation Kerala (IDA) development, slum upgrading, pected for management under way. improvements in delivery and improvement. management o~ urban services. total project cost estimated at $140 million,

Governments of 50.0 Northwest India Irrigation and No decision on consul­ Project preparation Haryana, (Bank) Drainage - To provide for a tants. under way. Punjab, and 100,0 sustained irrigated agriculture Rajas than (IDA) and control emerging salinity problems. Key components to be financed under the project would include: lining of main and dis­ tributory canals, development of operation plans, development of long-term plan for groundwater management, control of water­ logging and salinity,

To be determined 150.0 Electronics - Industrial Devel­ Consulting services not Project preparation (Bank) opment - To support fixed in­ yet known. under way. vestment for private and joint sector electronics firms; may involve a small venture capital element, a productivity fund and a training component. Other elements of the project could include: financing of the end­ use of electronics and an Export Marketing Fund.

Government of 50,0 Madhya Pradesh Water Supply - To Consulting services not Project preparation Madhya Pradesh: (Bank) enable water supply and sewerage yet known. under way. Public Health 50,0 operations in Madhya Pradesh to Engineering (IDA) be financially self-supporting. Department Total project cost estimated at $130 million,

National Thermal 300,0 (R) Talcher Thermal Power Project - Consultants services not Appraisal report Power Corpor­ (Bank) Includes (a) construction and yet known, in preparation. ation (NTPC) installation of two coal-fired 500 MW units in the State of Orissa; (b) the construction of transmission lines to integrate the plant with the Eastern Regional grid; (c) a communic­ ations network linking NTPC's plants with headquaters via satellite and terrestial micro­ wave links; and (d) a series 9f studies on organizational as­ pects of power sector institu­ tions. Total project cost estimated at $1, 1 billion, of which $421 million in foreign exchange.

See page 1 for footnotes, -49-

Member Country, Amount & and Implementing Probable stage of Processing and Agency Jj ~Jj Consulting Services Action of Procurement !±I

~ Bank of Maldives 5.0 Rural Production Promotion and Will be required for Project preparation under (BOM) (IDA) Credit Project: To develop technical assistance way. agricultural and agribusiness component. sectors through strengthening the development banking functions of BOM. Key compon­ ents financed under the project would be: vegetable, fruit, coconut, palmwood and firewood production, animal husbandry, cottage industries and transport vessels, along with technical assistance.

Nepal 22,0 (R) Telecommunications IV - Follow­ Required for financial Credit signed on Telecommuni­ (IDA) up for exparision of local and and organizational re­ April 10, cations international services. Total structuring of NTC. Corporation project cost estimated at $65.3 (NTC) million, of which $55 ,8 million in foreign exchange.

Ministry of About Babai Irrigation - Includes con­ Consul tan ts wil 1 be re­ Project processing Water Resources 35,0 struction of weir and headworks quired. delayed due to riparian (IDA) on Babai River, construction of issue, and country irri&ation and drainage facili­ assistance strategy I ties on about 13,000 ha of land, considerations. and strengthening of agricultur­ I al extension services in the area. Total project cost esti­ mated at $64.5 million, of which $45,2 million in foreign ex­ I change.

Ministry of About (R) Rural Development Ill - Follow­ No decision on consult­ Board presentation sub­ Panchayat and 19,0 up on first credit with emphasis ants. ject to resolution of Local Develop­ (IDA) on (i) achieving fuller use of outstanding issues I ment the infrastructure created related to project during the first phase; (ii) ex­ accounts. I panding and improving agricul­ tural support services; (iii) exploiting the irrigation potential of the area by con­ structing additional gravity irrigation schemes; and (iv) developing additional infra­ structure including drinking water supply systems. Total project cost estimated at $20. 0 million.

National 13,0 Population - Provide family Will be required. Project processing I Commission on (IDA) planning and mother and child postponed indefinitely Population; health services; improve and ex­ pending agreement with Ministry of pand training facilities and Government and principal I Health programs for field workers, par­ donors on project ob­ I amedics, doctors and nurses; jectives, design and 'develop a system of production, scope. distribution and logistics for informational and educational I materials; establish a national vital registration system. I Total project cost estimated at $18,0 million. ·

Ministry of 10,0 Deep Aquifer Exploration - Iden­ Consultant recruited for Project preparation Water Resources (IDA) tify new and untapped sources of project preparation. delayed pending agree­ irrigation water supply from ment on project scope deep aquifers which would in­ and design. crease cropping intensity in the Terai. This would include dril­ ling of exploratory boreholes; construction of wells; in-serv­ ice training; and preparation of reports, Total project cost estimated at $15 ,5 million,

See page 1 for footnotes.

I I -50-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ ~)_/ Consulting Services Action of Procurement!!./

~ (Cont'd)

Ministry of 10.0 (R) Second Cottage and Small Indus­ Consultants will be Board presentation on Industries (IDA) tries - Follow up to first required. May 13. (UNDP will Cottage and Small Industry provide $1.8 million to project. The objectives of the assist in financing project would be (a) consoli­ technical assistance dating institutional develop­ component.) ments initiated under the first project, and (b) developing and expanding small and cottage industry activity in districts· with existing artisan clusters and reasonable transport and institutional infrastructure. Specific project components include: ( i) credit component; ( ii) technical assistance to upgrade the commercial banking system; and.(iii) extension and training services. Total pro­ ject cost about $17 .J million, of which $6.9 million in foreign exchange.

Tribhuvan ·30.0 Engineering Education Development consultants may be Project preparation University (IDA) Administration - {i) Rationalize required. under way. existing teaching programs and resources; (ii) improve the in­ ternal efficiency, quality and relevance of engineering educat­ ion; and (iii) to establish the physical capacity to educate professional engineers at the Insitute of.Engineering (!OE) of Tribhuvan University.

Ministry of 24.5 (R) Narayani III (Consolidation) - Consultants will be Negotiations substan­ Water Resources (IDA) Includes civil works on 8,000 ha required. tially completed. of· farm area; groundwater devel­ opment to augment water supply in project area; operation and maintenance and agricultural support services.

Ministry of 40,0 Sunseri Morang II - Further Consulting services will Project preparation Water Resources (IDA) improvement of Chatra Main be required. under way. Canal; rehabilitation of irrig­ ation distribution system and drainage; improved water manage­ ment; strengthening agricultural services; equipment and build­ i~gs; technical assistance.

State Cement 100.0 (R) Cement Industry Restructuring - Consultants, financed by Appraisal mission tentat­ Corporation (Bank) To support rehabilitation and IDA Technical Assistance ively scheduled for June. introduction of energy efficien­ Project, being used for cy measures in six existing preparati9n. Additional cement plants. consultants will be re­ quired for project imp­ lementation.

Ministry of Jo.o Private Tubewells and Rural Consultants have been re­ Project preparation under Water and Power, (IDA) Electrification. cruited for project prep­ way, financed by UNDP. and Provincial ·aration. Additional con­ Departments of sultants will be required Irrigation and/ for project imple~enta- . or'Agrlculture· tion.

Pakistan 100.0 (R) Telecommunications V - To sup­ Consultants will be re­ Negotiations substan­ Telephone & (Bank) port the expansion and moderni­ quired for project im­ tially completed. (Co­ Telegraph zation of Pakistan's telecoDDDun­ plementation. financing approved by Department ications system. ADB, additional co­ financing being sought from OECF, export cre­ dits, and commercial banks.)

See page 1 for footnotes • ------

-51-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender J) Consulting Services Action of Procurement!!/

PAKISTAN (Cont'd)

National Highway 200,0 (R) Highways IV - Construction of Consultants will be Appraisal mission sched­ Board (Bank) about 700 km of 7 .3 m carriage­ required for implem­ uled for June. way in priority sections of the entation. existing North-South main road.

Punjab 10,0 (R) SCARP Transition Pilot Project - Consultants will be Board presentation on May Provincial (IDA) Transfer of responsibility for required for project 8, Department of groundwater development in sel­ implementation. Agriculture ected areas from public to pri­ vate sector; improvement of op­ eration and maintenance of tube­ wells. Total project cost about $21.8 million, of which $9,0 million in foreign exchange.

Ministry of 150,0 Agriculture Sector Loan - To Consultants will be Appraisal to be resumed Food, Agricul­ (Bank) support program of structural required for implem­ when conditions are met. ture and reforms to include set ting of entation. Cooperatives investment priori tie.a, rational­ ization of incentives and strengthening of institutions.

Agricultural 165,0 (R) ADBP VI - To support further Consultants will be Board presentation on May Development Bank (Bank) expansion in type and volume of required. 15, of Pakistan 55.0 ADBP lending, Total project (ADBA) (IDA) cost about $1,671 millio!l, .of which $652 ~illion in foreign exchange.

Ministry of 73,0 (R) Primary Education III - To im­ Consultants will be re­ Appraisal mission Education (IDA) prove the quality of primary quired for implement­ scheduled for July. education in Punjab province. ation.

Ministry of 50,0 Irrigation Rehabilitation II - Consultants will be re­ Appraisal mission Water and Power, (IDA) To rehabilitate deteriorated quired. scheduled for June. and Provincial canals and surface drains in Departments of four provinces. Irrigation

Ministry of 40,2 (R) Second Vocational Training Consultants will be re-· Credit signing on May 15. Labor and Man­ (IDA) Project. Project will upgrade quired for implement­ (Cofinancing arranged power vocational training facilities ation. with UNDP $2,9 million, in all four provinces through CIDA $6, 5 million, EEC improvement in equipment and $13,3 million,) staffing. Project will also strengthen apprenticeship pro­ gram and include an experimental women's training component. Total project cost estimated at $93,3 million, with $33,9 million in foreign exe;hange.

Provincial 36,0 (R) Agricultural Extension IV - Consultants will be re­ Appraisal report under Departments of (IDA) Second·phase extension project quired. preparation. Negotia­ Agriculture in Sind, and Punjab Provinces. tions scheduled for mid­ October.

Ministry of 70,0 (R) Export Development Loan - To Consultants will be Negotiations completed. Finance (Bank)· support industrial policy required for implement­ Board presentation sched­ changes, notably in export ation. uled for May 27, development and deregulation.

Punjab Depart­ 50,0 Punjab Urban Services and Water No decision made whether Project identification ment of Planning (IDA) Supply - Water supply, sewerage consultants will be under way. and urban services in various required. cities in Punjab province.

Ministry of 54,0 (R) Small Industries III- To conti­ Consultants will be Appraisal mission in the Finance (Bank) nue support for small industries required for project field, through delivery of financial implementation. resources and technical and mar­ keting services.

State Engineer­ 50,0 (R) Heavy Industries - To rehab­ Consultants, financed by Appraisal report ing Corporation (Bank) ilitate and improve the effi­ IDA Technical Assistance being prepared. ciency of selected engineering Project,being used for companies and a steel mill, as project preparation. well as to rationalize the policy environment in the sub­ sector.

See page 1 for footnotes. -52-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender Y Consulting Services Action of Procurement 4/

~ (Cont'd)

Water and Power To be Kalabagh Dam Project - Dam con­ Main consultants for Project preparation Development deter­ struction and installation of preparation and drafting being finalized, Authority mined 2400 mw hydro capacity. of tender documents (Bank) recruited. Further specialist consultants likely to be required,

Water and Power 90,0 (R) Kot Addu Combined Cycle Power Consultants will be Board presentation Development (Bank) Project (formerly called WAPDA required, scheduled for May 22. Authority VI) - Construction of a combined (WAPDA) cycle power plant at Kot Addu. Total project cost about $175 million, of which $90 million in foreign exchange.)

National 21.0 Refinery Energy Conservation and Consultants will be Appraisal mission sched­ Refinery Ltd, (Bank) Technology Acquisition - To im­ required. uled for August, (NRL) prove effienCy and increase (margi·nally) the refining capa­ city of the NRL, while reducing energy consumption and strength­ ening management capability.

Water and Power 70,0 (R) Thermal Rehabilitation Project Consultants will be Negotiations scheduled Development (Bank) (formerly called WAPDA VII) - To required. for mid-July. Authority rehabilitate WAPDA's thermal (WAPDA) generating facilities to in:iprove their reliability and efficiency as well as augment their gener­ ating capacity.

Ministry of 7,0 Technical Assistance III - Consultants will be Appraisal mission Planning and (IDA) Follow up of previous technical required. scheduled for August, Development assistance credits. The project would finance studies and con­ sultancies for preparation of sector/subsector policy adjust­ ment programs, and prefeasibil­ ity work to build a pipeline for projects for IBRD/IDA financing through subsectors studies identifying project and policy issues to be addressed.

