The Waterview Connection Motorway
Waterview Connection Information Sheet THE WATERVIEW CONNECTION MOTORWAY WHEN WILL THE WATERVIEW WHAT ARE THE TRAFFIC WHAT IS THE CONNECTION OPEN TO BENEFITS OF THE WATERVIEW TRAFFIC? WATERVIEW CONNECTION? Construction is on schedule for opening in early By bridging the gap between the Southwestern CONNECTION? 2017 as planned. and Northwestern motorways, the Waterview Connection will complete Auckland’s Western Being built is 5km of 6-lane motorway Ring Route. This is a 48km motorway link from to connect State Highways 20 (the Manukau in the south to Albany in the north that Southwestern Motorway) and 16 (the WHO WILL OPERATE will bypass central Auckland. Northwestern Motorway). THE MOTORWAY? Completing the Western Ring Route has been There will be three lanes southbound and prioritised as a Road of National Significance three lanes northbound between Maioro The Well-Connected Alliance, which is building because of the contribution it will make to New Street, where S.H.20 now ends, and the the Waterview Connection, will form an alliance Zealand’s future prosperity. It will provide Auckland Great North Road interchange on S.H.16. with international tunnel controls specialists SICE NZ Ltd (Sociedad Ibérica de Construcciones with a resilient and reliable motorway network by Half of the new motorway is underground in Eléctricas) to operate and maintain the motorway reducing the region’s dependence on the single twin tunnels 2.4km long and up to 30m below for the first 10 years of its life. A team from SICE spine comprising State Highway 1 and the Auckland the surface between the Alan Wood Reserve has worked with the Well-Connected Alliance Harbour Bridge for business to business trips, in Owairaka and Waterview. -
St Lukes Interchange (St Lukes Interchange) to Be Shown As Road Purposes for the Project (St Lukes Interchange)
6 Henderson Valley Road, Henderson, Auckland 0612 Private Bag 92250, Auckland 1142, New Zealand Ph 09 355 3553 Fax 09 355 3550 Notice of Requirement NOTICE OF REQUIREMENT FOR A DESIGNATION UNDER SECTION 168(2) OF THE RESOURCE MANAGEMENT ACT 1991 (RMA) TO: Auckland Council FROM: Auckland Transport 6 Henderson Valley Road Henderson Private Bag 92250 Auckland AUCKLAND TRANSPORT (an Auckland Council Controlled Organisation) as Requiring Authority under section 167 of the Resource Management Act 1991 gives notice of a requirement for a designation in the Auckland Council District Plan for works being the Waterview Connection SH16 St Lukes Interchange (St Lukes Interchange) to be shown as road purposes for the Project (St Lukes Interchange). 1. SUMMARY The St Lukes Interchange will generally comprise: Auckland Transport gives notice of a requirement for an alteration to “Designations D05- 08 and B08-04” in the Auckland Council District Plan (Isthmus Section) 2011 (“District Plan”) to widen St Lukes Road and Great North Road at the St Lukes Interchange. The purpose of Designation D05-08 is for regional road and the purpose of designation B08-04 is for public road network. The designations are identified on District Plan Maps D05 and D06 and in Appendix B of the Planning Maps, copies of which are contained in Appendix A this NoR. Under Section 176A(2)(b) of the RMA it is not intended to submit an Outline Plan of Works prior to construction as the details of the proposed works, as referred to in Section 176A(3), are addressed in this NOR. The proposed works are in keeping with the purpose of designations D05-08 and B08-04. -
Video Questions and Answers
Page 1 of 2 Waterview Connection Video Answers Tuesday 26 August 1. Meeting Auckland’s Roading Needs Drive down to the waterfront in the centre of Auckland City and meet Peter Spies from NZTA to find out more about Auckland’s road network. 1. Why are good roads important? They allow people, goods and services to travel easily and efficiently to help the economy 2. What are some of the challenges in providing good roads in Auckland? two harbours, volcanoes and an increasing population 3. What happens if there is an accident on the Harbour Bridge? There are very long delays as it shuts the main route through Auckland. Next step learning: Find out more about the State Highways in your local area and how they have changed over time. 2. The Western Ring – An Alternative Route Find out more about the Auckland Harbour Bridge and discover why Auckland needs the Western Ring Route. 