The Waterview Connection Motorway

Total Page:16

File Type:pdf, Size:1020Kb

The Waterview Connection Motorway Waterview Connection Information Sheet THE WATERVIEW CONNECTION MOTORWAY WHEN WILL THE WATERVIEW WHAT ARE THE TRAFFIC WHAT IS THE CONNECTION OPEN TO BENEFITS OF THE WATERVIEW TRAFFIC? WATERVIEW CONNECTION? Construction is on schedule for opening in early By bridging the gap between the Southwestern CONNECTION? 2017 as planned. and Northwestern motorways, the Waterview Connection will complete Auckland’s Western Being built is 5km of 6-lane motorway Ring Route. This is a 48km motorway link from to connect State Highways 20 (the Manukau in the south to Albany in the north that Southwestern Motorway) and 16 (the WHO WILL OPERATE will bypass central Auckland. Northwestern Motorway). THE MOTORWAY? Completing the Western Ring Route has been There will be three lanes southbound and prioritised as a Road of National Significance three lanes northbound between Maioro The Well-Connected Alliance, which is building because of the contribution it will make to New Street, where S.H.20 now ends, and the the Waterview Connection, will form an alliance Zealand’s future prosperity. It will provide Auckland Great North Road interchange on S.H.16. with international tunnel controls specialists SICE NZ Ltd (Sociedad Ibérica de Construcciones with a resilient and reliable motorway network by Half of the new motorway is underground in Eléctricas) to operate and maintain the motorway reducing the region’s dependence on the single twin tunnels 2.4km long and up to 30m below for the first 10 years of its life. A team from SICE spine comprising State Highway 1 and the Auckland the surface between the Alan Wood Reserve has worked with the Well-Connected Alliance Harbour Bridge for business to business trips, in Owairaka and Waterview. throughout the project’s design and construction, access to markets and jobs, and personal travel. It to ensure that what’s built is safe and cost will therefore improve business productivity, enable effective to operate. goods to be moved more efficiently, and provide more choices for private travel. The Waterview Connection will also give HOW WILL TRAFFIC ACCESS Auckland a direct, time-saving motorway link between the central business district and the THE NEW MOTORWAY? international airport. It’s predicted it will take The new motorway will connect to State Highway up to 15 minutes off a typical CBD to airport trip. 20 at Maioro Street and to State Highway 16 at The main benefit for local communities is the the Great North Road motorway interchange. removal of through traffic from local streets. The interchange at Maioro Street is being The project also includes investment to ensure expanded to provide an on-ramp for traffic joining that local communities are left with improved the motorway here to go north and an off-ramp walking and cycling connections and higher for southbound traffic leaving the motorway. quality open spaces and recreational facilities. At its northern end, the new motorway will connect to State Highway 16 via four new ramps. The ramps will provide access to and from the east (central Auckland) and the west. They will connect directly to the northern portals of the Waterview tunnels. HOW WILL TRAFFIC ACCESS THE NEW MOTORWAY? The new motorway will connect to State Highway 20 at Maioro Street and to State Highway 16 at the Great North Road motorway interchange. RAMP 3 Wa itakere City West Auckland The interchange at Maioro Street is being to Tunnel expanded to provide an on-ramp for traffic joining the motorway here to go north and an off-ramp RAMP 4 Tunnel to for southbound traffic leaving the motorway. Central Auckland At its northern end, the