World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document INTERNATIONAL BAIeK FOR RECONSTRUCTION AKNf D.:VELOP1iThNTt RESEARCH DEPART1,1ENT Public Disclosure Authorized ERM64 Public Disclosure Authorized THE IRON AIM STEEL INDUSTRY OF NORW.JAY Public Disclosure Authorized Prepared by-: Andretw C. Huang Apparoved by: Joseph S. Gould FM - 64 Public Disclosure Authorized March 1, l948 copy . TABLE CF COTENTS SUNRY I PURPOSE AND SCOPE II THE BASIS OF THE NORUEGIAN IRON AND STEEL INDUSTRY III i W NITERIALS IV IRON AND STEE PRODUCTION AID CAPACITY V DOESTIC IRON AID STEEL RUIRr240iTTS VI LABOR SITUATION AISD PRODUCTIVITY VII FOREIGN TRADE VIII THE EBPANSION PLAN APPENDIX Table I Production, consvmution, imports and exports of iron and steel II _ Production of iron and steel 'oy products, 1937-43 III - Principal imports and exports of iron and steel. 1938-44 IV Principal iaports of iron and steel, by countries of origin, 1938 and 1944 V Principal exports of iron and steel by countries.of destin- ation, 1938 and 1944 VI - Imports of chrome anec manganese ores by country of origin, 1938 and 1944 VII - Value of iron and steel imports and exports by country of origin, 1942-44 VIII - Actual irmports cf iron and steel by product, 1945-47 IX - Actual exports of iron and steel by product, 1945-47 X - Hard coal supply and conaurption XI - Actlual imports of hard coal by country of origin XII - Estimated requirements of hard coal in Norway by major industries XIII - Col,e stapply and consumption XIV - Consumption of oil and refractory materials in Norwegian iron and steel industry XV - Estimated mining equipment requirements of Norway XVI - Employment inde- of ores metal, iron ancd steel industries, 1943.-45 XVII _ Living conditions of mining aiac'. metal wrorkers, 1938-44 XVIII - Hourly wages of mining and metal workers, annual average XIX - Labor force and number of establishments - Nining, iron and metal industrieso XX - Employment of mining industries, 1936-45 XXI - Labor :Vorce and number of establishments - Iron and metallurgical industrry SIhIRY 1. The Norwegian iron and-steel industry is based on ample reserves of medium grade iron ores, cheap hydroelectric power, and an increasing domestic demand for finished steel products. The industry is very small from the stendpoint of tonnage produced, accounting for about one percent of the total of Western European countries. 2. Norway is the fifth largest iron ore producer in Western Europe wtith an outpat estimated at 1,,6 mIllion tons in 19386 About 90 percent of the domestic iron ore production was exported before the war, ohiefly to Gaimany as concent;.rates in exchnange for finished steele Only about 30 percent of domestic requiremrnets of finished steel was supplied oy the homne industry, 3. High production costs ancl the relatively low quality of domestic iron ore, along with reduction of capacity through extensive war damage will further intensify the baiance of payments problem within the iron and steel industry itself,. While iron ore exports are not expected to exceed 50 percent of the 19j.38 level in futu:ce years, the vol:ame of finished steel imported is expected to be twice the prewar level by 19510 4. Normy is self-sufficient in both pig iron and serp. A relatively high proportion of scrap (about 70 percent in 1938) was used in making crude steel due to a large domestic supply as compared with total steel pro- ductione 5. Norway produces substantial quantities of ferroalloys using imported ores and is in a good competitive position due to an ample supply of inexpensive electric power< Annzual production of ferro-silicon, ferro-manganese, ferro>-hroze, and ferro-silicon-manganese totalled 140,000 tons before the war. Practically all of these were exported to Gernany, the U.K. and Belgium-Luxembourg in exchange for finished steel. 6. The iron and steel industry produces all types of cornmercial steel with emphasis on those items required by the domestic construction and sl;ip- biilding industries* However, domestic needs of finished steel are far in excess of home Froduction, Prior to the war about 70 percent of industrial steel was supplied by imports largely from Germany* 7. The prewar, existing and prpjected capacitiep of the iron and steel production in Norway are as follows, in thousands of metric tons: a2 8 -9/j,7 19S1 Iron ore 1,7C0 700 1,000 Pig iron 45 80 200 Crude steel 70 70 100 Finished steel 90 90 200 8. The Norwegian iron and steel development plans contemplate expansion of both crude and finished steel production. The country, howiever, will not be self-sufficient in finished products, at least during the next five years on account of heavy reconstruction requirements even if the plan is completed according to schedule. PURPOSE ANM SCOPE