Sui Northern Gas 50,0 (N) Gas Development Project - To No decision on Preparation under Pipelines Ltd; (Bank) provide production facilities in consul tan ts. way. and Oil and Gas the Loti and Dhodak gas fields, Development and improved gas transmission Corporation facilities from the Pirkah, Loti and Dhodak fields,

Government of 150,0 (N) Energy Sector Loan II - To con­ Consultants will be re­ Identification to be Pakistan Plan­ (Bank) tinue the program of reforms in quired for implementation initiated in December ning and Devel­ pricing policies, investment 1986, opment Depart­ programming and institutional ment; Water and development started under the Power Develop­ First Energy Sector Loan. ment Authority; Karachi Electri­ city Supply Corp; Oil and Gas Development Corp; Southern Gas Co, Ltd.; Pakistan State Oil Co, Ltd,; Pakistan Mineral Development Corp; Sui North­ ern Gae Pipe­ lines Ltd,

See page l for footnotes, -53-

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj ~],_/ Consulting Services Action of Procurement !±_/

SRI LANKA

Ministry of Up to Fifth Tree Crops Diversification No decision made whether Project preparation under Plantation 15 .o - Increased production of tea, consultants will be re­ way, Industries (IDA) rubber and coconut for small­ quired. holder sector by enhancing producer incentives, improving extension services and the supply of inputs, reducing constraints to credit, rehabi­ litating private factories, and improving marketing mechanism for smallholder output.

Ministry of 25.o Agricultural Research Project - Consultants will be Appraisal report under Agricultural (IDA) Establishment of a national required. preparation. Develoment and agency to ensure coordinated Research research planning, and strength­ ening of the national agricul­ tural research institutions.

Ministry of 37 .o (R) Water Supply and Sanitaton Pro­ No decision on consul­ Board presentation on Local Govern­ (IDA) ject - Rehabilitation of tants. May 15, ment, Housing existing assets, particularly and Irrigation; production facilities, improve and National operation and maintenance faci­ Water Supply and lities, and upgrade distribution Drainage Board work in selected areas. Total (I/DB) project cost about $64,8 mil­ lion, of which $27,5 million in foreign exchange.

Ministry of 25.0 Ninth Power Project (Distribu­ Consultants required. Appraisal report under Power and Energy (Bank) tion Rehabilitation) - Rehabili­ preparation. 20.0 tation of Ceylon Electricity (IDA) Board's (CEB) power and trans­ mission system.

Ministry of 15.0 Health and Population - (To be No decision on Project preparation Health (IDA) determined) • · consul tan ts under way.

National 20.0 (R) Industrial Development II - To Consultants will be Board presentation on Development (IDA) continue improving the financial required. May 8, (Cofinancing by Bank/Development system and availability of fin­ AsDB for $20 million,) Finance Corpor­ ancing for large industrial in­ ation of Ceylon vestments. Total project cost about $94 million, of which $52 million in foreign exchange.

Ministry of 15.0 (R) Vocational Training II - To No decision on Board presentation on Local Govern­ (IDA) increase supply of skilled consultants. May 13. (Cofinancing by ment, Housing manpower to construction sec­ UNDP for $1.0 million.) and Construction tor. Total project cost about $24 ,5 million, of which $10 mil­ lion in foreign exchange.

Ministry of Plan 25,0 (R) Rural Development IV - To in­ Postponed to FY90 lending Implementation (IDA) crease incomes and improve program. Further report­ living standards of population ing will be discontinued. in Killinochchi and Trincomalee districts through an integrated set of investments in direct production, economic and social infrastructure. The project would also strengthen the plan­ ning, implementation, and monit­ oring of decentralized rural· development at district level.

Ministry of 13 .o (R) Municipal Management - To No decision on Board presentation on Local Govern­ (IDA) strengthen performance of urban consul ~ants. May 13, ment, Housing local authorities and to improve and Construction the efficiency and effectiveness of delivering urban services, including operations and main­ tenance. Total project cost about $20,4 million, of which $13 ,8 million in foreign ex­ change.

See page 1 for footnotes. -54-

Member Country, Amount & and Implementing Probable Agency }j ~y Stage of Processing and Consulting Services Action of Procurement!!_/ SRI LANKA (Cont'd)

National Devel­ Up to (N) Small and Medium Industries III No decision on opment Bank 45.Q - To complement and expand Project preparation (NDB) consul tan ts under way. (IDA) ongoing program of small and medium industry development through financing of eligible industries in selected sub­ sectors.

See page l for footnotes. - 55 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender J,/ Consulting Services Action on Procurement .!±./

V. EUROPE, MIDDLE EAST AND NORTH AFRICA

ALGERIA

SONELGAZ About (R) Power Ill - Project would fin­ To be determined. Identification under way 100.0 ance part of SDNELGAZ's 85/89 by Bank/Government. (Bank) Investment Program.

Ministry of About Highways V - Road maintenance, To be determined. Identification/ prepara­ Public Works 150.0 rehabilitation, technical tion under way by Gov­ (Bank) assistance and training. ernment.

Ministry of About (R) Construction of new irrigation To be determined. Appraisal mission Hydraulics, 110.0 schemes over 8,000 ha in Haut scheduled for June. Environment and (Bank) Cheliff and rehabilitation of Forestry 9,300 ha in Bas Chelif River.

Societe About Railways 11 - Project would help To be determined. Identification under way Nationale des 100.0 rehabilitate Societe Nationale by Bank/Government. (Bank) des Transports Ferroviaires Ferroviaires (SNTF), and provide technical assistance to improve financial management and operation.

Ministry.of About (R) National Water Supply II - To be determined. Appraisal mission tenta­ Hydraulics, 200.0 Improving and expanding water tively scheduled for June. Environment and (Bank) supply and sewerage systems in Forestry secondary urban centers.

Ministry of About Telecomm.unications II - Project To be determined. Identification under Post and 150.0 would finance part of 1985/89 way by Bank/Government. Telecommunic­ (Bank) telecommunications investment ations program.

CYPRUS

Sewerage Board About Larnaca Sewerage Project - Consultants have been re­ Negotiations postponed at of Larnaca 19.0 Provision of sewerage collec­ cruited. Government's request. (Bank) tion, waste water treatment systems to the major urban and tourist centers.

Ministry of 20.0 (R) Fourth Highway Project - Larnaca Consultants have been Approved by the Executive Communications (Bank) to Limassol and Limassol to recruited to assist in Directors on April 29. and Works Paphos Highways; rural road im­ project prepara- (Cofinancing arranged provements; highway maintenance tion/ feasibility studies. with Kuwait Fund for management. Total project cost $10. 6 million.) about $73.3 million, of which $34.5 million in foreign exchange.

To be determined About Industrial Sector Technology - To be determined. Further processing under 10.0 Promote the growth of manu­ review. (Bank) facturing exports.

Ministry of About (R) Southern Conveyor II - Phase 11 Appointment of consult­ Appraisal mission Agriculture 13 .o of the Southern Conveyor Project ants to undertake studies postponed at Govern­ (Bank) including execution of the under way. ment' a reauest. Dhiarizoe Diversion, irrigation (Cofinancing envisaged.) schemes, water supply and engin­ eering.

Sewerage Board About Waste Water II Project - Appointment of Project preparation of Paphos 10.0 Provision of sewerage and consultants to prepare under way. (Bank) drainage facilities for Paphos project under way. and surrouding areas.

EGYPT, ARAB REPUBLIC OF

Egyptian To be Fourth Power Project - Transmis­ No decision made. Project being prepared by Electricity deter­ sion, distribution and rural EEA. Authority (EEA) mined electrification. (Bank)

See page 1 for footnotes. - 56 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency j/ Lender JJ Consulting Services Action on Procurement 4/

EGYPT, ARAB REPUBLIC OF (Cont'd)

To be determined To be Gas Development V - Development No decision made. Project being prepared b cteter­ and distribution of natural gas. Egyptian General Petro­ mined leum Corporation (EGPC), (Bank)

Development 100.0 Construction Industry Sector - Consultants will be re­ Approved by the Executiv Industrial Bank (Bank) Assistance to Egypt's construc­ quired to the Joint Com­ Directors on June 28, tion industry through lines of mittee for sectoral stud­ 1984. credit and technical assist­ ies, for the management ance. Total project cost esti­ development program and mated at $132.2 million, with to the participating $100 million in foreign ex­ banks for sub-project ap­ change, praisal.

Ministry of 20,6 Vocational Training II - To in­ May be required for Board presentation Industry (Bank) crease the supply and upgrade technical assistance. delayed; awaiting Govern­ the quality of skilled and semi­ ment confirmation to skilled manpower in the indus­ proceed with project. trial sector and particularly in the automotive, electrical, metals, mechanical, foundry, chemical and marine subsectors by establishing four new Voca­ tional Training Centers (VTCs) and extending the training fa­ cilities of six existing VTCs.

Executive Agency 45.0 Solid Waste Project - Provision Consultants for prepara­ Negotiations to be for Joint Pro­ (Bank) of equipment, composting and in­ tion have been appointed. scheduled. jects (JP) cinerating plants and studies to Additional consultants support solid waste management wi 11 be required for var­ in two governorates. ious studies.

Productivity and 51.0 Industrial and Vocational Train­ Consultants required for Negotiations invited. Vocational (Bank) ing Project - Expanding and up­ development of training Training grading training in key indus­ programs. Department trial sectors, including tex­ (PVTD) and tiles, garment making, footwear, Ministry of food processing, and equipment Social Affairs maintenance. (MOSA)

River Transport 75.0 Inland Water Transportation­ Consultants selected for Feasibility studies ex­ Authority (RTA) (Bank) Rehabilitation of the Damietta­ project preparation. pee ted to begin in M_ay. Cairo Branch of the Nile, in­ cluding deepening of the branch, Bank Project Preparation improvement and construction of Facility advance of river ports, cargo handling $500,000 approved to equipment, navigational aids and finance consultant ser­ technical assistance. vices for preparation of: technical, financial and economic studies needed to determine the optimal phasing of the project; final designs, drawings, specifications; and other tender documents.

Alexandria Water 42.5 Alexandria Water Supply II - Consultants required for Appraisal report being General (Bank) Rehabilitation of water supply construction supervision, prepared. Tender doc­ Authority (AWGA) system, institutional develop­ updating of distribution uments under preparation ment and training. Total · system maps and water by Borrower. project cost estimated at $77 .6 supply master plan, and million. conducting leak detection survey and water study.

Ministry of 102.9 (R) Channel Maintenance Project - To be determined. Negotiations in mid­ Irrigation (Bank) Maintenance of irrigation canals May. and drains, including mechanical and chemical control of weeds. Provision of equipment and training.

See page l for footnotes. ------

- 57 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1_/ ~1:.I Consulting Services Action on Procurement 4/

EGYPT, ARAB REPUBLIC OF (Cont'd)

Port Said Port 10.0 Port Said Port· II - Expansion of Consultants appointed by Preparation by Port Said Authority (PSPA) (Bank) Port Said port to (a) eliminate Government for prepar­ Port Authority (PSPA) to barge handling operations; (b) ation. begin shortly. provide for container trans­ shipment facilities; (c) provide for general cargo and container handling; and (d) improve port operations and equipment maintenance.

0 National Bank of 100.0 (R) lnduetrial Restructuring - Consultants may be Negotiations substan­ Hungary (Bank) Policy/Institutional Development required. tially completed. (Co­ - To support industrial financing likely to be restructuring as well as a required.) specific program foi::used on res­ tructuring in the plastic pro­ cessing industry. Total project cost estimated at $300 million,

Hungarian 64.o (R) Power I - Refurbishment of coal­ Consultant services may Board pres en tat ion Electrical Power (Bank) fired power plants and modern­ be required. scheduled for May 20. Board ization of transmission and dis­ tribution systems. Total proj­ ect cost estimated at $620 mil­ lion, of which $194 million in foreign exchange.

National Bank of 100.0 (R) Modernization of crop production Consultant services may Board presentation Hungary (Bank) through provision of farm mach­ be required. scheduled for July 1. inery and land reclamation; construction of liquid fert­ ilizer plants, and strengthening of research and management information systems. Total project cost estimated at $331 million, with a foreign exchange component of $140 mil lion.

National Bank· of 2s.o (R) Industry/Energy Conservation II To be determined. Negotiations substan­ Hungary (Bank) - Energy rationalization credit tially completed. facility to finance direct industrial energy conservation projects, waste fuel utilization projects, and a few background industry projects.

National Bank of so.a Industrial Exports - To promote To be determined. Preparation under way. Hungary (Bank) exports of manufactured goods.

National Bank of 100.0 Industrial Restructuring II - Consultants may be Project preparation under Hungary (Bank) Policy/institutional development required. way. and restructuring of specific sectors.

National Oil and 100.0 Petroleum II/Gas - Unidentified To be determined. Project preparation to Gas Trust (OKGT) (Bank) but could entail combination of begin shortly. an exploration promotion comp­ onent and gas exploration or gas development and distribution •.

National Bank of so.a Telecommunications - Modern­ To be determined. Project preparation under Hungary (Bank) ization of telecommunication way. facilities.