new motorway will connect to State Highway 16 via four new ramps. The ramps will provide access to and from the east (central Auckland) and the west. They will Auckland City connect directly to the northern portals of the Waterview tunnels. RAMP 2 Tunnel RAMP 1 to West Central Auckland Auckland to Tunnel Northern Tunnel Portals WILL LOCAL TRAFFIC RD CARRINGTON GET ACCESS TO THE SOUTHBOUND MOTORWAY? TUNNEL GREAT NORTH RD The Waterview Connection is primarily a motorway for through traffic and there has been NORTHBOUND no provision for direct access from the residential TUNNEL areas along its route. Surface There will be relatively easy access via the Maioro Cycleway AVONDAL E Waterview interchange for people living in suburbs like New to Owairaka Windsor, Mt Roskill and Mt Albert at the southern end of the Waterview Connection. MT ALBE RT People living at the northern end - in Waterview, RICHARDSON RD NEW NORTH RD Pt Chevalier and Avondale for example – will HENDON AVE be able to access or leave the Northwestern Motorway in either direction as they do now. To go and from the new tunnels on the Southwestern Southern Motorway, they will need to use either the Tunnel Rosebank Road or St Lukes interchanges. Portals NORTHBOUND ON-RAMP SOUTHBOUND OWAIRAK A OFF-RAMP WERE LOCAL CONNECTIONS CONSIDERED? Various local connections were considered Existing O-Ramp Existing during the NZ Transport Agency’s planning and On-Ramp consultation for the Waterview Connection, STODDARD RD Richardson Rd including at New North Road and Great North motorway Road. These would have improved access overbridge between State Highway 20 and suburbs like Waterview, Avondale and Rosebank Peninsula. MAIORO ST However they also would have resulted in big increases in traffic on local streets, and possibly required removing additional homes to accommodate on and off ramps. Local access was a particular issue for Waterview RICHARDSON RD and Pt Chevalier people during the planning NEW WIND SOR hearings for the project. Many reasons for and against the ramps were put forward. The Board of Inquiry concluded that it was not Ai rpor t & SH1 practical to build more ramps at the Great North Sout h Road interchange because of space constraints. Also, there could be unacceptable environmental impacts for the Waterview and Pt Chevalier communities, including additional house removals. FREEPHONE 0508 TUNNEL(886635) www.nzta.govt.nz/waterviewconnection twitter.com/wcnow.
Recommended publications
  • Your Bus Service Is Changing
    120 Constellation Bus Station Constellation Bus Station Henderson Henderson Sunset Rd Sunset Rd Ratanui St Ratanui St Meadowood Dr Meadowood Dr Unitec Waitakere Unitec Waitakere Sunset Rd Sunset Rd Swanson Rd Swanson Rd Tableau Place walkway Tableau Place walkway Mt Lebanon Lane Mt Lebanon Lane Sunset Rd Sunset Rd Swanson Rd Swanson Rd North Shore Trias Rd Trias Rd Sturges Rd Station Sturges Rd Station Jo Sunset Rd Sunset Rd Swanson Rd Swanson Rd Golf Course hn Gl Target Rd Target Rd 114 Swanson Rd 114 Swanson Rd enn Av Elm e Sunset Rd Sunset Rd Swanson Rd Swanson Rd o ple Girrahween Dr Girrahween Dr Waitakere College Waitakere College r p by ei rmark Dr e R A Rd P Albany Highway Albany Highway Swanson Rd Swanson Rd d A n Dr Westminster Christian School Westminster Christian School Mihini Rd Mihini Rd io l Rosedale t Albany ba E a Upper Harbour Dr Upper Harbour Dr Swanson Rd Swanson Rd ell L Dene Court Lane Dene Court Lane Universal Drive roundabout Universal Drive roundabout n Junior High Park st av g Rosedale South n Upper Harbour Dr Upper Harbour Dr Don Buck Rd Don Buck Rd ny o e li C J ry Kereru Grove Kereru Grove Sabot Place Sabot Place s l Park d u P Greenhithe Rd Greenhithe Rd RiverheadDon Buck Forest Rd Don Buck Rd h R nipe 175 Greenhithe Rd 175 Greenhithe Rd Helena St Helena St H e ws Rd t r tthe e R L Oak v ul Ma s Greenhithe Rd Greenhithe Rd Don Buck Rd Don Buck Rd au ig A Pa n d S rel Oak Dr S l u Upper Harbour Motorway Upper Harbour Motorway Zita Maria Drive Zita Maria Drive Dr c h l Constellation S c A a h r Greenhithe Rd
