F1 (e_ International Bank for Reconstruction and Development !)$...eJ.vt.: <:., • International Development Association Public Disclosure Authorized

SecM86-962 FROM: The Deputy Secretary August 15, 1986 Public Disclosure Authorized MONTHLY OPERATIONAL SUMMARY

OF BANK AND IDA PROPOSED PROJECTS (As of July 31, 1986) Public Disclosure Authorized

Distribution: Executive Directors and Alternates President Senior Vice Presidents Senior Management Council

Public Disclosure Authorized Vice Presidents, IFC Directors and Department Heads, Bank and IFC

TABLE OF CONTENTS

SECTION REGION PAGES

I. EASTERN AND SOUTHERN AFRICA 1 12 Botswana . . • . 1 Burundi . . . . 1 Comoros . . • 2 Djibouti ...... 2 Ethiopia ...... 2 Kenya . . 3 Lesotho . . . . 4 Madagascar . . . . 4 Malawi . . . 5 Mauritius . • • . 6 Mozambique . . . . 6 Rwanda . . . 7 The Seychelles 7 Somalia . . 7 Sudan . . . 8 Tanzania .. . 8 Uganda . 9 Zaire . . 9 lI Zambia . 10 Zimbabwe . . 11 Regional . . . . 12

II. WESTERN AFRICA 13 27 Benin . 13 Burkina Faso . .. . . 13 Cameroon . . . . 14 Cape Verde . . 15 Central African Republic . . 15 Chad . . . 15 Congo, People's Republic of the . . . 16 Cote d'Ivoire 16 Equatorial Guinea • 18 The Gambia . .. . . • . 18 Ghana ...... 18 Guinea • 20 Guinea-Bissau . . . 20 Liberia . . . 21 Mali . . . . 21 Mauritania . 22 Niger . 22 Nigeria . . . 23 Sao Tome and Principe . . 25 Senegal . . . . 25 Sierra Leone . . . . . 26 Togo . . . • . . 26 ii

SECTION REGION PAGES

III. EAST ASIA AND PACIFIC 28 - 39 China • • • . . . . . • 28 Fiji . . . 30 Indonesia ...... 30 Korea . . . 32 Lao People's Democratic Republic . . 33 Malaysia . . . . 34 Papua New Guinea . . 35 Philippines . . . . . 36 Solomon Islands ...... 38 Thailand . . . . 38 Vanuatu . . . . 39 Western Samoa . . . 39 IV. SOUTH ASIA 40 - 52 Bangladesh . 40 Bhutan . . . . 41 Burma . . . . • . 41 India 43 Maldives . . . 48 Nepal ...... 48 Pakistan ...... 49 Sri Lanka ...... 51 v. EUROPE z MIDDLE EAST AND NORTH AFRICA 53 - 62 Algeria . . . 53 Cyprus . . 53 Egypt, Arab Republic of . . 53 Hungary . 55 Jordan ...... 55 Morocco . . . . . 56 Oman . • . • • . 57 Portugal . • . . 57 Romania . . . . . 57 Syrian Arab Republic . . . . . 57 Tunisia . . . . . 58 Turkey . . . . . 59 Yemen Arab Republic . . . . 60 Yemen, People's Democratic Republic of . 61 Yugoslavia . . . . . 61 VI. LATIN AMERICA AND CARIBBEAN 63 - 74 Argentina . • . . . . 63 Bahamas • . • . 64 Barbados . . . . 64 iii

SECTION REGION PAGES

LATIN AMERICA AND CARIBBEAN (Cont'd)

Belize ,•. ~~ Bolivia 64 65 Caribbean Region 67 Central America Regional 67 Chile 67 Colombia 68 Costa Rica 69 Dominica 69 Dominican Republic 69 Ecuador 70 El Salvador 70 Guatemala 70 Guyana. 71 Haiti 71 Honduras 71 Jamaica 71 ·Mexico 71 Panama 73 Paraguay 73 Peru 74 Uruguay 74

VII. NEW PROJECTS 75 - 80

EASTERN AND SOUTHERN AFRICA 75 Kenya 75 Lesotho 75 Rwanda .· 75 WESTERN AFRICA 75 Burkina Faso 75 Central African Republic 75 Chad 75 Mali 76 Niger. 76 Nigeria 76 Sierra Leone 76

EAST ASIA AND PACIFIC 77 Korea. 77 Malaysia. 77 Papua New Guinea 77 Philippines 78 Western Samoa 78

SOUTH ASIA 78 Bangladesh 78 India. 79 - iv -

SECTION REGION PAGES

EUROPE, MIDDLE EAST AND NORTH AFRICA 79 Hungary 79 Jordan . 79 LATIN AMERICA AND CARIBBEAN 79 Argentina 79 Brazil . 80 Colombia 80

Secretary's Department ------______, L__ -- -

Member Country, .Aaount & and Implementing Probable Stage of Proce••ing and ~y ~y Coneulti11.11 Barviceo Action on Procureraent !!/

I. IWITEBll .Ami SOllt'BlWf ARICA I 1 BOTSWARA

Miniatry of 7.6 Selebi-Phikue - Technical Conoultanta vill be re­ .Approved by the Executive Finance and (11,.nk) anai1tance for divernification quired for technical Director• on Mey 15. Development of mining tovn; regional devel­ aooistonce for multi- Planning Oplllent. Total project cost 1ectoral prOt!lotional about $12.0 million, of which unit, ,industrial devel­ $7.6 million in foreign ex­ opment/promotion, and change. irrigation.agronomy; atudiea for·various ae­ pectn of .....11 scale industry and irrigation development and market­ ing; and technical assistance for housing policy implementation at national/regional leve 1.

Water Utilitiea About Fourth Water Supply - Augment­ No decision made on Project under Corporation 25.0 ation of water supply to extent of consultant preparation. (Bank) Gaborone/Lobatse area. Total services required. project cost estimated at $50.0 I million.

~ I Ministry of About (R) Agriculture Muyinga - Pilot set­ FAO Cooperative Program ·Appraisal report under Agriculture 14.0 tlement scheme and development prepared project. preparation, (Cofinan­ ( (IDA) of coffee and foodcrop produc­ cing will be required for I tion in the Muyinga Province. $8.0 million.) Total project cost to be deter­ mined.

Ministry of About Agricultural Services. Total A consultant has been re­ Project under prepar­ Agriculture 15.0 project cost to be determined. cruited for preparation. ation. (IDA)

Ministry of 7.0 Health/Population I - Strength­ Consultants are being Appraisal mission tentat­ Health (IDA) ening of baeic maternal/child recruited. ively scheduled for health services; eupport to fam­ February 87. ily planning activities. Total project cost estimated at $11.0 million.

Ministry of About Economic and Public Enterprise Consultants will be· Appraisal mission tent­ Planning 5.0 Management - Strengthening of required. atively scheduled for (IDA) eervices of Ministry of Plan­ November. ning, 'Finances and Technical Ministries in support of struct­ ural adjustment program.

Ministry of About Education IV·- To be identified. No decision has been made Project under Education 10.0 whether consultants will preparation. (IDA) be required.

Ministry of About Communication II - Improvement Consultants being Appraisal report under , Poet 6.0 and expansion of postal and recruited for tariff preparation. and Telecom­ (IDA) telecommunications services. study. munications

1/ Addreases of the Implementing Agencies of new projects are given in Section VII of the Summary. y The nmount ie in millions of U.S. dollars and is approximate and tentative. SAF is the acronym for the Special Facility for Sub-Saharan Africa. lJ The letter (H) before the project means that the project is a new listing in the Summary; the , letter (R) mean• that the information about the project hos been revised since the last issue of the Sumnary. Section VII of the Summary contains a recapitulation of the new project• tioted in this iaaue. Thia column contairu, available information, if any, about action vith respect to the procurement of good• and oervicea expected to be financed by the Bank or IDA. - 2 -

Member Country, Amount & and Implementing Probable Stage of Proceaoing and ~l! ~y Conaul ting Serviceu Action on Procurement 4/ BURUNDI (Cont'd)

Ministry of About SAL II - Second ph118e of the Conaultant• will be Project preparation under Planning 13.0 etructural adjuotment prograa, required, vay. (IDA)

Ministry of About Public Sector Management - To Consultants will be re­ Project under prepara­ Planning 2.5 aasiat Government in improving quired, tion. (IDA) formulation of economic policy, planning, and management of key IDA Project Prep8l'ation sectors. Facility advance of $300,000 approved to finance • tart up of technical assistance activities.

Ministry of About (R) Education II - Educational plan­ No consultants required. Board presentation National Educ­ 7.9 ning and technical assistance; scheduled for August 28, ation, Culture, (IDA) vocational management and

Youth sl\d Sports r teacher training. Total project (MEN) cost estimated at $8,8 million.

Institut 5,0 Geothermal II - Follow up Consultants will be Project under Superieur (IDA) project to Cr, 1488, required. preparation. d 'Etudes et de··. Recherches Techniques et Scientifiques (ISERST)

Ministry of About (R) Livestock IV - Support for No decision made whether Appraisal report under Agriculture 50.0 improving animal heal th and consultaUts will be re­ preparation. (IDA) nutrition, utilization of graz­ quired. ing land, soil conservation, and applied research,

Ministry of 62,0 Energy - Rehabilitation of Consultants will be re­ Approved by the Executive Mines and (IDA) electric generation and trans­ quired for technical as­ Directors on May 20. Energy; and mission, rural electrification, sistance. Ethiopian and household energy. Total IDA Project Preparation Electric Light project cost estimated at $99,5 Facility advances total­ and Power million, of which $67,8 million ling $980,000 approved to Authority in foreign exchange. finance consulting ser­ (EELPA) vices.

Ministry of About (R) Peasant Agriculture Development Consultants will be re­ Appraisal report under Agriculture 55,0 I - Support for expansion and quired for technical as­ preparation. (IDA) intensification of integrated sistance. agricultural ·services, including construction of rural roads, seed multiplication programs; provision of training facilities in selected areas. Total proj­ ect coat to be determined.

Ministry of About (R) Forestry - Farm forestry and Consultants likely tu be Apprnved by the Executive Agriculture 45,0 fuelwood plantati6ns, Total required, possibly under Directors on July 3, (IDA) project cost to be determined. a Project Preparation Total project cost about $62.1 Facility advance. million, of which $17.8 million in foreign exchange.

Ministry of To be (R) Family Health - Strengthening of Conoultants.will be Pre-appraisal mission Health· deter­ family planning and health required. scheduled for August, mined services; support for training, (IDA) information, education and An IDA Project Prepara­ communication and pharmaceutical tion Facility advance of development, $0, 5 mil lion approved for consultants for manpower development; pharmaceu­ tical development; in­ formation, education and communication; insti­ tutional development; preparation of a zonal project; overall project preparation and archi­ tectural services •

.: See page 1 for footnotes , - 3 -

aber Country, Amount i ld I:apleanting Probable Staae of Proceaaina and tncy ll ~y ConaultiD& SarYicea Action on Procureaent !!/ ,11IOPIA (Cont'd) int.try of To be Bi1hlend Rehabilitation - To ba Bo deciaion aade whether Project under \riculture deter­ defined, conaul tanta vi 11 be preparation, mined required. (IDA)

1.... iuion for To be Technical Bducation and Treinina Ho deciaion aade whether Project under lgher !ducetion detnr- . - To be defined. conaultant• vill be preparation. 11ined required. I . (IDA) I-INYA . ?nya Induatrial 6.0 s.. 11-acale Enterpriaea - Second Conaultanta will be re­ Board preaentation ltatea (KIi!) (IDA) line of credit to ~I!. quired, awaiting Goverm1ent action on project condition••

iniatry of 4.0 Liveatock III - Support to dairy No decision made whether Project preparation 1griculture and (IDA) production. consultant• vill be re­ under way. (IFAD iveatock quired. cofinancing being 1ovelopment conaidered,) I iniatry of About Railways II - ·Inetitutional Consultants have been en­ Draft appraisal report 'raneport and 30.0 development, motive pover and gaged, awaiting Cabinet approval 1ammunicatione (IDA) rolling atock and operationa. of Jtenya Ba ilways special 10.0 action. plan. (Bank) tniatry of .About Agricultural Research - Support No deciaion made whether Project under prepara­ 'sr icu 1 ture and 30.0 for a national research program. conaultanta vill be re­ tion. -i.ve11toclt (IDA) quired, 1evelopment

;1n1stryI. . o f ll.5 Agricultural Management Aaaiat­ Previoualy engaged con­ Approved by the Executive gricul ture and (IDA) ance - Phaae II of agriculture aultanta expected to Director• on June 23, 1iveatock technical aaaietance. Total continue. (Cofinancing with CIDA ~velopment project coat about $20.6 mil­ for $2, 2 million, UNDP lion, of which $14.5 million in for $1,6 million, SIDA foreign exchange. for $0,4 million, USAID fur $0,l million,)

inistry of 20.0 Agricultural Sector Operation - No decision made whether Approved by the Executive griculture and (IDA) Policy-oriented •ector operation consultants vill be Directoro on June 23, livestock 40.0 to be supported by Agricultural required. evelopment (SAP) Management Aasiacance Project. linistry of 37.5 (B.) Education VI - ruining col­ Conoultanta will be Credit aigned on July 11, lducation (IDA) legea, and &one primary school•, needed for education aecondary curriculum develop­ planning, teacher ­ ment, media support aervicea, ing, management methods education planning and stath­ and resource mobilization tics, and project adminiatra­ and uee. tion. Total project coat about $56 Billion, of which $22 million in foreign exchange. linintry of About Population III - Project to be No deciaion made whether Project prep'11'ation w.i 11 'leolth and 30.0 aecond timealice of ongoing conaultante will be depend on progreod of '1inietry of HD11le (IDA) progr.,., required, ungoing project, lffairs

\inistry of About Agricultural National Extension No decision made whether Project preparation will ~riculture and 30.0 II - Follovup project to conault&nta vill be depend on progress of 1,iveatock (IDA) Rational lxtenaion Project nov required. ongoing project. >evelopment under illple111entation,

!linis try of 6.0 (R) Petroleum !xplorntion Technical Conaultanta may be Credit signed on Inergy Bnd (IDA) Aaaiatance - Continuation of required for technical July 11, ;legional onaoing aaaiotance in pr0110ting •••ietance. •>evelopmenc oil ezploration and developaent vith foreign companiea. Total project coat about $9,6 11i-llion, of which $6.0 million in foreign exchange,

See page l for footnotea. -4- Naber Country, AMaatl and lapl-tiq Prollul• ltap of Proeueiq and .Y!!!.S!.ll !=!!!!iY .ktiOII OD Proeu-t !I DlffA (Cont'd) aairabi City .About aairobi Water III - labuili­ Coaeultenta.., be Project at earl1 atep c ~.. ion, 40.0 tetiOD ... upeuion of tlle r ..uir .. for technical preparation. Water aad s-r­ (lank) aairobi •t•r aupplJ and uef.ataace. qe Departant ...r ... •1•teaaJ treiniq aad techaicel ..aiatance.

Ninhtry of .About <•> J'orHtry ff - lupport for in­ lo decbion baa been !Ude Project under prepar­ l!nviro-t and 20.0 t ..rated foreatry da..lopaant ..,ether conaultant• vill ation. General (Ill4) (fuelwod1 ti.•er, qro­ be required. 1118aourcea forHtry), Ninhtry of 40.0 <•> Induetr, Sector - To aupport lo deciaion ..de ubether Appraiaal aiaaion C-rcc and (lank) epecific ..aaurea of iaport conaultuta will be acheduled for March Induatry 40.0 li.berali.Htion, atreqtheniq of required. 1987. (Ill4) eaport incenti•••, and refora of the prica control ..chanin.

Niniatry of About Bi1hlanda Weter lqineeriq - Conaultenta vill be re­ Reaotiationa aubatan­ Water, lnerilY ,., Preparation of eqinceriq quired for cnaineerina tially coapleted. (Cofi­ and Ninina (IDA) d••iau end tender doc.,..nta for deaigna end tender docu­ nancing vith BBC, UIIDP I PhaH I of de~elopa11nt of •a.ta. USA, IS& and m: agreed,) Laaotho'a water reaourcae for eaport and h:,dra-electricitJ, mA Project Preparation and technical •••iatanco for Facility advance of project antitJ. Total project $100,000 approved to coat eeti.. ted at $46.1 aillion. finance project atert-up activitiea. Ninhtry of About <•> Acri.culture/Urban - Proviaion of To be deterained. Project under qdculture 10.0 teclulical aeeietance for plan­ preparation, (mA) nine and aene1eaent of aaricul­ turel deYelopa11nt1 and enhencina daliYer, of urban eervicea.

Ninietry of 10.0 Aaricultural Inatitutione Tech­ Coaaultanta required for . Approved bJ the laecutive .Agricultural (IDA) nical Aaeiatance II - J'oll...,..up technical aaaiatance to Director• on June 10, Production and to oqoiq qricultural inatitu­ be provided in the field (Cofinanciag provided by Niniatry of tiona technical aeaiatance proj­ of pricina policy, DBAm for $0,5 aillion,) Livutock ect, includiq policJ anal1eie, budaetary and planning and pnerel ..nq-nt aup­ poli.c,. mA Project Preparation port. Total project coat about Facility ad•ance of $12.8 ailli.on, of ubich $8.7 $875,000 approved to aillion in foreian eachaqo. finance atart-up activitiea, Niniatry of About J'orcatr, !II - To pro•ide fuel­ Conaultanta likely to be Project under prepar­ Asricultural 5,0 wood euppli•• (charcoal) to requirod, ation, (Cofinancina vill Production (IDA) Antanen•ri•o, Nahejanaa end be required.) Toli.ery. Total project coat to be deterainad. Niniatry of About Porta - lehebilitatina ph1aical Conaultanta will be Appraiaal report bei1111 Tranaport 15.0 infraatructure in'tbe ten prior­ required. prepared. (Cofinancing (mA) itJ porta1 iaprovina cargo hend­ beina aought,) liq, nevi1ation aida 1 dred1ina and aervicea to the ahippina An additional IDA advance aactor1 deYelopiq tho inatit­ of $550 1 000 under the utionel capabilit1, and particu­ Project Pruparation larlJ at the Port of ,.,...aina, Facility vaa approved on required to operate end ..intain March 14 to cover tech­ phJaical ••••t• et a reaaonable nical aaalatance required level of efficienc1, Total pro­ to coaplete the reora­ ject coat Htuoatad at $42.0 aaisation of the porta­ aillion. gub-aector. A firat advance under the PPP for $450 1000 waa approved on January 4 1 1985.

See pqe l for footnotea, - 5 - Meaber Country, Aaount. and Iapleaenti1111 Probabla Stasa of Procauina and .Y!!!5.i.. !/ ~·11 Conaulti91 larTicaa Action on Procur-nt !!J MADAGASCAll (Cont I d)

Miniatry of About (I) l'inancial/Induatrial liector Conaultanta ..,. be Projact baina prepared. Induatry; and 10·.o Adjuataant Cradit - l'oll~p raquirad, (Cofinancina being lankiq DJ' (IDA) Projact to 1541 HAG. 1ouaht.) Indoatria (Plue (National 60,0 Induatrial e:q,ac­ Deve lop110nt ted lank) froa SAP)

Kiniatry of About (a) Education III - Credit to Conaultanta likely to be Project bei1lll prepared. Education 5,0 aupport GoYaraaent education required, (IDA) policy refora by financina education ..terial• and equipaent.

Kiniatry of In­ About (I) Ener11 I - Intaarated eneray Conaultante will be Staff appraisal report duotry I Energy 25.0 prograu, including rehabil­ required. under preparation. and Kines/ (IDA) itation and expan•ion of power (Cofinencina being National Power facilitiea. Total project coat aought,) Authority about $69.6 aillion, includina (JIIWIA) $50.0 million in foreian ezchange. ·

Kiniotry of About BTK - Line of credit to rehab­ Conaultanta will be Negotiations scheduled Agricultural 5.0 ilitate agricultural holdi1111a required, for technical for September. Production/Na­ (IDA) and provide inatitutional aaaiatance program. tional Agricul­ aupport. tural Bank (BTK)

Kiniatry of About Hishway VII - Maintenance and Consultant• will be Project being ident­ Pub lie Worka 10.0 rehabilitation of highway required. ified. (Cofinancing · (IDA) network and rural roada •. proapects being explored.

Ministry of About (a) Health II - l!zpanoion of health Consultant• will be re­ Appraiaal report being Health s.o care delivery and maternal and quired for lllllnagement and prepared. (Cofinancing (IDA) child health and flllllily planning financial planning, and to be confirmed,) aervicea. Total project coat primary health care estimated at $43.2 million. evaluation. Pharmaceu­ tical epecialiatn will alao be required.

Lilongwe Water About (a) Weter II - lztenaion of water Conaultanta will be Apprai~•l report being Board 20.0 aupply to Lilongwe. Total required to help iaprove prepared. (Cofinancing (IDA) project coat about $30.5 mil­ ....,q,,...nt planni1111 and · ezpected from EIB and lion, technical capabilitiea. ODA.)

Ministry of About (H) Tranaport I - Upgrading Northern Con1ultanta aelected and Appraiaal report being Works and 14.0 Acceas Corridor, Total project are undertaking detailed prepared. (Cofinancing Supp lies ; and (IDA) coat about $85,0 million, engineerina atudiea. ezpected from USAID, KfW Ministry of (Germany), ODA, and EEC.) Tranoportation and Communica­ tions

Ministry of About (a) Education VI - Education Sector Consultants will be Appraisal mission com­ Education 25.0 Loan - Extenaion of pruoary/ required to help improve pleted. (Cofinancing (IDA) secondary education; inati­ manage,...nt and quality of being eought.) tutional atr9118thenina; improve­ education. &ent in quality of teachill8 materiala, training and ezam­ ination.ayate... Total project coat about $41.9 million.

Ministry of 16,7 (a) Wood lneray II - Fuelvood prod­ Conaultanu will be Loan aigned on Fores try and (Bank) uction and.protection; reaearch required for traini1111 and July 10. Natural in improved-aaro-foreatry aya­ management aasistance. Re~ource1 teaa and inatitutional atrenath­ ening. Total project coat about 19.6 aillion, includiiia $8,4 •illion in foreign exchanae.

Kiniotry of About Hiahvaya VI - Highway rehabil­ No deciaion made whether Project being identified, Works and 20.0 itation and phaae IV of diatrict conaultanta will be Suppliee (IDA) roada improvement uintenance required. program.

See page 1 for footnotea. - 6 -

Member Country, Amount & and'lllplementing Probabh! Staie of Proc•••ina and ~}j ~!/ Conaulti"I Barvicaa Action on Procurement Y

~ (Cont'd)

Agricultural About (11) Aaricultural Pricina and Market­ Tn be determined. Project under Development and 8.0 ing llefora - A project to aup­ preparation. Marketing Corp­ (IDA) port reforaa related to aari­ oration (ADMAllC) cultural -marketing. f.nclwU.ng and Miniatry of orsaniaational refora for Finance ADMAllC, the paraatatal which aarket• ...11 holder produce, and food aecurity policy.

Ministry of About (R) Agricultural Credit - Proviaion Agricultural credit Preparation mieeion cOD1- Agriculture 15.0 of credit for aupport of ....11- apeciali1ta to adviae on pleted. Project to be (IDA) holder production, ...11 rural organisation of a new appraised in Karch 1987. induetriea and qricultural inatitutional fraework aarketing enterpri•e•. Inatitu­ will be required. tional reorganization of niall­ holder credit ayatem.

Ministry of About Agricultural Diversification. To be determiDl!d• Project under Agriculture 15.0 preparation. (IDA)

MAURITIUS

Government of About Industrial Sector Adjustment No conaultanta required. Appraisal report being Mauritius (DBM) 23.0 Loan - :Finance for ezport prepared. (Cofinancing (Bank) industry. with AfDB probable.)

Central About Energy I - Rehabilitation of Consultants will be Project under prepar­ Electricity 10.0 power syatema, and technical required. ation. (Cofinancing Board (CEB) (Bank) assistance. Project cost to be with CCCE and BIB determined. poHible.)

Ministry of About (R) Sugar I - To support implement­ Consultant• will be Approved by the Executive Agriculture 30.0 ation of the Sugar Industry required. Directors on June 26. (Bank) Action Program end help improve Loan aigned on July 11. productivity of land uoe among smallholders. Total project coat eotimeted at $43.9 million, of which $30.0 million in foreign ezchange .

Ministry of About Structural Adjustment Lonn III. No deciaion made whether Project identification Economic 40.0 consultants will be under vay. Planning and (Bank) required. Development

Development Bank About (R) DBM/Indu•trinl Sites - To oup­ To be· determined. Pre-apprai1al mia1ion in of Mauritius 17.0 port development of industry the field. (DBM) (Bank) (including small-scale induatry) through line of credit and eat­ ablishaent of inductrial oiteo for export manufacturing indu1tries. ·

MOZAMBIQUE

Bank of About Rehabilitation II - Follow-up to To be determined. Project under Mozambique 45.0 firat rehabilitation program; preparation. (IDA) eq,ected to focus on agricul­ ture.

Bank of About (R) Technical A1oi•tance in economic Consultants will be Appraiaal miasion in Mozambique 10.0 planning, financial management required. the field. (IDA) and accounting, ntatiatics and international lav.

Ministry of About (R) Energy Technical Aaoiatance Consultants will ·be Appraiaal lllia1ion in the Energy 20.0 Asaistance to ERB, P!TROMOC, and required. field. (Cofinancing (IDA) BDM in planning and in manage­ being explored.) ment operations. Some equipment for urgent rehabilitation work• will be provided for !DM and PBTROKOC.

See page 1 for footnoteo. - 7 -

,Meaber Country, Aaount • and Impleaenti"i Probable Staie of Proc•••ina and l~ll 1!!!!!£!/ Couultiaa lar,ricaa Action on Procur-nt 4/ IIUWiDA Kiniatry of About (a) Water Supply II - ..babilit­ Conaultanta will ba Apprai••l aioaion oched­ Public Worka 1s:o ation, uintananca aa4 ..,.uioa required, uled for Septaaber. (Co­ (IDA) proara of rural ntar aupply financing with CCCE and •y•t-1 coutruction focua in AfDII probable. Special Lava ..,ion, aloq with auppert joint financing being to tbe iutitutional atnqth­ •ouaht.) eniq of th• Water Dapar-nt (11GB) and 110rlt with tbe c•• mmea •. Total project coat eat:laatad at $52.0 llillion.

Miniatry of About (a) roreatry II - Follow up to on- Couultant• will be Poet-appraiaal miasion Agriculture 28,0 9oi111 intearatad roraatry/ required. planned for Septeaber. (IDA) Liveatock Project. Total proj­ ect coat eat:laatad at $33.0 IDA Project Preparation million. Facility advance being considered.

Minietry of About Agricultural Service• II - Proj­ Conaultanta vitl be Project identified. Agriculture 35.0 ect would couiat of• number of required. (IDA) coaponents with eapha•i• on the A number of studies are development of national ezten-· under preparation with •ion •ervice• and. national Special Project Prepar­ coffee development progr... ation Facility and Study Fund financing,

Ministry of About Public Sector 11ana1eaent III - Conaultnnt• will be Appraisal report under Planning 8.0 Project IIOUld aaaiat Governaent required. preparation. (IDA) to atrengthen ita iutitutional develop11ent and to iaprove eco­ nOiilic and financial unaaeaent in key lilectora.

Ministries of About Public Enterpriae/Induatrial Couultont• will be Elements of project Finance and 25.0 Policy Operation - Would required. preparation are under way Industry (IDA) conaiat of financial and with financing frOlll induatrial componenta. project on Technical Ansistance II.

A Special Project Prepar­ ation Facility is envisaged.

Ministry of About (H) Urban I - aeaource aobilisation Conaultanto will be Project preparation under, Public Works 15.0 with iaproveaent in local tez required. way with IDA Project (IDA) baae; atrenathenina of urban Preparation Facility iutitutiou; upgrading and land advance of $400,000. tenure mproveaenta; eaployaent and incoae generation. THE SEYCHELLES

Seychelles s.o Water Supply and Sanitation for Conaultenta already Project under prepar­ Public Utilities (Bank) South Mahe, appointed for final ation. Appraisal mission Corporation engineering. ocbeduled for May 1987,

Miniotry of 22.6 (R) Porte Modernisation - Mainten­ Connultanu will be Approved by the Executive Pub lie Works (IDA) ance and rehabilitation of exia­ required, Direct?r• on July 3, ting ports, Total·project coat about $24.4 aillion, of which $22,6 aillion in foreian ex­ change.

Miniotry of About (R) Sbebelli Irria•tion Conaultanu will be Pre-appraisal miaaion Agriculture 11.0 Rehabilitation - To be required. acbeduled for November. (IDA) deterained, An IDA Project Prepar­ ation Facility advance of up to $1,0 million ap­ proved to engage conaul­ tanta.

See page 1 for footnote• , -a- Meaber Country, Aaount 6 and I!tpleaenting Probable. l!ltqe of Proceuina and ~l! ~y Conaultloa Bervicea Action on Procur-nt Y SOMALIA (Cont'd)

Miniatry of Aboqt (R) llainfed aariculture - To repli­ Conaultanta vill ba Appraiaal report Agriculture 10.0 cate and iu:p~nd a aucceaaful required. uudar preparation. (IDA) experiaent in aeai.-9echeniaed ferai.na under way. ilnte Hazionale About (R) Power Rehabilitation - To pro­ Conaultanta will be Pre-appraiaal ai.aaion Energia 10.0 vide for uraently needed rnhab­ required. · in Auauat. Blettrice (IDA) ilitation of electric power plant and diatribution ayateaa, training, and inatitutional atrengthening.

Minis t1-y of 30.0 (R) Cotton Proceaaing and Marketing Conaultanta will be Appraiaal ai.aaion Agriculture (IDA) - Rehabilitation of ginneriea required for telecoraun­ poetponed due to reduced and atrengthening of cotton icationa, training cot ton crop. production and marketing policy officer, market analyat, inatitutiona. Total project· cotton trader ·technician, An IDA Project Prepar­ coat eetimated at $47.5 million. procurement adviaor, ation Facility advance of civil, mechanical and up to $800,000 approved electrical engineers, and to help finance atart-up ahort-tena technical ae­ of the project. aiatance for evaluation, grading, and testing.

Ministry of To be Agriculture Rehabilitation No coruiultante required. Technical diacuasiona Finance and deter­ Credit III - Support to the completed. Economic mined irrigation eub-aector for Planning (IDA) recurrent inpub auch u fertilizers, peaticidea nnd spare parts.

National To be (R) Power IV - Power generation and No decision made whether Appreiaal aiaoion Electric deter­ trcnami•aion diatribution/expan­ conaultanta will be echeduled for October.• Corporation mined sion. Total project cost euti­ required. (NEC) (IDA) mated at $105 million.

Ministry of To be (R) Technical Aseintcnce - Macro­ To be determined after Pre-appraiaal aiaaion in Finance and deter­ economic; Public Enterpriee project ia defined. the field. Economic mined Management. Planning (IDA)

Ministry of 30.0 (R) Foreatry - Protection and To be determined ~fter Preparation under vay; Agriculture (IDA) management of exiating vood­ project ia defined. appraiaal tentatively landa, enteblinhment of plant­ scheduled for June 1987. ations and omall scale woodlots, and foreeting research.

Ministry of About (R) Agricultural Rehabilitation - No decision made whether Project being prepared. Agriculture and 20.0 Rehabilitation of cotton aub­ conoultante will be re­ (Cofinancing being Livestock (IDA) aector or other crop• yet to be quired. explored.) determined.

Ministry of About (R) Induotrial Rehabilitation - In­ No consultants required. Project being prepared. Industry and 25.0 duotriel rehabilitation through Trade (IDA) lines of credit to Tanzania In­ veatment Bank, Tanganyika Devel­ opment Finance Ltd. end National Bank of Connerce.

Ministry of About (R) Agricultural Reaearch - Streng­ No deciaion Qade whether Project being prepared. Agriculture and 10.0 thening national agricultural consultants vill be re­ Livestock (IDA) reaearch aervices. quirl!d.

See page 1 for footnotea. -' - lleaber Co~try, Aaount I and Iapl... ntina Probable ltaae of Procuaina and j', Alllit.Y ~rY eouu1uag 1emcu ktlllll on Procur!9!t Y TARZilHIA (Cont'd)

Minbtry of To be lllltl·•ector lahahllltation llo deci1ion sade wllatllar Project helna prepared. Finance, llcono­ deter­ Credit. coaaulta11t1 will ha (Cofiunclna balq aic Affair• and ained required. explored.) Plannina Cua/ IW')

Hinbtry of 20.0 Tea lahehilitation - llahabi­ Couultant1 will ba re­ .lppraiaal report under Agriculture and (IDA) litation of ••t•t• tea holdina• quired. ..preparation. l!'ore•try and nallholdar tea aardena and of tea procc••ina faciliti••, and atrenathenina of inatitut­ iona in the tea aector. Total project co•t ••ti.. ted at $72 •illion.

