Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area

New Projects

Site Development Permit to allow of one existing and construct a 20 345 South 2nd 1 Westbank Valley Title Planning Review 3 H21-012 story building with 1.39 million square feet of St commercial office with ground floor retail space Downtown

Special Use Permit to allow one 7 story mixed use building and one 5 story 1520 West 2 Residential West San Carlos Mixed Use Planning Review 6 SP21-007 affordable housing building, with a total of 202 San Carlos St residential units and 15,582 square feet of commercial space. Central Conditional Use Permit to allow a temporary 345 South 2nd 3 Westbank Valley Title Temporary Structure structure for exhibition purposes and public Planning Review 3 CP21-004 St outdoor events Downtown SW corner of PDC08-061; PDC13-004 ; PD12-013 West San 4 High Rise Residential Republic Urban Ohlone Block A Planning Approved 6 Block A; PD15-036 Block B; PD15- Carlos St and 035 Block C; PDA12-013-02 Planned Development Permit Amendment to decrease theCentral height of a previouslySunol approved St mixed-use residential tower from 14 stories to 12 stories, increase the podium apartment from four stories to six stories, and allow a alternative arrangement (puzzle lift) on an approximately 2.66-gross acre site

Construction of 7 8-story totaling 550 East 5 Office Caracol Owner LLC 550 East Brokaw Planning Review H21-005 approximately 2 million sq ft of office Brokaw North San Jose

Planning Review

Construction of a 21-story building with 194 residential units and 405,000 square feet of 35 South 2nd 6 Mixed Use Project Fountain Alley Westbank Historic District Planning Review 3 H20-037 office space with 31,959 sf ground floor St retail space Downtown

Construction of a 14-story, 512,031 sf 255 West 7 Office Westbank Project West Julian Planning Review 3 H20-036 commercial building Julian St Downtown Construction of a 29-story buidling with 520 8 Residential Westbank Project Bo Town residential units and 7,645 square feet of 409 S 2nd St Planning Review 3 H20-038 commercial Downtown

Demolition of the exiting building and 19 North 2nd 9 Residential Roygbiv Development 19 North 2nd St construction of 37,240 sf of commercial Planning Review 3 H20-040; HP21-001 St space and 210 residential units Downtown

Amendment to allow modificaitons to 5601 Great 10 Office Western Digital HGST, Inc. generator system, vehicular pavement, fire Planning Review 2 PDA14-005-011 Oaks Parkway access road, grading//irrigation. Edenvale

4/29/2021 1 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area

Planned Development rezoning to allow the demolition of three existing commercial buildings (77,000sf) and the construction of 11 Mixed Use MPG Stevens Creek Steven's Creek Promenade three residential buildings with 637 units, Planning Review 1 including 230 affordable units, and a 250- room hotel with 6,200 sf of ground floor retail space 4300-4360 Steven's Creek PDC20-021; PDC16-036 & PD17- West Valley 014

Planning Development Permit to allow the expansion of an existing concrete and 120 Granite 12 Commercial Granite Rock Granite Rock Planning Review 7 PDC20-023; PD20-013 asphalt recycling, manufacturing and Rock Way distribution facility. South

The construction of 1241820 sf of non- 13 Mixed Use Musuem Place Onwer, LLC Habitat Planning Review 3 residential space 180 Park Downtown Avenue SP20-032

Site Development Permit to allow approximately 1,280,250 sf of industrial uses including four office/R&D buildings 14 Office LBA Realty 350 West Trimble, South Planning Review 4 and two industrial/R&D buildings, a campus amenity building, and three parking 350 West garages. North San Jose Trimble H20-014 Site Development Permit to allow an 15 Office LBA Realty 350 West Trimble, North Parcel approximately 125,740 sf office/R&D 350 West Planning Review 4 building North San Jose Trimble H20-015

SB 35 Ministerial permit to allow the 16 Housing AMG & Associates Monterey Mixed Use construction of 3,035 sf of commercial Planning Review 2 4300 Monterey space and 438 residential units Edenvale Road H20-024

Construction of a 222-unit residential 17 High Rise Residential Urban Catalyst The Mark 459 South 4th Planning Review 3 building Downtown St SP20-021 Rezoning to allow an increase of allowable 2376 South 18 Commercial Arcadia Development Evergreen Arcadia Expansion commercial space from 344,000 to 404,000 Evergreen Planning Review 8 sf Evergreen Loop PDC20-002 SB 35 Ministerial Permit to allow the construction of a 100% affordable 289,324 19 Affordable Housing Roygbiv 605 Affordable Planning Review 3 square foot apartment building (29 stories) with a total of up to 345 residential units Downtown 605 S 2nd St H20-028