    [Show full text]
  • St Lukes Interchange (St Lukes Interchange) to Be Shown As Road Purposes for the Project (St Lukes Interchange)
    6 Henderson Valley Road, Henderson, Auckland 0612 Private Bag 92250, Auckland 1142, New Zealand Ph 09 355 3553 Fax 09 355 3550 Notice of Requirement NOTICE OF REQUIREMENT FOR A DESIGNATION UNDER SECTION 168(2) OF THE RESOURCE MANAGEMENT ACT 1991 (RMA) TO: Auckland Council FROM: Auckland Transport 6 Henderson Valley Road Henderson Private Bag 92250 Auckland AUCKLAND TRANSPORT (an Auckland Council Controlled Organisation) as Requiring Authority under section 167 of the Resource Management Act 1991 gives notice of a requirement for a designation in the Auckland Council District Plan for works being the Waterview Connection SH16 St Lukes Interchange (St Lukes Interchange) to be shown as road purposes for the Project (St Lukes Interchange). 1. SUMMARY The St Lukes Interchange will generally comprise: Auckland Transport gives notice of a requirement for an alteration to “Designations D05- 08 and B08-04” in the Auckland Council District Plan (Isthmus Section) 2011 (“District Plan”) to widen St Lukes Road and Great North Road at the St Lukes Interchange. The purpose of Designation D05-08 is for regional road and the purpose of designation B08-04 is for public road network. The designations are identified on District Plan Maps D05 and D06 and in Appendix B of the Planning Maps, copies of which are contained in Appendix A this NoR. Under Section 176A(2)(b) of the RMA it is not intended to submit an Outline Plan of Works prior to construction as the details of the proposed works, as referred to in Section 176A(3), are addressed in this NOR. The proposed works are in keeping with the purpose of designations D05-08 and B08-04.
    [Show full text]
  • Video Questions and Answers
    Page 1 of 2 Waterview Connection Video Answers Tuesday 26 August 1. Meeting Auckland’s Roading Needs Drive down to the waterfront in the centre of Auckland City and meet Peter Spies from NZTA to find out more about Auckland’s road network. 1. Why are good roads important? They allow people, goods and services to travel easily and efficiently to help the economy 2. What are some of the challenges in providing good roads in Auckland? two harbours, volcanoes and an increasing population 3. What happens if there is an accident on the Harbour Bridge? There are very long delays as it shuts the main route through Auckland. Next step learning: Find out more about the State Highways in your local area and how they have changed over time. 2. The Western Ring – An Alternative Route Find out more about the Auckland Harbour Bridge and discover why Auckland needs the Western Ring Route. 1. How long was it expected to take to complete the Western Ring Route? 15 years 2. What were some of the major projects involved in closing up the gaps in the Western Ring Route? Manukau Extension, the Mount Roskill Project, Manukau Harbour Crossing, Hobsinville Extension 3. Why is the Harbour Bridge not enough to meet transport needs? It cannot be extended, the clip-ons have a limited life and will need replacing Next step learning: Discuss how you think the Western Ring Route will impact on Auckland and how it might affect you. LEARNZ Waterview Connection Field Trip to Auckland – Term 3, 2014 Log in to http://www.learnz.org.nz/waterviewconnection143 Page 2 of 2 3.