Ministry of so.a Agro-industries Modernization - To be determined. Project preparation under Agricutlure; and (Bank) Increase agro-industrial exports way. National Bank of to convertible currency markets Hungary and efficiency of production at small farm level and at agro­ industrial level. Project would provide modern equipment for existing agroprocess firms.

See page 1 for footnotes. - 58 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ ~1/ Consulting Services Action on Procurement !!./

Jordan About (R) Sixth Power Project - Expansion Advisory services in­ Negotiations completed. E lee tricity 27 .5 and improvement of power dis­ cluded for undertaking ·Board presentation Authority (Bank) tribution in urban and rural diagnostic study of scheduled for June 3. areas. existing distribution system.

Jordan About Aqaba Power II - Second phase of No decision made whether Appraisal mission tentat­ Electricity 45.0 generation expansion at Aqaba consultants will be ively scheduled for late Authority (Bank) Power Station. required. June.

Water Authority 50.0 (R) Water Supply and Sewerage Consultants likely to be Board presentation on of Jordan (Bank) Project - Extension and rehab­ required for engineering May 15. ilitation of water transmission construction supervision, and distribution systems; exten­ and operation contract sion of sewerage and sewage and monitoring. disposal facilities in Greater Amnan, and sewerage facilities in three smaller towns. Total project cost aboµt $86.9 million, of which $54.5 million in foreign exchange.

To be determined About Third Urban Development Project To be determined. Preparation under way. 15.0 - To replicate, outside of (Bank) Amman, low-income shelter solu­ tions innovated in Amman region, and to include upgrading and sites and services.

Arab Potash About (R) Potash Optimization and Tech­ To be determined. Pre-appraisal mission Company 15.0 nology - Assistance for refinery reviewing its findings. (Bank) modifications including correc­ tive optimization measures to assess possibilities for further expansion in the context of technology improvements and cost reductions.

To be determined About (R) Sewerage - Rehabilitation and To be determined. Further processing con­ 80.0 extension of sewer network for tingent on Gov~rnment 1 s (Bank) Casablanca-Mohs.DDD.edia region. actions on institutional issues.

Office National 90.0 (R) Telecommunications Project - Ex­ Consultant will be First phase of negotia­ des Poe tee et (Bank) pansion and modernization of the required for technical tions completed in Te lecommunica­ existing telecommunications assistance to ONPT April. Remaining issues tions (ONPT) systems; technical assistance (accounting, orga­ need to be resolved to for organizational strength­ nization, sector complete negotiations. ening. planning, etc.) (Bilateral and tied financing sought by Government for part of investment pr_ogram.)

Office of 22.0 (R) Port Project - Rehabilitation of Consultancy services will Loan signing on Ports Operations (Bank) Casablanca Port; technical as­ be required for studies May 9. (ODEP) . sistance to improve efficiency and training. of port operations. Total pro­ ject cost about $41.0 million, of which $22.0 million in for­ eign exchange.

Office National About (R) Fourth Water Supply - Rehab­ Technical assistance Negotiations sched­ de 1 'Eau Potable 56.0 ilitation of distribution sys­ would be required to uled for end-May. (ONEP) (Bank) tems. reinforce institutional capability for sub­ project evaluation and implementation monit­ oring.

See page 1 for footnotes. ------

- 59 -

Member Country, Amount & and Imp 1 emen ting Probable Stage of Processing and Agency ]J Lender]:_/ Consulting Services Action on Procurement !!I

MOROCCO (Cont'd)

Ministry of 150.0 (R) Education Sector - Support for Consulting services Loan signing on Education (Bank) policy reforms to promote basic anticipated to support May 9. education and increase the effi­ implementation of · ciency of the education system government key reform at all levels. Total project measures. cost about $1,829 million, of which $250 million in foreign exchange.

Ministry of 46.0 (R) Large Irrigation·Improvement - Consulting services will Loan signed on April 11. Agriculture and (Bank) Improvement of operation, main­ be required for training, Agrarian Reform; tenance and agricultural produc­ improvement of management and ORMVAS tion in large-scale irrigation information systems, (Offices areas and reform of public sec­ accounting, operation and Regionaux de tor enterprises involved. Total maintenance of irrigation Mise en Va leur project cost about $92.5 mil­ schemes and engineering Agricoles) lion, of which $43 .2 million in studies. foreign exchange.

Caisse Nationale About (R) CNCA VI - To finance CNCA's To be determined. Negotiations completed. de Credit 120.0 medium and long term lending for Board presentation Agricole (CNCA) (Bank) (a) on-farm investments by scheduled for June 24. private farmers and (Co financing with AfDB, cooperatives; and (b) small and KfW Germany; OPEC Fund medium scale agro-industry. has been approached.)

To be determined About Power Sub-Sector Adjustment - To be determined. Appraisal mission tentat­ 50.0 Improving planning and ively scheduled for July. (Bank) distribution in sub-sector

Ministry of About (R) Agricultural Sector II - Support To be determined. Preparation mission in Agriculture and 100.0 for a second phase of policy re­ the field. Agrarian Reform (Bank) forms in the sector with empha­ sis on pricing.

Department of About Public Enterprise Rational­ Consul ting services President's Report Public Enter­ 200.0 ization Loan - Improvement in anticipated in execution being prepared. prises and (Bank) efficiency of public enterprises of enterprise, restruct­ Participations through policy and institutional uring programs, improving reforms and enterprise management information·. restructuring. and accounting sytems·, and in implementation Qf key reform measure&, as· well as in training.·

To be determined About (R) Export Development Finance - To be determined. Pre-appraisal mission 50.0 Line of credit and technical scheduled for end­ (Bank) assistance to promote private May/ June. sector industrial exports.

Ministry of About (N) Vocational Training II - Second To be determined. Preparation under Public Works and 30.0 phase of program designed to way. Vocational (Bank) improve quality of training in Training newly converted vocational training institutions.

To be determined About (N) Urban Upgrading - Policies, To be determined. Appraisal mission 10.0 measures, and interventions to tentatively scheduled for (Bank) provide infrastructure in order September. to contain and avoid unauthor­ ized housing developments.

OMAN

Ministry of About (R) Health - Strengthening health Consulting services to be Appraisal mission sched­ Health 12.0 information system, planning, provided from UN sources uled for late June. (Bank) health education; construction and ODA (UK) for project of water facilities. preparation.

Ministry of About Education III - Development of To be determined. Project preparation Education 10.0 teacher training and secondary under way. (Bank) schooling.

See page 1 for footnotes. - 60 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ ~],./ Consulting Services Action on Procurement!±_/

National Housing 25.0 Housing Finance - A general line No consultants required. Approved by the Executive Institute (Bank) of credit to provide· housing fi­ Directors on December J. nance for construction of hous­ (Cofinancing of $25.6 ing for low-income groups million from USAID through a housing development agreed,) bank, Total project cost esti­ mated at $56.6 million, includ­ ing $28 million in foreign exchange.

Junta Autonoma About Highways III - Support for High­ To be determined. Preparation under way. de Estrada& 50.0 way Rehabilitation Program of (Cofinancing possible,) (JAE) (Bank) Junta Autonoma de Estradas (J,A,E,) and improvement of maintenance standards, including technical assistance.

Ministry of About Manpower Training - Manpower To be determined. Preparation under way. Education; 30.0 training and development II with Ministry of (Bank) emphasis on middle-level tech­ Labor; and nician and management training. Ministry of Industry

Agricultural To be Irrigation IX - Drainage, land None required. Appraisal mission delayed Bank deter­ reclamation and other related at the Government I s re­ mined works on a sectorwide basis quest, pending finali­ (Bank) within the context of the Five­ zation of overall devel­ Year Plan. opment program. (Cofin­ ancing likely to be, sought,)

Investment Bank To be Power V - Time slice investment None required. Project preparation under deter­ for 1986-90 Plan period, way. mined (Bank)

Bank for Agri­ To be Livestock V (Livestock Feed) - None required. Appraisal report culture and Food deter­ Financing for direct imports of being prepared. I Indus try (BAFI) mined animal protein feeds and addit­ (Bank) ives, inputs for development of I· feasible domestic supplies and alternatives; and farm machinery associated with production of crops and livestock.

SYRIAN ARAB REPUBLIC

Ministry of To be Highways IV - Maintenance opera­ No decision made whether Preparation under way. Communications deter­ tions and training. consultants are required. mined (Bank)

Ministry of 10.0 (R) Aleppo Sewerage - Secondary Consultants required for Board presentation on May Housing and (Bank) treatment works, main inter­ technical assistance in 13. (Cofinancing with Utilities ceptors and secondary collection preparation of bid doc­ EIB for $12,0 million system for Aleppo, Total pro­ uments, studies and pro­ confirmed,) ject cost about $211.6 million, ject supervision. of which $82,0 million in for­ eign exchange.

Ministry of To be Damascus Sewerage - Secondary Consultants likely to be Preparation under way. Housing and deter­ treatment works, main inter­ required for technical Bank Preparation Facility Utilities mined ceptors and secondary collection assistance in preparation advance of $550,000 ap­ (Bank) system for Damascus. of bid docu~ents, studies proved for feasibility and project supervision. and engineering studies, detailed design and prep­ aration of bidding docum­ ents, (Cofinancing like­ ly to be sought,)

See page 1 for footnotes. ______/ ______

- 61 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj ~'l:l Consulting Services Action on Procurement 4/

SYRIAN ARAB REPUBLIC (Cont'd)

_To be determined To be Education III - Extension of No decision made whether P-reparation under deter­ vocational education and consultants are required. way. mined training. (Bank)

Ministry of To be Livestock II - Increasing the No decision made whether Project being prepared by Agriculture deter­ efficiency of the livestock consultants are required. Government and FAO. mined sector through improved veter­ (Bank) inary services, supply of feed and water.

Ministry of To be (R) Gas Appraisal and Petrolemn No decision made whether Appraisal report Petroleum and deter­ Engineering - Diagnostic consultants are required. under preparation. Mineral mined studies, technical assistance, Resources (Bank) training and equipment for appraisal of several gas structures and for petroleum development.

To be determined About (R) Small Scale Industry II - Line No decision made. Preparation by Government 44.0 of credit to be used for lending under way. (Bank) to small-scale industries.

Ministry of About (R) Highways Rehabilitation and No decision made. Appraisal report being Equipment and 31.0 Maintenance - Strengthening prepared. Housing; and (Bank) organization and management of Ministry of national road maintenance Transport system.

Agence pour la 30.0 Urban Development IV - Two lines Consultants required in Negotiations postponed at Rehabilitation (Bank) of credit for upgrading existing land management, public Government's requeef. et la Renovation settlements and servicing/ administration and Urbaine (ARRU) developing new ones. computer science. and Agence fonciere d 'Habitation

Office des About Grain Storage II - Improvement No decision made. Preparation under Cereales 30.0 of storage and distribution of way. (Bank) locally produced grain.

Office de About (R) Municipal Development (Cadastral Consultants already re­ Preparation under way by Topographie et 50.0 System) - Equipment and tech­ cruited. Government and Consul­ de Cartographie (Bank) nical assistance to improve tants. (OTC) municipal management and to modernize national cadastral s~rvey.

Ministry of About (R) Agricultural Sector Adjustment I No decision made. Appraisal mission in the Planning 65.0 - Policy and institutional field. (Bank) reforms.

Ministry of About (R) Industrial and Trade Policy No decision made. Preparation mission Planning 75.0 Adjustment Loan - Policy tentatively scheduled for (Bank) Reforms. mid-June.

Banque Nationale About (R) Agricultural Credit BNI (IV) - No decision made. Preparation under de Tunis ie and 30.0 Financing for national agricul­ way. commercial banks (Bank) tural credit operations.

Ministry of About (R) Energy Conservation Demon­ Consultants required for Negotiations in mid­ National 4.0 stration Project - Energy technical assistance in May. Economy (Bank) efficiency, pilot programs in energy audits, feasib­ industrial, transport and ility studies and plan­ tertiary sectors. ning and implementation of conservation measures.

Ministry of About (R) Forestry - Forestry Development No decision made. Preparation under way Agriculture 25.0 and Range Improvement - Improved by Government. (Bank) forestry exploitation and man­ agement; selected reforestation; range improvement; rural forestry.

See page 1 for footnotes. - 62 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )j Lender JJ Consulting Services Action on Procurement 4/

~(Cont'd)

To be determined 50.0 Public Enterprises- Financial To be determined. Identification under (Bank) assistance to public enterprises way. channelled through intermediary banks, as well as institutional improvements through key policy actions and technical assist­ ance.

To be determined To be Agriculture Credit III - Consultants for studies Timing dependent upon deter­ Strengthening of agricultural of credit cooperative progress under Agricul­ mined credit institutions and further system, financed by Bank tural Credit II. (Bank) rationalization of sector Project Preparation Fa­ policies. cility, to be recruited Bank Project Preparation by State Planning Organi­ Facility advance of zation. No decision yet $400,000 approved for on need for consultants consultant services. for project implementa­ tion.