1. How long was it expected to take to complete the Western Ring Route? 15 years 2. What were some of the major projects involved in closing up the gaps in the Western Ring Route? Manukau Extension, the Mount Roskill Project, Manukau Harbour Crossing, Hobsinville Extension 3. Why is the Harbour Bridge not enough to meet transport needs? It cannot be extended, the clip-ons have a limited life and will need replacing Next step learning: Discuss how you think the Western Ring Route will impact on Auckland and how it might affect you. LEARNZ Waterview Connection Field Trip to Auckland – Term 3, 2014 Log in to http://www.learnz.org.nz/waterviewconnection143 Page 2 of 2 3. -
South & East Auckland Auckland Airport
G A p R D D Paremoremo O N R Sunnynook Course EM Y P R 18 U ParemoremoA O H N R D E M Schnapper Rock W S Y W R D O L R SUNSET RD E R L ABERDEEN T I A Castor Bay H H TARGE SUNNYNOOK S Unsworth T T T S Forrest C Heights E O South & East Auckland R G Hill R L Totara Vale R D E A D R 1 R N AIRA O S Matapihi Point F W F U I T Motutapu E U R RD Stony Batter D L Milford Waitemata THE R B O D Island Thompsons Point Historic HI D EN AR KITCHENER RD Waihihi Harbour RE H Hakaimango Point Reserve G Greenhithe R R TRISTRAM Bayview D Kauri Point TAUHINU E Wairau P Korakorahi Point P DIANA DR Valley U IPATIKI CHIVALRY RD HILLSIDERD 1 A R CHARTWELL NZAF Herald K D Lake Takapuna SUNNYBRAE RD SHAKESPEARE RD ase RNZAF T Pupuke t Island 18 Glenfield AVE Takapuna A Auckland nle H Takapuna OCEAN VIEW RD kland a I Golf Course A hi R Beach Golf Course ro O ia PT T a E O Holiday Palm Beach L R HURSTMERE RD W IL D Park D V BEACH HAVEN RD NORTHCOTE R N Beach ARCHERS RD Rangitoto B S P I O B E K A S D A O Island Haven I RD R B R A I R K O L N U R CORONATION RD O E Blackpool H E Hillcrest R D A A K R T N Church Bay Y O B A SM K N D E N R S Birkdale I R G Surfdale MAN O’WAR BAY RD Hobsonville G A D R North Shore A D L K A D E Rangitawhiri Point D E Holiday Park LAK T R R N OCEANRALEIGH VIEW RD I R H E A R E PUPUKE Northcote Hauraki A 18 Y D EXMOUTH RD 2 E Scott Pt D RD L R JUTLAND RD E D A E ORAPIU RD RD S Birkenhead V I W K D E A Belmont W R A L R Hauraki Gulf I MOKO ONEWA R P IA RD D D Waitemata A HINEMOA ST Waiheke LLE RK Taniwhanui Point W PA West Harbour OLD LAKE Golf Course Pakatoa Point L E ST Chatswood BAYSWATER VAUXHALL RD U 1 Harbour QUEEN ST Bayswater RD Narrow C D Motuihe KE NS R Luckens Point Waitemata Neck Island AWAROA RD Chelsea Bay Golf Course Park Point Omiha Motorway . -
Notice of Requirement (Designation) Form
Notice of Requirement (Designation) Form For office use only: Private Bag 63002 Application number: .............................. Waterloo Quay Wellington 6140 Date received: ...................................... This form must be accompanied by a completed Nationally Significant Proposals Application Form. All legislative references relate to the Resource Management Act 1991 (RMA) unless stated otherwise. You must serve the relevant local authority with notice of this matter together with notice of its lodgement with the EPA. Part I: Notice of Requirement 1 by NZ Transport Agency for Alteration of Designation 6750 Sections 168(1), (2) and 181 and clause 4 of Schedule 1, RMA. This part of the form reflects the information requirements of Form 18 of the Resource Management (Forms, Fees, and Procedure) Regulations 2003. This application intends to gives notice of a requirement for a designation (or alteration to a designation) for a public work (or project or work, or in respect of any land, water, subsoil, or airspace where a restriction is necessary for the safe or efficient functioning or operation of a public work or a project or work). Give details of the nature of the proposed public work (or project or work). Designation 6750 applies to State highway 1 (SH1) from Greville Road in the north to the Auckland Harbour Bridge in the south. The work, the subject of NOR1 extends from the current northern boundary of Designation 6750 to the vicinity of the Sunset Road overbridge, together with adjacent land. The site to which NOR1 applies is identified and legally described in the Notice of Requirement Plans and Notice of Requirement Property Information Table contained within Volume 1. -