    [Show full text]
  • South & East Auckland Auckland Airport
    G A p R D D Paremoremo O N R Sunnynook Course EM Y P R 18 U ParemoremoA O H N R D E M Schnapper Rock W S Y W R D O L R SUNSET RD E R L ABERDEEN T I A Castor Bay H H TARGE SUNNYNOOK S Unsworth T T T S Forrest C Heights E O South & East Auckland R G Hill R L Totara Vale R D E A D R 1 R N AIRA O S Matapihi Point F W F U I T Motutapu E U R RD Stony Batter D L Milford Waitemata THE R B O D Island Thompsons Point Historic HI D EN AR KITCHENER RD Waihihi Harbour RE H Hakaimango Point Reserve G Greenhithe R R TRISTRAM Bayview D Kauri Point TAUHINU E Wairau P Korakorahi Point P DIANA DR Valley U IPATIKI CHIVALRY RD HILLSIDERD 1 A R CHARTWELL NZAF Herald K D Lake Takapuna SUNNYBRAE RD SHAKESPEARE RD ase RNZAF T Pupuke t Island 18 Glenfield AVE Takapuna A Auckland nle H Takapuna OCEAN VIEW RD kland a I Golf Course A hi R Beach Golf Course ro O ia PT T a E O Holiday Palm Beach L R HURSTMERE RD W IL D Park D V BEACH HAVEN RD NORTHCOTE R N Beach ARCHERS RD Rangitoto B S P I O B E K A S D A O Island Haven I RD R B R A I R K O L N U R CORONATION RD O E Blackpool H E Hillcrest R D A A K R T N Church Bay Y O B A SM K N D E N R S Birkdale I R G Surfdale MAN O’WAR BAY RD Hobsonville G A D R North Shore A D L K A D E Rangitawhiri Point D E Holiday Park LAK T R R N OCEANRALEIGH VIEW RD I R H E A R E PUPUKE Northcote Hauraki A 18 Y D EXMOUTH RD 2 E Scott Pt D RD L R JUTLAND RD E D A E ORAPIU RD RD S Birkenhead V I W K D E A Belmont W R A L R Hauraki Gulf I MOKO ONEWA R P IA RD D D Waitemata A HINEMOA ST Waiheke LLE RK Taniwhanui Point W PA West Harbour OLD LAKE Golf Course Pakatoa Point L E ST Chatswood BAYSWATER VAUXHALL RD U 1 Harbour QUEEN ST Bayswater RD Narrow C D Motuihe KE NS R Luckens Point Waitemata Neck Island AWAROA RD Chelsea Bay Golf Course Park Point Omiha Motorway .
    [Show full text]
  • Auckland's Strategic Public Transport Network – Lessons Learned from The
    Auckland’s Strategic PT Network D Newcombe Page 0 AUCKLAND’S STRATEGIC PUBLIC TRANSPORT NETWORK – LESSONS LEARNED FROM THE BUSINESS CASE APPROACH Author/Presenter: Daniel Newcombe, MEngSt (Transportation), BPlan, MNZPI City Centre & RTN Initiatives team manager, Auckland Transport [email protected] 15th December 2016 ABSTRACT Auckland Transport (AT) is investigating how best to plan and deliver future improvements to the Strategic Public Transport Network (SPTN) to cater for Auckland’s rapidly growing population. The way this work is being undertaken is influenced by NZTA’s new Business Case Approach required for all future transport investments. This paper will outline AT’s work to date on the SPTN and how AT is using the recent Auckland Transport Alignment Project (ATAP) to strategically direct this work. The paper will also cover what AT has learned from applying the various processes contained within the Business Case Approach, how this has shaped the future programme and any wider lessons that could be applied to other transport projects. IPENZ Transportation Group Conference, Hamilton, 29 – 31 March 2017 Auckland’s Strategic PT Network D Newcombe Page 1 INTRODUCTION Auckland Transport (AT) is the road controlling authority responsible for the planning, operation and maintenance of most components of the Auckland transport system, including the public transport network (buses, trains, and ferries). The core of the public transport system is the Strategic Public Transport Network (SPTN) which consists of the heavy rail network and Northern Busway. To receive transport investment from the New Zealand Transport Agency (NZTA) for developing the SPTN and all other transport infrastructure or services, AT is required undertake a range of business cases defined under the Business Case Approach (BCA).