4/29/2021 2 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area Planned Development Permit Amendment to allow the construction of of a 5-story, 20 Office Bloom Energy Bloom 92,350 -square foot bloom fuel cell Planning Review 2 structure to the east of the SV11 data 5 Great Oaks center building approved under PD15-031. Edenvale Boulevard PDA15-031-01 Construction of a 22,102 sf theatre and a 21 Hotel Barry Swenson Building San Jose Stage/ Home 2 Hotel 490 S 1st St Planning Review 3 C20-008, CP20-008 144 room hotel Downtown Construction of a 20-story, 1.01 million sf 22 Office KT Urban KT Urban Office @ Woz office tower with 10,100 sf ground floor 276 Woz Way Planning Review 3 H20-004 commercial Downtown Construction of two six-story residential buildings, with 10,750 sf of commercial 605 Blossom 23 Housing Swenson Blossom Hill Signature Planning Review SP20-012 space, 231 market rate units and 84 Hill Road affordable units Edenvale Construction of a six-story building with 5,540 sf of gallery space, 8,913 sq for 653 North 7th 24 Mixed Use Shea Properties Japantown Mixed Use Planning Review 3 PD20-004 music practice/performance space, and 65 St residential units Central 1770 N 1st 25 Hotel Bumb & Associates North 1st St Hotel Construction of a 171 room hotel North San Jose Planning Review 3 PDA13-049-03 Street Planned Development Rezoning to allow El Paseo & 1777 Saratoga Ave up to 800 residential units, 50,000 sf of 26 Mixed Use Eric Shoennauer Planning Review 1 Mixed Use Village retail, and up to 450,000 sf office or 1312 El Paseo 450,000 educational facility West Valley De Saratoga PDC19-049 & PD20-006

Planned Development Rezoning and Permit to allow the construction of 230 1301 West 27 Housing Core Companies 1301 West San Carlos residential units including 15% affordable Central Planning Review 6 SP19-067 San Carlos St units and 3,600 sf of commercial space on a 1.02 acre site

Planning Development for approximately 6.5 million sf of office, approximately 3,000-5,000 housing units, approximately 300,000 to 500,000 sf of 450 West 28 Office Google Google Diridon Planning Review 6 PDC19-039, PD19-029, GP19-009 active uses, approximately 100,000 sf of Santa Clara St event space, up to 300 hotel rooms and up to 800 rooms of limited-term corporate housing.

Rezoning and permit to demo existing buildings and construct 4 buildings with 1657 Alviso- 29 Data Center Microsoft 237 Industrial Center - Cilker either Option 1: 1,197,700 SF light Milpitas Road, Planning Review 4 industrial; Option 2: 2.35M SF data center NW Hwy 237 up to four stories North San Jose and McCarthy SP16-053 & SP19-066 Planned Development Permit Amendment to allow for the development of Phases 3 30 Housing KB Home Communications Hill Planning Review 7 and 4 of the Communications Hill project to construct 798 residences South 0 Curtner PDA14-035-06

4/29/2021 3 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area Construction of a seven-story building with 31 Mixed Use Urban LLC San Carlos Housing 104 residential units and approximately 1530 West Planning Review 6 12,600sf commercial use Central San Carlos SP20-004 Construct an 18-story building with 218 439 South 4th residential units with 1,345 sf ground floor Street near E. 32 High Rise Residential Nelly Amas 4th Street Metro Station Planning Review 3 H17-004 retail and 12,381 sf rooftop eating San Salvador establishment Downtown St. Annexation and prezoning to PDC for mixed use with potential for up to 238 hotel rooms, up to 150,000 sf office, up to 33 Mixed Use Weingarten Realty Investors Cambrian Plaza 115,000 sf retail, up to 280 attached Planning Review 9 units and 84 townhomes and up to 130,000 sf of 14200 Union PDC17-040 & Cambrian_37 & PD20- convalescent hospital. Cambrian/Pioneer Avenue 007

