SH 20 to 1 MANUKAU EXTENSION

Total Page:16

File Type:pdf, Size:1020Kb

SH 20 to 1 MANUKAU EXTENSION CASE STUDY ––––––––––––––––––––––––– SH 20 to 1 MANUKAU EXTENSION edoubt Road Flyover R Manukau, AUCKLAND, NZ Reinforced Earth™ Walls TerraPlus® Precast Concrete facing OWNER: NZ Transport Agency NZTA Consultant: AECOM CONTRACTOR: Leighton Works JV Contractors Design: SKM & Golder CONSTRUCTION: 2006 to 2010 Background: The SH20 to 1 Interchange forms a The Auckland Western Ring Route three level connection between the is being implemented, in stages, to two State Highways. The uppermost provide a second major traffic route level is a ten span, curved, 240m long from the South to the North of the bridge. The bridge allows traffic from Auckland isthmus. This Route is the SH1 Southbound lanes, and from designated SH20. Redoubt Road, in the East, direct access to the SH20 west bound SH20 connects to the existing lanes. motorway passing through Auckland (SH1) at Manukau in the Reinforced Earth Ltd’s Involvement South and proceeds west and Both abutments of the Redoubt Road north to the Auckland Airport; Flyover were piled. Reinforced Earth crosses the upper reaches of the Ltd was engaged by the Contractor to Manukau Harbour between design and Supply a “Headstock Mangere and Onehunga and Restraint” system, incorporating passes through the western side of proprietary REhas galvanised steel the Auckland isthmus to connect earth reinforcing strips and concrete with the Auckland Northwest connections, for each Abutment. Motorway (SH18) at Waterview. This Headstock Restraint system The Auckland Western Ring Route controlled longitudinal displacement will, when completed, significantly of the Headstocks which allowed the reduce the traffic which now bridge designers to reduce the cross- passes through and congests the section of the piles and hence reduce Auckland CBD Interchanges. It will cost. provide much enhanced access to the Auckland Airport as well as The Redoubt Road Flyover’s western allow traffic to pass seamlessly end lands on a piled abutment though Auckland without having to surrounded by Reinforced Earth™ cross the Auckland Harbour Retaining Walls. The Contractor also Bridge. engaged Reinforced Earth Ltd to Main picture and above: TerraPlus® at the design and supply the Reinforced SH20 to 1 Redoubt Road Flyover exit The SH20to1 – Manukau Earth™ walls (TerraPlus® facing embankment. The pattern comprises three panel finishes Extension Project was tendered as panel walls) supporting both sides arranged in a chequer pattern a Design and Construct Project. and abutment wall of the western embankment. The Project was awarded to the LeightonWorks JV in June 2006. Above: The Redoubt Road Flyover western approach embankment – north facing retaining wall Features of this project: The Reinforced Earth™ retaining One unusual feature was in the walls totalled 742 sqm over a total Project specifications piling. The use of REHas to length of 150 metres. The –––––––––––––––––––––––––––– control longitudinal maximum wall height was 10.980m System TerraPlus® displacement of the headstock on the northern side of the –––––––––––––––––––––––––––– resulted in the use of multiple Abutment wall. Finish Special slender precast concrete piles. These were driven through Design of the Reinforced Earth ™ –––––––––––––––––––––––––––– voids left in the constructed retaining walls and Headstock Structure Reinforced Earth™ Reinforced Earth™ Block rather Restraint systems was carried out wall than the more usual method of in the Reinforced Earth Pty Ltd –––––––––––––––––––––––––––– first driving the piles and then Design Office in Sydney, in Area 742 sqm constructing the Reinforced accordance with the requirements –––––––––––––––––––––––––––– Earth™ Block around the piles. of the Transit New Zealand Bridge Max. Height 10.98 m Manual 2nd Edition. Independent Another, was the architectural Verification was undertaken by –––––––––––––––––––––––––––– finish. The Reinforced Earth™ Michael Adler and Associates, also Length Total length of the Structure was very visible, not of Sydney. Seismicity in this region three walls is 150 m only from both Motorways but is low resulting in the use of a also from the nearby arterial seismic design coefficient of just –––––––––––––––––––––––––––– road. 0.175g Design load Transit New Zealand Bridge Manual The Contractor achieved a nd Construction commenced in July 2 edition stunning visual impact by using 2009 and was completed to three differently coloured facing Abutment Beam level in October –––––––––––––––––––––––––––– panels arranged in a chequer 2009. The construction was finally Design life 100 years for RE walls pattern. One panel type had an completed in June 2010 after all exposed basalt aggregate with adjacent bridge works were –––––––––––––––––––––––––––– black oxide, one similar but complete ground smooth to give a “terrazzo” finish and the other painted glossy white Reinforced Earth Pty Limited Reinforced Earth Limited Level 4, 20 George Street PO Box 72 734 Hornsby NSW 2077 Australia Papakura Auckland New Zealand Ph +61 2 9910 9910 Ph +64 9 236 3385 Fax +61 2 9910 9999 Fax +64 9 236 3385 www.reco.com.au www.reco.com.au .