Uganda Poata and 20.0 Telec...... ,ication• II - Contin­ Conaultanta already Apprai•al report under Telecoaauni­ (IDA) uation of rehabilitation progr.. recruited. preparation. cation• in po•t• and tolecoammication• Corporation aector, Total project coat o•ti... ted at $32 million,.

Miniatry of 25.0 (R) Sugar Rehabilitation - Rehabili­ Con•ultantn are Appraiaal report Indu•try and (IDA) tation of cane production, fac­ being recruited. under preparation, Technology/ tory and infra•tructure in Kakira Sugar ltakira eugar •cherae; •upport .to Works aector policy and in•titu• tiona. Total project coat eati!Uted at $65 million.

Ministry of 25.0 Pourth Highway ·Project - . Conaultanta will Appraiaal report under Workg (IDA) Rehabilitation of four major be required. preparation. artery roada prepared under Third Highway Project. Total project coot eatimated at,$70.0 million,

Hini•try of 15.0 (R) Poreatry/FUelvood - Social Preparation completed by Appraiaal report under Agriculture and (IDA) foreatry, peri-urban fuelvood !BKAP. preparation. (Cofinen­ Pore•try plantation•, improved lilAnagement cing being explored.) of the national fore•ta and aoftvood plantation•, rehabil­ itation of the foreatry depart:.. ment. Total project coat about $37 million,

Gecaainea 110.0 Gecaminee II - Rehabilitation Ho conaultant• required Approved by the Executive (Bank) and aaintenance of exieting for project preparation. Director• on April 29. aining facilitie•. Total (Cofinancina arranged project co•t eatimated at . with BEC/SYSMIN for $27 $703.0 aillion, including $436 aillion, AfDB $65 mil­ million in foreign exchange. lion, BIB $48 million and CCCE $28.6 aillion.)

Ministry of About Kvongo ltvilu - Agricultural De­ ~o con•ultant• required Project under Agriculture 13.2 velopment Project in Bandundu for project preparation, preparation. (I2A) Region. Total project cont eetimated at $18.1 million.

Societe 37,0 (B) Power II - Rehabilitation and Conaultante will be re­ Approved by the Executive Rationale (IDA) expanaion of the Kivu region hy­ quired for training and Director• on June 19, d'!lectricite draulic netvork, including the engineering aervicee. (Cofinancing vith UHDP (SHEL) Ruzizi I facility. Total proj­ Con•ultant• have been for $0,6 aillion.) ect co•t eati1Uted at $41.9 mil­ recruited for atudiee lion, of which $37,6 aillion in financed under the An IDA Project Prepara­ foreign exchange. Project Preparation tion Facility advance of Facility. $440,000 ha• been ap­ proved to finance co•t and engineering atudiea.

Hinbtry of About Food Crop• TAS - roodcrop Ho deci•ion !Ude vhether Project under Agriculture 15.0 production throuah improved coneultant1 vill be re­ preparation. (IDA) input aupply syatem and in­ quired. fraatructure nupport. Total project coat to be determined.

See page l for footnote•. - 10 -

!lamber Country, Amount.• and Iapleaentina Probable It&&• of l'rocuaiq an, ~y !!!!!!!!.r l/ Conaalti11& larvicaa Action on Procur-t !

~ (Cont'd)

Societe 50;0 (ll) Dre VIII - lipth lim of cr.. it l'rojact financad atudiea Approved by the lxecut: l'inanciere de (IDA) to SOJ'Da. Onpiq u•btance aay raquira conaultanta. Director• on April 29. Developpeaent to the developamat of t~e.psod­ (SOl'm!) uctive •actora · in Zaire, partic­ ularly private iinraataanta in unufacturiq an.4.qro­ induatri••• Total project coat about $140,l aillioa, of llllieh $103.9 aillion in foreiln. exchaqe,

Regie dea Voiea About (R) 9avigation Iaproveaant - ltrena­ Conaultanta to prepare 9egotiationa acbeduled J'luvialea (B.VJ'); 25.0 theniq ..naaaaant rehabilita­ project financed UDder for early Septeaber, B.egie des-Voies (mA) tion of facilitie•, and intro­ Credit 1335-Zll. aubject to tiaely reaol Karitimes (RVH) duction of new tachniquaa for ution of financial iaa, Regiea de• Voiea J'luvialaa/Xari­ by Gove:naent. (Cofi,u tiaea. Total project coat••• cina being explored.) ti.. ted at $45.0 llillion.

Ministries of About Technical aaaiatance for Conaultant being Project under Finance, Plan­ 10.0 public aector ,..na1eaent and identified. preparation. ning and Higher (mA) higher education. Total project Education coat to be.deterllioed,

Regie de About Water Supply and Urban Deve­ To be determined, Project under Dietribution 30.0 lopaent - Iaproveaent -and preparation. d'Eau (REGIDESO) (IDA) conatruction of.water -ayateaa in • ...., eight center&. Total project coat to.be determined.

Societe About Pover III - Inergy 1/Bateke · Conaultanta have been Project under prepar­ d'Electricite 40.0 Fuelvood - High priority-iteaa retained to aaaiat in ation. (Cofinancing (SNEL); and (mA) of SN!L Inveataent Pro1raa1 preparation, vill be required.) Ministry of management aaaiatance, and Environment poHibly aupport for charcoal production and de.and ..naaement of houaehold fuel•. J'uelvood development in Bateke plateau. Total project coat to be determined.

Department of About Railvaya III - Continuation of Conaultanta vill be Project in early Transportation 35.0 the Rehabilitation Prograa of needed. atage of identification (IDA) the lailvaya.

Department of About OIL\TIA - Continuation of the Conaultant• vill be Project under Transportation 40.0 rehabilitation of the rail and needed, preparation, (mA) river tranaport ayateaa, and aanageaent,

Department of 20.0 (R) Induatrial Sector Adjuatllent Conaultanta vill not be Approved by the ilxecuti• Plan (IDA) Credit - To increaae the needed, Director• on 3une 10. 60.0 efficiency of the aector, and (Cofinancing arrangemen' (SAi') provide financing for illported being explored,) inputa, Total project coat eatillated at $80.0 aillion.

Office des About Highvaya VII/reeder Road& - Re­ To be determined. Project under Routes; and 60.0 habilitation and ..intenance of preparation. Ministry of (IDA) ..in and feeder roada and key · Agriculture agricultural road•, atrength­ ening of aector inatitutiona and training. Total project coat to be determined,

Miniatry of About (B.) Agricultural Reaearch and Conaultanta vill be re­ Project baa been rede­ Agriculture and 10,0 !xtenaion - Agricultural re­ quired; varioua expert• aigned. Appraiaal repo1 Water Develop­ (mA) aearch and extenaion aervice and apecialiat• in being prepared. ment aupport for Miniatry of qri'­ reaearch and extenaion. culture. Total project coat eatiaated at $41.0 llillion.

See page 1 for footnote•, - 11 -

Xnber Country, Allount, encl lllpleaenting Probable llta&• of 1roceuina end ~!/ !!erY Conaultillll 8ervicea Action on Procureaent !!../

~ (Cont'd)

. Niniatry of About Faaily.llaalth - Objective• ara Conaultanta will be re­ Project under prepar­ Health 8.0 to 1-prove priaary health care quired to prepare clinic ation. (Cofinancing (mA) aervice•, ezpand faaily plannina daaiana and tender doc­ beiaa explored.) activitiea, and introduce coat­ ~nta, and help deaian recovery in the haalth aactor. and inatall financial and An mA Project Prepar­ Total project coat eatillated at procureaent ayateaa. ation Facility advance $12-15 million. of $500,000 approved for technical aaaiatence end conaultanta aervicea.

!linia try of About (a) Coffee II - To e"Jland the pro­ Conaultanta vill be re­ Appraiaal report being Agriculture and 10.0 duction of coffee for e,.,ort. quired. prepared. Water Devel­ (mA) Total project coat eati1111ted at opment $34.9 aillion. An IDA Project Prepar­ ation Facility advance of $688,000 approved to finance completion of certain expenditures required to complete preparation of the project.

Tazama Pipe line About Tazama Pipeline Rehabilitation - Consultants vill be re­ Appraisal miaaion timing Ltd., Hdola/ 10.0 Rehabilitation of Taz&1111 Petrol­ quired, but tenui of ref­ awaiting completion of ZIHCO (mA) ema Pipeline and modification ea erence atill not fully engineering studies. neceenary to Indeni Refinery. defined. (Cofinancing being explo­ Total project cost tentatively red with BIB end others.) eetimated at $40 million.

Niniatry of About (a) Agricultural Credit - Develop­ · Consultants will be Appraisal report being Agriculture and 10.0 ment of rural financial institu­ required. prepared. Water Devel­ (mA) tions and support to financial opment intermediaries.

Development Bani< · About (R) DBZ III·- Third Line of Credit Coneultante will be Appraisal report being of Zambia (DBZ) 10.0 to Development Bank of Zambia. required. prepared. (IDA)

Kiniatry of About (R) Highway IV - Rehabilitation of Project deferred. Work• end Supply 20.0 priority roads; improvement in Further reporting will be (llanlt) road maintenance and training of discontinued. Ministry Works ataff.

Minietry of 50.0 Economic Recovery Support - Pro­ Consultants will be Approved by the Executive Finance (IDA) vioion of ainimWII level of im­ required for mining Director• on June 26. ports needed to raiae capacity audito, debt management utilization in the econOIII}' and and foreign exchange support economic recovery management. efforte.

ZIMBABWE

Ninietry of 10.0 (R) Family Health - Provide rural No decision made whether Approved by the Executive Health (!lank) health aervicen and preventive coneultenta will be re­ Directors on July 22. intervention•; family planning quired. activitiea. Total project coot estimated 11t $48.4 million.

Ministry of About (a) Petroleum Puelo II - Detailed Project deferred. Bnergy, Water 25.0 coat and engineering package for Further reporting will Reaourcea and (Bani<) petrolema fuel• supply. Total be discontinued. Developlll!nt project cost to be determined.

Ministry of About Power II - Power ayotem rehabil­ Ho decision made whether Project under prepar­ !ner11, Water 30.0 itation and manpower develop­ consultants vill be re­ ation. (Cofinancing aeaources and (Bani<) ment. Total project coat eatim­ quired. likely.) Development/ ated at $150 million. !lectric Supply C~uion

!liniatry of About (a) Cbisumbanje Irrigation~ Medium­ No deciaion made whether Date of negotiations to Land, Agricul­ 14.0 end a1111ll-acale achemee in com­ consultants will be re­ be determined. (Co­ ture and Rural (!lank) munal landa. Totlll project coat quired. financing being ex­ aeaettleaent eatimated at $20.0 million. plored.) (IILAU)

See page 1 for footnotea. - 12 -

Heaber.Country, Allollllt ... and Iapleuntiq Probable Stqe of Proce•dq and ~ll ~y froject Y Co11a11lti:!I ler,ric•• ktioa oa frocur-t y ZIIIIABW! (Cont'd)

Kini.try of About bport Pr-tioa - lnppert of llo deci•ion 111111• whether Project under Finance, Icon.. - 12.5.0 GoY•~nt uport p~tion couultaata will be preparation. ic Planning and (lank) proar-J provbioa of foreip required. Developaeut; and ezchanae for ~rted input• for Reaerve lank of Zillheb.. ezportera. Zimbabwe

Minintry of About (R) Rural financial Service• - Project deferred. Land, Agricul- 20.0 Develo.-.nt of rural financial further reportiq vill ture and Rural (lank) inatitution•, ..viq• oraaai•a- be di•coatiaued. Reaettleaent tiona, etc., iacludiq continued (IILARR) aupport for the .&ariculturel riaaace Corporation.

Reaerve Bank of About (R) Dre I - Line of Credit to Ho deci•ioa aede whether Project under Zimbabwe (RIIZ) I 30.0 . Ziabeb.. Developaeat lank and coaaulteata vill be preparation. and Zimbabwe (lank) other financial iaatitutioaa. required. Development Bank (ZDB)

Ministry of About (R) Manpower Developaeat - Technical Ro deci•ioa made whether Project under Labor, Manpower 40.0 education; vocational training; coaaultaata vill be preparation. Development and (Bank) and aeaageaent training. required. Social Welfare (HLIIDSW)

Ministry of About Highway• II - reeder roada; No deci•ion made whether Project under Trmnsport so.o ro•d• rehabilitation; •ad conaultant• vill be preparation. (lank) training. Total project coat required. e•tiaated at $80.0 million. REGIONAL But African About Dl'C III~ Continuation of aup- No conaultanta required. Project under Development Bank 10.0 port through a third line of preparation. (IDA) credit, vith emphasis on region- al project•.

See page 1 for footaotaa. .-U.oe Member Country, Aaount. and Iapleaentina Probable lltaa• of ProceHina and ~l! ~y Coaaulti111 ler.lc.. .ktion on Procur-t y

II. BIITIIII Anl~

,~ Coaaultanta haft bean Approved by the llxecutive Miniatry of 15.0 Public lnterpriaea - PrOYide Ju•tice in (IDA) atudiae, line of credit, techni­ recruited for atudiHo Director• on Jun• 9, Charge of State cal aoaiatance and traini1111 to lnterpriae certain kay atate enterpriaea. An IDA Project Prepara­ Inopection Total project coat eati.. ted at tion Pacility advance of $23.0 •illion, of which $15.0 $1,0001000 haa been ap­ million in foreian axchana•• proved to help finance project preparation,

Office dee 7.5 Telecoaaunicationa - Rehabilita­ Conaultanta are being re­ Project under prepara­ Po•teo et des (IDA) tion and expanaiOD of local tel­ cruited for atudiaa. tion, Telecommunica­ ephone netvorka, and technical tiona aaaiotance to the Office dea An IDA Project Prepara­ Poatea et Telecoaaunicationa du tiOD Pacility advance of Benin. $500,000 haa been ap­ proved to help finance project preparation.

Ministry of 19.5 Transport Infraotructure - Road• Conaultant•' report OD Appraiaal report being Transport and (IDA) and Ports rehabilitation and preli•inary deaign com­ prepared, (Cofinancing Equipment maintenance; institution buil­ pleted. Tender document& agreed vith BOAD, l!DP, ding, training and tranaport beina prepared, and PAC, Cofinancing planning atudiea. Total project vith CCCI, OPEC, IaDB, cont about $56.2 million, of and l.uwait Pund to be which $40.0 million in foreign confirmed.) exchange. IDA Project Preparation racility advances total­ ina $980,000 have been approved to help finance project preparation.

Societe 10.0 Water II - Ezpanaion of urban Conaultanta for detailed Approved by the Executive Beninoise (IDA) water eupply facilitiea in atudiea and tender Directora on Juae 30, d'Electricite et Cotonou, and Porto llovo. Re­ docuaenta aelected. (Cofinancing vith CCCB d 1Bau (SBEE) inforcellU!nt of SBEB'a aanagerial (Financed under ongoina for $10 •illion, IaDB for and financial capabilitiea. eD3ineering credit), $4.5 •illion and OPEC for Total project cont about $33.0 $2,7 •illioa beina million, of which $23.7 million Technical aaaiatance confirmed,) in foreign exchange. conaultanta to be aelected.

Ministry of 18.0. Phase II Borgou Province Rural Conaultanta vill be Appraiaal report under Rural Develop­ (IDA) DevelopllU!nt - Cotton and food­ required for varioua preparation, (CCCB and ment and crop development through input atudiee and aaaiatance in IPAD have expreaeed in­ Cooperative aupply, expanaion of draft cul­ _financial manaa-nt, tereat in cofinancing,) Action, Centre tivation, credit for purcha•e of d Action llegion­ inputs, oxen and draft equip­ al pour le ment, increaaed local production Developpe11U!Dt of ox-drawo equipment, foodcrop Rural (CARDER), storage at farmer•' level, and Societe the strengthening of CARDER and Rationale pour SOIIAPIA'o adminiatrative la Proaotion de aervicea. Support for l 'Agriculture atabili~ation of cotton (SOIIAPRA) eubaector. BllllltIIIA PASO

llegie Abidjan­ To be Railwaya II (Tranaport Sector Conaultanta to aaaiat Project proceacing awaitn lliger (RAIi) / deter­ Credit) - IDA funda would help with procure:aent.of apare diacuaaiona on tranaport Minbtere du mined finance Ci) repayment of parta and for project aector vith Government Tranoport et deo (IDA) Burkina'• arrear• to RAIi a• part preparation, and clarification of IIA!l Communication• of a financial rehabilitatiOD etatua follavJD3 Cote plan, (ii) Burkina'• ahare of d'Ivoire'• recent indic­ railway• project coat, and (iii) ation to aplit the IIAR, other investment• in traneport aector.

Miniatere de la 10.0 Technical Aaaiatance - latab­ Conaultanta will be re­ Project proceaai111 depen­ Planification et (IDA) liahment of DevelopllU!nt Inveat­ quired to help prepare dent upon Govarnaent'a du Developpeaent uent Budaet and aanietance in and execute project, broad aareeaent on in­ financial manaaeaent to vaataent prioritiea and atrenathen inveataent budaet­ financial reatructurina ina and aODitoring development which are under active expanditurea. Total project diacuaaion. coat eatimated a~ $13.0 aillion.

See page 1 for footnotea. - 14 -

Member Country, Amount I, and Implementing Probable Stage of Processing &no ~y Lender ·y Con1ulting Service, . Action on Procurement ~

BURKINA FASO (Cont'd)

Ministere de 20~0 (R) Highway, V - Upgrading of the Con1ultanta will be re­ Project proceeeing depE l'Equipement (IDA) Ouagadougou-ltaya-Dori road and quired. dent upon resolution ol improving the ltaya-Dori road to transport sector i.-oue1i all weather 1tandards. Total which are under active coote are eati111ted at $60.0 diacuaaiona with the. million. Government. (The Itdi Govermnent has agreed I finance all-weather gravel road between K&J Dori. KfW Germany has allocated DH.38 IDillion for Ouaga-Kaya road.)

Ministere.de 25.0 (R) Agricultural Research - Streng­ Consultants will.be Appraisal mission sche• l'Enseignement (IDA) 'thening of Burkina In1titute for required. uled for October. et de la Agricultural and Zoological Recherche Research (IBRAZ), improving IDA Project Preparatioo Scientifique production •yateme, development Facility advance of of research, infrn8tructure, $275,000 approved to fl strengthening of linkage between ance research advisor a research and extension servicee. workshop/seminar. An additional advance of $225,000 approved to continue preparation activities.

Ministere de 20.0 (R) Urban II - Financial and human Consultants provided by Appraisal mission l'Adminietration (IDA) reaource mobilization for Consortium BCEOM/Groupe scheduled for Territoriale et Ouagadougou and Bobo Dioulaaeo Huit are already in place September/October. de la Securite to improve (a) tax collection; carrying out feasibility (b) urban municipal management study. IDA Project Preparation and resource allocation includ­ Facility (PPF) advance ing civil works and detailed $500,000 approved to engineering. Total project coat finance preparation act estimated at $15.0 million. ivities for Urban II an a pilot maintenance pro gram of existing infra­ structure.

Minietere de 20.0 (N) Agricultural Extension - To be determined. Preparation und_er way. l'Agriculture et (IDA) Strengthening of agricultural de l 'Elevage support services at national level.

CAMEROON

Mini9tere de 30.1 (R) Education and Vocational Train­ Consultants'Proposals for Loan signed on July 10. l'Education (Bank) ing - Expansion of primary vocationel training comp­ Rationale et teacher training college,; reha­ onent to be evaluated in Ministere du bilitation of technical aecond­ Auguot. Travail ary schools. Improvement of vocational training capabili­ ty. Strengthening of key insti­ tutions responsible for educa­ tion and manpower planning. Total project coat about $61.2 million, of which $32.6 million in foreign exchange.

Ministere de 16.5 (R) Agricultural Research - Improv­ Technical staff will be Completion of.appraisal l 1Enseignement (Bank) ing scope and application of required for research report postponed pendi~ Superieur et de national agricultural reeearch programming and resolution of sector la Recherche through institution building in­ management. investment iaeuee. Scientifique volving The Ministry of Higher Education and Scientific Re­ Con•ultants will be search, and crop and live1tock required to.assese research in1titute1. Particular specific technical and emphasis on training, organi­ financial probleme, and zation, evaluation and building for training. pre-extension linkage• to re­ gional research and develop­ ment. Total project coat about $41.0 million, of which $21.3 million in foreign exchange.

See page 1 for footnotes. - 15 -

Member Country, Amount & and Implementing Probable Stage of Proceaeing and ~l! ~y Conaultiog Service• Action on Procurement 4/

CAMEROON (Cont'd)

Minietere de 75.0 Cocoa Sector Rehabilitation - To Conaultanta will be Appraisal report 1 'Agriculture & (!lank) establiah the baaia for a dyna­ required for export being prepared. Societe de mic cocoa induatry in Cameroon, atrategy, -technology Developpement du to illprove the balance of pay­ development and monitor­ Cacao (SODECAO) ments by increaaing cocoa ex­ ing and evaluation. port•, and improve rural incomes and living conditions.

Ministere de 19.3 Technical Teacher Training - Conaultanta will be Appraisal report being 11Enseignement (Bank) Increasing the output and im­ required for workahop prepared. (Cofinancing Superieur et de proving the qualification• of organization and being sought.) la Recherche technical teachers. Improving maintenance and for Scientifique planning and management of education planning and reeourcea. ·project 11&nagement.

Ministere de 115.0 (R) Douala Infrastructure - Removal Consultants have sub­ Negotiations planned for 1 1 Urbanisme et (Bank) of major infrastructure cona­ mitted feasibility stu­ early September. de l'Habitat trainte in Douala through dies for roads· and for traffic management plan, rehab­ drainage. Contracts for ilitation and construction of detailed engineering primary and secondary urban studies have been agreed. roads, improvements and cons­ truction of major storm drains, institutional strengthening for efficient operation end main­ tenance of urban transportation end drainage syotem. Total project coat about $240.0 mil­ lion, of which $115.0 million in r foreign exchange. Ministere de 25.0 (R) National csdaetre project - Aims Consultants will be Appraisal mission ) l'Urbanisme et (Bank) to extend secure land ownership required for project scheduled for October. '( de I 'Habitat to urban dwellers. Project implementation and element• include: geodetic net­ technical aeaistance. work for the whole country, aer­ ial photographs at various scales; equipment, material, vehicles and facilities for the services and technical assis­ tance and training programs. CAPE VERDE

Ministry of 7.0 (R) Basic Education Development - Technical assistance (yet Appraisal mission National (IDA) Support of basic education to be determined) expect­ tentatively scheduled for Education development and strengthening of ed to be required. October. education administration. CENTRAL AFRICAN REPUBLIC

Ministry of 10.0 (R) Education Rehabilitation - To There will be a need for Pre-appraisal mission Education School (IDA) assist in a structural ad­ technical assistance in­ returned on July 12. Building Service justment of the sector and cluding project prepar- Preparation continuing. and Maintenance promote improvements in the ation. · Service of internal efficiency and man­ School Building agement of education, partic­ (SCEBS) ularly at the primary level.

Ministry of 14.0 (N) Structural Adjustment Lending in To be determined. Negotiations completed. Planning, (IDA) support of the CAR's economic Statistics and 16.0 reform and atabilization pro­ Cooperation (SAF) gram; etrengthening economic management and planning; im­ proving resource allocation proceduree; civil service reform of key Minietriea; trade liber­ alization; review of producer prices; closure or diveatiture of certain paraatatal•; supply reaponaea in the productive sectora.

Ministry of 10.0 (R) Rural Fund II - To help finance To be determined.· Identification under Agriculture and (IDA) amall-ecale rural development way. Rural Devel­ schemes and atrengthen Chadian opment (MADR) institution• involved with rural development.

See page 1 for footnotes. - 16 -

Member Country, Amount & end Implementing Probable Stage of Proceaaing anc ~ll Lender Y Conaulting Servicea Action on Procurenent ~

CHAD (Cont'd)

Ministry of 18.0 Agriculture Rehabilit·ation Technical asaiatance Appraiaal report Agriculture and (IDA) Project - Central objectivea peraonnel for• (1) atrat­ under preparation. Rural Devel­ involve the development of egy planning in key opment (MADR) agricultural inatitutiona and departmenta; (2) aub­ pilot actions and atudies to aector etudiea. ezpand crop production.

Ministry of 66.0 (R) Agriculture Sector Project - To be determined. Pre-appraiaal mioeion Agriculture (IDA) Strengthen and improve the scheduled for Septembe, and Rural organization and management of Development the MADR with specific targets (MADR) to: (i) increase the quantitien and reliability of food crop production; and (ii) improve the efficiency of cotton production.

Ministry of 20.0 CR) Highway Maintenance - Mainten­ Consultants will be Approved by the Bzecuti Public Works, (IDA) ance of recently rehabilitated required for transport Directors on July 29. Mines and priority infrastructure and sector planning, road (Cofinancing arranged Geology equipment, and development of network management and with AfDF for $7.2 maintenance capacity in road planning, equipment million.) sector. Total project coat management, aupervioion estimated at $29.8 million, of of work and training. which $22.6 million in foreign exchange.

Office National 30.0 Road Rehabilitation and Maint­ To be determined. Project being prepared. dee Routes (IDA) enance - Rehabilitation of (OFNAR) transport sector infrastructure and related institution building.

Cotontchad ·1s.o CR) Cotton - A two-year program Consultant has already Credit signed on July (IDA) credit to support a firot phase been selected as Project 18. Ccofinancing with rehabilitation of the cotton Coordinator. Consultants FAC for $0.8 million, sector. Total project cost will be needed for CCCB for $15.6 million, about $47 .4 million, of which studies. EDF for $13.7 million a $39.S million in foreign the Netherlands for ezchange. $2.3 million.) Ministry of 42.0 CH) Petroleum Project - To support To be determined. Appraisal mission Planning and (IDA) implementation of a least coat scheduled for November. Reconstruction product supply system and pro­ vide technical assistance to strengthen the Government's management of the petroleum sector.

CONG0 1 PEOPLE'S REPUBLIC .2!...!!!! Hinistere du 15.0 (R) Agriculture Sector Project - Consultants likely to be Project appraisal await, Developpement (Bank) Hain components to include required to provide outcome of macro-economl Rural selected sectoral reforms, rural technical assistance diacueaions with Govern· roads, marketing, and during implementation. ment. agricultural research.

To be so.o (R) Public Enterprise Reform - Consultants required to Appraisal contingent on determined (Bank) Support for rationalization and assist Government in for­ successful implementatic reform of public enterprise sec­ mulation of reform plan of Goverllllent Stabil­ tor. and for project implem­ ization Program. entation.

Office of the 4.0 CR) Technical Aeeistance II - To be determined. Negotiations in early Prime Minister (Bank) Project deeigned to oupport August. Government adjustment program. COTE D'IVOIRE

Regie Abidjan­ 30.0 Railways II - Rehabilitation of Consultants may be re­ Project proceosing await Niger (RAH) (Bank) Rolling stock, consulting ser­ quired to provide tech­ outcome of discussions vices and training. nical assistance in key of tranaportation sector management poaition. with Government and clarification of RAH atatus following Cote d'Ivoire'• indication to eplit RAH (see under Burkina Faso).

See page 1 for footnotes. - 17 -

!lember Country, Aaount • 1and Iaplementing Probablf) Stage of Proce••ins and ·~!/ ~y Conaultiug Service• Action on Procurement Y

\COTE D'IVOIRE (Cont'd).

IHinutry·o • • f 34.-0 (R) Agricultural Ezten•ion Project - Con•ultant• will be Negotiation• •cheduled IAgricul ture; (Bank) Iaproving eztenaion •ervice• in required for •tudy for Augu•t 26, Ministry of three aain ezten•ion agencie• and a••istance in ClDT, SATMACl and SOD!PALM, financial ..nageaent, [:~:! :e..:elop- 1Minie try of !scientific •Research

To be determined 250,0 Structural Adjustment Loan (SAL) Ho con•ultante required Approved by the Ezecutive (!lank) 1Il - Further support to Govern­ at this time, Directors on June 3, · ment's progr11111 of economic policy reform.

Ministry of 30,0 (R) Agricultural Research - To cre­ Requirements not yet Project preparation Scientific (Bank) ate a new institutional frame­ defined, completed with usietance Research work for research, Project from PAO/Bank Cooperative would emphasize ezpan1ion of Progrm:i, food crope and farming ay•tema reeearch and consolidation of tree cropo reaearch.

Ministere dea 115,0 (R) Urban 11I - (e) aaaistance to: Consultente will be Negotiations tentat­ Travaus: Publics; (Bank) (i) re-orient the policies end required for studies end ively scheduled for and Ministere de programs of the public sector technical aaaietance. October, (Cofinancing la Construction housing and land servicing agen­ with AID for $10,0 mil­ et de l'Urbanisme cies; and (ii) introduce lion,) mechaniams to provide long-term resources to encourage private aector finance for housing and for households; and (b) finen­ cing of complementary inve1t­ menta required to make opt,imal use of infraotructure and public transportation facilities finan­ ced under the on-going second project. Total project coat estimated at $270,0 million,

Port Autonome 9,5 Port rehabilitation - Improve­ Consultants will be Project being prepared, d'Abidjan (PAA) (Bank) ments to ezieting port facil­ required for p~oject ities end institution building, preparation, for improve­ ment in management, oper­ atione and planning, and for carrying out tech­ nical studies.

Societe 13.0 (R) Rubber V - Planting additional Consultants may be Appraisal report Africaine de (Bank) outgrower rubber on •mall- and required for land use being prepared. Plantations medium-oize holdins• and ez­ murvey. d'Heveas tendins a nucleus estate; main­ (SAPH)/Minietry taining into production rubber of Agriculture planted under projects Ill & IV; land use survey of tree crop development in the Southwest,

Ministry of 17.0 (R) Education IV (Renovation) - Technical assistance Appraisal mission National (Bank) Improved uoe of educational would be required to completed, Proceasing Education resource• through renovation and supervise renovation, temporarily suspended upgrading of institutions and­ maintenance and acience while implications of new facilities. components, and will also ministerial changes are be needed for planning determined, and general fin&nce administration.

Ministry of Eco­ 150.0 (R) Agricultural Sector Loan - To Requirements not yet Project being prepared. nomy end Fin­ (Bank) con•olidate, and in the future defined, ance; Ministry expand, atructural adjuatment of Agriculture, refo....., mainly in the field of end Minbtry of agricultural •ector pricing Rural Develop­ policy and in•titutional ment improvements,

Miniatere de - - 20.0 Municipal Development - Country­ Conaultants required for Project being prepared, 11 lnterieur - (Bank) wide 1trensthening of local project implementation Direction dee govera,aent in•titutiona through and technical aaei•tance, Collectivite• technical aaei•tance to Mini•try Locales of Interior; creation of a municipal develol""8nt fund, and implementation of urban infra­ etructure works in •elected citiea,

Bee page l for footnote•. - 18 -

Member Country, Amount & and Implementing Probable Stage of Proce•aing and ~!/ Lender y Con•ultina Service• Action on Procureaent 4/

EQUATOllIAL GUINEA Ministerio de 3.0 (R) Primary Education - Improvement To be detenoined. Apprai•al aiaoion took Educacion y (WA) and ezpan•ion of the primary place in June-July. · Deportee education ~ub•ector; •trength• Apprai•al report being ening of education admini•tra• prepared. tion aa 11 prerequisite for further educational development.

THE GAMBIA

The Gambill 5.0 (R) WP II - Line of Credit for re­ Con•ultante for project Project preparation •tar· Commercial and (IDA) atructuring some exinting enter­ preparation financed by ted with a private eectot Development Bank priaee, and new inveetmente in the Project Preparation development review mis­ (GCDB) vnrioua sectors, technical Facility. sion in February. assistance and extension aer­ vicea to enterprise support mA Project Preparation agencies and entrepreneurs as Facility advance of well as for GCDB for restruct­ $450,000 approved to uring and •trengthening ito finance banking con­ financial base and operations eultant services and cap11bilities. Total project overseas training for coat estimated at $12.0 million, GCOB ataff. A consultant of which $10.7 million in study of technical as­ foreign exchange. sistance needs and design of institutional arrange­ ment for delivery of extension services to private enterprises and inatructional aids for local training. The Gambia 7.0 (R) Water Supply/Electricity Project Consultants for detailed Approved by the Executive Utilities (IDA) - Rehabilitation and expansion engineering design have Director• on July 8. Corporation of water supply systems in been selected. Con­ (Cofinancing with ADP for (GUC) Greater Banjul and provincial sultant for technical $4.0 million, EDF for urb11n areas. Banjul electricity · assistance and training $2.6 million, IDB for system rehabilitation, technical will be required. $4 .O million.) aosiatance and training. Total project cost estimated at $19.4 million, of which $15.1 million in foreign exchange. Total project cost 11bout $19.4 mil­ lion, of which $15.1 million in foreign exchange.