This report is one of a series covering the iron and steel iidustries of the individ-aal Europeen coiuntries and is intended for consolidatioi later in a study of the European iron and steel industry as a whole to determine those areas with best prospec ts for fut,ire reconstruction and developmento E iasis -is plac-eId In this report on the maximum capacity which is -to be providad for particu,alar types of products required for home consinption and e c'rt0 This preliininary report is based primarily on the Norwegian o.fficial stati,sitical and commnercial books and other goverment reports now available in the Barnk and in various United States Government agenflies. along with the C.E,ET,C reports and worlring rapers, It isl-b no means complste0, Nvuch essential aC.:7uiati.aa is lacking, particularly with respeet to existing capacity for production of specific items of finished steel ana probabole domestic reouirements for finished steel in futu!re years, Such inforxmation must be obtained from the sourceo THE BASIS ;F THE NORWIEGIAN IRON AMD STEML INWIJSTRY The basis of the iron and steel industry in Norway consists of ample reserVes of medium grade iron ores and plentiful, cheap hydroelectric power. Practically all coke required for the industry was imported from tl-e U.KI., the Netherlands end Germany before the war. Inefficient operation of the plants, combined. with high labor costs, places Norwegian iron and steel products in an unfavorable position in the e=rt market. Norway is not an important iron and steel producing aantry nor has the country been self-sufficient as far as iron and steel products are concerned. Production of iron ore had started early in the 16th cdntury when charoal was used to reduce the iron ore to pig iron. On account of the deficiency of domestic conl production and high production costs, the country has been comnelled to export abcut 90 percent of its iron ore in exchange for finished products to meet domestic requirements with an adverse balance in thle industry. Production of steel, even in its most active prewar year, amounted to only about 1 percent of that of the total Western %iTro-eancountries. Plans are under consideration to expand the iron and steel industry in Norway because of the currenit stagnation of ore mining due to the decline in German demand and anticipated increase of domestic requirements for recon- struction purposes. However, because of lack of coal and hig,h production costs, lack of skilled labor and for technical reasons, Norway will not be self-sxxffi.cient as far as finished steel is concerned at least during the next five years. Within the industry, iron ore mininR is the predominant branch and it is ine of the tvwo chief mining industries of the country. Iron ore produ.ction ameunted in vralue to about 28 million kroners or abcut 50 percent of total cres extracted in Norway in 1938. Pig iron and steel are produced aimost exclusively in electric furnaces. In additioni, a substantial production and trade has been developed in ferroalloys, particularly ferro-chrome, which requiro electric fur-aaces for economic production. In Norway the iron and steel industry, intncudin; iron ore mining and the metallur-ical industries, is one of the most important, ranking with, forestry as far as national income and foreign, trad. arb concerned. -3- M..W T Lo Iron -ore There are three principal iron ore mines in operation in Norway - the Sydvaranger Mines at Kirkenes in the extreme north of the country; the Fosdalen mine at Malm and the Rodsand mine at liesset, both in the center pert of the country. The ore extracted by the open pit operation at the Sydvaranger mines is magnetite occurring in Archeaean Gneisses in the form of long bands of varying thicknesses. Crude ores have an average of 34 to 35 percent iron content, .01 to 07 percent phosphorus, o01 to .07 percent sulphur, .1 to .4 percent manganese, and .04 to .35 percent titanium oxide. The ore reserves are estimated to be 200 million tons to a depth of 250 meters. The ores concen- trated by magnetic separators yields a product with 66 percent iron content, In 1935, 770 workers were employed in these raines writh an output of 1.3 million tons of iron ores. The ores of the Fosdalen mine are a mixture of pyrites and magnetite. They occur in two elongated lenses overlying one ano-ther. The lenses are in general six meters wide with a 70 degree dip and 18 degree pitch. The cre contains about 45 percent iron and is mined underground by the shrinkage stoppage method0 The crude ore is treatecl in man,netic concentrating plants yielding product with 65 percent of iron content. In 1935, 181 miners were used to extract a total o, 246,477 tons of crude ores which yielded 142,219 tons of concentrates after dressing.