Recommended publications
  • The Waterview Connection Motorway
    Waterview Connection Information Sheet THE WATERVIEW CONNECTION MOTORWAY WHEN WILL THE WATERVIEW WHAT ARE THE TRAFFIC WHAT IS THE CONNECTION OPEN TO BENEFITS OF THE WATERVIEW TRAFFIC? WATERVIEW CONNECTION? Construction is on schedule for opening in early By bridging the gap between the Southwestern CONNECTION? 2017 as planned. and Northwestern motorways, the Waterview Connection will complete Auckland’s Western Being built is 5km of 6-lane motorway Ring Route. This is a 48km motorway link from to connect State Highways 20 (the Manukau in the south to Albany in the north that Southwestern Motorway) and 16 (the WHO WILL OPERATE will bypass central Auckland. Northwestern Motorway). THE MOTORWAY? Completing the Western Ring Route has been There will be three lanes southbound and prioritised as a Road of National Significance three lanes northbound between Maioro The Well-Connected Alliance, which is building because of the contribution it will make to New Street, where S.H.20 now ends, and the the Waterview Connection, will form an alliance Zealand’s future prosperity. It will provide Auckland Great North Road interchange on S.H.16. with international tunnel controls specialists SICE NZ Ltd (Sociedad Ibérica de Construcciones with a resilient and reliable motorway network by Half of the new motorway is underground in Eléctricas) to operate and maintain the motorway reducing the region’s dependence on the single twin tunnels 2.4km long and up to 30m below for the first 10 years of its life. A team from SICE spine comprising State Highway 1 and the Auckland the surface between the Alan Wood Reserve has worked with the Well-Connected Alliance Harbour Bridge for business to business trips, in Owairaka and Waterview.
    [Show full text]
  • Video Questions and Answers
    Page 1 of 2 Waterview Connection Video Answers Tuesday 26 August 1. Meeting Auckland’s Roading Needs Drive down to the waterfront in the centre of Auckland City and meet Peter Spies from NZTA to find out more about Auckland’s road network. 1. Why are good roads important? They allow people, goods and services to travel easily and efficiently to help the economy 2. What are some of the challenges in providing good roads in Auckland? two harbours, volcanoes and an increasing population 3. What happens if there is an accident on the Harbour Bridge? There are very long delays as it shuts the main route through Auckland. Next step learning: Find out more about the State Highways in your local area and how they have changed over time. 2. The Western Ring – An Alternative Route Find out more about the Auckland Harbour Bridge and discover why Auckland needs the Western Ring Route. 1. How long was it expected to take to complete the Western Ring Route? 15 years 2. What were some of the major projects involved in closing up the gaps in the Western Ring Route? Manukau Extension, the Mount Roskill Project, Manukau Harbour Crossing, Hobsinville Extension 3. Why is the Harbour Bridge not enough to meet transport needs? It cannot be extended, the clip-ons have a limited life and will need replacing Next step learning: Discuss how you think the Western Ring Route will impact on Auckland and how it might affect you. LEARNZ Waterview Connection Field Trip to Auckland – Term 3, 2014 Log in to http://www.learnz.org.nz/waterviewconnection143 Page 2 of 2 3.