Ministry of 5.1 (R) Population, Health and Nutrition Consultants for project Appraisal report being Health, Labor (WA) Project - Strengthening of fami­ preparation financed by prepared. (Italy and the and Social ly pl11nning, health, and nutri­ the Project Preparation Netherlands have ex­ Welfare tion facilities through financ­ Facility. pressed interest in co­ ing of drugs, rehabilitation, financing.) acquisition of essential equip­ ment, nurse training, improve­ mA Project Preparation ment in communications infra­ Facility advance of structure. Total project cost $400,000 approved to e•timated at $18.2 million, of finance consultant which $15.8 million in foreign services to complete exchange. necessary preparation studies and detailed plans.

Ministry of 5.0 (R) Structural Adjustment Credit. - To be determined. Board presentation Economic (IDA) Support to the Government's scheduled for August Planning and 11.5 recovery program. Total program 26. (Cofinancing Industrial (SAF) coot estimated at $30.0 million. confirmed with UK for Development 4.5 $4.5 million under Spe­ (SJF) cial Joint Financing, and AfDF for $9.0 mil­ lion.)

Ghana Cocoa 15.0 (R) Cocoa III - Comprehensive . To be determined. Project preparation Marketing Board (IDA) rehabilitation of cocoa under way. industry, including assistance for di•ease control, cocoa research, planting of hybrid• and further institutional work. Total project cost e•timated at $20.0 million.

See page 1 for footnote•. - 19 - Amount 6 and Implementing Probable Stase of Proceaaing and ·~yL-~. ~y Conaulting Service• Action on Procurement 4/

IGIIAHA (Cont'd)

)office of the 20.0 Public Enterprise• Rehabilita­ Bzternal conaultanta Project scope to be dia­ cuaaed with Government. 1Chairman, (IDA) tion - Inntitutional and policy have coapleted prepar­ ·Proviaional reforms to improve perforaance ation atudy. Other con­ (Cofinancing will be re­ :National Defense of the public enterpriae aector, sulting aervicea to be quired.) Council and rationalization of aise determined with Govern­ through diveetiture. Total l!lllnt. IDA Project Preparation project cost estimated at $20.0 Facility advance of million. $400,000 approved to finance consultant ser­ vices and certain equip­ ment required to complete preparation work. UHDP is also contributing $308,000 to finance their preparatory work of Phase I.

GBAIP 10.0 Refinery and Distribution Rehab­ Conaultants are likely Appraisal report Ministry of (IDA) ilitation - To rehabilitate end to be required but being prepared. Fuel and Power improve Tema Refinery and the details ere still to be transportation and distribution worked out. of petroleum products.

Ministry of 30.0 (R) Education Sector Adjustment Bud­ Consultants will be Negotiations in early Education (IDA) getary Support for implement­ required for school September. (British.ODA, ation of 1987-89 structural re­ location planning, and AFDB, WFP and UHDP have forms in educational ayStB11 and universities rational­ expressed interest in policy changee in financing of ization planning. cofinancing. A special education. sector. Total project donor's meeting to seek cost about $55-70 million. additional assistance is ·planned for end-September in Vienna.)

IDA Project Preparation Facility advance of $300,000 approved for consultant services and other essential project preparation work.

Ministry of 30.0 (R) Structural Adjustment Credit - To be determined. President's Report being Finance and (IDA) Reform of incentives, partic­ prepared. (Germany, Economic Plan­ 75.0 ularly through trade liberal­ Canada and UK expressed ning (SAF) ization and cocoa producer interest in cofinancing.) prices; financial aector re­ formo; atreng~hening the econo­ mic management capabilitiee of key government institutions, improving the allocation of resources through formulation of a 3-year public expenditure program; monitoring of atote enterprise.

Ministry of 4.0 (R) Technical Assistance in Support To be detennined. President's Report being Finance and (IDA) of Structural Adjustment prepared. Economic Program. Planning

Ministry of 27.0 (R) Agriculture Sector Adjustment - To be determined. Appraisal mission sched­ Agriculture (IDA) To e~siot in rehabilitating uled for October. (ADF Ghana'• food and industrial expressed interest in crops. Total project coat possible cofinancing, estimated at $80.0 million. for $20.0 mil1ion and KfW (Germany) for DM 16.0 mil­ lion.)

Volta River 10.8 (R) Northern Grid Ezteneion - Re­ To be determined. Appraisal report being Authority (IDA) inforcement and extenaion of prepared. (Cofinancing Volta River Authority (VBA) confirmed with AfDB for Tranamioaion Grid to Northern $38.0 million, CIDA and Ghana with related distribution. BIB expressed interest.) Ministry of 20.0 Transport Rehabilitation - Im­ To be determined. Project preparation Transport and (IDA) provement of tranaport aector under way. CODDunications policy; rehabilitation and im­ provement of tranaport service•, infrastructure and inatitutiona.

See page 1 for footnote&. - 20 - Kembar Country, Aaount I and Impleaenting Probabla Btaae of Proceaaing ·and .Y!!.Sil! .!:!!!m.Y Conaultiaa Sarvicea Action on Procurement ~

llinietry 9,8 CR) LiYeatock Sector Rehabilitation · Loq-tera conaultanu to Approved by the l!zecutive of Burd (mA) Davalopaant Projact, Proaraa to be financed by CCCI and Director• on July 8, Development iaprova aniul health, veter­ PAC, Som, ahort-ten:i (Cofinancing vith CCCI! inary aarYicae and aupport to conaultant• vill be for $3,8 •illion; PAC for harder•, Total projact coat required for warioue $1,4 million and IIADl!A about $22,2 million, of which atudiea, for $4,5 •illion,) $19,2 •illion in foreign ez­ chaqe, mA Project Preparation Facility advance of $465,000 to finance project etart-up.

Ministry for 15,0 (a) Second Water Supply Project, Conaultante for prepar­ Appraisal miaeion sched­ Natural (IDA) Rehabilitation of operationa and ation •elected, financed uled for April 1987, llenourcea, water aupply ayateu. lzpanaion under the Project Prepar­ (Cofinancing vill be re­ Energy, and the of Conakry and aecondary center• ation Facility Advance. quired,) l!nvironment facilitiea, Conaultant report ezpec­ ted in September. mA Project Preparation Facility advance of $400,000 to finance inventory of customers, inveatzaent program, water tariff, legal framework preparation, ae well as preparation of terma of reference for the private partner to be twinned to the ezisting vater authority, Secretary of 20.0. (R) Tranaport Sector - Rehabil-. Conaultante for prep­ Appraisal misaion eched­ State for Trana­ (IDA) itation and 11aintenence of aration selected, fin­ uled for January 1987. port tranaport aector, including anced under PPP advance, port• and airfield•, IDA Project Preparation Facility (FPF) advance of $515,000 approved for aqo.aultant services in project preparation, including institutional reforms of port•, pe­ troleum products diatri­ bution, and airport oper­ ationa.

Ministry of 11,0 Rural Health Project - Quant­ Conaultanto for prepar­ Appraisal mission Hedth and (IDA) itative and qualitative i.ia­ ation· selected, scheduled for October, Social Affairs proveaenta in rural health ayat1111 and development of family mA Project Preparation planning aervicea vith primary Facility advance of health care, $800,000 to finance pr­ eparation neaistance (technical coordinator, architect, epidemo­ logist), equipment end vehicles,

Secretariat 7,0 (R) Reorganisation of Poat and Tele- To be determined. Identification report of State for (mA) cC11111UDication1 Sector - Progr!lll under review. Telecom- for atrengthening nev entities munication• to ..nage and operate the aec- tor, program for rehabilitation of local end trunk network, vehicle• and aiacellaneoua equipaent, GUINl!A-B IS SAU

Ministry of 3,0 (R) Inatitutional developaent in Consultant• required for Negotiatione echeduled Rural Devel- CmA) agricultural eector planning; adviaory aervices in pro- for September. opmnet and apecific formulation of ject adminiatration, inveataenta. planning, foreatry, fieheriea, animal production, fruit prod- uction and irrigation. Ministry of 2,0 Aaricultural input• to the rural Preparation report Project proceesins Planning (IDA) aector linked to policy refol:lllll, coapleted by conaul- poatponed pending 5,3 tanta. aeeeaament of refor11a (SAP) under vay.

See page 1 for footnotaa, ... 21 -

Mellber Country .Amount 6 and Iapleceatiag Probable Stage of Proceaai1111 and ~!/ Lender :Y Coaeultina Service• Action on Procurement !!/

Miaietry of 10.4 Structural Adjuetllent Credit to Technical aeeietaace to Will require reappraiaal. Finance (li>A) bring about an improveaeat of be provided under eep­ the Govermoent'• fiecal perform­ arate IDA credit. ance in the quality of ita in­ vestment program, in the effi­ ciency of public eaterprieea and in export performance.

Ministry of 3.3. Technical Aaaietaace in eupport Coneultante for technical Will require reappraiaal. Planning and (IDA) of structural adjuutment pro­ aeointance to aev Bureau (Cofinanciag with UNDP Economic Affair• gram. Total project coat about of State Enterprise• have for $0.4 million envis­ $3.8 million, of which $3.3 mil­ been eelected and term• aged.) lion in foreign exchanse. of reference and con­ tract• are being negotia­ ted.

Ministry of 5.1 Population and Health - To help Consultant to be Appraisal report being Planning end (IDA) develop a national population appointed by the reviewed. Economic policy end program and strens­ Governnent. Affairs; and then the health oervice delivery IDA Project Preparation Ministry of support ayeteme. Total project Facility (PPF) advance Health nod cost estimated et $5.6 million, of $300,000 approved. Social Welfare of which $3.2 million in foreign exchenge.

Miaiatere de 1S.O (R) Office du Niger II - Strens­ Consultants vill be re­ Appraisal report beins 1 1 Agriculture (IDA) theaing and rehabilitation of quired for aaoietance in prepared. (Cofinaacins 20.0 Office du Niger. Total project project implemeatetioa, with XfW Germony for (SAF/ cost estimated at $67.3 million, and in financial $16.0 million, and SJF) of which $47.3 million in for­ restructurins of the CCCE for $20.0 mil- · eign exchange. Office du Niger. lion confirmed, The Netherlanda hae expreoaed intereat in poasible cofiaancing.)

An advance of $1,500 0 000 under the IDA Project Preparation Facility approved for the fin­ ancing of technical assistance, training program, mapa and studies.

Miaiatere du 14.9 (R) Public Entreprieee - Rationali­ Consultants to provide Negotiations au6stan­ Plan (IDA) zation of the oize of the public overall advisory services tially completed. 25.0 enterpriee sector to reduce bur­ to Bureau de• Eatreprisea (SAF/ den on Mali'• economy; policy Publiques have been sel­ An advance of $992,000 SJF) and institutional reforms to im­ ected, and proposals for under the IDA Project prove the performoace of the specific aspects of proj­ Preparation Facility public enterprise sector and ect preparation have been approved for the finaac­ financial restructuring of the received from abort­ ins of studies and audit• sector. Total project cost listed firms. Consul­ of public eaterprisee to estimated at $147.5 million of tants will also be re­ be cloeed, rehabilitated which $83.B million in foreign quired to assist Govern­ or transferred to the exchange. ment in project implem­ private sector for the entation. proposed public enter­ prise project. A second PPF advance of $508,000 and a SPPr of $318 0000 have been approved.

Energie du Mali 20.3 (R) Power II - Policy and institu­ Coasultsats have been re­ Appraisal miosioa eched­ (EDM) (IDA) tional reforllB, and financial cruited to prepare the uled for September. 15.0 restructurins, to improve per­ atudies uad~r onaoing ( CIDA, KfW (Germany) , (SAF) formance of the energy sector. Power Project. Coneul­ OPBC Fund, DIGIS, AfDB, Reinforcement and extenaion of taato will be required to CCCB, and BIB have been the service• of EDM by cone­ provide technical asaio­ approeched for cofiaan­ ·tructins a tranemissioa line taace, including addi­ cing. Auetria has between Bamako and Segou;.re­ tional otudieo. expreeeed intereat.) inforcement and eEtenaion of distribution eystem, rehab­ ilitation of Felou and Sotuba Hydro plant•, technical aoois­ tance trainins, spare part• and studies. Total project coet about $62.5 million, of which $59.0 million in foreign es.change.

See page l for footnotes. .:. 22 -

Member Country .Aaount , and Implementing Probable Stage of PrQceasing and ~ll ~-!I Conaultina Service, Action on Procurement Y

~ (Cont'd)

Minietere du 60,0 (ft) SAL - Macro/1ectoral policy re­ Con1ultant1 have been A public expenditure Plan (I!)A) folCIII addre1aing 111nage11ent of eaployed to a11i1t in review i1 scheduled for public re1ource1, the 1tructure public expenditure diacu1aion in October. of 111cro incentive, and agric­ review, Additional Appraiaal will be sched­ ultural policy frlllt!Vork. conaultant 1ervice1 uled when action baa been likely to be required at taken on reforms being appraisal stage, supported by proposed Public Enterprise and Office du Niger Credits.

MAURITANIA

Ministere de 10.0 (R) Development Management - Tech­ To be determined, Preparation under way. l'Economie et (IDA) nical aneiatance to key Govern­ Appraisal mission tentat­ des Finances ment agencies to aid in implem­ ively scheduled for entation of economic recovery Sept/Oct, (Cofinancing progr11111 and to initiate reform needs to be determined,) of public administration, IDA Project Preparation Facility advance of $500,000 approved for financing of studies and technical assistance.

Ministere de 5,0 (a) Structural Adjustment Credit - To be determined, Appraisal mission in the l'Economie et (IDA) Support to Government's recovery field, des Finances 28,0 program. Total project cost (SM') estimated at $33.0 million in foreign exchange,

Ministere du 10.0 Small Rural Operations - Small­ No decision made whether Preparation under way by Plan (IDA) scale irrigation sad bottomland con1ultants will be re­ FAO/CP. development schemes; cooperative quired. and group 1upport activities; Financing to help prepar­ medium term loans to farmers. ation was provided for Total project coat estimated at by an advance of $430,000 $12.0 million. from the IDA Project Preparation Facility; Ministere de 17.9 Primary Education Development - Consultants in textbooks, Negotiations tentatively 11Educstion (IDA) Expansion and rehGbilitation of editing and publishing, scheduled for September. primary achools; education plan­ in project management and (Cofinencing with KfW ning, textbooks, teacher train­ ayatema analyaia will be Germany for $1,4 million, ing and institution building, required. and Norway for $4.5 mil­ Total project cost estimated at lion confirmed.). $25,3 million, of which appro­ ximately 65% in foreign ex­ change,

Ministere de 15.0 (R) Public Enterprise Rehabilitation Consultant was selected Preparation under way. Tute lle des· (IDA) - Policy and institutional re­ to design and implement Entreprises forms to improve the performance public enterprise reform IDA Project Preparation Publiques of the sector; and rehabilita­ m.eaeure1. Facility advance of tion of selected public enter­ $500,000 approved to fin­ priae1. Total project cost ance start-up, studies of eutimated at $36,7 million, enterprises and audits.

Ministry of 15,0 (N) Water Supply II - Extension of Consultant to be re­ Pre-appraisal mission Hydraulics and (IDA) assistance to the nev water au­ cruited to provide tech­ scheduled for end­ Environment thority and to the'Ministry of nical assistance to the September, (CCC! has Hydraulics for rural water sup­ water authority and the expressed interest in ply policy reform, Expansion of Ministry. cofinancing.) Niamey water supply. Total pro­ ject coat e1timated at $37,0 million, of vhich $22,0 million in foreign exchange,

Societe 20.0 (N) Energy - Continuation of finan­ Consultants will be re­ Appraisal mission sched­ Nigerienne (IDA) cing priority investments in quired for di1tribution uled for November. d'Electricite energy uector. Total project and tranami1eion studies (Belgium has expressed coat estimated at $34,0 million, as well aa land manage­ interest in cofinancing.) of which $33,0 million in for­ ment/energy conversation eign exchange, atudy.

See page 1 for footnote&, - 2.3 -

Member Country Aaount, and Implementing Probable Stage of Proceaaing and ~1./ ~y Conaulting Service• Action on Procurement 4/

Federal Ministry 25.0 Ca) Southern llorno Agricultural Dev­ Short-term consultant Approved by the Ezecutive of Agriculture, (!lank) elopment - Fana aupport aervicea service& would be re­ Directora on July 15, Water Reaourcee and general rural infraatructure quired in areas of inter­ and Rural Devel­ ailled at crop and liveatock dev­ mediate technology, Procure11ent: Retroactive opment elop111ent, Total coat eatilllllted amall-scllle irrigation, financing up to $1 mil­ at $39,3 million, of which $2.0.3 land uae planning, train­ lion recOl!il!lended to cover million in foreign exchange. ing, and maintenance of et11rt-up activitieo. feeder roads and rural water auppliee. Other consultant services to be determined.

Federal Miniatry 71,0 Foreatry II - The project will Con1ultanta will be re­ Awaiting final of Agriculture, (Bank) (1) aupport an afforestation quired for post planting agreement. Water Reaourcec, prograa; (2.) establiah pulpwood management. and Rural Devel­ and tillber plantation•; and pro­ opment vide support to forest manage­ ment in three middle belt state,. Total project coat estimated at $110.7 million, of which $41.4 million in foreign exchange,

Federal Minietry 162.0 Kulti-atate Agriculture Develop­ Consultants services Approved by the Exec­ of Agriculture, (Bank) ment Project - Phased financing would be required for: utive Directors on Jurie Water Resources of agriculture development pro­ (i) agricultural planning 26. (Cofinancing with and Rural Devel­ ject•, in seven couthern states. data atudiea; (ii) food IFAD for $12..0 million.) opment Total coat estimated at $256.4 co-op marketing study; million, of which $143.6 million (iii) water supply feas­ Procurement: Retroactive in foreign exchange, ibility atudy for seven financing of about $16.0 state• and (iv) prepar­ million proposed for fin­ ation study for oecond ancing start-up activ­ phaee of project. ities.

Federal Ministry 81.0 Ca) Second Livestock Development - Consultants will be re­ Approved by the Executive of Agriculture, (Bank) National IS!!l&llholder liveatock quired for ""'nagement and Directors on July 8, Water Resources production project aupported by technical support oa and Rural Devel­ credit, extension research and project management unit. Bank Project Preparation opment training aerviceo. Total cost Facility advance of $1.0 estimated at $12.8.0 million, of million approved for which $69.7 million in foreign bridge financing from exchange, Livestock I and for short term training of Niger­ ians.

National 100- Power VII - Diatribution system To be determined. Continued processing of Electric Power 200 expanaion to match ongoing gen­ Power VII is related to Authority (NEPA) (Bank) eration projecto; spare pert resolution of sector purchaaes; and technical aaeio­ policy issues and tance to improve all aapects of progrees on Power V and NEPA'e operatione and systemo VI Projects. facilitiea. Total project coat eotimated at $150-2.50 million, of which $100-2.00 million in foreign exchange.

Federal Miniotry 2.0.9 Traneport Paraatatala - Spare Required in areas of man­ Approved by the Exec­ of Tranaport and (Bank) parts, workehop equipment, agement information eye­ utive Directors on Aviation training and technical aaaiat­ tema, accounting, work­ June 2.6, ance to improve management and shop operation•, and port operations of tranaport para­ technical training. Procurement: Retroactive atatala, eepecially Nigerian financing of $2,0 million Porta Authority and Nigerian proposed for financing Railway Corporation, Total coat start-up activities in­ eati11&ted at $30,3 million of cluding procurement for which $2.5.6 million in foreign emergency spare parts, ezchange.

Federal Ministry s.o (a) Industrial Technical Assistance Consultant oervicea will Loan signed on July 17, of Induetriea (!lank) Project, To asaiat in (a) be required to design (Cofinancing being sought strengthening the inatitutional specific policy packages with EEC, UNDP/UNIDO.) frlllllevork for fornulation and aimed at stimulating in­ coordination of induatrial poli­ vestment growth in the Procurement: Retroactive ciea; (b) developing induatrial private industrial aector financing up to $400,000 incentive& policies and promo­ end improve efficiency of to cover start-up activ­ tion mea1urea to etimulate more public aector inveet­ itiea. efficient private aector growth; mente. and (c) iaproving the efficiency of public aector induatrial incentiveo. Total coat eatimat­ ed at $8,6 million, of which $4,1 million in foreign ez­ chanae,

See page 1 for footnote&. .. 24 -

Naber Country Aaount 6 and Impl-ntiq Probable Btqa of ProcaHing and · Asml.ll -~.Y Con1ultina Sorvicaa Action oa Procureaent i/

~ (Cont'd)

Pederal Niniatry 100.0. (R) Water Supply Sector llehabilita­ Coaaultant• being Preparation under vay. of Agriculture, (Bank) tion - Proviaion of fund• throuah appointed to carry out Water Reaourcea l'IIA'lfll to aaaiat atatea with reha­ aa1e, ...nt of urban water Bank Project Preparation and l:lural bilitation of exiatina water aup­ facility rehabilitation Facility advance of Development ply facilitiea, provide aector need,. $0.3 million approved to trainiq; accountiq ayateaa; finance technical a1aia­ technical aaaiatance. Total coat tance/rehabilitation eatillated at $152.0 •illion, of 11tudiea. which $75.0 million in foreign exchange.

Lagoa State 160.0. (R) Lago• Water Supply - Expansion Con1ultant1 have coa­ Apprai,al report being Water Cor­ (Bank) of water aupply ayatea; rehab­ pleted hydraulic aaalyaia prepared. (Cofinancing poration ilitation, organiaation and of diatribution·netuorh is envbeged.) management atudiea; auperviaion and are finalizing organ­ of coaatruction; technical aa­ ization and aanage1111nt Project Preparation Fa­ aiatance and training. Total 1tudie1. Coaaultant• for cility advance of $0.5 project coat eatimated at $530 construction supervision •illion approved by aillioa, of which $357 Dillion have ant yet been Bank to facilitate in foreign exchange. aelected. · hydraulic analysi1. Ministry of 80.0 (R) Urban - Infraatructure Develop­ Technical ansiatance for Appraiaal report being lforko and (Bank) ment Fund. !atabliahaeat of a Fund operation. De"i81l prepared. Housing new aechaniaa to identify, prep­ and 1upervision of Fund are,aad finance urban infra­ aubprojecta. Technical atructure inveatlleat in Rigeria. aoai1tance to borrowing Technical aaaiatance frDIII local State• and local author­ aourcea would be provided for ities for improved finan­ the setting up and for oper~ cial aanagemant and urban a tione of the Fund I and pilot 1ervicea. operatioaa in aeveral Statee vould be included. Financing, for a aecond tranche of sub­ projects to be selected and appraiaed during the iaplea­ eatation of the project, would also be included. Total project coat eati.. ted at $120.0 mil­ lion, of which about $74.0 ail­ lion in foreign exchange.

Ministry of 200.0 Highway Sector Loan - Strength­ To be detetermined. Appraisal report Works and (Bank) ening, rehabilitation and per­ being prepared. Housing iodic raainteaance of Federal highway•, bridge replacement, rehabilitation and maint­ enance. Total project coat estimated at $2.6 billion, of which $1.6 billion in foreign exchange. This total project coat of $2.6 billion repreaenta the total proposed highway investment program for 1988- 19901 the expected disburaen,ent period.

Ministry of 400.0 (R) Trade Policy and Export I - Re­ To be determined. Negotiations scheduled Pinance; Central (Bank) fol'III of trade, incentives and for end-August. Bank of Rigeria; export policiea, provision of and Ministry of finance for general illporta Commerce throu9h the aecond tier foreign exchange market and strength-. ening of export prOIIOtion inatitutiona.

Ministry of so.o (R) Imo Health and Population - To To b~ determined. Preparation under Health (Bank) aasiat Imo State improve primary va:,. health services and to initiate a population avareness and fllll"" ily planning service program.

See page 1 for footnote•. - 25 -

Member Country Amou11t & and Implementing Probable Stage of Processing and ~y ~l.l Consulting Servicen Action on Procurement 4/ SAO TOME AND PRINCIPE

Ministry of 7,4 (R) Cocoa - Rehabilitation of cocoa Two foreign firmo have Negotiations tent11tivaly. Agriculture and (IDA) plantations through improved or­ been aelected for man­ scheduled for October. Rural ganization and management, tech­ agement service contract• (Moat cofinanciere have Development nical naeietance, and provision with the Government to been identified.) of inputs, manage one plantation each, with the possib­ ility of adding a further plantation each after 2-3 years.

Societe 22.0 Telec01li:lllunications II - Exten­ 48 man-month• of consul­ Approved by the Executive Nationale de (IDA) oion of Dakar telephone ex­ tant services to aeaiet Directors on June 19, Telecom­ changes; extension of transmis­ SONATEL in areao of plan­ (Cofinancing confirmed munication sion network to the South and ning, data processing, with AfDB for $12 .6 mil­ (SONATEL) East of country; technical ae­ management information, lion, CCCE for $21 mil­ sistance. Total project cost tariffs and supply lion, BOAD for $4.2 mil­ estimated at $157.0 million, of logistics, lion end credit guar­ which $90.8 million in foreign antees for $5.S mil­ exchange, lion. EIB considering cofinancing,)

SENELEC 20.0 Energy Sector - Rehabilitation A consultant hae been Approved by the Exec­ (IDA) and extension of generation, selected for the gener­ utive Directors on June tranemieeion and distribution ation component engin­ 10. (Cofinencing con­ system, and related technical eering and construction firmed with AfDB for assistance. Estimated project supervision. $8 million, BOAD for coat $80,8 million of which $5 million and CCCE $61.0 million in foreign for $28,0 million,) exchange,

Ministry of 15,2 (R) Education IV - Primary Education Consultants will be re­ Negotiations in pro- · Educatian (IDA) Development, Total project cost qUired in education greee. (AfDB confirmed estimated at $19.3 million, of planning, financial cofinancing of $5.0 which $11,9 million in foreign management and school million,) exchange. construction design.

Societe 16.0 (R) Irrigation IV - Irrigation and To be determined. Appraisal report being d'Amenagement et (IDA) drainage rehabilitation works on prepared. (Cofinancing d'Exploitatian existing perimeters; electrific­ confirmed with France and du Delta (SAED) ation program for pumping sta­ IFAD for $5,0 million tion; agricultural credit train­ each; BADEA, Kuwait Fund, ing, adapted research; and stu­ and Saudi Fund have also dies. Total project cost estim­ expressed interest,) ated at $40,0 million, of which $25,6 million in foreign ex­ change,

Ministry of 15.0 (R) Transport Sector Rehabilitation To be determined, Project preparation in Equipment (IDA) - Road upgrading and strength­ progress. (Cofinancing ening; road maintenance program; will be required.) technical assistance and studies.

Ministry of 10.0 Municipal and Management Devel­ Consultants for studies Project preparation in Works; Ministry (IDA) opment - Project would consist and technical assistance progreaa. of Urbanism; of: Ci) small scale investments will be required. Municipality of in the Dakar metropolitan area; I- Dakar (ii) generetion of aources of revenues for the municipalities of Greater Dakar; (Hi) reorgan­ ization of the municipal admin­ istration; and (iv) provision of finance to the land development agency.

Kinistere ·du 10,0 Development Management - Tech­ To be determined. Project preparation in Plan et de la (IDA) nical aaeietance, equipment, and progreae, (Cofinancing Cooperation training to key goverlll!lent agen­ to be determined,) cies to atrengthen economic and financial management and to un­ dertake reform of public admi­ nistration.

See page 1 for footnotes, .; 26 -

Member Country Amount 6 and Implementing Probable Staie of Proceaaiag and Action on Procureaent !!/ !ll!!!EI.1./ Lender!!:_/ Conaultilljl Service• SIEIIIIA LEONE Rational Power 14.0 (R) Power Rehabilitation V - Elec­ Project will not be Authority (IDA) tric Sy•tma Rehabilitation Proj­ proceaaed further, due to (HPA) ect. Total project co•t e•ti• cha111ina priorities and mated at $25.4 aillion, of which in abaence of til:!ely $20.0 million in foreian ex­ tariff increaaea. ~hange. Reporting will be dis­ continued next month.

Ministry of 5.3 (R) Population and Health - To Conaultant• aay be re­ Credit aigned on July 24. Health; and the (IDA) strengthen health and family quired. Detail• not yet Rational Popu­ planning aervicen. Total decided. Two IDA Project Prepar­ lation Co111nis­ project co•t e•timated at $5.7 ation Facility advances eion Secretariat million, of which $4.l million totaling $250,000 in foreign exchange. approved to COl:lplete project preparation.

Ministry of 27.0 (N) Structural Adju•tment Credit to To be determined. Project preparation Finance (IDA) improve Government's fiecal per­ under way. formance in the quality of ite ' investment progr11111 and support policy reforms.

Ministry of 2.0 (H) Technical Aa•istance in Support To be deterained. Project preparation Finance (IDA) of Structural Adjustment under way. Program.

Office Togolais 50.0 Phosphoric acid plant. Fea•ibility atudy by Pboaphate aector strategy des Phosphates (Bank) con•ultanta coopleted. under atudy.

Ministry of 15.0 Agricultural Extension Services Consultant• selected and Appraisal mission tentnt­ Rural (IDA) Improvement - Eztenaion aervicea contracted for project ively scheduled for ' Development rehabilitation, with e11Phania on preparation. October. improving organization of field operations. IDA Project Preparation Facility advnnce of $200,000 to defray coat of conuultnnte to prepare project.

Ministry of 14.0 Agricultural Service& Rehabi­ Ho deciaion made on need Project beina identified. Rural (IDA) litation - Rehabilitation of for conaultanta. Development General Agricultural Support Service• including input supply, seed production, applied research end cooperative devel­ opement.

Ministry of 15.l (R) Cocoa/Coffee III - Replanting Consultant& will be Negotiations scheduled Rural (IDA) end maintenance of 10-lS,OOO ha required for technical for early September. Development old cocoa and coffee; diaeaoe aaaiatance and training. (Cofinancing will be control over 5-10,000 ha mature required.) cocoa; pruning of S-10,000 ha mature coffee; integration of food crope; reeearch in cocoa, coffee, food crop•. Total project coat about $32.2 mil­ lion, of which $19.2 million in foreign exchange.

Ministry of 15.0 (R) Highway Kaintenance/Coa•tal Preparatory study under Preparation under way. Equipment, (IDA) Protection - Road maintenance way by conaultante. (Substantial cofinancing Kines and Post and rehabilitation, related will be required.) and Telecommuni­ inatitutional •trengthening and cations coastal protection. CEET (Compagnie 10.0 Power Distribution - Inatitu­ Coneultante required for Project preparation under Energie Elec­ (IDA) tional diagno•tic study and in•titutional atudiea, way. trique du Togo) action plan. Rehabilitation and technical a•aiotance and extension of diatribution •yatea trainina, and engineerina in Lome; purchase of eparee and for rehabilitation and equipment; technical a•ei•tance exten•ion of ayatea. and training at all level• to improve all aspect• of opera­ tiona.

See page l for footnote•. - 27 - Member Country Amount & and Implementing Probable Stage of Proceseing end ~y ~,y Consulting Service, Action on Procurement f!/ !!!!iQ (Cont'd)

Ministry of 10.0 CR) Small- and Medium-Enterprise Study on 61111 aupport ay1- Appraisal mission tentat­ Planning and (Il)A) (SKI) Development - Line of tem c011pleted. Iaplea­ ively scheduled for· Induetry credit, and technical aaeiatance entation under way. December. for develop11ent of SMI! proj­ ects. A component for privat­ Con1ultant1 nl10 required iBation of industrial para­ for privatiBation atatale may be added. etudiee,

Ministry of 17.0 (R) Third Structural Adjustment Ho decision aade on uae Program being Planning and (IDA) Program - Action program aimed of conaultanta. identified. Industry at accelerating real economic growth; continuous improvement of public sector 111Anegement (public inventment, divestiture of PES) end incentives to agric­ ulture and other productive sectors.