Recommended publications
  • Statens Vegvesen Finnmark Vegkontor Reguleringsplan Ev6, Kirkenes
    Statens vegvesen Finnmark vegkontor Reguleringsplan Ev6, Kirkenes sentrum Asplan Viak Trondheim AS MA /22.12.02 rev.13.12.2002 Ref: P-201316 / ma INNHOLDSLISTE §2. Oppheving av tilgrensende reguleringsplaner.................................. 16 §3. Fellesbestemmelser .......................................................................... 16 §4. Offentlige trafikkområder ................................................................ 17 1 FORORD ...........................................................................................................1 §5. Friområder........................................................................................ 17 §6. Fellesområder................................................................................... 17 2 SAMMENDRAG...............................................................................................1 §7. Generelle bestemmelser ................................................................... 17 3 PROSJEKTETS BETYDNING.......................................................................2 3.1 EKSISTERENDE FORHOLD.................................................................................................. 2 VEDLEGG Generelt................................................................................................................................................... 2 Estetiske / stedsmessig beskrivelse av planstrekning .............................................................................. 2 Tiltakssoner............................................................................................................................................
    [Show full text]
  • Tacora Resources Inc. Completes Acquisition of Sydvaranger
    Tacora Resources Inc. 102 NE 3rd Street Suite 120 Grand Rapids, MN 55744 Tel: +1 218-999-7018 NEWS RELEASE ______________________________________________________________ FOR IMMEDIATE RELEASE Tacora Resources Inc. Completes Acquisition of Sydvaranger GRAND RAPIDS, MN, January 14, 2021 – Tacora Resources Inc. (“Tacora” or the “Company”) today announced that it has completed the acquisition of Sydvaranger Mining AS and its subsidiaries (“Sydvaranger”), an iron ore mine and processing plant located in Sør-Varanger, Norway. The acquisition of Sydvaranger provides Tacora with a 4 million tonne per year shovel-ready expansion opportunity and geographical diversification in a tier 1 jurisdiction. Sydvaranger operated from 1910 to 1997, and then from 2009 to 2015 producing high grade iron ore concentrate, with an iron content of 68%, for pelletizing operations. The Tschudi Group, a Norwegian shipping and logistics company, has been involved with the Sydvaranger Mine since 2006. In 2016, the Tschudi Group re-acquired the Sydvaranger assets and has since focused its activities on completing a feasibility study and preparing for restarting the operations. Sydvaranger’s high quality, low impurity, magnetite iron ore concentrate has significant environmental and cost benefits for steel producers and pelletizing operations, including increased blast furnace productivity, reduced slag volumes, lower CO2 emissions per tonne of steel produced and reduced energy requirements for pelletizing, amongst others. Thierry Martel, the President and CEO of Tacora
    [Show full text]