Planned Development Zoning to allow up to 34 Mixed Use Berryessa FM Development LLC 3,450 residential units and 3.4 million sf of Planning Review 4 Flea Market South 1590 commercial sf on a 60.7 gross acre site Alum Rock Berryessa PDC17-051 Construction of a five-story mixed use 35 Housing Silicon Sage Buiders Sunset Mixed use building with 33,841 sf retail and 792 2101 Alum Planning Review 5 residential units Alum Rock Rock Ave CP20-001 Construction of a 15-17 story buiding with 36 Office Boston Properties up to 1.8 million square feet of commercial Planning Review 3 South Almaden Woz Way and office and parking on a 3.67-gross-acre site Downtown Almaden SP20-005 Faculty/Staff Housing & Tech Planned Development Rezoning for up to 37 Housing Santa Clara University 290 residential units and 26,000 sf 1202 Planning Review 3 Center commercial office West Valley Campbell GP18-015, PDC18-038, & PD19-020

Planning Approved

Special Use Permit/Amendment to allow a 252-foot-high mixed-use tower with 5,655 sf High Rise Residential KT Urban Garden Gate Planning Approved 3 ground floor commercial and 336 600 South 1st 38 residential units. Downtown Street SPA18-001-01

Construction of a five story building with 1936 Alum Affordable Housing Pacific West Communities Del Sol Mixed Use Residential 3,000 sf of commercial space and 194 Planning Approved CP20-015 Rock Ave affordable units 39 Alum Rock

Construction of a 18-story office building Office The Sobrato Organization Block 8 with 482,026 sf of office and 12,771 sf Planning Approved 3 ground floor commercial space 282 South 40 Downtown Market St H19-033

Conditional Use Permit to allow the demolition of existing commercial buildings 3806 Stevens and construction of an approximately Office Cypress Equities 3806 Stevens Creek Boulevard Creek Planning Approved 1 CP19-031 270,000 sf office building, 150,000 sf Boulevard athletic facility, and 15,000sf of ground floor retail on a 6.30 acres site 41 West Valley

4/29/2021 4 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area Planned Development Rezoning and PD Mixed Use Silicon Sage Buiders Little Portugal Gateway Permit to allow a new 6-story building with 1663 Alum Planning Approved 5 42 121 residential units and 14,170 sf retail Alum Rock Rock Ave PDC18-021 and PD18-016 Construction of up to 569 residential units 1197 Lick Affordable Housing UrbanCo Tamien LLC Tamien Residential Planning Approved 3 43 and up to 3,000 sf of commercial space Central Avenue PDC18-025 & PD20-003 1510 S Hotel North Star Development Group Hotel on DeAnza Construction of a four story 132-room hotel DeAnza Planning Approved 1 44 West Valley Boulevard H19-017 Rezoning from IP to CIC and construction Educational Avenues Silicon Valley LLC Avenues School of 354,332 sf in seven buildings for a Planning Approved 6 45 school Central 529 Race St C19-013 & CP19-013 Construction of 1,297,000 sf of office space 90 East Office Perry-Arrillaga Brokaw Road Office-Parcel III Planning Approved 3 HA13-040-03 46 in five buildings North San Jose Brokaw Construction of 376,250 square feet of 3161 Olsen Office Federal Realty Santana West Phase 2 Planning Approved 1 PDA18-045-01 commercial space Drive 47 West Valley