1

I I i 1,

I See page 1 for footnotes. I

I - 28 -

Member Country, Amount & ·and Implementing Probable Stage of Proceaaing and A&!!!:l. ll Lender!/ Conaultina Service• Action on Procureaent 4/

III, BAST ASIA A!ID PACIPIC

Shanghai Machine 100,0 Shanghai Machine Tool• - Ration­ Evaluation of conault­ Negotiation• tentatively Tool Works (Bank) alization and product upgrading anta' propoaala for echeduled for Septeaber. (Sl!TW) and of the induatry in Shanghai, feaaibility atudiea Corporation c011pleted, (SllTC)

Ministry of 65.0 Health II - Two ID4iD parts: Conaultant·aervicea to be Approved by the Exec­ Pub lie Heal th (IDA) preventive medicine and rural financed by·Govermment; utive Director• on 15.0 health, For preventive medi­ Management of coneultants June 19, (Bank) cine, aaaiatance to 1) National by WHO, Center for Preventive Medicine; 2) rehabilitation of vaccine production; 3) improvement of drug quality testing, For rural health, support to county level activitiee in 8 provinces. Total project coat about $177,4 million, of which $78,4 million in foreign exchange.

Ministry of 163.0 (R) Beijing Tianjin-Tanggu Express­ Most consultant eervices Poot-appraisal mieaion Communications (Bank) way - Civil worka; training and provided under bilat­ scheduled for end­ 45.0 possibly technical assistance, eral aid. November, (IDA)

Ministry of 130.0 Tianjin Port - The project will: Consultant services will Approved by the Executive Comnunications (Bank) Ca) increase capacity of the be required, Directors on Hay 6, Tianjin port by conetructing 2,150 m of quaywalls for timber, construction material and gener­ al cargo berths with the neces­ sary works like dredging, rec­ lamation, railways, pavement, roadways, utilities, and eupply of equipment; (b) provide tech­ nical assistance and training for port personnel to minimize ailtation, to extend computer control of operation•, to prep­ are a master plan for the port and to further develop manage­ ment information systems; and Cc) establish the Tianjin Port Development Center and provide the necessary equipment and technical easistance, Total project cost about $282 million, of which $14,3 million in for­ eign exchange.

Miniotry of 60,0 Freshwater Fisheriea - Con­ No decision yet made. Approved by the Executive Agriculture, (IDA) struction of new fiohing ponds Directore on May 6, Animal Husbandry and improvement/expansion of and Fiaheries exiating fiahing pondo; tech­ nical assiatance for etaff training, and strengthening of fishery research and exten­ aion, Project area covers eight major cities, Total project coat about $197,7 million, of which $60 million in foreign exchange,

Municipality of 145.0 (R) Shanghai Environmental - Cons­ Consultant eervices being Appraieal mission ached­ Shanghai (IDA) true tion of eewera to remove end provided under bilateral uled for September. dispose of waateweter from the aid, central cODDercial dietrict, areae with high population dens­ ity and induotrial concentration in Shanghai; and for inatitu­ tional strengthening to improve ·the enviro11t1ental conditions in the city of Shanghai,

See page 1 for footnotea, - 29 -

Member Country, Amount 6 and Implementing Probable Stage of Proceaeing and ~ll Lender Y Conaulting Service• Action on Procurement 4/ CHIHA (Cont'd)

. Ministry of 160,0 11.ailvaya III - Proviaion of Conaultant eervicea will Approved by the Executive .Rnilwaya (Bank) civil vorka, aateriala, equip- be required, Directora on April 1S, 70,0 11ent, technical aaeiotance and (IDA) training, to increase tranaport capacity, 110dernize end increaae production of a aianalling fac­ tory, inititate llflchanized track maintenance and to continue dev­ elopment and implementation of the 111&nagement information sys­ tea, Total project coat about $S77,S million, of which $297 million in foreign exchange,

Minis try of· 40.0 Ca) Red Soila ·Area Development - Consultant aerviceo will Negotiations eubatan­ Agriculture, (IDA) Agricultural development in be required, tially completed, Ani11141 Husbandry certain counties of Jiangxi and Forestry end Fujian Provinces,

Administration 100.0 Cement - Rehabilitation end Coneultant aerviceo will Preparation report for Building (Bank) modernization comprising new be required, under way. Materials plant, wet-to-dry process con­ Industry version, and technical aesis­ tance·for optimization of small­ ecale plant design and for design and research institutes.

Ministry of 70.0 Xinjiang Development - Integra­ Heed for consultants to Appraisal report Agriculture, (IDA) ted development in agricultural be determined, being prepared, Ani11141 Huabandry production, livestock end pas­ and Forestry ture improvement, irrigation, (HAAF) hydropower 1 and agro-proceaaing, Ministry of 108.0 Huongpu Port - Construction of Heed for conoultanta to Appraisal report Communications (Bank) new berths and technical aeoiet­ be determined, being prepared, snce and training.

Ministry of 176.0 CR) Power V - Shuikou Hydro-power, Consultants have been Negotiations ocheduled Water Resources (Bank) Provision of peaking and reserve appointed, for September, and Electric capacity to the East Cbina power P°'i'er (Mlllll!P) grid, by construction of a con­ crete gravity dam with navig­ ation facilities and trans­ miasion lines, installation of generating unite, resettlement of people, and relocation of railroad and highways,

Ministry of 90.0 (R) Dongpu Basin Natural Gas - Ex­ Heed for conaultanta to Awaiting Gover11111ent deci­ Petroleum (Bank) ploration, appraisal and prod­ be determined, sion on project 11cope. Industry uction of natural gas in Dongpu Basin, Also introduction of integrated approach to planning for gas development, transport and utilization,

China Investment 200,0 (R) DFC IV - To finance expansion Ho decision yet made, Appraisal report Bank (Bank) and modernization in light being prepared, . so.o industry, principally, (IDA)

Gansu Provincial 130.0 (R) Gansu Agriculture - Completion Ho deciaion yet msde, Appraisal report Gover11111ent (IDA) of irrigation projects nerving being prepared. 90,000 ha and land development for rainfed agriculture on 200,000 ha, training and reaearch.

Gansu Provincial 30,0 (R) Gensu Induatrial Credit - Line Ho deciaion yet made, Appraiael mission Government (Bank) of Credit to one or two finan­ tentatively echeduled for cial inatitutions or agencies in October, Ganeu to support light indUQtry development in the province,

Gansu Provincial 2S.O (R) Gnnsu Education - Improving Ho decieion yet aede, Appraioal mission tent­ ·Government (IDA) training for primary and lover atively acheduled for secondary teachers, improving September, the planning and information systems, and estebliahing supervision and inspection.

See page 1 for footnote&, - 30 -

Member Country, Amount & and Implementing Probable Stage of Proceuing and ~!/ Lender!/ Consulting Services Action on Procurement· 4 CHINA (Cont'd)

Miniatry of 110,0 Coal II - Rehabilitation of Consultants will be Appraisal aioeion Coal Industry, (Bank) existing mines in Shanzi required for design and in the field, Province, engineering,

State Education To be Educational Material - )lodern­ Heed for consultants to Preparation mission COl!ll!liesion deter­ ization of textbook design, be determined. scheduled for November, mined production and diatribution for primary, secondary and higher education. The project would aasiet inter alia a National Curriculum Development Center, and production and diotribution facilities,

Ministry of 140.0 (R) Fertilizer II - Plant rehabilit­ Heed for consultants to Preparation under Chemical (Bank) ation; production diversifica­ be determined, way. Industry tion; energy saving modifica­ tions; technical assistance to improve finnncial management and accounting eystems; training.

Agricultural To be Rural Credit III - To provide Heed for consultants to Appraisal mission Bank of China deter­ funds to ABC for medilll!I to long­ be determined, tentatively scheduled (ABC) mined term loans to individual farmers for October, and households, collectives and enterprises. China National To be (R) South China Sea Gas - Provision Consultants will Project identifica­ Offshore Oil deter­ of well-head services, technical be required. tion miaaion in August. Corporation mined assiotance and training to CNOOC (CNOOC) for the development of natural gae at South China Sea, Project would include construction of a pipeline, gao-fired power plant and possibly.some distribution network,

Ministry of 14,0 Road Improvement - Upgrading of No decision yet.made, Project preparation und, Communications, (Danit) selected road segments in way, (Cofinancing with Transport and Government's development ADD for $15,0 million,) Works program.

IHDOHl!SIA

Agency for Agri­ 70.0 (R) Agricultural Extension III - To Consulting services. in Approved by the Executi, cultural Educa­ (Bank) re-order subeectoral extension extension, training, rur­ Directors on July 29, tion, Training services into a unified exten­ al sociology, monitoring and Extension sion service for rice and non­ and evaluation, are ex­ '(METE) rice food crops, estate crops, pected to be provided by livestock and fisheries. Total the Australian Develop­ project cost about $136,2 mil- · ment Assistance Bureau lion, of which $23.3 million in (ADAB), foreign exchange. G: National 250.0 (R) Power Transmiosion and Engineering consultants Negotiations tentat­ Electricity ·(Bank) Diotribution - To expand the already in place, Other ively scheduled for Authority (PLN) tranemisaion and distribution consultancy needs relate early October, facilities in Java, to equipment selection for Testing and Research Center; and establishment of an Engineering Center within PLH,

Perum 14,5 (R) Teleconounications Technical Likely to include cons­ Negotiations completed, Telekomunikasi (Bank) Asoistance - Technical asois­ truction management, fin­ Board presentation schec (Perlll!ltel) tance to the telecommunications ancial management infor­ uled for September 16, organization in achieving its mation system develop­ expansion program during the ment, and training. fourth five year development plan.

Ministry of 35,4 Maritime Training - To develop ,Consultant services will Appraisal report being Communications (Bank) manpower within the maritime be required for training reviewed. sector by establishing large­ services and technical scale training systemo in the assistance, sector.

See page 1 for footnotes, - 31 -

Member Country, Amount 6 and Implementing Probable Stage of Processing and .!&!!!£I.Y ~y Conaultilll! Servicea Action on Procurement !/ IHDOIIBSIA (Cont'd)

Agency for 4S.O Agricultural Reaearch III - The Conaultanta vi.11 be re­ Appraiaal report Agricultural (Bank) project would atrengthen re­ quired to coordinate being prepared. lleaearch and aearch adainiatration and pro­ manpauer training and Development gralllling, and develop reaearch reaearch progr... ing. (AAlll>) progra,ui in agroeconaaica; poat­ Local conaultanta would harveat technology; germ-pla.., be engaged to prepare collection; horticultural crop•; detailed deaigna and eelected induatrial crop• like tender docuaenta of civil cotton, coconut; fresh water and works. 1111rine fiaheries.

Rational 200.0 Paiton Thermal - The project Conaultants are already Project preparation Electricity (Bank) include• construction of 2/400 in place. under way. Authority (PLH) KW coal fired generating unite at Paiton in East Java, 500 kV tranaminaion lines from Paiton to Krian and aaaociated aubetatione at Paiton and Krian.

Directorate 60.0 Regional Cities Urban Transport Coneultante have been Appraisal report General for (Bank) - Road improvements and traffic recruited for project being prepared. Highway Con­ management measurea for the preparation; need for struction, largest cities. other consultants to be Ministry of determined. Public Works (Bina Marga)

Director General 22.4 (R) Treecropo Bl.ll!l4n Reaourcea Consultants may be Appraisal report of Estatea (Bank) Development - To eaoe manpower required for the being prepared. (DGE), Ministry constraints in the implement­ technical aeaiatance of Agricu 1 ture ation of the estate crop pro­ component. gram, through training to emall­ holders and to DGE provincial and headquarters staff.

Indonesia State 2S.O (R) Railways Technical Assistance - Consultants will be Appraisal report being Railways (PJKA) (Bank) To eesiet the Indonesian State required for technical prepared. Railway in raising operational assistance and training. efficiency through training and technical assistance and •elect• ed items of equipment needed to improve operations and mainten­ ance.

Ministry of 2S.O Industrial Energy Conservation - Consultants will be Appraisal report Kines and (Bank) Eetablishmant of national energy requi~ed in the area of being reviewed. . Energy/P.T. conservation center to assist energy audita/feaeibility Pupuk Sriwidjaja. the industrial sector in redu­ atudiee. Indonesia cing energy coats through con­ (PUSRI), (a gov­ servation and rationalization enment-owned activities, modification in fertilizer PUSRI ammonia plants to reduce company) energy use end optimize produc­ tion capacity, and carrying out of feasibility atudies in four other fertilizer plants to eval­ uate potential for energy savings.

Ministry of llo1ile 1SO.O Rural Roads II - Civil works for Conaultants will be Project preparation under Affairs (Bank) road conatruction; ·rehabilita­ required for technical way. tion equipment; workahope for aeoistance and training. maintenance, and technical aaaiatance and training.

Directorate :is.o (R) Riau Oil Palm - To promote Heed for conaultants to Appraisal report being General of (Bank) private aector involvement in be determined. reviewed. Eatatea Crops, the development of approximately Ministry of 13,000 ha of oil palm in Riau Agriculture Province; half for outlying 11118llholdera.

Miniatry of 70.0 (R) Foreetry Institutional Develop­ Ho decision yet made. Project preparation under Forestry (Bank) ment - Forestry planning, mana­ way. gement, reeearch, conservation, and·aseistance t~ prepare future forestry projects.

See page 1 for footnotes. - 32 -

Me!lber Country, .Amount & Qlld Imple111enting Probable Btaae of ProceHing and ~y Lender!/ Conaultina Service• Action on Procureaent ~ INDOlll!SIA (Cont Id)

Directorate 29,3 (a) Fiaheriea Support Service• - To Conaultanta needed for Appraiaal report General of (Bmnk) atrengthen fiaheriea technique conatruction auperviaion, beins reviend. Fisheries, developaent, prograa aupport, technical aaaiatance to Ministry of credit, input aupply, iafra­ hatcheriea, ·and marketing Agriculture atructure and 11J1rketing aupport aupport. services for fiaheriea in Aceh, Sulaveai and Foree.

Ministry of 38.5 Library Services Development - Consulting services Project preappraiosl Education (Bank) To atrengthen five major part• will be required. miaaion acheduled for of the library and information mide-October. ayatem: policy/planning/manage­ ment capability; peraonnel reaourcea; public libraries; specialized libraries; and the publishing/printing/traDSlation services.

BAPINI>O-Bank 125.0 Development Banking/Bapindo - Ho decision yet made. Project preparation Pembangunan (Bmnk) Follow up to BAPIRDO V with under way. Indonesia emphaaia on iDStitution building aad portfolio rehabilitation.

Ministry of 150.0 Rural Electrification - A Ho consultants Identification of proje Mines and (Bank) timealice of the investment required. The project components will be car­ Energy; aad progrmn. for transmisaion and will be prepared by PLN. ried out during a Bani< National distribution, including miseion in late 1986. Electricity extension of supply to rural Corporation areas. (PLN)

Directorate 250.0 (R) Irrigation Subaector -·Upgrading To be determined. Project preparation General for (Bank) O&M of complete projects aad en­ under way. Water Resources suring adequate coat recovery; Development completing on-going wholly GOI­ financed ·projects; promoting groundwater development; and institutional strengthening, Ministry of so.o (H) Third Health - Strengthening of Coaoultant services will Project preparation Health (Bank) health planning and the prov­ be required. under way. ision of services in about three provinces, tentatively ident­ ified to include Kalimanten Timur, Maluku and Husa Tenggar• Barat.

Bank Rakyat 105.0 (R) KUPEDES/Rural Banking - To Consultant may be Project preparation Indonesia (Bank) provide support to Bank Rakyat required in the area of under way. Indonesia in relation to ito rural branch banking. KUPEDES (small loan) program to enable it to transform its unit deaa system into a viable rural banking ayatem.

Directorate 125.0 SCDP/Tree Crop Development - To To be decided. Project preparation General of (Bank) support Government's efforts to under way. Estate improve amallholder coconut production.

Ministry of 111.0 Small/Medium Industries - Line Consultants may be re­ Approved by the Executi Finance (Bank) of credit to aelected financial quired for the technical Director• on April 16, inatitutiong to aupport term assistance component. 1985...... _ lending to small and medium in­ duatriee; and technical assist­ ance to small and medium indus­ try development. Total project coat eatimated at $182 million including $111 million in for­ eign exchange.

Korean Maritime 141.0 (R) Pusan Port - To provide addi­ . Connultants needed for Loan signing on sad Port (Bank) tional container facilitiea at technical asoietance end Auguet 6. Authority Pusan to handle the increaeed construction nupervieion. port traffic.

See page 1 for footnotea. - 33 -

!ember Country, Aaount & 11nd Inpleaenting Probable Stage of Procesei113 and '~y ~y Con•ulting Service• Action on Procurement 4/, I tOIU!A (Cont'd) I- . 230.0 (R) Second Paver (Tran••i•aion and Con•ultanta will be Loan aigned on July 14. Corea Electric (B..,k) Diatribution) - To finance a needed for• load Power Corpor­ part of DPCO' • 1986-89 trana­ management progr11111. ttion (KEPCO) •i••ion and di•tribution pro­ Sr8111, and technicl a•aiatance and training. Total project coat e•timated at $3,068 Dillion including $1,028 million in for­ eign ezchange.

I,i.oree Land 150.0 (R) Urban Land Develop,:sent - Deve­ Conaultanta needed for Loan signed on July 14. Development (Bank) lopment of urban land for hou­ land develO(llll!Dt and for 'corporation ning and indu•trial eatotea. utudiee of land pricing, '(KLDC) Total project co•t about $1.8 financial management and billion, of which $150 Dillion computerization of KLDC in foreign exchange. operationa. l,.,...,, ., 150.0 Kyonggi Region Multi-Model Detailed engineering to Project preparation under 1Construction; (Bank) Trenoport - To provide int­ be carried out by Korean vay. lend Korean egrated network of ouburban Highway Corporation and 'National expreaowayo end railways in KllR plua conaultant 'aailroad (KNR) Seoul Greater Metropolitan area. a1eistance.

IM1n1stry . . o f HD111e 250.0 Second Highway Sector - To Heed for consultants to Project preparation under !Affairs and (Bank) support ~orea•a highway improve­ be determined. way. i~iniatry of ment program under Sizth Five­ (°onstruction Year PlQn. jMiniotrieo of 150.0 (H) Housing Sector Adjustment - To Heed for constants to be Project under Finance and (Bank) support inotitutional and policy determined. preparation. Construction improvements relating to public sector housing programs end to the housing finance nyatem.

Ministry of 200.0 (H) Third sector Loan - To upgrade Heed for conaultanta to Project under 1l!ducation (Bank) capacity and quality of training be determined. preparation. and of advanced technology research undertaken by univer­ sities end by the Ministry of Science and Technology.

Korea Technology 50.0 (H) Technology Development - To sup­ Heed for consultants to Project under Development (Bank) port institutional improvements be determined. preparation. Corporation in KTDC end to finance a line of (KTDC) credit for enterprises engaged in the development of new tech­ nologies.

Ministry of 60.0 (H) Regional Development - To help Ho consultants required. Project under Construction (Bank) finance infrastructure develop­ preparation. ment in the Chungbo region.

LAO PEOPLE I S DEMOCRATIC REPUBLIC

Electricite du . 35.0 (R) Electrification of Southern Consultants have cD111plet­ Appraisal mission sched­ Laos (EDL) (IDA) Provinces - Tranemieeion, and ed preparatory engineer­ uled for Sept0lllber/ distribution of electricity in ing funded out of exist­ October. selected provinces. ing IDA credit.

Ministry of 3.9 TelecD111DUnications Rehabilita­ Con•ultant •hortliot for Approved by the Executive Transport and (IDA) tion - Rehabilitation and re­ ·engineering and planning, Directors on April 22. Poots equipping of existing telephone financial-m&nagement and (Cofinancing 'lfith UHDP network, in•titutional develop­ project coordination and for $1.23 million ment, training, and preparation implementation (to be confirmed.) of a phased ezpannion program. financed from UHDP funds) Total project coat estimated et to be prepared by the $7.8 million, of which $4.3 executing agency, to be million in foreign ezchange. confirmed.

Ministry of 12.5 To set up an engineering school Consultanto required for Project under Education (IDA) specializing in civil, mechanic­ architectural design, ad­ preparation. al and electrical engineering. mini•tration and academic This would include the provision program. of inatructional facilitiee, purche•e of equipment and educ­ ational material• and the oupply of technical asaietence and fellovshipa.

See page 1 for footnote•. - 34 -

Mealier Country, Amount & and Implementing Probable Btaae of Proceaaina and ~ll ~y Conaultiaa Bervicaa Action on Procur-nt ~ MALAYSIA

Kiaietry of 55,.0 CR) Weatern Johore II - lntearated Buperviaion conaultanta Approved by the Baecutiva Agriculture (Bank) Aaricultural Developaent - required, Director• on July 15, and Conatruction of farm roada and aigaed on July 30, drainaae facilitiea, and pro­ viaion of asricultural aupport aervicoa, Total projact coat about $148,3 million, of which $55,0 aillion in foraian aa­ chanaa,

Rationnl 100.0 CR) Energy Efficiency and Plant Conaultanta will be re­ Appraisal report being Electricity (Bank) Rehabilitation (Power XII) - quired for project prepared. (Cofinancing Board (HEB) Power tranamieaion and dia­ implementation, may be sought,) tribution facilitiea, Total project coat estimated at $294,1 million, of which $211,0 million in foreign eachange, Bank ltemajuan 65.0 Development Finance - Financing No conaultant• required, Appraisal report Peruaahaan (Bank) of mediua- and larga-acale being prepared. Malayaia Berhad enterpriae• in the Induatrial (BKPMB); Sabah sector through participation of Development Bank public and private financial . (SDB) inatitutiou. Kinietry of 40.0 Kuda III - Conatruction of No deciaion made whether Project preparation under Agriculture (Bank) irrigation canal• and drainage conaultanta will be way, ayateme and upgrading of veter required. control CCl!ll!lunicationa ayatem in the Nude basin,

Public Works 85.0 Road Rehabilitation and Imp~ove­ No deciaion made whether Project preparation Department (Bank) ment - Rehabilitation and conaultanta will be under vay. maintenance program for federal required, and atate highwaya,

Ministry of 6,2 CR) Induatrial Energy Rationaliz­ Since no Bank financing Energy (Bank) ation - Technical Aaaiatance to required, reporting will reduce energy consumption of ~e discontinued, industrial aector, Forest Research s.o Forest Reaearch and Technical Conaultants may be Project preparation Institute of (Bank) Aesimtance - Strenathening of required, under way. Malaysia (PRIM) research and foreatry related studies in Peninnular Kalayaia and Sarawak, Ministry of 100.0 Bisher Education - To aaaiat the Reed for conaultanta to Project preparation Education (Bank) Govenllllent to eapand the univer­ be determined, under vay. aity ayatem and to improve qual­ ity and relevance.

Federal Land so.o FELCRA II - Rehabilitation as Need for coneultanta to Project preparation Consolidation (Bank) mini-eatatea of about 40,000 ha be determined, under vay. and Rehab­ of idle padi lands; aenile tree ilitation crop areas with oil palm (35,000 Authority ha); rubber and diveraified (FELCBA) cropa (5,000 ha); and mainten­ ance to harveet (19,000 ha) of tree cropa planted under F!LCRA I, Conatruction of ache..e acceaa roade and infrastructure; palm oil proceaaing adlla; trai­ ning facilitiea; and atrength­ ening of aupport aervicea, Ministry of 30.0 CR) Bamarahan Rural Development - Conaultanta will be Project preparation Agriculture/ (Bank) Drainase irriaation and flood required for project under vay. Department of mobilization vorka, roada end implementation, Irrigation and agricultural development in the Drainage Samarahan River Baain, Total project coat estimated at $160,0 million,

See page 1 for footnotes, -' 35 - lember {lountry, Amount & 'ind Implementing Probabl.e Stage of Proceaaing and \senc:r"Y · ~1..1 Conaulting Service, Action on Procurement f!/ 1--.Jw.&YBIA (Cont'd) rederal Land 45.0 (H) Felda Sabah Infrastructure - To be deterained, P~oject preparation ~velopment · (Bank) Time slice financing of FBLDA'• under vay. 'wthority (FELDA) Land Settlement Program in Sabah, I PAPUA HEW GUINEA I ,Department of 45.5 (R) Transport Improvenent II - Consultants will be re­ Approved by the Esecutive rraneport and (Bank) Construction and improvement of quired for detailed en­ Directors on July 22, 'civil Avietion about 90 Ian of nationel roads, gineering,· institution :c DTCA) and De­ improvement of four national building for DTCA and partment of aerodromes, road maintenance, DWS, and local staff ;11orka and Supply and consultant services and training. (DWS) technical eooistance, Total project cost e•timated at $64,7 million, of which $48,6 million in foreign exchange,

,Electricity 28.5 Third Power - Construction of Consultants for project Approved by the Ezecutive Conniesion (Bank) dam at Yonki to firm up existing preparation ore being fi­ Directors on June 19, (ELCOM) capacity at Ramu Power Station nanced by the Bank Proj­ (Cofinancing with OECF. and provision of two additional ect Preparation Facility, (Japan) for $38 million, generating units (2xl5 Mil), plus Consultant• also required and EIB for $16 million,) training and technical for eupervieion of proj­ assistance for Rural Electrifi­ ect construction and to A $1,0 million advance cation Study, Total project review the design and frOl!l Bank Project Prep­ cost about $99,6 million, of eefety of the dam, aration Facility approved which $52,6 million in foreign to finance consultant exchange, services for preliminary design and detailed engineering.

Ministry of 35.3 (R) Education IV - (Primary educa­ Ho decision made whether Appraisal report being Education (Bank) tion) - Improvement of quality, consultants will be prepared, enrollment rates and sub-sector required, management, Total project cost estimated at $52 million,

Department of 15.0 Land Evaluation and Demarcation Consultants will be re­ Project preparation to Landa; Depart­ (Bank) - Institution building for quired for project prep­ begin in October. ment of Primary Department of Lands; demarcation aration, Consultante Industry; and of alienated and customary land; would also be required Department of land resources and forest for the project to assist Forest inventories; national mapping in institution building and coordination of mapping and training, activities; and preparation of selected agricultural and forestry projects,

National Water 25.0 (H) Urban and Water Supply - Consultants will be Project preparation Supply mnd (Bank) Provision of serviced plots to ~equired for project mission scheduled for Sewerage Board be sold to low-income families implementation, October, (HWSSB) and for construction of individual Department of houses; seed money for mortage Housing financing; rehabilitation and expansion of several water supply systems; technical assistance to strengthen HWSSB,

Department of 25.0 (H) Embi-Garua Oil Palm - To develop To be determined, Project preparation Primary In­ (Bank) about 6,000 ha of land at Embi­ under way, duatry; and Garua into oil palm estate and Higaturu Oil smallholder settlements, Palm Pty, Ltd,

Poat• & Telecom­ 30.0 (N) Telecommunications III - To No decision made whether Project preparation to municationa (Bank) strengthen Posts and Telecom­ consultants ~ill .be begin in October, Corporation munications to enable it to required, (PTC) msnege the sector efficiently; to improve quality of service and to extend aervices to rural areao, The project would.com- . prise: a) digital switching and tranemiaeion; b) cable networks; c) computer facilities for mana­ gement ayetema; d) upgrading planning, financial controls, operations and maintenance; and e) training.

See page 1 for footnotes, Member Country, Aaount 6 and Implementing Probable Stage of Proceaaiag and ~y Lender Y Conaulting Service• Action on Procureaent !!J PAPUA HEW GUIRBA (Cont'd)

Department of 70.0 (R) Petroleum II - To aaaiat Govern­ To be determined, Project preparation Minerals and (Bank) ment in joint venture develop­ under way. Energy ment of current hydrocarbon di•• coveriea; development of infra­ structure to traneport gaa; pro­ vide technical aeaiatance and lll!Dpover development.

PRILIPPIHES

National 28.0 Central Viaayas Regional II Consultants have been re­ Government is reaaeeaeing Economic and (Bank) (Urban) - Emphaaia on urban cruited. project priority. Development development aupporting upgrading Authority (NEDA) of 11UDicipal infraatructure, aanegeaent of municipal enter­ priaea, transportation, traffic management, maintenance and training, Total project coat eatimated at $42.2 million,

Ministry of 10.0 (R) Export Technical Assistance - To This project is no longer Trade and (Bank) finance technical aasietance in the lending program Indus try (MTI) ; including recruitment of and reporting will be and Bureau of experts, training and related discontinued. Customa (BOC) equipment in support of the 1 Government & ezport promotion efforte and rehabilitation program, including development of adequate administrative arransemente for the present export financing system and deaigning appropriate euppor.ting policies. Totel project cost eatimated at $16.6 million, of which $10.0 million in foreign exchange.·

Philippine 25.0 (R) Geothermal Development - Bacon­ Consultants will be re­ Government is preparing Nationel Oil (Bank) Manito I - To finance the drill­ quired for engineering project. Project may be Company (PNOC) ing of about 17 additional studies and drilling man­ poatponed by a year, wells, plus the installation of agement. (Cofinancing is envi­ 21 kiloaetera of steam-gathering saged.) and reinjection lines and 2 steam separator atetione for a 110 MIi power plant in Bacon-Man­ ito (Southern Luzon). Total coat eatimated at $95 million, of which about $50 million in foreign exchange.

Nationel 45.0 Irrigation Operations Support - No Consultants required. Appraisal mission tentat­ Irrigation (Bank) Aseiatance to National Irri­ ively scheduled for late Authority gation Authority for ey•teli1ll September. (NIA) improvement, maintenance and rehabilitation,

Minis.try of 50.0 (R) Manila Urben Transport - Pro­ Consultants for project Government is preparing Public Works end (Bank) vieion of improved road system preparation are being project. Its timing will Righ11ays (MPWR); capacity end safety; strength­ finsnced under an ongoing depend on newly defined and Ministry of ening the Government's trans­ loan. Consultants will investment priorities. Transportation portation planning; programning, be required for project and Comuunic­ and policy formulation acti­ implementation. ations (HOTC) vities; and encouraging an in­ creased role for affected local Government• in project implem­ entation and financial reapons­ ibilitieo.

To be determined 150.0 (a) Public Corporate Sector Ratio­ Conaulcanto will be Appraisal mission tent­ (Bank) nalization Loan - To support a required for technical atively scheduled for program of reform to rationalize aesistance. Mid-October. ond iaprove the efficiency.of govermaent owned or controlled corporatione; including tech­ nical a•aietance to etrengthen the performance monitoring and control functionn, cost recov­ ery, per•onnel and compeneation policiea, and management audits of •elected corporatione.

See page l for footnotee. - 37 -

Member Country, Amount & and Iapleaenting Probable Staie of Proce11ing and ~l! ~y Conaultina Service, Action on Procur-nt 4/ ~·'• PBILIPPIHBS :tbont'd)

Central llanlt\of 65.,0 Soall and MediU111 Indu1trie1 IV - Ho deci1ion aade whether Project preparation under the Philippines (Bank) To provide fund1 for relending con1ultant1 will be wr,. (Cofinancing aay be (CBP) . to IITl811 and medium indu1try, required, 1ought,) including exporting, and 1up­ porting technical aaai1tance to specific sub1ectora.

To be determined 70.0 Sugar Rehabilitation and Divers­ Ho deciaion made whether Apprai1al mieaion tentat­ (Bank) ification - To aa1i1t crop div­ con1ultant1 will be ively 1cheduled for ersification in augar area• . required,. October, (Cofiuncing through provision of appropriate may be sought,) infraatructure, proceeaing and marketing facilitie11 increased productivity of the •ugar vector; rationalization of auger milling, and watershed manage­ ment, Total project cost eatim­ ated at $100 million, of which $70 million is foreign exchange,

Ministry of 50,0 Population/Health - To aasiet Consultant• will be Project being prepared Health (MOB) (Benk) the Government in the implement­ required, by the Government, Ceo­ and Commission ation of policy reformn per­ financing ia envisaged,) on Population taining to the decentralization (POPCOM) of program implementation, inte­ gration of rural health and hoe­ pital services, intensification of family planning service deli­ very, unification of outreach networks, improvement in finan­ cial management logiatice and maintenance.

To be determined 8.0 (R) Land elaesification and Titling No decision made whether Appraisal mission in (Bank) Technical Assiatance - To est­ consultant• will be early September, Ceo­ ablish a geodeti~ network and to required, financing is envisaged,) lay the inatitutional and tech­ nical foundation for a long-term program in land-mapping, land classification, land adjud­ ication, titling, and regi­ stration and to set up a land information-syetem,

To be determined 100.0 (R) Houoing Sector Loan - Develop­ Ho decision made whether Project preparation (Bank) ment of an equitable, viable and conaultanta will be under way, eventual aelf-suataining housing required, production and finance system with an increasing degree of privatization.