  • The Tschudi Group Divests Sydvaranger to Tacora Resources Inc
    NEWS RELEASE ______________________________________________________________ FOR IMMEDIATE RELEASE The Tschudi Group Divests Sydvaranger to Tacora Resources Inc. OSLO, NORWAY, January 14, 2021 The Tschudi Group today announced that it has completed the sale of Sydvaranger Mining AS and its subsidiaries -Varanger, Norway, to Tacora Resources Inc -based iron ore mining and mineral processing company focused on high-grad iron ore commodities. Tacora recommenced operations after five years closure in June 2019 at the Scully Mine, a 6 million tonne per year iron ore concentrate producer, after its acquisition of the mine in 2017. Sydvaranger operated from 1910 to 1997, and then from 2009 to 2015 producing high grade iron ore concentrate, with an iron content of 68%, for pelletizing operations. The Tschudi Group, a Norwegian shipping and logistics company, has been involved with the Sydvaranger Mine since 2006. In 2016, the Tschudi Group re-acquired the Sydvaranger assets and has since focused its activities on completing a feasibility study and preparing ore concentrate has significant environmental and cost benefits for steel producers and pelletizing operations, including increased blast furnace productivity, reduced slag volumes, lower CO2 emissions per tonne of steel produced and reduced energy requirements for pelletizing, amongst others. The recent Definitive Feasibility Study confirmed a potential for a 4 million tonne pear year iron ore concentrate production. welcome Tacora as the new owners of Sydvaranger. Since 2016, the Tschudi Group has sought to provide Sydvaranger with the financial and operational capabilities to enable a restart of the mining operations. By introducing Orion Mine Finance as a financial partner in 2018 and by now combining Sydvaranger with the operationally experienced Tacora team, we believe Sydvaranger is in an excellent position to succeed with a restart.
    [Show full text]
  • Joint Barents Transport Plan Proposals for Development of Transport Corridors for Further Studies
    Joint Barents Transport Plan Proposals for development of transport corridors for further studies September 2013 Front page photos: Kjetil Iversen, Rune N. Larsen and Sindre Skrede/NRK Table of Contents Table Summary 7 1 Introduction 12 1.1 Background 12 1.2 Objectives and members of the Expert Group 13 1.3 Mandate and tasks 14 1.4 Scope 14 1.5 Methodology 2 Transport objectives 15 2.1 National objectives 15 2.2 Expert Group’s objective 16 3 Key studies, work and projects of strategic importance 17 3.1 Multilateral agreements and forums for cooperation 17 3.2 Multilateral projects 18 3.4 National plans and studies 21 4 Barents Region – demography, climate and main industries 23 4.1 Area and population 23 4.2 Climate and environment 24 4.3 Overview of resources and key industries 25 4.4 Ores and minerals 25 4.5 Metal industry 27 4.6 Seafood industry 28 4.7 Forest industry 30 4.8 Petroleum industry 32 4.9 Tourism industry 35 4.10 Overall transport flows 37 4.11 Transport hubs 38 5 Main border-crossing corridors in the Barents Region 40 5.1 Corridor: “The Bothnian Corridor”: Oulu – Haparanda/Tornio - Umeå 44 5.2 Corridor: Luleå – Narvik 49 5.3 Corridor: Vorkuta – Syktyvkar – Kotlas – Arkhangelsk - Vartius – Oulu 54 5.4 Corridor: “The Northern Maritime Corridor”: Arkhangelsk – Murmansk – The European Cont. 57 5.5 Corridor: “The Motorway of the Baltic Sea”: Luleå/Kemi/Oulu – The European Continent 65 5.6 Corridor: Petrozavodsk – Murmansk – Kirkenes 68 5.7 Corridor: Kemi – Salla – Kandalaksha 72 5.8 Corridor: Kemi – Rovaniemi – Kirkenes 76