Office JP DiNapoli Companies Almaden Boulevard Tower Construction of a 596,750 sf office building S Almaden & Planning Approved 3 48 Downtown Post Street H20-021 49 Housing Holmes Business LLC 259 Meridian Ave Construction of 241 residential units Central 259 Meridian Planning Approved 6 PDC18-016 & PD19-011 Construction of an approximately 3.4 150 Almaden Office SJ Cityview LLC CityView Plaza Planning Approved 3 50 million sf office development Downtown Boulevard H19-016 PD Zoning from HI to A(PD) for residential High Rise Residential First Community Housing McEvoy Residences uses and PD Permit for 12-story, 358 unit Planning Approved 6 affordable housing. 51 Diridon 0 McEvoy SP18-059 Construction of a 24-story, 279 room hotel Hotel Khanna Enterprises Tribute Hotel integrated into a historic buiding 211 South 1st Planning Approved 3 52 (Montgomery Hotel) Downtown Street H16-042 & HP17-003 Construction of a nine-story office buidling 1601 Office Hudson Skyport LLC and a one-story industrial office building Planning Approved 3 Hudson Skyport Phase 2 Technology totaling 350,000 sf 53 North San Jose Drive PDC13-041, PD18-039 Site Development Permit to allow the Hotel KT Urban Almaden Corner Hotel construction of a 19-story hotel with 272 8 North Planning Approved 3 54 guest rooms Downtown Almaden H18-038 Construction of and 18-story towers with High Rise Residential KT Urban / Starcity Aviato 803 co-living units and 3,800 sf ground 199 Bassett Planning Approved 3 SP17-023 & SPA17-023-01 55 floor retail Downtown 2890 N. First Demo of 8 existing industrial buildings St. between totalling 364,854 sf and construction of up Zanker, N First Office Boston Properties The Station on North First Planning Approved 4 to 1,653,761 sf industrial office and St and East H14-029 submitted 8/14/14 56 commercial support on a 24.3 gross acres North San Jose Plumeria Dr Approved 12/10/14 3130, 3120, 3110, and 3100 Zanker (new Construction of two office buildings addresses will Office Broadcom Innovation Place Planning Approved 4 totallying 536,949 sf and a parking garage be 228, 230, 250, 260, 270, 280, 288, and 290 Innovation 57 North San Jose Dr. H15-037

4/29/2021 5 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area W. Santa Mixed use development with two office Clara at 87, buildings (12 and 13-stories), a 10-story Mixed Use Trammell Crow Destination DIRIDON adjacent to Planning Approved 3 residential building with 325 apts and Guadalupe PDC15-051, PD15-061, PDA15-061- 30,892 retail throughout the site 58 Diridon River Trail 01 Construction of up to 307 units and 52,167 350 South Mixed Use Winchester Plaza LLC Volar Planning Approved 6 PDC15-065, PD15-059 59 sf commercial and office uses West Valley Winchester 455-493 S. First St Construction of a 25-story building with 300 northeast High Rise Residential The Core Companies Gateway Tower residential units and 4,850 sf ground floor Planning Approved 3 H15-047 & HP15-003 corner of S. retail Market and E. 60 Downtown William Construction of a two-tower (23- and 24- 70 S. Almaden High Rise Residential Z&L Properties Greyhound stories) building with 708 residential condo Planning Approved 3 SP16-021 Ave. 61 units and 13,974 sf ground floor retail Downtown

Construction of up to 360,000 sf Medical Office Samaritan Medical Center Samaritan Drive Planning Approved 9 commercial space for medical office 2505 62 Cambrian/Pioneer Samaritan Dr. PDC15-028 & PD16-023 Construction of a two-towered (18- and 12- stories) residential building with 215 252 N. 1st High Rise Residential Z&L Properties Park View Towers Planning Approved 3 HA14-009-02 & HPA14-002-02 residential units, 5 townhomes, and 18,537 Street 63 sf ground floor retail Downtown Construction of a 21-story residential tower 171 Post High Rise Residential Simeon Properties Post and San Pedro Tower with 228 residential units and 10,863 sf of Planning Approved 3 H14-023 to HA14-023-02 Street 64 ground floor retail Downtown Construction of an 18-story residential 323 Terraine High Rise Residential Z&L Properties N. San Pedro Tower 3 building with 313 residential condos units Planning Approved 3 SP16-020 St. 65 and, 1,400 sf ground floor retail Downtown

Construction of a 22-story mixed use Black Sea Gallery Dev LLC, Alterra 27 South 1st High Rise Residential 27 West building with 374 units and 35,712 sf retail Planning Approved 3 SP18-016 Worldwide Street space 66 Downtown

Pre Construction Review

Construct a five-story affordable housing Building / PW 66 Affordable Housing Eden Housing 425 Auzerais 3 building with 130 residential units Central 425 Auzerais Review H19-051 961 Meridian 67 Housing ROEM Corporation Construction of 230 residential units PW Review 6 961 Meridian Willow Glen Ave SP19-064 Construction of a 21-story mixed use building with 220 residential units, 4,000 sf 68 High Rise Residential Acuity Realty Carlysle PW Review 3 of commercial space, and 70,000 sf of 51 Notre office space Downtown Dame Ave SP20-020 Construction of a six-story co-living, mixed income building with 115 units, including 28 Building / PW 69 Affordable Housing The Kelsey The Kelsey 3 apartments dedicated to the 447 North 1st Review developmentally disabled. Central St H20-005