Cukurova 146.6 (R) Sir Hydropower - Construction of No decision yet on need Negotiations scheduled Electric (Bank) the Sir Dam, and associated for consul tan ts. for end-May. Company ( CEAS) hydroelectric-power plant.

Turkish State 191.0 (R) Railways II - Main line track Technical assistance to Awaiting final agree­ Railways (TCDD) (Bank) renewal and track maintenance be provided in locomotive ment. (Cofinancing may machinery; modernization of operation and mainten­ be arranged.) locomotive maintenance ance, movement of bulk facilities and provision of commodities, and manage­ spare parts; signalling and ment information systems. telecommunication improvements; construction of 66 km of new line; staff training and technical assistance.

Ministry of To be Agricultural Extension and No decision yet on need Timing dependent upon Agriculture deter­ Applied Research II - Introduc­ for consul tan ts. progress of Agricultural mined tion of improved extension and Extension and Applied (Bank) applied research methods in Research I Project. additional priority areas.

To be determined To be Cukurova Region Urban Develop­ No decision yet on need Scope of project and deter­ ment - Provision of infrastruc­ for consul tan ts. timing dependent upon mined ture, urban development and progress under Cukurova (Bank) technical assistance for region­ Region Urban Engineering al planning in the Cukurova Loan. Region.

To be determined To be Energy Sector Adjustment - No decision yet on need Preparation under way. deter­ Financing of imported inputs for consultants. mined for the energy sec tor. (Bank)

To be determined To be Industrial Restructurfng - Loan Consultants have been Restructuring studies deter­ to support restructuring of pub­ hired to work on three under way. mined lic and private sector industry subsector restructuring (Bank) in selected sub-sectors along studies and on prepar­ lines of comparative advantage. ation of a privatization master plan.

To be determined 250.0 (R) Financial Sector Adjustment No decision yet on need Negotiations in early (Bank) Loan - Support for policy-based for consul tan ts. May. reforms and industrial invest­ ment.

To be determined To be (R) Non-Formal Vocational Training - No decision yet on need Appraisal report being deter­ Provision of basic and voca­ for consul tan ts. prepared. mined tional training. (Bank)

To be determined To be Izmir Water Supply - Imp_rovement No decision yet on need Preparation under way. deter­ of water supply and sewerage for consultants. mined facilities in the city of Izmir. Bank Project Preparation (Bank) Facility advance of$ l million approved to fin­ ance technical assist­ ance.

See page 1 for footnotes. - 63 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J:/ Lender Jj Consulting Services Action on Procurement it

TURREY (Cont'd)

To· be determined To be Second Agricultural Sector No decision yet on need Timing dependent upon deter- Adjustment Loan - Support for for consul tan ts. progress of first Agric­ mined agricultural sector policy ultural Sector Adjustment (Bank) reforms. Loan.

To be determined To be (R) Drainage and On-Farm Development Consultants under Identification mission deter- II - Completion of second time- Drainage and On-farm scheduled for mined slice of core program for elim- Development I expected to September. Timing (Bank) inating backlog of drainage and assist in preparation. dependent on progress of other on-:-farm works on ongoing Drainage and On-farm or completed OSI projects. Development I

State Hydraulic To be Boyabat Hydropower - Cons true- No decision yet on need Preparation under Works (DSI) deter- tion of Boyabat Kepez Dam and for consul tan ts. way. mined Power Plant on the Kizilirmak (Bank) River in North Central Turkey.

To be determined To be Transport Sector Adjustment Loan No decision yet on need Identification mission deter- - Emphasis on sect-0ral policy for consul tan ts. scheduled for September. mined and institutional reforms (Bank)

To be determined To be (N) Industrial Training and Tech- No decision yet on, need Project being identified. deter- nology - Training of higher for consultants. mined level technical/ industrial (Bank) manpower.

YEMEN ARAB REPUBLIC

Yemen General 11. 7 (R) Power IV - Phase III of regional Consultants will be re­ Board presentation on May Electricity (IDA) electrification program, includ­ quired for construction 15. (Cofinancing from Corporation ing distribution, technical as­ supervision and technical Islamic Development Bank (YGEC) sistance and training. Total assistance. $10.5 million; Arab Fund project cost estimated at $58.9 $14.5 million; and Sweden million of which $47.2 million $11.1 million.) in foreign exchange. Procurement: Retroactive financing recommended to provide technical assist­ ance.

Ministry of 15 .5 (R) Southern Regional Agricultural Preparation assistance Appraisal mission in the Agriculture and (IDA) Development: Agriculture devel­ being provided by FAO­ field. (Cofinancing will Fisheries opment of areas in Southern YAR CP. Consul tan ts likely be required.) not covered under SURDP I and to be required for proj­ II, including strengthening of ect management, technical extension services, establish­ assistance and training. ment of regional operation and maintenance service and irrig­ ation improvement.

Highway About Sanaa-Hodeidah Road - Rehabil­ Consul tan ts have prepared Preparation under way. Authority (HA) 10.0 itation project; assistance to feasibility studies and (Cofinancing will be (IDA) the construction indus~ry. engineering design. required.) Total project cost about $46.0 Consultants will also be million of which $34.7 million, required to carry out in foreign exchange. construction supervision.

Ministry of 12.7 (R) Technical training - Establish­ Consultants will be Credit signing on May Education (IDA) ment of Polytechnic Institute required to provide 9. (Cofinancing of about and other training Centers and technical assistance and $7.2 million from Germany Establishment of a National training. likely.) Training Board. Total project cost estimated at $28.1 million of which $18.6 million in foreign exchange.

Ministry of 10.0 (R) Tihama V - Regional development Consultants will be re­ Credit signing on May Agriculture and (IDA) in Tihama region, including quired to provide tech­ 9. (Cofinancing agreed, Fisheries strengthening of extension nical assistance, con­ in principle, with Kuwait services, establishment of struction supervision, Fund for $15 million and regional operations and main­ and training. the Netherlands for $9.4 tenance, irrigation development million.) in Wadi Siham, feeder roads, technical assistance and train­ ing. Total project cost about $47 .o million, of which $28.8 million in foreign exchang.

See page 1 for footnotes. - 64 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency )j Lender 1./ Consulting Services Action on Procurement 4/

YEMEN ARAB REPUBLIC (Cont'd)

Ministry of Oil About (R) Technical Assistance to Petrol­ Consultants appointment Board presentation on and Mineral 12.0 eum Sector - Technical Assist­ through IDA Project Prep­ May 15. (Cofinancing Resources (MOMR) (IDA) ance to the Energy Sector in­ aration Facility to prov­ with USAID for $2 .1 cluding assistance to MOHR. ide technical assistance million and Government of Total project cost about $417.0 and training. Netherlands for $1.1 million, of which $13.3 million million is envisaged.) in foreign exchange. IDA Project Preparation Facility advance of $870,000 approved to fin­ ance needed legal ser­ vices; a feasibility study for a second refin­ ery; and to meet the cost of the resident advisors.

Highway About (R) Marib-Safir Road: Construction Consultants employed to Negotiations in early Authority (HA) 10.0 to asphalt standard of road prepare feasibility May. (IDA) connecting oil refinery to main study, and will be highway network. Total cost required for cOnstruction estimated at $25 .6 million of supervision. which $17.2 million in foreign exchange.

Ministry of Oil, 50.0 Gas I - LPG recovery and gas To be determined. Project preparation to and Mineral (Bank) utilization; project related to begin late 1986. Resources (MOMR) the development of the recent oil recovery.

Yemeni General About Power Distribution V - Likely to Consultants will be Project preparation Electricity 12.0 include more power distribution. required to supervise under way. ( Co­ Corporation (IDA) construction. financing will be (YGEC) required.)

YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF

Public Corpor­ To be Power III - Rehabilitation of Consultants required to Feasibility studies to be ation for E lec­ deter­ Aden system network. prepare feasibility prepared. tric Power mined study, detailed engineer­ (IDA) ing design, supervise construction management, and other technical as­ sistance.

Public Water 5.6 Phase II of Greater Aden Water Consultants were employed Negotiations substan­ Corporation (IDA) Supply project. Total project to prepare feasibility tially completed. (Co­ cost estimated at $32.2 million, studie"s. financing from the Danish of which $27 .95 million in International Development foreign exchange. Corp. (DANIDA) for $10 million and from Kuwait Fund for $6.9 million agreed. Further cofinan­ cing being explored.)

Ministry of About Highways V - Implementation Continuation of technical Appraisal report being Construction 10.0 phase of road maintenance and assistance for implement­ prepared. (Cofinancing (IDA) rehabilitation program initiated ation of road maintenance being explored.) under Highway IV, including and training programs procurement of additional road initiated under Highways maintenance equipment, construc­ IV. Additionally, con­ tion of a new central workshop, sul ting services will be and technical assistance. required for preparation of a Highway Master Plan.

YUGOSLAVIA

Road Organiza­ About (R) Highways Sector Project - To Consultants will be Negotiations substan­ tion of 121.5 assist financing of rehabili­ required for roads and tially completed; await­ Slovenia, (Bank) tation and construction of bridges maintenance ing final agreement. Croatia, Serbia, priority roads including study. Bosnia-Herze­ sections of the Trans-Yugoslav Procurement: Retroact­ govina, Highway. Total project cost ive financing will be Montenegro, and estimated at $268.0 million, sought. the Federal with $121.5 million in foreign Association of exchange. Republican Provincial Road Organizations (FARP)

See page l for footnotes. - 65 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender J/ Consulting Services Action on Procurement 4/

YUGOSLAVIA (Cont'd)

Privredna Banka 35,0 Bosnia Forestry - Development of Consultants will be re­ Loan approved by the Sarajevo (Bank) forest roads and nurseries, and quired for review of ge­ Executive Directors on provision of logging and debark­ netic research program. June 6, 1985, Awaiting ing equipment, research equip­ indication from borrower ment, and training. Total proj­ on whether it wishes to ect cost estimated at $94,8 mil­ proceed with project. lion, with $35 million in for­ eign exchange.

Sava Basin Water About Lonjsko Polje Drainage (Previ­ Consultants will be re­ Awaiting indication from Organization 78,0 ously reported as part of Sava quired for agro-socio­ borrower on whether it (VRO) (Bank) Drainage II) - Provision of economic study, and wishes to proceed with drainage to about 49,000 ha in review of annual produc­ project. Croatia. Will include pumping tion plans. stations, on-farm development, Procurement: construction and farm equipment. Retroactive financing wil 1 be sought,

Vojvodjanska 90,0 Fertilizer Sector - Financing Consul tan ts will be re­ Approved by the Executive Banka, Novi Sad (Bank) inputs, raw materials, technical quired for technical and Directors on May 8, 1984, and energy studies for Yugoslav energy studies of Yugo­ Government has proposed fertilizer industry, including slav fertilizer produ­ revisions to the project incremental fertilizer require­ cers. which are now being ments for 1984-85. Total for­ considered. eign exchange costs estimated at $90,0 million,

To be determined To be Industrial Restructuring I - To be determined. Sub-sector studies and deter­ Improvement in selected sub­ specific projects for mined sec tors and enterprises. chemical, cement and (Bank) steel are being prepared.

To be determined To be (R) Agricultural Sector Input Loan - To be determined. Further processing de~­ deter­ Foreign exchange (working endent upon confirmation mined capital) for input manufacturing of Government interest in (Bank) enterprises and sectoral the project and signing improvements. of the Fertilizer Sector Loan.

Ljubljanska About (R) Energy Efficiency Credit Line I Consultants may be re­ Negotiations scheduled Banka Ljubljana 70,0 - Loans to medium-sized indus­ quired to assist local for May. (Bank) tries primarily in Slovenia for technical enterprises for energy conservation ~nvestments. energy audits for complex Procurement: Retroact­ subprojects. ive financing will be sought,

Hydroelektrane About (R) Perucica Hydroelectric Project - Local consultants already Awaiting confirmation by Perucica 11,0 Reconstruction of power station employed, Borrower on timing of (Bank) waterway and modernization of negotiations. control systems. Procurement: Borrower in process.of preparing procurement documents.

Belgrade Water About Belgrade Water Supply - Second Consultants for prepar­ Appraisal report under and Sewer age 46.0 stage of Makis treatment plant ation of final designs preparation. Enterprise (Bank) with transmission mains, and already employed, three tunnels to connect to Procurement: Retroactive existing system. financing will be sought.

To be determined To be (R) Railways VII - Time-slice of To be determined. Appraisal mission sched­ deter­ investment plans for four rai~­ uled for September. mined way transport organizations (Bank) directed at increasing the capa­ city of the main trunk 1 ine.

Hidroelektrane About (R) Buk Bijela - Construction of dam To be determined. Preparation under na Drini 200,Q and hydroplant on Drina River way. (Bank) and related transmission facilities.