    [Show full text]
  • Annual Report and Sustainability Report
    ANNUAL REPORT AND LKAB SUSTAINABILITY REPORT ANNUAL REPORT AND SUSTAINABILITY REPORT AND SUSTAINABILITY ANNUAL REPORT CONTENTS Events in brief 2 The LKAB Manifesto 3 Overview of the past year 4 President’s report 6 Group strategies 9 LKAB 2009 11 Economic trends, market 13 Steel demands iron ore 16 International trade 17 The iron ore mines 18 Prospecting, ore reserves 19 From iron ore to pellets 20 Production 2009 21 Research and development 22 Human resources 23 Investments 24 The industrial minerals business 25 Subsidiaries 26 2009 SUSTAINABILITY REPORT 27 Stakeholders and sustainability issues 28 Value creation 29 Control of sustainability activities 30 Urban transformation 31 Environment 34 Co-workers 44 Involvement in local communities 49 About LKAB’s Sustainability Report for 2009 106 GRI index 106 Auditors’ statement of assurance 108 CORPORATE GOVERNANCE REPORT 50 Board of Directors and Group Management 55 FINANCE 58 Group overview 58 Contents, financial statements 59 Report of the Directors 60 Financial reports and notes 68 LKAB, BOX 952, SE-971 28 LULEÅ, SWEDEN Proposed disposition of unappropriated earnings 104 www.lkab.com Auditors’ Report 105 Glossary 109 Addresses 110 Annual General Meeting 20092009 and financial information 111 ANNUAL REPORT AND LKAB SUSTAINABILITY REPORT ANNUAL REPORT AND SUSTAINABILITY REPORT AND SUSTAINABILITY ANNUAL REPORT CONTENTS Events in brief 2 The LKAB Manifesto 3 Overview of the past year 4 President’s report 6 Group strategies 9 LKAB 2009 11 Economic trends, market 13 Steel demands iron ore 16
    [Show full text]
  • Julkaisun Nimi
    Ramboll Finland Oy Kaivostoiminnan liikenteelliset tarpeet pohjoisessa -esiselvitys Loppuraportti (Kommenttiversio) Liikennevirasto Helsinki 2012 2 Kannen kuvat: LKAB ja Northlan Resources Inc. 3 Tiivistelmä, johtopäätökset ja jatkotoimenpiteet KAIVOSTOIMINTA NYT JA TULEVAISUUDESSA Suomessa toimi syksyllä 2012 noin 50 kaivosta tai louhosta, joista 12 oli metallimal- mikaivoksia. Kaivokset sijoittuvat pääsääntöisesti Pohjois- ja Itä-Suomeen. Teolli- suusmineraaleja louhittiin vuonna 2011 noin 30 kaivoksessa tai louhoksessa. Sekä metalli- että teollisuusmineraaleja tuottavien kaivosten tuotteet päätyvät pääsään- töisesti kotimaiseen jatkojalostukseen. Suomen malmivarannoista on kiinnostunut yli 30 toimivaa kaivosyhtiötä. Pohjoiseen ja itäiseen Suomeen on suunnitteilla useita uusia kaivoksia ja nykyisten kaivosten tuotannon laajennuksia. Jos suunnitelmat to- teutuvat, nykyiset kaivoskuljetusmäärät tulevat moninkertaistumaan. Kaivosalan tulevaisuutta leimaa epävarmuus Euroopan ja muun maailman talouden kehityksestä. Kaivostoiminnan ennustettavuus on vähentynyt ja toimintaan liittyvät riskit ovat viime vuosina kasvaneet. Kaivosteollisuuden pitkän aikavälin odotukset ovat kuitenkin edelleen hyvin positiiviset. Väestönkasvu, kehittyvien talouksien ky- synnän kasvu ja kaupungistuminen lisäävät erilaisten metallien ja mineraalien kysyn- tää. Kysyntään vaikuttavat vahvasti etenkin Kiinan ja kehittyvien maiden talouksien kasvu, mutta myös taloustilanne Euroopassa. Euroopan unionin raaka-ainepolitiikan mukaan tavoitteena on vahvistaa EU:n sisällä