    [Show full text]
  • South & East Auckland Auckland Airport
    G A p R D D Paremoremo O N R Sunnynook Course EM Y P R 18 U ParemoremoA O H N R D E M Schnapper Rock W S Y W R D O L R SUNSET RD E R L ABERDEEN T I A Castor Bay H H TARGE SUNNYNOOK S Unsworth T T T S Forrest C Heights E O South & East Auckland R G Hill R L Totara Vale R D E A D R 1 R N AIRA O S Matapihi Point F W F U I T Motutapu E U R RD Stony Batter D L Milford Waitemata THE R B O D Island Thompsons Point Historic HI D EN AR KITCHENER RD Waihihi Harbour RE H Hakaimango Point Reserve G Greenhithe R R TRISTRAM Bayview D Kauri Point TAUHINU E Wairau P Korakorahi Point P DIANA DR Valley U IPATIKI CHIVALRY RD HILLSIDERD 1 A R CHARTWELL NZAF Herald K D Lake Takapuna SUNNYBRAE RD SHAKESPEARE RD ase RNZAF T Pupuke t Island 18 Glenfield AVE Takapuna A Auckland nle H Takapuna OCEAN VIEW RD kland a I Golf Course A hi R Beach Golf Course ro O ia PT T a E O Holiday Palm Beach L R HURSTMERE RD W IL D Park D V BEACH HAVEN RD NORTHCOTE R N Beach ARCHERS RD Rangitoto B S P I O B E K A S D A O Island Haven I RD R B R A I R K O L N U R CORONATION RD O E Blackpool H E Hillcrest R D A A K R T N Church Bay Y O B A SM K N D E N R S Birkdale I R G Surfdale MAN O’WAR BAY RD Hobsonville G A D R North Shore A D L K A D E Rangitawhiri Point D E Holiday Park LAK T R R N OCEANRALEIGH VIEW RD I R H E A R E PUPUKE Northcote Hauraki A 18 Y D EXMOUTH RD 2 E Scott Pt D RD L R JUTLAND RD E D A E ORAPIU RD RD S Birkenhead V I W K D E A Belmont W R A L R Hauraki Gulf I MOKO ONEWA R P IA RD D D Waitemata A HINEMOA ST Waiheke LLE RK Taniwhanui Point W PA West Harbour OLD LAKE Golf Course Pakatoa Point L E ST Chatswood BAYSWATER VAUXHALL RD U 1 Harbour QUEEN ST Bayswater RD Narrow C D Motuihe KE NS R Luckens Point Waitemata Neck Island AWAROA RD Chelsea Bay Golf Course Park Point Omiha Motorway .
    [Show full text]
  • Notice of Requirement (Designation) Form
    Notice of Requirement (Designation) Form For office use only: Private Bag 63002 Application number: .............................. Waterloo Quay Wellington 6140 Date received: ...................................... This form must be accompanied by a completed Nationally Significant Proposals Application Form. All legislative references relate to the Resource Management Act 1991 (RMA) unless stated otherwise. You must serve the relevant local authority with notice of this matter together with notice of its lodgement with the EPA. Part I: Notice of Requirement 1 by NZ Transport Agency for Alteration of Designation 6750 Sections 168(1), (2) and 181 and clause 4 of Schedule 1, RMA. This part of the form reflects the information requirements of Form 18 of the Resource Management (Forms, Fees, and Procedure) Regulations 2003. This application intends to gives notice of a requirement for a designation (or alteration to a designation) for a public work (or project or work, or in respect of any land, water, subsoil, or airspace where a restriction is necessary for the safe or efficient functioning or operation of a public work or a project or work). Give details of the nature of the proposed public work (or project or work). Designation 6750 applies to State highway 1 (SH1) from Greville Road in the north to the Auckland Harbour Bridge in the south. The work, the subject of NOR1 extends from the current northern boundary of Designation 6750 to the vicinity of the Sunset Road overbridge, together with adjacent land. The site to which NOR1 applies is identified and legally described in the Notice of Requirement Plans and Notice of Requirement Property Information Table contained within Volume 1.