Auckland Transport Quarterly Report
Auckland Transport Quarterly Report Quarter ended 30 September 2017 New electronic ticketing gates at Ōtāhuhu station Auckland Transport Quarterly Report – Quarter ended 30 September 2017 Page 1 of 25 Table of Contents 1. Executive summary 3 2. Strategic issues and focus areas 5 3. Highlights for the last quarter 12 4. Future outlook 12 5. Key deliverables 14 6. Financial performance 16 7. Performance measures 17 8. Contribution to Māori outcomes 22 9. Key Local Board Issues 24 10. Risk Management 25 Auckland Transport Quarterly Report – Quarter ended 30 September 2017 Page 2 of 25 1. Executive summary Strategic Context Auckland Transport (AT) has made significant progress in recent years, with major improvements in the public transport system, strong patronage growth, increasing customer satisfaction ratings, commencement of the City Rail Link and investment in active modes of transport, particularly cycling facilities. However, despite this progress, these achievements are quickly becoming neutralised by Auckland’s rapidly increasing population and the emerging impacts of an historical infrastructure deficit. Unprecedented growth in Auckland’s population is driving a significant increase in the demand for travel, putting severe pressure on the transport network and causing sustained levels of high congestion on the arterial network, although this has eased to an extent by the opening of the Waterview Tunnel. In the past quarter, AT has begun preparing the next suite of ten year planning documents (Long Term Plan, Regional Land Transport Plan and the Regional Public Transport Programme). These plans will need innovative and customer focused solutions on a tight budget. At the same time, AT has continued solid delivery of core business. -
Opus Consultation and Community Engagement Report
Appendix F Opus Consultation and Community Engagement Report Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 This page has been intentionally left blank. Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 Northern Corridor Improvements Project Stakeholder and Community Engagement Report September 2015 Northern Corridor Improvements Project Stakeholder and Community Engagement Report September 2015 Prepared By Tania Reynolds Opus International Consultants Ltd Community Engagement Specialist Auckland Environmental Office The Westhaven, 100 Beaumont St PO Box 5848, Auckland 1141 New Zealand Reviewed By Telephone: +64 9 355 9500 Rebekah Pokura-Ward Facsimile: +64 9 355 9584 Technical Principal Environmental Management Date: September 2015 Reference: 1-T0086.00 Status: Version 2 Approved for Release By Phil Harrison – Design Manager © Opus International Consultants Ltd 2015 Northern Corridor Improvements Project i Contents 1 Introduction ....................................................................................................... 1 1.1 Project Overview ............................................................................................................... 1 1.2 Project Objectives .............................................................................................................. 3 1.3 Project Timeframes ........................................................................................................... 4 2 Engagement Strategy......................................................................................... -
Auckland Regional Land Transport Plan 2015-2025 Auckland Transport