    [Show full text]
  • Høringsliste Jernbane Virksomhet Adresse Postnr/Sted E-Post Org
    Høringsliste jernbane Virksomhet Adresse Postnr/Sted E-post Org. nummer Arbeidstilsynet Postboks 4720 Torgarden 7468 TRONDHEIM [email protected] 974761211 Bane NOR SF Postboks 4350 2308 HAMAR [email protected] 917082308 Bergens Elektriske Sporvei Postboks 812 Sentrum 5807 BERGEN [email protected] 990512469 Boreal Bane AS Postboks 3448 Havstad 7425 TRONDHEIM [email protected] 954653137 Borregaard AS Postboks 162 1701 SARPSBORG [email protected] 895623032 Bybanen AS Kokstadflaten 59 5257 KOKSTAD [email protected] 977511402 CargoNet AS Postboks 1800 Sentrum 0048 OSLO [email protected] 983606598 Direktoratet for samfunnssikkerhet og beredskap (DSB) Postboks 2014 3103 TØNSBERG [email protected] 974760983 Etterretningstjenesten Postboks 193 Alnabru bedriftssenter 0614 OSLO 974789221 Flytoget AS Postboks 19 Sentrum 0101 OSLO [email protected] 965694404 Go-Ahead Norge AS v/Yngve Kloster Jernbanetorget 1 0154 OSLO [email protected] 917132577 Green Cargo AB Box 39 17111 Solna, Sverige [email protected] Grenland Rail AS Bølevegen 202 3713 SKIEN [email protected] 988703680 Hector Rail AB Svärdvägen 27 18233 DANDERYD [email protected] Hellik Teigen AS Postboks 2 3301 HOKKSUND [email protected] 941538576 Jernbanedirektoratet Postboks 16 Sentrum 0101 OSLO [email protected] 916810962 Jernbanevirksomhetenes sikkerhetsforening Postboks 7052 Majorstuen 0306 OSLO [email protected] 818315392 Keolis Norge AS Kokstad depot, Kokstadflaten 59 5257 KOKSTAD [email protected] 993050377 LKAB Malmtrafik AB 98186
    [Show full text]
  • NORWAY by Jozef Plachy 1
    THE MINERAL INDUSTRY OF NORWAY By Jozef Plachy 1 While about 25% of Norway's gross national product about 45% of total exports, followed by metals (7.7%) and (GNP) is supplied by natural resource industries (including industrial minerals, mainly dimension stone. agriculture, fisheries and forestry), only a small amount (less than 1%) is contributed by the mineral industry. Readily Structure of the Mineral Industry available hydroelectric power and ice-free ports facilitated the growth of energy intensive industries, namely production Despite recent changes, the Norwegian Government's of aluminum, ferroalloys, magnesium, and silicon metal. involvement in the mineral industry remained relatively high, However, by far the largest mineral contribution to the GNP especially in offshore hydrocarbon production. The (about 17%) is by the hydrocarbon industry. Government, through the state-owned Den norske stats oljeselskap A/S (Statoil), continued to control all production Government Policies and Programs and refining. The rest of the mineral industry was dominated by Elkem A/S and Norsk Hydro A/S. Despite rejection of membership in the European Union Elkem A/S is one of the world's leading diversified (EU), Norway has continued to liberalize its mining law. metallurgical companies with a strong hydroelectric energy The Government refunded up to 50% of the cost of base and significant global presence through its 17 plants exploration drilling, and additional grants provided up to and 26 offices on 3 continents. Elkem is publicly owned 35% of the capital cost of developing certain minerals and company in which the largest investors, Orkla, specific areas (mainly north of Trondheim).