S topanska Banka About Energy Efficiency Credit Line II To be determined. Preparation is under Skopje 30,0 - Loans to medium-sized indus­ way. (Bank) tries primarily in Macedonia for energy conservation investments.

To be determined To be Textiles and Manmade Fiber - To be determined. Sub-sector study and deter­ Multi-republic subsector loan project identification mined for selected export-oriented are under way. (Bank) textile projects.

See page 1 for footnotes. - 66 -

Member Country, Amount & and implementing Probale Staae of Processing and Agency JJ Lender 1./ Consulting Services Action on Procurement!!_/

VI. LATIN AMERICA AND CARIBBEAN

ARGENTINA

Ministry of Pub­ Up to Ports I - Improvements to Consul tan ts required to Appraisal report being lic Works and 40.0 Blanca port. assist in project prepar­ prepared. Services (Bank) ation.

Ministry of Pub­ 60.0 Water Supply and Sewerage En­ Consulting services Loan approved by the lic Works, Na­ (Bank) gineering - Technical assistance required for water and Executive Directors on tional Sanitary for institutional improvement; sewerage system rehab­ December IO • Works (OSN), metering unaccounted for water ilitation; institutional Empresa Provin­ program; and pilot project in improvement; financial cial de Obras the province of Cordoba. Total and commercial ac tivi­ Sani tarias de project cost estimated at $120.4 ties. Cordoba (EPOS); million, of which about $52 and Sante Fe million in foreign exchange. Water Utilities (DIPOS)

Yacimientos 180.0 Gas Utilization - L.iquid reco­ To be determined. Loan approved by the Petroliferos (B_ank) very facilities, gas conversion, Executive Directors on F iscales (YPF) and technical assistance. Total June 25,1985. (Co­ project cost estimated at $802.6 financing agreed with IDB million, of which $251.6 million for $59 .5 million.) in foreign exchange.

Energy 13.0 (R) Power Engineering - Financing of Consultants will be Negotiations in mid­ Secretariat (Bank) studies to define and analyze required for studies on May. national program for dis tri- distribution planning. bu tion systems expansion and to unify design and construction standards. Total project cost estimated at $19.6 million, of which $13 million in foreign exchange.

Banco Nac:ional 100.0 Financial Restructuring - Sup­ To be determined. Project preparation under de Desarrollo (Bank) port of institutional mechanism. way. (IIANADE) for industrial restructuring of private sect.or industrial prod­ ucers through investment banking and financial advisory services.

Secretariat of 350.0 (R) Agricultural Sector Loan Linked Consultants will be Approved by the Executive Agriculture (Bank) to Policy Package. To encourage required for a series of Directors on April 3. increases in agricultural pro­ studies. due tion and exports.

Banco Nacional 50.0 (R) Small and Medium Industries To be determined. Project preparation under de Desarrollo (Bank) Project - Policy; ins_titutional; way. (Banade) financial and technical assis­ tance support to small-and­ medium-sized industries •.

Ministry of 20.0 (R) Economic Management Technical Consul tan ts required for Negotiations in early Economy (Bank) Assistance - Technical assist­ project implementation. May. ance for reforming public sector management and strengthening trade and industrial policies.

Servicios 150.0 (N) SEGBA V Power - Rehabilitation To be defined. Preparation mission in Electricos del (Bank) and expansion of distribution May. Gran Buenos networks in Buenos Aires. Aires (SEGBA)

Yacimientos 116.0 (N) Refinery Conversion - Supplem­ Consul tan ts required for Board presentation Petroliferos (Bank) entary-Loan to complete project financial management planned for late Mey. Fiscales (YPF) on revised schedule. Total assistance. project cost estimated at $769.7 million, of which $361.9 million in foreign exchange.

See page I for footnotes. ------

- 67 -

Member Country, Amount & and implementing Probale Stage of Processing and Agency l/ Lender J:/ Consulting Services Action on Procurement !!I

Water and 10.0 (R) Water Supply and Sewerage Private consultants al­ Appraisal report being Sewerage (Bank) Rehabilitation - Institutional ready working with WSC reviewed. (Cofinancing Corporation development and training; reduce would be engaged for being discussed.) (WSC) operating costs and unaccounted technical assistance and for water; protection of water rehabilitation services. Procurement: Retroactive shipping facilities; technical f inane ing to be proposed assistance. Total project cost for project preparatory estimated at $38.5 million, of services started on which $27,5 million in foreign October 1, 1985. exchange.

Ministry of 10.0 (R) Education 11 - Education plan­ Contract for technical Board presentation on Education (Bank) ning; expansion of primary and assistance has been May 6. (IDB cofinancing and Labor secondary education; and voca­ awarded. of $17 million expected.) tional training. Total project cost estimated at $37. 7 million, of which $17.2 million in for­ eign exchange.

Ministry of 9,0 (R) Sites and Services - Rehabi­ Consultants for project Appraisal report being Housing and (Bank) litation of low-income housing. preparation appointed. prepared. Lands

Ministry of 4.o (R) Agriculture Development Project cOnsultants required for Negotiations scheduled Finance (Bank) with two components: ( l) Agro­ technical assistance for late May. Industries credit; and (2) component. Technical assistance for agri­ cultural diversification and study of the sugar sub sector. Total project cost estimated at $5,9 million, of which $4 mil­ lion in foreign exchange.

Belize Electri­ 7.5 (R) Power I - Generating sets, spare Services required for Negotiations in pro­ city Board (Bank) parts, improvements and expan­ engineering; construction gress. (Expected co­ sion of distribution system, and and supervision of works; financing with Caribbean institutional strengthening. for studies on future Development Bank and Bank is expected to finance energy sources; training Commonwealth Development equipment and materials, engin­ and technical assistance. Corporation.) eering studies and training. Total project cost estimated at $15 million of which $12,5 mil­ lion in foreign exchange.

Yacimientos 15 .o (R) Gas Recycling - Liquids Consultants will be re­ Negotiations in early Petroliferos (IDA) condensate extraction and gas quired for supervision of May. Fiscales recycling ·at Vuelta Grande construction. Bolivianos retrograde gas condensate Procurement: (a) Project (YPFB) field. Total project cost Preparation Facility ad­ estimated at $94.5 million of vance of $1 million ap­ which $67,0 million in foreign proved for gas recycling exchange. simulation study, de­ tailed design and prepar­ ation of bidding docu­ ments; (b) advance con­ tracting under !CB satis­ factory to Bank for up to $2 million to be recom­ mended.

Empress Nacional 7 .2 (R) Power Engineering - Final design To be determined. Appraisal mission de Electricidad (IDA) of generation units, management scheduled for S.A. information system, and acqui­ August/September. sition of spare parts.

Ministry of 55.0 (R) Reconstruction Import Credit - None. Board presentation Finance; and (IDA) Financing of priority imported scheduled for May 20. Central Bank equipment, spare parts and materials in mining, agric­ ulture, industry and transport sectors.

See page 1 for footnotes. - 68 -

Member Country, Amount & and implementing P.robale Stage of Processing and Agency lf ~y Consulting Services Action on Procurement 4/

Companhia de 57.0 (R) Upper and Middle Sao Francisco Consultants will be Awaiting fulfillment of Desenvolvimento (Bank) Irrigation - Follow-up irri­ required for engineering conditions for Board do, Vale do Sao gation development in the Sao designs and supervision presentation. Francisco Francisco river valley; studies; of construction. (CODEVASF) institutional strengthening. Total project cost estimated at $124 million, of which $49 million in foreign exchange.

Superintendency 171.0 Rural Development - Northeast Consultants to be Awaiting fulfillment for the (Bank) Region III - Support of selected retained for irrigation of conditions for Development of rural development activities in component. Board presentation. the Northeast the State of Bahia, Total (SUDENE) project cost estimated at $356,2 million, of which $46,8 million in foreign exchange.

Superintendency Up to (R) Rural Development - Northeast Consultants will be Negotiations in early for the Develop­ 78,0 Region IV - Support of selected required for irrig~tion May, ment of the (Bank) rural development activities in component. Northeast the state of Piaui. Total proj­ (SUDENE) ect cost estimated at $160,3 million, of which $15,3 million in foreign exchange.

Empresa de -Up to Ports·II - Redevelopment of ma­ To be determined. Project preparation Portos do Brasil so.o jor commercial port facilities under way. S,A, (PORTOBRAS) (Bank) for containerized traffic, im­ proved access infrastructure, and institutional changes to the National Port Authority,

Central Bank of Up to (R) Agricultural Sector II - To No consultants required. Negotiations in mid:.. Brazil 450.0 support · changes in Government May, (Bank) agricultural policies and prov­ ide financing for agricultural investment and storage of agr,icultural commodities.

Central Bank ·of Up to Agricultural Sector III - To No consultants required. Project preparation to be Brazil 250,0 support changes in Government initiated in conjunction (Bank) agricultural policies as a fol­ with processing of Agri­ low-up to Agricultural Sector cultural Sector II. II.

Conselho Up to Urban Management for Medium To be determined. Project preparation Nacional de 50,0 Cities - Strengthening urban under way. Desenvolvimento (Bank) finance and management, for Urbano (CNDU) secondary cities with a focus on improving urban efficiency.

Banco do Brasil Up to Export Development II - Indus­ Consultant has been Preparation mission 300.0 trial eXport development. selected. scheduled for August. (Bank)

Centrais Up to (R) Rural Electrification II - Sup­ To be determined. Preparation mission Eletricas 175.0 port for next phase of sector scheduled for June. Brasileiras S .A. (Bank) rural electrification program. (ELETROBRAS)

Centrais Eletri­ Up to (R) Electric Power Sector - Finan­ No consultants required. Negotiations in mid-May. cas Brasileiras, 500.0 cing of equity contributions S ,A, (ELETRO­ (Bank) towards power sector investment BRAS) program.

Ministry of Up to (R) Public Sector Management - Consultants required. Negotiations in early Planning/ 34,0 Strengthening of Government ca­ May. Miniatry of (Bank) pacity for economic and finan­ Finance cial management of the public Procurement: Bank Pro­ sector, including state enter­ ject Preparation Facility prise investment, and in fin­ advance of $600,000 ap­ ancing related computer equip­ proved to finance consul­ ment. tant services to complete preparatory work on the state enterprise rehabil­ itation component.

See page 1 for footnotes, ------

- 69 -

Member Country, Amount & and implementing Probale Stage of Processing and Agency Jj Lender J;/ Consulting Services Action on Procurement !!_/

~ (Cont'd)

Banco Nacional Up to Financial Reform I - To support To be determined. Preparation mission do Desenvol­ 300.0 implementation of broader based pending further consulta­ vimento Econo­ (Bank) financial sector reform under tions with the Govern­ mico e Social preparation by Government. ment. (BNDES)

Secretaria de Up to Livestock Disease Control - Sup­ To be determined. Project being revised by Defensa so.a port of Government efforts to Government. Sanitaria Animal (Bank) improve livestock disease con­ trol and pro.due tion.

Secretaria de 24.5 (R) Santa Catarina Small Towns - To To be determined. Loan signing delayed by Planejamento E (Bank) support infrastructure legislative require­ Coordenacao investments, and strengthening ments. Signing now Geral, State of of municipal finance in the expected in May. Santa Catarina state. Total project cost estimated at $70.0 million, of which $21,3 million in foreign exchange.

Empresa 155.0 (R) Agricultural Extension 11 - Consultants will be Approved by the Executive Brasileira de (Bank) Follow-up to Agricultural Exten­ required for training; Directors on April 22, Assistencia sion I. Total project cost studies on extension Loan signing scheduled Tecnica E about $349,l million, of which methodology; and monit­ for May. Extensao Rural $117. 5 million in foreign ex­ oring civil works (EMBRATER) change. contracts.

Secretariat of 55 .o (R) Salvador Metro Urban Development To be determined. Approved by the Executive Urban Develop­ (Bank) - Metropolitan investment pro­ Directors on April 22. ment/Ministry of gram in Salvador designed to im­ Loan signing scheduled Urban Develop­ prove resource allocation, cost for May. ment and recovery, municipal finance and I Envirorunent management. Total project cost (SDU/MDU); estimated at $151 million, of Secretariat of which $56 million in foreign I Planning, exchange. I Science and I Technology (SEPLANTEC); and Salvador I Metropolitan Development Authority i (CONDER) of the I State of Bahia I i Ministry of Up to (R) Northeast Basic Health Services Consultants required. Negotiations completed. I Health 59,5 - Support for improvement of Board presentation (Bank) basic health services in the scheduled for May 22. Northeast States, complementing the rural development effort. Total project cost estimated at $122 million, of which $27 mil­ lion in foreign exchange.