    [Show full text]
  • Auckland Transport Quarterly Report
    Auckland Transport Quarterly Report Quarter ended 30 September 2017 New electronic ticketing gates at Ōtāhuhu station Auckland Transport Quarterly Report – Quarter ended 30 September 2017 Page 1 of 25 Table of Contents 1. Executive summary 3 2. Strategic issues and focus areas 5 3. Highlights for the last quarter 12 4. Future outlook 12 5. Key deliverables 14 6. Financial performance 16 7. Performance measures 17 8. Contribution to Māori outcomes 22 9. Key Local Board Issues 24 10. Risk Management 25 Auckland Transport Quarterly Report – Quarter ended 30 September 2017 Page 2 of 25 1. Executive summary Strategic Context Auckland Transport (AT) has made significant progress in recent years, with major improvements in the public transport system, strong patronage growth, increasing customer satisfaction ratings, commencement of the City Rail Link and investment in active modes of transport, particularly cycling facilities. However, despite this progress, these achievements are quickly becoming neutralised by Auckland’s rapidly increasing population and the emerging impacts of an historical infrastructure deficit. Unprecedented growth in Auckland’s population is driving a significant increase in the demand for travel, putting severe pressure on the transport network and causing sustained levels of high congestion on the arterial network, although this has eased to an extent by the opening of the Waterview Tunnel. In the past quarter, AT has begun preparing the next suite of ten year planning documents (Long Term Plan, Regional Land Transport Plan and the Regional Public Transport Programme). These plans will need innovative and customer focused solutions on a tight budget. At the same time, AT has continued solid delivery of core business.
    [Show full text]
  • Opus Consultation and Community Engagement Report
    Appendix F Opus Consultation and Community Engagement Report Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 This page has been intentionally left blank. Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 Northern Corridor Improvements Project Stakeholder and Community Engagement Report September 2015 Northern Corridor Improvements Project Stakeholder and Community Engagement Report September 2015 Prepared By Tania Reynolds Opus International Consultants Ltd Community Engagement Specialist Auckland Environmental Office The Westhaven, 100 Beaumont St PO Box 5848, Auckland 1141 New Zealand Reviewed By Telephone: +64 9 355 9500 Rebekah Pokura-Ward Facsimile: +64 9 355 9584 Technical Principal Environmental Management Date: September 2015 Reference: 1-T0086.00 Status: Version 2 Approved for Release By Phil Harrison – Design Manager © Opus International Consultants Ltd 2015 Northern Corridor Improvements Project i Contents 1 Introduction ....................................................................................................... 1 1.1 Project Overview ............................................................................................................... 1 1.2 Project Objectives .............................................................................................................. 3 1.3 Project Timeframes ........................................................................................................... 4 2 Engagement Strategy.........................................................................................
    [Show full text]
  • Auckland Regional Land Transport Plan 2015-2025 Auckland Transport
    18pt Auckland Regional Land Transport Plan 2015-2025 Auckland Transport Adapted in accordance with Section 69 of the Copyright Act 1994 by the Royal New Zealand Foundation of the Blind, for the sole use of persons who have a print disability. No unauthorised copying is permitted. Produced 2015 by Accessible Format Production, Blind Foundation, Auckland Total print pages: 137 Total large print pages: 315 Publishing Information This large print edition is a transcription of the following print edition: Published by Auckland Council, 6 Henderson Valley Road, Henderson, Auckland © Auckland Transport 2015 Logos represented on the publication cover: NZ Land Transport Agency, KiwiRail, Auckland Council, Auckland Transport Large Print Edition Main text is in Arial typeface, 18 point. Headings, in order of significance, are indicated as: Heading 1 Heading 2 The publisher's page numbering is indicated in text as: Page 1 Omissions and Alterations Brief descriptions have been given in the place of figures. These figures include diagrams, graphs and maps. Where the figure is made up largely of text elements (for example a flowchart), it has been transcribed in full. Map descriptions focus on the scope of the map rather than the details. Notes from the transcriber have been prefaced by "TN" (transcriber's note). Contact Auckland Transport for further Information For extended verbal descriptions of maps or for further information on the maps please call Auckland Transport, (09) 301 0101, or email [email protected]. Please make it clear your query relates to the Regional Land Transport Plan. If you email us please provide your name and a contact phone number.