Rational Council 30,0 Rural Development (Mindanao) - . Ho decision made whether Project being prepared for Integrated (Bank) To improve the standard of li­ consultants will be by Government, Area Development ving of the population in the required, (HACIAD) provinces of Bukidnon1 Davao and Lanao Del Sur (Mindanao) through coordinated planning and implem­ entation of multi-sectoral rural development activitiea,

Philippine Ports 40,0 (R) Port IV - Secondary Porte Devel­ Ho decision made whether Appraisal mia1ion ached­ Authority (pp•i (Bank) opment Program for Calapan, San consultants will be uled for mid-September, Jose, Haaipit Pulupandan, required, Tagbilaran, rehabilitation of typhoon damaged port of Surigao and other ports, technical assistance and improvement of inter-ialand •hipping,

Ministry of 50,0 Secondary Education - To improve No decision on whether Project being prepared Education (Bank) quality, increaae efficiency and con1ultant• will,be by Govermoent, expand access to aecondory required. education,

See page 1 for footnotes, - 38 -

Meriber Country, .Aaount • and Imple111enting Probable Stage of Proceuina and .!m!:%.ll Lender Y Conaultina Service• Action on Procuremnt ~ PBILIPPIHBS (Cont'd)

Central Bault of 100.0 Dre - Induatrial Finance II - Ro deciaion made whether Project preparation the Philippines (!lank) rollov-up to the onaoing conaultante will be under way, induatrial finance (Apex) required. projectJ to aupport lendina through accredited financial intermediarie• to induatrial enterpriaea, and continued strengthening of financial aector through atrengthening term lending capabilitie• of accredited intermediaries, and poaaibly uelected fin&ncial ~ector reform measure~. To be determined 60.0 (R) Power VIII - Tentative proposal Ro decision made whether Project preparation (Bank) froa National Pover Corporation consultant• will be under. way, (RPC) conaiata of rehabilitation required. of the Sucat ~11-fued power · plant and upgrading of Luzon diapatching counter in Metro Manila.

SOLOMON ISLANDS

Ministry of 5.0 (B) Education II - Expansion of Consultants in education Credit signed on July Education and (IDA) junior secondary education. To field will be required 30. (Cofinancing with Training widen educational opportunity and financed by ADAB ADAB for $4.3 million has and improve equity, quality and grant. been arranged.) educational management. Total project cont estimated at $10.0 million, of which $5.8 million in foreign exchange,

THAILAND

Ministry of 175.0 Third Structural Adjustment Loan Consultants will be re­ Further processing in Finance (11'1nk) - To help the Government imple­ quired for public re­ abeyance pending Govern­ ment the next phase of its source management reform. ment decision to borrow atructural adjustment policies Previously engaged con­ for the program, related to public resource man­ aultanta expected to con­ agement and export development. tinue.

Bangkok 51.9 Bangkok Flood Control - To Consultants will be re­ Further processing in Metropolitan (Bank) provide flood protection and quired for conetruction abeyance pending Govern­ Administration drainage in the city core area, supervision and advisory ment decision to borrow (BIIA) technical aaeietance, and train­ servi~ea for institution­ for the project, ing, Total project coat estima­ al development, and for ted at $90,8 million, of which training in drainage man­ foreign exchange component $26,6 agement, and corporate million. management.

National Rousing 44.0 (B) Third Shelter - To support the Coneultents required for Negotiations tentatively Authority (NRA) (Bank) National Rousing Authority's Ci) strengthening HBA'e scheduled for end­ (NBA) low-income housing pro­ planning and policy dev­ September, grams in metropolitan Bangkok elopment functions and and regional cities, to in­ computer data processing troduce 111<>rtgage financing by capabilities; (ii) devel­ the Govermnent Rouoing Bault as a oping housing prototypes part of NBA'• program and tech­ and infraatructure stan­ nical aaeiatance to strengthen dards; (iii) developing NBA. . Rousing Information Center. Electricity 100.0 Power Tranemiaaion - Kain Engineering and super­ Project preparation Generating (!lank) coaponent• might include, Ce) vision consultants will under way. Authority of tranamiaaion eyetem for Mae Mah be required. Thailand (EGAT) Unit 9; (b) tranamieaion liult between the southern and central regiona a• well ae related in­ veatments; Cc) seventh trane­ miaeion system expansion; and (d) load diapatch centers;

See page 1 for footnotes. - 39 -

Member Country, .Amo11nt & and Implementing Probable Stage of Proceeaing and .!&!!!!:z. ll ~!/ Conaultilljl Services Action on Procureaent !/ TBAILA!ID (Cont'd)

To be determined 30.0 Rural Land Uae - Pinancina of Conaultanta have been Project preparation (Dank) land policy and ..naaeaent aelected for project under vay. center, reaource inventory, land preparation. reclaaaification, land ovnerahip titling, infraatructure develop­ ment and foreatry.

Electricity 50.0 Lignite III Mae Moh Bzpanaion - Ro decieion aade whether Project preparation Generating (Bank) Lignite development in aupport conaultante will be under vay. Authority of of pover generation ezpanaion at required •. Thailand (EGAT) Mae Moh Unite# 8 and# 9. Petroleum 60.0 Energy IV (Oil/Gae) - Project To be determined. Diecuaeiona on p·roject Authority of (Bonk) could conaiat of ezpanaion of scope in progreee. Thailand (PTT) LPG plant, product• pipeline, and nev ga• pipeline to Southern Thailand.

·Ministry of 100.0 Highway Sector - To eupport the Ro deciaion aade whether Project preparation under Communications (Bank) road atrengthening and rehabil­ conaultanta will be woy. itation progrlll!l including over­ required. lay,road aafety prograa, train­ ing and technical aaaiatance. State Railway of 15.0 Rail Efficiency Iaprovement - To Coneultant• will be Project preparation Thailand (Sll't~ (Banlt) support a package of efficiency needed in marketing, under way. enhancing policy and operational traffic, end operation. changes and certain inveataenta. Telephone 100.0 (R) Telecmmnunication V - Bzpanaion To be determined. Project preparation Organization of (Bank) of Thailand's doaeetic telephone under way. Thailand network by about one aillion lines; and technical aeaiatance.

Ministry of 5.0 Education - Scope to be To be determined. Project will be identi­ Education and (IDA) determined. fied after completion of Sports Education Sector Invest­ ment plan. WESTERN SAMOA

Electric Power 3.0 (R) Power - Construction of a 4 11W To be determined. Project preparation under Corporation (IDA) hydro power plant along with the way. (AaDB, EEC and BIB associated dam, reservoir, pe.n­ to co finance.) atock and powerhouse. The pro­ ject will have energy storage potential end will obviate need for Weetern SlllllDa to import diesel fuel for electricity generation.

See page 1 for footnotes. - 40 -

Member Country, Amount 6 and lllplementing Probable Stage of Processing and ~ll Lender Y Consulting Services Action on Procurement 4/

IV. SOUTH ASIA

BANGLADESH Bangladesh ,, .. Up to (R) Inland Water Transport III - To Project dropped from Inland Water ' 40.0 aaaist Dangladeah Inland Water lending program. Further Transport (IDA) Tranoport Authority (DIWTA), reporting will be dis- Authority Bangladesh Inland Water Trana­ continued. · port Corporation (DIWTC) and Ministry of Porta, Shipping and Inland Waterways (MPSI).

Dhaka Water and About (R) Dhaka WASA III - To continue Consultants for project Board presentation Sewerage 30.0 development of ground water preparation financed scheduled for Au~hority (IDA) supply in Dhaka and of aecondary under ongoing project. September 9. system; to further institutional development of DWASA through Consultants will be technical assistance; and to required for· leak promote the use of low cost · detection study and sanitation through a pilot production study. project.

Bangladesh Dank 80.0 (R) Agricultural Credit II - To sup­ Consultants being Project preparation will (IDA) port further reform of agricul­ recruited to assist in be coordinated with tural credit system, strengthen project preparation. Financial Sector Review. agricultural financial institu­ tions and to provide credit to farmers for on-farm investments.

Bangladesh Bank so.o (R) Industrial Investment - Provi­ As part of the project, Project timing dependent (IDA) sion of term finance to private consultants will be on improved recovery sector industry through finan­ required for training in rates for industrial· cial institutions to be the preparation of sub­ loans. selected. sector studies.

Bangladesh S2.0 (R) Refinery Modification and LPG Consultants have been re­ Negotiations in progress. Petroleum (IDA) Recovery - To establish a sec­ cruited for feasibility Corporation ondary conversion capacity at study financed under on­ facilities of Eastern Refinery going project. Limited.

Bangladesh Rural 15.0 (R) Hand Tubewells II - To increase FAO/CP assisted in Appraisal mission Development (IDA) agricultural production and project preparation. to be scheduled. Board employment by providing low cost manual irrigation facilities.

Ministry of 100.0 (R) Roads Rehabilitation and Consultants conducting Appraisal mission sched­ CODllunications (IDA) Maintenance - To rehabilitate feasibility and finan­ uled for October. national roads. cial/engineering studies are in the field.

Cabinet Division 6.0 (R) Rural Employment and Training - Consultants will be re­ Identification/prepar­ (IDA) To promote rural non-farm emp­ quired to survey demand ation mision scheduled loyment opportunities in 15 for viable investment for September. upazilas of Faridpur and Rajbari items. districts.

Dangladeah Water 20.0 (R) Flood Control and Drainage IV - Consultants requirements Negotiations sched­ Development (IDA) To improve physical production to be determined. uled for late August. Board environment by controlling floods and improving drainage system. Total project cost estimated at $26.0 million, of which $5.8 million in foreign exchange.

Ministry of 24.0 (R) Urban Development - To improve Consultants _(Louis Berger Appraisal mission find­ Works; end (IDA) the efficiency of delivery of International Inc.) have ings under review. N~go­ Ministry of urban infrastructure, services been selected for project tiations scheduled for Local Govern­ and affordable ehelter at local preparation. late September. ment, Rural level, and to strengthen the Development and management of sector agencies Cooperatives and increase reliance on local resource mobilization.

See page 1 for footnotes. - 41 -

Member Country, Amount & and Implementing Probable Stage of Proceeaing and ~1./ Lender.!/ Coneulting Servicee Action on Procureaent !!J BANGLADESH ( Cont Id)

Ministry of 190.0 (R) Industrial Sector Credit - Prov-· Consultants may be Negotiations delayed Finance (IDA) ieioo of foreign ezchange for employed to help pending reaulto of.July procurement of essential strengthen ezport post-appraisal mission• imports. administration and financing.

Ministry of 19.0 Industrial Energy Efficiency - Consultan·ts· will be Appraisal miseion sched­ Energy and (IDA) To reduce energy import require­ required during project uled for late ·September. Mineral ments and enhance industrial implementation to aaeiet Resources efficiency by providing credit Energy Management Unit. for investments to improve energy efficiency of existing industries.

To be determined 6S.O (R) Cyclone Protection II - To prov­ Consultants will be Discussions being held (IDA) ide assistance to eatabliah in­ required for project with Government on scope frastructure to reduce the loss preparation. of project. of life and property due to cy­ clones. Project will provide for coastal embankments, feeder roads, and technical aesietancea

To be determined 120.0 Energy Sector - To encourage the Consultants have been Project preparation (IDA) efficient use of resources and identified to assist in under way. improve resource mobilization; project preparation. support institutional reforms and sectoral coordination; and identify and assist GOB in im­ plementing a core least-cost in­ vestment program for the energy sector.

Ministry of 40.0 (N) Rural Roads and Marketing - To Technical consultancy Project preparation · Local Govern­ (IDA) complement past investments to services· are likely to be under way. ment, Rural increase food grain production required. Development and by providing necessary road and Cooperatives marketing infrastructure. Pro­ ject would include construction of feeder roads, bridges and culverts, improvement of mar­ kets, and technical assistance.

Ministry of 10.0 (R) Forestry II - Salvage logging Consultants may be Appraisal mission sched­ Trade, Industry (IDA) and reforestation in forest required. uled for late October. and Forests areas near Paro affected by beetles and fungal attacks.

Department of s.o (R) Education - To assist the Consultants will be Pre-appraisal mission Education c/o (IDA) Government in meeting both required for education scheduled for September. Ministry of qualitative end quantitative planning, curriculum Development demands in ita primary development, school schools. The project would aim design, etc. to (a) strengthen planning and the administration of the educ­ ation sector; (b) improve Grade 1 participation rates end reduce dropout; and (c) improve teacher effectiveness in the classroom especially in the primary grades.

Ministry of 14.0 (R) Irrigation Rehabilitation - To Consultants will be Board presentation sched­ Agriculture and (IDA) rehabilitate existing gravity required. uled for August 26. Forests irrigation systems in the Cen­ tral Dry Zone of Burma. Mein Technical assistance component would comprise: major ($1.7 million) would be civil work including repairs to financed by UNDP. and remodelling of major struct­ ures, canal desilting and land development; provision of equip­ ment and vehicles and agricult­ ural support services. Total project cost estimated at $27.0 million, of which $12.6 million in foreign exchange.

See page 1 'for footnotes. - 42 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~)J ~y Conaulting Services Action on Procurement-~

~ (Cont'd)

Ministry of 4S.O (R) Industrial Rehabilitation - Project postponed to l!'Y89 Industry (IDA) Pilot project with aim of dev­ lending program. Further eloping a program to rehabilit­ reporting will be dio­ ate eziating facilitie• of eel­ continued. ected eubaectoro/corporetion• in the manufacturing oector through modernization, rationalisation, balancing end upgrading of aye­ teme end operational practicea.

Ministry of 20.0 Tank Irrigation II (Crop Divera­ Conaultanta will be Project preparation Agriculture and (IDA) ification) - The project would required. under uay. Foreots (a) complement the Govermaent'e efforts in agricultural divere­ ificetion with particular empha­ sis on production of export pro­ moting end import eubatituting crops; end (b) increeae crop production and farm income• in areas where Government invest­ ments in irrigation have been relatively small. Major comp­ omenta of the project ere (a) conatruction of one or two earth-fill dama in Yin Basin with heights ranging from 90-160 ft.; (b) construction of main canal• and irrigation distrib­ ution ayatema for each comaand area ranging from 10,000 to 40,000 ac.; (c) agricultural support including ezteneion, research and inputs for crop divereification; (d) technical asaiotence and training; and Ce) monitoring and evaluation. Ministry of 40.0 Groundwater II (Crop Diveraifi­ Consultants will be Project preparation Agriculture and (IDA) cation) - The project would ex­ required. under way. Forests pand diversified crop production and farm incomes in Taze/Ye U, Budalin and Pale/Salingyi by in­ creasing the irrigation area from 400 ac. to 43,SOO ac., using groundwater reaourcea. The project would include: (a) conatruction of 2SS new deep tubewells and provision of pump­ ing equipment; (b) construction of irrigation and drainage aye­ tems for these 2SS new wells; (c) construction of a 132 kV tranemisaion line from Mandalay to Ye u, to provide power to the Taze/Ye U wella; (d) construc­ tion of power·distribution lines to serve the new wells in all three areaa; Ce) provision of agricultural extension, increm­ ental fertilizer and agro­ chemicals requirements for crop diversification; (f) technical aesistance and training; and (g) monitoring and evaluation.

Ministry of 40.0 (R) Gas Development and Utilization Consultants will be Appraisal mission sched­ Bnergy (IDA) - To include drilling of apprai­ required. uled for mid-September. sal and development wells, con­ Substantial technical as­ struction of surface facilities sistance and training and a 16-inch pipeline from component; considerable Payagon to Ywama. Technical cofinancing involved. aaeiotance and training.

See page 1 for footnotes. - 43 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender Y Consulting Service• Action on Procurement !!J

~ Baldia Water 125.0 Baldia Water Supply and Sewerage Consultants' service• Project preparation under Development (IDA) - Construction of 225 million likely to aaaeaa tech­ way. Authority, liters/day treatment plant, 4 nical options for the Government of pumping stations and a 90 km project. West Bengal long water transmission main to serve the Baldia Development Authority, 2 towns and rural communities en route. Total project cost estimated at $180 million, of which $36 million in foreign exchange.

Narmada 350.0 (R) Narmada (Madhya Pradesh) Dam and Project preparation ae­ Further processing of Planning (Bank) Power (formerly Narmada MP I) - sieted by mainly local this project awaits en­ Agency Construction of the Narmada consultants financed froo vironmental clearance by Sagar dam and hydropower station 'Project Preparation Faci­ GOI. to generate 1,000 MW of power lity advance included in and to evaluate future irri­ Credit 1332-IN. gation of about 300,000 ha. of land. Total project cost is Consultants wil'i be used estimated at $925 million, of for design and construc­ which $250 million in foreign tion management. exchange.

Narmada 70.0 (R) Narmada (Madhya Pradesh) Reset­ Project preparation as­ Further processing of Planning (IDA) tlement and Rehabilitation (for­ sisted by mainly local this project awaits Agency merly Narmada MP I) - Reset­ consultants financed frOIII environmental clearance tlement of about 100,000 people Project Preparation Fund by GOI. affected by Narmada Sagar reser­ advance included in voir submergence. Total project Credit 1332-IN. No deci­ cost is estimated at $250 mil­ sion yet made whether lion, of which $5 million in consul tents are required foreign exchange. during implementation.

Industrial 200.0 (R) Cement Energy Savings - Assis­ Consultants in cement Loan signed on Credit and (Bank) tance, through financial inter­ technology will be re­ July 22. Investment mediaries, to a number of cement quired; no decision yet Corporation of plants to convert from wet to on choice of consultants. India, Ltd. dry process technology. Total (ICICI); and project cost about $470 million, Industrial of which about $211 million in Development Bank foreign exchange. of India (IDBI)

Indian Council 80.0 Forestry, Research, Education Foreign technical assist­ Project preparation under for Fores try (IDA) and Training - The project will ance to upgrade forestry way. (Cofinancing Research; and develop and support forestry . research, education and likely.) Indian Council research, education and manpowe.r training methodology ia for Agricultural development at all levels, and likely to be required. Research support the proposed Indian Council for Forestry Research. Total project cost estimated at $160 million, of which $10 million in foreign exchange.

Bombay Municipal 100.0 (R) Bombay III Water Supply - Pro­ Local and expatriate Board presentation sched­ Corporation (Bank) duction of an additional 100 mgd consultants required for uled for October. 70.0 of water for the Bombay Metro­ project management and (IDA) politan area from the Bhatsai implementation. River, trunk distribution, dis­ tribution mains and sewage col­ lectors, low-cost sSnitation, and studies to determine the next incremental production of water required to serve the Bombay area. Total project cost about $304 million, including a $60 million foreign exchange component.

Ministry of 100.0 (R) National Water Management - Sup­ No decision on consult­ Appraisal report Water Resources; (IDA) port for improved water manage­ ants. being prepared. and Irrigation ment activities in selected Departments of projects covering 500,000 ha in participating three States (Andhra Pradesh, States Karnataka, and Tamil Nadu). Total project cost estimated at $200 million.

See page 1 for footnotes. - 44 -

Member Country, Amount & and Implementing Probable Stage of Proceosing and ~!/ Lender Y Consulting Services Action on Procurement 4/ INDIA (Cont'd)

India Department 300.0 Telecommunications IX - Provi­ No decision on con­ Appraisal report being of Telecom­ (Bank) sion of imported equipment and sultants,· prepared. (Cofinancing munications raw materials to support reha­ likely,) bilitation and expansion of telecomnunicationa networks.in Procurement: Standard four major metropolitan areae, bidding documents and provide for expane ion and approved, modernization of long-distance transmission links, Total coat estimated at $2,4 billion,

National Thermal 350.0 (R) National Capital Power Supply - Consultants may be Appraisal report com­ Power (Bank) Installation of four coal/oil­ required for design of pleted, Negotiations Corporation fired 210 MW unite as first ash disposal facility, tentatively scheduled for etage of a new plant in September, (Cofinancing Ghaziabad District in the State possible.) of Utter Pradesh, together with associated 400 kV transmission lines; rehabilitation of power station at Badarpur; completion of transmission ring around Delhi; execution of a series of technical managerial and financial studies, Total project cost about $1,3 billion, of which $528 million in foreign exchange.

Ministry of 85.0 (R) National Agricultural Extension No expatriate consultants Negotiations planned for Agriculture; and (IDA) III (NAEP III) - Assistance required. end-September. State Govern­ to: (a) the S.tate of Assam in ments of Uttar strengthening its training and Pradesh, Himacal visit (T&V) system; (b) the Pradesh and introduction of T&V system to Assam the States of Utter Pradesh and Himachal Pradesh; and (c) the replenishment of the Special Sub-project Fund established under NAEP I, Total project cost estimated at $140 million, of which $5,5 million in foreign exchange.

Coal India Ltd, 340,0 Gevra Thermal Coal - Assistance No decision on Technical discussions and (Bank) to CIL Subsidiaries in expanding consultants. negotiations suspended. production of thermal coal at Completion of negotia­ two mine sites ($180 million) ,tions subject to agree­ plus support for imports of ment on medium-term cost coking coal ($160 million), reductions program for Total project cost about $643 Coal India Limited, million, of which $319 million in foreign exchange.

Roads and 100.0 (R) Gujarat Rural Roads - Assistance Expatriate consultants Negotiations postponed at Buildings (IDA) to GOG to upgrade rural road not likely to be request of Government, Department, construction, maintenance, and required, Government of management capabilities, Total Gujarat (GOG) project cost estimated at $158 million of which $33 million in foreign exchange,

Indian Farmers 302,2 (R) Cooperative Fertilizer Industry Process technology and Loan signed on July 22, Fertilizer (Bank) - Construction of a large consultant have been (Cofinancing of $150-200 Cooperative Ltd, anmonia/urea plant to expand selected, million with OECF and domestic production cspscity. others to cover equipment Total project cost estimated at packages,) $499.8 million, of which $274,1 million in foreign exchange,

Government of 90,0 (R) Cauvery Delta Modernization - No decision on con­ Project preparation Tamil Nadu (IDA) Modernization of about 64 1 500 ha sultants, delayed pending agreement of existing irrigation and drai­ between Karnataka and nage facilities in the delta Tamil Nadu on utilization area including improved system of Cauvery water, operation and training pro­ grams, Total project cost estimated at $154 million,

See page 1 for footnotes, - 45 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~ll ~y Consulting Service• Action on Procurement 4/ .Y!!!!! ( Cont 'd)

National Thermnl 485.0 Combined Cycle Power - Instal­ Consultant• will be Approved by the Executive Power Corpor­ (Bank) lation of 3 cO!lbined-cycle ga• required for deaign ••• Director• on April 1. ation power stations in the Western pect• of coabined cycle (Cofinancing possible.) end Northern Regions, Total plant, and for monitor­ project coat estimated at $1.2 ing, teating and c~i•• billion, of which about $666 •ioning of equipment. million in foreign exchange.

Industrial 250.0 CR) Automotive Industry - Modern­ Ho deciaion on con­ Project preparation under Credit and (Bank) ization, rationalization and aultanta. way. Sector report to be Investment integration of vehicle ancillary diacuaaed with GOI Corporation of equipment manufacturers (Cofinancing likely.) India Limited

Karnataka Power 270,0 Karnataka Power (formerly Ho decision on con­ Apprainal report being Corp, (Bank) Kalinadi II Hydro) - Increase sultants. prepared. (Cofinancing the power supply and reduce the possible.) power outages in the State of Karnataka (Southern Region) through the development of the hydroelectric potential of the Kalinadi River. It would provide 300 MW of additional inotalled generation capacity. Total project cost estimated at $589 million, of which $233 million in foreign exchange,

Governments of 80.0 Bombay and Madras Population - No decision on con­ Project preparation Tamil Hadu and (IDA) Reduce infant/child/maternal sultants. under way. Maharashtra mortality; moderate fertility; and improve municipal author­ ities'abilities to design and implement health and family welfare programs,

Government of 70,0 Bihar Tubewells - Construction No decision on con­ Negotiations substan­ Bihar (IDA) of new public tubewella and the sultants. tially completed. rehabilitation of existing tube­ wells; construction of power lines to serve only public tube­ wells; and organization and man­ agement improvements. Total project cost estimated at $100 million, of which $15 million in foreign exchange.

Steel Authority 200.0 (R) Steel Energy Saving - Restruct­ Consultant requirements Project preparation under of India Limited (Bank) uring of SAil and its opera­ not known at this time. way. Sector report to be (SAIL) tions, end modernization of one discu•ned with GOI. of SAIL's existing integrated (Cofinancing likely.) steel mills, Total project cost estimated at $665 million, of which $250 million in foreign exchange.

Oil India 150.0 (R) Oil India Limited Petroleum - To Conaultanta aervices not Appraieal mission in the Limited (OIL) (Bank) accelerate India's exploration known at thia tiae. field. (Cofinancing efforts, to build up the instit­ likely,) utional capabilities of OIL; and to facilitate the introduction of the private sector into the petroleum sector in India. Total project cost estimated at approvixmately $900 million or $1.0 billion,

Government of 350,0 Nathpa Jhakri Hydro - To support Consultant requirements Project preparation under India; and State (Bank) the development of the hydro­ not yet detenained, but way. (Cofinancing Electricity electric potential of the Satluj unlikely to be needed. · likely.) Board of River, as well as add 1,500 MW Himachal Pradesh of power generating capacity to the Northern Region thereby helping to alleviate critical power shortages there. Total project cost estimated at $1.9 billion, of which $465 million in foreign exchange.

See page 1 for footnotes. - 46 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~l! ~y Consulting Services Action on Procurement 4/ _!!!!!!! (Cont I d)

Indian Telephone 100.0 (R) Telecommunications Equipment Consultant services may Project now on hold, Industries (Bank) Restructuring - To meet be required. pending decisions by GOI (ITI); efficiently the growing domestic on domestic competition. Hindustan Cables demand for telecommunications Limited (BCL); equipment, and to support the Hindustan Government's decision to in­ Teleprinters crease domestic competition for (RTL); the telecommunications cable, Industrial subscriber and transmission Credit and equipment supplied to the DT. Investment Total project cost estimated at Corporation of $150 million. India Ltd. (ICICI)

Department of 50.0 Karnataka Irrigation II - The No expatriate consultants Project preparation Irrigation, (Bank) objectives of the project are required. under wayo Government of 150.0 to: (a) develop over five years Karnataka (IDA) a total of about 200,000 ha out of a command area of 425,000 ha, and (b) provide a modern irrig­ ated agriculture based on rota­ tional water supply tech­ niques. Total project cost es­ timated at $390 million.

Madras 56.0 Madras Water Supply and Sewerage Consultants expected for Project preparation unde Metropolitan (Bank) - To increase the effectiveness operational efficiency. way. Water Supply and of abstraction, distribution and Sewerage Board usage of water supply; ensure (KKWSSB) full recovery of HMWSSB's in­ vestment and operational costs; support appropriate programs for conjunctive water sharing. Total project cost estimated at $120 million, of which $36 mil­ lion in foreign exchange.

Department of 100.0 (R) Uttar Pradesh Urban Development Expatriate and local Appraisal report being Rousing and (IDA) - Serviced land, core housing, consultants expected for prepared. Urban Devel­ slum upgrading, area develop­ institution building. opment, Govern­ ment, water supply, sewerage, ment of Utter sanitation in about 12 towns. Pradesh Total project cost estimated at 200 million, of which $50 mil­ lion in foreign exchange •

. Metropolitan 75.0 Tamil Nadu Urban Development - Consultants expected for Project preparation Development (Bank) Improve sector institutions management improvement. under way. Authority 125.0 responsible for managing urban (IDA) development and public urban investment; strengthen local government financial and manage­ rial capability; secure private participation in land develop­ ment; and reform procedures for revising tariffs for public services. Total project cost estimated at $440 million, of which $65 million in foreign exchange.

Government of 70.0 Kerala Urban Development - Area Local consultants ex­ Project preparation Kerala (IDA) development, slum upgrading, im­ pected for management under way. provements in delivery and man­ improvement. agement of urban services. Total project cost estimated at $140 million.

Governments of 50.0 Northwest India Irrigation and No decision on consul­ Project preparation Baryana, Punjab, (Bank) Drainage - To provide for a tants. under way. and Rajasthan 100.0 sustained irrigated agriculture (IDA) and control emerging salinity· problems. Key components to be financed under the project would include: lining of main and dis­ tributory canals, development of operation plans, development of long-term plan for groundwater management, control of water­ logging and salinity.

See page 1 for footnotes. - 47 -

Member Country, Amount & and Implementing Probable Stage of Processing end ~'J/ Lender Y Consulting Services Action on Procurement !!./ _!!!!!! ( Cont 'd)

To be determined 150.0 (R) Electronice - Industrial Devel­ Consulting aervices not Project prepareti.on under (Bank) opment - To support fixed in­ yet knovn. way. Sector report to be vestment for private and joint discussed with GoverDment nectar electronics firms; may (Cofinancing likely.) involve a small venture capital element, a productivity fund and a training compoment. Other element• of the project could include: financing of the end­ use of electronics and an E"Port Marketing Fund.

Government of 60.0 Madhya Pradesh Water Supply - To Consulting services, Project preparation Madhya Pradesh: (Bank) enable water supply and sewerage mostly local, needed for under way. Pub lie Heal th operations in Hadhya Pradesh to financial and accounting Engineering be financially self-supporting. management systems. Department Total project cost estimated at $130 million, of which $30 mil­ lion in foreign exchange.

National Thermal 300.0 (R) Talcher Thermal Power - Includes Consultants aervicea not Negotiations tentatively Power Corpor­ (Bank) (a) construction and instal­ yet known. scheduled for September. ation (NTPC) lation of two coal-fired 500 MW (Cofinancing likely.) units in the State of Orissa; (b) the construction of trans­ mission lines to integrate the plant with the Eastern Regional grid; Cc) a communications network linking NTPC's plants with headquarters via satellite and terreetial microwave links; and (d) a series of studies on organizational aspects of power sector institutions. Total project cost estimated at $1.1 billion, of which $421 million in foreign exchange.

Oil and Natural 250.0 Western Gss Development - Con­ No decision on Project preparation Gas Commission (Bank) struction of Phase II of the consultants. under way. (Co­ (ONGC) and Gas South Bassin development to financing likely.) Authority of increase gas production and India Limited onshore treatment capacity from (GAIL) 10 to 20 million cubic meters per day, including production treatment end NGL facilities. Total project cost estimated at $1.5 billion.

Government of 60.0 Utter Pradesh II Population Ho decision on Project preparation Uttar Pradesh (IDA) To assist UP in strengthening consultants. under way. (Co­ key elements (management, com­ financing likely.) munications, monitoring/evalua­ tion) of the State family wel­ fare program and implementing appropriate service delivery strategies.

National Dairy 35.0 (R) National Dairy II - To assist in Expatriate consultancy Project preparation under Development (Bank) optimizing past dairy invest­ not required. way. (Cofinancing Board (NDDB)/ 115.0 ments, extending the cooperative likely.) Indian Dairy (IDA) dairy infrastructure to new Corporation states, and removing various (IDC) and institutional policy constraints National to dairy development. Cooperative Development Corporation (NCDC)

Ministry of 85.0 (N) National Agricultural Extension No decision on Project preparation Agriculture; and (IDA) IV - Project would finance: consultants. under way. State Govern­ introduction of training and ments of Utter visit system in Western Utter Pradesh, Tarail Pradeah and eight districts of Nedu, Wast Bihar, 88 well as improvement of Bengal, Kerala extension in four-second phase gnd Maharashtra stateo, and special Directorate of Extension subproject&. Total project cost estimated at $130.0 million.

See page 1 for footnotes. - 48 -

Member Country, .Amount 6 and Implementing Probable Stage of Processing andl ~!/ ~y Consulting Servi9ee Action on Procurement 4 MALDIVES I Bank of Maldives (BON) s.o (R) Rural Production Promotion and Will be required for Appraiual report under (IDA) Credit - To develop agricultural technical assistance preparation. (Cofinan­ and agribusiness sectors through component. cing with IFAD for abou strengthening the development $1.0 million.) banking functions of BOH. Key component• financed under the project would be: vegetable, fruit, coconut, palmwood and firewood production, animal husbandry, cottage industries and transport veesels, along with technical assistance.

Ministry of About Babai Irrigation - Includes con­ Consultants will be re­ Project processing Water Resources 37.0 otruction of weir and headworks quired. delayed due to riparian (IDA) on Babai River, construction of issue, and country irrigation and drainage facili­ assistance strategy ties on about 13,000 ha of land, considerations. and strengthening of agricult­ ural extension services in the area. Total project cost estim­ ated at $64.5 million, of which $45.2 million in foreign ex­ change.

Ministry of About (R) Rural Development III - Follow­ No decision on consult­ Approved by the Executi, Panchayat and 19.0 up on first credit with emphasis ants. Directors on July 1S. Local Develop­ (IDA) on (i) achieving fuller use of (Cofinancing with UNDP ment the infrastructure created dur­ for $1.l million.) ing the first phase; (ii) ex­ panding and improving agricul­ tural support services; (iii) exploiting the irrigation poten­ tial of the area by constructing additional gravity irrigation schemes; and (iv) developing ad­ ditional infrastructure includ­ ing drinking water supply sys­ tems. Total project cost estim­ ated at $23.5 million, of which $8.7 million in foreign ex­ change.