18pt Auckland Regional Land Transport Plan 2015-2025 Auckland Transport Adapted in accordance with Section 69 of the Copyright Act 1994 by the Royal New Zealand Foundation of the Blind, for the sole use of persons who have a print disability. No unauthorised copying is permitted. Produced 2015 by Accessible Format Production, Blind Foundation, Auckland Total print pages: 137 Total large print pages: 315 Publishing Information This large print edition is a transcription of the following print edition: Published by Auckland Council, 6 Henderson Valley Road, Henderson, Auckland © Auckland Transport 2015 Logos represented on the publication cover: NZ Land Transport Agency, KiwiRail, Auckland Council, Auckland Transport Large Print Edition Main text is in Arial typeface, 18 point. Headings, in order of significance, are indicated as: Heading 1 Heading 2 The publisher's page numbering is indicated in text as: Page 1 Omissions and Alterations Brief descriptions have been given in the place of figures. These figures include diagrams, graphs and maps. Where the figure is made up largely of text elements (for example a flowchart), it has been transcribed in full. Map descriptions focus on the scope of the map rather than the details. Notes from the transcriber have been prefaced by "TN" (transcriber's note). Contact Auckland Transport for further Information For extended verbal descriptions of maps or for further information on the maps please call Auckland Transport, (09) 301 0101, or email [email protected]. Please make it clear your query relates to the Regional Land Transport Plan. If you email us please provide your name and a contact phone number. -
Attachment 2
Attachme nt 2 Appendix 1 Table 1A: Auckland Transport Proposed Funded Capital Programme for AT Board approval (20th June 2018) Prioritisation Key: 1 Committed/Ring-fenced The following programme has been developed for the Regional Land Transport Plan 2018-28. Indicative project costs (nominal values, including inflation) represent the estimated cost of project/programme delivered 2 Funded by Auckland Transport, including any financial assistance from the Transport Agency unless stated otherwise. 3 Unfunded Projects carried forward from 2017/18 ($m) 2024/25 - Project Name Project Description Prioritisation Duration 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2027/28 Albany Station P&R Extension stage 1 1 2018/19 0.5 Double Decker Network Mitigation 1 2018/19 3.7 Ormiston Town Centre Main Street Link 1 2018/19 6.9 Rail Crossing Safety Improvements 1 2018/19 0.2 Rail Crossing Separation (Phase 1B) 1 2018/19 1.9 Rail Crossing Separation (Phase 2) 1 2018/19 3.3 Projects carried forward from 2017/18 Regional Park and Ride Fund 1 2018/19 2.5 SaFE Set-up Rail Integration 1 2018/19 1.0 Takanini Station Upgrade 1 2018/19 1.1 Te Mahia Station Upgrade 1 2018/19 0.9 Wiri EMU Depot Extension (Wiri II) 1 2018/19 6.0 Other projects 1 2018/19 38.0 Committed, Ring-fenced, On-going Operational and Renewal Projects and Programmes (Alphabetical order, $m) 2024/25 - Project Name Project Description Prioritisation Duration 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2027/28 Committed Projects and Programmes Phases 1 of the Albany park'n'ride extension to increase capacity and patronage on the Northern Albany Station P&R Extension stage 1 1 2018/19 0.8 0.0 0.0 0.0 0.0 0.0 0.0 Busway. -
VINCI Construction Selected to Build Major New Motorway Connection in Auckland, New Zealand
Rueil-Malmaison, 21 February 2018 VINCI Construction selected to build major new motorway connection in Auckland, New Zealand • Design-build of a major new motorway connection in New Zealand’s economic capital, Auckland • Project with a value of $700 million New Zealand dollars (around €415 million) VINCI Construction subsidiary HEB Construction, has been chosen as part of an alliance contract 1 to build the Northern Corridor Improvements Project (NCI Project). With a total value of $700 million New- Zealand dollars (around €415 million), the contract aims at creating a new connection north of Auckland between the Northern Motorway (State Highway 1) and Upper Harbour Highway (State Highway 18), as well as extending the Northern Busway to Albany and add more than 7 kilometres of new walking and cycling paths. The NCI Project Alliance comprises the New Zealand Transport Agency, HEB Construction, Fulton Hogan, Opus and Jacobs. The project is an important link in helping to realize the full benefits of the Western Ring Route by giving users an alternative route to