    [Show full text]
  • Ledernes Årsrapport 2010
    ! !""#$%& !"#"$%" L '()*+(,-.+*+(/0/1-2343 M 5+,67(8(*+1/,98:-;<*-2343 4N 5+=0,<*,-.+*+(/0/1-;<*-2343 22 5+10</->%> 2O 5+10</-?0@(A"<*1+ 2M 5+10</-"<*@ L2 5+10</-'B* LP 5+10</-C+,( LM 5+10</-D,( P3 5+10</-$7E+-<1-18,, PL- %+@+*/+,-F</1*+,, PL %+@+*/+,-6(=871-(07-433AG*,E6.07++( PP %+@+*/+,-#?'A6(=871- PQ %+@+*/+,-433AG*,E6.07+6H PM %+@+*/+,-;<*.6/@,,()*+- PN %+@+*/+,-F<H:+(8/,+A-<1-,+*=0I+6(=871 PN %+@+*/+,-<*18/0,8,E</,6(=871 R3 %+@+*/+,-6(=871-;<*-,+/0<*:<70(099 R4 !/(+*/8,E</87(-,8H8*.+0@ R4 F6*,-<1-9<H:+(8/,+ RL %+@+*/+,-.*8/,E+6(=871-;<*-76;(;8*( RO %+@+*/+,-.*8/,E+6(=871-;<*-<;;+/(701-,+9(<* RM %+@+*/+,-.*8/,E+6(=871-;<*-.8*/+J81+7+@+*+ O3 %+@+*/+,-.*8/,E+6(=871-;<*-=+9,(-<1-8((;B*0/1- O4 K=(87+;<*J<7@ OR F<HH6/098,E</-<1-H8*9+@,;B*0/1 " 'ST5US'-VU5US"!"W &'(' 2343-.7+-+(-,:+,0+7(-G*-;<*-%+@+*/+X disse forholdene blir et overskudd i årsresultatet på Forbundet fylte 100 år og markerte dette gjennom kr. 868.070,- Dette er vesentlig bedre enn budsjettet store deler av året. Høydepunktet var jubileumsfesten kongressen i 2009 vedtok for 2010, hvor underskud- som ble avholdt i Håkonshall i Bergen fredag 17. det var satt til kr. 1.401.000,-. Ved å avskrive jubileet september med æresmedlemmer, tillitsvalgte, gjester over flere år, kunne forbundet unngått underskudd på og samarbeidspartnere. Også Bergens ordfører var til- driftsresultatet. Men, styret har allikevel valgt å ta hele stede under arrangementet. Totalt var 250 deltakere på kostnaden ved 100-års jubileet i 2010.
    [Show full text]
  • Downloaded From
    Connecting and correcting : a case study of Sami healers in Porsanger Miller, B.H. Citation Miller, B. H. (2007, June 20). Connecting and correcting : a case study of Sami healers in Porsanger. CNWS/LDS Publications. CNWS Publicaties, Leiden. Retrieved from https://hdl.handle.net/1887/12088 Version: Corrected Publisher’s Version Licence agreement concerning inclusion of doctoral License: thesis in the Institutional Repository of the University of Leiden Downloaded from: https://hdl.handle.net/1887/12088 Note: To cite this publication please use the final published version (if applicable). Connecting and Correcting A Case Study of Sami Healers in Porsanger Proefschrift ter verkrijging van de graad van Doctor aan de Universitet Leiden, op gezag van Rector Magnificus prof.mr. P.F. van der Heijden, volgens besluit van het College voor Promoties te verdedigen op woensdag 20 juni 2007 klokke 16.15 uur door Barbara Helen Miller geboren te Oconomowoc, Wisconsin, USA in 1949 Promotiecommissie: Promotor: Prof. Dr. J.G. Oosten Referent: Mw. Dr. N.J.M. Zorgdrager Overige leden: Prof. Dr. P.J. Pels Prof. Dr. P.J.M. Nas Mw. Dr. S.W.J. Luning Connecting and Correcting A Case Study of Sami Healers in Porsanger CNWS Publications Leiden CNWS Publications, Vol. 151 CNWS publishes books and journals which advance scholarly research in Asian, African and Amerindian Studies. CNWS Publications is part of the Research School of Asian, African and Amerindian Studies (CNWS) at Leiden University, The Netherlands. All correspondence should be addressed to: CNWS Publications c/o Research School CNWS Leiden University PO Box 9515, 2300 RA Leiden The Netherlands.