    [Show full text]
  • Notice of Requirement (Designation) Form
    Notice of Requirement (Designation) Form For office use only: Private Bag 63002 Application number: .............................. Waterloo Quay Wellington 6140 Date received: ...................................... This form must be accompanied by a completed Nationally Significant Proposals Application Form. All legislative references relate to the Resource Management Act 1991 (RMA) unless stated otherwise. You must serve the relevant local authority with notice of this matter together with notice of its lodgement with the EPA. Part I: Notice of Requirement 1 by NZ Transport Agency for Alteration of Designation 6750 Sections 168(1), (2) and 181 and clause 4 of Schedule 1, RMA. This part of the form reflects the information requirements of Form 18 of the Resource Management (Forms, Fees, and Procedure) Regulations 2003. This application intends to gives notice of a requirement for a designation (or alteration to a designation) for a public work (or project or work, or in respect of any land, water, subsoil, or airspace where a restriction is necessary for the safe or efficient functioning or operation of a public work or a project or work). Give details of the nature of the proposed public work (or project or work). Designation 6750 applies to State highway 1 (SH1) from Greville Road in the north to the Auckland Harbour Bridge in the south. The work, the subject of NOR1 extends from the current northern boundary of Designation 6750 to the vicinity of the Sunset Road overbridge, together with adjacent land. The site to which NOR1 applies is identified and legally described in the Notice of Requirement Plans and Notice of Requirement Property Information Table contained within Volume 1.
    [Show full text]
  • Auckland Transport Quarterly Report
    Auckland Transport Quarterly Report Quarter ended 30 September 2017 New electronic ticketing gates at Ōtāhuhu station Auckland Transport Quarterly Report – Quarter ended 30 September 2017 Page 1 of 25 Table of Contents 1. Executive summary 3 2. Strategic issues and focus areas 5 3. Highlights for the last quarter 12 4. Future outlook 12 5. Key deliverables 14 6. Financial performance 16 7. Performance measures 17 8. Contribution to Māori outcomes 22 9. Key Local Board Issues 24 10. Risk Management 25 Auckland Transport Quarterly Report – Quarter ended 30 September 2017 Page 2 of 25 1. Executive summary Strategic Context Auckland Transport (AT) has made significant progress in recent years, with major improvements in the public transport system, strong patronage growth, increasing customer satisfaction ratings, commencement of the City Rail Link and investment in active modes of transport, particularly cycling facilities. However, despite this progress, these achievements are quickly becoming neutralised by Auckland’s rapidly increasing population and the emerging impacts of an historical infrastructure deficit. Unprecedented growth in Auckland’s population is driving a significant increase in the demand for travel, putting severe pressure on the transport network and causing sustained levels of high congestion on the arterial network, although this has eased to an extent by the opening of the Waterview Tunnel. In the past quarter, AT has begun preparing the next suite of ten year planning documents (Long Term Plan, Regional Land Transport Plan and the Regional Public Transport Programme). These plans will need innovative and customer focused solutions on a tight budget. At the same time, AT has continued solid delivery of core business.