4/29/2021 6 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area Construction of an eight-story building with Building / PW 70 Affordable Housing First Communities Housing Roosevelt Park Apartments 80 dwelling units and 10,400 sf commercial 21 North 21st 3 Review space Central St SP17-027

West San Carlos Supportive Construction of a seven-story building with Building / PW 71 Affordable Housing Danco Communities 6 Housing 80 residential units Review 750 West San Central Carlos H19-028 4040 Stevens Construction of a showroom addition, Building / PW 72 Commercial Jaguar Rover Stevens Creek Jaguar Expansion Creek 1 additional office, and exterior modifications Review West Valley Boulevard H19-014

Site Development Permit to allow 73 Office UC Fountain Alley Owner Fountain Alley/Lido Building demolition of Lido Nighclub and construct a Downtown Building Review 3 six story, 84,404 sf office building 26 South 1st St H19-041 & T19-035

Planned Development Permit Amendment to allow an additional level to an approved 74 Office Hunter Properties Coleman Highline- Garage Central 1125 Coleman Building Review 3 garage to increase the number of spaces by 396 spaces PDA19-012-01

Construction of a nine-story hotel with 311 75 Hotel Diridon Hospitality Stockton Hotel Building Review 3 hotel units and 19 residential units Diridon 292 Stockton C19-039 & SP19-063 Construction of 147 affordable housing 397 Blossom 76 Affordable Housing Charities Housing Blossom Hill units and approximately 16,000 sf Hill Road PW&Building Review 2 commercial Edenvale CP18-022 Planned Development Rezoning for up to Building & PW 77 Housing Pulte Homes Winchester Ranch 688 residential units on a 15.69 gross acre 555 South 1 GP18-014, PDC18-037 & PD19-019 Review site West Valley Winchester Planned Development Zoning and PD Permit to demo existing residential PW & Building 78 Housing Avalon Bay Communities Avalon Bay West ammenities and construct 300 residential 1 Review units and 17,800 sf commercial on a 20 700 Saratoga acre site West Valley Ave PDC17-056 & PD17-027 Planned Development to allow 447 1410 S PW & Building 79 Mixed Use Baywest Bascom Gateway Station 6 residential units and up to 300,000 sf retail Willow Glen Bascom Review PDC17-047, PD18-015 Demolition of an existing buiding and construction of relocated 68,652sf cardroom with 24 hour use/drinking 80 Mixed Use Bumb & Associates Bay 101 est/banquet facility, construction of a nine- Planning Approved 3 story 234,192 sf office building, and SE corner N. construction of 151,870 sf hotel with 174 1st St and PDC13-017, PD13-049, PDA13-049- rooms w/ banquet facility North San Jose Matrix Blvd. 01, PD15-062

Under Construction

Construction of a 46-unit affordable 81 Affordable Housing Eden Housing Eden @ Gallup Under Construction 10 housing development 5647 Gallup Cambrian/Pioneer Drive H19-023

4/29/2021 7 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area Construction of an 87-unit residential 82 Housing Alum Rock Family Housing LP Alum Rock Family Housing 2348 Alum Under Construction 5 building with 3,000 sf of commercial space Alum Rock Rock Ave CP18-044 Satellite Affordable Housing Construction of an eight-story building with 83 Affordable Housing Balbach Housing Under Construction 3 Associates 87 residential units Downtown 0 Balbach St H18-057 Construction of a six-story building with 82 329 Page St SP17-037 84 Affordable Housing Charities Housing Page Street Under Construction 6 residential units Central Construction of 61 permanent supportive 85 Affordable Housing Abode Services & Charities Housing Evans Lane Under Construction 6 housing units 0 Evans Lane GP19-007, PDC16-007 & PD18-007