    [Show full text]
  • Jernbanemagasinet Nr 1 2015
    JernbaneJernbanemagasinet nr. 1-2015 GODS: NY MODELL FOR TERMINALDRIFT GODT MOTTATT Med togene eksporteres fisk for sju milliarder kroner årlig BJØRN KANSTAD, mangeårig godsaktør på bane Gods må løftes Godstrafikken på bane kan kollapse hvis det ikke satses. Bjørn Kanstad har lyktes før og har resepten klar. Bildet ¦Rombaksbotn Jernbane JERNBANEMAGASINET nr. 1-2015 Ansvarlig redaktør: SVEIN HORRISLAND Redaktør: TORE HOLTET Fotojournalist: ØYSTEIN GRUE Journalist: ARVID BÅRDSTU Medarbeidere i dette nummeret: Anne Mette Storvik, Olav Nordli og Stig Herjuaune Adresse, redaksjonen: Tore Holtet Jernbaneverket HK Boks 788, Sentrum, 0106 Oslo 22 45 52 98 (916 55 298) E-post: [email protected] Redaksjonen avsluttet 04.02.2015 Utgitt av: Jernbaneverket Stortorvet 7 Oslo www.jernbaneverket.no Opplag: 7 300 DET STORE BILDET Design: Rombaksbotn gjenoppstår REDINK tekst ARVID BÅRDSTU foto KARL INGE PUNSVIK CHRISTEN PEDERSEN www.redink.no ROMBAKSBOTN var byen som for- ke. I Rombaksbotn var det mange butikker; Forsidefoto: svant da Ofotbanen sto ferdig. I dag er det skomaker, skredder, urmaker, baker – og KARL INGE PUNSVIK Rettelse: Forsidefoto i nummer 8 2014 bare noen tufter som vitner om denne rare bordell. Byen eksisterte i fire-fem år, og ble var tatt av Lars Frøystein byen som ble anlagt innerst i Rombakfjorden innimellom rammet av ras og branner. Både under byggingen av Ofotbanen. hus og mennesker forsvant. Noen hus ble Trykk og distribusjon: Men så har underet skjedd; byen har til aske mens andre befinner seg i Narvik – i RK GRAFISK dukket opp igjen – som en miniatyrby. Snart daglig bruk, som det heter. kan den beskues av alle som vil se hvordan Dette kunstverket av en miniatyrby er laget denne rallarbyen, som brått vokste fram og av Per Henrik Mørk, og er finansiert av et bredt omtrent like fort forsvant, så ut.
    [Show full text]
  • NFF English Report Series
    S USTAINABLE UNDERGROUND CONCEPTS SUSTAINABLE UNDERGROUNDCONCEPTS NORWEGIAN TUNNELLING SOCIETY PUBLICATION NO. 15 NORWEGIAN TUNNELLING SOCIETY REPRESENTS EXPERTISE IN • Hard Rock Tunneling techniques • Rock blasting technology • Rock mechanics and engineering geology USED IN THE DESIGN AND CONSTRUCTION OF • Hydroelectric power development, includ- ing: - water conveying tunnels - unlined pressure shafts - subsurface power stations - lake taps - earth and rock fill dams • Transportation tunnels • Underground storage facilities • Underground openings for for public use NORSK FORENING FOR FJELLSPRENGNINGSTEKNIKK Norwegian Tunnelling Sosiety P.O. Box 34 Grefsen, N-0409 Oslo, Norway [email protected] - www.tunnel.no SUSTAINABLE UNDERGROUND CONCEPTS Publication No. 15 NORWEGIAN TUNNELLING SOCIETY 2006 DESIGN/PRINT BY HELLI GRAFISK AS, OSLO, NORWAY Publication No. 15 ISBN-NR. 82-92641-04-1 Front page picture: Gjøvik Olympic Mountain Hall, span 61 meters. Courtesy VS-Group/Bjørn Fuhre Layout/Print: Helli Grafisk AS [email protected] www.helligrafisk.no Disclaimer This publication issued by the NorwegianT unnelling Society (NFF) is prepared by professionals with expertise within the actual subjects. The opinions and statements are based on sources believed to be reliable and in good faith. Readers are advised that the Publications from NorwegianT unnelling Society NFF are issued solely for informational purposes. The opinions and statements included are based on reliable sources in good faith. In no event, however, shall NFF and/or the authors be liable for direct or indirect incidental or conse- quential damages resulting from the use of this information. SUSTAINABLE UNDERGROUND CONCEPTS Norway is a mountainous country. Topographical features along the western coastline are long fjords cutting into steep and high mountains.
    [Show full text]