Ministry of 100.0 (R) Second Stage Northeast Urban Consul tan ts from OAS Loan signed on Interior /Super­ (Bank) Flood Reconstruction of about Regional Planning Special April 24, intendency for 160 municipalities in 9 states Research Institute, Sao the Development in the Northeast to provide com­ Paulo. of the Northeast munity facilities, shelter, ur­ (SUDENE) ban infrastructure, and micro­ enterprises credits. Total project cost estimated at $208,6 million, of which $68,8 million in foreign exchange.

Superintendency Up to (R) Rural Development - Northeast Consultants will be Appraisal report being for Development 117,0 Region VI - Support of Ceara required for irrigation prepared. of the Northeast (Bank) State plan under N.E. rural and special studies. (SUDENE) develoment program. Total project cost estimated at $243 million.

Ferrovia Up to FEPASA Railways 11 - Financial To be determined. Project preparation under Paulis ta S ,A, 100.0 rehabilitation of Sao Paulo way. (FEPASA) (Bank) State Railways, improvement of its commercial performance, and improvement and rehabilitation of track and other facilities.

See page l for footnotes. - 70 -

Member Country, Amount & and implementing Probale Stage of Processing and Agency 1J L~nder 1=_/ Consulting Services Action on Procurement 4/

BRAZIL (Cont'd)

Banco do Brasil Up to (R) Agricultural Credit - Support No consultants required. Project preparation under (Central Bank of 150,0 private sector financing for way. Brazil) (Bank) agricultural investment.

Superintendency 48.0 (R) Irrigation Engineering Project - Consultants will be re­ Approved by the Executive for Development (Bank) To finance execution of: (a) quired for preparation of Directors on April 22. of the Northeast SUDENE's program for preparation 12 feasibility studies Loan signing scheduled (SUDENE) of irrigation projects, includ­ and 8 engineering de­ for May. ing development of local water signs. resources under SAO Francisco Trans Basin Project and other areas under CODEVASF and DNOCS jurisdiction; (b) pilot irriga­ tion schemes in the J aguaribe­ Apodi and Piranhas-Acu areas; (c) dam's safety policies and regulation; and (d) strengthen local management capacity in public irrigation subsector. Total project cost eStimated at $107 million, with $36 million in foreign exchange.

Empresa 200.0 (R) Urban Transport IV - Sector To be determined. Appraisal mission Brasileira dos (Bank) lending for urban transport scheduled for June. Transportes systems in Brazil's 9 metro­ Urbanos (EBTU) politan regions. Project includes investment and main­ tenance to conserve energy; improve urban efficiency; lower transport system user-costs, particularly to the urban poor, and institutional strength­ ening. Total project cost estimated at $400 million.

Superintendency Up to (R) Rural Development - Northeast Consultants will be Negotiations in early for the Develop­ 92,0 Region V - Support of selected required for irrigation May. ment of the (Bank) rural development activities in component. Northeast the state of Pernambuco. Total (SUDENE) project cost estimated at $188 million, of which $17,7 million in foreign exchange. ·

Superintendency Up to (R) Rural Development - Northeast Consultants will be Appraisal report being for the Develop­ 91.Q Region VII - Support of Maranhao required for irrigation prepared. ment of the (Bank) State plan under N.E. Rural Dev­ and special studies. Northeast elopment Program. Total project (SUDENE) cost estimated at $188 million.

Sao Paulo State Up to (R) Sao Paulo State Highway Manage­ To be determined Appraisal mission planned Government (Sao 150.0 ment - Highway improvement and for June. Paulo State (Bank) rehabilitation, and institu­ Department of tional improvements for highway Roads - DER) maintenance operations.

Centrais 200.0 (N) Electric Power Sector II No consultants required. Appraisal mission Eletricas (Bank) Continuation of support for scheduled for June. Brasileiras S .A. Government measures to rehab­ (ELETROBRAS) ilitate power sector.

Centrais 350.0 (N) Electric Power Sector III - To be determined. Preparation mission Eletricas (Bank) Continuation of assistance in May. Brasileiras S .A. towards the financial rehab­ (ELETROBRAS) ilitation of selected utilities.

CARIBBEAN REGION

Caribbean 6.0 (R) CDB IV/Organization of Eastern To be determined. Appraisal report being Development (IDA) Caribbean States (OECS) Tech­ prepared. (Possible Bank (CDB) nical Education - Technical and cofinancing being vocational training. Total discussed.) project cost estimated at $14,4 million, of which $11 million in foreign exchange.

See page 1 for footnotes. ------

- 71 -

Member Country, Amount & and implementing Probale Stage of Processing and Agency Jj Lender 1/ Consulting services Action· on Procurement !!/

CENTRAL AMERICA REGIONAL

Central American 65.0 Central American Regional Devel­ To be determined. Project preparation under Bank for (Bank) opment. way. Economic Integration

Ministry of 40.0 Irrigation Rehabilitation - To be determined. Project preparation under Agriculture (Bank) Rehabilitation of irrigated way. (MINAG); areas and creation of project Ministry of authority to manage programs. Public Works (MOP)

Empresa Nacional 60.0 (R) Small-and Medium-Scale Mining. Consulting services to be Appraisal mission de Mineria (Bank) determined. scheduled for July. (ENAMI)

Ministry of 35.0 (R) Intermodal Transport Project. .First phase of consulting Project preparation un4er Tra~sport and (Bank) services completed. Pos­ way. Telecomm.unic­ sible follow-up feasib­ at ions (MIT) ility and engineering.

Empresa 15 .o (R) Railway Rehabilitation Project. Consulting services being Appraisal mission Ferrocarriles (Bank) contracted. scheduled for June. ·del Estado (EFE)

Government (to 100.0 Pulp and Paper Project. Consulting services to be Project preparation be determined) (Bank) determined. under way.

Ministry of 250.0 (N) Structural Adjustment Loan II. Consultants have been Appraisal mission in Finance; (Bank) retained. the field. Ministry of Economy; and the Central Bank of Chile

Banco ·de la Up to Ag·riculture Financing Fund - Institutional/Credit con­ Further preparation Republica 80.0 Marketing and processing credit sultants will be re­ subject to Government's (Bank) loan to effect improvements in quired. decision on project I s credit delivery system. priority at this time.

Institute 114.0 Irrigation Rehabilitation II - Further consultants Loan approved by the Colombiano de (Bank) Rehabilitation of irrigation services required. Executive Directors on Hidrologia, and drainage districts, and March 25. Meteorologia y construction of new small-scale Adecuacion de irrigation schemes. Total Tierras (HIMAT) project cost estimated at $257 .5 million, of which $114 million in foreign exchange.

Institute Colom­ 30.0 Agricultural Technology Transfer There wil 1 be an im­ Project processing de­ biano Agro­ (Bank) - Project to accelerate diffu­ portant external con­ layed pending agreement pecuario (ICA); sion and adoption of agricultur­ sultant component. with Government on Institute Colom­ al technology. concept and design. biano de la Reform.a Agraria (INCORA); Ministry of Agriculture

Fonda Nacional 62.0 (R) Rural Transport - Construction, Consultants will be Loan approved by the de Caminos (Bank) deferred and periodic mainten­ required. Executive Directors on Vecinales (FNCV) ance of rural roads; strength­ March 25. ening of routine road main­ tenance, construction and rehabilitation of minor canals, and technical assistance. Total project cost estimated at $362 million, of which $182 million in foreign exchange.

See page l for footnotes. - 72 - Member Country, Amount & and implementing Probable Stage of Processing and Agency 1f Lender J:/ Consulting Services Action on Procucurement !!/

COLOMBIA (Cont'd)

Empresa de 171.0 Power - Bogota Distribution II - Consultants to be hired Loan approved by the Energia Electri­ (Bank) Participation in 1985-1990 for distribution system Executive Directors on ca de Bogota Bogota sub-transmission and reliability, sub­ November 26. (EEEB) distribution program; and sup­ transmission system ope­ port to the organization and ration and losses control management of EEEB. Total systematization, and for project cost estimated at $390 management training. million, of which $190 million in foreign exchange.

Financiera To be (R) Power Sector Loan - Financing E lectrica deter­ portion of power sector To be determined. Preparation mission Nacional (FEN) mined investment and focussing on scheduled for June. (Bank) strengthening of sector fin­ ances. Institutional strength­ ening program focusing on ( i) improving the integration of sectoral policies in macro­ economic decision making process and (ii) management improvement of electric utilities.

To be determined To be (R) Financial Sector - Financial To be determined. Project preparation deter­ Restructuring of Productive and postponed; awaiting mined Financial Sectors to solve their discussions with (Bank) liquidity/solvency problems. Government. Support policy measures to improve the country's financial systems efficiency in mobilizing resources.

Ministry of 250.0 (R) Trade and Agriculture Sector - To be determined. Approved by the Exefutive Agriculture (Bank) Support Government policies in Directors on April 15. trade and agriculture sector.

Caja Agraria Up to (R) Caja Agraria - Institutional Consultant required for Appraisal mission in May. 150.0 strengthening, and loans to systems analysis. (Bank) small and medium-sized farmers.

To be determined To be National Rehabilitation Plan To be determined Project preparation deter­ Project - Institutional planning underway. mined and monitoring and evaluation (Bank) strengthening of national rehab­ ilitation plan. Project to finance production activities and infrastructure in selected rural areas.

To be determined To be Fifth Small-Scale Industry Ad­ To be determined. Project preparation deter­ justment - Institutional support has been initiated. mined and financing of small-scale (Bank) industry in Colombia.

COSTA RICA

Banco Nacional 22.0 (R) Atlantico Agricultural Develop­ To be determined. Negotiations scheduled de Cos ta Rica; (Bank) ment - Development of agricul­ for early June. Ministry of tural exports, mainly cacao re­ Planning; habilitation in Atlantic Region Institute of through credit programs and im­ Agrarian Devel­ proved technology. Total project opment; and cost estimated at $43.5 million, Ministry of of which $11.2 million in Pub lie Works foreign exchange. and Transport

Central Bank 35.0 Industrial Financial Sector To be determined. Project preparation under (Bank) Loan. way.

Dominica 5.0 (R) Power - Hydroelectric plant, To be determined. Pre-appraisal mission Electricity (IDA) transmission and distribution in May. Services Limited improvements, training and (DOMLEC) technical assistance.

See page 1 for footnotes. ------

- 73 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency )J Lender];_/ Consulting Services Action on Procucurement !!_/

DOMINICAN REPUBLIC

Corporacion 60.0 (R) Power - Financing of expansion To be determined. Appraisal mission tentat­ , Dominicana de (Bank) and rehabilitation of distrib­ ively scheduled for June. Electricidad ution network. (CDE)

Corporacion Up to Oil exploration promotion, Consultants being selec­ Project preparation Estatal 60.0 production and product ted. under way. Petrolera (Bank) distribution. Ecuatoriana Bank Project Preparation (CEPE) Facility advance for $1 million approved to fi­ nance preparatory stud­ ies.

Banco Central 115.0 (R) Industrial Finance - Term fi­ One consultant has been Loan signed on (Bank) nancing for medium-scale manu­ engaged. April 10. facturing and service indus­ tries. Total project cost estimated at $153 million, of which $120 million in foreign exchange.

Banco Central 30.0 (R) Small Scale Industry Credit III Consultants have been Loan signed on (Bank) - Term financing and technical engaged. April 10. assistance for small-scale manu­ facturing and service enter­ prises. Total project cost estimated at $94 million, of which $42 million in foreign exchange.

Instituto Up to (R) Engineering loan to finance Consultants will be Negotiations substan­ Ecuatoriano de 8.5 management improvement and other required. tially completed. Board E lee trificacion (Bank) studies. presentation scheduled (INECEL) for June.

Banco Nacional 48.0 (R) Agricultural Credit - Line of To be determined. Negotiations scheduled de Fomento (BNF) (Bank) credit for farmers and insti­ for June. tutional support for BNF.

Empress 34.0 (R) Water Supply - Technical Consultants required for Appraisal report being Municipal de (Bank) assistance for institutional engineering services and prepared. Agua Potable de development; improvement and construction supervision. Guayaquil expansion of water production; (EMAP-G) transmission and distribution facilities. Total project cost estimated at $52 million, of which about $34 million in'for­ eign exchange.

Instituto Up to (R) Power - Financing of trans­ Consultants will be Project preparation Ecuatoriano de 70.0 mission, subtransmission and required. under way. E lee tricidad (Bank) distribution. (INECEL)

EL SALVADOR

Banco Central Up to {R) Export sector - Provision of To be determined. Project preparation so.a working capital and investment under way. (Bank) credit for export oriented en­ terprises.

GUATEMALA

Municipality of 35.0 Urban Development - Scope to be No consultants required. Project preparation under Guatemala City (Bank) determined. way.

Empress E lec­ 77.0 (R) Power V ~ Distribution expansion Consultants will be re­ Negotiations in progress. trica de (Bank) and training program of EEGSA, quired. Guatemala (EEG) thermal plant rehabilitation, and Institute dispatch center, communications Nacional de and preinvestment studies and Electrificacion training program for INDE. (INDE) Total project financing require­ ments estimated at $128.9 mil­ lion of which $92.7 million in foreign exchange.