    [Show full text]
  • Attachment 2
    Attachme nt 2 Appendix 1 Table 1A: Auckland Transport Proposed Funded Capital Programme for AT Board approval (20th June 2018) Prioritisation Key: 1 Committed/Ring-fenced The following programme has been developed for the Regional Land Transport Plan 2018-28. Indicative project costs (nominal values, including inflation) represent the estimated cost of project/programme delivered 2 Funded by Auckland Transport, including any financial assistance from the Transport Agency unless stated otherwise. 3 Unfunded Projects carried forward from 2017/18 ($m) 2024/25 - Project Name Project Description Prioritisation Duration 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2027/28 Albany Station P&R Extension stage 1 1 2018/19 0.5 Double Decker Network Mitigation 1 2018/19 3.7 Ormiston Town Centre Main Street Link 1 2018/19 6.9 Rail Crossing Safety Improvements 1 2018/19 0.2 Rail Crossing Separation (Phase 1B) 1 2018/19 1.9 Rail Crossing Separation (Phase 2) 1 2018/19 3.3 Projects carried forward from 2017/18 Regional Park and Ride Fund 1 2018/19 2.5 SaFE Set-up Rail Integration 1 2018/19 1.0 Takanini Station Upgrade 1 2018/19 1.1 Te Mahia Station Upgrade 1 2018/19 0.9 Wiri EMU Depot Extension (Wiri II) 1 2018/19 6.0 Other projects 1 2018/19 38.0 Committed, Ring-fenced, On-going Operational and Renewal Projects and Programmes (Alphabetical order, $m) 2024/25 - Project Name Project Description Prioritisation Duration 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2027/28 Committed Projects and Programmes Phases 1 of the Albany park'n'ride extension to increase capacity and patronage on the Northern Albany Station P&R Extension stage 1 1 2018/19 0.8 0.0 0.0 0.0 0.0 0.0 0.0 Busway.
    [Show full text]
  • VINCI Construction Selected to Build Major New Motorway Connection in Auckland, New Zealand
    Rueil-Malmaison, 21 February 2018 VINCI Construction selected to build major new motorway connection in Auckland, New Zealand • Design-build of a major new motorway connection in New Zealand’s economic capital, Auckland • Project with a value of $700 million New Zealand dollars (around €415 million) VINCI Construction subsidiary HEB Construction, has been chosen as part of an alliance contract 1 to build the Northern Corridor Improvements Project (NCI Project). With a total value of $700 million New- Zealand dollars (around €415 million), the contract aims at creating a new connection north of Auckland between the Northern Motorway (State Highway 1) and Upper Harbour Highway (State Highway 18), as well as extending the Northern Busway to Albany and add more than 7 kilometres of new walking and cycling paths. The NCI Project Alliance comprises the New Zealand Transport Agency, HEB Construction, Fulton Hogan, Opus and Jacobs. The project is an important link in helping to realize the full benefits of the Western Ring Route by giving users an alternative route to State Highway 1 and the Auckland Harbour Bridge. It will also create better travel choices for walkers, cyclists and users of public transport. The Alliance is now tasked with finalising the detailed design and beginning construction early this year. The project will be undertaken in stages over the next four years. The first steps towards construction will include road resurfacing and the installation of moveable median barriers. The Alliance has started recruiting for more than 150 new roles including surveyors, engineers, safety advisors, machine operators, drainlayers, carpenters and general construction field staff.