    [Show full text]
  • To View an Individual Route Map, Click on the Route Number
    Ngataringa Bayswater PROPOSED SERVICES Bay KEY SYMBOLS FREQUENT SERVICES LOCAL SERVICES PEAK PERIOD SERVICES Little Shoal Station or key connection point Birkenhead Bay Northwestern Northwest to Britomart via Crosstown 6a Crosstown 6 extension to 101 Pt Chevalier to Auckland University services Northwestern Motorway and Selwyn Village via Jervois Rd Northcote Cheltenham Rail Line Great North Rd To viewNorthcote an individualPoint route map, click on the route number (Passenger Service) Titirangi to Britomart via 106 Freemans Bay to Britomart Loop 209 Beach North Shore Northern Express routes New North Rd and Blockhouse Bay Stanley Waitemata service Train Station NX1, NX2 and NX3 138 Henderson to New Lynn via Mangere Town Centre to Ferries to Northcote, Point Harbour City LINK - Wynyard Quarter to Avondale Peninsula Wynyard Quarter via Favona, Auckland Harbour Birkenhead, West Harbour, North City Link 309X Bridge Beach Haven and Karangahape Rd via Queen St 187 Lynfield to New Lynn via Mangere Bridge, Queenstown Rd Ferries to West Harbour, Hobsonville Head Ferry Terminal Beach Haven and Stanley Bay (see City Centre map) Blockhouse Bay and Pah Rd (non stop Hobsonville Services in this Inner LINK - Inner loop via Parnell, Greenwoods Corner to Newmarket) Services to 191 New Lynn to Blockhouse Bay via North Shore - direction only Inner Link Newmarket, Karangahape Rd, Avondale Peninsula and Whitney St Panmure to Wynyard Quarter via Ferry to 701 Lunn Ave and Remuera Rd not part of this Ponsonby and Victoria Park 296 Bayswater Devonport Onehunga
    [Show full text]
  • Opus Consultation and Community Engagement Report
    Appendix F Opus Consultation and Community Engagement Report Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 This page has been intentionally left blank. Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 Northern Corridor Improvements Project Stakeholder and Community Engagement Report September 2015 Northern Corridor Improvements Project Stakeholder and Community Engagement Report September 2015 Prepared By Tania Reynolds Opus International Consultants Ltd Community Engagement Specialist Auckland Environmental Office The Westhaven, 100 Beaumont St PO Box 5848, Auckland 1141 New Zealand Reviewed By Telephone: +64 9 355 9500 Rebekah Pokura-Ward Facsimile: +64 9 355 9584 Technical Principal Environmental Management Date: September 2015 Reference: 1-T0086.00 Status: Version 2 Approved for Release By Phil Harrison – Design Manager © Opus International Consultants Ltd 2015 Northern Corridor Improvements Project i Contents 1 Introduction ....................................................................................................... 1 1.1 Project Overview ............................................................................................................... 1 1.2 Project Objectives .............................................................................................................. 3 1.3 Project Timeframes ........................................................................................................... 4 2 Engagement Strategy.........................................................................................
    [Show full text]
  • Auckland Regional Land Transport Plan 2015-2025 Auckland Transport
    18pt Auckland Regional Land Transport Plan 2015-2025 Auckland Transport Adapted in accordance with Section 69 of the Copyright Act 1994 by the Royal New Zealand Foundation of the Blind, for the sole use of persons who have a print disability. No unauthorised copying is permitted. Produced 2015 by Accessible Format Production, Blind Foundation, Auckland Total print pages: 137 Total large print pages: 315 Publishing Information This large print edition is a transcription of the following print edition: Published by Auckland Council, 6 Henderson Valley Road, Henderson, Auckland © Auckland Transport 2015 Logos represented on the publication cover: NZ Land Transport Agency, KiwiRail, Auckland Council, Auckland Transport Large Print Edition Main text is in Arial typeface, 18 point. Headings, in order of significance, are indicated as: Heading 1 Heading 2 The publisher's page numbering is indicated in text as: Page 1 Omissions and Alterations Brief descriptions have been given in the place of figures. These figures include diagrams, graphs and maps. Where the figure is made up largely of text elements (for example a flowchart), it has been transcribed in full. Map descriptions focus on the scope of the map rather than the details. Notes from the transcriber have been prefaced by "TN" (transcriber's note). Contact Auckland Transport for further Information For extended verbal descriptions of maps or for further information on the maps please call Auckland Transport, (09) 301 0101, or email [email protected]. Please make it clear your query relates to the Regional Land Transport Plan. If you email us please provide your name and a contact phone number.