See page 1 for footnotes. - 74 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency J:./ ~J:.l Consulting Services Action on Procucurement ~/

GUATEMALA (Cont'd)

Ministry of 35.0 Highlands rural development To be determined. Project preparation under Agriculture; (Bank) project - Execution of regional way. SEGEPLAN development plan to increase small farmer production through introduction of improved agri­ cultural practices, physical access to farm markets, soil conservation and strengthening of participating agencies.

Empresa 15.0 Water. Supply EMPAGUA Rehabilit­ Consultants will be Appraisal report being Municipal (Bank) ation Project - To improve fin­ required for technical prepared. de Aguas ancial and operational manage­ assistance. (EMPAGUA) ment of EMPAGUA, and prepare a program for reducing water losses.

Banco de ao.o Export Development - Support of Consultant services to be Project preparation under Guatemala (Bank) Government export program; prov­ determined. way. ision of foreign exchange for priority inputs for Guatemala exporters.

Bauxite Industry 1.0 (R) Bauxite Technical Assistance - Consultants have been Board presentation Development Co. (IDA) Financing of management assis­ retained. planned for early June. Limited tance contract, including pilot plant for new product develop­ ment and cost control system for bauxite sector. Total project cost estimated at $7 .0 million of which $6.0 million in foreign exchange.

Ministry of 26.2 Transportation VII Project Consultants required for Awaiting resolution of Public Works, (IDA) (Road, Ports) - Bridge rehab­ detailed design of marit­ country issues to invite Transportation ilitation and reconstruction, ime service facilities, for negotiations. and Communica­ road improvement, technical ·and supervision; organ­ tions assistance and road maintenance; ization; management and port improvement maintenance and training on labor in­ operation, provision of navig­ tensive techniques. ation aids, communications and slipway for boat inspection.

Ministry of 12.6 (R) Tree Planting and Forestry - To be determined. Processing suspended Agriculture (IDA) Fuel wood and multi purpose tree until country issues are phnting. resolved.

Ministry of 19.0 (R) Agricultural Sector - To support To be determined. Processing suspended Agriculture (IDA) Government's adjustment efforts until country issues are in the sector. resolved.

Ministry of 10.0 Guayape Rural Development II - Consultants will be re­ Further processing Natural (Bank) Integrated package of assistance quired for technical as­ postponed. Resources and services for about 3,000 sistance, including mar­ farmers and 100 agrarian reform keting and credit. settlers. Total project cost about $15 million, including $6 million in foreign exchange.

Fondo de 37 .o (R) Small and Medium Industry Dev­ Consultants required for Negotiations substan­ Desarrollo (Bank) elopment - Credit and technical monitoring information tially completed. Industrial assistance including institu­ system and strengthening (FONDEI) in the tional strengthening. ,of project evaluation/ Banco Central de supervision by financial Honduras intermediaries.

Empresa Nacional 40.0 Power IX - Sub-transmission and To be determined. Project preparation under de Electri­ (Bank) distribution; expansion and way. ficacion (ENEE) technical assistance. Total project cost estimated at $50.0 million, of which $40.0 million in foreign exchange.

See page 1 for footnotes. ------·----

- 75 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency l/ Lender J/ Consulting Services Action on Procucurement !±./

Ministry of 34.0 (R) Sugar Rehabilitation II - Fac­ Main consulting services Negotiations in Agriculture (Bank) tory and field rehabilitation to will be management con­ progress. restore viability of public tract with Tate and Lyle. sugar sector and increase ex­ ports to fil 1 export quotas. Total project cost estimated at $51.0 million, of which $38.0 million in foreign exchange.

Ministry of 9.0 (R) Population III - Continued Some consulting services Appraisal report being Health (Bank) strengthening of population and for technical assistance reviewed. family planning services, and to the Ministry to be rationalization of public health included. expenditures.

Ministry of Up to (R) Education IV - Basic Education Consulting Services for President's Report being Education 6.0 Preparation Project. various studies in educ­ prepared. (Bank) ation will be required.

Jamaica Public Up to Power IV - Transmission and dis­ Consultants will be Appraisal report being Service Company 11.0 tribution expansion; training, required for engineering prepared. (Bank) design and bidding documents for of coal-fired plant.a and coal-fired plants including coal coal harbour, distribu­ harbour. tion master plan and ins­ titution building.

Bank of Jamaica 40.0 Industrial and Financial Sector No consultants required. President's Report (Bank) Adjustment - Loan to support being prepared. policy reform in industrial and financial sectors.

Bank of Jamaica 20.0 Public Enterprise Sector No consultants required. President's Report (Bank) Adjustment - To improve the being prepared. financial performance of the public enterprises.

Nacional Finan­ 75.0 Irrigation Rehabilitation - Re­ No decision made whether Project preparation under ciera (NAFINSA) (Bank) habilitation of existing irriga­ consultants will be re­ way. tion investments. quired.

Nacional Up to Agricultural Extension and To be determined. Project preparation Financier a 150.0 Research - Strengthening under way. (NAFINSA) (Bank) Government's agricultural extension and research programs.

Banco Nacional 40.0 (R) Municipal Development - Support Consulting services will Loan signed on April 9. de Obras y Ser­ (Bank) to the Government I s national be required to assist in vicios Publicos program for improving public developing training Procurement: Retroactive (BANOBRAS) sector management policies policy. financing would be prov­ focused on the strenthening of ided for expenditures for municipalities. Total project preparation of promo­ cost about $80 million, of which tional and training mat­ $18.3 million in foreign ex­ erials, and technical change. assistance incurred on or after September 1 1 1985.

Banco Nacional 100.0 Small Cities and Rural Water - Consultants for project Project preparation de Obras y Ser­ (Bank) Rehabilitation and expansion of preparation (feasibility under way. vicios Publicos water supply and sewerage sys­ study) will be required. (BANOBRAS) tems in about 30 small cities.

Banco Nacional 25.0 (R) Solid Waste Pilot Project - Consultants will be re­ Loan signed on April 9. de Obras y (Bank) Technical assistance and engin­ quired for feasibility Servicios eering project to assist Govern­ studies and pilot work. Procurement: Retroactive Publicos ment to define policies, provide financing would be prov­ (BANOBRAS) training, strengthen institu­ ided for expenditures ions, and undertake studies in incurred after August 3, the subsector. Project will 1985. finance pilot works in five c1t1es. Total project cost about $50 million, of which $12.5 million in foreign ex­ change.

See page 1 for footnotes. - 76 -

Member c·ountry, Amount & and implementing Probable Stage of Processing and Agency J/ Lenler 1=_/ Consulting Services Action on Procucurement ~/

MEXICO (Cont'd)

Nacional 150.0 Industrial Recovery - General To be determined. Board presentation plan­ Financier a (Bank) industrial credit support. ned for June. (NAFINSA)

Banco Nacional 48.0 (R) Technology Development - To Consultants will be Negotiations completed. de Mexico, S .A. (Bank) promote industrial technology required for industrial Board presentation (BANCOIIEX) development among industrial technology policy scheduled for July. firms, particularly exporters. analysis and studies.

Nacional 109.0 (R) PRODERITH II - Second phase of Consultants will be Loan signed on April 9. Financiera (Bank) agricultural development of required for soil con­ (NAFINSA) Mexico 1 s tropics. Total project servation and rural Procurement: Retroactive cost estimated at $217. 5 mil­ communications. financing would be prov­ lion, of which $66. l million in ided for infrastructure foreign exchange. and purchase of laborat­ ory equipment incurred after July l, 1985.

Nacional 400.0 (R) Agricultural Credit - FIRA/ To be determined. Appraisal report being Financier a (Bank) FICART - General agricultural prepared. (NAFINSA) credit support.

Nacional 100.0 (R) Forestry - To increase produc­ To be determined. Preparation under way. Financier a (Bank) tion of logs from natural pine (NAFINSA) forest areas, and improve log utilization by local forest industries in Durango/Chihuahua States.

Nacional 20.0 Seeds - To strengthen PRONASE to To be determined. Appraisal report being Financier a (Bank) become operationally, finan­ prepared. (NAFINSA) cially, and technically more efficient, and improve the quality of seeds through the upgrading of technical skills and technology.

Banco Nacional Up to Export Development Project II - Consultants will be Appraisal report being de Comercio 250.0 Continuation of Government required for technical prepared. Exterior (BNCE) (Bank) efforts to promote non-petroleum support. exports including support to in­ direct exporters.

Secretaria de Up to Trade Adjustment Loan - Assist­ To be determined. Negotiations in progress. Hacienda y soo.o ance to trade liberalization Credito Publico (Bank) program. (SHCP)

Banco Nacional 100.0 Ports IV - Support to commercial To be.determined. Preparation under Pesquero y (Bank) port modernization and rehab­ way. Portuario ilitation program. (BANPESCA)

Banco Nacional 130.0 (RO Urban Transport Investment in To be determined. Preparation under de Obras y (Bank) transport infrastructure and way. Servicios traffic management in Publicos Guadalajara, Monterrey and the Bank Project Preparation (BANOBRAS) State of Mexico. Facility advance of $500,000 proposed to help finance preparation of detailed technical, ec­ onomic and financial an­ alysis of urban transport improvements in project areas.

Nacional 125.0 Agro-Processing - To provide To be determined. Preparation under Financier a (Bank) credit and technical assistance way. (NAFINSA) to the agro-industries sub­ sectors.

Nacional 10.0 Mining - Investment in large To be determined. Preparation under Financierp. (Bank) public mining corporations way. (NAFINSA) (sulphur and phosphate).

See, page 1 for footnotes. ------

- 77 -

Member. Country, Amount & and implementing Probable Stage of Processing and Agency lf Lender J) Consul ting Services Action on Procucurement 1./

MEXICO (Cont'd)

Nacional 80.0 (R) Adult Training -,Development of To be determined. Appraisal mission sched­ .Financiera (Bank) an ·intensive system for· the uled for August. (NAFINSA) provision of skills for both employed and unemployed adults among the non-farm rural and ~rban poor.

Banco Nacional 400.0 (R) Reconstruction Loan - Financing Consultants will be Loan signed on April 9. de Obras y (Bank) a portion of the Government's required for technical Servicios Earthquake Reconstruction Pro­ support. ' Procurement: Retroactive Publicos .gram. Total projeCt Cost about financing to cover eli­ (BANOBRAS) $571 million, of which $186 mil­ gible expenditures incur­ lion ·in foreign exchange. . red after September 19, 1985.

Nacional 250.Q (R) Fertilizer Sector Re.str~cturing To be determined. Preparation under way. Financiera (Bank) -: Support for Fertimex 1.s reV'ised (NAFINSA) investment program and its financial restructuring.

Nacional 135 .o R) Small and Medium Industry IV - To be determined. Appraisal mission sched­ Financiera (Bank) Support to integrated program of uled for September. (NAFINSA) assistance to Small and Medium Industry.

Ministry of Up to (R) SAL II - Support to Government To be determined. Appraisal mission in Planning and 80.0 structural program in agricultu­ the field. Economic Policy (Bank) re, industry and public sector reform.

Ministry of Up to Technical Assistance - Studies Will be required. Project pr·eparation Planning and 5.0 to support the ongoing struc­ under way. Economic Policy (Bank) tural adjustment reform and public sector institutions.

Autoridad Up to Balboa Port - A~sist APN in To be ·determined. Project preparation Portuaria 20.0 increasing its container hand­ Under way. Nacional (APN) (Bank) ling and storage capacity; and enhance the transit capability and efficiency ,of the port.

Banco Nacional 50.0 Second Stage National Agri­ No consultants .required. Project preparation de Fomento (Bank) cultural Credit ~reject. un.der way.

~inistry of 35.0 R0ad Maintenance and Rehabili­ Consultants will be re­ Project preparation Public Works and (Bank), tation - Strengthening of pa"ve-. quired for supervision of under way. Communications ment structure sections of paved civil works. network, ~mprovement~ in drain­ age system, and programs for periodic and routine· main­ tenance.

Servicio Up to Provision of technical assist­ Consultants would be re­ Project preparation Nacional de 20.0 ance for institution building. quired for management of under way. Abastecimiento (Bank) Water supply and sewerage in water systems. de Agua Potable several. secondary-sized cities · y Alcantarillado and towns with special emphasis (SENAPA) on rehabilitation, and tech~ical assistance.

Ministry of Up to Irrigation Rehabilitation III - Not decided. Project preparation und'er Agriculture 40.0 Rehabilitation of drainage and way. (Bank) irrigation systems in two coast­ al valleys; oper-ations and Bank Project Preparation maintenance program. Facility advance of $500,000 approved to fi­ nance aerial mapping for pre-feasibility study.