Ministry of 10.0 Deep Aquifer Exploration - In­ Consultants recruited for Project preparation del· Water Resources (IDA) dentify new and untapped sources project preparation. ayed pending agreement, of irrigation water supply from project scope and desig, deep aquifers which would in­ crease cropping intensity in the Terai. This would include dril­ ling of exploratory boreholes; construction of wells; in­ service training; and prepar­ ation of reports. Total project cost estimated at $15.5 million.

Ministry of 10.0 Second Cottage and Small Indus­ Consultants will be Approved by the Executi, Industries· (IDA) tries - Follow-up to first required. Directors on Hay 13. Cottage and Small Industry (UNDP will provide $1.8 project. The objectives of the million to assist in project would be (a) consolidat­ financing technical ing inotitutional development assistance component.) initiated under the first pro­ ject, and (b) developing and expanding small and cottage induetry activity in districts with existing artisan clusters and reasonable transport and institutional infrastructure; Specific project components include: (i) credit component; (ii) technical assistance to upgrade the coD1Dercial banking syatem; and (iii) extension and training services. Total pro­ ject coat about $17.3 million, of which $6.9 million in foreign exchange.

See page 1 for footnotes. - 49 -

ember Country, Amount & ~d ImpleBenting Probable Stage of Processing and 'gency ll ~y Conaulting Servicee Action on Procurement!/ I l!PAL ( Cont I d)

~ibhuvan 15.0 Technical and Engineering Educ­ Consultants may be Project preparation (IDA) ation - (i) Rationalize existing required. under way. teaching programs and reaourcea; (ii) improve the internal effi­ ("'" ciency, quality and relevance of technical and engineering educa­ tion; and (iii) to establish the physical capacity to educate technicians and professional engineers at the Institute of Engineering (IDE) of Tribhuvan University. linistry of Narayani III (Consolidation) - Consultants will be Approved by the Executive 1 24.5 ater Resources (IDA) Include civil works OD a,ooo ha required. Directors on June 19. of farm area; groundwater devel­ (Cofinancing arranged opment to augment water supply with Switzerland for $7.5 in project area; operation and million.) maintenance and agricultural support services. Total project cost about $35.5 million, of· which $20.5 million in foreign exchange.

inistry of Sunsari Morang II - Further Consulting services will Project preparation 1 40.0 later Resources (IDA) improvement of Chatra Main be required. under way. Canal; rehabilitation of irriga­ tion distribution system and drainage; improved water manage­ ment; strengthening agricultural service•; equipment and build­ ings; technical assistance. r ,--PAKISTAN Sate Cement 100.0 (R) Cement Industry Restructuring Consultants, financed by Appraisal mission tent­ :corporation/ (Bank) To support rehabilitation end IDA Technical Assistance atively scheduled for Ministry of introduction of energy effi­ Project, being used for end-September. Production ciency measures in existing preparation. Additional public sector cement plants. consultants will be re­ quired for project im­ plementation.

;Ministry of 30.0 Private Tubewell Development. Consultants have been Project preparation under Water and Power, (Bank) recruited for project way, financed by UNDP. and Provincial preparation. Additional Departments of consultants will be re­ Irrigation and/ quired for project imp­ or Agriculture lementation.

Pakistan 100.0 (R) Telecommunications V - To Consultants will be Approved by the Executive Telephone & (Bank) support the expansion and required for project Directors on July 22. Telegraph modernization of Pakistan's implementation. Loan signing on August 8. Department telecOl!lllunicationa system.

National Highway 150.0 CR) Highway IV - Construction of Consultants will be Appraisal mission sched­ Board (Bank) about 490 km of 7.3 m carriage­ required for implem­ uled for end-September. way in priority sections of the entation. existing North-South main road.

Ministry of 150.0 Agriculture Sector Loan - To Consultants will be Appraisal to be resumed Food, Agricul­ (Bank) support program of structural required for implement­ when conditions are met. ture and Cooper­ reforms to include oetting of ation. atives investment priorities, rational­ ization of incentives and strengthening of institutions.

Ministry of 117.0 (R) Primary Education III - To Consultants will be re­ Appraisal mission Education (IDA) improve the quality of primary quired for implementa­ scheduled for mid­ education in Punjab province. tion. September.

Ministry of 80.0 Irrigation Rehabilitation II - Consultants will be Appraisal mission Water and Power, (IDA) To rehabilitate deteriorated required. delayed. and Provincial canals and surface drains in Department of four provinces. Irrigation

Provincial 39.0 Agricultural Extension IV - Consultanta will be re­ Negotiations scheduled Department of (IDA) Second phaae extension project quired. for mid-OC:tober. IAgriculture in Bind, and Punjab Provinces.

See page 1 for footnotes. - 50 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~y Lender 1/ Consulting Services Action on Procurement:!/ PAKISTAN (Cont'd)

Punjab Depart­ 60.0 (R) Punjab Urban Services and Water No decision made whether Project preparation ment of Planning (IDA) Supply - Water aupply, uewerage consultants will be under way. and urban services in varioua required. cities in Punjab province.

Ministry of 54.0 Small Industries III - To conti­ Consultants will be Appraisal report under Finance (Bank) nue support for small industries required for project preparation. through delivery of financial implementation. resources and technical and marketing services.

State Engineer­ 50.0 Heavy Industries - To rehab~ Consultants, financed by Project preparation ing Corporation (Bank) ilitate and improve the effi­ IDA Technical Assistance under way. ciency of selected engineering Project, being used for companies and a steel mill, as project preparation. well aa to rationalize the policy environment in the sub­ aector.

Water end Power To be Kalabagh Dam - Dam construction Main consultants for pre­ Project preparation being Development deter­ and installation of 2400 mw paration and drafting of finalized. Authority mined hydro capacity. tender documents re­ (Bank) cruited. Further spe­ cialist consultanta likely to be required.

National 21.0 (R) Refinery Energy Conservation and Consultants will be Appraisal mission sched­ Refinery Ltd. (Bank) Technology Acquisition - To im­ required. uled for December. (NRL) prove efficiency and increase (marginally) the refining capa­ city of the NRL, while reducing energy consumption and strength­ ening management capability.

Water and Power 70.0 (R) Power Plant Efficiency Improve­ Consultants will be Negotiations scheduled Development (Bank) ment (formerly called WAPDA VII) required. for early September. Authority - To rehabilitate WAPDA's ther­ (WAPDA) mal generating facilities to improve their reliability and efficiency as well as augment their generating capacity.

Ministry of 7.0. (R) Technical Assistance III - Consultants will be Appraisal mission sched­ Planning and (IDA) Follow-up of previous technical required. uled for end-August/ Development aasietance credits. The project September. would finance studies and con­ sultancies for preparation of Seventh Plan (FY89-93) and sector/aubaector policy adjustment programs.

Sui Northern Gas so.o Gas Development - To provide No decision on Project preparation Pipelines Ltd; (Bank) production facilities in the consultants. under way. end Oil and Gas Loti and Dhodak gas fields, and Development improved gas transmission Corporation facilities from the Pirkah, Loti and Dhodak fields.

Government of 150.0 Energy Sector Loan II - To con­ Consultants will be re­ Identification to be Pakistan Plan­ (Bank) tinue the program of reforms in quired for implement­ initiated in December ning and Devel­ pricing policies, investment ation. 1986. opment Depart­ programming and institutional ment; Water and development started under the Power Develop­ First Energy Sector Loan. ment Authority; Karachi Electri­ city Supply Corp.; Oil and Gas Development Corp.; Southern Gas Co. Ltd.; Pakistan State Oil Co. Ltd.; Pakistan Mineral Development Corp.; Sui Northern Gas Pipelines Ltd.

See page 1 for footnotes. - 51 -

1 Hember Country, Amount Ii and Implementing Probable Stage of Processing and l~l! ' ~y Consulting Services Action on Procurement !!J !PAKISTAN (Cont'd) Project preparation Water and 150.0 Jamshoro Thermal Power Plant Ex­ Consultants will be being completed, Power Devel­ (Bank) pansion - Installation of three - required. opment Author­ 300 MW oil-fired generation ity (WAPDA) units at Jamshoro. Total project cost estimated at about $710 million.

Civil Aviation To be (R) Transport Sector Loan - To sup­ Consultants will be Preparation under Authority; deter­ port a program of policy required. way. Karachi Port mined reforms, investment, institional Trust; Ministry (Bank) and organizational reform, and of Communic­ training in the transport ations; Ministry sector. of Railways; National High­ ways Board; Pakistan Rail­ ways Planning and Development Department; Ports and Ship­ ping; Port Qasi.ni Authority

SRI LANKA

Ministry of Up to Fifth Tree Crops Diversification Ho decision made whether Project preparation under Plantation 15.0 - Increased production of tea, consultants will be way. Industries (IDA) rubber and coconut for small­ required. holder sector by enhancing producer incentives, improving I extension services and the supply of inputs, reducing r constraints to credit, rehab­ ilitating private factories, and improving marketing mechanism for smallholder output.

Ministry of 18.0 Agricultural Research - Esta­ Consultants will be Negotiations tentatively Agricultural (IDA) blishment of a national agency required. scheduled for September. Development and to ensure coordinated research Research planning, and strengthening of the national agricultural research institutions.

Ministry of 37.0 (R) Water Supply and Sanitation - No decision on consul­ Credit signed on July 24, Local Govern­ (IDA) Rehabilitation of existing tants. ment, Housing assets, particularly production and Irrigation; facilities, improve operation and National and maintenance facilities, and Water Supply and upgrade distribution work in Drainage Board selected areas. Total project (WDB) cost about $64.B·million, of which $27.5 millin in foreign exchange.

Ministry of 52.0 CR) Ninth Power (Distribution Consultants required. Appraisal report under Power and Energy (IDA) Rehabilition) - Rehabilitation preparation. of Ceylon Electricity Board's (CEB) power and transmission system.

Ministry of 15.0 Health and Population - (To be No decision on Project preparation Health (IDA) determined). consultants. under way.

National 20.0 (R) Industrial Development II - To Consultants will be Credit signed on Development (IDA) continue improving the financial required. July 24. Bank/Development system and availability of fin­ Finance Corpor­ ancing for large industrial in­ ation of Ceylon vestments. Total project cost about $94 million, of which $52 million in foreign exchange.

Ministry of 15.0 Vocational Training II - To in­ No decision on Approved by the Executive Local Govern­ (IDA) crease supply of skilled man­ consultants. Directors on May 13. ment, Housing power to construction sector. CCo financing by UHDP for and Construction Total project cost about $24.5 $1.0 million.) million, of which $10 million in foreign exchange,

See page 1 for footnotes. - 52 - Member Country, Amount, and Implementing Probable Stage of Proceaeing and ~l! .!:!!!!!I. y Consulting Servicee Action on Procurement if SRI LANKA (Cont'd)

Ministry of 13.0 (R) Municipal Management - To Ho deciaion on Credit signed on Local Govern­ (IDA) atrengthen performance of urban consultants. July 24. ment, Rousing local authorities and to improve and Construction the efficiency and effectiveness of delivering urban eervicea, including operatione and main­ tenance. Total project cost about $20.4 million, of which $13.8 million in foreign ex­ change.

National Devel­ Up to S11&ll and Medium Industries III No decision on Project preparation opment Bank 1S.O - To complement and expand on­ coneultante. under way. (NDB) (IDA) going program of small and medium industry development through financing of eligible industries in selected sub­ nectore.

See page 1 for footnotes. ·------

- 53 -

Member Country, Amount & and Implementing Probable Stage of Processing end Agency ]J Lender y Consulting Services Action on Procurement 4/

V. EUROPE, MIDDLE EAST AND NORTH AFRICA

SONELGAZ About Power III - Project would fin­ To be determined, Preparation under way by 100.0 ance part of SONELGAZ's 85/89 Bank/Government, (Bank) Investment Program.

Ministry of About (R) Highways V - Road maintenance, To be determined, Appraisal mission sched­ Pub lie Works 80.0 rehabilitation, technical uled for September. (Bank) organization assistance and training.

Ministry of About Construction of new irrigation To be determined, Appraisal report Hydraulics, 110.0 schemes over 8,000 ha in Haut being prepared, Environment and (Bank) Cheliff and rehabilitation of Forestry 9,300 ha in Bas Chelif River,

Societe About Railways II - Project would help To be determined, Bank involvement under Nationale des 100.0 rehabilitate Societe Nationale review by Bank/Govern­ (Bank) des Transpo~ts Ferroviaires ment. Ferroviaires (SNTF), and provide technical assistance to improve financial management and operation.

Ministry of About (R) National Water Supply II - Pro­ To be determined. Appraisal report being Hydraulics, 200,0 ject would finance part of the prepared, Environment and (Bank) Ministry's 1985/89 investment Forestry program,

Ministry of About Telecoonnunications II - Project To be determined, Identification under Post and 150.0 would finance part of 1985/89 way by'Bank/Goveroment, Telecommunic­ (Bank) telecommunications investment ations program,

Sewerage Board About Larnaca Sewerage - Provision of Consultants have been re­ Negotiations postponed at of Larnaca 19,0 sewerage collection, waste water cruited. Government's request. (Bank) treatment systems to the major urban and tourist centers.

To. be determined About Industrial Sector Technology To be determined, Further processing 10,0 Promote the growth of manu­ under revieW. (Bank) facturing exports.

Ministry of About Southern Conveyor II - Phase II Appointment of consult­ Appraisal mission tentat­ Agriculture 13.0 of the Southern Conveyor Project ants to undertake studies ively rescheduled for (Bank) including execution of the under way, October, (Cofinancing Dbiarizos Diversion, irrigation envisaged,) schemes, water supply and engin­ eering.

Sewerage Board About Waste Water II - Provision of Appointment of consult­ Project preparation of Paphos 10,0 sewerage and drainage facilities ants to prepare project under way, (Bank) for Paphos and surrouding areas. under way,

EGYPT 1 ARAB REPUBLIC OF Egyptian To be Fourth Power - Transmission, No decision made. Appraisal mission sched­ Electricity deter­ distribution and rural electri­ uled for September, Authority (EEA) mined fication. (Bank)

To be determined To be Gas Development V - Development No decision made, Project being prepared by deter­ and distribution of natural gas. Egyptian General Petro­ mined leum Corporation (EGPC), (Bank)

Development 100.0 Construction Industry Sector - Consultants will be re­ Approved by the Executive Industrial Bank (Bank) Assistance to Egypt's construc­ quired to the Joint Com­ Directors on June 28, tion industry through lines of mittee for sectoral stud­ 1984. credit and technical assist­ ies, for the management ance, Total project cost esti­ development program and mated at $132,2 million, with to the participating $100 million in foreign ex­ banks for sub-project ap­ change, praisal.

See page 1 for footnotes. - 54 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~ll Lender Y Consulting Services Action on Procurement 4/

EGYPT, ARAB REPUBLIC OF (Cont'd)

Ministry of 20.6 Vocational Training II - To in­ May be required for Board presentation Industry (Bank) crease the supply and upgrade technical aosistance. delayed; awaiting Govern­ the quality of skilled and semi­ ment confirmation to skilled manpower in the indus­ proceed with project. trial sector and particularly in the automotive, electrical, metals, mechanical, foundry, chemical and marine subeectors by establishing four new Voca­ tional Training Centers (VTCs) and extending the training fa­ cilities of six existing VTCs.

Executive Agency 45.0 Solid Waste - Provision of Consultants for prepara­ Negotiations to be for Joint Pro­ (Bank) equipment, composting and in­ tion have been appointed. scheduled. jects (JP) cinerating plants and studies to Additional consultants support solid waste management will be required for var­ in two governorates. ious studies.

Productivity and 51.0 Industrial and Vocational Train­ Consultants required for Negotiations to be Vocational (Bank) ing - Expanding and upgrading development of training scheduled. Training training in key industrial programs. Department sectors, including textiles, (PVTD) and garment making, footwear, food Ministry of processing, and equipment Social Affairs maintenance, (MOSA)

River Transport 75.0 Inland Water Transportation - Consultants selected for Consultants have st4rted Authority (RTA) (Bank) Rehabilitation of the Damietta­ project preparation, feasibility studies. Cairo Branch of the Nile, in­ cluding deepening of the branch, Bank Project Preparation improvement and construction of Facility advance of river ports, cargo handling $500,000 approved to equipment, navigational aids and finance consultant ser­ technical assistance. vices for preparation of: technical, financial and economic studies needed to determine the optimal phasing of the project; final designs, drawings, specifications; and other tender documents.

Alexandria Water :38.8 Alexandria Water Supply II - Consultants required for Appraisal report being General (Bank) Rehabilitation of water supply construction supervision, prepared. Tender doc­ Authority (AWGA) system, institutional develop­ updating of distribution uments under preparation ment and training. Total system maps and water by Borrower. (Cofinan­ project coet estimated at $77.6 supply master plan, and cing arranged with million. conducting leak detection Ministry of Economic survey and water study. Cooperation, Federal Republic of Germany, for $:3.7 million.)

Ministry of 70,0 Channel Maintenance - Maint­ To be determined. Approved by the Executive Irrigation (Bank) enance of irrigation canals and Directors on June 26. drains, including mechanical and chemical control of weeds. Pro­ vision of equipment and train­ ing. Total project cost about $126.9 million, of which $78.8 million in foreign exchange.

Port Said Port 70.0 Port Said Port II - Expansion of Consultants appointed by Preparation by Port Said Authority (PSPA) (Bank) Port Said port to (a) eliminate Government for prepar­ Port Authority (PSPA) to barge handling operations; (b) ation. begin shortly. provide for container trans­ shipment facilities; (c) provide for general cargo and container han4ling; and (d) improve port operations and equipment maintenance.

See page 1 for footnotes. - 55 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~ll ~!/ Conaulting Service• Action on Procurement 4/

~ 50.0 Industrial Export• - To pr01110te To be determined. Preparation under way. Notional Bank of (Bank) exports of ,..nufactured goada. Hungary

National Danit of 150.0 (R) Induatrial lleatructuring II - Coneultanta may be Second phase appraisal Hungary (Bank) Policy/institutional development required. mieaion planned far and restructuring of apecific October. sectore.

National Oil and 100.0 Petroleum II/Gaa - Unidentified Ta be determined. Project preparation Gae Trust (OKGT) (Bank) but could entail combination-of postponed ta permit an exploration pr011Dtian c010p­ consideration of the onent and gaa exploration or gao results of studies - development and distribution. under way.

National Bank of_ 50.0 (R) Telec011111unicatiana - Modern­ Consultants may be Appraisal mission Hungary (Bank) ization of telec0111111unicatian required. scheduled for facilities. September/October.

Ministry of 50.0 Agro-industries Modernization - Consultanta may be Project preparation Agricutlure; and (Bank) Increase agro-induetrial export• required. under way. National Bank of ta convertible currency markets Hungary and efficiency of production at small farm level and at agro­ induatrial level. Project would provide 1110dern equipment far existing egroprocese firms.

National Bank 150.0 (N) Industrial Restructuring III - Ta be determined. Project identification of Hungary (Bank) Policy development to support scheduled for September. industrial restructuring oe well ea specific program focussed an restructuring in eelected subaectora.

Jordan About CR) Aqaba Power II - Second phase of Consultants may be Appraisal report being Electricity 45.0 generation expansion at Aqaba required. prepared. (Cofinancing Authority (Bank) Power Station. with Kuwait Fund con­ firmed. Other cofin­ anciers have expressed interest.) To be determined About Third Urban Development - To Ta be determined. Preparation under way. 15.0 replicate, outside of Amman, (Bank) law-income shelter solutions innovated in Amman region, end ta include upgrading and sites and eervicea.

Arab Potash About (R) Potash II - Assistance far re­ To be determined. Appraisal report Company 15.0 finery modifications including being prepared, (Bank) corrective optimisation meaauren· ta eesesa possibilities for fur­ Procurement: Retroactive ther expansion in the context of financing to be recom­ technology improvements and cast mended.) reductions.

Ministry of To be (N) Education Sector·Inveatment Loan Consultants may be Preparation under Education deter­ - Support for GovernDent'e five­ required. way. mined year plan for education sector, (Bank) including construction, equip­ ment and technical aa•i•tance to replace rented primary and in­ termediate level achool buildings and.purpose-built facilities.

Jordan Phosphate About (N) Phosphate Mining - Initial To be determined. Project preparation Mining Company 25.0 development of the El Shidiya under way, (Bank) Phosphate Mining and Benef­ iciation Facilities.

See page l for footnotes. - 56 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~y Lender Y Conaulting Service• Action on Procurement 4/

Regie Autonome About (R) Sewerage - Rehabilitation and Consultant• likely to be Appraisal report being Interc01lllllunale 55.0 extension of aewer network for required for training, prepared. de Distribution (Bank) Caaablanca-Moh11111111edia region. preparation of newerage d'Eau et d'Elec­ masterplan•, feaaibility tricite de atudiea, preparation of Casablanca (RAD) design and bidding documents, inatitutional and financial etudieo.

Office National 90.0 Telec01lllllunications - Expansion Consultants will be First phase of negotia­ dee Poe tee ·et (Bank) and modernization of the exiat­ required for technical tions completed in Telecommunica­ ing telec0111Dunications aysteme; assistance to ONPT April. Remaining issues tions (ONPT) technical assistance for organ­ (accounting, orga­ need to be resolved to izational strengthening. nization, sector complete negotiations. planning, etc •. > (Bilateral and tied financing sought by Govermnent for part of investment program.)

Office National About (R) Fourth Water Supply - Rehab~ Technical assistance Negotiations postponed at de l'Eau Potable 44.0 ilitation of distribution sys­ would be required to Government's request to (ONEP) (Bank) tems. reinforce institutional early 1987. capability for sub­ project evaluation and implementation monit­ oring.

Caisse Rationale 120.0 CNCA VI - To finance CNCA'e To be determined. Approved by the Executive de Credit (Bank) medium and long term lending for Directors on ~une 26. Agricole (CNCA) (a) on-farm investments by pri­ (Cofinancing with A(DB vate farmers and cooperatives; for $66 million, KfW and (b) small and medium scale Germany for $3.5 million agro-induetry. Total project confirmed.) cost about $720.3 million, of which $221.4 million in foreign exchange.

To be determined About (R) Power Sub-Sector Adjustment To be determined. Appraisal mission 50.0 Improving planning and diatrib­ scheduled for October. (Bank) ution in sub-sector end finan­ cing investments in sub-sector.

Ministry of About Agricultural Sector II - Support To be determined. Date of appraisal Agriculture and 100.0 for a second phase of policy re­ mission to be con­ Agrarian Reform (Bank) forms in the sector with empha­ firmed by Goverl'llllent. sis on pricing.

Department of About Public Enterprise Rational­ Consulting services Appraisal report Pub lie Enter­ 200.0 ization Loan - Improvement in anticipated in execution being prepared. prises and (Bank) efficiency of public enterprises of enterprise, restruct­ Participations through policy and institutional uring programs, improving reforms and enterprise management information reatructuring. and accounting sytema, and in implementation of key reform ~easures, ae veil as in training.

To be determined About (R) Induotrial Export Development To be determ~ed, 50.0 Finance - Line of.credit and ~ppra1sal mi~~i~n (Bank) technical aaei•tance to promote scheduled for September.•. private sector industrial exports.

Miniatry of About Vocational Training II - Second To be determined. Appraisal report Public Works and 30.0 phaae of program designed to being prepared. Vocational (Bank) improve quality of training in Training newly converted vocational training institutiona.

To be determined About Urban Upgrading - Policie•, To be determined. Appraisal missiun 70.0 measures, and interventions to tentatively scheduled (Bank) provide infra•tructure in order for September. to contain and avoid unauthor­ ized housing developments.

Ministry of About Small and Medium Irrigation - To be determined. Preparation under Agriculture and 50.0 Rehabilitation of !llllall and way. Agrarian Reform (Bank) medium scale irrigation ayatema affecting about 30,000 ha.

See page 1. for footnotes. - 57 -

Member Country, Amount 6 and Implementing Probable Stage of Processing and ~ll Lender!/ Connulting Services Action on Procurement!/

~(Cont'd)

Ministry of About Education Sector II - Support To be determined, Preparation under Education 150.0 for second phase of policy way, (Danit) reforms to promote basic educ­ ation end to increaoe efficiency of education system.

Ministry of About (R) Health - Strengthening health Consulting services Appraisal mission tentat­ Health 12.0 information system, planning, provided from UN sources ively sechduled for early (Bank) health education; construction and ODA (UK) for project September, of water facilities. preparation.

Ministry of About Education.III - Development of To be determined. Appraiaal mission Education 10.0 teacher training and secondary scheduled for early (Bank) schooling. September,

PORTUGAL

National Housing 25.0 Housing Finance - A general line No consultants required, Approved by the Executive Institute {Bank) of credit to provide housing fi­ Directors on December 3. nance for construction of hous­ (Cofinancing of $25.6 ing for low-income groups million from USAID through a housing development agreed,) bank. Total project cost esti­ mated st $56.6 million, includ­ ing $28 million in foreign exchange.

Junta Autonoma About (R) Highways III - Support for High­ To be determined. Appraisal report being de Estradas 50.0 way Rehabilitation Program of prepared, (Cofinan­ (JAE) (Bank) Junta Autonoma de Estradaa cing posaible,) (J.A.E.) and improvement of maintenance standards, including technical assistance.

Ministry of About (R) Technology Education - Introd­ To be determined, Appraisal mission sched­ Education; 30.0 uction and/or improvement of uled for September, Ministry of (Danit) technology education in second­ Labor; and ary schools, polytechnics and Ministry of universities. Industry

Agricultural To be Irrigation IX - Drainage, land None required. Appraisal mission de Bank deter­ reclamation and other related layed at the Govern­ mined worka on a sectorwide basis ment's request. (Bank) within the context of the Five­ Year Plan.

Investment Danit To be Power V - Time slice investment None required, Project scope under deter­ for 1986-90 Plan period, discussion with the mined Government, (Bank)

Danit for Agri­ About (R) Livestock V - Time slice None required, Appraisal report culture and Food 150.0 investment for 1986-90 Plan being prepared, Industry (BAFI) (Bank) period,

SYRIAN ARAB REPUBLIC

Ministry of To be Highways· IV - Maintenance opera­ No decision made whether Preparation under way. Communications deter­ tions and training, consultant• are required. mined (Bank)

Ministry of To be Damascus Sewerage - Secondary Consultants likely to be Preparation under way. Housing and deter­ treatment works, main inter­ required for technical Danit Preparation Facility Utilities mined ceptora and secondary collection assistance in.preparation advance of $550,000 ap­ (Bank) system for Damascus, of bid document•, studies proved for feasibility and project supervision. and engineering studies, detailed deeign and prep­ aration of bidding docum­ ents. (Cofinencing like­ ly to be sought,)

See page 1 for footnotes. - 58 -

Member Country, Amount 6 and Implementing Probable Stage of Processing and ~]J ~y Conaulting Services Action on Procurement 4/

SYRIAN ARAB REPUBLIC (Cont'd)

To be determined To be Education III - Extension of Ho deciaion made whether Preparation under deter­ vocational education and consultanta are required. way. mined training. (Bank)

Ministry of To be Liveotock II - Increaaina the Ho deciaion made whether Project appraisal Agriculture and deter­ efficiency of the livestock conaultante are required. under way. Agrarian Reform mined sector through improved veter­ (Bank) inary services, supply of feed end water.

Ministry of To be Gas Appraisal and Petroleum Ho deciaion made whether Appraisal report Petroleum and deter­ Engineering - Diagnoetic coneultante are required. under preparation. Mineral mined studies, technical assistance, Resources (Bank) training and equip11ent for appraisal of several gae structures and for petroleum development.

Agence de About (R) Small Scale Industry II - Line No decision made. Preparation by Govern­ Promotions des 44.0 of credit to be used for lending ment under way. Investisaements (Bank) to small-scale industries. (API)

Ministry of About Highways Rehabilitation and No decision made. Appraisal report being Equipment and 65.0 Maintenance - Strengthening prepared. (Cofinancing Housing; and (Bank) or9anization and management of for technical assistance Ministry of national road maintenance possible.) Transport system.

Agence pour la 30.2 (R) Urban Development IV - Two lines Conaultants required in Loan signed on Rehabilitation (Bank) of credit for upgrading existing land management, public July 18. et la Renovation settlements and servicing/ administration and Urbaine (ARRU) ; developing new ones. Total computer science. and Agence fon­ project coot about $67.4 mil­ ciere d 1 Habita­ lion, of which $30.2 million in tion (AFH) foreign exchange.

Office des About Grain Storage II - Improvement Ho decision made. Preparation under Cereales 30.0 of storage and distribution of way. (Bank) locally produced grain.

Office de About (R) Municipal Development/Cadaater Consultants already re­ Preparation under way by Topographie et 50.0 Equipment and technical aasist­ cruited. Government and Consul­ de Cartographie (Bank) ance to improve municipal man­ tants. (OTC) agement and to modernize na­ tional cadastral survey.

Ministry of About (R) Agricultural Sector Adjustment I Ho deciaion made. Negotiations in mid­ Planning 125.0 - Policy and inatitutional August. (Bank) reforms.

Ministry of About (R) Industrial and Trade Policy No decision made. Appraisal mission Planning 125.0 Adjustment Lol!!.ll - Policy scheduled for (Bank) Reformn. September/October.

Banque Rationale About Agricultural Credit (IV) - Ho decision made. Preparation under de Tunisie and 30.0 Financing for national agricul­ way. cD11DDercial banks (Bank) tural credit operations.

Agence de 4.0 (R) Eneray Conservation Demon­ Consultants required for Loan signed on July 18. Heitrise de (Bank) etration Project - Eneray effi­ technical assistance in l'Energie ciency, pilot programs in indus­ eneray audits, feasib­ (AME) trial, transport and tertiary ility atudies and plan­ sectors. Total project coat ning and implementation about $6.25 million, of which of conservation measures. $4.00 million in foreign exchange.

Ministry of About Forestry Development and Range Ho decision made. Preparation under Agriculture 25.0 Improvement - Improved forestry way by Government. (Bank) exploitation and management; aelected reforestation; range improvement; rural forestry.

See page l for footnotes. ------

- 59 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~y ·Lender y Consulting Services Action on Procurement 4/

TUNISIA (Cont'd)

To be determined About (R) Public Enterprises - Financial To be determined, Identification under 50.0 assistance to public enterprises way. (Bank) channelled through intermediary banks, as well as institutional improvements through key policy actions and technical assist­ ance.

To be determined To be (R) Agriculture Credit III - Consultants for studies Preparation under way. deter­ Strengthening of agricultural of credit cooperative Timing dependent upon mined credit institutions and further system, financed by Bank progress under Agricul­ (Bank) rationalization of sector Project Preparation Faci­ tural Credit II, policies. lity, to be recruited by State Planning _Organiz­ Bank Project Preparation ation. No decision yet Facility advance of on need for consultants $400,000 approved for for project implement­ consultants services. ation.

Cukurova 132.0 (R) Sir Hydropower - Construction of No decision yet on need Board presentation sched­ Electric Company (Bank) the Sir Dam, and associated for consultants. uled for August 26. (CEAS) hydroelectric-power plant, Total project cost about $241 mi 11 ion, of which $114 million in foreign exchange.

Turkish State 197.0 (R) Railways II - Main line track Technical assistance to Approved by the Executive Railways (TCDD) (Bank) renewal and track maintenance be provided in locomotive Directors on July 8 and machinery; modernization of operation and mainten­ signed on July 24, locomotive maintenance ance, movement of bulk facilities and provision of commodities, and manage­ spare parts; signalling and ment information systems. telecommunication improvements; construction of 66 km of new line; staff training and technical assistance. Total project cost about $582.2 million, of which $224.5 million in foreign exchange.

Ministry of To be Agricultural Extension and No decision yet on need Timing dependent upon Agriculture deter­ Applied Research II - Introduc­ for consultants. progress of Agricultural mined tion of improved extension and Extension and Applied (Bank) applied research methods in Research I Project. additional priority areas.

To be determined To be Cukurova Region Urban Develop­ No decision yet on need Appraisal mission sched­ deter­ ment - Provision of infrastruc­ for consultants. uled for September, mined ture, urban development and Scope of project and (Bank) technical assistance for region­ timing dependent upon al planning in the Cukurova progress under Cukurova Region. Region Urban Engineering Loan.