    [Show full text]
  • St Lukes Interchange - Project Update
    Board Meeting | 20 February 2015 Agenda item no. 10.1 Open Session St Lukes Interchange - Project Update Recommendation(s) That the Board: i. Notes this update on the status of the St Lukes Interchange project. Executive summary The New Zealand Transport Agency (NZTA) is upgrading the St Luke’s Interchange (the Project) to accommodate future increased traffic demand at the intersection as a consequence of the opening of the SH16/SH20 Waterview Connection in March 2017. NZTA’s proposed upgrade offers Auckland Transport (AT) an opportunity to provide bus priority, cycling and pedestrian improvements (Improvements) at this location as part of the NZTA project. The Improvements were not included in the 2012-2015 RLTP, as the opportunity to deliver the works early through the Project had not been identified. In August 2012, AT and NZTA made an agreement in principle (subject to Board approval if required) that AT would deliver the Improvements through the Project and contribute to the related costs, then estimated to be between $4.5m and $8.0m. The most recent assessment, received in January 2015, puts the estimated total AT cost at $5.5m for which budget is allocated in the 2014/15 Annual Plan. Works to increase the number of lanes on the St Lukes section of the motorway are already underway (Stage 1) and consents to lift and widen the motorway overbridge as well as associated works affecting the St Lukes Interchange were granted to both AT and NZTA for their respective portions in February 2014. NZTA and AT are seeking to provide an additional turning lane for westbound access to the motorway overbridge on Great North Road and additional lane allocation to provide for bus priority through the St Lukes Road-Great North Road intersection.
    [Show full text]
  • Auckland Transport Alignment Project April 2018
    Auckland Transport Alignment Project April 2018 Foreword I welcome the advice provided by the Auckland Transport Alignment Project (ATAP). The ATAP package is a transformative transport programme. Investment in transport shapes our city’s development and is a key contributor to economic, social and environmental goals. The direction signalled in this update is shared by Government and Auckland Council and demonstrates our commitment to working together for a better Auckland. Auckland is facing unprecedented population growth, and over the next 30 years a million more people will call Auckland home. Growth brings opportunities but when combined with historic under- investment in infrastructure the strain on the Auckland transport system is unrelenting. Existing congestion on our roads costs New Zealand’s economy $1.3b annually. We need to do things differently to what has been done in the past. Auckland needs a transport system that provides genuine choice for people, enables access to opportunities, achieves safety, health and environmental outcomes and underpins economic development. Our aspiration must be to make sure Auckland is a world class city. Auckland’s success is important not just for Aucklanders, but for our country’s long-term growth and productivity. The Government and Auckland Council have agreed to a transformative and visionary plan. ATAP is a game-changer for Auckland commuters and the first-step in easing congestion and allowing Auckland to move freely. I believe this ATAP package marks a significant step in building a modern transport system in Auckland. ATAP accelerates delivery of Auckland’s rapid transit network, with the aim of unlocking urban development opportunities, encourages walking and cycling, and invests in public transport, commuter and freight rail and funds road improvements.
    [Show full text]
  • Template for Treasury Report
    IN-CONFIDENCE SH-8-6-2-4 Treasury / MoT Report: Business Case for the Waterview Connection Executive Summary This paper outlines the business case for the Waterview Connection as a tunnel and seeks guidance from Ministers as to next steps. Background The Waterview Connection is a proposed extension of State Highway 20 from Mt Roskill to intersect with State Highway 16 at Waterview. The current proposal for the Waterview Connection project is to construct it within twin two-lane tunnels (northbound traffic in one tunnel, southbound in the other), with interchanges at either end. Construction of the Waterview Connection completes the Western Ring Route, a strategic route that links the cities of Manukau, Auckland, Waitakere and North Shore while avoiding SH1 and the Auckland Harbour Bridge. Cost The Waterview Connection is estimated to cost $2.77 billion in 2015 dollars, including the costs of financing the project across the construction period. This is an increase from the published estimate of $1.89 billion in 2015 dollars. The increase in cost has been driven by increases in scope, input cost increases and the inclusion of the costs of financing the project. Scope With the additional traffic volumes that the Waterview Connection brings to the SH16 North- western motorway corridor, it is not possible to integrate the Western Ring Route into the corridor without some form of improvement to SH16. The base Waterview Connection project scope proposes additional lanes in each direction both east and west of the interchange at Waterview. Two alternative scope options have been considered that could vary this scheme.
    [Show full text]