See page l for footnotes. - 78 -

Member Country, Amount & and imp~ementing Probable Stage of Processing and Agency J_/ Lender 1/ Consulting Services Action on Procucurement !!./

PERU (Cont'd)

To be determined To be Sugar Diversification - Rehabil­ Detailed study I financed Bank Project Preparation deter­ itation and improvement of man­ by PPF advance, completed Facility advance of mined agement for sugar cooperatives, by consultants. Possible $500,000 to finance fea­ (Bank) and/or diversification in use of need for consultants for sibility studies fully lands. project implementation disbursed. not decided.

Ministry of Up to Public Sector Management II - To be determined. Project being prepa!ed. Finance 15.0 Training; and Central Government (Bank) and State-owned enterprise management.

PETROPERU 60.0 Petroleum III - Increase oil To be determined. Project being prepared. (Bank) production through secondary recovery; exploration promotion for private companies; and technical assistance.

National Center 4.0 Energy Conservation - Establish­ Consultants will be re­ Approved by the Executive for Energy Con­ (Bank) ment ofnational energy ration­ quired to assist with Directors on May 9, 1985. servation and alization center to do energy energy audits and train­ Rationalization audits and carry out other ener­ ing. gy saving activities. Total cost about $6.1 million, inclu­ ding $4.0 million in foreign ex~hange.

ELECTROPERU 13. 5 Power Engineering II - Institu­ Consultants will be re­ Approved by the Exec­ (Bank) tional strengthening of regional quired to assist with utive Directors on July utilities, and evaluation of re­ studies. 2, 1985. habilitation and development needs.

Empresa Nacional 9.7 Railway Technical Assistance Consultants will be Project preparation de Ferrocarriles (Bank) Institutional assistance to required to assist with under way. del Peru ENAFER and purchase of spare operations, maintenance, (ENAFER) parts. finance, planning and micro computer based management systems.

Administracion 45.2 (R) Power Sector Rehabilitation - Consultants will be Loan approved by the Nacional de (Bank) Financing of UTE'S Investment required to assist Executive Directors on Usinas y Plan, combined with commercial borrower with project September 19, 1985. (Co­ Transmisiones banks re-financing of existing supervision. financing being consid­ E lectricas (UTE) UTE' s debt. Total project cost ered.) estimated at $138 million of which $98 million in foreign exchange.

Obras Sanitarias 9.0 Water Supply Engineering - Tech­ No decision on consult­ PrOject being prepared. del Estado (OSE) (Bank) nical assistance and studies, ants. and related equipment and works.

To be determined 60.0 (R) Industrial Credit - Credit line Project postponed. (Bank) for export development, includ­ Reporting will be ing financial restructuring of discontinued. over-indebted enterprises.

Administracion 30.0 (R) Oil Refinery Modernization - To be determined. Project being prepared. Nacional de (Bank) Revamping of existing facilities Combustibles and related technical Alcohol and assistance. Portland (ANCAP)

See page 1 for footnotes. - 79 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender Consulting Services Action on Procurement

vn. NEW PROJECTS ADDED IN THIS ISSUE

EASTERN AND SOUTHERN AFRICA

Ministry of 15 .o Urban fuelwood plantations, Preparation completed by Appraisal mission sched­ Agriculture and (IDA) improved management of the ESMAP. uled for late June. Forestry national forests and softwood (Cofinancing being ex­ P.O. Box 102 plantations, rehabilitation of plored.) Entebbe, Uganda the forestry department. Total Telex: 61287 project cost about $30 million.

WESTERN AFRICA

GHANA

Volta River Authority 5.0 Northern Grid Extension - Re­ To be determined. Appraisal mission in P.O. Box M77 (IDA) inforced extension of Volta the field. (Cofinan­ Accra, Ghana River Authority (VRA) Trans­ cing will be required.) mission Grid to Northern Ghana with related distribution.

Minis tere du Plan et 8.0 Development Management - To be determined Identification prepar­ de la Cooperation (IDA) Technical assistance, equipment, ation mission in Kay. Dakar, Senegal and training to key government (Cofinancing needs to be Telex: 3133 SG agencies to strengthen economic determined.) and financial management and to initiate reform o public administration.

EAST ASIA AND PACIFIC

Gansu Provincial To be Gansu Industrial Credit - Line No decision yet made. Preparation mission Government deter­ of Credit to several financial in May Lanzhou, Gansu, China mined institutions or agencies in Gansu to support light industry development in the province.

Gansu Provincial To be Gansu Education - Upgrading No decision yet made. Appraisal mission tent­ Government deter­ primary schools, improving atively scheduled for Lanzhou, Gansu, China mined training for primary and lower August. secondary teachers, improving the planning and information systems, and establishing supervision and ins pee tion.

INDONESIA

Ministry of Education 38.5 Library Development - To streng­ Consulting services will Project preappraisal and Culture (Bank) then five major parts of the be required. mission scheduled for Center for Library library and information sys­ June/July. Development tem: policy/Planning/management Jalan Merdeka capability; personnel resources; Selatan No.11 public libraries; specialized Jakarta lOllO, libraries; and the publishing/ Indonesia printing/ translation services. Telex: 44471

BAPINDO-Bank 175 .o Development Banking/Bapindo - No decision yet made. Project preparation Pembangunan Indonesia (Bank) Follqw up to BAPINDO V with under way. P.O. Box 140, emphasis on institution building Jakarta, Indonesia and portfolio rehabilitation. Telex: 44242 44335 42772

See page 1 for fo.otnotes. - 80 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender Consulting Services Action on Procurement

EAST ASIA AND PACIFIC (Cont'd)

INDONESIA (Cont'd)

Ministry of Mines and 175.0 Rural Electrification - A No consul tan ts re­ Identification of Energy (Bank) timeslice of the investment quired. ·The project project components JL. Rasuna Said program for transmission and will be prepared by PLN. will be carried out Kav. 7-8, Blk X-2 distribution, including during a Bank mission Jakarta, Indonesia extension of supply to rural in late 1986. Telex: 44363 areas. 62319 ENERGI IA

National Electricity Corporation PLN - Jalan Trunojoyo Blok - MI/ 135 Jakarta, Indonesia Telex: 47248 PLN PST - IA

Ministry of Energy, 5.0 Industrial Energy Rationaliz­ Consultclnts may be Project preparation Telecommunications (Bank) ation Project - Technical required. un:ier way. and Posts Assistance to reduce energy :;round Floor, Wisma consumption of industrial Damansara sector. Jalan Semantan, Kuala Lumpur, Malaysia

Forest Research 5.0 Forest Research and Technical Consultants may be Project preparation Institute of Malaysia (Bank) Assistance - Strengthening of required. under way. (FRIM) research and forestry related Kepong, Selangor studies in Peninsular Malaysia 52109 Kuala Lumpur, and Sarawak. Malaysia Telex: FRIM-MA 27007

PHILIPPINES

Central Bank of the 100.0 DFC - Industrial Finance II No decision made whether Project preparation Philippines (Bank) Follow-up ~o the ongoing consul tan ts will be under way. Central Bank Building industrial finance (Apex) required. Manila 2801, project; to support lending Philippines through accredited financial Telex: GMC 40030 intermediaries to industrial CENBANK PM enterprises, and continued strengthening of financial sector through strengthening term lending capabilities of accredited inte~mediaries, and possibly selected financial sector re'form measures.

SOUTH ASIA

BANGLADESH

To be determined 120.0 Energy Sector - To encourage the Consultants have been Project preparation (IDA) efficient use of resources and identified to assist in under way. improve resource mobilization; project p~eparation. support institutional reforms and sectoral coordination; and identify and assist GOB in implementing a core least-cost investment program for the energy' sec tor.

Sui Northern Gas 50.0 Gas Development Project - To No decision on Preparation under Pipelines Ltd. (Bank) provide production facilities in consul tan ts. way. 14/295 Sarwar the Loti and Dhodak gas fields , 1 Shaheed Road and improved gas transmission Lahore, Pakistan facilities from the Pirkah, Loti Telex: 44677 SNGP PK and Dhodak fields. i

Oil and Gas Develop- ment Corporation Shafi Chambers, Club Road, Karachi, Pakistan Telex: 5692 OGDC PK

See page 1 for footnotes. ------

- 81 -

Member Country, Amount & and Implementing Probable Stage of Processing and Consulting Services Action on Procurement Agency J_/ ~

SOUTH ASIA (Cont'd)

(Implementing Agencies Listed Below)

Government of Water and Power ·Karachi Electricity Oil and Gas Develop- Pakistan Planning and Development Authority Supply Corporation, ment Corporation Development Depart­ 622 - WAPDA House Ltd.' Shafi Chambers, ment The Mall, Lahore, P.O. Box 7197 Club Road Room 210, Block P Pakistan Karachi-3, Pakistan Karachi, Pakistan Pakistan Secretariat Telex: 44869 WAPDA Telex: 25601 KESCO Telex: 5692 OGDC PK Is lamabad, Pakistan PK PK Telex: 5717

Southern Gas Co. Ltd; Pakistan State Oil Pakistan Mineral Sui Northern Gas State Life Building Company, Ltd., Development Pipelines Ltd. No. 2, Dawood Center, Corporation 14/295 Sarwar Shaheed 2-A Wallace Road Moulvi Tamizuddin PIDC House, Road, Lahore, Off I.I. Chundrigar Khan Road, Karachi, Dr. Zia-ud-Din Ahmad Pakistan Road, Karachi Pakistan Road, Karachi, Telex: 44677 SNGP Pakistan Pakistan PK Telex: 25608 KGC-PK

150-0 Energy Sector Loan II - To Consultants will be Identification to (Bank) continue the program of reforms required for implem­ be initiated in in pricing policies, investment entation. December 1986. programming and institutional development started under the First Energy Sector Loan.

SRI LANKA

National Development Up to Small and Medium Industries III No decision on consul­ Project preparation Bank (NDB) 45.0 - To complement and expand tants. under way. Central Bank of (!DA) ongoing programof small and J Ceylon medium industry development J anadhipathi Mawatha through financing of eligible Colombo 1, Sri Lanka industries in eelec ted I subsectors.

( EUROPE, MIDDLE EAST AND NORTH AFRICA

MOROCCO

Ministere de l 1Equi­ About Vocational Training II - Second To be determined.· Preparation under pement, de la For­ 30.0 phase of program designed to way. mation Profession­ (Bank) improve quality of training in nelle et de la For­ newly converted vocational mation des Cadres training institutions. Rabat, Morocco Telex: 61613

To be determined About Urban Upgrading - Policies, To be determined. Appraisal mission 70.0 measures, and interventions to tentatively scheduled (Bank) provide infrastructure in order for September. to contain and avoid unauthor­ ized housing developments.

To be determined To be Industrial Training and Tech­ No decision yet on need Project being ident­ deter­ nology - Training of higher for consul tan ts. ified. mined level technical/industrial (Bank) manpower.

LATIN AMERICA AND CARIBBEAN

ARGENTINA

Servicios Electricos 150.0 SEGBA V Power - Rehabilitation To be defined. Preparation mission del Gran Guenos (Bank) and expansion of distribution in May. Aires (SEGBA) networks in Buenos Aires. Balcarce 184, Buenos Aires, Argentina Telex: 390 1043

See page 1 for footnotes. - 82 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender Consulting Services Action on Procurement

LATIN AMERICA AND CARIBBEAN (Cont'd)

ARGENTINA (Cont'd)

Yacimientos 116.0 Refinery Conversion - Supplem­ Consultants required for Board presentation Petroliferos Fiscales (Bank) entary-Loan to complete project financial management planned for late May. (yPF) on revised schedule. Total assistance. Avda. Saenz Pena 777 project cost estimated at $ 769. 7 piso 5 million, of which $361.9 million Buenos Aires, in foreign exchange. Argentina Telex: 21999 yPF

BRAZIL

Centrais Eletricas 200.0 Electric Power Sector II - No consultants required. Appraisal mission Brasileiras S .A. (Bank) Continuation of support for scheduled for June. (ELETROBRAS) Government measures to rehab­ SAN - Ed. da ilitate power sector. Petrobras, 4° Andar, Cep. 70.040 Brasilia D .F., Brazil Telex: 391 611450

Centrais Eletricas 350.0 Electric Power Sector III - To be determined. Preparation mission Brasileiras S .A. (Bank) Continuation of assistance in May. ( ELETROBRAS ) towards the financial rehab­ SAN - Ed. da ilitation of selected utilities. Petrobras, 4° Andar, Cep. 70.040, Brasilia D.F., Brazil Telex: 391 611450

CHILE

Ministry of Finance; 250.0 Structural Adjustment Loan II. Consultants have been Appraisal mission in Ministry of Economy; (Bank) retained. the field. Teatinos 120, Santiago, Chile Telex: 392 241-334 MOF 392 240-318 MOE Central Bank of Chile Augustinas 1180 Santiago, Chile Telex: 392 240267

See page 1 for footnotes.

I I I I I·