To be determined To be Energy Sector Adjustment - No decision yet on need Preparation under eay. deter­ Financing of imported inputs for consultants. mined for the energy sector, (Bank)

To be determined To be (R) Industrial Restructuring - Loan Consultants studies on Appraisal mission sched­ deter­ to support restructuring of pub­ three sub-sectors have uled for October may be mined lic and private sector industry been completed, Privat­ delayed pending Govern­ (Bank) in selected sub-sectors along ization Master Plan under ment's decision on Priv­ lines of comparative advantage. consideration by the atization Master Plan. Government

To be determined To be Non-Formal Vocational Training - No decision yet on need Appraisal report being deter­ Provision of basic and voca­ for consultants, prepared, mined tional training. (Bank)

See page 1 for footnotes.

I I I I ' - 60 -

Member Country, Amount & and lllplementing Probable Stage of Processing and ~lf Lender]:_/ Consulting Services Action on Procurement 4/

~ (Cont'd)

To be determined To be Izmir Water Supply - Improvement Consultants have been Preparation under way. deter­ of water supply and sewerage hired to assist municip­ mined facilities in the city of Izmir. ality in project prepar­ Bank Project Preparation (Bank) ation work. Facility advance of$ 1 million approved to fin­ ance technical assist­ ance.

To be determined To be Second Agricultural Sector No decision yet on need Timing dependent upon deter- Adjustment Loan - Support for for consultants, progress of first Agric­ mined agricultural sector policy ultural Sector Adjustment (Bank) reforms. Loan.

To be determined To be Drainage and On-Farm Development Consultants under Identification mission deter- II - Completion of second time- Drainage and On-farm scheduled for February mined slice of core program for elim- Development I expected to 1987. Timing dependent (Bank) inating backlog of drainage and assist in prep&ration. on progress of Drainage other on-farm works on ongoing and On-farm Development I or completed DSI projects.

State Hydraulic To be Boyabat Hydropower - Construe- No decision yet on need Preparation under Works (DSI) deter- tion of Boyabat Kepez Dam and for consultants. way. mined Power Plant on the Kizilirmak (Bank) River in North Central Turkey,

To be determined To be (R) Transport Sector Adjustment Loan No decision yet on need Identification mission deter- - Emphasis on sectoral policy for consultants, scheduled for October. mined and institutional reforms (Bank)

To be determined To be Industrial Training and Tech- No decision yet on need Project being identified. deter- nology - Training of higher for consultants. mined level technical/industrial (Bank) manpower.

YEMEN ARAB REPUBLIC

Yemen General 11.7 Power IV - Phase III of regional Consultants will be re­ Approved by the Executive Electricity (IDA) electrification program, includ­ quired for construction Directors on May 15. Corporation ing distribution, technical as­ supervision and technical (Cofinancing from Islamic (YGEC) sistance end training. Total assistance. Development Bank $10.5 project cost estimated at $58.9 million; Arab Fund $14.5 million of which $47.2 million million; and Sweden $11.l in foreign exchange. million.)

Procurement: Retroactive financing recommended to provide technical assist­ ance.

Ministry of 15.5 Southern Regional Agricultural Preparation assistance Appraisal report being Agriculture and (IDA) Development - Agriculture devel­ being provided by FAO­ prepared. (Cofinancing Fisheries opment of areas in Southern YAR CP. Consultants likely will be required.) not covered under SURDP I and to be required for proj­ II, including strengthening of ect·management, technical extension services, establish­ assistance and training. ment of regional operation and maintenance service and irrig­ ation improvement.'

Highway About Sanaa-Hodeidah Road - Rehabil­ Consultants have prepared Preparation under way. Authority (HA) 10.0 itation project; assistance to feasibility studies and (Cofinancing will be (IDA) the construction industry. engineering design. required.) Total project coat about $46.0 Consultants will also be .million of which $34.7 million required to carry out in foreign exchange. construction supervision.

Minie try of Oil About Technical Assistance to Petrol­ Consultants appointment Approved by the Executive and Mineral 12.0 eum Sector - Technical Assist­ through IDA Project Prep­ Directors on May 15. Resources (MOHR) (IDA) ance to the Energy Sector·in­ aration Facility to prov­ (Cofinancing with USAID cluding assistance to MOHR. ide technical assistance for $2.l million and Total project cost about $17.0 and training. Government of Netherlands million, of which $13.3 million for $1.1 million is in foreign exchange. envisaged.)

IDA Project Preparation Facility advance of $870,000 approved to fin­ ance needed legal ser­ vices; a feasibility study for a second refin­ ery; and to meet the cost of the resident advisors. Sae page 1 for footnotes. - 61 -

Member Country, Amount & and Implementing Probable Stage of Processing and ~y Lender Y Con1ulting Services Action on Procurement 4/

YEMEN ARAB REPUBLIC (Cont'd)

Highway About (R) Karib-Safir Road - Construction · Consultants employed to Approved by the Executive Authority (HA) 10.0 to asphalt standard of road prepare feasibility Directors on July 8. (IDA) connecting oil refinery to main study, and will be highway network. Total cost required for construction estimated at $26.2 million of supervision. which $14.0 million in foreign exchange.

Ministry of Oil, 50.0 Gas I - LPG recovery and gas To be determined. Project preparation to and Mineral (Bank) utilization; project related to begin late 1986. Resources (MOMR) the development of the recent oil recovery. ·

Yemeni General About Power Distribution V - Likely to Consultants will be Project preparation Electricity 12.0 include more power distribution. required to supervise under way. Ceo­ Corporation -(IDA) construction. financing will be (YGEC) required.)

YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF

Pub lie Corpor­ To be (R) Power III - Rehabilitation of Consultants required to Feasibility studies to be ation for Elec­ deter­ Aden system network. prepare feasibility prepared. (Cofinancing tric Power mined study, detailed engineer­ being explored.) (IDA) ing design, supervise construction management, and other technical as­ sistance.

Public Water 5.6 Phase II of Greater Aden Water Consultants were employed Project re-appraisal com­ Corporation (IDA) Supply project. Total project to prepare feasibii'ity pleted. Final documents cost estimated at $32.2 million, studies. being prepared for Board of which $27.95 million in presentation. Ceo­ foreign exchange; financing from -the Danish International Development Corp. (DANIDA) £or $10 million and from Kuwait Fund for $6.2 million agreed. Further cofinan­ cing being explored.)

Ministry of About _(R) Highways V - Implementation Continuation of technical Reappraisal 1nission Construction 10.5 phase of road maintenance and assistance for."implement­ completed. (Cofinancing (IDA) rehabilitation program initiated ation of road maintenance being explored.) under Highway IV, including and training programs procurement of additional road initiated under Highways maintenance equipment, construc­ IV. Additionally, con­ tion of a new central workshop, sulting services will be preparation of a Higway Master required for preparation Plan, and technical assistance. of a Highway Master Plan. YUGOSLAVIA

Road Organiza­ 121.5 Highways Sector Project - To Consultants will be Loan approved by the tion of (Bank) ·assist financing of rehabili­ required for roads and Executive Directors on Slovenia, tation and construction of bridges maintenance June 10. Croatia, Serbia, priority roads including study. Bosnia-Herze­ sections of the Trans-Yugoslav Procurement: Retroact­ govina, and the Highway. Total project cost ive financing for the Federal Asso­ estimated at $268.0 million, maintenance study ciation of with $121 ~5 million in foreign included. Republican exchange. ·- Provincial Road Organizations (FARP)

Privredna Banke 35.0 (R) Bosnia Forestry - Development of In view of the time which Sarajevo (Banlt) forest roads and nurseries, and · has elapsed-since this provision of logging and debark­ loan wns approved by the ( ing equipment, research ·equip­ Executive Directors on ment, and training. Total proj­ June 6, 1985, and fol­ ect coat estimated at $94.8 mil­ lowing communications to lion, with $35 million in for­ the Yugoslav authorities, eign exchange. the offer of a $3S mil­ I lion Bank loan for this project was withdrawn on July 31 1986. l 1

See page 1 for footnotes. \,f / - 62 -

Member Country, Amount 6 and Implementing Probable Stage of Processing and ~Jj Lender!/ Consulting Services Action on Procurement !!f

YUGOSLAVIA (Cont'd)

Sava Basin Water About Lonjako Polje Drainage (Previ­ Conaultants will be re­ Awaiting indication from Organization 78,0 ouely reported as part of Bava quired for' agro-aocio­ borrower on whether it (VRO) (Bank) Drainage II) - Proviaion of economic atudy, and wishes to proceed with drainage to about 49 1000 ba in review of annual produc­ project. Croatia, Will include puaping tion plans, etatione, on-farm development, Procurement: conetruction and fana equipment, Retroactive financing will be sought,

Vojvodjanska 90,0 (R) Pert.Hizer Sector - Financing In view or the time which Banka, Novi Sad (Bank) inputa, .raw lil&terials, technical has elapsed since this· and energy atudiee for Yugoslav loan was originally ap­ fertiliser induetry, including proved by the Execut'ive increaental fertilizer require­ Directors on May 8, 1984, ments for 1984-85. Total for­ and reapproved on a ."no eign exchange coeta estimated at objection basis" in $90,0 million, September 1985, and · following extensive consultations between the Yugoslav authorities. and the Bank on the out­ standing issues which still remain unresolved, the offer of a $90 mil­ lion Bank loan for this project was withdrawn on July 31, 1986,

To be determined To be Industrial Restructuring I - To be determined. Sub-sector studies an4 deter­ Improvement in selected sub­ specific projects for mined sectors and enterprisea. chemical, cement and (Bank) steel ere being prepared, To be determined To be Agricultural Sector Input Loan - To ~e determined, Further processing dep­ deter­ Foreign exchange (working ca­ endent upon confirmation mined pital) for input manufacturing of Government interest ir (Bank) enterprises and sectoral the project. improvements.

Ljubljanska About Energy Efficiency Credit Line I Consultants may be re­ Negotiations under way, Banks Ljubljana 70,0 - Loans to medium-sized indua­ quired to assist.local (Bank) triea primarily in Slovenia for technical enterprises for Procurement: Retroact­ energy conservation investments. energy audits for complex ive financing will be subproject a, sought, Hydroelektrane About (R) Perucica Hydroelectric Project - Local consultants already Awaiting confirmation by Perucica 11.0 Reconstruction of power station employed. Borrower on whether it i1 (Bank) waterway and modernization of tends to proceed with control systems, project,

Procurement: Borrower it process of preparing procurement documents.

Belgrade Water About Belgrade Water Supply - Second Consultants for prepar­ Awaiting confirmation and Sewerage 46.0 stage of Hakie treatment plant ation of final designs from Borrow~~ on timing Enterprise (Bank) with transmission mains, and already employed. of negotiations. three tunnels to connect to existing ayatem. · Procurement: Retroactiv, financing will be sought, To be determined To be Railways VII - Time-alice of To be determined. Appraisal mission sched­ deter­ inveatment plans for four rail­ uled for September. mined way transport organizations (Bank) directed at increasing the capa­ city of the main trunk line,

Hidroelektrane About Buk Bijela - Construction of dam Local consultants already Preparation ·under na Drini 200.0 and hydroplant on Drina River employed, way. (Bank) and related trengmioaion facilities,

Stopanska Banke About Energy Efficiency Credit Line II To be determined, Preparation is under Skopje 30.0 - Loan• to medium-aized indus­ way. (Bank) tries primarily in Macedonia for energy conservation investments,

To be determined To be Textiles nnd Hanmade Fiber - To be determined, Sub-sector study and deter­ Multi-republic eubaector loan project identification mined for 1elected export-oriented are under way. (Bank) textile project,,

See page 1 for footnotea.

--! ! - 63 -

Member Country, Amount • and implementing Probale Stage of Processing and ~!/ Lender Y Conaulting Services Action on Procurement 4/

VI. LATIN All!RICA A!ID CARIBBEAN

ARGENTINA

Ministry of Pub­ 46.0 Porta I - Improvement• to Conaultents required to Appraisal report being lic Work• and (Bank) Blanca port. Total project coat aasiet in project prepar­ prepared. Servicee eatiuted at $90.0 •illion, of ation. which $53.0 million in foreign exchange.

Ministry of Pub­ 60.0 · Water Supply and Sewerage Bn­ Con•ulting services Loan approved by the lic Works, N11- (Bank) gineering - Technical aeaistance required for water and Executive Directors on tional Sanitary for in•titutional improvement; sewerage •ystem rehab­ December 10, 1985. Works (OSN), metering unaccounted for water ilitation; inotitutional Bmpresa Provin­ program; and pilot project in improvement; financial cial de Obrao the province of Cordoba. Total and connercial activi­ Sanitarian de project coat estimated at $120.4 ties. Cordoba (BPOS); million, of which about $52 and Sante Fe million in foreign exchange. Water Utilities (DIPOS)

Bnergy 14.0 (I) Power Engineering - Finan~ing of Consultants will be Negotiations substan­ Secretariat (Bank) studies to define and analyze required for studies on tially completed. Board national program for distri­ distribution planning. presentation scheduled bution oyatema expansion and to for August 26, unify design and construction atandarda. Total project coat estimated at $21.3 million, of which $14 million in foreign exchange. r Banco Nacional 200.0 Financial Reatructuring - Sup­ To be determined. Project preparation de Deearrollo (Danit) port of institutional mechanism under way. I (BABADB) for industrial re•tructuring of private sector indu•trial prod­ ucers through investment hanking and financial advisory eervicea.

Banco Nacionel 50.0 Small and Medi1111 Indu•trieo To be determined. Appraisal mission sched­ de Deearrollo (Bank) Project - Policy; institutional; uled for September. (Banade) financial and technical assis­ tance aupport to amall-and­ medi1111-aized indu•trie•. Ministry of 18.5 Public Sector Management Tech-. Consultants required for Loan approved by the . Bconomy (Bank) nical Aaeiatance - Technical project implementation. Executive Directors on assistance for reforming public June 3. sector unagement and •trength• ening trade Qlld industrial policies. Total project coat eeti11111ted at $31.l million, of which $10.4 million in foreign exchange.

Servicios 150.0 SEGBA V Power - Rehabilitation N~t ·required. Appraisal mission Blectricos del (Bank) and expanaion of diatribution scheduled for October. Gran Buenoo network• in Buenos Aire•• Total Aires ( SBGBA) project coat e•tim~ted at $350 million, of which $150 million in foreign exchange. Banco Nacional 1SO.O (N) Industrial Credit III - Finan­ To be determined. Preparation to start in de Deoarrollo (Bank) cing of medi11111 and long-term October. (BABADE) credit through BABADE for in­ duatrial inveatmenta.

Banco Central de 150.0 (N) Export Development - Support of Consultants required for Project preparation under la Repub lica (Bank) financial and non-financial project implementation. way. Argentina (BCRA) machahiama to promote non­ traditional exports; eatabliah~ meat of an export development facility in BCRA and provision of technical asoiotance to go­ vernment agencies and exporters.

Banco Central de 250.0 (N) Financial Sector Loan - Support To be determined. Project preparation la Republics (Bank) to the first phase of structural under way. Argentina (BCRA) reform in the financial sector.

Bee page 1 for footnotea. Member Country, Amount & and implementing Probale Stage of Processing and ~ll Lender]:./ Conoulting Services Action on Procurement !!f

Water and 10,0 (R) Water Supply and Sewerage Private consultants al­ Negotiations substan­ Sewerage (Bank) Rehabilitation - Institutional ready working with WSC tially completed, Ceo­ Corporation development and training; reduce would be engaged for financing with EIB 1 CDB (WSC) operating costs and unaccounted technical assistance and and National Insurance for water; protection of water rehabilitation services, Board in the Bahamse is shipping facilities; technical expected,) assistance. Total project cost estimated at $33,5 million, of Procurement: Retroactive which $21,4 million in foreign financing to be proposed exchange, for project preparatory services started on September 11 1985. BARBADOS

Ministry of 8.6 (R) National Low-Income Housing - Consultants for project Awaiting Government's Housing and (Bank) Rehabilitation of low-income preparation appointed, response to appraisal Lande housing, Total project cost mission's proposals. estimated at $17,6 million, of which $8,6 million in foreign exchange,

Ministry of 4.0 (R) Agriculture Development Project Consultants required for Board presentation Finance (Bank) with two components: (1) Agro­ technical assistance postponed pending Industries credit; and (2) component. Government's final Technical assistance for agri­ approval of draft cultural diversification and negotiated documents, study of the sugar subsector, Total project cost estimated at $5.9 million, of which $4 mil­ lion in foreign exchange.

Belize Electri­ 7.5 (R) Power I - Generating sets, spare Services required for Board presentation on city Board (Bank) parts, improvements and expan-­ engineering, construction August 5, (Cofinancing sion of distribution system, and and supervision of works, with Caribbean Develop­ institutional strengthening. studies on future energy ment Bank $3.2 million Bank is expected to finance sources, training and and Commonwealth Devel­ equipment and materials, engin­ technical assistance. opment Corporation $1.5 eering studies and training. million.) Total project cost estimated at $13,2 million of which $10,7 million in foreign exchange.

Yacimientos 15,0 Gas Recycling - Liquids Consultants will be re­ Credit approved by the Petroliferos (IDA) condensate extraction and gas quired for supervision of Executive Directors on Fiscales recycling at Vuelta Grande construction. June 23. Bolivianoe retrograde gas condensate (YPFB) field, Total project cost Procurement: (a) Project estimated at $46.9 million of Preparation Facility ad­ which $30,8 million in foreign vance of $1 million ap­ exchange. proved for gas recycling simulation study, de­ tailed design and prepar­ ation of bidding docu­ ments; (b) advance con­ tracting under ICB satis­ factory to Bank for up to $2 million approved,

Empress Nacional 7,2 Power Engineering - Final design To be determined, Project being prepared. de Electricidad (IDA) of generation facilities, man­ S,A, agement information system, and acquisition of spare parts,

Ministry of Fin­ 6.0 (R) Public Sector Financial Man­ Consultants will be Appraisal mission plannec ance; Central (IDA) agement - To institute financial required. for September, Bank; end systems reforms and reorganize Comptroller public financial institutions, Procurement: Benk Pro­ General Total project coot estimated at ject Preparation Facilit~ $9,0 million, of which $6,0 advance of $500 1 000 million in foreign exchange, approved for project preparation,

See page 1 for footnotea, ------~------

- 6S -

Member Country, Amount & and implementing Probale Stage of Processing and ~l! Lender J:./ Coneulting Services Action on Procurement f!/

State of Bahia 171.0 Rural Development - Northeast Consultants to be Board presentation post­ (Bank) Region III - Support of selected retained for irrigation poned pending resolution rural development activities in component. of counterpart funding the State of Bahia. Total issues. project coot estimated at $356.2 million, of which $46.8 million in foreign exchange.

State of Piaui 78.0 Rural Development - Northeast Consultants will be Board presentation post­ (Bank) Region IV - Support of selected required for irrigation poned pending resolution rural development activities in component. of counterpart funding the state of Piaui. Total proj­ issues. ect cost estimated at $160.3 million, of which $15.3 million in foreign exchange.

Empresa de Up to Ports II - Redevelopment of ma­ To be determined. Project preparation Portos do Brasil 50.0 jor commercial port facilities under way. S.A. (PORTOBRAS) (Bank) for containerized traffic, im­ proved access infrastructure, and institutional changes to the National Port Authority.

Central Bank of 500.0 (K) Credit and Marketing Reform - To No consultants required. Loan signed on July 15. Brazil (Bank) support changes in Government agricultural policies and prov­ ide financing for agricultural investment and storage of agricultural commodities.

Central Bank of Up to (R) Agricultural Sector III - To No consultants required. Project preparation ) Brazil 250.0 support changes in Government under way. ( (Bank) agricultural policies as a fol­ I, low-up to Agricultural Sector II.

Conselho Up to Urban Management for Medium To be determined. Project preparation Nacional de 50.0 Cities - Strengthening urban under vay. Desenvolvimento (Bank) finance and management for Urbano (CNDU) secondary cities with a focus on improving urban efficiency. I Ministry of Up to (R) Export Development II - Indus­ No consultants required. Preparation mission I Finance 300.0 trial export development. scheduled for October. (Bank)

I Centrais Up to Rural Electrification II - Sup­ To be determined. Appraisal mission Eletricas 225.0 port for next phase of sector planned for September. Brasileiras S.A. (Bank) rural electrification program. I (ELETROBRAS) Centrais Eletri- 500.0 (R) Electric Power Sector - Finan­ No consultants required. Loan signed on July 15. ) cas Braeileiras, (Bank) cing of equity contributions S.A. (ELETRO- towards power sector investment BRAS) program.

Ministry of 29.0 (R) Public Sector Management - Consultants required. Loan signed on July 15. Planning/ (Bank) Strengthening of Government ca­ Ministry of pacity for economic and finan­ Procurement: Bank Pro­ Finance cial management of the public ject Preparation Facility sector, including state enter­ advance of $600 1 000 ap­ prise investment, and in fin­ proved to finance consul­ ancing related computer equip­ tant services to complete ment. Total project cost preparatory work on the estimated at $58.5 million, of state enterprise rehabil­ which $29.0 million in foreign itation component. exchange.

Central Bank Up to (R) Financial Reform I - To support To be determined. Pre-appraisal scheduled of Brazil 300.0 implementation of broader ·based for September. (Bank) financial sector reform under preparation by Government.

Secretaria de Up to Livestock Disease Control - Sup­ To be determined. Project being revised by Defensa 50.0 port of Government efforts to Government. Sanitaria Animal (Bank) improve livestock disease con­ trol and production.

See page 1 for footnote&. - 66 -

Member Country, Amount & and implementing Probale Stage of Proceasing and ~ll ~1/ Conaulting Service• Action on Procure111ent !!/

~ (Cont'd)'

Secretariat of 55.0 (R) Salvador Metro Urban Development To be determined. Loan signed on July 15. Urban Develop­ (Bank) - Metropolitan inveatment pro­ ment/Ministry of gram in Salvador designed to im­ Urban Develop­ prove resource allocation, coat ment and recovery, municipal finance and Environment management. Total project coat (SDU/MDU); estimated at $151 million, of Secretariat of which $56 million in foreign Planning, exchange. Science and Technology (SEPLANTEC); and Salvador Metropolitan Development Authority (CONDER) of the State of Bahia

Ministry of 59.5 (R) Northeast Basic Health Services Consultants required. Loan signed on July 15. Health (Bank) - Support for improvement of basic health services in the Northeast States, complementing the rural development effort. Total project coot estimated at $122 million, of which $27 mil­ lion in foreign exchange.

Stat:e of Ceara Up to (R) Rural Development - Northeast Consultants will be Negotiations substan­ 122.0 Region VI - Support of Ceara required for irrigation tially completed. Board (Bank) State plan under N.E. rural dev­ end special otudies. presentation to be sched­ eloment program. Total project uled pending resolution cost estimated at $254.3 mil­ of counterpart funding lion, of which $27.B million in issues. foreign exchange,

Ferrovia Up to (R) FEPASA Railways II - Financial To be determined. Appraisal mission in Paulis ta S .A. 100.0 rehabilitation of Sao Paulo August. (FEPASA) (Bank) State Railways, improvement of its commercial performance, and improvement and rehabilitation of track and other facilities. Total project cost estimated at $262.0 million, of which $140.0 million in foreign exchange.

Banco do Brasil Up to Agricultural Credit - Support No consultants required. Appraisal report being (Central Bank of 150.0 private sector financing for prepared. Brazil) (Bank) agricultural investment.

Empress 200.0 (R) Urban Transport IV - Sector Consultants will be Appraisal report being Brasileira doe (Bank) . lending for urban transport required for institu­ prepared. Transportes systems in Brazil's 9 metro­ tional development Urbanos (EBTU) politan regions. Project component, includes investment and main­ tenance to conserve energy; improve urban efficiency; lower transport system user-costs, particularly to the urban poor, and institutional strength­ ening. Total project coat estimated at $468 million, of which $153 million in foreign exchange.

State of 92.0 (R) Rural Development - Northeast Conaultanto will be Loan signed on July 15. Pernambuco­ (Bank) Region V - Support of selected required for irrigation PE rural development activities in component. the state of Pernambuco. Total project coat estimated at -$188 million, of which $17.7 million in foreign exchange.

State of 88.0 (R) Rural Development - Northeaet Coneultanta will be Negotiations in Auguet. Maranhao (Bank) Region VII - Support of Maranhao required for irrigation ( SEPLAN-IIA) State plan under N.E. Rural Dev­ and special studies. elopment Progr11111. Total project cost estimated at $184.5 mil­ lion, of which $25.3 million in foreign exchange.

See page 1 for footnotes. - 67 -

Member Country, Amount 6 and implementing Probale Stage of Processing and ~y Lender y Consulting Service• Action on Procurement !!J

~ (Cont'd)

Sao Paulo State Up to (R) Sao Paulo State Highway Manage­ Coneultanto will be Appraisal report being Government (Sao 200.0 ment - Highway rehabilitation required for engineering, prepared. Paulo State (Bank) and institutional improvement• deaign, con•truction, Department of for highway maintenance oper­ aupervision, and tech­ Roads - DER) ations. Total project coot nical and inatitutional estimated at $400.0 million, of atudiea. which $150 million in foreign exchange.

Centrais 300.0 (R) Electric Power Sector II - No consultants required. Appraisal misoion Eletricas (Bank) Continuation of support for ocheduled for October. Brasileiras S.A. Government measures to rehab­ (ELETROBRAS) ilitate power sector.

Centrais 350.0 (R) Electric Power Sector III - Con­ To be determined. Pre-apraiaal mission Eletricas (Bank) tinuation of asaiatance towards scheduled for October. Brasileiras S.A. the financial rehabilitation of (ELETROBRAS) selected utilities. Total pro­ ject coat estimated at $900.0 million, of which $300.0 million in foreign exchange.

Ministry of 100.0 (R) Industrial Skills Vocational To be determined. Appraisal mission Labor (Bank) Training - Support of Govern­ planned for September. ment's efforts to increase labor productivity in industrie• and commerce through training. Total project coot estimated at $130.0 million.

Companhia de 125.0 (N) Northeaot Irrigation II Consultants required for Project preparation Desenvolvimento (Bank) (Itaparica) - To reoettle about engineering and under way. do Vale do Sao 36,000 people presently living settlement planning. l Francisco in the area of the Itaparica (CODEVASF) reoervoir. It would include relocation of urban center&, roads and power lines but would consist mainly of agricultural reoettlement on· irrigated farms.

Instituto 20.0 (N) Kinas Gerais Forestry - To fin­ Consultant services Project preparation Estadual de (Bank) ance small-scale forestry devel­ required. under way. Foresta& (IEF) opment; forestry conservation, education and training; a line of credit for industrial scale reforestation; and special studies. CARIBBEAN REGION

Caribbean 6.0 (R) CDB IV/Regional Eastern To be determined. Appraisal report being Development (IDA) Caribbean States Technical prepared. (CDB co- Bank (CDB) Education - Technical end voc­ finenciug of $5 million ational training. Total project agreed.) cost estimated at $11.6 million, of which $8.9 million in foreign exchange. CENTRAL AMERICA REGIONAL

Central American 65.0 Central American Regional Devel­ To be determined. Project preparation Bank for (Bank) opment. under way. Economic Integration

Ministry of 40.0 Irrigation Rehabilitation - To be determined. Project preparacion Agriculture (Bank) Rehabilitation of irrigated under way. · (KINAG); areas and creation of project Ministry of authority to manage programa. Pub lie Works (MOP)

Empress Nacional 60.0 Small-and Medium-Scale Mining. Conoulting service• to be Appraisal mioaion de Kineria (Bank) detemined. scheduled for October. (ENAKI)

See page 1 for footnotes. i - 68 -

Member Country, Amount 6 and implementing Probale Stage of Processing and ~ll ~y Conaulting Services Action on Procurement!±/

CHILE (Cont'd)

Ministry of 80.0 Intermodal Tranaport and Port First pheae of conaulting Project preparation Transport and (Bank) Rehabilitation - Valparaiao and eervicea completed. under vay. Telecommunic­ San Antonio Porta. Follow-up feasibility and ations (MTT) engineering needed.

Empresa 15.0 (R) Railway R0habilitation Project. Consulting services being Appraisal mission Ferrocarriles (Bank) contracted. scheduled for December. del Eatado (EFE)

Government (to 100.0 Pulp and Paper Project. Consulting services to be Project preparation be determined) (Bank) determined. under way.

Ministry of 250.0 (R) Structural Adjuatment Loan II - Coneultante have been Negotiations in mid­ Finance; (Bank) To support the Government's retained. August Ministry of program designed to accelerate Economy; exports and domestic savings 10 and the Central ao to permit a recovery of Banlt of Chile economic growth and employment while the country services its external debt.

COLOMBIA

Banco de la Up to Agriculture Financing Fund - Inatitutional/Credit con­ Further preparation Republics 80.0 Marketing and processing credit sultenta will.be re­ oubject to Government's (Bank) loan to effect improvements in quired. decision on project's credit delivery system. priority at this time.

Instituto Colom­ 30.0 Agricultural Technology Transfer There will be an im­ Project processing de­ biano Agro­ (Bank) - Project to accelerate diffu­ portant external con­ layed pending agreement pecuario (ICA); sion and adoption of agricultur­ sultant component. with Government on Instituto Colom­ al technology. concept and design. biano de la Reforms Agraria (INCORA); Ministry of Agriculture

Empress de 171.0 Power - Bogota Distribution II - Consultants to be hired Loan approved by the Energia Eletrica (Bank) Participation in 1985-1990 for distribution aystem Executive Directors on de Bogota (EEEB)' Bogota eub-tranamiaaion and reliability, sub­ November 26, 1985. distribution prograI1; and sup­ transmission system ope­ port to the organization and ration and losses control management of EEEB. Total systematization, and for project cost estimated at $390 management training. million, of which $190 million in foreign exchange.

Financiers To be (R) Power Sector Loan - Financing To be determined. Appraisal mission sched­ Electrics deter­ portion of power sector in­ uled for October. Nacional (FEN) mined vestment and focusing on .(Bank) strengthening of sector fin­ ances. Institutional strength­ ening program focusing on management improvement of electric utilitiea.

To be determined To be (R) Financial Sector - Financial To be determined. Project preparation deter­ Restructuring of Productive and postponed; awaiting mined Financial Sectors to solve their discussions with new (Bank) liquidity/aolvency problema. Government. Support policy meagurea to im­ prove the country's financial systems efficiency in mobilizing resourcea.

Caja Agraria Up to (R) Caja Agraria - Institutional Consultant required for Apprail report 150.0 strengthening, and loans to systems analysis. being prepared, (Bank) small and medium-abed farmers.

Presidency's To be (R) National Rehabilitation Plan To be determined Project preparation Secretariat deter­ Project - Institutional planning scheduled for October. (S/P) will mined end monitoring and evaluation coordinate (Bank) strengthening of national rehab­ project to be ilitation plan. Project to implemented by a finance production activities large number of and infraatructure in aelected agencies. rural areaa.

To be determined 60.0 (R) Fifth Small-Beale Induatry Ad­ To be determined. Project preparation (B11nk) juatment - Inatitutional aupport scheduled for October. and financing of 11111411-acale industry in ColOllbia.

See page 1 for footnotes. . - 69 -

Member Country, Amount & and implementing Probable Stage of Proceaeing and ~ll Lender !:J Consulting Services . Action on Procucurement !!./

COLOMBIA (Cont'd)

Ministry of 215.0 (N) Second Highway Sector - Im­ To be dete,:mined. Project preparation Public Works and (Bank) plementation of required adjust­ under way. Transportation ments in sector policies and (MOPT) management, Project would finance up to 35% of MOPT I a 1987-90 investment and main­ tenance program.

To be determined 120,0 (N) Water Supply and Wastes Sector - To be determined; Pre-appraisal miseion (Bank) To support preparation and im­ scheduled for September. plementation of a sector adjust­ ment program designed to sub­ stantially increase service coverage within macroeconomic constraints.

COSTA RICA

Banco Nacional 26,0 (R) Atlantico Agricultural Develop­ To be dete,:mined.' Negotiations substan­ de Cos ta Rica; (Bank) ment - Development of agricul­ tially completed, Ministry of tural exports, mainly cacao re­ Planning; habilitation in Atlantic Region Institute of through credit programs and im­ Agrarian Devel­ proved .technology. Total project opment; and coat estimated at $43.5 million, Ministry of of which $11.2 million in Pub lie Works foreign exchange. and Transport

Central Bank 35.0 (R) Industrial Financial Sector To be dete,:mined, Appraisal mission tentat­ (Bank) Loan. ively scheduled for September. ·

DOMINICA

Dominica 3.0 Power - Hydroelectric plant, To be dete,:mined. Appraisal mission t~nt&t­ Electricity (IDA) transmission and distribution ively scheduled for Services Limited improvements, training and October. (DOMLEC) technical assistance. Total project cost estimated at $17,7 million, of which $14,9 million in foreign exchange,

DOMINICAN REPUBLIC

Corporacion 60.0 (R) Power - Financing of expansion To be dete,:mined. Appraisal mission tentat­ Dominicans de (Bank) and rehabilitation of distrib­ ively scheduled for Electricidad ution network. October. (CDE)

Corporacion 'Up to (R) Oil production, pipeline Consultants being selec­ Project preparation Estatal 95.0 expansion, and institutional ted, under way. Petrolera (Bank) development, Ecuatoriana Bank Project Preparation (CEPE) Facility advance for $1 million approved to fi­ nance prdparatory stud­ ies.