Allow addition of two additional ice rinks, 1500 South 86 Misc Sharks Ice Sharks Ice associated amenities, and medical offices Under Construction 7 CP19-024 10th St totalling 204,193 sf to an existing ice rink Central South side Construction of a 69,250 sf medical office 87 Medical Office Samaritan Medical Center Samaritan Court terminus of Under Construction 9 building Cambrian/Pioneer Samaritan Ct. PDC15-029 & PD14-013 Construction of approximately 180,500 sf 88 Industrial LBA Realty 1605 Industrial 1605 Industrial Under Construction 3 PD18-044 industrial warehouse Berryessa Construction of a new five-story hotel with 89 Hotel Hunter Storm Coleman Highline- Hotel Under Construction 3 175 guest rooms North San Jose 1130 Coleman PDA12-019-04 Construction of a 1.3 million sf office 90 Office Jay Paul 200 Park Under Construction 3 building Downtown 200 Park Ave H18-045, AT19-037 440 W. Julian SP18-020, SPA18-020-01, SPA18- 91 Office TMG/Boston Properties Construction of 1 million sf office Under Construction 3 Platform 16 Diridon St 020-02 Construction of a 576,892 sf eight story 1125,1143, 92 Mixed Use Hunter Storm Coleman Highline building and two two-story amenity 1173 Coleman Under Construction 3 buildings and a three story parking garage North San Jose Ave PDC19-007 & PD19-012 3161,3162 and 3164 Olsen Dr., 449 93 Mixed Use Federal Realty Santana West Phase 1 Construction of 850,000 sf office. Under Construction 1 South Winchester West Valley Boulevard PDC14-068, PD18-045 Construction of a residential service facility 94 Affordable Housing First Community Housing North San Pedro Apartments 201 Bassett Under Construction 3 CP11-034 for 135 residents Downtown

Construction of 1.3 million sf 18 story 95 Office Adobe Adobe building with 8,132 of commercial retail Under Construction 3 333 W. San space Downtown Fernando H18-037 Construction of two eight-story office 60 E. Brokaw N. First / Brokaw Corporate buildings, one four-story building, one five- Rd, betw. N. Under Construction/ 96 Office Peery- Arrillaga 3 Campus story office/R&D building, and a three-story First Street Planning Review parking garage North San Jose and Bering Dr. H13-040 & HA13-040-03 Planned Development Permit to allow the Related California Urban construction of 520 residential units and 97 Mixed Use Japantown Corp Yard Residences Under Construction 3 Residences 19,191 sf commercial space on a 5.25 acre lot Central 0 North 6th St PD15-055

4/29/2021 8 Key Economic Projects List

Line Type Developer Project Name Project Description Address Status CC Dist Planning File # Area Planned Development Zoning and PD Permit to remove existing buildings and 98 Mixed Use The Hanover Company 715 West Julian St construct a 7-story building with 249 Under Construction 6 residential units and 26,572 sf commercial 715 West space on a 1.22 acre site Diridon Julian St PDC17-058 & PD17-029

Construct a new 182,000 sf office building 99 Office Supermicro Supermicro 750, 708 Under Construction 3 and a 209,320 sf light industrial building Ridder Park North San Jose Dr. H14-020, H15-012, H16-031 1125,1143, 6 bldgs from 5 to 10 stories,15K sf retail; 100 Mixed Use Hunter Storm Coleman Highline 1173 Coleman Under Construction 3 PDC09-004, PD12-019 to PDA12- 150 room hotel on 30 gross acres North San Jose Ave 019-03, PD18-011 Construct up to 310,000 sf retail and 250 101 Mixed Use Arcadia Development Evergreen Arcadia residential units and 17.2 acres parkland on 2140 Quimby Under Construction 8 80.89 acres. Evergreen Rd PDC10-022 & PD15-013 Hampton Inn + Holiday Inn Consturction of two 5-story buildings 102 Hotel KKS Hospitality INV LLC totaling 20,052sf: Hampton Inn 144 rooms; 2108 & 2116 Under construction 4 Express Holiday Inn Express 146 rooms North San Jose N. 1st St. H13-048

Construction of a two-towered (20- and 22- 188 West 103 High Rise Residential Z&L Properties Silvery Towers stories) mixed use building with 643 Saint James Under construction 3 H13-041 to HA13-041-03 residential units and 30,228 sqft retail. St Downtown Construction of a two-tower (each 28 stories) building with 630 residential units, 104 High Rise Residential Bayview Development Group Miro / SJSC Towers 39 N. 5 St. Under Construction 3 SP17-009 & SPA17-009-01 14,381 sf ground floor retail, and up to 24,693 sf flex/office space Downtown iStar Great Oaks mixed use development: Allow up to 418 residential units (6 5855 Monterey Building and PW detached, 358 attached) & Allow Road & 6520 105 Mixed use iStar Review & Under 2 construction of 301 multi-family units in two Gamma & PDC12-028, PD14-023, PD15-033, Construction four-story buildings and two six-story 6670 PDC15-059; PDA15-033-01 & PD16- parking structures Emergent 005