State Highway 1 and the Auckland Harbour Bridge. It will also create better travel choices for walkers, cyclists and users of public transport. The Alliance is now tasked with finalising the detailed design and beginning construction early this year. The project will be undertaken in stages over the next four years. The first steps towards construction will include road resurfacing and the installation of moveable median barriers. The Alliance has started recruiting for more than 150 new roles including surveyors, engineers, safety advisors, machine operators, drainlayers, carpenters and general construction field staff. -
Waterview Tunnel Project
CASE STUDY GOING UNDERGROUND: THE Waterview Tunnel Project CLIENT: Well-Connected Alliance LOCATION: Waterview, West/Central Auckland SPECIALIST COATING TEAM: Topcoat Specialist Coatings Ltd PRODUCTS: Ceramicoat, UK Sikagard Wallcoat T, Sika (NZ) Ltd Emerstop crème, Concrete Plus TOTAL AREAS COMPLETED: Sika wall Gard T - Ceiling/Sikafoor 2540W floors 95,600m² Ceramicoat - walls 44,500m² Emer crème - Motorway T beam columns 7,000m² Topcoat Specialist Coatings Ltd played a key role in the successful coating – in a brighter shade – demarcates the side-walls and completion of one of New Zealand’s largest infrastructure guides the way for drivers. For additional safety, a total of 18 projects – the NZ Transport Agency’s Waterview Connection in cross-passages linking the south and north-bound tunnels Auckland. A specially-commissioned Topcoat team worked on the needed to be coated in safety green. large-scale and complex project for more than two years. It was Exacting requirements a collaborative effort; and along with the other key contractors Following a rigorous tender process, Topcoat was chosen as and suppliers, they were proud to celebrate the tunnel’s opening the preferred specialist coating applicator. in mid-2017. Topcoat already had a successful track record in tunnel About the Waterview Connection projects; having previously worked on the Johnstones Hill Designed to help ease Auckland’s growing traffic congestion, the tunnels in Puhoi, and Wellington’s Arras tunnel. Waterview Connection comprises two 3-lane motorway tunnels, both 2.4km long. Coupled with the Great North Road Interchange, it completes the Western Ring Route – which is one of the NZ Government’s roads of national significance (RoNS). -
St Lukes Interchange - Project Update
Board Meeting | 20 February 2015 Agenda item no. 10.1 Open Session St Lukes Interchange - Project Update Recommendation(s) That the Board: i. Notes this update on the status of the St Lukes Interchange project. Executive summary The New Zealand Transport Agency (NZTA) is upgrading the St Luke’s Interchange (the Project) to accommodate future increased traffic demand at the intersection as a consequence of the opening of the SH16/SH20 Waterview Connection in March 2017. NZTA’s proposed upgrade offers Auckland Transport (AT) an opportunity to provide bus priority, cycling and pedestrian improvements (Improvements) at this location as part of the NZTA project. The Improvements were not included in the 2012-2015 RLTP, as the opportunity to deliver the works early through the Project had not been identified. In August 2012, AT and NZTA made an agreement in principle (subject to Board approval if required) that AT would deliver the Improvements through the Project and contribute to the related costs, then estimated to be between $4.5m and $8.0m. The most recent assessment, received in January 2015, puts the estimated total AT cost at $5.5m for which budget is allocated in the 2014/15 Annual Plan. Works to increase the number of lanes on the St Lukes section of the motorway are already underway (Stage 1) and consents to lift and widen the motorway overbridge as well as associated works affecting the St Lukes Interchange were granted to both AT and NZTA for their respective portions in February 2014. NZTA and AT are seeking to provide an additional turning lane for westbound access to the motorway overbridge on Great North Road and additional lane allocation to provide for bus priority through the St Lukes Road-Great North Road intersection.