Instituto 8.5 Power Sector Improvement Loan - Consultants will be Approved by the Ecuatoriano. de (Bank) To finance management improve­ required, Executive Directors Electrificacion ment and other studies. Total on June 3. (INECEL) project cost about $11.8 mil­ lion, of which $9.5 million in foreign exchange.

Banco central 48.0 (R) Agricultural Credit - Line of To be determined. Negotiations substan­ (Bank) credit for farmers and ineti­ tially completed, Board tutional support for BNF. presentation scheduled ·for September 16,

See page 1 for footnotes. - 70 -

Member Country, Amount & and implementing Prob ..ble Stage of Procea aing and · ~l! ~11 Consulting Services Action on Procucurement 4/

~ (Cont'd)

Empress 34,0 (R) Water Supply - Technical Consultants required for Negotiations scheduled Municipal de (Bank) aaaiataoce for institutional engineering services and for late Auguat, Agua Potable de development; improvement and conetruction supervision. Guayaquil expanaion of water production; (EMAP-G) traoamiaaioo and distribution facilitiea. Total project cost eotimated at $52 million, of which about $34 million in for­ eign exchange,

Ins ti tu to Up to Power - Financing of traos­ Consultants will be Project preparation Ecuatoriano de 70,0 miaeioo, subtransmissioo end . required.· under way, Electricidad (Bank) distribution, (INECEL)

EL SALVADOR

Banco Central Up to (R) Export sector - Provision of To be determined, Appraisal mission tent~t­ 80,0 working capital and investment ively scheduled for (Bank) credit for export oriented en­ September, terprises. GUATEMALA

Municipality of 27,3 (R) Guatemala City - Strengthening No consultants requir0d. Appraisal report Guatemala City (Bank) of cadaatre and management of being prepared, municipality infrastructure in lov income houeing development; street maintenance and rehabilitation,

Instituto 81,0 Power Distribution - Expansion Consultants will be re­ Approved by the Executive Nacional de (Bank) end training program of EEGSA; quired, Directors on June 23. Electrificacion thermal plant rehabilitation, (INDE) and dispatch center, comm.unicatione, Empress Elec­ preioveatmeot studies, training trica de program and technical assistance Guatemala (EEG) for INDE, Total project finan­ cing requirements estimated at $133.2 million of which $100,0 million in foreign exchange,

Ministry of 35,0 Highlands rural development - To be detec,,"ined, Project preparation under Agriculture; (Bank) Execution of regional develop­ way. SEGEPLAN ment plan to increase small farmer production through introduction of improved agri­ cultural practices, physical access to farm markets, soil conaervetion and strengthening of participating agencies.

Empress 23,0 (R) Water Supply Rehabilitation - To Consultants will be Negotiations substan­ Municipal (Bank) improve financial and opera­ required for operational tially completed. Board de Aguas tional management of EMPAGUA, and special studies, presentation scheduled (EMPAGUA) and prepare a program for for August 26~ reducing water looses,

Banco de 80,0 CR) Export Development -.Support of Consultant services to be Appraisal mission tentat­ Guatemala (Bank) Government export program; prov­ determined, ively scheduled for iaioo of foreign exchange for September, priority inputs for Guatemala e"portera,

Bauxite Industry 7,0 (R) Bauxite Technical Aasistence - Consultants have been Board presentation on Development Co, (IDA) Financing of management assis­ retained, August S, Limited tance contract, including pilot plant for new product develop­ ment and cost control system: for bauxite aector, Total project coat estimated at $8.0 million of which $7,0 million in foreign exchange.

See page l for footnote&, 11··- ltl!aber Country, Aaount I and iapleaeotioa Probable Stage of Proceaoing and ~y ~y C::On1ulting Serviceo Action on Procucurement !!./

Ministry of 18.0 (I) Trnneportation VII (!load, Porta) C::Ooaultanta required for Deciaion on proceesing Public Work•, (IDA) - Bridge rehabilitation and detailed de•ign and in Auguot. Traneportatioo recooatruction, road iaprove­ auperviaion, organiza­ and C::O!nllnica­ ..nt, technical asaiatance and tion, aenogement and tiona alipvay for boat inapection, training.

Kiniatry of 12.6 Tree Plantina and Foreatry - To be determined. Proceoning suspended Agriculture (IDA) Fualvood and 1111ltipurpoae tree until country iaaues are planting. resolved.

Kinietry of 19.0 Agricultural Sector - To aupport To be determined. Processing suspended Agriculture (IDA) Governaent'• adjuataent effort• until country issues are in the aector.

BOliDlll!AS

Empreaa Nacional 40.0 (&) Power IX - Sub-traoamiaaion and de Electri­ (!lank) diatribution expanaion and Fur·ther procesaing ficacion (END) technicel aoaiatance. Total postponed. Reporting project coat estilllAted at $50.0 will be discontinued. aillion, of which $40.0 million in foreign exchange.

Ministry of 3.5 (I) Education III - Pre-Inveatment To be determined. Appraisal mission tentat­ Public Education (!lank) Project in Rural Priaary Educ­ ively scheduled for ation. Total project coat eat­ September. iaated at $6.0 ~illion, of which $2.5 million in foreign ex­ change.

Ministry of 34.0 Sugar Rehabilitation II - Fac­ Main consulting services Negotiations substan­ Agriculture c1ank> tory and field rehabilitation to will be management con­ tially completed. reatore viability of public tract with Tote and Lyle. sugar aector and increage ex­ portc to fill export quotaa. Total project coat eatiaated at $51.3 million, of which $36.7 aillion in foreign exchan;e.

Miniatry of Up to Population III - Continued Some consulting services Appraisal report being Health 11.0 atrenathening of population and for technical assistance reviewed. (lank) faaily planning aervicea, and to the Ministry to be rationalization of Public Health included. expenditurea. Total project coat eatisated at $11.S million, of which $7.3 million in foreign exchange.

Ministry of Up to (k) Education IV - Education Prepar­ Consulting Services for President's Report being Education 7.7 ation and Student Loans Project. varioue studies in educ­ prepared. (llank) ation will be required.

Jamaica Public Up to Paver IV - Tranemiaaion and dia­ Consultant• will be Appraisal report being Service C:O.pany 17.0 tributioo expanaion; training, required for engineering reviewed. (llank) deaign and bidding docuaenta for of coal-fired plants and coal-fired plante including coal cool harbour, distribu­ harbour. Total project coat tion ID4nter plan and ins­ eutiaated at $31.8 million, of titution building. which $22.8 aillion in foreign exchange.

Bank of Jauica 40.0 lnduatrial and Financial Sector No consultants required. President's Report (lank) Adjuat11ent - Loan to aupport being prepared. policy refoffl in industrial and financial aectoro.

Bank of J811aica 20.0 Public Bnterpriee Sector No conaultants required. President's Report (Bank) Adjuatment - To improve the being prepared. financial perforaance of the public enterprieea.

lfacional Finan­ 1S.O Irri;ation Rehabilitation - Re­ lfo decision 11U1de whether Project preparation under ciera (IIAFIMSA) (Dank) habilitation of eziating irriga­ cooaultante will be re­ way. tion inveataenta. quired.

See paae 1 for footnotea. - 72 .;,

Member Country, Amount & and implementing Probable Stage of Processing and ~y Lender!/ Consulting Serviceu Action on Procucurement !!)

~ (Cont'd)

Nacionol Up to Agricultural Extension and Re­ To be determined. Project preparation Financiers 150.0 search - Strengthening Govern­ under way. (NAFIRSA) (Bank) ment's agricultural extension and research programs.

Banco Racional 100.0 Small Cities and Rural Water - Consultants for project Project preparation de Obraa y Ser­ (Bank) Rehabilitation and expansion of preparation (feasibility under way. vicios Publicos water supply and sewerage sys­ study) will be required. (BAHOBRAS) tems in about 30 small citiea.

Racionsl 150.0 (R) Industrial Recovery - General Consultants will be Approved by the Executive Financiera (Bank) industrial credit support. required for financial Directors on July 29. (NAFIRSA) market studies. Loan signing on August 8.

Procurement: Retroactive financing for up to $15.0 million for expenditures incurred after September 30, 1985.

Banco Nacional 48.0 {R) Technology .Development - To Consultants will be Approved by the Executive de Mexico, S.A. (Bank) promote industrial technology required for induntrial Directors on July 29. (BANCOMEX) development among industrial technology policy firms, particularly exporters. analysis and studies. Procurement: Retroactive financing now included for technology development subloans and consulting services incurred after Septem~er 1, 1985.

Racionsl 400.0 Agricultural Credit - FIRA/ To be determined. Appraisal report being Financier a (Bank) Flf;.\f'T - General agricultural prepared. (NAFINSA) credit support.

Racional 100.0 Forestry - To increase produc­ To be determined. Preparation under way. Financiers (Bank) tion of loge from natural pine, (RAFINSA) forest areas, and improve log utilization by local forest industries in Durango/Chihuahua States.

Banco Racional 250.0 (R) Export Development Project II - Consultants will be Appraisal report being de Comercio (Bank) Continuation of Government required for technical prepared. Exterior (BNCE) efforts to promote non-petroleum support. exports including support to in­ direct exporters.

Banco Racionsl 500.0 (R) Trade Policy Loan - Assistance Consultants may be Approved by the Executive de Comercio (Bank) to trade liberalization·program. required. Directors on July 29. Exterior (BNCE) Loan signing on August B.

Banco Nacional 100.0 Porta IV - Support to commercial To be determined. Preparation under Peequero y (Bank) port modernization and rehab­ way. Portuario ilitation program. (BANPESCA)

Banco Nacionsl 130.0 (R) Urban Transport - Investment in To be.determined. Appraisal mission in the de Obras y (Bank) transport infrastructure and field. Servicios traffic management in Publicoe Guadalajora, Monterrey and the Bank Project Preparation (BAHOBRAS) State of Mexico. Facility advance of $500,000 propooed to help finance preparation of detailed technical, ec­ onomic and financial an­ alysis of urban transport improvements in project areas.

Nacional 125.0 Agro-Processing - To provide To be determined. Preparation under Financiers (Bank) credit and technical aosistance way. (IW'INSA) to the agro-industries sub­ sectore,

See page 1 for footnotes. - 73 - Member Country, Amount & and implementing Probable Stage of Procee•ing and !!s!!!£l'.. !/ ~y Consulting Services Action on Procucurement 4/

.!!!!!£!I_ (Cont ' d)

Nacionn.1 10.0 Mining - Investment in large To be dete:rained. Preparation under Financiera (Bank) public mining corporations way. (NAFINSA) (sulphur and phoaphate).

Nacional 80.0 (R) Adult Training - Development of To be determined. Project delayed until Financiers (Bank) an intensive ayatem for the further diacus•ion with (NAFINSA) provioion of ekilla for both the Minie try of employed and unemployed odulte Education/National llll!ong the non-farm rural and Institute of Adult urban poor. Education.

Nacional 250.0 Fertilizer Sector Restructuring To be determined. Preparation under way. Financiers (Bank) - Support for Fertimex'e revioed (NAFINSA) investment program and ite financial reetructuring.

Nacional 135.0 (R) Small and Medium Industry IV - To be determined. Appraisal mission nou Financier a (Bank) Support to integrated program of scheduled for October, (NAFINSA) assistance to Small and Medium Induatry.

Banco Nacional Up to (R) Federal District Water and To be determined. Preparation under de Obras y 25.0 Sewerage - Technical aoaietance way. Servicios (Bank) and operational improvement in Publicos the D.F. (BANOBRAS)

Banco Nacional 175.0 Housing II - Support to housing To be determined. Preparation under de Obras y (Bank) credit provided by FOVI. way. Servicios Publicos (BANOBRAS)

Secretaria de 10.0 (R) Public Sector Management Tech­ Consulting services Appraisal mission sched­ Hacienda y (Bank) nical Assistance Project - To will be required. uled for October. Credito Publico assist the Mexican Government in (SHCP) increasing efficiency of para­ Bank Project Preparation etatal enterprises and improving Facility advance of resource allocation through $500,000 proposed for public sector budgeting/expend­ sectoral review and itures. restructuring study.

Ministry of 45.0 Skills Training - To establish a To be determined. Preparation under Labor (STYPS) (Bank) program for retraining worker9, way. assist in developing in-plant training for existing workers and establish a manpower inform­ ation system.

Ministry of Up to SAL II - Support to Government To be determined. President's report being Planning and 80.0 structural program in agricultu­ prepared. Economic Policy (Bank) re, induetry and public sector reform.

Ministry of Up to Technical Aasistance - Studies Will be required. Project preparation Planning and 5.0 to •upport the ongoing struc­ under way. Economic Policy (Bank) tural adjustment reform and public sector inotitutions.

Autoridad Up to (R) Balboa Port - Assist APN in To be determined. Appraisal postponed for Portuaria 20.0 increasing its container hand­ February 1987 due to the Nacional (APN) (Bank) ling and storage capacity, and borrowers financial enhance the transit capability constraints. and efficiency of the port.

PARAGUAY

Banco Nacional 50.0 Second Stage National Agri­ No consultants required. Project preparation de Fomento (Bank) cultural Credit Project. under way.

Ministry of 35.0 Road Maintenance and Rehabili­ Consultants will be re­ Project preparation Public Work• and (Bank) tation - Strengthening aectiona quired for supervieion of under way. Communications of paved network, improvements civil works. in drainage eyetem, and programs for periodic and routine main­ tenance.

See page l for footnotea. - 74 -

Member Country, .Amount & and implementing Probable Susa of ProcaHilll and ~y ~y Conaulting Bol'Vlcaa ActlOD oa ProcucureMnt !JI

Servicio Up to Provision of technical a11i1t­ Con1ultanta uould ba ra­ Projact preparation 'llacional de 20.0 ance for in1titution buildina. qulred for ..naaeaeat of uadar RJ'• Abastecimiento (Bank) Water 1upply and 1everage in nter ayet-. de Agua Potable several 1econdary-1ized citiea y Alcantarilledo and towne vith apecial eaphaaia (SE'IIAPA) on rehabilitation, and technical auiatance.

Ministry of Up to Irrigation Rehabilitation III - llot decided. Projact preparation under Agriculture 40.0 Rehabilitation of drainage' and way. (Bank) irrigation ayatema in tuo coaot­ el valleya; operation• and Bank Project Preparation maintenance prograa. facility advance of ,,00,000 approved to fi­ nance aerial mapping for pre-feaaibility atudy.

Ministry of Up to Public Sector Management II - To be determined. Project being prepared. Finance 15.0 Training; and Central Gover1111ent (Bank) and State-owned enterpriae management.

PETROPERU 60.0 Petroleum III - Increase oil To be determined. Project being prepared. (Bank) production through aecondary recovery; exploration proaotion for private companiea; and technical asaiatance,

National Center 4.0 Energy Conservation - !etabliah­ Conaultante will be re• Approved by the Executive for Energy Con­ (Bank) ment ofnational energy ration­ quired to a11i1t with Director• on May 9, 1985. servation and alization center to do energy energy audits and train• Rationalization audits and carry out other ener­ ing. gy.saving activitie1. Total coat about $6.1 million, inclu­ ding $4.0 million in foreign exchange.

ELECTROPERU 13.5 Power Engineering II - In1titu­ Conaultant1 will be re­ Approved by the Exec­ (Bank) tional strengthening of regional quired to auiat with utive Director• on July utilitiea, and evaluation of re­ studies. 2, 1985. habilitation and development needs,

Empress 'llacional 10.1 Railway Technical Aaaietance - Consultant• will be Project preparetion de Ferrocarriles (Bank) Institutional aeaiatance to required to Hlht with under way. del Peru EIIAFER and purchaae of spare operationo, maintenance, (E'IIAFER) parta. finance, planning and micro computer baaed management ayatema.

Administracion 45.2 (R) Power Sector Rehabilitation - Con1ultanta will be Loan approved by the 'llacional de (Bank) Financing of UTE'S Invegl:llent required to aaai1t Executive Directora on Uoinas y Plan, combined with C01111ercial borrower with projact September 19, 1985. Tranamisionee banka re-financing of exiating •upervision. (Co-financing i11 being Electricas (UTE) DTE'• debt. Total project coat foraaliaed.) estimated at $138 million of which $98 million in foreign Signing delayed pending exchange. · Conareas approval. Obras Sanitaries 9.0 (R) Water Supply Engineering - Tech­ llo decioion on conault· Project being prepared. del Estado (OSE) (Bank) nical asaietance and 1tudiea, anta. and related equipment and uork1. Total project coat estimated at $17.0 million, of which $12.0 million in foreign exchange.

Administracion 30.0 (R) Oil Refinery Modernization - To be deten,ined. Apprai1al mi11ion 'llacional de (Bank) Revamping of exi1ting facilities planned for Septeaber. Combuatibles and related technical Alcohol and assistance. Port lend (AllCAP)

See page 1 for footnotes. - 75 -

Member Country, Amount 6 and Implementing Probable Staie of Processing and .Y!!!£1'.. 1./ Lender J:/ Co1111ultina Service• Action ,n Procurement !!.f

VII. NBW PROJECTS ADDED IN rRIS ISSUE

I. BASTEIIN AND SOUTHBIN ARICA

Ministry of About Forestry IV - Support for integrated No deciaion haa been Project under prepar­ Environment and 20.0 forestry development (fuelwood, made whether co1111ultanta ation. Natural Resources (IDA) timber, agroforeotry). will be· required. P.O. Box 30126 Nairobi, Kenya

Ministry of Commerce 40.0 Industry Sector - To mupport spe­ No deciaion made whether Appraisal mission and Industry (Bank) cific measures of import liberaliz­ ·consul tanta will be acheduled for March P.O. Box 30430 40.0 ation, strengthening of export required. 1987. Nairobi,· Kenya (IDA) incentives, and reform of the price control mechanism.

Ministry of Agricul­ About Agriculture/Urban - Provision of To be determined. Project under ture 10.0 Technical assistance for planning preparation. ·P.O. Box MS 24 (IDA) and management of agricultural Maseru, Lesotho development; and enhancing d8livery Telex: 990-4330 of urban servic_es.

') Ministry of Public About Urban I - Resource mobilization with Consultants will be Project preparation Works 15.0 . improvement in local tax base; required • under vay with IDA Kigali, Rwanda (IDA) . strengthening of urban institutions; Project Preparation upgrading and land tenure improve­ Facility advance of J ments; employment and income $400,000. /. generation.

II. WESTERN AFRICA

BURKINA FASO

Minietere de 20.0 Agricultural Extension - To be determined. Preparation under way. l'Agriculture et de (IDA) Strengthening of agricultural 1 1Elevage _support services at national level. B.P. 7005 Ouagadougou, Burkina Faeo

CENTRAL AFRICAN REPUBLIC

Ministry of Planning, 14.0 Structural Adjustment Lending in To be determined. Negotiations completed. Statistics and In­ (IDA) support of the CAR's economic reform ternational .Cooper­ 16.0 and stabilization program; . ation, Bangui· . . (SAF) strengthening economic management Central African and p[anning; improving resource Republic allocation procedures; civil service Telex: MINIPLAN reform of key Ministries; trade . 5217 RC liberalization; review of producer prices; closure or divestiture of certain paraststalo; supply responsea in the prOductive sectors,

Ministry of Planning 42.0 Petroleum - To support implem­ To be determined. Appraisal mission and Reconstruction (IDA) entation of a least cost product acheduled for November. N,Jemena, Chad supply system and provide technical Telex: 5201 KD assistance to strengthen the Government's management of the petroleum sector.

See page 1 for footnotes. I - 76 -

Member Country, Amount & and Implementing Probable Stage of Processing and !s!!!!:l: !/ Lender l./ Project l,/ Conoulting Services Action on Procurement 4/ Wl!STl!Rll AFRICA (Cont'd)

Ministere du Plan 60.0 SAL - Macro/sectoral policy reforms Consultants have been A public expenditure Bamako, Hali (IDA) addressing management of public employed to assist in review is scheduled for Telex: 412 resources, the structure of macro public expenditure discussion in October. incentives and agricultural policy review. Additional Appraisal will be ochec framework. consultant services uled when action has likely to be required at been taken on reforms appraisal stage. being supported by proposed Pub lie Enterprise and Office d Niger Credits.

Ministere de 15.0 Water Supply II - llxtension of Consultant to be re­ Pre-appraisal mission l'hydraulique et de (IDA) assistance to the new water au­ cruited to provide tech­ scheduled for end­ !'Environnement thority and to the Ministry of nical assistance to the September. (CCCE has Niamey, Niger Hydraulics for rural water supply water authority and the expressed interest in policy reform. Expansion of Niamey Ministry. co financing.) water supply. Total project cost estimated at $37.0 million, of which $22.0 million in foreign exchange.

Societe Nigerienne 20.0 Energy - Continuation of financing Consultants will be re­ Appraisal mission ached d 'Electricite (IDA) priority investments in energy quired for distribution uled for November. (NIGELEC) sector. Total project cost estim­ and transmission studies (Belgium has expressed B.P. 11202 ated at $34.0 million, of which aa well as land manage­ interest in cofinan­ Niamey, Niger $33.0 million in foreign exchange. ment/energy conversation cing.) Telex: 5224-NI study.

400.0 Trade Policy and Export I - Reform Negotiations scheduled Federal Ministry of (Bank) of trade, incentives and export To be determined. for end-August. Finance policies, provision of finance for Federal Secretariat general imports through the second Ikoyi, Lagos tier foreign exchange market and Nigeria strengthening of export promotion Telex: PERMFIN Lagos institutions. 21248

Central Bank of Nigeria Tinubu Square Lagos, Nigeria Telex: CEBANK HG 21350 Federal Ministry of Indus tries /Commerce Federal Secretariat Ikoyi, Lagos Nigeria

Federal Ministry of 50.0 Imo Health and Population - To To be determined. Preparation under Health (Bank) assist Imo State improve primary way. Federal Secretariat health services and to initiate a Ikoyi, Lagos . population awareness and family Nigeria planning service program. SIERRA LEONE

Ministry of Finance Ministerial Building 27.0 Structural Adjustment Credit to To be determined. Project preparation Freetown, Sierra (IDA) improve Government's fiscal per­ under way, Leone formance in the quality of its investment program and support policy reforms.

Miniatry of Finance 2.0 Technical Assistance in Support of To be determined. Project preparation Ministerial Building (IDA) Structural Adjustment Program. under way. Freetown, Sierra Leone

See page 1 for footnotes. I - 77 - I . Member Country, Amount & Stage of Processing and 'I and Implementing Probable Agency ]J ~:l:..I Project }_/ Consulting Services Action on Procurement!!_/ III, EAST ASIA AND PACIFIC 1~I Ministry of Finance Housing Sector Adjustment - To 108-4; ·susong-Dong 150.0 support institutional and policy Need· for constants to be· Project under Jongro-Gu (Bank) improvements relating to public determined. preparation, Seoul 110, Korea sector housing programa and to the Telex: MIOFF, K23243 housing finance system,

Ministry of Con­ structior, 1 Kungang Dong Gwa Cheon, Gyunggi-Do Seoul, Korea Telex: K 24755 m.oconst or 27393

Ministry of Education 200.0 Third sector Loan - To upgrade Need for consultants to Project under Seoul, Korea (Bank) capacity and quality of training and be determined. preparation. Telex: K 24758 of advanced technology.research undertaken by universities and by the Ministry of Science and Technology, Korea Technology so.a Technology Development - To oupport Need for coneultants to Project under 1 Development (Bank) institutional improvements in KTDC be determined, preparation, 'j' Corporation (KTDC) and to finance a line of credit for FKI Bldg, 9th Floor enterprises engaged in the 28-1 Yoido-Dong development of new technologies, Yong Ding Po-ku l. Seoul, Korea Telex: FEKDIS /, 25544 SEOUL l Mini~try of 60.0 Regional Development - To help No consultants required. Project under Construction (Bank) finance infrastructure development preparation. 1 Kungang Dong in the Chungbo region. Gwa Cheon, Gyunggi Do Seou 1, Korea Telex: K 24755 moconst or 27393

MALAYSIA

Minist,y of Agricul­ 30.0 Samarahan Rural Development - Consultants will be Project preparation ture/ Department of (Bank) Drainage irrigation and flood required for project under way. Irrigation and mobilization works, roads and imp lemen tat ion, Drainage agricultural development in the DID Headquarters Samarahan River Basin, Total Jalan Mahameru project cost estimated at $160,0 Kuala Lumpur, million, Malaysia

Federal Land 45.0 Felda Sabah Infrastructure - Time To be determined, Project preparation Development Authority (Bank) slice financing of FELDA's Land under way. (FELDA) Settlement Pcogram in Sabah, Jalan Maktab Kuala Lumpur, Malaysia Telex: MA 32159 ~ MA 32155

PAPUA NEW GUINEA

National Water Supply 25,0 Urban and Water Supply - Provision Consultants will be Project preparation and Sewerage Board (Bank) of serviced plots to be sold to low­ required for project mission scheduled for Boroko, income families for construction of implementation. October. Papua New Guinea individual houses; seed money for Telex: NE 22114 mortage financing; rehabilitation and expansion of several water Department of Housing supply systems; technical assistance Boroko, to strengthen NWSSB. Papua New Guinea Telex: NE 22327

See page 1 for footnotes,

I I L -·- - - 78 - Member Country, Aaount & and laplelll!!nting Probable' Stage of Processing and ~l! ~y Conaulting Servicee Action on Procurement !!J EAST ASIA AND PACIFIC (Cont'd)

PAPUA REV GUIHEA (Cont'd)

Departaent of Primary 25.0 Embi-Garua Oil Palm - To develop To be determined. Project preparation Industry (Bank) about 6 1 000 ha of land at Embi-Garua under way. P.O. Bolt 2417 into oil palm estate and smallholder Konedobu 1 Papua New settlements. Guinea Telelt: NE 22143

Poets & Telecom­ 30.0 Telecommunications III - To No decision made whether Project preparation to munications (Bank) strengthen Poets and Telecom­ consultants will be begin in October. Corporation (PTC) munications to enable it to manage required. .P.O. Box 6112 the sector efficiently; to improve Boroko, Papua New quality of service and to extend Guinea services to rural areas. The Teleu 22372 project would comprise: a) digital switching and transmissio~; b) cable networks; c) computer facilities for management systems; d) upgrading planning, financial controls, operations and maintenance; and e) training.

Department of 70.0 Petroleum II - To assist Government To be determined. Project preparati~n Minerals and Energy (Bank) in joint venture development of under way. P.O. Box 778 current hydrocarbon discoveries; Port Moresby development of infrastructure to Papua New Guinea transport gas; provide technical Telex: NE 23305 assistance and manpower development.

PHILIPPINES

To be determined 60.0 Power VIII - Tentative proposal from No deciaion made whether Project preparation (Bank) National Power Corporation (NPC) coneultants will be under: way. conaiete of rehabilitation of the required. Sucat Oil fired power plant and upgrading of Luzon dispatching counter in Metro·Manila.

WESTERN SAMOA

E lee tric Power 3.0 Power - Construction of a 4 MW hydro To be determined. Project preparation Corporation (IDA) power plant along with the asso­ under way. (AsDB 1 EEC P.O. Bolt 879 ciated dam, reservoir, penetock and and EIB to cofinance.) Apia, Western Samoa powerhouse. The project will have Telelt: 263 EPCO SX energy storage potential and will obviate need for Western Samoa to import diesel fuel for electricity generation.

IV. SOUTH ASIA

IWllGLADESH

Ministry of Local 40.0 a.;rsl Roads and Marketing - To com­ Technical consultancy Project preparation Government, Rural (mA) plement past investments to increase services are likely to under way. Development and food grain production by providing be required. Cooperatives necessary road and marketing. in­ Dhaka, Bangladesh frastructure. Project would include Telex: 642200 construction of feeder roads, PAMA BJ bridges and culverts, improvement of markets, and technical assistance.

See page 1 ior footnotes. - 79 -

:r Country, Amount & 1mplementing Probable Stage of Proceaaing and ':x_y ~:Y _ProJ.ect H Conaultins Service• . Aetion on Procureaent 4/.~ I SOUTH ASIA (Cont'd)

I.l

r,try of. 85.0 National Agricultural Extension IV - No deciaion on Project preparation 1:ulture and Rural (IDA) Project would finance: introduction conoultanta. .under way. :lopment of training and visit system in :,i Bhavan Western Uttar Pradesh and eight Delhi llO 001, districts of Bihar, as well as improvement of extension in four­ 1'•x: 312405 Food second phase states, and special in or Directorate of Extension· 313334 Krsi subprojects. Total project coat in estimated at $130.0 million.

V. EUROPE, MIDDLE EAST AND NORTH AFRICA

;ARY

I.anal Bank 150.0 Industrial Restructuring III - -To be determined. Project identification 'tungary (Bank) Policy development to support scheduled for Septeaber fadsag Ter 8/9 industrial restructuring as well as 1pest, ~ungary specific program focussed on 1,x: 227267 restructuring in selected l SMAFU H subsectors. i, MN 1- ,istry of Education To be Education Sector Investment Loan~ Consultants may be Preparation under ,. Box 9640 deter­ Support for Government's five-year required. way. ;an, Jordan mined plan for education sector, including lex: 21396 EDUCAT (Bank) construction, equipment and tech­ nical assistance to replace rented primary and intermediate level school buildings and purpose-built facilities. '

dan Phosphate About Phosphate Mining - Initial To be deterained. Project preparation ing Company 25.0 development of the El Shidiya under way. • Box 30 (Bank) Phosphate Mining and Beneficiation l,an, Jordan Facilities. J8x: 21223

( roffAU

VI. LATIN AMERICA AND CARIBBEAN

·~ENTINA

lco Nacional de 150.0 Industrial Credit III - Financing of To be determined. Preparation to start in 1,arrollo (BANADE) (Bank) medium and long-term credit through October. j DE MAYO 1'1145 BANADE for industrial investments. D2 Buenos Aires 1gentina ~ex: 390 9180/9119/ I 17 /23 nco Central de la 150.0 Export Development·- Support ·of Consultants required for Project preperation publica Argentina (Bank) financial and non-financial project implementation. under way • l.n Martin 2 75 mechanisms to promote non­ lenos Aires, traditional exports; establishment lgentina of an export development facility in l.lex: 390 24035 BCRA and provision of technical BCAID assistance to government agencies J AR/24364 BANCT and exporters.

' AR 1,e page a for footnotes. i I

) - 80 - Member Country, Amount & and Implementing Probable Stage of Processing and ~l! Lender J:./ Consulting Services Action on Procurement!±_/ LATIN AMERICA AND CARIBBEAN (Cont'd)

ARGENTINA (Cont I d)

Banco Central de la 250,0 Financial Sector Loan - Support to To be determined, Project preparation Republics Argentina (Bank) the first phaue of atructural reform under way, (BCRA) I in the financial aector, San Martin 275 Buenoo Airee, Argentina Telex: 390 24035 BCAID A!!./24364 BANCT All

Companhia de 125.0 Northeaat Irrigation II (Itaparica) Consultants required for Project preparation Desenvolvimento do (Bank) - To resettle about 36,000 people engineering and under way. Vale do Sao Francisco presently living in the area of the settlement planning. (CODEVASF) Itaparica reservoir, It would SGAN Quadra 601 include relocation of urban centers, Lote 1 roads and power lines but would 70830 Brasilia, D,F,, consist.mainly of agricultural Brazil resettlement on irrigated farma. Telex: 0611057

Inetituto Eotadual de 20,0 Minas Gerais Forestry - To finance Consultant services Project preparation Forestas (IEF) (Bank) small-scale foreetry development; required. under way. Palacio dos foreatry conservation, education and Despschos training; a line of credit for Cep: 30000 industrial scale reforestation; and Belo Horizonte, Minas special studies. Gerais, Brazil

COLOMBIA

\ Ministry of Public Project preparation Works and Transport 215.0 Second Highway Sector - Im­ To be determined. under way, Centro Administrativo (Bank) plementation of required adjustments Nacional (CAN) in sector policies and management. Bogota D.E., Colombia Project would finance up to 35% of Telex: 45656 DMOPT MOPT's 1987-90 investment and main­ co tenance program.

To be determined 120,0 Water Supply and Wastes Sector - To To be determined. Pre-appraisal mission (Bank) support preparation and implement­ scheduled for September. ation of a sector adjustment program designed to substantially increase service coverage within macro­ economic constraints.

See page 1 for footnotes.

!------~~~-~-~-