    [Show full text]
  • Name Suburb Notes a Abbotleigh Avenue Te Atatu Peninsula Named C.1957. Houses Built 1957. Source: Geomaps Aerial Photo 1959
    Name Suburb Notes A Abbotleigh Avenue Te Atatu Peninsula Named c.1957. Houses built 1957. Source: Geomaps aerial photo 1959. Abel Tasman Ave Henderson Named 7/8/1973. Originally named Tasman Ave. Name changed to avoid confusion with four other Auckland streets. Abel Janszoon Tasman (1603-1659) was a Dutch navigator credited with being the discoverer of NZ in 1642. Located off Lincoln Rd. Access Road Kumeu Named between 1975-1991. Achilles Street New Lynn Named between 1943 and 1961. H.M.S. Achilles ship. Previously Rewa Rewa Street before 1930. From 1 March 1969 it became Hugh Brown Drive. Acmena Ave Waikumete Cemetery Named between 1991-2008. Adam Sunde Place Glen Eden West Houses built 1983. Addison Drive Glendene Houses built 1969. Off Hepburn Rd. Aditi Close Massey Formed 2006. Previously bush in 2001. Source: Geomaps aerial photo 2006. Adriatic Avenue Henderson Named c.1958. Geomaps aerial photo 1959. Subdivision of Adriatic Vineyard, which occupied 15 acres from corner of McLeod and Gt Nth Rd. The Adriatic is the long arm of the Mediterranean Sea which separates Italy from Yugoslavia and Albania. Aetna Place McLaren Park Named between 1975-1983. Located off Heremaia St. Subdivision of Public Vineyard. Source: Geomaps aerial photo 1959. Afton Place Ranui Houses built 1979. Agathis Rise Waikumete Cemetery Named between 1991-2008. Agathis australis is NZ kauri Ahu Ahu Track Karekare Named before 2014. The track runs from a bend in Te Ahu Ahu Road just before the A- frame house. The track follows the old bridle path on a steeply graded descent to Watchman Road.
    [Show full text]
  • Attachment 2
    Attachme nt 2 Appendix 1 Table 1A: Auckland Transport Proposed Funded Capital Programme for AT Board approval (20th June 2018) Prioritisation Key: 1 Committed/Ring-fenced The following programme has been developed for the Regional Land Transport Plan 2018-28. Indicative project costs (nominal values, including inflation) represent the estimated cost of project/programme delivered 2 Funded by Auckland Transport, including any financial assistance from the Transport Agency unless stated otherwise. 3 Unfunded Projects carried forward from 2017/18 ($m) 2024/25 - Project Name Project Description Prioritisation Duration 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2027/28 Albany Station P&R Extension stage 1 1 2018/19 0.5 Double Decker Network Mitigation 1 2018/19 3.7 Ormiston Town Centre Main Street Link 1 2018/19 6.9 Rail Crossing Safety Improvements 1 2018/19 0.2 Rail Crossing Separation (Phase 1B) 1 2018/19 1.9 Rail Crossing Separation (Phase 2) 1 2018/19 3.3 Projects carried forward from 2017/18 Regional Park and Ride Fund 1 2018/19 2.5 SaFE Set-up Rail Integration 1 2018/19 1.0 Takanini Station Upgrade 1 2018/19 1.1 Te Mahia Station Upgrade 1 2018/19 0.9 Wiri EMU Depot Extension (Wiri II) 1 2018/19 6.0 Other projects 1 2018/19 38.0 Committed, Ring-fenced, On-going Operational and Renewal Projects and Programmes (Alphabetical order, $m) 2024/25 - Project Name Project Description Prioritisation Duration 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2027/28 Committed Projects and Programmes Phases 1 of the Albany park'n'ride extension to increase capacity and patronage on the Northern Albany Station P&R Extension stage 1 1 2018/19 0.8 0.0 0.0 0.0 0.0 0.0 0.0 Busway.
    [Show full text]